TOWER 2

External False Ceiling Paint


Block Masonry Internal Plaster Curtain Wall Floor Tile Wall Tile Screed
LEVEL Contractor Contractor Contractor Plaster Contractor Contractor Contractor Suspension Contractor Primer
36,000 72,152 10,000 40,000 12,000 44,000
14,175 14,500 100,000
Yar Zaman / Contractor
Podium 2 2488 2000 1175 10000 2000
Amin Required
Contractor
Level 1 Abdul Salam 2488 2000 1175 8000 4000
Required
Level 2 Sardaar Al Fattah 2000 1175 Azeem 8000 Azeem 4000
Contractor
Level 3 Jalal 2000 1175 8000 4000
Required
Anas / Anas /
Level 4 Amin 2000 1175 8000 4000
Azeem Azeem
Yarzaman /
Level 5 1800 Rahet Rahet 2000 4000
Abdul Salam 12000
Anas / Anas /
Level 6 Nazeer 1800 Ashraf / 12000 Ashraf / 2000
Rahat Rahat
Level 7 Muhkamin 2350 6000
Level 8 Azeem 2350 12000
Level 9 Salam Sagar 12000
Level 10 Muhkamin
Level 11 Salam Sagar 7464
Level 12 Amin 9000 Amin 7464
Level 13 Azeem 14928
Level 14 Amin 14928
Level 15 Salam Sagar 14928
Salam Sagar / Salam Sagar /
Level 16 9000 7464
Azeem Azeem
Level 17 Salam Sagar 9000
Level 18 Amin 9000
Per Day Target 1200 2405 333 473 1333 400 1467 483 3333
Target Productivity
50 100 322 50 90 60 326
(S.ft / Day)
# of Teams / Masons
24 24 1 9 15 7 4