FORM 10
Regulation 50 (5)
‘THE PUBLIC PROCUREMENT AND DISPOSAL OF PUBLIC ASSETS ACT, 2008
RECORD OF MINUTES OF PRE-BID MEETING
Procurement Reference Number
Code of Prosarng and Disposing Supplies/ Works! Financial year Sequence number
Eni Non-consuliancy services
UNRA WORKS OTIS ‘007
Particulars of Procurement
Subject of procurement PROCUREMENT OF A DESIGN AND BUILD CONTRACTOR TO DEVELOP
FERRY LANDING SITES FOR SIGULU FERRY ON LAKE VICTORIA
Location of Pre-bid Meeting
UNRA PDU Office
Date and time of Meeting
3% April 2018,
Page 1 ofS Kase‘Record of Pre-bid Meeting Minutes
‘Question asked
Response given
"The bd closing date should be extended to allow ample ime
to prepare our bids
"The bid closing date willbe exiendod 10" May 2018 to enable bidders
Ihave ample time to prepare their bids
‘Oa page 9 Appendix to bid 14, Toual advance payment of
15% is small considering the nature of projects where
saficient cashflow will be required ta achieve good
performance ofthe contract. We request thatthe advance
payment i used upward 10 20%
‘The UNRA policy provides for 15% total alvance payment Therefor
the percentage will not be revised upwards 1 20%,
‘On page 4 Appendix to bid 142,Number of Gmaing of
Installments, the bidding document states that advance
payment shall be paid as follows;
50% ofthe advance payment shall be payable not later than 63,
days after provision by the contractor ofan approved bank
guarantee and presentation of acceptable mobilsation
Schedule. The mobilstion schedule must include details of
how the advance shal be utilized
The spit ofthe advance is unfavorable tothe cashflow ofthe
Contractor given the nature of te project where sufficient
cashflow shal be required to atain good performance ofthe
contract. We request that advance payment be lumped
ther
Page2 ofS
The proposed advance payment installments will not be changed
the maximum, Otherwise payments ean even come ear.
Vee‘On page 50 Appendix to bid 14200), Repayment amorization
of advance payment. The bidding document states tht
recovery of advance payment shall start from the first interim
payment certificate and to be fully recovered when 60% of |
the accepted contract sum, excluding any addenda has been
certified for payment. The contractor shall not charge the
Employer interest on delayed advance payment
This isnot practical and mulifies the purpose ofthe
‘advance. We request that recovery ofthe advance payment
begins when cumulative value of worksis at 30% of the
‘contract sum as per best practice on similar contracts.
‘On page 0 Appendix to bid 143,The percentage of
retention, 10% ofeach certified interim payment certificate is
too high. We request thatthe percentage of retention is revised
downvrard to 5% forthe purpose of improving the contractors
performance and cashflows in accordance to industri
practice
“Advance repayment shall sar aie 30% of works, and W shall be 25% of
the advance per subsequent interim certificate
"This isthe UNRA polly on ration
‘On page 258 Parcular conditions of contact, Application oF
interim payments part C, Warks.
10% of each IPC i too high and unrealistic. Client and the
sucessful bidder should agree ona payment schedule based
on milestones of achieved work
‘Gent and sucessful bidder shall agree on a paymnent schedule
based on finished and accepted items of works/deliverables
Centification of minutes a true record of the proceedings ofthe meeting
‘Name Keryelq Geotivey
Signature: t
Page 3 of 5
Position: Chainperson of the meeting
od
Date