WORK DIARY:
Day/Date Daily Work ‘Special Signature of the
(Brief Work) Observation company guide
0203.15 ‘General introduction about the company ‘Organizational Structure Pe
3.08.15 Daalld abou the company’ sinfrastiucture | BEL isa navratna Company im
408.15 Products produced by the Company Produce both Defence and nos
defense products for.
5.03.15 Aesigned to the QA team ‘General introduction Pom
6.03.15 “Organization of the QA department and the | Flowchart of the process
facilities prem PO
703.15 MC lab facilities Observed ie varios teat condueed | Ap
90315 ‘Verddor manageraent process- General Detailed Study
1003.15 Suudy of the Anmunl report ol the company | Detailed Study OW
11.03.15 Financial stracture of the company | Balance sheet and turnover of he Tom
| company
120315 SUicholdew and Sareholdes information | Complete financial analysts Pon
‘ a = | f
13.0315 ‘SAP Trandag Modules | Detaled Study 8
| A
740515 Waterlals Management Module Detailed Study ir
7603.15 Production Planning Module Detaled Study 7 fo
17.03.15 Supplier Relationship Management Detailed Study To.
i
al eriais Requirement Planning, Detailed Study Pm
1903.15 Tils of Materials Deailed Study 1
20.03.15 Purchase Process Detailed Study h.
W035 Procurement Process Detailed Study ne
L =
Ree es [brute
Signature of Student Signature of the Company AAs
M. KABILAN
BCE 208333
. SR. DGM/HR/EW RA
Seal of the Company BHARAT ELECTRONICS LTD
st Ganqatern RANTS
dalahaiti ns
ote: Submit the work diary to the internal guide after the completion of the project and attach a copy in the
original report