You are on page 1of 29
AICL BUILDING, LAHORE, HVAC SYSTEM. nen, BULL OF QUANTITIES & EQUIPMENT SCHEDULES INDEX SECTION — 1 BILL OF QUANTITIES SECTION -2 SUMMARY OF COST (COMPLETE SUPLLY & INSTALLATION) SECTION - 3 SUMMARY OF COST (CRF PRICE FOR EQUIPMENT UNDER SECTION -1) SECTION - 4 SUMMARY OF COST (DUTIES & LOCAL CARRIAGES FOR EQUIPMENT UNDER SECTION -1) SECTION - 5 SUMMARY OF COST (INSTALLATION FOR EQUIPMENT UNDER SECTION -1) SECTION — 6 SUMMARY OF COST (SUM OF (SECTION — 3) + (SECTION —4) + (SECTION - 5) SECTION —7 EQUIPMENT SCHEDULES GREEN DESIGN Page 2 of S2 No. 1.1 Serew Type Electric Chillers ‘Supply, Installation, Testing & Commissioning of Water Cooled Electric Chillers, lifting to Plant Room at Fourth Floor level, preparation of foundations, placing, fixing and leveling on foundations, making all utility connections, complete in every respect. 1.2 Cooling Towers Supply, Installation, Testing & Commissioning of Three Cell Cooling ‘Tower, lifting to Roof, assembly of ‘Towers, preparation of foundations, placing, fixing and leveling on foundations, making all utility ‘connections, complete in every respect. crt Description 13 Air Handling Units GREEN DESIGN BILL OF QUANTITIES & EQUI ‘SCHEDULES Now? 2 (OTR (ey "oan \2\ nea eae Sp ae ck Que Uae Aone Page 4 of 52 AICL BUILDING, LAHORE BYAC SYST aniceanenai SECTION - 1 BILL OF QUANTITIES "Page 3 of S2 AICL BUILDING, LAHORE HVAC SYSTEM BILL OF QUANTITIES & EQUIPMENT SCHEDULES Supply, Installation, Testing & Commissioning of Air Handling Units, lifting of each AHU to respective Air Handling Unit Room, preparation of foundations, placing, fixing and leveling on foundations, making all utility ‘connections, complete in every respect. ABU-1 Nos 1 AHU-2 Nos 1 ABUS Nos 1 AnU-8 Nos 1 ABUS Nos 1 AHU-G Nos 1 ABU-7 Nos 1 AHUS Nos 1 : AHUS Nos 1 AHU-10 Nos 1 ABU-LL Nos 1 Description Ss. No. 14 Fan Coil Units GREEN DESIGN Page 5 of S2 AICL BUILDING, LAHORE HAC SYSTEM 1s BILL OF QUANTITIES & EQUIPMENT SCHEDULES Supply, Installation, Testing & ‘Commissioning of Fan Coil Units, fabrication of hanging arrangement, fixing and leveling, making all utility connections, complete in every respect. TYPE-A Nos 19 TYPE-B : Nos 95 TYPE-C Nos gy TYPE -D Nosy Energy Recovery Unit Supply, Installation, Testing & Commissioning of Energy Recovery Unit, lifting to Roof level, preparation of * foundations, placing, fixing and leveling, ‘making all utility conneetions, complete in every respect. ERU-1 Nos 9) Sub Total Section - 1 Qua tity Description Unit Chilled, Condenser and Hot Water Pumps GREEN DESIGN Page 6 of 52 AICL BUILDING, LAHORE HVAC SYSTEM 23 Supply, Installation, Testing & Commissioning of Pumps, lifting to Plant Room level at Fourth Floor, preparation of foundations, placing, fixing and leveling on foundations, making all utility connections, complete in every respect. Chilled Water Primary Pumps ~ PP. 1-3 Chilled Water Secondary Pumps SP 1-3 Condenser Water Pumps 1-3 Hot Water Heater Pumps 1-2 Nos Nos cwr Nos HWP Nos Air Separator Supply & Installation of Centrifugal Type ‘Air Separator as specified and scheduled including unloading, lifting, placing and fixing on foundation in Plant Room as shown on the drawings, AS-1 Nos ‘Feed Water Pressurization Unit Supply & installation of Feed Water Pressurization Unit complete with duplex. pumps, closed expansion tank, electric panel, skid mounted complete as package, including all unloading, lifting, placing ‘and fixing on foundation as shown on drawings PU-1 Description Chemical Feeders and Chemicals Chilled and Hot Water System Supply & Installation of Gravity By Pass Chemical feeder of Capacity 5 U.S Gallons made of or chemical resistant [ABS plastic as specified, GREEN DESIGN 1 Qua tity __ BILL OF QUANTITIES & EQUIPMENT SCHEDULES, Unit Rate Rs. Page 7 of 52 AICL BUILDING, LAHORE HVAC SYSTEM i) b) i 25 No. 26 27 Supply of chemicals for use during. system flushing, testing and commissioning and during | year of operation & maintenance period Condenser Water System ‘Supply, Installation Testing & Commissioning of Fully Automatic and Programmable Type chemical feeding system complete with Acid Pump, Inhibitor Pump, Algaecide Pump, Biocide Pump, ABS Plastic Storage Vessels, Conductivity Controllers, PH Meter, Flow ‘Meter, Automatic Valves, interconnecting piping and electronic programmable control system. No 1 Supply of chemicals for use during system flushing, testing aud commissioning and during 1 year of operation & maintenance period ee 1 ‘Temperature Gauges Supply & Installation of Temperature ‘gauges complete with thermo wells Nos 65 Description Unit ce tity Pressure Gauges Supply & installation of Pressure gauges complete with siphon and gauge cocks Nos _70 ‘Ventilation Fans Supply, Installation, Testing & Commissioning of Ventilation Fans, preparing foundations, fabricating hanging and fixing arrangement, fixing and leveling, making all utility connections, complete in every respect. Basement —4, Jet Fan System, Software Selected Lot__o1 GREEN DESIGN Qua Unit Rate (TITLES & EQUIPMENT SCHEDULES ~ Amount Rs. Rs. Page 8 of 52 AICL BUILDING, LAHORE, Hvac} IUIPMENT SCHEDULES. 29 Basement ~ 3, Jet Fan System, Software Selected Lot Basement 2, Jet Fan System, Software Selected Lot ‘Basement ~1, Jet Fan System, Software Selected Lot FAN-I : Nos FAN2 Nos FANS Nos FAN Nos FAN-S Nos FANG Nos FANT Nos FANS Nos FANS ‘Nos FAN-10 Nos FAN-L Nos FAN-12 Nos ‘Heat Exchanger Supply and installation of Plate & Frame ‘Type Heat Exchanger For Winter Space Heating System as Specified and Scheduled, Including , unloading , lifting, placing and fixing on foundation at location shown on drawing. HE-1 Nos. Electric Hot Water Heater for Winter Space Heating Supply, Installation, Testing & Commissioning of Electric Heaters, lifting to Plant Room at Fourth Floor level, 1 o1 on Amount GREEN DESIGN AICL BUILDING, LAHORE, HVAC SYSTEM preparation of foundations, placing, fixing and leveling on foundations, making all utility connections, complete in every respect. Nos. 1 Sub Total Section -2 as ous UnitRate Amount No. vou eae _ Rs. 3.1 Duets 8) Supply and Installation of SMACNA. Standard Machine Fabricated G.L. ducting & Sheet Metal works complete with hhangers, brings, splitters, dampers ete. All hangers are galvanized 9500 st 0 ) Supply and installation of 18 gauge Welded MS duct for Kitchen Exhausts with fire resistant paint complete with hangers, flanges & dampers etc, i St 1880 Page 10 of 32 AICL BUILDING, LAHORE HVAC SYSTEM BILLOF )UANTITIES & EQUIPMENT SCHEDULES Supply & Installation of Factory Fabricated 22 Gauge G.1 Sheet Metal Plenum Boxes complete with Hanging and Fixing Arrangement. Plenums to be ‘Manufactured along with Air Devices ‘from same facility. 48" x 15" x6" 12"x 10" x 10" 33° Supply & Installation of round insulated flexible duct complete with jubilee clamps. oo cr) 3.4 Supply & Installation of Pre-assembled flexible duct connectors, factory fabricated, with coated woven fabric and GIL. Collars both by means of double lock seam on each side as specified and scheduled 35 supply and installation of 26 gauge GI sheet cladding over duct and piping ‘exposed to view in plant rooms and AHU rooms complete in all respects as per ‘Schedule, Specifications and drawings 3.6 Supply and installation of galvanized iron sheet metal Exhaust Air ducting complete in all respect as per Schedule, Specificatioas and drawings. All hangers ‘to be galvanized GREEN DESIGN Nos 15 Nos 425 RR 1260 Re 250 Unit Rate Amount Unit tity Rs. Sft 180 1850 Sh a0 st 6800 Page 11 of 52 AICL BUILDING, LAHORE, YA 4. Sub Total Section ~3 Grills & Diffusers ‘Supply & installation of Powder Coated Aluminum air devices as specified and scheduled. 2 Slot 1" Linear Difluser RR Circular Supply Air Diffuser 12” Dia Nos Linear Grills 48°x6" Nos 8° Exhaust Air Valve Nos Retum Air Grills, sft ‘Exhaust Air Grills st Fresh Air Grills SR lume Control Dampers sft GREEN DESIGN 25 386 15 58 380 50 50 280 Amount Rs. Page 12 of 52 AICL BUILDING, LAHORE HYACS 42 43 44 ss No. sa Splitter Dampers st 50 Fire Dampers st 8 Fresh Air Intake Louvers with filters and Dampers for AHU Room and Fain Inlet, complete supply & installation st 74 Exhaust Air Louvers for Fan Discharge, complete supply and installation. st 150 Installation of Variable Air Volume Units supplied under BMS Contract, complete with duct connections and hanging arrangement. Nos. 82 ___ Sub Total Section-4 i = Qua Description Unit Nie Section - 5 Pine Work & Accessories Pipes Supply, fabrication and installation of Seamless M.S schedule 40 piping & fittings including hangers, anchor bolts, rubber vibration mounts etc, All hangers are galvanized 10" Rt 70 8"O RR 1120 oo RR 1090 sO Re 860 £o RA 520 Biol? RR 945 212"O RR 1160 ~ GREEN DESIGN _ BILL OF QUANTITIES & EQUIPMENT SCHEDULES AICL BUILDING, LAHORE /AC SYSTEM. 112" RR 1160 11a" RA 1070 "0 RR 1280 3/4" @. z RR 1760 12" RR 250 5.2 uPVC Piping for concealed Drains Supply, fabrication and installation of uPVC, piping and fittings including hhangers anchor bolts, rubber vibration mounts etc, 3/4" RR 780 i Rf 630 s. ae Qua aa Description Unit ity 11a" Rt 690 lino Rt 900 53. GI Piping for Exposed Drains Supply, fabrication and installation of GI. Piping & fittings excluding valves and strainers and including hangers, anchor bolts, rubber vibration mounts etc. 3a" RR 150 "0 Re 400 11s" RA 400 Lio RR 950 20 RR 540 30 Rt 280 ao J Rf 850 54° Valves & Strainers 4) Supply & Installation of Gate Valves GREEN DESIGN Page 14 of 52 AICL BUILDING, LAHORE HVAC SYSTEM, BILL OF QUANTITIES & EQUIPMENT SCHEDULES complete with Flanges, Gaskets and all accessories. so Nos 13 oo Nos 30 so 2 Nos 10 a) Nos 2 a) Nos 20 212" @ Nos 10 20 Nos 8 11a" Nos 18 1s" casei Nos 12 F Re Description Unit = sve Rath V0 Nos 18 314°" Nos 36 . 12"@ Nos 18 b) Supply & instalation of Double Regulating Valves complete with read-out ports, graduated scales, Flanges, Gaskets and all accessories. sO Nos 5 oo Nos 10 "0 Nos 6 : ao Nos 4 vo Nos 7 san RN 212" ; Nos 6 (el -ncyoer 5) 2" Nos 6 Xx 2) 112" Nos 7 1s" Nos 3 GREEN DESIGN Page 15 of 52 AICL BUILDING, LAHORE, HVAC SYSTEM ©) Supply & installation of Globe Valves ‘complete with Flanges and Gaskets. ao Nos 2 ag Nos 2 Qua Unit Rate Tat sisy Rs 212" O Nos: 2 x0 No 4 112"O ‘Nos 6 Lua" ® ‘Nos. 6 1"o ‘Nos 12 3/4" ‘Nos 18 2" Nos 10 4) Supply & installation of Strainers ‘ ‘complete with Flanges, Gaskets and all accessories. 3"o Nos 5 6"o : Nos 10 sO ‘Nos 1 4" Nos 1 Page 16 of $2 AICL BUILDING, LAHORE HVACSYSTEM xo Nos 10 2172" @ Nos 3 20 Nos 4 112"@ 3 Nos 5 11a"o Nos 12 10 Nos 10 38" Nos 18 120 Nos 10 «) Supply & installation of NRV's complete with Flanges, Gaskets and all accessories. 80 Nos 5 oo Nos 10 so Nos 1 3" Nos 1 £) Supply & Installation of Flexible Connectors for connection with pumps, chillers, cooling towers, AHU and long flexible pipes for FCU connections , . complete installation with Flanges and Gaskets. 80 Nos 5 CO Nos 18 or) Nos 2 ao Nos 2 Page 17 of $2 AICL BUILDING, LAHORE, HVAC SYSTEM 78 212" 20 Lino : 1ua"o 7) 314" 12" Nos Nos Nos Nos Nos 16 2 36 18 2) Supply & Installation of Pipe Line, Expansion Bellows complete fixing and finishing as Specified and per Schedule 80 oo so 4a" 3° 212" bh) Supply & installation of Automatic ‘Type Air Vents with all accessories at locations shown on the drawings i) Installation of all Control Valves, ‘Sockets for piping system of AHU’s, ECU's, Chillers and Electric Heaters supplied under BMS Contract. BMS Contractor shall provide all Control GREEN DESIGN Nos Nos Nos Nos ‘Nos Nos Nos 126 120 BILL OF QUANTITIES & EQUIPMENT SCHEDULES Unit Rate * Amount Rs. Rs. Page 18 of 52 AICL BUILDING, LAHORE HVAC SYSTEM 61 62 Valves, Flanges Nut Bolts and Gaskets. HVAC Contractor shall arrange all consumables. Sub Total Section - 5 Description Sect sulations Insulation for Ducts Supply & Installation of ASJ Type Fiber Glass insulation with Reinforced ‘Aluminum Foil Vapor Barrier for shect metal ductworks complete with sealing, fixing and finishing as specified and scheduled 7500 Blanket Type sf 0. 2000 Rigid Board Type : st 0 : Preformed Insulation for Pipes ‘Supply & installation of Preformed Fiber Glass Insulation ASJ Type with Reinforced Aluminum Foil Vapor Barrier {for piping network, complete with sealing, fixing and finishing as specified and scheduled 80 RR 760 eo RR 1090 cr) RA 860 ‘i ao RR . 520 30 RR 945 212" RR 1160 20 RR 875 Luar RR 1160 Liao RR 2 ‘GREEN DESIGN Page 19 of 32 AICL BUILDING, LAHORE HYAC SYSi "oe RR 1280 3/4" RR 1760 12" RR 250 63 é Supply & Installation of insulation for condensate drain piping complete fixing and finishing as specified and scheduled 3/4" @ RR 780 Smee ner it Qua Unit Rate "Amount No Deseripsion unit Oe Re ae ro RR 630 114" 9 RR 690 112" RR 900 20 RA $40 38 RR 280 64 Sound Liner Supply & Installation of Sound Liner complete with adhesives and sealers as 1050 specified & scheduled st 0 65 Exhaust Duct Insulation Supply & Installation of Insulation, Jacketing and complete fixing in every . respect for Kitchen Exhaust duet sR 1880 Insulation with Removable Boxes for 66 Valves Supply & Installation of insulation with Removable Boxes for Valve, Pumps, Air Separator, Boxes complete installation i every respect si 1750 6.7 Fire stop System GREEN DESIGN Page 20 of 52 AICL BUILDING, LAHORE HVAC SYSTEM Supply and installation of fire sealing of verticle services openings in slabs after completion of Piping and Ducting Risers, with MS 18 Gauge Fire Resisant Painted Sheet, Comers, Edges and Sides Sealed by Hilti Fire Stop Sealent, quick curing expanding type as scheduled - sk 250 Sub Total Section - 6 Qua = ena = Sectic Electrical Equipment & Cabling 7.1 Supply and Installation of HVAC Related Electric Panels, complete with all. connections, lifting ftom yard space at site to respective locations as marked on drawings, placing, fixing, bracketing and leveling on foundations, making panels ready for operation in every respect, 1-MCC-1 Nos, 1 2-MCC-2 Nos i. 3-MCP-1 Nos 1 4-MCP-2 ‘Nos 4 S-MCP-3 ‘Nos L 6-MCP-4 Nos 1 7-MCP-5 Nos 1 8-MCP-6 ‘Nos 1 9-MCP-7 Nos 1 10-MCP-8 ‘Nos 1 11-MCP-9 ‘Nos 1 12-MCP-10 ‘Nos 1 13 -MCP-L1 GREEN DESIGN ~ _BILL OF QUANTITIES & EQUIPMENT SCHEDULES Unit Rate Rs. Rs. AICL BUILDING, LAHORE HVAC SYSTEM BILL OF QUANTITIES & EQUIPMENT SCHEDULES 14-McP-12 Nos I 15 -MCP-13 Nos 1 16-MCP-14 Nos 1 17-MCP-15 s Nos 1 18-MCP-16 Nos 1 in Qua ‘Unit Rate Amount _ Description Unit ety ast : net 72 Supply & Installation of all HVAC System related Electrical cabling and wiring onward from MCC to MCP panels and HVAC equipment including earthling and cable trays as shown on Drawings. 7.24 Supply, installation, testing and commissioning of PVC: insulated PVC sheathed non armored copper conductor + cable 600 / 1000 V grade, 2) 4Cx240 Sqmm Cu. Rf 100 ») 1¢x240Sq.mm Cu. Rf 700 ©) 40x 150 SqmmCu. Rf 400 9) 1¢x150SqmmCu. RR 800 @) 40x70 Sqmm cu. RR 900 ) 1x70 Sq.mm Cu. Rft 400 9) 4Cx50Sq.mmCu. Rft 800 h) 10x50 Sq.mm Cu. Rft 400 ) 40x25 Sq.mmCu. Rft 700 D140 x26 Sq.mm Cu. Rft 300 ®) 4¢x16SqmmCu. Rt 900 40x16 Sq.mm Cu. Rft 500 ™ 40x10 Sqmm Cu. Rf 688 1) 1¢x40SqmmCu Rf 480 ©) 4C.x6 Sq.mm Cu. Rft 550 °) 40x6 SqmmCu, Ri 9 4Cx4SqmmCu. RR 730 1) 1Cx4Sq.mm Cu. Rit 550 5) 4 4C x 2.5 Sq.mm Cu. RA 2350 9) 40x25 Sqmm cu RR 730 8) 40x1.5 Sqmm Cu Rit 2600 YW 40x45 Sqmm Cu, Rtt 5050 7.22. Cooper Farthing for HVAC Panels and : GREEN DESIGN Page 22 of 52 AICL BUILDING, LAHORE, BILL OF QUANTITIES & EQUIPMENT SCHEDULES a) 25mm x3 mm Copper strips. Rt 375 ) 40 SWG dia Copper wire Rit 550 7.23 SITC of Cable Trays : ‘Supply and Installation of 16G Hot dipped Galvanized Perforated sheet cable trays for laying of cables, complete with galvanized hanging arrangement a) 300 mmx 75 mm Rit 635 ©) 450 mmx 75 mm Rit 850 Sub Total Section ~7 Deseription Unit iey ne a GREEN DESIGN Page 23 of S2 IC 81 87 88 Bo 8.10 cay BUILDING, LAHORE SYSTEM, Supply, Installation, Testing & Commissioning (SITC) of Microprocessor Based Direct Digital BMS Master Controlier for Compiete Plant SITC of Controls for Air Handling Units. SITC of Controls for Three Cell Cooling Tower. SITC of Controls for Fan Coil Units SITC of Controls for Energy Recovery Unit SITC of Variable Air Volume Units SITC of Variable Frequency Drives SITC of Controls for Fire Alarm Panel Interface. SITC of Controls for Elevator Interface. SITC of Controls for Ventilation Fans. SITC of Controls for Interfacing with Parking Jet Fan Syste : SITC of Controls for Smoke Management System SITC of Contfuls for Fire Escape Stairwell Pressurization System SITC of Controls for Inpat Energy Measurement SITC of Controls for Water Flow ‘Measurement SITC of Controls for Gas Flow Measurement SITC of Controls for Diese! Flow Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. u 32, 2 04 on oO a SITC of BMS Licensed Software SITC of BMS Hardware AICL BUILDING, LAHORE HIVACSYSTEM _ 8.20 SITC of BMS Control Room Items. Lot. Supply of Manufacturer Recommended 8.21 Spare Parts Lot 8.22 Complete Supply and Installation of all local electro mechanical supplies & services required for valves, gauges, thermostats, sensors, transmitters (cluding all flanges, nut bolts, gaskets, relays)and controls related Materials & Consumables. Section - 9 Miscellaneaus Works Relat C System Supply and installation of Painting of all 9.1. services and Identification Marks complete in all respect as per Schedule, Specifications, and drawings Lot Cleaning, Testing, Adjusting, Balancing of complete HVAC system including all ‘consumables complete in all respects as per Schedule, Specifications and drawings Lot 92 9.3 Commissioning of HVAC system Including all consumables complete in all respects as per Schedule, Specifications and drawings Lot GREEN DESIGN _BILL OF QUANTITIES & EQUIPMENT SCHEDULES ol o1 oO Unit Rate Page 25 of 52 AICL BUILDING, LAHORE HVACSYSTEM os BILL OF QUANTITIES & EQUIPMENT SCHEDULES Operation and maintenance manuals complete in all respects as per Schedule, Specifications & drawings Lot 1 94 Preparation of shop drawings (7 sets each), complete in all respect per Schedule, Specifications & drawings ot 95 Preparation of as built drawings (7 sets ea.), complete as per Schedule, Specifications and drawings Lot 1 Supply of Spare Parts, necessary Tools and Instruments required for HVAC System complete inall respects as per Schedule, Specifications and drawings Lot. 96 97 9.8 HVAC System Related Civil works including wall / slab cutting, patching, plastering etc, and construction of ‘equipment foundations. Providing/laying of RCC footings for HVAC equipment (chillers, Boilers, cooling towers, AHU's, ‘pumps ete.) including cost of steel reinforcement Grade-60, crush, sand, ‘coment (1:2:4 ratio). Machine mixing, ; vibrating, including cork-sheet pads complete in all respects Lot 1 & Deserptin Un Que Unit Rat 9.9 Coordination with BMS Contractor for fixing and Installation of Control Valves, Sensor Wells, Pipe Line Sockets and VAV"s. Consumables related to installation of these items are included in this contract, Tote 9.10 Operation and maintenance of entire HVAC System complete in all respects fora period of 12 months after handover Lot 1 GREEN DESIGN Page 26 of 52 AICL BUILDING, LAHORE, HVAC SYSTEM NTITIES & EQUIPMENT SCHEDULES Sub Total Section —9 SECTION - 2 SUMMARY OF COSTS SECTION —1, SUB TOTAL (RS.) —— SECTION ~2, SUB TOTAL (RS.) SECTION -3, SUB TOTAL (RS.) -——— SECTION - 4, SUB TOTAL (RS) SECTION —5, SUB TOTAL RS.) SECTION — 6, SUB TOTAL (RS.) — SECTION —7, SUB TOTAL (RS.) — SECTION 8, SUB TOTAL (RS) ——~ SECTION -9, SUB TOTAL (RS.) — TOTAL AMOUNT (RS) (iN WORDS) ANY DISCOUNT OFFERED (%) FINAL DISCOUNTED AMOUNT (RS) -. ne GREEN DESIGN Page 27 of 52 AICL BUILDING, LAHORE. BVACSYSTEM 7 BILL OF QUANTITIES & EQUIPMENT SCHEDULES AUTHORIZED SIGNATURE NAME DESIGNATION DATE COMPANY STAMP. SECTION -3 SUMMARY OF COSTS (C&F PRICE FOR EQUIPMENT UNDER SECTION -1) 1.1 Electric Chillers, 02 Nos. 12 Cooling Tower, 01 No. 13 Air Handling Units, AHU-1 61 No. AHU - 2 01 No. AHU -3 01 No. AHU - 4 01 No. AHU - 5 01 No. AHU -6 01 No. AHU -7 01 No. AHU - 8 01 No. AHU-9 01 No. AHU - 10 O1 No. AHU- 11 01 No. 1.4 Fan Coil Units, TYPE-A 12Nos. TYPE-B 05 Nos. TYPE -C 03 Nos. TYPE-D 12 Nos. 1.5 Energy Recovery Unit 01 No. GREEN DESIGN Page 28 of 32. AICL BUILDING, LAHORE HVAC SYSTEM ____ BILL OF QUANTITIES & EQUIPMENT SCHEDULES SECTION -4 sU OF COSTS (DUTIES& LOCAL CARRIAGES FOR EQUIPMENT UNDER SECTION -1) 1.1 Electric Chillers, 02 Nos. 1.2 Cooling Tower, 01 No. 1.3 Air Handling Units, AHU-1 01 No. AHU-2 01 No. AHU-3 . —-OLNo. AHU-4 01 No. AHU-5 01 No. AHU - 6 01 No. AHU-7 01 No. AHU-8 01 No. AHU -9 01 No. AHU - 10 01 No. AHU- 11 01 No. 1.4 Fan Coil Units, TYPE -A 12 Nos. TYPE-B 05 Nos. TYPE -C 03 Nos. TYPE -D 12 Nos. 1.5 ’ Energy Recovery Unit 01 No. GREEN DESIGN Page 29 of $2 AICL BUILDING, LAHORE, HVAC SYSTEI : __ BILL OF QUANTITIES & EQUIPMENT SCHEDULES SECTION -5 SUMMARY OF COSTS (INSTALLATION FOR EQUIPMENT UNDER SECTION -1) 1.1 Electric Chillers, 02 Nos. 1.2 Cooling Tower, 01 No. 1.3 Air Handling Units, AHU-1 01 No. AHU -2 OL No. AHU-3 01 No. AHU-4 01 No. AHU; 5 O1 No. AHU-6 01 No. AHU-7 01 No. AHU-8 01 No. AHU-9 OL No. AHU- 10 01 No. AHU-11 01 No. 14 Fan Coil Units, TYPE-A 12 Nos. TYPE-B 05 Nos. TYPE-C 03 Nos. TYPE-D 12Nos. 1.5 Energy Recovery Unit 01 No. GREEN DESIGN Page 30 of $2

You might also like