You are on page 1of 1

Process: FG can't be dismantled and the dismantled products can be used.

Produces Semi-finsihed products that can be sold or used as input for


another process.
Produces 2nd Grade (By-Product) or Co-Products (Do product is a second
item that is planned to be procuded along with the main product),
2nd Grade is produced as a result of production
ineffeciency (Not Planned).

Discrete: FG can be dismantled


Does not produce Semi-Finsihed products that can be sold or used as
input for another process.
Produces 2nd Grade (By-Product), 2nd Grade is produced as a result of
production ineffeciency (Not Planned).

Examples:

Process: Chemicals
Paper Concerting
Mill Converting
Drug

Discrete: Vehicle

You might also like