Confidential
Agenda

 Customer requirement
 Scope
 Out of scope
 Assumptions
 Phases of implementation
 Challenges
 Delivery model

© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 2


Customer Requirement

 GST is being rolled out in India to simplify the indirect taxation regime
and to remove the cascading effect of indirect taxes on the end
consumer
 It is now mandatory to use TAXINN tax procedure (condition based
rather than tax code based) in SAP
 Hence the primary requirement is to migrate from TAXINJ to TAXINN

© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 3


Scope

 Understanding current logistic scenario (procurement, sales, sub-


contracting) and the tax calculations using TAXINJ frame work
 Map the scenario to TAXINN frame work
 Execute calculation of taxes in TAXINN scenario and validate with
TAXINJ frame work results (procurement and sales scenarios)
 Setting up necessary enhancement for TAXINN if needed
 Maintain mapping table of TAXINJ tax code to new TAXINN tax codes
 Execute migration of open MM documents (PO and contract) to
TAXINN frame work

© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 4


Out of Scope

 Changes in process of procure to pay, order to cash, record to report


etc.,
 Change management needed for the new tax procedure
 End user training
 Changes to indirect tax return preparation and filing process
 Changes to any enhancement or development other than covered in
the scope
 Any kind of basis activity
 Re-design of user authorizations
 Changes to any legacy system or interfaces
 Changes to business place setting in the system
© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 5
Out of Scope

 Changes in any other SAP systems (SRM, CRM, Ariba etc.,)


 Data cleansing
 Performance optimization

© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 6


Assumptions

 Availability of core SAP team (FI, MM and SD)


 Availability of business team to validate the results in the new
TAXINN procedure
 Separate system or a new client with copy of production data (may
not be full data) for executing mock migration before migrating in
quality environment
 Quality system should be copied with the latest production data (may
not be full data) for executing quality system migration
 Need production system shutdown (no logistic operations) during
productive migration
 Patch level required for tax procedure migration would be ensured by
customer before start of the project
© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 7
Phases of implementation

 Project preparation
 Blueprint
 Realization
 Deploy, Go-live and support

© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 8


Project preparation

High Level Activity Activity Details Customer Pre Requisites Assumptions Exclusions

Check the patch level Check the compliance to Update to the patch level Patch level would be Helping in update to the
patch level as pre required updated before project start required patch level
requirement
Ensure availability of Check the availability of Make the mock system Mock system with copy of Setting the mock system
system system for the project (mock available production data (may not be with production data
system) full data)
Empower the project team Will conduct brief session on Availability of Project team
TAXINN Tax procedure and
Tax Migration in Indian
Localization

© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 9


Blue print (1 of 2)

High Level Activity Details Customer Pre Requisites Assumptions Exclusions


Activity

Study of existing • Tax procedure and routines • Availability of Core tax • For changes in Non SAP • Any changes on non SAP
TAXINJ procedure • Tax conditions and controls processing team. applications or changes in applications/Custom
• Account key used for posting to FI • Availability of documented Collabra analysis should be applications
• User exit or BADI in tax calculation business process relating to done by Customer.
• List of Tax codes and usage Taxes. • ABAP and Basis Resource
• Custom development in tax calculation • Availability of Test scripts used will be provided by Customer
for validating tax process. • Only higher level impact of
• Customer to share all the custom program for reporting
Business Scenarios and return process would be
Study of reporting • Understand the reports usage for tax • SAP can provide standard studied
and return process • Understand the reports or development for scenarios which can be •
return preparation considered for initial testing
• Changes to existing custom
development would be taken
Interface with other • Understand interface with Collabra care by customer
applications • Understand interface with any other custom
applications
• understand interface with any other SAP
applications

Logistic scenario • Understand the procurement process from tax


angle
• Understand the sales process from tax angle

© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 10


Blue print (2 of 2)

High Level Activity Details Customer Pre Requisites Assumptions Exclusions


Activity
Recommendation of • TAXINN procedure to be used
TAXINN (Blue print • Tax conditions to be used
document) • Access sequence to be used
• Usage of user exit or BADI for meeting
customer specific requirement
• Enhancement needed in logistic transactions
to meet TAX requirement
• Changes or enhancement to Reporting and
return process
• Changes or enhancement to interface with
other systems
• Identification of Number of Condition Records
to be maintained and how it will be maintained
(Tool to upload condition records per
condition types)
• Identification of Changes with regards to
Master Data (Material, Vendor, Customer &
Services)

© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 11


Realization
High Level Activity Details Customer Pre Requisites Assumptions Exclusions
Activity

TAXINN Configure TAXINN Creating the required Tax Existence of mock system Setting up system or
Configuration Realize all development objects Codes (MM, SD and FI Transport route for moving transport route
side) changes to development
Support in building the system
effective condition technique
/ Access sequence.
Creating condition records
for all the scenarios & Tax
Codes in TAXINN.
Identifying the custom
reports/programs, external
interfaces and testing with
new tax procedure
Testing Test various scenarios Testing all the tax related
Confirm tax calculation as per current scenarios effectively in short
TAXINJ procedure period.
SAP will support throughout
the testing phase for all
critical issues.

Migration to Maintain mapping table between SAP will provide custom QA system with latest copy
TAXINN (QA TAXINJ and TAXINN reports and tools related to of production data.
with Production Execute migration of open logistic (MM) migration in few cases to
data) documents reduce the efforts and
Test the result of migration improving the project quality
SAP will support throughout
the testing phase for all
critical issues after
migration.

© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 12


Deploy & Go Live Phase

High Level Activity Details Customer Pre Requisites Assumptions Exclusions


Activity
Plan for system Transport all changes to production Ensure no logistic users are
shutdown (no Migrate production system using the system during
logistic production migration
transactions)

After go-live Support business users (Level 2) Level 1 support to be Availability of system to log Level 1 support
support provided by customer the issues and tracking Setting up system for
status support

© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 13


Challenges

 Identification of all logistic scenario


 Availability of core team and business users
 Availability of system for doing configuration and mock migration
 Through testing to ensure results of all scenario under TAXINN

© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 14


Delivery Model

Project Governance  SAP Delivery – Highlights


 SAP Consulting : Bangalore
SAP Consulting involvement:
Scope & Timelines  Configurations as per the SAP Standard CIN processes
 Location Scope:  Approach for deploying SAP CIN functionalities in SAP system
 India  Support customer team in Unit & Integration Test
 Support End user and configuration documentation preparation
 Resources : SAP
by customer team
 MM consultant – 1
 Knowledge transfer
 SD consultant – 1
 FI/CO Consultant – 1
 Expert Consultant – Need Base
Execution highlights:
 ABAP & BASIS consultant – To be provided by  Global Template developed & maintained by customer team
customer  Knowledge Transfer at Customer site
 Resources : Customer
 MM consultant – 1
 SD consultant – 1
 FI/CO Consultant – 1
 ABAP & BASIS consultant
 Business users for testing various scenarios

© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 15


Time Lines

Phase/Timeline (Weeks) Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15

Preparation

Business Blue print

Realization

Deploy

Go-live support

© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 16


SAP India Education
GST Trainings
SAP India Education – GST Trainings

Training # Topic Duration Availability


1 Tax INJ to Tax INN Migration 2 days Available
2 GST Migration 2 or 3 days After GST solution release
by SAP Product Team

Audience
Members of Consulting Organizations or Customer Core Teams, focused on
1. Procurement
2. Sales
3. Finance
4. Project Management

© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 18


Tax Migration Training

Unit Content Unit Content


Unit 0 1. Understanding GST Unit 3 1. Learning Configuration steps
Introduction 2. Understanding impact of GST in customer SAP Do 2. Learning generic approaches for re-working
applications customized developments
3. Understanding need for migrating from Tax INJ to Tax
INN as a preparation for GST migration

Unit 1 Checklist based approach to arrive at the total work Unit 4 1. Operating SAP tool to identify open purchase
Study involved in Tax INJ to Tax INN migration in customer SAP Migrate documents (like Purchase Order, Contracts
system, including etc.)
1. Configuration 2. Operating SAP tool to migrate open purchase
2. Developments documents from Tax INN to Tax INJ
3. Testing
4. Data Migration
5. User Training
Unit 2 Planning the work estimated in ‘Study’ step in sequence of Unit 5 Understanding minimum scenarios to be tested to
Plan activities to be carried out for migration from Tax INJ to Tax Test confirm successful migration
INN
Details of Tax Migration Training available in link https://www.sapindiacertification.com/gstphase1/

© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 19


Approach

Send in your inquiries to following members of


Content Server SAP India Education
Hard Copy Practice Simulations
Akshay Gaikwad
E: akshay.gaikwad@sap.com
SAP
Education G Chandra Mouleeswaran
GST Training
E: gchandra.mouleeswaran@sap.com

Instruction Outcome
Class Room / Virtual Live Course completion
Class Room certificate

© 2016 SAP SE or an SAP affiliate company. All rights reserved. Public 20

You might also like