You are on page 1of 2

FOSTER WHEELER ENERGY LTD

INDEX
Process Standards Date: 10-Jun-05
REFERENCE TITLE REV ACTION DATE
D - Process Engineering
Process Std 1001 Utilities - Boiler Feedwater 0 New 17-Feb-03
Process Std 1002 Utilities - Steam Generation 0 Withdrawn 01-Aug-02
Process Std 1003 Utilities - Steam System 0 New 01-Aug-02
Process Std 1004 Utilities - Gas Turbines 0 Withdrawn 01-Aug-02
Process Std 1005 Utilities - Heat Recovery Steam Generators 0 Withdrawn 01-Aug-02
Process Std 101 Vessels - Drums 11 Revised 26-Nov-03
Process Std 102 Tanks and Tank Fittings 10 Withdrawn 13-Sep-02
Process Std 103 Vessels - Tower Internals 10 Withdrawn 13-Sep-02
Process Std 104 Vessels - Reactors 12 Revised 08-Oct-03
Process Std 105a Vessels - Tower Trays 10 Withdrawn 13-Sep-02
Process Std 1102 Offsites - Atmospheric Storage Tanks 0 Withdrawn 01-Aug-02
Process Std 1103 Offsites - Marine Systems 0 Withdrawn 01-Aug-02
Process Std 1103 Offsites - Marine Systems Attachment 0 Withdrawn 01-Aug-02
Att
Process Std 1104 Offsites - Pressure Storage of Equilibrium Liquids 0 Withdrawn 01-Aug-02

Process Std 1105 Offsites - Refrigerated Storage of Equilibrium 0 Withdrawn 01-Aug-02


Liquids
Process Std 1201 Utilities - Fire Fighting 0 Withdrawn 01-Aug-02
Process Std 201 Fluid Flow Single Phase 2 Withdrawn 31-Jul-02
Process Std 202 Fluid Flow Two Phase 0 Withdrawn 31-Jul-02
Process Std 204 Fluid Flow Liquid Slurries 0 New 17-Feb-03
Process Std 301 Heat Transfer - Shell and Tube Heat Exchangers 10 Withdrawn 31-Jul-02
Process Std 302 Heat Transfer - Air Cooled Exchangers 10 Withdrawn 31-Jul-02
Process Std 306 Heat Transfer - Heaters/Furnaces 10 Withdrawn 31-Jul-02
Process Std 308 Heat Transfer - Cooling Towers and Systems 10 Withdrawn 31-Jul-02
Process Std 400- Mechanical Equipment - Pumps General 10 Withdrawn 31-Jul-02
1.0
Process Std 400- Mechanical Equipment - Centrifugal Pumps 10 Withdrawn 31-Jul-02
1.1
Process Std 400- Mechanical Equipment - Reciprocating Pumps 11 Revised 22-Mar-05 *
1.2
Process Std 400-2. Mechanical Equipment - Compressors 10 Withdrawn 31-Jul-02
Process Std 400-3 Mechanical Equipment - Reciprocating 10 Withdrawn 31-Jul-02
Compressors
Process Std 400-4 Mechanical Equipment - Drivers 10 Withdrawn 31-Jul-02
Process Std 507 Instrumentation - Distillation Towers 10 Revised 31-Jul-02
Process Std 508 Instrumentation - Heater and Furnace Control 10 Withdrawn 31-Jul-02
Systems
Process Std 509 Instrumentation - Compressors 10 Withdrawn 31-Jul-02
Process Std 601 Safety - Design Philosophy 0 Withdrawn 01-Aug-02

Note: * Signifies document has been posted to Quality Net but not yet transmitted in hard copy Page 1 of 2
FOSTER WHEELER ENERGY LTD
INDEX
Process Standards Date: 10-Jun-05
REFERENCE TITLE REV ACTION DATE
Process Std 602 Safety - Relieving Devices 4 Revised 22-Mar-05 *
Process Std 603 Safety - Flare Headers and Blowdown Systems 10 Withdrawn 02-Aug-02
Process Std 604 Safety - Flares and Vent Stacks 11 Revised 14-May-04 *
Process Std 701 Miscellaneous - Dryers 10 Withdrawn 02-Aug-02
Process Std 702 Miscellaneous - Inert Gas Systems 10 Withdrawn 02-Aug-02
Process Std 703 Miscellaneous - Mixing Systems 10 Withdrawn 02-Aug-02
Process Std 704 Miscellaneous - Steam Jets and Ejectors 10 Withdrawn 02-Aug-02
Process Std Index Process Standards Index 0 New 11-Feb-03

Note: * Signifies document has been posted to Quality Net but not yet transmitted in hard copy Page 2 of 2

You might also like