Analisis Hidrologi 1400898
400 15
300
10
200
5
100
0 0
Jan Feb Mar Apr Mei Jun Jul Agt Sep Okt Nop Des Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Bulan
Bulan
NILAI Yt Gumbel NILAI Yn Gumbel
Tr Reduced
n Yn n Yn n
(tahun) Variate
2 0.36651292 10 0.4952 31 0.5371 52
5 1.49993999 11 0.4996 32 0.538 53
10 2.25036733 12 0.5035 33 0.5388 54
20 2.97019525 13 0.507 34 0.5396 55
25 3.19853426 14 0.51 35 0.5402 56
50 3.90193866 15 0.5128 36 0.541 57
100 4.60014923 16 0.5157 37 0.5418 58
200 5.29581214 17 0.5181 38 0.5424 59
500 6.21360726 18 0.5202 39 0.543 60
1000 6.90725507 19 0.522 40 0.5436 61
2000 7.60065241 20 0.5236 41 0.5442 62
5000 8.51709318 21 0.5252 42 0.5448 63
10000 9.21029037 22 0.5268 43 0.5453 64
20000 9.90346255 23 0.5283 44 0.5458 65
50000 10.8197683 24 0.5296 45 0.5463 66
100000 11.5129205 25 0.5309 46 0.5468 67
26 0.532 47 0.5473 68
27 0.5332 48 0.5477 69
28 0.5343 49 0.5481 70
29 0.5353 50 0.5485 71
30 0.5362 51 0.5489 72
Yn n Yn n Yn n
0.5493 73 0.5555 94 0.5592 10
0.5497 74 0.5557 95 0.5593 11
0.5501 75 0.5559 96 0.5595 12
0.5504 76 0.5561 97 0.5596 13
0.5508 77 0.5563 98 0.5598 14
0.5511 78 0.5565 99 0.5599 15
0.5515 79 0.5567 100 0.56 16
0.5518 80 0.5569 17
0.5521 81 0.557 18
0.5524 82 0.5672 19
0.5527 83 0.5574 20
0.553 84 0.5576 21
0.5533 85 0.5578 22
0.5535 86 0.558 23
0.5538 87 0.5581 24
0.554 88 0.5583 25
0.5543 89 0.5585 26
0.5545 90 0.5586 27
0.5548 91 0.5587 28
0.555 92 0.5589 29
0.5552 93 0.5591 30
1000
0.1
7.25
6.6
6.2
5.91
5.66
5.39
5.11
4.82
4.54
4.395
4.25
4.105
3.96
3.815
3.67
3.525
3.38
3.235
3.09
2.95
2.81
2.675
2.54
2.4
2.275
2.15
2.035
1.91
1.8
1.625
1.465
1.28
1.13
1
0.91
0.802
0.668
NILAI Sn Gumbel
Yn n Yn n Yn n Yn
0.9496 31 1.1159 52 1.1638 73 1.1881
0.9676 32 1.1193 53 1.1658 74 1.189
0.9833 33 1.1226 54 1.1667 75 1.1898
0.9971 34 1.1255 55 1.1681 76 1.1906
1.0095 35 1.1286 56 1.196 77 1.1915
1.0206 36 1.1313 57 1.1708 78 1.1923
1.0316 37 1.1339 58 1.1721 79 1.193
1.0411 38 1.1363 59 1.1734 80 1.1938
1.0493 39 1.1388 60 1.1747 81 1.1945
1.0565 40 1.1413 61 1.1759 82 1.1953
1.0628 41 1.1436 62 1.177 83 1.1959
1.0696 42 1.1458 63 1.1782 84 1.1967
1.0754 43 1.148 64 1.1793 85 1.1973
1.0811 44 1.1499 65 1.1803 86 1.1987
1.0864 45 1.1519 66 1.1814 87 1.1987
1.0915 46 1.1538 67 1.1824 88 1.1994
1.0861 47 1.1557 68 1.1834 89 1.2001
1.1004 48 1.1547 69 1.1844 90 1.2007
1.1047 49 1.159 70 1.1854 91 1.2013
1.1086 50 1.1607 71 1.1864 92 1.202
1.1124 51 1.1623 72 1.1873 93 1.2026
NILAI m Haspers
n Yn T m T m
94 1.2032 1 -1.86 1.05 -1.15
95 1.2038 1.01 -1.35 1.06 -1.12
96 1.2044 1.02 -1.28 1.08 -1.07
97 2.2049 1.03 -1.23 1.1 -1.02
98 1.2055 1.04 -1.19 1.15 -0.93
99 1.206
100 1.2065 2 -0.22 3 0.17
2.2 -0.13 3.2 0.24
2.4 -0.04 3.4 0.29
2.6 0.04 3.6 0.34
2.8 0.11 3.8 0.39
10 1.26 15 1.63
11 1.35 16 1.69
12 1.43 17 1.74
13 1.5 18 1.8
14 1.57 19 1.85
30 2.27 35 2.41
31 2.3 36 2.44
32 2.33 37 2.47
33 2.36 38 2.49
34 2.39 39 2.51
50 2.75 60 2.93
52 2.79 62 2.96
54 2.83 64 2.99
56 2.86 66 3.11
58 2.9 68 3.16
T m T m nF q
1.2 -0.85 1.5 -0.54
1.25 -0.79 1.6 -0.46
1.3 -0.73 1.7 -0.4
1.35 -0.68 1.8 -0.33
1.4 -0.63 1.9 -0.28
20 1.89 25 2.1
21 1.94 26 2.13
22 1.98 27 2.17
23 2.02 28 2.19
24 2.06 29 2.24
40 2.54 45 2.65
41 2.56 46 2.67
42 2.59 47 2.69
43 2.61 48 2.71
44 2.63 49 2.73
70 3.08 80 3.21
72 3.11 82 3.23
74 3.13 84 3.26
76 3.16 86 3.28
78 3.18 88 3.3
5000 7.79
10000 8.83
50000 11.08
80000 12.32
500000 13.74
Coba-coba Melchior Tabel Koreksi Melchior
nF q nF q T (menit)
0
40
115
190
270
360
450
540
630
720
810
895
980
1070
1150
1240
T (menit) Peninggian (%) T (menit) Peninggian (%)
40 1330 1420
115 1420 1510
190 1510 1595
270 1595 1680
360 1680 1770
450 1770 1860
540 1860 1950
630 1950 2035
720 2035 2120
810 2120 2210
895 2210 2295
980 2295 2380
1070 2380 2465
1150 2465 2550
1240 2550 2640
1330 2640 2725
Hujan ekstrim metode Hasper
Periode Rt (mm)
No Tahun Hujan DAS No μt
Ulang DAS
1 1993 87.465 1 2 -0.22 79.700
2 1994 69.121 2 5 0.64 104.980
3 1995 72.910 3 10 1.26 123.204
4 1996 115.856 4 20 1.89 141.723
5 1997 74.702 5 25 2.1 147.896
6 1998 71.872 6 50 2.75 167.002
7 1999 164.139 7 100 3.43 186.991
8 2000 70.299 8 200 4.14 207.861
9 2001 78.162 9 500 5.13 236.961
10 2002 79.981 10 1000 5.92 260.183
11 2003 63.331
Jumlah 947.837
Rata-rata 86.167
SD 29.395
Varians 864.045
Skewness 2.271
Kurtosis 5.227
Hujan Ekstrim metode Weduwen
Periode R70 Rt
No Tahun Hujan DAS No Mn
Ulang Hujan DAS Hujan DAS
1 1993 87.465 1 2 0.457 164.539 75.194
2 1994 69.121 2 5 0.602 164.539 99.052
3 1995 72.910 3 10 0.705 164.539 116.000
4 1996 115.856 4 20 0.811 164.539 133.441
5 1997 74.702 5 25 0.833 164.539 137.061
6 1998 71.872 6 50 0.948 164.539 155.983
7 1999 164.139 7 100 1.05 164.539 172.766
8 2000 70.299 8 200 1.152 164.539 189.549
9 2001 78.162 9 500 1.254 164.539 206.332
10 2002 79.981 10 1000 1.356 164.539 223.115
11 2003 63.331
Jumlah 947.837
Rata-rata 86.167
SD 29.395 Luas pengaruh Sta. Sukaresmi
Varians 864.045 Luas pengaruh Sta. Cintaasih
Skewness 2.271 Luas pengaruh Sta. Sirnagalih
Kurtosis 5.227 Σ
RII 116.000 Sukaresmi ρ1 =
Metode Log Person III Stasiun Cintaasih
600
Q2
500 Q5
Q10
Q20
Debit (m3/det)
400
Q25
Q50
300
Q100
Q200
200 Q500
Q1000
100
0
0 5 10 15 20 25 30 35 40 45
Waktu (t)
Hidrograf Satuan
2
1.8
1.6
1.4
Debit (m3/det)
1.2
1
0.8
0.6
0.4
0.2
0
0 5 10 15 20 25 30 35
Waktu (t)
Tebal Hujan Maksimum DAS
I = a/tm
t (menit) I (mm/jam)
log I = log a - m log t
bila :log I = y 5 147.65818
Intensitas (mm/jam)
untuk log t = x 120 66.712112 100 T20
180 60.281198 T25
maka B = -m 80
T50
m= 0.25 360 50.690243 60 T100
720 42.625244 40 T200
I = 59,443/t0,5
T500
20
T1000
0
0 100 200 300 400 500 600 700 800
Durasi (menit)
Intensitas Hujan 1000 tahun
2.5
1.5
0.5
0
0.5 1 1.5 2 2.5 3
T (menit)
Kelembaban (%)
KELEMBABAN (%)
TAHUN
Jan Feb Mar Apr Mei Jun Jul Agt Sep Okt Nop Des
1993 89 89 87 83 81 84 79 63 69 72 86 86
95.00
1994 89 88 86 84 79 80 68 73 74 80 83 86
1995 89 85 82 83 82 78 68 65 61 57 66 80 90.00
1996 83 88 87 86 83 84 84 77 74 82 87 87 85.00
1997 88 87 84 83 81 76 72 67 61 89 84 85
80.00
1998 86 83 83 84 81 78 73 67 65 74 84 82
1999 75.00
85 85 86 82 79 79 74 64 70 79 85 82
2000 83 83 83 83 81 83 83 79 83 83 83 83 70.00
2001 83 83 83 83 82 83 83 79 83 83 83 83 65.00
2002 88 85 84 86 88 85 87 89 87 76 87 87
60.00
2003 87 88 84 82 80 75 75 66 61 58 72 82 Jan Feb Mar Apr Mei Jun Jul Agt Sep Okt Nop Des
Rerata 86.36 85.82 84.45 83.55 81.55 80.45 76.91 71.73 71.64 75.73 81.82 83.91
Min 83.00 83.00 82.00 82.00 79.00 75.00 68.00 63.00 61.00 57.00 66.00 80.00 Bulan
Max 89.00 89.00 87.00 86.00 88.00 85.00 87.00 89.00 87.00 89.00 87.00 87.00 Rerata Max
Max Abs 89.00
2001 1.542 1.542 1.542 1.542 1.542 1.542 1.542 1.542 1.542 1.542 1.542 1.542 2.000
2002 2.056 2.056 2.056 1.542 1.542 1.542 1.542 2.570 2.056 2.056 1.542 1.542
1.500
2003 4.000 1.894 1.645 1.645 1.645 1.645 1.850 2.056 1.902 1.748 1.645 1.696
1.000
Rerata 1.999 1.894 1.645 1.645 1.645 1.645 1.850 2.056 1.902 1.748 1.645 1.696 Jan Feb Mar Apr Mei Jun Jul Agt Sep Okt Nop Des
Min 1.54 1.54 1.03 1.54 1.54 1.03 1.54 1.54 1.54 1.54 1.03 1.03
Bulan
Max 4.00 2.57 2.06 2.06 2.06 2.06 2.57 3.08 2.57 2.06 2.06 2.06
Rerata Max
Max Abs 4.00
Bulan
No Uraian Sat
Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
A DATA
1 Temperatur (T) °C 28.281 28.613 29.032 28.756 29.047 28.631 28.317 28.584 28.718 28.856 29.014 28.984
2 Kelembaban Relatif (RH) % 86.364 85.821 84.455 83.545 81.545 80.455 76.909 71.727 71.636 75.727 81.818 83.909
3 Kecepatan angin (U) m/det 1.999 1.894 1.645 1.645 1.645 1.645 1.850 2.056 1.902 1.748 1.645 1.696
4 Penyinaran Matahari % 46.192 46.636 54.182 64.727 74.000 69.455 71.455 79.818 79.636 62.091 53.182 50.182
B PERHITUNGAN EVAPOTRANSPIRASI (ETo)
5 ea mbar 38.389 39.087 39.967 39.387 39.998 39.124 38.466 39.026 39.308 39.597 39.929 39.865
6 ed = ea x RH mbar 33.155 33.545 33.754 32.906 32.616 31.477 29.584 27.993 28.159 29.986 32.669 33.451
7 ea - ed mbar 5.235 5.542 6.213 6.481 7.381 7.647 8.882 11.034 11.149 9.611 7.260 6.415
8 f(u) 0.275 0.275 0.274 0.274 0.274 0.274 0.275 0.276 0.275 0.275 0.274 0.275
9 1-w 0.227 0.224 0.220 0.222 0.220 0.224 0.227 0.224 0.223 0.221 0.220 0.220
10 At (Rt) 2.074 2.066 2.035 2.009 1.965 1.932 1.845 1.729 1.726 1.824 1.971 2.022
11 RA mm/hr 17.714 17.731 17.752 17.738 17.752 17.732 17.716 17.729 17.736 17.743 17.751 17.749
12 0,25 + 0,5S 0.481 0.483 0.521 0.574 0.620 0.597 0.607 0.649 0.648 0.560 0.516 0.501
13 Rs mm/hr 8.520 8.567 9.247 10.175 11.006 10.591 10.758 11.508 11.496 9.944 9.158 8.891
14 Koef. Pemantulan Sinar (a) 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200 0.200
15 Rns mm/hr 1.704 1.713 1.849 2.035 2.201 2.118 2.152 2.302 2.299 1.989 1.832 1.778
16 F(t) 16.356 16.423 16.506 16.451 16.509 16.426 16.363 16.417 16.444 16.471 16.503 16.497
17 F(ed) 0.097 0.095 0.094 0.098 0.099 0.103 0.111 0.117 0.117 0.109 0.099 0.096
18 F(s) 0.516 0.520 0.588 0.683 0.766 0.725 0.743 0.818 0.817 0.659 0.579 0.552
19 Rnl mm/hr 0.815 0.812 0.915 1.096 1.248 1.228 1.346 1.575 1.565 1.183 0.941 0.869
20 Rn mm/hr 0.889 0.901 0.934 0.939 0.953 0.890 0.806 0.727 0.734 0.805 0.891 0.909
21 w 0.783 0.786 0.790 0.788 0.790 0.786 0.783 0.786 0.787 0.789 0.790 0.790
22 w.Rn + Rt 2.770 2.774 2.773 2.748 2.718 2.632 2.476 2.300 2.304 2.459 2.675 2.740
23 c 1.010 0.990 0.990 0.990 0.980 0.960 0.960 0.930 0.940 0.960 0.990 0.980
24 ETo mm/hr 2.798 2.747 2.745 2.721 2.664 2.527 2.377 2.139 2.166 2.361 2.648 2.685
25 Ep mm/hr 86.732 76.909 85.110 81.628 82.585 75.801 73.700 66.317 64.985 73.186 79.451 83.243
5
4
3
2
1
0
1 2 3 4 5 6 7 8 9 10 11 12
Bulan
900
1100 1100
800
600
700 700
500
300
300 300
200
0
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
-100 1 2 3 4 5 6 7 8 9 10 11 12 -100
1100
Calculate Discharge (mm/month)
900
700 800
700
600
500
500
400
300
300
200
100
100
0
1 2 3 4 5 6 7 8 9 10 11 12
-100 1 2 3 4 5 6 7 8 9 10 11 12 -100 1 2 3 4 5 6 7 8 9 10 11 12
MONTH
NO PARAMETER UNITY YEAR
JAN FEB MAR APR MEI JUN JUL AGUST SEP OKT NOP DES
Meteorogical Data
1 catchment prepetition (P) mm/month 520.42 510.70 565.47 290.28 53.09 0.00 0.00 0.00 6.35 33.65 211.39 396.58 2587.93
2 catchment raindays (n) days 29 27 27 23 5 0 0 0 1 8 18 28
3 days of month (Hr) days 31 28 31 30 31 30 31 31 30 31 30 31
4 temperatur (T) C 28.28 28.61 29.03 28.76 29.05 28.63 28.32 28.58 28.72 28.86 29.01 28.98
5 sunshine (S) % 46.19 46.64 54.18 64.73 74.00 69.45 71.45 79.82 79.64 62.09 53.18 50.18
6 Relative HUmidity (H) % 86.36 85.82 84.45 83.55 81.55 80.45 76.91 71.73 71.64 75.73 81.82 83.91
7 Wind Speed (w) mile/day 3.50 3.69 3.20 3.20 3.20 3.20 3.60 4.00 3.70 3.40 3.20 3.30
Potensial Evapotranpiration (Ep)
8 Solar Radiation ( R ) mm/day 14.57 15.07 15.27 14.77 13.97 13.47 13.57 14.27 14.97 15.07 14.67 14.37
9A mmHg/F 0.92 0.93 0.95 0.94 0.96 0.95 0.93 0.94 0.95 0.96 0.96 0.96
10 B mmH2O/day 16.66 16.72 16.81 16.75 16.96 16.86 16.78 16.85 16.88 16.91 16.95 16.95
11 ea mmHg 28.39 28.86 29.44 29.06 29.92 29.28 28.79 29.21 29.41 29.63 29.87 29.82
12 ed = H*ea mmHg 24.52 24.77 24.87 24.28 24.40 23.55 22.14 20.95 21.07 22.44 24.44 25.03
13 F1 ( T;S)=A*(0,18+(0,55*S))/(A+0,27) 0.34 0.34 0.37 0.42 0.46 0.44 0.44 0.48 0.48 0.41 0.37 0.36
14 F2 (T;H)=A*B(0,56-(0,092)ed^0,5)))/(A+0,27) 1.34 1.32 1.32 1.39 1.40 1.49 1.65 1.82 1.81 1.64 1.39 1.32
15 F3(T;H)=0,27*0,36(ea-ed)/(A+0,27) 0.32 0.33 0.37 0.39 0.43 0.46 0.54 0.66 0.66 0.57 0.43 0.38
16 reflection coeficient ( r ) 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
17 E1=F1(1-r)R 3.66 3.82 4.26 4.61 4.81 4.42 4.52 5.15 5.40 4.60 4.06 3.84
18 E2=F2(0,1+(0,9*S)) 0.69 0.69 0.78 0.95 1.07 1.08 1.23 1.49 1.48 1.08 0.81 0.73
19 E3=F3(K+o,o1w) ; k=1 0.33 0.34 0.38 0.40 0.45 0.47 0.56 0.69 0.69 0.59 0.44 0.39
20 Ep=E1-E2+E3 mm/day 3.30 3.48 3.86 4.06 4.18 3.81 3.85 4.35 4.61 4.11 3.70 3.50
21 Epm= Hr x Ep mm/month 102.28 97.42 119.64 121.78 129.66 114.29 119.35 134.84 138.42 127.29 110.89 108.51
Limited Evapotranspirasi (Ea)
22 Exposed Surface (m) % 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00
23 Number of rain days (n) days 29.00 27.00 27.00 23.00 5.00 0.00 0.00 0.00 1.00 8.00 18.00 28.00
24 ∆E/Epm=(m/20)(18-n) % -24.75 -20.25 -20.25 -11.25 29.25 40.50 40.50 40.50 38.25 22.50 0.00 -22.50
25 ∆E = (∆E/Epm)*(Epm/100) mm/month -25.32 -19.73 -24.23 -13.70 37.92 46.29 48.34 54.61 52.95 28.64 0.00 -24.41
26 E actual=Epm - ∆E mm/month 127.60 117.15 143.87 135.48 91.73 68.00 71.01 80.23 85.47 98.65 110.89 132.92 1263.00
Water Surplus (WS)
27 P - Ea mm/month 492.03 481.84 536.02 261.22 23.16 -29.28 -28.79 -29.21 -23.06 4.02 181.52 366.76
28 SMS=ISMS + (P-Ea) mm/month 692.03 681.84 736.02 461.22 223.16 170.72 171.21 170.79 176.94 204.02 381.52 566.76
29 Soil moisture Capacity(SMC), ; ISMC=20 mm/month 200.00 200.00 200.00 200.00 200.00 170.72 171.21 170.79 176.94 200.00 200.00 200.00
30 Soil storage (SS),if P-Ea≥0 ,SS=0 mm/month 0.00 0.00 0.00 0.00 0.00 29.28 28.79 29.21 23.06 0.00 0.00 0.00
31 Water Surplus (WS), WS=27+30 mm/month 492.03 481.84 536.02 261.22 23.16 0.00 0.00 0.00 0.00 4.02 181.52 366.76
Total Run Off (TRO)
32 infiltration Coefficien (if) 0.30 0.50 0.38 0.50 0.40 0.50 0.50 0.30 0.40 0.30 0.30 0.40
33 infiltration (i), I =31 x if mm/month 9.30 15.50 11.75 15.50 12.40 15.50 15.50 9.30 12.40 9.30 9.30 12.40 148.15
34 Month flow Recession Constant (K) 1.00 1.00 1.00 1.00 1.00 1.00 0.88 0.85 0.90 0.99 0.95 0.80
35 Percentage Factor (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 1/2 x (1 + K) i 9.30 15.50 11.75 15.50 12.40 15.50 14.57 8.60 11.78 9.25 9.07 11.16
37 K xGsom, Gsom = 229,14 229.14 229.14 229.14 229.14 229.14 229.14 229.14 201.64 194.77 206.23 226.85 217.68 183.31
38 GS = 36 + 37 mm/month 238.44 244.64 240.89 244.64 241.54 244.64 216.21 203.37 218.01 236.10 226.75 194.47
39 ∆GS = GS - Gsom mm/month 9.30 15.50 11.75 15.50 12.40 15.50 -12.93 -25.77 -11.13 6.96 -2.39 -34.67 0.02
40 Base Flow , BF = I -∆GS mm/month 0.00 0.00 0.00 0.00 0.00 0.00 28.43 35.07 23.53 2.34 11.69 47.07 148.12
41 Direct Run Off, DRO = WS - i mm/month 482.73 466.34 524.27 245.72 10.76 -15.50 -15.50 -9.30 -12.40 -5.28 172.22 354.36
42 Storm Run Off, if P≥200, SRO =0 ; SRO mm/month 0.00 0.00 0.00 0.00 5.31 0.00 0.00 0.00 0.64 3.36 0.00 0.00
43 Total Run Off (TRO)=BF+DRO+SRO mm/month 482.73 466.34 524.27 245.72 16.07 -15.50 12.93 25.77 11.77 0.42 183.91 401.43
44 catchment Area km2 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69
45 Stream Flow ( calculated discharge )mm/month 867 927 942 456 29 -29 23 46 22 1 341 721 4347
WATER BALANCE CALCULATION YEAR 1995
MONTH
NO PARAMETER UNITY YEAR
JAN FEB MAR APR MEI JUN JUL AGUST SEP OKT NOP DES
Meteorogical Data
1 catchment prepetition (P) mm/month 565.92 516.45 685.54 303.01 158.85 257.94 28.37 0.00 167.39 72.00 469.56 342.98 3567.99
2 catchment raindays (n) days 30 26 28 21 10 18 2 0 9 5 24 19
3 days of month (Hr) days 31 28 31 30 31 30 31 31 30 31 30 31
4 temperatur (T) C 28.28 28.61 29.03 28.76 29.05 28.63 28.32 28.58 28.72 28.86 29.01 28.98
5 sunshine (S) % 46.19 46.64 54.18 64.73 74.00 69.45 71.45 79.82 79.64 62.09 53.18 50.18
6 Relative HUmidity (H) % 86.36 85.82 84.45 83.55 81.55 80.45 76.91 71.73 71.64 75.73 81.82 83.91
7 Wind Speed (w) mile/day 3.50 3.69 3.20 3.20 3.20 3.20 3.60 4.00 3.70 3.40 3.20 3.30
Potensial Evapotranpiration (Ep)
8 Solar Radiation ( R ) mm/day 14.57 15.07 15.27 14.77 13.97 13.47 13.57 14.27 14.97 15.07 14.67 14.37
9A mmHg/F 0.92 0.93 0.95 0.94 0.96 0.95 0.93 0.94 0.95 0.96 0.96 0.96
10 B mmH2O/day 16.66 16.72 16.81 16.75 16.96 16.86 16.78 16.85 16.88 16.91 16.95 16.95
11 ea mmHg 28.39 28.86 29.44 29.06 29.92 29.28 28.79 29.21 29.41 29.63 29.87 29.82
12 ed = H*ea mmHg 24.52 24.77 24.87 24.28 24.40 23.55 22.14 20.95 21.07 22.44 24.44 25.03
13 F1 ( T;S)=A*(0,18+(0,55*S))/(A+0,27) 0.34 0.34 0.37 0.42 0.46 0.44 0.44 0.48 0.48 0.41 0.37 0.36
14 F2 (T;H)=A*B(0,56-(0,092)ed^0,5)))/(A+0,27) 1.34 1.32 1.32 1.39 1.40 1.49 1.65 1.82 1.81 1.64 1.39 1.32
15 F3(T;H)=0,27*0,36(ea-ed)/(A+0,27) 0.32 0.33 0.37 0.39 0.43 0.46 0.54 0.66 0.66 0.57 0.43 0.38
16 reflection coeficient ( r ) 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
17 E1=F1(1-r)R 3.66 3.82 4.26 4.61 4.81 4.42 4.52 5.15 5.40 4.60 4.06 3.84
18 E2=F2(0,1+(0,9*S)) 0.69 0.69 0.78 0.95 1.07 1.08 1.23 1.49 1.48 1.08 0.81 0.73
19 E3=F3(K+o,o1w) ; k=1 0.33 0.34 0.38 0.40 0.45 0.47 0.56 0.69 0.69 0.59 0.44 0.39
20 Ep=E1-E2+E3 mm/day 3.30 3.48 3.86 4.06 4.18 3.81 3.85 4.35 4.61 4.11 3.70 3.50
21 Epm= Hr x Ep mm/month 102.28 97.42 119.64 121.78 129.66 114.29 119.35 134.84 138.42 127.29 110.89 108.51
Limited Evapotranspirasi (Ea)
22 Exposed Surface (m) % 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00
23 Number of rain days (n) days 30.00 26.00 28.00 21.00 10.00 18.00 2.00 0.00 9.00 5.00 24.00 19.00
24 ∆E/Epm=(m/20)(18-n) % -27.00 -18.00 -22.50 -6.75 18.00 0.00 36.00 40.50 20.25 29.25 -13.50 -2.25
25 ∆E = (∆E/Epm)*(Epm/100) mm/month -27.62 -17.54 -26.92 -8.22 23.34 0.00 42.97 54.61 28.03 37.23 -14.97 -2.44
26 E actual=Epm - ∆E mm/month 129.90 114.96 146.56 130.00 106.32 114.29 76.38 80.23 110.39 90.06 125.86 110.95 ###
Water Surplus (WS)
27 P - Ea mm/month 537.52 487.59 656.09 273.95 128.92 228.67 -0.42 -29.21 137.97 42.37 439.69 313.15
28 SMS=ISMS + (P-Ea) mm/month 737.52 687.59 856.09 473.95 328.92 428.67 199.58 170.79 337.97 242.37 639.69 513.15
29 Soil moisture Capacity(SMC), ; ISMC=20 mm/month 200.00 200.00 200.00 200.00 200.00 200.00 199.58 170.79 200.00 200.00 200.00 200.00
30 Soil storage (SS),if P-Ea≥0 ,SS=0 mm/month 0.00 0.00 0.00 0.00 0.00 0.00 0.42 29.21 0.00 0.00 0.00 0.00
31 Water Surplus (WS), WS=27+30 mm/month 537.52 487.59 656.09 273.95 128.92 228.67 0.00 0.00 137.97 42.37 439.69 313.15
Total Run Off (TRO)
32 infiltration Coefficien (if) 0.30 0.50 0.38 0.50 0.40 0.50 0.50 0.30 0.40 0.30 0.30 0.40
33 infiltration (i), I =31 x if mm/month 9.30 15.50 11.75 15.50 12.40 15.50 15.50 9.30 12.40 9.30 9.30 12.40 148.15
34 Month flow Recession Constant (K) 1.00 1.00 1.00 1.00 1.00 1.00 0.88 0.85 0.90 0.99 0.95 0.80
35 Percentage Factor (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 1/2 x (1 + K) i 9.30 15.50 11.75 15.50 12.40 15.50 14.57 8.60 11.78 9.25 9.07 11.16
37 K xGsom, Gsom = 229,14 229.14 229.14 229.14 229.14 229.14 229.14 229.14 201.64 194.77 206.23 226.85 217.68 183.31
38 GS = 36 + 37 mm/month 238.44 244.64 240.89 244.64 241.54 244.64 216.21 203.37 218.01 236.10 226.75 194.47
39 ∆GS = GS - Gsom mm/month 9.30 15.50 11.75 15.50 12.40 15.50 -12.93 -25.77 -11.13 6.96 -2.39 -34.67 0.02
40 Base Flow , BF = I -∆GS mm/month 0.00 0.00 0.00 0.00 0.00 0.00 28.43 35.07 23.53 2.34 11.69 47.07 148.12
41 Direct Run Off, DRO = WS - i mm/month 528.22 472.09 644.35 258.45 116.52 213.17 -15.50 -9.30 125.57 33.07 430.39 300.75
42 Storm Run Off, if P≥200, SRO =0 ; SRO mm/month 0.00 0.00 0.00 0.00 15.88 0.00 2.84 0.00 16.74 7.20 0.00 0.00
43 Total Run Off (TRO)=BF+DRO+SRO mm/month 528.22 472.09 644.35 258.45 132.41 213.17 15.76 25.77 165.84 42.61 442.08 347.82
44 catchment Area km2 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69
45 Stream Flow ( calculated discharge )mm/month 949 939 1157 480 238 396 28 46 308 77 821 625 6063
WATER BALANCE CALCULATION YEAR 1996
MONTH
NO PARAMETER UNITY YEAR
JAN FEB MAR APR MEI JUN JUL AGUST SEP OKT NOP DES
Meteorogical Data
1 catchment prepetition (P) mm/month 387.60 438.98 658.78 424.83 160.13 121.73 83.46 180.38 165.81 213.36 627.99 406.03 3869.09
2 catchment raindays (n) days 29 27 27 24 16 11 13 17 16 26 28 25
3 days of month (Hr) days 31 28 31 30 31 30 31 31 30 31 30 31
4 temperatur (T) C 28.28 28.61 29.03 28.76 29.05 28.63 28.32 28.58 28.72 28.86 29.01 28.98
5 sunshine (S) % 46.19 46.64 54.18 64.73 74.00 69.45 71.45 79.82 79.64 62.09 53.18 50.18
6 Relative HUmidity (H) % 86.36 85.82 84.45 83.55 81.55 80.45 76.91 71.73 71.64 75.73 81.82 83.91
7 Wind Speed (w) mile/day 3.50 3.69 3.20 3.20 3.20 3.20 3.60 4.00 3.70 3.40 3.20 3.30
Potensial Evapotranpiration (Ep)
8 Solar Radiation ( R ) mm/day 14.57 15.07 15.27 14.77 13.97 13.47 13.57 14.27 14.97 15.07 14.67 14.37
9A mmHg/F 0.92 0.93 0.95 0.94 0.96 0.95 0.93 0.94 0.95 0.96 0.96 0.96
10 B mmH2O/day 16.66 16.72 16.81 16.75 16.96 16.86 16.78 16.85 16.88 16.91 16.95 16.95
11 ea mmHg 28.39 28.86 29.44 29.06 29.92 29.28 28.79 29.21 29.41 29.63 29.87 29.82
12 ed = H*ea mmHg 24.52 24.77 24.87 24.28 24.40 23.55 22.14 20.95 21.07 22.44 24.44 25.03
13 F1 ( T;S)=A*(0,18+(0,55*S))/(A+0,27) 0.34 0.34 0.37 0.42 0.46 0.44 0.44 0.48 0.48 0.41 0.37 0.36
14 F2 (T;H)=A*B(0,56-(0,092)ed^0,5)))/(A+0,27) 1.34 1.32 1.32 1.39 1.40 1.49 1.65 1.82 1.81 1.64 1.39 1.32
15 F3(T;H)=0,27*0,36(ea-ed)/(A+0,27) 0.32 0.33 0.37 0.39 0.43 0.46 0.54 0.66 0.66 0.57 0.43 0.38
16 reflection coeficient ( r ) 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
17 E1=F1(1-r)R 3.66 3.82 4.26 4.61 4.81 4.42 4.52 5.15 5.40 4.60 4.06 3.84
18 E2=F2(0,1+(0,9*S)) 0.69 0.69 0.78 0.95 1.07 1.08 1.23 1.49 1.48 1.08 0.81 0.73
19 E3=F3(K+o,o1w) ; k=1 0.33 0.34 0.38 0.40 0.45 0.47 0.56 0.69 0.69 0.59 0.44 0.39
20 Ep=E1-E2+E3 mm/day 3.30 3.48 3.86 4.06 4.18 3.81 3.85 4.35 4.61 4.11 3.70 3.50
21 Epm= Hr x Ep mm/month 102.28 97.42 119.64 121.78 129.66 114.29 119.35 134.84 138.42 127.29 110.89 108.51
Limited Evapotranspirasi (Ea)
22 Exposed Surface (m) % 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00
23 Number of rain days (n) days 29.00 27.00 27.00 24.00 16.00 11.00 13.00 17.00 16.00 26.00 28.00 25.00
24 ∆E/Epm=(m/20)(18-n) % -24.75 -20.25 -20.25 -13.50 4.50 15.75 11.25 2.25 4.50 -18.00 -22.50 -15.75
25 ∆E = (∆E/Epm)*(Epm/100) mm/month -25.32 -19.73 -24.23 -16.44 5.83 18.00 13.43 3.03 6.23 -22.91 -24.95 -17.09
26 E actual=Epm - ∆E mm/month 127.60 117.15 143.87 138.22 123.82 96.29 105.92 131.80 132.19 150.20 135.84 125.60 ###
Water Surplus (WS)
27 P - Ea mm/month 359.21 410.12 629.33 395.77 130.21 92.46 54.67 151.18 136.40 183.73 598.12 376.21
28 SMS=ISMS + (P-Ea) mm/month 559.21 610.12 829.33 595.77 330.21 292.46 254.67 351.18 336.40 383.73 798.12 576.21
29 Soil moisture Capacity(SMC), ; ISMC=20 mm/month 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00
30 Soil storage (SS),if P-Ea≥0 ,SS=0 mm/month 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
31 Water Surplus (WS), WS=27+30 mm/month 359.21 410.12 629.33 395.77 130.21 92.46 54.67 151.18 136.40 183.73 598.12 376.21
Total Run Off (TRO)
32 infiltration Coefficien (if) 0.30 0.50 0.38 0.50 0.40 0.50 0.50 0.30 0.40 0.30 0.30 0.40
33 infiltration (i), I =31 x if mm/month 9.30 15.50 11.75 15.50 12.40 15.50 15.50 9.30 12.40 9.30 9.30 12.40 148.15
34 Month flow Recession Constant (K) 1.00 1.00 1.00 1.00 1.00 1.00 0.88 0.85 0.90 0.99 0.95 0.80
35 Percentage Factor (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 1/2 x (1 + K) i 9.30 15.50 11.75 15.50 12.40 15.50 14.57 8.60 11.78 9.25 9.07 11.16
37 K xGsom, Gsom = 229,14 229.14 229.14 229.14 229.14 229.14 229.14 229.14 201.64 194.77 206.23 226.85 217.68 183.31
38 GS = 36 + 37 mm/month 238.44 244.64 240.89 244.64 241.54 244.64 216.21 203.37 218.01 236.10 226.75 194.47
39 ∆GS = GS - Gsom mm/month 9.30 15.50 11.75 15.50 12.40 15.50 -12.93 -25.77 -11.13 6.96 -2.39 -34.67 0.02
40 Base Flow , BF = I -∆GS mm/month 0.00 0.00 0.00 0.00 0.00 0.00 28.43 35.07 23.53 2.34 11.69 47.07 148.12
41 Direct Run Off, DRO = WS - i mm/month 349.91 394.62 617.58 380.27 117.81 76.96 39.17 141.88 124.00 174.43 588.82 363.81
42 Storm Run Off, if P≥200, SRO =0 ; SRO mm/month 0.00 0.00 0.00 0.00 16.01 12.17 8.35 18.04 16.58 0.00 0.00 0.00
43 Total Run Off (TRO)=BF+DRO+SRO mm/month 349.91 394.62 617.58 380.27 133.82 89.13 75.95 194.98 164.11 176.77 600.51 410.88
44 catchment Area km2 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69
45 Stream Flow ( calculated discharge )mm/month 629 785 1109 706 240 165 136 350 305 318 1115 738 6596
WATER BALANCE CALCULATION YEAR 1997
MONTH
NO PARAMETER UNITY YEAR
JAN FEB MAR APR MEI JUN JUL AGUST SEP OKT NOP DES
Meteorogical Data
1 catchment prepetition (P) mm/month 460.77 369.08 371.90 478.91 193.14 15.05 27.64 12.44 2.64 43.97 151.74 674.55 2801.83
2 catchment raindays (n) days 28 19 19 21 15 4 4 4 1 8 25 26
3 days of month (Hr) days 31 28 31 30 31 30 31 31 30 31 30 31
4 temperatur (T) C 28.28 28.61 29.03 28.76 29.05 28.63 28.32 28.58 28.72 28.86 29.01 28.98
5 sunshine (S) % 46.19 46.64 54.18 64.73 74.00 69.45 71.45 79.82 79.64 62.09 53.18 50.18
6 Relative HUmidity (H) % 86.36 85.82 84.45 83.55 81.55 80.45 76.91 71.73 71.64 75.73 81.82 83.91
7 Wind Speed (w) mile/day 3.50 3.69 3.20 3.20 3.20 3.20 3.60 4.00 3.70 3.40 3.20 3.30
Potensial Evapotranpiration (Ep)
8 Solar Radiation ( R ) mm/day 14.57 15.07 15.27 14.77 13.97 13.47 13.57 14.27 14.97 15.07 14.67 14.37
9A mmHg/F 0.92 0.93 0.95 0.94 0.96 0.95 0.93 0.94 0.95 0.96 0.96 0.96
10 B mmH2O/day 16.66 16.72 16.81 16.75 16.96 16.86 16.78 16.85 16.88 16.91 16.95 16.95
11 ea mmHg 28.39 28.86 29.44 29.06 29.92 29.28 28.79 29.21 29.41 29.63 29.87 29.82
12 ed = H*ea mmHg 24.52 24.77 24.87 24.28 24.40 23.55 22.14 20.95 21.07 22.44 24.44 25.03
13 F1 ( T;S)=A*(0,18+(0,55*S))/(A+0,27) 0.34 0.34 0.37 0.42 0.46 0.44 0.44 0.48 0.48 0.41 0.37 0.36
14 F2 (T;H)=A*B(0,56-(0,092)ed^0,5)))/(A+0,27) 1.34 1.32 1.32 1.39 1.40 1.49 1.65 1.82 1.81 1.64 1.39 1.32
15 F3(T;H)=0,27*0,36(ea-ed)/(A+0,27) 0.32 0.33 0.37 0.39 0.43 0.46 0.54 0.66 0.66 0.57 0.43 0.38
16 reflection coeficient ( r ) 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
17 E1=F1(1-r)R 3.66 3.82 4.26 4.61 4.81 4.42 4.52 5.15 5.40 4.60 4.06 3.84
18 E2=F2(0,1+(0,9*S)) 0.69 0.69 0.78 0.95 1.07 1.08 1.23 1.49 1.48 1.08 0.81 0.73
19 E3=F3(K+o,o1w) ; k=1 0.33 0.34 0.38 0.40 0.45 0.47 0.56 0.69 0.69 0.59 0.44 0.39
20 Ep=E1-E2+E3 mm/day 3.30 3.48 3.86 4.06 4.18 3.81 3.85 4.35 4.61 4.11 3.70 3.50
21 Epm= Hr x Ep mm/month 102.28 97.42 119.64 121.78 129.66 114.29 119.35 134.84 138.42 127.29 110.89 108.51
Limited Evapotranspirasi (Ea)
22 Exposed Surface (m) % 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00
23 Number of rain days (n) days 28.00 19.00 19.00 21.00 15.00 4.00 4.00 4.00 1.00 8.00 25.00 26.00
24 ∆E/Epm=(m/20)(18-n) % -22.50 -2.25 -2.25 -6.75 6.75 31.50 31.50 31.50 38.25 22.50 -15.75 -18.00
25 ∆E = (∆E/Epm)*(Epm/100) mm/month -23.01 -2.19 -2.69 -8.22 8.75 36.00 37.59 42.47 52.95 28.64 -17.47 -19.53
26 E actual=Epm - ∆E mm/month 125.30 99.61 122.33 130.00 120.90 78.29 81.75 92.36 85.47 98.65 128.35 128.04 1291.07
Water Surplus (WS)
27 P - Ea mm/month 432.38 340.22 342.46 449.85 163.22 -14.23 -1.16 -16.76 -26.78 14.34 121.87 644.72
28 SMS=ISMS + (P-Ea) mm/month 632.38 540.22 542.46 649.85 363.22 185.77 198.84 183.24 173.22 214.34 321.87 844.72
29 Soil moisture Capacity(SMC), ; ISMC=200 mm/month 200.00 200.00 200.00 200.00 200.00 185.77 198.84 183.24 173.22 200.00 200.00 200.00
30 Soil storage (SS),if P-Ea≥0 ,SS=0 mm/month 0.00 0.00 0.00 0.00 0.00 14.23 1.16 16.76 26.78 0.00 0.00 0.00
31 Water Surplus (WS), WS=27+30 mm/month 432.38 340.22 342.46 449.85 163.22 0.00 0.00 0.00 0.00 14.34 121.87 644.72
Total Run Off (TRO)
32 infiltration Coefficien (if) 0.30 0.50 0.38 0.50 0.40 0.50 0.50 0.30 0.40 0.30 0.30 0.40
33 infiltration (i), I =31 x if mm/month 9.30 15.50 11.75 15.50 12.40 15.50 15.50 9.30 12.40 9.30 9.30 12.40 148.15
34 Month flow Recession Constant (K) 1.00 1.00 1.00 1.00 1.00 1.00 0.88 0.85 0.90 0.99 0.95 0.80
35 Percentage Factor (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 1/2 x (1 + K) i 9.30 15.50 11.75 15.50 12.40 15.50 14.57 8.60 11.78 9.25 9.07 11.16
37 K xGsom, Gsom = 229,14 229.14 229.14 229.14 229.14 229.14 229.14 229.14 201.64 194.77 206.23 226.85 217.68 183.31
38 GS = 36 + 37 mm/month 238.44 244.64 240.89 244.64 241.54 244.64 216.21 203.37 218.01 236.10 226.75 194.47
39 ∆GS = GS - Gsom mm/month 9.30 15.50 11.75 15.50 12.40 15.50 -12.93 -25.77 -11.13 6.96 -2.39 -34.67 0.02
40 Base Flow , BF = I -∆GS mm/month 0.00 0.00 0.00 0.00 0.00 0.00 28.43 35.07 23.53 2.34 11.69 47.07 148.12
41 Direct Run Off, DRO = WS - i mm/month 423.08 324.72 330.71 434.35 150.82 -15.50 -15.50 -9.30 -12.40 5.04 112.57 632.32
42 Storm Run Off, if P≥200, SRO =0 ; SRO=PxPF mm/month 0.00 0.00 0.00 0.00 19.31 1.50 2.76 1.24 0.26 4.40 15.17 0.00
43 Total Run Off (TRO)=BF+DRO+SRO mm/month 423.08 324.72 330.71 434.35 170.13 -14.00 15.69 27.01 11.40 11.78 139.44 679.39
44 catchment Area km2 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69
45 Stream Flow ( calculated discharge ) mm/month 760 646 594 806 306 -26 28 49 21 21 259 1220 4684
WATER BALANCE CALCULATION YEAR 1998
MONTH
NO PARAMETER UNITY YEAR
JAN FEB MAR APR MEI JUN JUL AGUST SEP OKT NOP DES
Meteorogical Data
1 catchment prepetition (P) mm/month 125.44 732.85 677.11 389.04 261.84 313.19 160.11 24.42 66.13 195.86 670.34 608.44 4224.77
2 catchment raindays (n) days 18 28 30 28 23 24 19 5 7 19 27 28
3 days of month (Hr) days 31 28 31 30 31 30 31 31 30 31 30 31
4 temperatur (T) C 28.28 28.61 29.03 28.76 29.05 28.63 28.32 28.58 28.72 28.86 29.01 28.98
5 sunshine (S) % 46.19 46.64 54.18 64.73 74.00 69.45 71.45 79.82 79.64 62.09 53.18 50.18
6 Relative HUmidity (H) % 86.36 85.82 84.45 83.55 81.55 80.45 76.91 71.73 71.64 75.73 81.82 83.91
7 Wind Speed (w) mile/day 3.50 3.69 3.20 3.20 3.20 3.20 3.60 4.00 3.70 3.40 3.20 3.30
Potensial Evapotranpiration (Ep)
8 Solar Radiation ( R ) mm/day 14.57 15.07 15.27 14.77 13.97 13.47 13.57 14.27 14.97 15.07 14.67 14.37
9A mmHg/F 0.92 0.93 0.95 0.94 0.96 0.95 0.93 0.94 0.95 0.96 0.96 0.96
10 B mmH2O/day 16.66 16.72 16.81 16.75 16.96 16.86 16.78 16.85 16.88 16.91 16.95 16.95
11 ea mmHg 28.39 28.86 29.44 29.06 29.92 29.28 28.79 29.21 29.41 29.63 29.87 29.82
12 ed = H*ea mmHg 24.52 24.77 24.87 24.28 24.40 23.55 22.14 20.95 21.07 22.44 24.44 25.03
13 F1 ( T;S)=A*(0,18+(0,55*S))/(A+0,27) 0.34 0.34 0.37 0.42 0.46 0.44 0.44 0.48 0.48 0.41 0.37 0.36
14 F2 (T;H)=A*B(0,56-(0,092)ed^0,5)))/(A+0,27) 1.34 1.32 1.32 1.39 1.40 1.49 1.65 1.82 1.81 1.64 1.39 1.32
15 F3(T;H)=0,27*0,36(ea-ed)/(A+0,27) 0.32 0.33 0.37 0.39 0.43 0.46 0.54 0.66 0.66 0.57 0.43 0.38
16 reflection coeficient ( r ) 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
17 E1=F1(1-r)R 3.66 3.82 4.26 4.61 4.81 4.42 4.52 5.15 5.40 4.60 4.06 3.84
18 E2=F2(0,1+(0,9*S)) 0.69 0.69 0.78 0.95 1.07 1.08 1.23 1.49 1.48 1.08 0.81 0.73
19 E3=F3(K+o,o1w) ; k=1 0.33 0.34 0.38 0.40 0.45 0.47 0.56 0.69 0.69 0.59 0.44 0.39
20 Ep=E1-E2+E3 mm/day 3.30 3.48 3.86 4.06 4.18 3.81 3.85 4.35 4.61 4.11 3.70 3.50
21 Epm= Hr x Ep mm/month 102.28 97.42 119.64 121.78 129.66 114.29 119.35 134.84 138.42 127.29 110.89 108.51
Limited Evapotranspirasi (Ea)
22 Exposed Surface (m) % 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00
23 Number of rain days (n) days 18.00 28.00 30.00 28.00 23.00 24.00 19.00 5.00 7.00 19.00 27.00 28.00
24 ∆E/Epm=(m/20)(18-n) % 0.00 -22.50 -27.00 -22.50 -11.25 -13.50 -2.25 29.25 24.75 -2.25 -20.25 -22.50
25 ∆E = (∆E/Epm)*(Epm/100) mm/month 0.00 -21.92 -32.30 -27.40 -14.59 -15.43 -2.69 39.44 34.26 -2.86 -22.46 -24.41
26 E actual=Epm - ∆E mm/month 102.28 119.34 151.94 149.18 144.24 129.72 122.03 95.40 104.16 130.16 133.34 132.92 ###
Water Surplus (WS)
27 P - Ea mm/month 97.05 703.99 647.66 359.98 231.92 283.92 131.32 -4.78 36.72 166.23 640.47 578.62
28 SMS=ISMS + (P-Ea) mm/month 297.05 903.99 847.66 559.98 431.92 483.92 331.32 195.22 236.72 366.23 840.47 778.62
29 Soil moisture Capacity(SMC), ; ISMC=20 mm/month 200.00 200.00 200.00 200.00 200.00 200.00 200.00 195.22 200.00 200.00 200.00 200.00
30 Soil storage (SS),if P-Ea≥0 ,SS=0 mm/month 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.78 0.00 0.00 0.00 0.00
31 Water Surplus (WS), WS=27+30 mm/month 97.05 703.99 647.66 359.98 231.92 283.92 131.32 0.00 36.72 166.23 640.47 578.62
Total Run Off (TRO)
32 infiltration Coefficien (if) 0.30 0.50 0.38 0.50 0.40 0.50 0.50 0.30 0.40 0.30 0.30 0.40
33 infiltration (i), I =31 x if mm/month 9.30 15.50 11.75 15.50 12.40 15.50 15.50 9.30 12.40 9.30 9.30 12.40 148.15
34 Month flow Recession Constant (K) 1.00 1.00 1.00 1.00 1.00 1.00 0.88 0.85 0.90 0.99 0.95 0.80
35 Percentage Factor (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 1/2 x (1 + K) i 9.30 15.50 11.75 15.50 12.40 15.50 14.57 8.60 11.78 9.25 9.07 11.16
37 K xGsom, Gsom = 229,14 229.14 229.14 229.14 229.14 229.14 229.14 229.14 201.64 194.77 206.23 226.85 217.68 183.31
38 GS = 36 + 37 mm/month 238.44 244.64 240.89 244.64 241.54 244.64 216.21 203.37 218.01 236.10 226.75 194.47
39 ∆GS = GS - Gsom mm/month 9.30 15.50 11.75 15.50 12.40 15.50 -12.93 -25.77 -11.13 6.96 -2.39 -34.67 0.02
40 Base Flow , BF = I -∆GS mm/month 0.00 0.00 0.00 0.00 0.00 0.00 28.43 35.07 23.53 2.34 11.69 47.07 148.12
41 Direct Run Off, DRO = WS - i mm/month 87.75 688.49 635.92 344.48 219.52 268.42 115.82 -9.30 24.32 156.93 631.17 566.22
42 Storm Run Off, if P≥200, SRO =0 ; SRO mm/month 12.54 0.00 0.00 0.00 0.00 0.00 16.01 2.44 6.61 19.59 0.00 0.00
43 Total Run Off (TRO)=BF+DRO+SRO mm/month 100.29 688.49 635.92 344.48 219.52 268.42 160.26 28.21 54.47 178.86 642.85 613.29
44 catchment Area km2 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69
45 Stream Flow ( calculated discharge )mm/month 180 1369 1142 639 394 498 288 51 101 321 1193 1102 7280
Stream Flow 1999 Stream Flow 2000
1700 1000 800
1500 900
700
800
1300 600
700 400
300
500 300
200
300 200
100
100
100
0 0
-100 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2
Month Month
1100 900
900
700
700
500
500
300
300
100
100
1 2 3 4 5 6 7 8 9 10
-100
1 2 3 4 5 6 7 8 9 10 11 12
-100
Month
Month
WATER BALANCE CALCULATION YEAR 2000
MONTH
NO PARAMETER UNITY YEAR
JAN FEB MAR APR MEI JUN JUL AGUST SEP OKT NOP DES
Meteorogical Data
1 catchment prepetition (P) mm/month 335.88 359.85 410.82 410.54 293.87 100.75 63.62 75.43 103.38 196.59 438.30 482.14 3271.16
2 catchment raindays (n) days 30 23 25 25 21 11 11 11 15 22 23 26
3 days of month (Hr) days 31 28 31 30 31 30 31 31 30 31 30 31
4 temperatur (T) C 28.28 28.61 29.03 28.76 29.05 28.63 28.32 28.58 28.72 28.86 29.01 28.98
5 sunshine (S) % 46.19 46.64 54.18 64.73 74.00 69.45 71.45 79.82 79.64 62.09 53.18 50.18
6 Relative HUmidity (H) % 86.36 85.82 84.45 83.55 81.55 80.45 76.91 71.73 71.64 75.73 81.82 83.91
7 Wind Speed (w) mile/day 3.50 3.69 3.20 3.20 3.20 3.20 3.60 4.00 3.70 3.40 3.20 3.30
Potensial Evapotranpiration (Ep)
8 Solar Radiation ( R ) mm/day 14.57 15.07 15.27 14.77 13.97 13.47 13.57 14.27 14.97 15.07 14.67 14.37
9A mmHg/F 0.92 0.93 0.95 0.94 0.96 0.95 0.93 0.94 0.95 0.96 0.96 0.96
10 B mmH2O/day 16.66 16.72 16.81 16.75 16.96 16.86 16.78 16.85 16.88 16.91 16.95 16.95
11 ea mmHg 28.39 28.86 29.44 29.06 29.92 29.28 28.79 29.21 29.41 29.63 29.87 29.82
12 ed = H*ea mmHg 24.52 24.77 24.87 24.28 24.40 23.55 22.14 20.95 21.07 22.44 24.44 25.03
13 F1 ( T;S)=A*(0,18+(0,55*S))/(A+0,27) 0.34 0.34 0.37 0.42 0.46 0.44 0.44 0.48 0.48 0.41 0.37 0.36
14 F2 (T;H)=A*B(0,56-(0,092)ed^0,5)))/(A+0,27) 1.34 1.32 1.32 1.39 1.40 1.49 1.65 1.82 1.81 1.64 1.39 1.32
15 F3(T;H)=0,27*0,36(ea-ed)/(A+0,27) 0.32 0.33 0.37 0.39 0.43 0.46 0.54 0.66 0.66 0.57 0.43 0.38
16 reflection coeficient ( r ) 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
17 E1=F1(1-r)R 3.66 3.82 4.26 4.61 4.81 4.42 4.52 5.15 5.40 4.60 4.06 3.84
18 E2=F2(0,1+(0,9*S)) 0.69 0.69 0.78 0.95 1.07 1.08 1.23 1.49 1.48 1.08 0.81 0.73
19 E3=F3(K+o,o1w) ; k=1 0.33 0.34 0.38 0.40 0.45 0.47 0.56 0.69 0.69 0.59 0.44 0.39
20 Ep=E1-E2+E3 mm/day 3.30 3.48 3.86 4.06 4.18 3.81 3.85 4.35 4.61 4.11 3.70 3.50
21 Epm= Hr x Ep mm/month 102.28 97.42 119.64 121.78 129.66 114.29 119.35 134.84 138.42 127.29 110.89 108.51
Limited Evapotranspirasi (Ea)
22 Exposed Surface (m) % 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00
23 Number of rain days (n) days 30.00 23.00 25.00 25.00 21.00 11.00 11.00 11.00 15.00 22.00 23.00 26.00
24 ∆E/Epm=(m/20)(18-n) % -27.00 -11.25 -15.75 -15.75 -6.75 15.75 15.75 15.75 6.75 -9.00 -11.25 -18.00
25 ∆E = (∆E/Epm)*(Epm/100) mm/month -27.62 -10.96 -18.84 -19.18 -8.75 18.00 18.80 21.24 9.34 -11.46 -12.48 -19.53
26 E actual=Epm - ∆E mm/month 129.90 108.38 138.48 140.96 138.41 96.29 100.55 113.60 129.08 138.75 123.36 128.04 ###
Water Surplus (WS)
27 P - Ea mm/month 307.49 330.99 381.37 381.48 263.95 71.47 34.83 46.22 73.96 166.96 408.43 452.31
28 SMS=ISMS + (P-Ea) mm/month 507.49 530.99 581.37 581.48 463.95 271.47 234.83 246.22 273.96 366.96 608.43 652.31
29 Soil moisture Capacity(SMC), ; ISMC=20 mm/month 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00
30 Soil storage (SS),if P-Ea≥0 ,SS=0 mm/month 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
31 Water Surplus (WS), WS=27+30 mm/month 307.49 330.99 381.37 381.48 263.95 71.47 34.83 46.22 73.96 166.96 408.43 452.31
Total Run Off (TRO)
32 infiltration Coefficien (if) 0.30 0.50 0.38 0.50 0.40 0.50 0.50 0.30 0.40 0.30 0.30 0.40
33 infiltration (i), I =31 x if mm/month 9.30 15.50 11.75 15.50 12.40 15.50 15.50 9.30 12.40 9.30 9.30 12.40 148.15
34 Month flow Recession Constant (K) 1.00 1.00 1.00 1.00 1.00 1.00 0.88 0.85 0.90 0.99 0.95 0.80
35 Percentage Factor (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 1/2 x (1 + K) i 9.30 15.50 11.75 15.50 12.40 15.50 14.57 8.60 11.78 9.25 9.07 11.16
37 K xGsom, Gsom = 229,14 229.14 229.14 229.14 229.14 229.14 229.14 229.14 201.64 194.77 206.23 226.85 217.68 183.31
38 GS = 36 + 37 mm/month 238.44 244.64 240.89 244.64 241.54 244.64 216.21 203.37 218.01 236.10 226.75 194.47
39 ∆GS = GS - Gsom mm/month 9.30 15.50 11.75 15.50 12.40 15.50 -12.93 -25.77 -11.13 6.96 -2.39 -34.67 0.02
40 Base Flow , BF = I -∆GS mm/month 0.00 0.00 0.00 0.00 0.00 0.00 28.43 35.07 23.53 2.34 11.69 47.07 148.12
41 Direct Run Off, DRO = WS - i mm/month 298.19 315.49 369.63 365.98 251.55 55.97 19.33 36.92 61.56 157.66 399.13 439.91
42 Storm Run Off, if P≥200, SRO =0 ; SRO mm/month 0.00 0.00 0.00 0.00 0.00 10.07 6.36 7.54 10.34 19.66 0.00 0.00
43 Total Run Off (TRO)=BF+DRO+SRO mm/month 298.19 315.49 369.63 365.98 251.55 66.04 54.12 79.53 95.43 179.66 410.82 486.98
44 catchment Area km2 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69
45 Stream Flow ( calculated discharge )mm/month 536 627 664 679 452 123 97 143 177 323 763 875 5458
WATER BALANCE CALCULATION YEAR 2001
MONTH
NO PARAMETER UNITY YEAR
JAN FEB MAR APR MEI JUN JUL AGUST SEP OKT NOP DES
Meteorogical Data
1 catchment prepetition (P) mm/month 420.65 324.75 422.74 339.16 64.13 180.29 116.47 38.21 117.15 187.93 373.79 171.30 2756.57
2 catchment raindays (n) days 26 28 27 23 14 15 13 8 19 19 23 13
3 days of month (Hr) days 31 28 31 30 31 30 31 31 30 31 30 31
4 temperatur (T) C 28.28 28.61 29.03 28.76 29.05 28.63 28.32 28.58 28.72 28.86 29.01 28.98
5 sunshine (S) % 46.19 46.64 54.18 64.73 74.00 69.45 71.45 79.82 79.64 62.09 53.18 50.18
6 Relative HUmidity (H) % 86.36 85.82 84.45 83.55 81.55 80.45 76.91 71.73 71.64 75.73 81.82 83.91
7 Wind Speed (w) mile/day 3.50 3.69 3.20 3.20 3.20 3.20 3.60 4.00 3.70 3.40 3.20 3.30
Potensial Evapotranpiration (Ep)
8 Solar Radiation ( R ) mm/day 14.57 15.07 15.27 14.77 13.97 13.47 13.57 14.27 14.97 15.07 14.67 14.37
9A mmHg/F 0.92 0.93 0.95 0.94 0.96 0.95 0.93 0.94 0.95 0.96 0.96 0.96
10 B mmH2O/day 16.66 16.72 16.81 16.75 16.96 16.86 16.78 16.85 16.88 16.91 16.95 16.95
11 ea mmHg 28.39 28.86 29.44 29.06 29.92 29.28 28.79 29.21 29.41 29.63 29.87 29.82
12 ed = H*ea mmHg 24.52 24.77 24.87 24.28 24.40 23.55 22.14 20.95 21.07 22.44 24.44 25.03
13 F1 ( T;S)=A*(0,18+(0,55*S))/(A+0,27) 0.34 0.34 0.37 0.42 0.46 0.44 0.44 0.48 0.48 0.41 0.37 0.36
14 F2 (T;H)=A*B(0,56-(0,092)ed^0,5)))/(A+0,27) 1.34 1.32 1.32 1.39 1.40 1.49 1.65 1.82 1.81 1.64 1.39 1.32
15 F3(T;H)=0,27*0,36(ea-ed)/(A+0,27) 0.32 0.33 0.37 0.39 0.43 0.46 0.54 0.66 0.66 0.57 0.43 0.38
16 reflection coeficient ( r ) 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
17 E1=F1(1-r)R 3.66 3.82 4.26 4.61 4.81 4.42 4.52 5.15 5.40 4.60 4.06 3.84
18 E2=F2(0,1+(0,9*S)) 0.69 0.69 0.78 0.95 1.07 1.08 1.23 1.49 1.48 1.08 0.81 0.73
19 E3=F3(K+o,o1w) ; k=1 0.33 0.34 0.38 0.40 0.45 0.47 0.56 0.69 0.69 0.59 0.44 0.39
20 Ep=E1-E2+E3 mm/day 3.30 3.48 3.86 4.06 4.18 3.81 3.85 4.35 4.61 4.11 3.70 3.50
21 Epm= Hr x Ep mm/month 102.28 97.42 119.64 121.78 129.66 114.29 119.35 134.84 138.42 127.29 110.89 108.51
Limited Evapotranspirasi (Ea)
22 Exposed Surface (m) % 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00
23 Number of rain days (n) days 26.00 28.00 27.00 23.00 14.00 15.00 13.00 8.00 19.00 19.00 23.00 13.00
24 ∆E/Epm=(m/20)(18-n) % -18.00 -22.50 -20.25 -11.25 9.00 6.75 11.25 22.50 -2.25 -2.25 -11.25 11.25
25 ∆E = (∆E/Epm)*(Epm/100) mm/month -18.41 -21.92 -24.23 -13.70 11.67 7.71 13.43 30.34 -3.11 -2.86 -12.48 12.21
26 E actual=Epm - ∆E mm/month 120.70 119.34 143.87 135.48 117.99 106.58 105.92 104.50 141.53 130.16 123.36 96.30 ###
Water Surplus (WS)
27 P - Ea mm/month 392.26 295.89 393.29 310.11 34.21 151.01 87.68 9.01 87.74 158.30 343.92 141.48
28 SMS=ISMS + (P-Ea) mm/month 592.26 495.89 593.29 510.11 234.21 351.01 287.68 209.01 287.74 358.30 543.92 341.48
29 Soil moisture Capacity(SMC), ; ISMC=20 mm/month 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00
30 Soil storage (SS),if P-Ea≥0 ,SS=0 mm/month 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
31 Water Surplus (WS), WS=27+30 mm/month 392.26 295.89 393.29 310.11 34.21 151.01 87.68 9.01 87.74 158.30 343.92 141.48
Total Run Off (TRO)
32 infiltration Coefficien (if) 0.30 0.50 0.38 0.50 0.40 0.50 0.50 0.30 0.40 0.30 0.30 0.40
33 infiltration (i), I =31 x if mm/month 9.30 15.50 11.75 15.50 12.40 15.50 15.50 9.30 12.40 9.30 9.30 12.40 148.15
34 Month flow Recession Constant (K) 1.00 1.00 1.00 1.00 1.00 1.00 0.88 0.85 0.90 0.99 0.95 0.80
35 Percentage Factor (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 1/2 x (1 + K) i 9.30 15.50 11.75 15.50 12.40 15.50 14.57 8.60 11.78 9.25 9.07 11.16
37 K xGsom, Gsom = 229,14 229.14 229.14 229.14 229.14 229.14 229.14 229.14 201.64 194.77 206.23 226.85 217.68 183.31
38 GS = 36 + 37 mm/month 238.44 244.64 240.89 244.64 241.54 244.64 216.21 203.37 218.01 236.10 226.75 194.47
39 ∆GS = GS - Gsom mm/month 9.30 15.50 11.75 15.50 12.40 15.50 -12.93 -25.77 -11.13 6.96 -2.39 -34.67 0.02
40 Base Flow , BF = I -∆GS mm/month 0.00 0.00 0.00 0.00 0.00 0.00 28.43 35.07 23.53 2.34 11.69 47.07 148.12
41 Direct Run Off, DRO = WS - i mm/month 382.96 280.39 381.55 294.61 21.81 135.51 72.18 -0.29 75.34 149.00 334.62 129.08
42 Storm Run Off, if P≥200, SRO =0 ; SRO mm/month 0.00 0.00 0.00 0.00 6.41 18.03 11.65 3.82 11.72 18.79 0.00 17.13
43 Total Run Off (TRO)=BF+DRO+SRO mm/month 382.96 280.39 381.55 294.61 28.22 153.54 112.25 38.60 110.59 170.13 346.31 193.27
44 catchment Area km2 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69
45 Stream Flow ( calculated discharge )mm/month 688 558 685 547 51 285 202 69 205 306 643 347 4585
WATER BALANCE CALCULATION YEAR 2002
MONTH
NO PARAMETER UNITY YEAR
JAN FEB MAR APR MEI JUN JUL AGUST SEP OKT NOP DES
Meteorogical Data
1 catchment prepetition (P) mm/month 646.26 350.39 557.59 289.29 159.48 78.40 171.27 58.79 24.89 51.98 387.34 511.36 3287.04
2 catchment raindays (n) days 27 27 26 23 15 8 13 5 5 11 24 24
3 days of month (Hr) days 31 28 31 30 31 30 31 31 30 31 30 31
4 temperatur (T) C 28.28 28.61 29.03 28.76 29.05 28.63 28.32 28.58 28.72 28.86 29.01 28.98
5 sunshine (S) % 46.19 46.64 54.18 64.73 74.00 69.45 71.45 79.82 79.64 62.09 53.18 50.18
6 Relative HUmidity (H) % 86.36 85.82 84.45 83.55 81.55 80.45 76.91 71.73 71.64 75.73 81.82 83.91
7 Wind Speed (w) mile/day 3.50 3.69 3.20 3.20 3.20 3.20 3.60 4.00 3.70 3.40 3.20 3.30
Potensial Evapotranpiration (Ep)
8 Solar Radiation ( R ) mm/day 14.57 15.07 15.27 14.77 13.97 13.47 13.57 14.27 14.97 15.07 14.67 14.37
9A mmHg/F 0.92 0.93 0.95 0.94 0.96 0.95 0.93 0.94 0.95 0.96 0.96 0.96
10 B mmH2O/day 16.66 16.72 16.81 16.75 16.96 16.86 16.78 16.85 16.88 16.91 16.95 16.95
11 ea mmHg 28.39 28.86 29.44 29.06 29.92 29.28 28.79 29.21 29.41 29.63 29.87 29.82
12 ed = H*ea mmHg 24.52 24.77 24.87 24.28 24.40 23.55 22.14 20.95 21.07 22.44 24.44 25.03
13 F1 ( T;S)=A*(0,18+(0,55*S))/(A+0,27) 0.34 0.34 0.37 0.42 0.46 0.44 0.44 0.48 0.48 0.41 0.37 0.36
14 F2 (T;H)=A*B(0,56-(0,092)ed^0,5)))/(A+0,27) 1.34 1.32 1.32 1.39 1.40 1.49 1.65 1.82 1.81 1.64 1.39 1.32
15 F3(T;H)=0,27*0,36(ea-ed)/(A+0,27) 0.32 0.33 0.37 0.39 0.43 0.46 0.54 0.66 0.66 0.57 0.43 0.38
16 reflection coeficient ( r ) 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
17 E1=F1(1-r)R 3.66 3.82 4.26 4.61 4.81 4.42 4.52 5.15 5.40 4.60 4.06 3.84
18 E2=F2(0,1+(0,9*S)) 0.69 0.69 0.78 0.95 1.07 1.08 1.23 1.49 1.48 1.08 0.81 0.73
19 E3=F3(K+o,o1w) ; k=1 0.33 0.34 0.38 0.40 0.45 0.47 0.56 0.69 0.69 0.59 0.44 0.39
20 Ep=E1-E2+E3 mm/day 3.30 3.48 3.86 4.06 4.18 3.81 3.85 4.35 4.61 4.11 3.70 3.50
21 Epm= Hr x Ep mm/month 102.28 97.42 119.64 121.78 129.66 114.29 119.35 134.84 138.42 127.29 110.89 108.51
Limited Evapotranspirasi (Ea)
22 Exposed Surface (m) % 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00
23 Number of rain days (n) days 27.00 27.00 26.00 23.00 15.00 8.00 13.00 5.00 5.00 11.00 24.00 24.00
24 ∆E/Epm=(m/20)(18-n) % -20.25 -20.25 -18.00 -11.25 6.75 22.50 11.25 29.25 29.25 15.75 -13.50 -13.50
25 ∆E = (∆E/Epm)*(Epm/100) mm/month -20.71 -19.73 -21.54 -13.70 8.75 25.72 13.43 39.44 40.49 20.05 -14.97 -14.65
26 E actual=Epm - ∆E mm/month 123.00 117.15 141.17 135.48 120.90 88.57 105.92 95.40 97.93 107.24 125.86 123.16 ###
Water Surplus (WS)
27 P - Ea mm/month 617.87 321.53 528.15 260.23 129.56 49.13 142.48 29.58 -4.52 22.35 357.47 481.53
28 SMS=ISMS + (P-Ea) mm/month 817.87 521.53 728.15 460.23 329.56 249.13 342.48 229.58 195.48 222.35 557.47 681.53
29 Soil moisture Capacity(SMC), ; ISMC=20 mm/month 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 195.48 200.00 200.00 200.00
30 Soil storage (SS),if P-Ea≥0 ,SS=0 mm/month 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.52 0.00 0.00 0.00
31 Water Surplus (WS), WS=27+30 mm/month 617.87 321.53 528.15 260.23 129.56 49.13 142.48 29.58 0.00 22.35 357.47 481.53
Total Run Off (TRO)
32 infiltration Coefficien (if) 0.30 0.50 0.38 0.50 0.40 0.50 0.50 0.30 0.40 0.30 0.30 0.40
33 infiltration (i), I =31 x if mm/month 9.30 15.50 11.75 15.50 12.40 15.50 15.50 9.30 12.40 9.30 9.30 12.40 148.15
34 Month flow Recession Constant (K) 1.00 1.00 1.00 1.00 1.00 1.00 0.88 0.85 0.90 0.99 0.95 0.80
35 Percentage Factor (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 1/2 x (1 + K) i 9.30 15.50 11.75 15.50 12.40 15.50 14.57 8.60 11.78 9.25 9.07 11.16
37 K xGsom, Gsom = 229,14 229.14 229.14 229.14 229.14 229.14 229.14 229.14 201.64 194.77 206.23 226.85 217.68 183.31
38 GS = 36 + 37 mm/month 238.44 244.64 240.89 244.64 241.54 244.64 216.21 203.37 218.01 236.10 226.75 194.47
39 ∆GS = GS - Gsom mm/month 9.30 15.50 11.75 15.50 12.40 15.50 -12.93 -25.77 -11.13 6.96 -2.39 -34.67 0.02
40 Base Flow , BF = I -∆GS mm/month 0.00 0.00 0.00 0.00 0.00 0.00 28.43 35.07 23.53 2.34 11.69 47.07 148.12
41 Direct Run Off, DRO = WS - i mm/month 608.57 306.03 516.40 244.73 117.16 33.63 126.98 20.28 -12.40 13.05 348.17 469.13
42 Storm Run Off, if P≥200, SRO =0 ; SRO mm/month 0.00 0.00 0.00 0.00 15.95 7.84 17.13 5.88 2.49 5.20 0.00 0.00
43 Total Run Off (TRO)=BF+DRO+SRO mm/month 608.57 306.03 516.40 244.73 133.11 41.47 172.53 61.23 13.62 20.58 359.86 516.20
44 catchment Area km2 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69
45 Stream Flow ( calculated discharge )mm/month 1093 609 928 454 239 77 310 110 25 37 668 927 5477
WATER BALANCE CALCULATION YEAR 2003
MONTH
NO PARAMETER UNITY YEAR
JAN FEB MAR APR MEI JUN JUL AGUST SEP OKT NOP DES
Meteorogical Data
1 catchment prepetition (P) mm/month 283.94 283.92 236.45 203.19 176.09 18.74 0.00 6.52 53.96 91.73 340.22 527.31 2222.07
2 catchment raindays (n) days 26 21 23 21 15 4 0 3 4 14 22 26
3 days of month (Hr) days 31 28 31 30 31 30 31 31 30 31 30 31
4 temperatur (T) C 28.46 27.90 28.70 27.88 28.41 28.00 28.97 29.00 29.14 29.62 29.67 29.76
5 sunshine (S) % 42.80 47.00 48.00 47.00 60.00 65.00 56.00 61.00 72.00 71.00 59.00 54.00
6 Relative HUmidity (H) % 87.00 88.00 84.00 82.00 80.00 75.00 75.00 66.00 61.00 58.00 72.00 82.00
7 Wind Speed (w) mile/day 4.00 1.89 1.64 1.64 1.64 1.64 1.85 2.06 1.90 1.75 1.64 1.70
Potensial Evapotranpiration (Ep)
8 Solar Radiation ( R ) mm/day 14.57 15.07 15.27 14.77 13.97 13.47 13.57 14.27 14.97 15.07 14.67 14.37
9A mmHg/F 0.92 0.93 0.95 0.94 0.96 0.95 0.93 0.94 0.95 0.96 0.96 0.96
10 B mmH2O/day 16.66 16.72 16.81 16.75 16.96 16.86 16.78 16.85 16.88 16.91 16.95 16.95
11 ea mmHg 28.39 28.86 29.44 29.06 29.92 29.28 28.79 29.21 29.41 29.63 29.87 29.82
12 ed = H*ea mmHg 24.70 25.39 24.73 23.83 23.94 21.96 21.59 19.28 17.94 17.18 21.51 24.46
13 F1 ( T;S)=A*(0,18+(0,55*S))/(A+0,27) 0.32 0.34 0.35 0.34 0.40 0.42 0.38 0.40 0.45 0.44 0.39 0.37
14 F2 (T;H)=A*B(0,56-(0,092)ed^0,5)))/(A+0,27) 1.32 1.25 1.34 1.44 1.46 1.69 1.72 2.04 2.24 2.36 1.77 1.39
15 F3(T;H)=0,27*0,36(ea-ed)/(A+0,27) 0.30 0.28 0.38 0.42 0.47 0.59 0.58 0.80 0.91 0.99 0.66 0.42
16 reflection coeficient ( r ) 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
17 E1=F1(1-r)R 3.51 3.84 3.96 3.77 4.17 4.22 3.85 4.29 5.04 5.03 4.34 4.01
18 E2=F2(0,1+(0,9*S)) 0.64 0.65 0.71 0.75 0.93 1.16 1.04 1.33 1.67 1.74 1.11 0.81
19 E3=F3(K+o,o1w) ; k=1 0.31 0.29 0.38 0.43 0.48 0.59 0.59 0.81 0.93 1.00 0.67 0.43
20 Ep=E1-E2+E3 mm/day 3.18 3.47 3.63 3.44 3.72 3.66 3.40 3.77 4.29 4.29 3.89 3.63
21 Epm= Hr x Ep mm/month 98.57 97.27 112.42 103.33 115.38 109.83 105.48 117.01 128.78 133.01 116.74 112.54
Limited Evapotranspirasi (Ea)
22 Exposed Surface (m) % 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00
23 Number of rain days (n) days 26.00 21.00 23.00 21.00 15.00 4.00 0.00 3.00 4.00 14.00 22.00 26.00
24 ∆E/Epm=(m/20)(18-n) % -18.00 -6.75 -11.25 -6.75 6.75 31.50 40.50 33.75 31.50 9.00 -9.00 -18.00
25 ∆E = (∆E/Epm)*(Epm/100) mm/month -17.74 -6.57 -12.65 -6.97 7.79 34.60 42.72 39.49 40.57 11.97 -10.51 -20.26
26 E actual=Epm - ∆E mm/month 116.31 103.83 125.07 110.31 107.59 75.24 62.76 77.52 88.22 121.04 127.25 132.80 ###
Water Surplus (WS)
27 P - Ea mm/month 255.55 255.07 207.01 174.13 146.17 -10.53 -28.79 -22.69 24.54 62.10 310.35 497.49
28 SMS=ISMS + (P-Ea) mm/month 455.55 455.07 407.01 374.13 346.17 189.47 171.21 177.31 224.54 262.10 510.35 697.49
29 Soil moisture Capacity(SMC), ; ISMC=20 mm/month 200.00 200.00 200.00 200.00 200.00 189.47 171.21 177.31 200.00 200.00 200.00 200.00
30 Soil storage (SS),if P-Ea≥0 ,SS=0 mm/month 0.00 0.00 0.00 0.00 0.00 10.53 28.79 22.69 0.00 0.00 0.00 0.00
31 Water Surplus (WS), WS=27+30 mm/month 255.55 255.07 207.01 174.13 146.17 0.00 0.00 0.00 24.54 62.10 310.35 497.49
Total Run Off (TRO)
32 infiltration Coefficien (if) 0.30 0.50 0.38 0.50 0.40 0.50 0.50 0.30 0.40 0.30 0.30 0.40
33 infiltration (i), I =31 x if mm/month 9.30 15.50 11.75 15.50 12.40 15.50 15.50 9.30 12.40 9.30 9.30 12.40 148.15
34 Month flow Recession Constant (K) 1.00 1.00 1.00 1.00 1.00 1.00 0.88 0.85 0.90 0.99 0.95 0.80
35 Percentage Factor (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 1/2 x (1 + K) i 9.30 15.50 11.75 15.50 12.40 15.50 14.57 8.60 11.78 9.25 9.07 11.16
37 K xGsom, Gsom = 229,14 229.14 229.14 229.14 229.14 229.14 229.14 229.14 201.64 194.77 206.23 226.85 217.68 183.31
38 GS = 36 + 37 mm/month 238.44 244.64 240.89 244.64 241.54 244.64 216.21 203.37 218.01 236.10 226.75 194.47
39 ∆GS = GS - Gsom mm/month 9.30 15.50 11.75 15.50 12.40 15.50 -12.93 -25.77 -11.13 6.96 -2.39 -34.67 0.02
40 Base Flow , BF = I -∆GS mm/month 0.00 0.00 0.00 0.00 0.00 0.00 28.43 35.07 23.53 2.34 11.69 47.07 148.12
41 Direct Run Off, DRO = WS - i mm/month 246.25 239.57 195.26 158.63 133.77 -15.50 -15.50 -9.30 12.14 52.80 301.05 485.09
42 Storm Run Off, if P≥200, SRO =0 ; SRO mm/month 0.00 0.00 0.00 0.00 17.61 1.87 0.00 0.65 5.40 9.17 0.00 0.00
43 Total Run Off (TRO)=BF+DRO+SRO mm/month 246.25 239.57 195.26 158.63 151.38 -13.63 12.93 26.42 41.07 64.31 312.73 532.16
44 catchment Area km2 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69 55.69
45 Stream Flow ( calculated discharge )mm/month 442 476 351 294 272 -25 23 47 76 116 580 956 3609