You are on page 1of 1
Hydraulic calculation Road Name: NHSOA, District, Betul e arda Location = Chikm + Span arrangement 4X 10.00 1 Discharge: 2) Discharge from catchment area Dicken's Discharge a = CxM™ —asper SP-13-2004 Clause 42 (Clause 4.2 of $P-13-2004,C Where c 1411-44 where the annual rainfalls ‘more than to 120 om) Catchment Area at Site’M = = $0226), GaKin Gorman ty Q xu Q (14x (10.226)°3/4) a . 80.06 miisec »b) Discharge By Area -Velocity Method (Cross section considered as per SP-13-2004 Clause 3.3(Table-3.1) Velocity HL | Avg flow Section imaisec) OWmsisec) | (sec) | (in Meter) | depth ‘AProposed ste | 176620 Tz wze0_| 235 2 Max discharge from Dickens formula 8006 maisee b Max discharge from area velocity method 178.62 m/sec © Max discharge from Rational formula 146.18 maisec max discharge - 17862 itso Discharge a av A ov Natural inear water way = Lxo aw i‘ = aK) 17741,5242.38) 2 Linear water way required 49.409 M Provide 4 Span of 10.00 m (total length of bridge ~40.00m) Calculation for design velocity - ‘The length of bridge proposed 40m ‘The average flow depth below HF L 2346 M No of piers proposed 3 Nos Thickness of proposed pier 1om With of Abutment in flow area 10M Thus Clear water way avilablo (40-3K1- 2x1) 35M ‘Thus the design velocity A v (176.62y(35x2.35) v 2.18 WiSec The Design velocity 2.48 misec

You might also like