You are on page 1of 2

Performance Evaluation Instrument

Name
Qualification Computer System Servicing NC II
Date
Accomplished
5– Very Satisfactory 3 – Good
SCALE GUIDE 1 – Poor
4 – Satisfactory 2 – Fair
RATING
ITEM
5 4 3 2 1
Computer Teardown
1. Plan and prepare disassembly
2. Disassemble and Assemble Computer according to standard
3. Able to identify parts of the system unit.
Installation
1. Planned and prepared installation
2. Boot sequence was set
3. Followed require partition
4. Install Win XP on primary partition
5. Install Win 7 On Secondary partition
6. Install Win 10 on Third Partition
7. Machine Name has been set according to instruction
8. Network Name has been set according to instruction
9. User Name has been set according to instruction
10. Date and time has been set
11. Device drivers has been installed
Networking
1. IP Address set
2. Workgroup was set according to instruction
3. Local printer installed and shared
4. Network printer installed
5. Shared a folder as per instruction
6. Transfer file according to instruction
7. Another folder is created following the instruction
8. Backup files over the network computer
9. Restore files
FINAL RATING
Trainer: Signature of Trainee
Written Test

Give the meaning of the following abbreviations.

1. BIOS –

2. CMOS –

3. HDD –

4. CPU –

5. RAM –

6. EULA -

7. IP –

8. DHCP –

9. DOS –

10. USB -

Please provide what is asked.

1. What do we mean when we say boot?

2. Give the right boot sequence used in installing windows.

3. In your own words define hard disk partition.

4. What time zone should we use here in the Philippines?

5. You want to do a dual boot scenario between windows XP and Windows 7, how would you do
this? Please write the summarized steps in doing it.

6. What are the 2 most widely used type of windows file system

7. Define Operating System

8. What are the types of Software

9. Name at least 5 components of system unit

You might also like