Professional Documents
Culture Documents
Hyper Link Data
Hyper Link Data
Non
Recurring p.a
Component Recurring (In
S.No (In Lakhs)
Lakhs)
Capital Cost
1 Construction of new geriatric ward 33.54
2 Cost of renovation 3.44
3 Equipment cost 1.77
Operation Cost
4 Manpower cost 18.6
5 Supplies and consumables 12
6 Purchased services (Water, Power, Telephone, Power back up) Borne by GoK
7 Maintenance cost of the building 0.05
8 Maintenance cost of equipments 0.05