VIGAS

ADECUACION
L k h h' b
B H H'
3.45 9 0.3833333 40 20 25 35.777088 40
5 9 0.5555556 55 27.5 30 52.658491 50

COLUMNAS
METRADO DE CARGAS
COLUMNA N° PISOS AT Wu PG k n bxt(area) b
C1 4 2.3 7008 16118 1.5 0.2 576 25
C2 4 5.91 7008 41417 1.25 0.25 986 25
C3 4 3.6 7008 25229 1.5 0.2 901 25
C4 4 4.65 7008 32587 1.25 0.25 776 25
C5 4 9.33 7008 65385 1.1 0.3 1142 25
C6 4 5.69 7008 39876 1.25 0.25 949 25
C7 4 4.12 7008 28873 1.25 0.25 687 25
C8 4 8.85 7008 62021 1.1 0.3 1083 25
C9 4 4.73 7008 33148 1.25 0.25 789 25
C10 4 3.66 7008 25649 1.25 0.25 611 25
C11 4 7.88 7008 55223 1.1 0.3 964 25
C12 4 4.21 7008 29504 1.25 0.25 702 25
cargas

carga 2 piso 3 piso 4 piso 5 piso azotea total


losa 300 300 300 300 300 1500
piso term 100 100 100 100 100 500
tabiqueria 120 120 120 120 60 540
vigas 100 100 100 100 100 500
columnas 60 60 60 60 60 300
t s/c 200 200 200 200 150 950
23 35
39 40
36 40 carga preven total
31 35 Wm= 3340 1.7 5678
46 45 Wv= 950 1.4 1330
38 40 total 7008
27 35
43 45
32 35
24 35
39 45
28 40