Kontrol overlapping

Vr = 100 x 1000
3600
= 27.7777777778 m/det

d' = 27.77777778 x 3
= 83.333 m

d1 (P6-P0) = 840 - 0
= 840 > 83.333 (aman)
d2 (P20-P8) = 2172 - 1217
= 955 > 83.333 (aman)
d3 (P25-P22) = 2793 - 2573
= 220 > 83.333 (aman)

CEMBUNG

CEKUNG
PERENCANAAN ALYNEMEN VERTIKAL
Berdasarkan data yang diperoleh dan hasil dari gambar profil memanjang diperoleh hasil
A.

No Elevasi
Titik STA Gradien
Patok Tanah Asli

P0 0 310.000
-1.732
P1 110 308.095
-2.470
P2 210 305.625
-7.031
P3 290 300.000
-20.000
P4 340 290.000
-20.000
P5 390 280.000
-12.500
P6 460 271.250
1.389
P7 490 271.667
9.259
P8 PVI.1 580 280.000
8.125
P9 PVI.2 756 288.125
-2.592
P10 PVI.3 931 283.571
-5.102
P11 1001 280.000
-9.091
P12 PVI.4 1111 270.000
0.000
P13 PVI.5 1281 270.000
9.142
P14 PVI.6 1514 291.250
-0.538
P15 1746 290.000
-5.000
P16 1846 285.000
-4.545
P17 1956 280.000
-5.263
P18 2146 270.000
-6.250
P19 2306 260.000
-5.000
P20 2506 250.000
-3.167
P21 2676 244.615
-3.297
P22 2816 240.000
-5.000
P23 2856 238.000
-5.443
P24 3111 224.118
-7.044
P25 3366 206.154
-5.594
P26 3476 200.000
-5.229
P27 3566 195.294
-5.294
P28 3666 190.000
-5.833
P29 3746 185.333
-4.848
P30 3856 180.000
-10.000
P31 3956 170.000
-7.692
P32 4086 160.000
PVI.1
g1 = 8.125
g2 = -2.592
Perbedaan aljabar landai (A)
A = -2.592 - 8.125
= -10.717 % ( CEMBUNG) GAMBAR NYA DIBAWAH TERBALIK
Jh = 0.694 x 80 +
= 150.775814 m
- Perhitungan panjang lengkung vertikal
Berdasarkan grafik V,untuk A = 10.717% dan Vr= 80Km/Jam didapat :
Lv = 380 m
Berdasarkan syarat keluwesan
Lv = 0.6 x 80
= 48 m
Berdasarkan syarat drainase :
Lv = 40 x -10.717
= 428.687291778 m
Berdasarkan syarat kenyamanan
6400 x -10.717
Lv =
360
= 190.527685235 m
Diambil nilai terbesar yaitu Lv :
Cek syarat ; Jh < Lv 150.7758139535 <

Ev = -10.717 x 428.6872918
800
= -5.7428998166 m
X = 0.25 x 428.6872918
= 107.171822945 m
Y = -10.717 x 11485.79963
85737.4583556597
= -1.4357249542 m
Perhitungan stasiun dan elevasi rencana lengkung vertikal :
Data Lengkung PVI.1
stasiun = 756
Elevasi = 288.125 m
Ev = -5.7428998166 m
Stasiun dan elevasi rencana jalan pada PVI.1 asalah sbb :
Titik PLV : STA = 756
= 541.3219096664
=
ELEV = 288.125
= 270.710
Titik A STA = 756
= 648.4937326
=
ELEV = 288.125
= 277.982

Titik PVI STA = 756


ELEV = 288.125
= 282.382
Titik B STA = 756
= 862.8373785
=
ELEV = 288.125
= 285.555
Titik PTV STA = 756
= 970.0092014
=
ELV = 288.125
= 282.569

Lv: 245m

123m 123m

PLV

A B
0.254
g1=-3.738% 1.0147

PVL

Sta. 2+142,641 Sta. 2+203,89 Sta. 2+265,141 Sta. 2+326,4


Elv. 205.089 m Elv. 203.053 m Elv. 201.525m Elv. 203.053 m

Gambar 1.3 Lengkung Vertikal PVI.1 (cekung)


B. PVI.2
g1 = 0.000
g2 = 9.142
Perbedaan aljabar landai (A)
A = 9.142 - 0.000
= 9.142 % ( CEKUNG)
0.004 x 6400 / 0.35 - 0.08125 Jh = 0.694 x 60
= 88.0916129 m
- Perhitungan panjang lengkung vertikal
Berdasarkan grafik V,untuk A = 9.142 dan Vr=60Km/Jam did
Lv = 258 m
Berdasarkan syarat keluwesan
Lv = 0.6 x
= 36 m
Berdasarkan syarat drainase :
Lv = 40 x
= 365.674406 m
Berdasarkan syarat kenyamanan
3600 x
Lv =
360
= 91.4186016 m
428.6872918 m Diambil nilai terbesar yaitu Lv :
428.6872918 ……………(ok) Cek syarat ; Jh < Lv 88.0916129

Ev = 9.142 x
800
= 4.17868036 m
X = 0.25 x
= 91.4186016 m
Y = 9.142 x
73134.8812753194
= 1.04467009 m
Perhitungan stasiun dan elevasi rencana lengkung vertikal :
Data Lengkung PVI.1
stasiun = 1281
Elevasi = 270.000
Ev = 4.17868036
Stasiun dan elevasi rencana jalan pada PVI.2 asalah sbb :
- 214.344 Titik PLV : STA =
41.3219096664 =
=
+ -17.4154 ELEV =
m =
- 107.172 Titik A STA =
=
=
- 8.70771 + -1.436 ELEV =
m =

Titik PVI STA =


+ -5.7429 ELEV =
m =
+ 107.172 Titik B STA =
=
=
- 4.00608 - -1.436 ELEV =
=
+ 214.344 Titik PTV STA =
=
=
+ -5.55618 ELV =
=

100m
123m

PTV A
g1=-0.425% 0.63

B PLV
g2=-0.425%

Sta. 2+326,4 Sta. 2+387,64


Elv. 203.053 m Elv. 201.031 m Sta. 2+285.246 Sta. 2+335.246 Sta. 2+385.246
Elv. 199.575 m Elv. 199.946m Elv. 200.636 m
kal PVI.1 (cekung) Gambar 1.4 Lengkun
C. PVI.3
g1 = 4.000
g2 = 0.000
Perbedaan aljabar landai (A)
A = 0.000 -
= -4.000 %
+ 0.004 x 3600 / 0.35 - 0.04 Jh = 0.694 x
= 198.43 m
- Perhitungan panjang lengkung vertika
142 dan Vr=60Km/Jam didapat : Berdasarkan grafik V,untuk A = -5.143
Lv = 300
Berdasarkan syarat keluwesan
60 Lv = 0.6
= 60
Berdasarkan syarat drainase :
9.142 Lv = 40
= -160
Berdasarkan syarat kenyamanan
9.142 10000
Lv =
360 360
= -111.1111
365.674406 m Diambil nilai terbesar yaitu Lv :
< 365.674406 ……………(ok) Cek syarat ; Jh < Lv

365.674406 Ev = -4.000
800 800
= -1.5
365.674406 X = 0.25
= 75
8357.36072 Y = -4.000
4.8812753194 60000
= -0.375
Perhitungan stasiun dan elevasi renca
Data Lengkung PVI.1
stasiun =
m Elevasi =
m Ev =
Stasiun dan elevasi rencana jalan pada
1281 - 182.8372031883 Titik PLV : STA
1098.49391

270.000 - 0 ELEV
270.000 m
1281 - 91 Titik A STA
1189.91251

270.000 - 0 - 1.0447 ELEV


268.955 m

1281 Titik PVI STA


270.000 - 4.1786803587 ELEV
265.821 m
1281 + 91.4186016 Titik B STA
1372.74971

270.000 - 0 - 1.0447 ELEV


268.955
1281 + 182.8372031883 Titik PTV STA
1464.16831

270.000 + 16.7147214349 ELV


286.715
200m

100m
196
m
PVL

B
0.63 g1=-2.967% g1=-2.967%
PTV
PLV

5.246 Sta. 2+385.246 Sta. 2+435.246 Sta. 2+485.246 Sta. 2+392.441


46m Sta. 2+294.316
Elv. 200.636 m Elv. 199.946 m Elv. 197.033 m Elv. 193.333 m
Elv. 191.052 m
Gambar 1.4 Lengkung Vertikal PVI.2 (cembung) Gambar
D. PVI.4
g1 = 0.000
g2 = -1.940
r landai (A) Perbedaan aljabar landai (A)
4.000 A = -1.940 -
( cekung) = -1.940 %
100 + 0.004 x 10000 / 0.35 - 0.04 Jh = 0.694 x
= 183.686 m
panjang lengkung vertikal - Perhitungan panjang lengkung vertikal
grafik V,untuk A = -5.143% dan Vr=100Km/Jam didapat : Berdasarkan grafik V,untuk A = -5.110%
m Lv = 130
syarat keluwesan Berdasarkan syarat keluwesan
x 100 Lv = 0.6
m = 60
syarat drainase : Berdasarkan syarat drainase :
x -4.000 Lv = 40
m = -77.6
syarat kenyamanan Berdasarkan syarat kenyamanan
x -4.000 10000
Lv =
360 360
m = -53.8889
terbesar yaitu Lv : 300 m Diambil nilai terbesar yaitu Lv :
198.432 < 300
……………(ok) Cek syarat ; Jh < Lv

x 300 Ev = -1.940
800 800
m = -1.39713
x 300 X = 0.25
m = 144.0336
x 5625.000 Y = -1.940
60000 115226.863033873
m = -0.34928
stasiun dan elevasi rencana lengkung vertikal : Perhitungan stasiun dan elevasi rencana
Data Lengkung PVI.1
2676 stasiun =
270.000 m Elevasi =
-1.5 m Ev =
elevasi rencana jalan pada PVI.3 asalah sbb : Stasiun dan elevasi rencana jalan pada P
= 2676 - 150 Titik PLV : STA
= 2340.566
= 2+294.316
= 270.000 - 4.4505 ELEV
= 265.550 m
= 2676 - 75 Titik A STA
= 2415.566
= 2+392.441
= 270.000 - 2.22525 + -0.375 ELEV
= 267.400 m

= 2676 Titik PVI STA


= 270.000 + -1.5 ELEV
= 268.500 m
= 2676 + 75 Titik B STA
= 2565.566
= 2+588.691
= 270.000 - 2.22525 + -0.375 ELEV
= 267.400
= 2676 + 150 Titik PTV STA
= 2640.566
= 2+686.816
= 270.000 + -12.165 ELV
= 257.835

392.5
m 195
196 196 m
m m
PVL
A
A B g1=-8.110%
g1=-2.967% 0.63 g1=-8.11%
PLV
PTV

Sta. 2+400.887 Sta. 2+498.387


Sta. 2+392.441 Sta. 2+490.566 Sta. 2+588.691 Sta. 2+686.816 Elv. 172.519 m Elv. 179.803m
Elv. 193.333 m Elv. 194.352m Elv. 193.333 m Elv. 180.959 m
Gambar 1.5 Lengkung Vertikal PVI.3 (cekung) Gambar 1.6 Leng
E. PVL 5
g1 = -1.940
g2 = -9.280
r landai (A) Perbedaan aljabar landai (A)
0.000 A = -9.280 - -1.940
Cekung = -7.340 % ( CEKUNG)
100 + 0.004 x 10000 / 0.35 - 0 Jh = 0.694 x 100
= 190.3921 m
panjang lengkung vertikal - Perhitungan panjang lengkung vertikal
grafik V,untuk A = -5.110% dan Vr=100Km/Jam didapat : Berdasarkan grafik V,untuk A = 2.955% dan Vr
m Lv = 550 m
syarat keluwesan Berdasarkan syarat keluwesan
x 100 Lv = 0.6 x
m = 60 m
syarat drainase : Berdasarkan syarat drainase :
x -1.940 Lv = 40 x
m = -293.6 m
syarat kenyamanan Berdasarkan syarat kenyamanan
x -1.940 10000 x
Lv =
360 360
m = -203.9 m
terbesar yaitu Lv : 576.13 m Diambil nilai terbesar yaitu Lv :
183.6857 < 576.13 ……………(ok) Cek syarat ; Jh < Lv 190.3921

x 576.13432 Ev = -7.340 x
800 800
m = -5.046 m
x 576.13432 X = 0.25 x
m = 137.5 m
x 20745.672 Y = -7.340 x
115226.863033873 110000
m = -1.262 m
stasiun dan elevasi rencana lengkung vertikal : Perhitungan stasiun dan elevasi rencana leng
Data Lengkung PVI.1
2816 stasiun = 2856
270.000 m Elevasi = 266.500
-1.39713 m Ev = -5.04625
elevasi rencana jalan pada PVI.1 asalah sbb : Stasiun dan elevasi rencana jalan pada PVI.1 a
= 2816 - 288.067 Titik PLV : STA =
= 2307.8198 =
= 2+400.887 =
= 270.000 + -23.3622 ELEV =
= 246.638 m =
= 2816 - 144.034 Titik A STA =
= 2451.8534 =
= 2+498.387 =
= 270.000 + -11.6811 + -0.35 ELEV =
= 257.970 m =

= 2816 Titik PVI STA =


= 270.000 + -1.39713 ELEV =
= 268.603 m =
= 2816 + 144.034 Titik B STA =
= 2739.9206 =
= 2+693.387 =
= 270.000 + -11.6811 + -0.35 ELEV =
= 257.970 =
= 2816 + 288.067 Titik PTV STA =
= 2883.9542 =
= 2+790.887 =
= 270.000 + -38.0825 ELV =
= 231.918 =
390
m
195 195
m m
PVL
90m
A B
1=-8.110% 0.623 g1=-13.220% PLV
PTV
A
0.254
g1=-13.220%

Sta. 2+498.387 Sta. 2+595.887 Sta. 2+693.387 Sta. 2+790.887 Sta. 2+499.637 Sta. 2+597.762
Elv. 179.803m Elv. 185.842 m Elv. 179.803 m Elv. 162.554 m Elv. 187.012 m Elv. 181.229 m

Gambar 1.6 Lengkung Vertikal PVI.4 (cembung) Gambar 1.7 Leng


F. PVL 6
g1 = -9.280
g2 = -4.875
Perbedaan aljabar landai (A)
A = -4.875 - -9.280
( CEKUNG) = 4.405 % Cembung
+ 0.004 x 10000 / 0.35 - 0.0194 Jh = 0.694 x 100
= 202.18008 m
lengkung vertikal - Perhitungan panjang lengkung vertikal
untuk A = 2.955% dan Vr=100Km/Jam didapat : Berdasarkan grafik V,untuk A = 11.212% dan Vr=100Km
Lv = 335 m
Berdasarkan syarat keluwesan
100 Lv = 0.6 x
= 60 m
Berdasarkan syarat drainase :
-7.340 Lv = 40 x
= 176.2 m
Berdasarkan syarat kenyamanan
-7.340 10000 x
Lv =
360 360
= 122.3611 m
550 m Diambil nilai terbesar yaitu Lv :
< 550
……………(ok) Cek syarat ; Jh < Lv 202.18008

550 Ev = 4.405 x
800 800
= 1.844594 m
550 X = 0.25 x
= 83.75 m
18906.25 Y = 4.405 x
110000 67000
= 0.461148 m
an elevasi rencana lengkung vertikal : Perhitungan stasiun dan elevasi rencana lengkung verti
Data Lengkung PVI.1
stasiun = 3111
m Elevasi = 260.000
m Ev = 1.8445938
ncana jalan pada PVI.1 asalah sbb : Stasiun dan elevasi rencana jalan pada PVI.1 asalah sbb
2856 - 275 Titik PLV : STA =
2420.887 =
2+605.887 =
266.500 + 36.355 ELEV =
302.855 m =
2856 - 137.5 Titik A STA =
2558.387 =
2+650.887 =
266.500 + 18.1775 + -1.262 ELEV =
283.416 m =

2856 Titik PVI STA =


266.500 + -5.04625 ELEV =
261.454 m =
2856 + 137.5 Titik B STA =
2833.387 =
2+740.887 =
266.500 + 18.1775 + -1.262 ELEV =
283.416 =
2856 + 275 Titik PTV STA =
2970.887 =
2+785.887 =
266.500 + 28.2288 ELV =
294.729 =

Lv: 180m Lv: 700m

90m 350m

PTV PLV

A B A
0.254 g2=-10.265% 2.453
-13.220% 0.665 g1=-13.220%

PVL

Sta. 2+597.762 Sta. 2+695.887 Sta. 2+794.012 Sta. 2+892.137 Sta. 2+445.887 Sta. 2+620.887 Sta. 2+795.887
Elv. 181.229 m Elv. 175.778m Elv. 181.229 m Elv. 184.352 m Elv. 203.229 m Elv. 185.265 m Elv. 174.659m

Gambar 1.7 Lengkung Vertikal PVI.5 (cekung) Gambar 1.8 Lengkung V


Tabel 1.7 Hasil perhitungan Alinemen Vertik
PVI
Stasiun
g1(%)
g2(%)
Lv (m)
Ev(m)
+ 0.004 x 10000 / 0.35 - 0.04875 X (m)
Y (m)
Jh (m)
A = 11.212% dan Vr=100Km/Jam didapat : Vr (Km/Jam)
Elev.Tanah PVI
Elev. Rencana
100 Stasiun
PLV
Elev.Rencana
Stasiun
PTV
4.405 Elev.Rencana
Kondisi Lengkung

4.405
360

335 m
< 335 ……………(ok)

335
800

335

7014.0625
67000

evasi rencana lengkung vertikal :

m
m
jalan pada PVI.1 asalah sbb :
3111 - 168
2628.387
2+445.887
260.000 + 17.1939
277.194 m
3111 - 83.75
2712.137
2+620.887
260.000 + 8.59694 + 0.4611
269.058 m

3111
260.000 + 1.84459
261.845 m
3111 + 83.75
2879.637
2+970.887
260.000 + 8.59694 + 0.4611
269.058
3111 + 167.5
2963.387
3+145.887
260.000 + 1.58623
261.586

Lv: 700m

350m

PTV

B
2.453 g2=-10.265%
9.881
PVL

20.887 Sta. 2+795.887 Sta. 2+794.012 Sta. 3+145.887


.265 m Elv. 174.659m Elv. 185.265 m Elv. 168.163 m

Gambar 1.8 Lengkung Vertikal PVI.6 (cekung)


asil perhitungan Alinemen Vertikal
1 2 3 4 5 6
755.67 1281.33 2676.23 2816.23 2856.23 3111.26
8.13 0.00 4.00 0.00 -1.94 -9.28
-2.59 9.14 0.00 -1.94 -9.28 -4.88
576.13 258.00 300.00 130.00 550.00 335.00
4.18 4.18 -1.50 -1.40 -5.05 1.84
107.17 75.00 75.00 144.03 137.50 83.75
-1.44 1.04 -0.38 -0.35 -1.26 0.46
150.78 88.09 198.43 183.69 190.39 202.18
100.00 100.00 100.00 100.00 100.00 100.00
288.13 270.00 270.00 270.00 266.50 260.00
282.38 265.82 268.50 268.60 261.45 261.84
0.00 0.00 2+294.316 2+400.887 2+605.887 2+445.887
270.71 270.00 265.55 246.64 302.86 277.19
0.00 0.00 2+686.816 2+790.887 2+785.887 3+145.887
282.57 286.71 257.84 231.92 294.73 261.59
Cukung Cembung Cembung Cembung Cukung Cukung