where:
zo,II = 0.05m (terrain category II, table 4.1)
zmin is the minimum height defined in table 4.1
zo is the roughness length
zmax is taken to be 200m
5. Determine cr(z)
6. Determine vm(z)
7. Determine lv(z)
8. Determine qp(z)
The internal pressure coefficient depends on the size and distribution of the openings in the building envelope
When is not possible to estimate the permeability and opening ratio of the building, cpi should be taken as
the most onerous of +0.2 and -0.3.
11. Calculate internal and external pressures (unless using a net pressure coefficient)