UPAH

Pekerja Tukang Kepala Tukang Mandor Tanah Urug Urugan Sirtu Koral Beton Pasir Cor Semen

0.38
0.38
0.04
0.02

6.82
3.41

20.96

5.24
0.17

15.14

3.79
0.13

999.89
75248.01
112872.01
177.88
29.65
3.02
8.95

14.33
7.17

0.05

0.25

14.34
7.17

4.55
7.59
0.76
0.23

3.37
1.69

6.81
6.81
0.68
0.29

3.94
3.94
0.39
0.17

57.25
28.63
2.86
2.86
13.60
6.80
0.68
0.68

312.34 83.79 8.43 33.18 15.14 20.96 112872.01 75248.01 999.89


313.00 84.00 9.00 34.00 16.00 21.00 112,873.00 75,249.00 1,000.00
26 7 1 0 95 133 92 64 998
20,592,000 6,384,000 936,000 - 6,887,500 14,630,000 17,480,000 10,880,000 52,894,000
20,614,519 6,367,755 657,737 - 1,097,940 2,306,040 15,885,691 9,137,258 52,994,326
BAHAN

Beton K225 Kayu / Papan


Bb Ø 10 mm x 12 Kawat Beton Bb D 19 mm x 12 Multiplex 9 mm Paku Papan Nama Minyak Aspal Curah
Readymix Meranti

3.21
0.08
1.09

999.89
99.88
24.24
1022.12
14.60

590.98
8.44

4.40
33.03
226.26
11.01
1.05
7.84
53.73
2.61

23.04 40.95 4.31 1.00 37.87 99.88


24.00 41.00 5.00 1.00 38.00 100.00
125 138 30 30 120 40 5 1 39 100
81,250,000 9,671,346 525,000 5,400,000 13,800,000 680,000 275,000 350,000 429,000 859,000
81,250,000 9,671,346 403,277 5,400,000 13,800,000 696,125 236,993 350,000 416,552 857,991
PERALATAN

Plastik Polythene Pipa Pvc 1'' Alat Groving 1 set Alat Bantu Aspal Sprayer Compressor Concrete Cutter cangkul Kertas HVS 70 gr Katrid Printer
1.99
39.85

0.02

0.02

752.66

39.85

151.74
2.53
8.43
752.66 151.74 1.99 88.13 0.02 0.02 2.53
753.00 152.00 2.00 89.00 1.00 1.00 3.00
753 45 2 85 1 1 3 5 3 4
3,237,900 2,475,000 110,000 1,530,000 44,376 99,878 165,000 275,000 111,000 960,000
3,236,425 8,345,700 109,493 1,586,371 44,376 99,878 165,000 275,000 111,000 960,000
ATK

Snellhercter
Bulpoint Tipe X Pensil Tinta Printer Stopmap Ordner Buku Tulis Staples Paper clip
Plastik
1 1 1 4 10 3 1 15 1 12
3,500 7,000 2,000 140,000 15,000 7,500 4,500 30,000 7,000 60,000
3,500 7,000 2,000 140,000 15,000 7,500 4,500 30,000 7,000 60,000
Honor Konsumsi Rapat

Pajak PPN 10%


Materai Lem Kertas Biaya Penjilidan Honor Panitia Biaya Perencanaan Makan Minum TOTAL
Bahan

176823.61
1350.29
65639.07
#VALUE!
0.00
24755.30
28506.11
2925.63
0.00

#VALUE!
#VALUE!
0.00
0.00
0.00
450000.00
0.00
#VALUE!
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00

0.00
345906.00
0.00
#VALUE!
#VALUE!
0.00
0.00

0.00
249876.00
0.00
#VALUE!
#VALUE!
0.00
10%
35 2 1 1 1 105 105
227,500 6,000 29,000 2,050,000 5,445,000 2,520,000 262,500 Rp 170,610,000.00
227,500 6,000 29,000 2,050,000 5,445,000 2,520,000 262,500 Rp 11,887,500.00
1. 1m1 Uitzet 4 METER
Bahan
0.857 Ljr Kayu meranti 5/7 x 4 m @ Rp. 55,000.00 = Rp. 47,142.86
0.020 kg Paku @ Rp. 18,000.00 = Rp. 360.00
0.292 Ljr Papan meranti 2/20 x 4 m @ Rp. 60,000.00 = Rp. 17,500.00
Sub total = Rp. 65,002.86
Upah An. SNI ( Revisi ) 6.4.2
0.100 Oh Pekerja @ Rp. 66,000.00 = Rp. 6,600.00
0.100 Oh Tukang Kayu @ Rp. 76,000.00 = Rp. 7,600.00
0.010 Oh Kepala Tukang @ Rp. 78,000.00 = Rp. 780.00
0.005 Oh Mandor @ Rp. - = Rp. -
Sub total = Rp. 14,980.00
Total Upah dan Bahan = Rp. 79,982.86
300,000

3.21 Ljr 176,824


0.08 kg 1,350
1.09 Ljr 65,639

0.38 Oh 24,755
0.38 Oh 28,506
0.04 Oh 2,926
0.02 Oh -
Rp 300,000.00
2 1 m3 Pembersihan Awal/Akhir Pekerjaan 68 m
Upah
0.1000 Oh Pekerja @ Rp. 66,000.00 = Rp. 6,600.00
0.0500 Oh Mandor @ Rp. 0.00 = Rp. 0.00
Sub total = Rp. 6,600.00
Total Upah dan Bahan = Rp. 6,600.00
450,000

6.82 Oh 450,000
3.41 Oh -
Rp 450,000.00
3. 1 bh Papan nama 1 bh
350,000
Rp 350,000.00
4 1 m3 Urugan Sirtu 17 m3
Bahan An.SNI ( Revisi ) 6.15.1
1.200 m3 Sirtu @ Rp. 110,000.00 = Rp. 132,000.00
Sub total = Rp. 132,000.00
Upah
0.300 Oh Pekerja @ Rp. 66,000.00 = Rp. 19,800.00
0.0100 Oh Mandor @ Rp. 0.00 = Rp. 0.00
Sub total = Rp. 19,800.00
Total Upah = Rp. 151,800.00
Rp 2,651,946.00

20.96 m3 2,306,040

5.24 Oh 345,906
0.17 Oh -
Rp 2,651,946.00
5 1 m3 Urugan Tanah 13 m3
Bahan An.SNI ( Revisi ) 6.9.1
1.2000 m3 Tanah Urug @ Rp. 72,500.00 = Rp. 87,000.00
Sub total = Rp. 87,000.00
Upah An.SNI ( Revisi ) 6.9.2
0.300 Oh Pekerja @ Rp. 66,000.00 = Rp. 19,800.00
0.0100 Oh Mandor @ Rp. 0.00 = Rp. 0.00
Sub total = Rp. 19,800.00
Total Upah dan Bahan = Rp. 106,800.00
Rp 1,347,816.00

15.14 m3 1,097,940

3.79 Oh 249,876
0.13 Oh -
Rp 1,347,816.00
6 Membuat 1 M3 beton mutu f'c=19,3 Mpa (K225), slump 2 cm / W/c = 0,58. 108 Meter3
Bahan An. SNI ( Revisi ) 6.18.1
371.000 Kg PC @ Rp. 1,325.00 491,575.00
698.000 Kg Pasir Cor @ Rp. 121.43 84,758.14
1047.000 Kg Krikil (maksimum 30 mm) @ Rp. 140.74 147,354.78
215.000 Ltr Air. @ Rp. 0.00 0.00
Sub total : 723,687.92
Upah An. SNI ( Revisi ) 6.18.2
1.650 Oh Pekerja @ Rp. 66,000.00 108,900.00
0.275 Oh Tukang batu @ Rp. 76,000.00 20,900.00
0.028 Oh Kepala tukang @ Rp. 78,000.00 2,184.00
0.083 Oh Mandor @ Rp. 0.00 0.00
Sub total : 131,984.00
Total upah+bahan : 855,671.92

7 1 m2 Pekerjaan Groving 717 M2


Sewa alat 0.0028 jam Sewa alat Groving @ Rp. 55,000.00 = 152.78
0.0556 jam Sewa alat Bantu (1 set @ 3 alat) @ Rp. 18,000.00 = 1,000.80
Sub total = Rp. 1,153.58

Upah 0.0200 Oh Pekerja @ Rp. 66,000.00 = 1,320.00


0.0100 Oh Mandor @ Rp. 0.00 = -
Sub total = Rp. 1,320.00
Total upah+bahan : = Rp. 2,473.58
Rp 92,245,856.34

999.89 zak 52,994,326


75,248.01 Kg 9,137,366
112,872.01 Kg 15,885,607
23,178.11 Ltr -

177.88 Oh 11,739,983
29.65 Oh 2,253,128
3.02 Oh 235,446
8.95 Oh -

Rp 92,245,856.34

Rp 1,772,735.98
1.99 jam Rp 109,492.56
39.85 jam Rp 717,241.48

14.33 Oh Rp 946,001.95
7.17 Oh Rp -
Rp 1,772,735.98
8 1 ltr pekerjaan Lapis Perekat (aspalt Sealent) 118 Ltr
Sewa al 0.0002 jam Asphalt Sprayer @ Rp. 44,976.00 = 9.00
0.0002 jam Compresor @ Rp. 134,937.00 = 26.99
Sub total = Rp. 35.98

Upah 0.0004 Oh Pekerja @ Rp. 66,000.00 = 26.40


0.0021 Oh Mandor @ Rp. 0.00 = -
Sub total = Rp. 26.40

Bahan 0.8487 kg Aspal Curah @ Rp. 8,590.00 = 7,290.33


0.2060 ltr Kerosin/Minyak Tanah @ Rp. 11,000.00 = 2,266.00
Sub total : = 9,556.33
Harga Satuan = 9,618.72
Rp 1,132,015.76
0.024 jam Rp 1,058.63
0.024 jam Rp 3,176.12

0.047 Oh Rp 3,106.99
0.247 Oh Rp -

99.883 kg Rp 857,991.05
24.244 ltr Rp 266,682.98
Rp 1,132,015.76
9 1 m2 Pemasangan plastik Polythene T:150 Mikron 717 M2
Bahan 1.0500 m2 Plastik Polythene @ Rp. 4,300.00 = Rp. 4,515.00
Sub total : = Rp. 4,515.00

Upah 0.0200 Oh Pekerja @ Rp. 66,000.00 = Rp. 1,320.00


0.0100 Oh Mandor @ Rp. 0.00 = Rp. 0.00
Sub total : = Rp. 1,320.00

Sewa alat 0.0556 jam Sewa Alat Bantu (1 set @ 3 Alat) @ Rp. 18,000.00 = 1,000.80
Sub total : 1,000.80
Harga Satuan = Rp 6,835.80
Rp 4,900,011.50
752.66 m2 Rp 3,236,424.69

14.34 Oh Rp 946,197.25
7.17 Oh Rp -

39.85 jam Rp 717,389.55

Rp 4,900,011.50
10 Memasang 1 m' pipa PVC ø 1" 126 M'
Bahan
1.2000 m' Pipa PVC 1" @ Rp. 13,750.00 = Rp. 16,500.00
@ Rp. Sub total = Rp. 16,500.00
Upah
0.0360 Oh Pekerja @ Rp. 66,000.00 = 2,376.00
0.0600 Oh Tukang @ Rp. 76,000.00 = 4,560.00
0.0060 Oh Kepala @ Rp. 78,000.00 = 468.00
0.0018 Oh Mandor @ Rp. 0.00 = -
Sub total = Rp. 7,404.00
Total Upah dan Bahan = Rp. 23,904.00
Rp 3,022,660.80

151.74 m' Rp 2,086,425.00

4.55 Oh Rp 300,445.20
7.59 Oh Rp 576,612.00
0.76 Oh Rp 59,178.60
0.23 Oh Rp -
Rp 3,022,660.80
11 1 m2 Pekerjaan Concrete Cutting 169 M2
Sewa alat 0.0150 jam Sewa alat Concrete Cutter @ Rp. 55,000.00 = 825.00
0.0500 jam Sewa alat Bantu (1 set @ 3 alat) @ Rp. 374,355.00 = 18,717.75
Sub total = Rp. 19,542.75

Upah 0.0200 Oh Pekerja @ Rp. 66,000.00 = 1,320.00


0.0100 Oh Mandor @ Rp. 0.00 = -
Sub total = Rp. 1,320.00
Total upah+bahan : = Rp. 20,862.75
Rp 3,517,459.65
2.53 jam Rp 139,095.00
8.43 jam Rp 3,155,812.65

3.37 Oh Rp 222,552.00
1.69 Oh Rp -
Rp 3,517,459.65
12 1 Kg Pembesian dengan besi polos 973 Kg
Bahan An. SNI ( Revisi ) 6.25.1
1.050 Kg Besi beton ( polos ) @ Rp. 8,700.00 9,135.00
0.015 Kg Kawat beton @ Rp. 17,500.00 262.50
Sub total : 9,397.50
Upah An. SNI ( Revisi ) 6.25.2
0.007 Oh Pekerja @ Rp. 66,000.00 462.00
0.007 Oh Tukang besi @ Rp. 76,000.00 532.00
0.0007 Oh Kepala tukang @ Rp. 78,000.00 54.60
0.0003 Oh Mandor @ Rp. 0.00 0.00
Sub total : 1,048.60
Total upah+bahan : 10,446.10
Rp 10,168,761.69

1022.12 Kg Rp 8,892,471
14.60 Kg Rp 255,531

6.81 Oh Rp 449,734
6.81 Oh Rp 517,876
0.68 Oh Rp 53,150
0.29 Oh Rp -
Rp 10,168,761.69
13 1 Kg Pembesian dengan besi Ulir 563 Kg
Bahan An. SNI ( Revisi ) 6.25.1
1.050 Kg Besi beton ( Ulir) @ Rp. 11,000.00 11,550.00
0.015 Kg Kawat beton @ Rp. 17,500.00 262.50
Sub total : 11,812.50
Upah An. SNI ( Revisi ) 6.25.2
0.007 Oh Pekerja @ Rp. 66,000.00 462.00
0.007 Oh Tukang besi @ Rp. 76,000.00 532.00
0.0007 Oh Kepala tukang @ Rp. 78,000.00 54.60
0.0003 Oh Mandor @ Rp. 0.00 0.00
Sub total : 1,048.60
Total upah+bahan : 12,861.10
Rp 7,238,765.04

590.98 Kg Rp 6,500,823
8.44 Kg Rp 147,746

3.94 Oh Rp 260,033
3.94 Oh Rp 299,432
0.39 Oh Rp 30,731
0.17 Oh Rp -
Rp 7,238,765.04
14 1 m2 Pasang bekisting untuk pondasi 110 M2
Bahan An. SNI ( Revisi )
0.040 m3 Kayu bekisting @ Rp. 5,580,000.00 223,200.00
0.300 Kg Paku biasa 2" - 5" @ Rp. 17,000.00 5,100.00
2.055 Kg Besi Beton 10 mm @ Rp. 8,700.00 17,878.50
0.100 Ltr Minyak bekisting @ Rp. 24,000.00 2,400.00
Sub total : 248,578.50
Upah An. SNI ( Revisi )
0.520 Oh Pekerja @ Rp. 66,000.00 34,320.00
0.260 Oh Tukang kayu @ Rp. 76,000.00 19,760.00
0.026 Oh Kepala tukang @ Rp. 78,000.00 2,028.00
0.026 Oh Mandor @ Rp. 0.00 0.00
Sub total : 56,108.00
Total upah+bahan : 304,686.50
Untuk 2 Kali Pemakaian 152,343.25
Rp 33,545,983.65

4.40 m3 Rp 24,574,320.00
33.03 Kg Rp 561,510.00
226.26 Kg Rp 1,968,422.85
11.01 Ltr Rp 264,240.00

57.25 Oh Rp 3,778,632.00
28.63 Oh Rp 2,175,576.00
2.86 Oh Rp 223,282.80
2.86 Oh Rp -

Rp 33,545,983.65
Pagu fisik
Rp 170,610,040.96
14 1 m2 Pasang Kayu filler 7 mm 26.15 M2
Bahan An. SNI ( Revisi )
0.040 m3 Kayu bekisting @ Rp. 5,580,000.00 223,200.00
0.300 Kg Paku biasa 2" - 5" @ Rp. 17,000.00 5,100.00
2.055 Kg Besi Beton 10 mm @ Rp. 8,700.00 17,878.50
0.100 Ltr Minyak bekisting @ Rp. 24,000.00 2,400.00
Sub total : 248,578.50
Upah An. SNI ( Revisi )
0.520 Oh Pekerja @ Rp. 66,000.00 34,320.00
0.260 Oh Tukang kayu @ Rp. 76,000.00 19,760.00
0.026 Oh Kepala tukang @ Rp. 78,000.00 2,028.00
0.026 Oh Mandor @ Rp. 0.00 0.00
Sub total : 56,108.00
Total upah+bahan : 304,686.50
Rp 7,966,028.54

1.05 m3 Rp 5,835,564
7.84 Kg Rp 133,340
53.73 Kg Rp 467,433
2.61 Ltr Rp 62,748

13.60 Oh Rp 897,296
6.80 Oh Rp 516,625
0.68 Oh Rp 53,022
0.68 Oh Rp -
Rp 7,966,028.54
Beton k225 108 M3 108
Beton Ulir Bb D 19 mm x 12 591 Kg 26.50 19 22
Beton Polos Bb Ø 10 mm x 12 1022 Kg 7.40 10 138
Pipa PVC 1'' 152 M' 38
Plastik Polythene 753 M2 753
Triplex 4 M3 110
M3
Lj
Lj
Lj
M2
Lmbr
BUKU KAS UMUM
KEGIATAN PEMBANGUNAN GEDUNG BKD
Ds.Budugsidorejo Kec. Sumobito. Kab. Jombang Tahun 2017

Bukti Penerimaan Belanja Penerimaan Pajak Pengeluaran Saldo


No. Uraian Transaksi
Nomor Tanggal (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7
1 BK DESA TAHUN 2017 Rp 75,000,000.00 Rp 75,000,000.00

Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan


16 Agustus 2017 Musyawarah Rapat Pertama Rp 600,000.00 Rp 74,400,000.00
PPN 10% Rp 54,545.45 Rp 74,345,454.55
PPH 1,5% (PASAL 22) Rp 74,345,454.55
PPH 1,5% (PASAL 22) Rp 74,345,454.55
16 Agustus 2017 Biaya AtK Rp 150,000.00 Rp 74,195,454.55
PPN 10% Rp 74,195,454.55
PPH 1,5% (PASAL 22) Rp 74,195,454.55
16 Agustus 2017 Biaya Perencanaan Tim Pembangunan Desa Rp 340,000.00 Rp 73,855,454.55
PPN 10% Rp 73,855,454.55
PPH 4% (Pasal 4 Ayat 2) Rp 73,855,454.55
19 Agustus 2017 Biaya Pembelian Batu Kali Rp 2,300,000.00 Rp 71,555,454.55
PPN 10% Rp 71,555,454.55
PPH 4% (Pasal 4 Ayat 2) Rp 71,555,454.55
19 Agustus 2017 Biaya Pembelian Pasir Pasang Rp 2,500,000.00 Rp 69,055,454.55
PPN 10% Rp 69,055,454.55
Rp - PPH 1,5% (PASAL 22) Rp 69,055,454.55
19 Agustus 2017 Biaya Pembelian Kayu Bowplank Rp 358,000.00 Rp 68,697,454.55
22 Agustus 2017 Biaya Pembelian Besi Beton Rp 1,922,000.00 Rp 66,775,454.55
Rp 1,747,272.73 PPN 10% Rp 66,775,454.55
PPH 1,5% (PASAL 22) Rp 66,775,454.55
Biaya Pembelian Semen Portand Rp 1,697,500.00 Rp 65,077,954.55
PPN 10% Rp 154,318.18 Rp 64,923,636.36
PPH 1,5% (PASAL 22) Rp 64,923,636.36
22 Agustus 2017 Biaya Pembelian Triplek Dan Paku Rp 685,000.00 Rp 64,238,636.36
PPN 10% Rp 64,238,636.36
PPH 1,5% (PASAL 22) Rp 64,238,636.36
Bukti Penerimaan Belanja Penerimaan Pajak Pengeluaran Saldo
No. Uraian Transaksi
Nomor Tanggal (Rp) (Rp) (Rp) (Rp)
27 Agustus 2017 HOK Pekerja Mingguan Ke I Rp 3,750,000.00 Rp 60,488,636.36
PPN 10% Rp 60,488,636.36
PPH 4% (Pasal 4 Ayat 2) Rp 60,488,636.36
29 Agustus 2017 Pembelian Bata Merah Rp 2,750,000.00 Rp 57,738,636.36
PPN 10% Rp 250,000.00 Rp 57,488,636.36
Rp 2,500,000 PPH 1,5% (PASAL 22) Rp 34,090.91 Rp 57,454,545.45
01 September 2017 Biaya Pembelian Pasir Pasang Rp 1,250,000.00 Rp 56,204,545.45
PPN 10% Rp 56,204,545.45
PPH 1,5% (PASAL 22) Rp 56,204,545.45
01 September 2017 Biaya Pembelian Semen Portand Rp 1,455,000.00 Rp 54,749,545.45
PPN 10% Rp 132,272.73 Rp 54,617,272.73
PPH 1,5% (PASAL 22) Rp 54,617,272.73
02 September 2017 HOK Pekerja Mingguan Ke II Rp 3,495,000.00 Rp 51,122,272.73
PPN 10% Rp 51,122,272.73
PPH 1,5% (PASAL 22) Rp 51,122,272.73
05 September 2017 Biaya Pembelian Bambu Rp 375,000.00 Rp 50,747,272.73
PPN 10% Rp 50,747,272.73
PPH 1,5% (PASAL 22) Rp 50,747,272.73
09 September 2017 HOK Pekerja Mingguan Ke III Rp 3,750,000.00 Rp 46,997,272.73
PPN 10% Rp 46,997,272.73
PPH 1,5% (PASAL 22) Rp 46,997,272.73
12 September 2017 Pembelian Bata Merah Rp 2,062,500.00 Rp 44,934,772.73
PPN 10% Rp 187,500.00 Rp 44,747,272.73
PPH 1,5% (PASAL 22) Rp 44,747,272.73
12 September 2017 Biaya Pembelian Besi Beton Rp 1,761,000.00 Rp 42,986,272.73
PPN 10% Rp 160,090.91 Rp 42,826,181.82
PPH 1,5% (PASAL 22) Rp 42,826,181.82
12 September 2017 Biaya Pembelian Triplek Dan Paku Rp 874,458.68 Rp 41,951,723.14
PPN 10% Rp 41,951,723.14
PPH 1,5% (PASAL 22) Rp 41,951,723.14
16 September 2017 HOK Pekerja Mingguan Ke IV Rp 3,750,000.00 Rp 38,201,723.14
PPN 10% Rp 38,201,723.14
PPH 1,5% (PASAL 22) Rp 38,201,723.14
Bukti Penerimaan Belanja Penerimaan Pajak Pengeluaran Saldo
No. Uraian Transaksi
Nomor Tanggal (Rp) (Rp) (Rp) (Rp)
23 September 2017 HOK Pekerja Mingguan Ke V Rp 3,580,000.00 Rp 34,621,723.14
PPN 10% Rp 34,621,723.14
PPH 1,5% (PASAL 22) Rp 34,621,723.14
24 September 2017 Biaya Pemasangan Atap Garvalum Rp 4,500,000.00 Rp 30,121,723.14
PPN 10% Rp 409,090.91 Rp 29,712,632.23
Rp 4,090,909 PPH 1,5% (PASAL 22) Rp 55,785.12 Rp 29,656,847.11
24 September 2017 Biaya Pembelian Ramyen Dinding Rp 2,430,000.00 Rp 27,226,847.11
PPN 10% Rp 220,909.09 Rp 27,005,938.02
Rp 2,209,091 PPH 1,5% (PASAL 22) Rp 30,123.97 Rp 26,975,814.05
29 September 2017 Biaya Pemasangan Plafond Rp 3,750,000.00 Rp 23,225,814.05
PPN 10% Rp 340,909.09 Rp 22,884,904.96
Rp 3,409,091 PPH 1,5% (PASAL 22) Rp 46,487.60 Rp 22,838,417.36
30 September 2017 Biaya Pembelian Keramik Lantai Rp 2,646,000.00 Rp 20,192,417.36
PPN 10% Rp 240,545.45 Rp 19,951,871.90
Rp 2,405,455 PPH 1,5% (PASAL 22) Rp 32,801.65 Rp 19,919,070.25
30 September 2017 HOK Pekerja Mingguan Ke VI Rp 3,665,000.00 Rp 16,254,070.25
PPN 10% Rp 16,254,070.25
PPH 1,5% (PASAL 22) Rp 16,254,070.25
30 September 2017 Biaya Pembelian Kyusen Alumunium Rp 6,525,000.00 Rp 9,729,070.25
PPN 10% Rp 593,181.82 Rp 9,135,888.43
Rp 5,931,818 PPH 1,5% (PASAL 22) Rp 80,888.43 Rp 9,055,000.00
07 Oktober 2017 HOK Pekerja Mingguan Ke VII Rp 3,750,000.00 Rp 5,305,000.00
PPN 10% Rp 5,305,000.00
PPH 1,5% (PASAL 22) Rp 5,305,000.00
14 Oktober 2017 HOK Pekerja Mingguan Ke VIII Rp 2,645,000.00 Rp 2,660,000.00
PPN 10% Rp 2,660,000.00
PPH 1,5% (PASAL 22) Rp 2,660,000.00
Biaya Pembayaran HOK Tim Pelaksana Rp 2,250,000.00 Rp 410,000.00
PPN 10% Rp 410,000.00
PPH 1,5% (PASAL 22) Rp 410,000.00
Bukti Penerimaan Belanja Penerimaan Pajak Pengeluaran Saldo
No. Uraian Transaksi
Nomor Tanggal (Rp) (Rp) (Rp) (Rp)
15 Oktober 2017 Biaya Papan Nama dan Prasasti Rp 410,000.00 Rp 0.00
PPN 10% Rp 0.00
PPH 1,5% (PASAL 22) Rp 0.00
Pajak Yang Terbayar PPn Dan PPh Rp 0.00
PPN 10% Rp 2,555,863.64 Rp 0.00
PPH 1,5% (PASAL 22) Rp 280,177.69 Rp 0.00
PPH 2% (PASAL 23) Rp - Rp 0.00
PPH 4% (PASAL 4 Ayat 2) Rp - Rp 0.00
Rp 0.00
JUMLAH Rp 75,000,000.00 Rp 3,023,541.32 Rp 71,976,458.68 Rp 0.00
TOTAL SALDO Rp 0.00

Budugsidorejo.............................. 2017
Mengetahui Menyetujui: Dibuat Oleh,
Kepala Desa Bendahara Desa Ketua Tim Pelaksana
Ds Budugsidorejo Kec.Sumobito Kab.Jombang Ds Budugsidorejo Kec.Sumobito Ds Budugsidorejo Kec.Sumobito Kab.Jombang
Kab.Jombang

CHOIRUL ANAM SUPENDIK

SAMSUL HUDA
REKAPITULASI PENERIMAAN DAN PENYETORAN PAJAK
KEGIATAN PEMBANGUNAN GEDUNG BKD
Ds.Budugsidorejo Kec. Sumobito. Kab. Jombang Tahun 2017

Penerimaan:
No Uraian Tanggal PPN 10% PPh 4% psl 4(2) PPh 1.5% psl 22 PPh 2% psl 23 Jumlah

Biaya Pembelian Nasi Kotak, Minuman, untuk


1 16 Agustus 2017
Kegiatan Musyawarah Rapat Pertama
Rp 109,090.91 Rp 109,090.91
2 Biaya Perencanaan Tim Pembangunan Desa 16 Agustus 2017 Rp - - Rp -
3 Biaya Pembelian Besi Beton 22 Agustus 2017 Rp - Rp - Rp -

JUMLAH Rp 263,409.09 Rp - Rp - Rp 263,409.09


JUMLAH TOTAL Rp 263,409.09

Mengetahui Menyetujui: Dibuat Oleh,


Kepala Desa Ketua Tim Pembangunan Desa Bendahara
Ds Trawasan Kec.Sumobito Kab.Jombang Ds Trawasan Kec.Sumobito Kab.Jombang Ds Trawasan Kec.Sumobito Kab.Jombang

TOHA KUSEN IMAM HAMBALI

EMI WULANDARI
Penerimaan:

###
###
###

-12686252
Rincian Kegiatan Pembangunan Gedung BKD
Ds.Budugsidorejo Kec. Sumobito. Kab. Jombang Tahun 2017
Bukti Harga Satuan Jumlah Biaya
Jumlah rekap Uraian Transaksi Volume Satuan
No No Rekening Tanggal (Rp) (Rp)
1 2 3 4 5 6 7 8
00085/kwt/II.08/2017 14 Agustus 2017 Dana Masuk

16 Agustus 2017 Rp 600,000.00 Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan Musyawarah Rapat Pertama
Pembelian Makan 2 Kali 30 Kotak Rp 18,500.00 Rp 555,000.00
Pembelian Minum 2 Kali 30 Botol Rp 1,500.00 Rp 45,000.00
16 Agustus 2017 Rp 150,000.00 Biaya AtK
Pembelian Buku Tulis 1 Pak Rp 28,000.00 Rp 28,000.00
Pembelian Bulpoin 1 Pak Rp 32,000.00 Rp 32,000.00
Pembelian Materai 15 Lbr Rp 6,000.00 Rp 90,000.00
16 Agustus 2017 Rp 340,000.00 Biaya Perencanaan Tim Pembangunan Desa
Biaya Perencanan Rab Dan Desai Gambar Gedung 1 Set Rp 340,000.00 Rp 340,000.00
19 Agustus 2017 Rp 2,300,000.00 Biaya Pembelian Batu Kali
Pembelian Batu Kali 2 Rit Rp 1,150,000.00 Rp 2,300,000.00
19 Agustus 2017 Rp 2,500,000.00 Biaya Pembelian Pasir Pasang
Pembelian Pasir Pasang 2 Ls Rp 1,250,000.00 Rp 2,500,000.00
19 Agustus 2017 Rp 358,000.00 Biaya Pembelian Kayu Bowplank
Kayu 4/6 15 Ljr Rp 17,500.00 Rp 262,500.00
Benang 3 Roll Rp 11,000.00 Rp 33,000.00
Paku 5 Kg Rp 12,500.00 Rp 62,500.00
22 Agustus 2017 Rp 1,922,000.00 Biaya Pembelian Besi Beton
Besi Beton 12 mm 15 Ljr Rp 67,000.00 Rp 1,005,000.00
Besi Beton 10 mm 8 Ljr Rp 37,000.00 Rp 296,000.00
Besi Beton 6 mm 27 Ljr Rp 23,000.00 Rp 621,000.00
Bukti Harga Satuan Jumlah Biaya
Jumlah rekap Uraian Transaksi Volume Satuan
No No Rekening Tanggal (Rp) (Rp)
1 2 3 4 5 6 7 8
22 Agustus 2017 Rp 1,697,500.00 Biaya Pembelian Semen Portand
Semen Portand 35.00 Zak Rp 48,500.00 Rp 1,697,500.00
22 Agustus 2017 Rp 685,000.00 Biaya Pembelian Triplek Dan Paku
Triplek 99 mm 3 Lbr Rp 120,000.00 Rp 360,000.00
Kayu 4/6 15 Ljr Rp 17,500.00 Rp 262,500.00
Paku Campur 5 Kg Rp 12,500.00 Rp 62,500.00
27 Agustus 2017 Rp 3,750,000.00 HOK Pekerja Mingguan Ke I
Biaya Pembayaran Mingguan Pekerja Tukang Dan
Pekerja 1 Mgg Rp 3,750,000.00 Rp 3,750,000.00
29 Agustus 2017 Rp 2,750,000.00 Pembelian Bata Merah
Bata Merah 5000 Bj Rp 550.00 Rp 2,750,000.00
01 September 2017 Rp 1,250,000.00 Biaya Pembelian Pasir Pasang
Pembelian Pasir Pasang 1 Rit Rp 1,250,000.00 Rp 1,250,000.00
01 September 2017 Rp 1,455,000.00 Biaya Pembelian Semen Portand
Semen Portand 30.00 Zak Rp 48,500.00 Rp 1,455,000.00
02 September 2017 Rp 3,495,000.00 HOK Pekerja Mingguan Ke II
Biaya Pembayaran Mingguan Pekerja Tukang Dan
Pekerja 1 Mgg Rp 3,495,000.00 Rp 3,495,000.00
05 September 2017 Rp 375,000.00 Biaya Pembelian Bambu
Pembelian Bambu 15 Ljr Rp 25,000.00 Rp 375,000.00
09 September 2017 Rp 3,750,000.00 HOK Pekerja Mingguan Ke III
Biaya Pembayaran Mingguan Pekerja Tukang Dan
Pekerja 1 Mgg Rp 3,750,000.00 Rp 3,750,000.00
12 September 2017 Rp 2,062,500.00 Pembelian Bata Merah
Bata Merah 3750 Bj Rp 550.00 Rp 2,062,500.00
12 September 2017 Rp 1,761,000.00 Biaya Pembelian Besi Beton
Besi Beton 12 mm 15 Ljr Rp 67,000.00 Rp 1,005,000.00
Besi Beton 10 mm 8 Ljr Rp 37,000.00 Rp 296,000.00
Besi Beton 6 mm 20 Ljr Rp 23,000.00 Rp 460,000.00
12 September 2017 Rp 874,458.68 Biaya Pembelian Triplek Dan Paku
Triplek 99 mm 3 Lbr Rp 120,000.00 Rp 360,000.00
Kayu 4/6 25 Ljr Rp 17,500.00 Rp 437,500.00
Paku Campur 6.2 Kg Rp 12,500.00 Rp 76,958.68
16 September 2017 Rp 3,750,000.00 HOK Pekerja Mingguan Ke IV
Biaya Pembayaran Mingguan Pekerja Tukang Dan
Pekerja 1 Mgg Rp 3,750,000.00 Rp 3,750,000.00
Bukti Harga Satuan Jumlah Biaya
Jumlah rekap Uraian Transaksi Volume Satuan
No No Rekening Tanggal (Rp) (Rp)
1 2 3 4 5 6 7 8
23 September 2017 Rp 3,580,000.00 HOK Pekerja Mingguan Ke V
Biaya Pembayaran Mingguan Pekerja Tukang Dan
Pekerja 1 Mgg Rp 3,580,000.00 Rp 3,580,000.00
24 September 2017 Rp 4,500,000.00 Biaya Pemasangan Atap Garvalum
Pembelian Dan Pemasangan Atap Garvalum 1 set Rp 4,500,000.00 Rp 4,500,000.00
24 September 2017 Rp 2,430,000.00 Biaya Pembelian Ramyen Dinding
Pembelian Ramen Dinding 18 Bji Rp 135,000.00 Rp 2,430,000.00
29 September 2017 Rp 3,750,000.00 Biaya Pemasangan Plafond
Pembelian dan Pemasangan Plafond 1 set Rp 3,750,000.00 Rp 3,750,000.00
30 September 2017 Rp 2,646,000.00 Biaya Pembelian Keramik Lantai
Keramik Lantai 42 Mgg Rp 63,000.00 Rp 2,646,000.00
30 September 2017 Rp 3,665,000.00 HOK Pekerja Mingguan Ke VI

Biaya Pembayaran Mingguan Pekerja Tukang Dan


Pekerja 1 Mgg Rp 3,665,000.00 Rp 3,665,000.00
30 September 2017 Rp 6,525,000.00 Biaya Pembelian Kyusen Alumunium
Pintu Alumunium 1 Set Rp 2,475,000.00 Rp 2,475,000.00
Jendela Alumunium 3 set Rp 1,350,000.00 Rp 4,050,000.00
07 Oktober 2017 Rp 3,750,000.00 HOK Pekerja Mingguan Ke VII
Biaya Pembayaran Mingguan Pekerja Tukang Dan
Pekerja 1 Mgg Rp 3,750,000.00 Rp 3,750,000.00
14 Oktober 2017 Rp 2,645,000.00 HOK Pekerja Mingguan Ke VIII

Biaya Pembayaran Mingguan Pekerja Tukang Dan


Pekerja 1 Mgg Rp 2,645,000.00 Rp 2,645,000.00
Bukti Harga Satuan Jumlah Biaya
Jumlah rekap Uraian Transaksi Volume Satuan
No No Rekening Tanggal (Rp) (Rp)
1 2 3 4 5 6 7 8
10 Oktober 2017 Rp 2,250,000.00 Biaya Pembayaran HOK Tim Pelaksana
Honor Tim Pelaksana 1 ls Rp 2,250,000.00 Rp 2,250,000.00
15 Oktober 2017 Rp 410,000.00 Biaya Papan Nama dan Prasasti
Pembelian Prasasti 1 Bh Rp 170,000.00 Rp 170,000.00
Pembelian Papan Nama 1 Bh Rp 240,000.00 Rp 240,000.00
Total Rp 71,976,458.68 Total Rp 72,496,458.68

Budugsidorejo …….. ......... 2017

Mengetahui Menyetujui: Dibuat Oleh,


Kepala Desa BendaharaDesa Ketua Tim Pelaksana Pembangunan
Ds Budugsidorejo Kec.Sumobito Kab.Jombang Ds BudugsidorejoKec.Sumobito Ds Budugsidorejo Kec.Sumobito Kab.Jombang
Kab.Jombang

CHOIRUL ANAM SUPENDIK


SAMSUL HUDA
SURAT PERNYATAAN TANGGUNG JAWAB BELANJA
DESA TRAWASAN KECAMATAN SUMOBITO
TAHUN ANGGARAN 2017

1. Bidang :PELAKSANAAN PEMBANGUNAN DESA

2. Kegiatan :PENINGKATAN PEMBANGUNAN GEDUNG BKD

Jumlah
No Penerima Uraian
( Rp. )
Biaya Pembelian Nasi Kotak,
1 Minuman, untuk Kegiatan Musyawarah
600,000
Rapat Pertama
2 Biaya AtK 150,000
3 Biaya Perencanaan Tim Pembangunan De 340,000
Biaya Pembelian Batu Kali 2,300,000
Biaya Pembelian Pasir Pasang 3,750,000
4 Biaya Pembelian Semen Portand 3,152,500
Biaya Pembelian Bambu 375,000
Besi Beton 12 mm 2,010,000
5 Besi Beton 10 mm 592,000
Besi Beton 6 mm 1,081,000
Triplek 99 mm 720,000
6 Kayu 4/6 962,500
7 Paku Campur 216,417
Benang 33,000
8 Pembelian Bata Merah 4,812,500
9 Biaya Pemasangan Atap Garvalum 4,500,000
10 Biaya Pembelian Ramyen Dinding 2,430,000
11 Biaya Pemasangan Plafond 3,750,000
12 Biaya Pembelian Keramik Lantai 2,646,000
13 Biaya Pembelian Kyusen Alumunium 6,525,000
Biaya Pembayaran Mingguan Pekerja
Tukang Dan Pekerja 28,385,000
Biaya Pembayaran HOK Tim Pelaksana 2,250,000
Biaya Penyusunan SPJ Pertanggung
Jawaban Pekerjaan -
14 Pembelian Prasasti 170,000
Pembelian Papan Nama 240,000
15
16
17
18
19
20
21
22 Silpa
JUMLAH 71,990,917

Bukti-bukti pengeluaran atau belanja tersebut diatas sebagai terlampir, untuk


Demikian surat pernyataan ini dibuat dengan sebenarnya.

BUDUGSIDOREJO................. 2017
Pelaksana Kegiatan

SAMSUL HUDA
SURAT PERNYATAAN TANGGUNG JAWAB BELANJA
DESA TRAWASAN KECAMATAN SUMOBITO
TAHUN ANGGARAN 2017

1. Bidang :PELAKSANAAN PEMBANGUNAN DESA


2. Kegiatan :PENINGKATAN INFRASTRUKTUR JALAN LINGKUNGAN (HRS HOTMIX)

Yang Betanda tangan Di bawah Ini Saya:


Nama : IMAM HAMBALI
Alamat :Desa Trawasan, Kecamatan Sumobito, Kabupaten Jombang
Jabatan : Ketua Tim Pembangunan Desa
Menyatakan Saya Selaku Ketua Tim Pembangunan Desa Bertanggung Jawab atas Dana Yang Di Serahkan Kepada
Saya Dari Bendahara Desa Trawasan, Kecamatan Sumobito, Kabupaten Jombang Sebesar Rp. 196.422.000,-( Seratus
sembilan Puluh Enam Juta Empat Ratus Dua Puluh Dua Ribu Rupiah) Sebagai Berikut Rincianya:

NO Penerimaan Belanja Pengeluaran


TANGGAL No Bukti URAIAN TRANSAKSI
(Rp) (Rp)
1 2 3 4 5 7
1 14-Aug-17 00085/kwt/II.08/2017 Terima dari Bendahara Desa Rp 25,892,417.35
Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan
2 16-Aug-17 DD/2017/001 Musyawarah Rapat Pertama Rp 300,000.00
3 21-Jun-17 DD/2017/002 Biaya Uitzet Rp -
Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan
4 3-Jul-17 DD/2017/003 Musyawarah Rapat Kedua Rp 300,000.00
5 16-Aug-17 DD/2017/004 Biaya AtK Rp 150,000.00
6 16-Aug-17 DD/2017/005 Biaya Pembelian Semen Portand Rp 340,000.00
7 19-Aug-17 DD/2017/006 Biaya Pembelian Batu Kali Rp 2,300,000.00
8 19-Aug-17 DD/2017/007 Besi Beton 10 mm Rp 2,500,000.00
9 19-Aug-17 DD/2017/008 Kayu 4/6 Rp 962,500.00
10 22-Aug-17 DD/2017/009 Paku Campur Rp 216,417.35
11 22-Aug-17 DD/2017/010 Pembelian Bata Merah Rp 4,812,500.00
12 22-Aug-17 DD/2017/011 Biaya Pemasangan Atap Garvalum Rp 4,500,000.00
13 27-Aug-17 DD/2017/012 HOK Pekerja Mingguan Ke I Rp 2,646,000.00
14 DD/2017/013 Biaya Pembelian Ramyen Dinding Rp 1,250,000.00
15 DD/2017/014 Biaya Pembelian Ramyen Dinding Rp 1,455,000.00
16 DD/2017/015 Biaya Pemasangan Plafond Rp 3,750,000.00
17 15-Oct-17 DD/2017/017 Biaya Pembelian Kyusen Alumunium Rp -
18 15-Oct-17 DD/2017/018 Pembelian Prasasti Rp 170,000.00
Pembelian Papan Nama Rp 240,000.00
19 DD/2017/019 Rp - Rp -
20 DD/2017/020 Rp - Rp -
21 DD/2017/021 Rp - Rp -
22 DD/2017/022 Rp - Rp -
23 DD/2017/023 Rp - Rp -
24 DD/2017/024 Rp - Rp -
25 DD/2017/025 Rp - Rp -
26 DD/2017/026 Silpa Rp 0.00
JUMLAH Rp 25,892,417.35 Rp 25,892,417.35
Bukti-bukti pengeluaran atau belanja tersebut diatas sebagai terlampir, untuk kelengkapan administrasi
dan pemeriksaan
Demikian sesuai peraturan
surat pernyataan perundang-undangan.
ini dibuat dengan sebenarnya.

TRAWASAN .............. 2017


Pelaksana Kegiatan

IMAM HAMBALI
Bendahara TPK Desa Lebak Jabung

Tujuh Juta Sembilan Ratus Dua Puluh Ribu Rupiah


Biaya Pembelian Material Batu Kali
Desa Lebak Jabung Kecamatan Jatirejo Kabupaten Mojokerto

Dibayar Lunas Mojokerto, 18 Maret 2016


Mengetahui, Menyetujui Bendahara Penerima,
Kepala Desa Lebak Jabung Ketua TPK Suplier

ARIF RAHMAN SOFYAN MOHALI …………….………

7920000
Bendahara Desa Trawasan
DUA JUTA LIMA RATUS RIBU RUPIAH

Pembelian Pasir Pasang


Desa Trawasan, Kecamatan Sumobito, Kabupaten Jombang
Trawasan 19 Agustus 2017
Mengetahui, Menyetujuhi Dibayar Lunas Penerima,
Kepala Desa Trawasan Ketua TPD Bendahara Pekerja

TOHA KUSEN IMAM HAMBALI EMI WULANDARI ....................

2,500,000
RINCIAN BIAYA PEKERJA MINGGU KE - I (SATU)
Kegiatan Pembangunan Gedung BKD

NILAI INSENTIF (TK)


NAMA DESA : Budugsidorejo MANDOR : Rp. -
KECAMATAN : Sumobito KEPALA TUKANG : Rp. 110,000.00
KABUPATEN : Jombang TUKANG : Rp. 100,000.00
TANGGAL : 22 Agustus 2017 s/d 27 Agustus 2017 PEKERJA : Rp. 85,000.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
21 22 23 24 25 26 HOK INSENTIF (RP.)

1 Tukang 1 1 1 1 1 1 6 Hari 600,000.00


1 2
2 Tukang 1 1 1 1 1 1 6 Hari 600,000.00

3 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00


3 4
4 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

5 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00


5 6
6 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

7 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00


7
JUMLAH 3,750,000.00

Mengetahui, Mengetahui, Jombang 27 Agustus 2017


KETUA TIM PENGELOLA KEGIATAN BENDAHARA TIM PENGELOLA KEGIATAN KEPALA TUKANG
DS.Budugsidorejo KEC.Sumobito Kab Jombang DS.Budugsidorejo KEC.Sumobito Kab Jombang

SAMSUL HUDA KHAMIM .............................


RINCIAN BIAYA PEKERJA MINGGU KE - II (DUA)
Kegiatan Pembangunan Gedung BKD

NILAI INSENTIF (TK)


NAMA DESA : Budugsidorejo MANDOR : Rp. -
KECAMATAN : Sumobito KEPALA TUKANG : Rp. 110,000.00
KABUPATEN : Jombang TUKANG : Rp. 100,000.00
TANGGAL : 28 Agustus 2017 s/d 02 September 2017 PEKERJA : Rp. 85,000.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
28 29 30 31 1 2 HOK INSENTIF (RP.)
1 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
1 2
2 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
3 Pekerja 1 1 1 1 1 5 Hari 425,000.00
3 4
4 Pekerja 1 1 1 1 1 5 Hari 425,000.00
5 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
5 6
6 Pekerja 1 1 1 1 1 5 Hari 425,000.00
7 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
7
JUMLAH 3,495,000.00

Mengetahui, Mengetahui, Jombang 02 September 2017


KETUA TIM PENGELOLA KEGIATAN BENDAHARA TIM PENGELOLA KEGIATAN KEPALA TUKANG
DS.Budugsidorejo KEC.Sumobito Kab Jombang DS.Budugsidorejo KEC.Sumobito Kab Jombang

SAMSUL HUDA KHAMIM .............................


RINCIAN BIAYA PEKERJA MINGGU KE - III (TIGA)
Kegiatan Pembangunan Gedung BKD

NILAI INSENTIF (TK)


NAMA DESA : Budugsidorejo MANDOR : Rp. -
KECAMATAN : Sumobito KEPALA TUKANG : Rp. 110,000.00
KABUPATEN : Jombang TUKANG : Rp. 100,000.00
TANGGAL : 04 September 2017 s/d 09 September 2017 PEKERJA : Rp. 85,000.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
4 5 6 7 8 9 HOK INSENTIF (RP.)
1 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
1 2
2 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
3 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
3 4
4 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
5 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
5 6
6 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
7 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
7
JUMLAH 3,750,000.00

Mengetahui, Mengetahui, Jombang 09 September 2017


KETUA TIM PENGELOLA KEGIATAN BENDAHARA TIM PENGELOLA KEGIATAN KEPALA TUKANG
DS.Budugsidorejo KEC.Sumobito Kab Jombang DS.Budugsidorejo KEC.Sumobito Kab Jombang

SAMSUL HUDA KHAMIM .............................


RINCIAN BIAYA PEKERJA MINGGU KE - IV (Empat)
Kegiatan Pembangunan Gedung BKD

NILAI INSENTIF (TK)


NAMA DESA : Budugsidorejo MANDOR : Rp. -
KECAMATAN : Sumobito KEPALA TUKANG : Rp. 110,000.00
KABUPATEN : Jombang TUKANG : Rp. 100,000.00
TANGGAL : 11 September 2017 s/d 16 September 2017 PEKERJA : Rp. 85,000.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
11 12 13 14 15 16 HOK INSENTIF (RP.)
1 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
1 2
2 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
3 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
3 4
4 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
5 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
5 6
6 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
7 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
7
JUMLAH 3,750,000.00

Mengetahui, Mengetahui, Jombang 16 September 2017


KETUA TIM PENGELOLA KEGIATAN BENDAHARA TIM PENGELOLA KEGIATAN KEPALA TUKANG
DS.Budugsidorejo KEC.Sumobito Kab Jombang DS.Budugsidorejo KEC.Sumobito Kab Jombang

SAMSUL HUDA KHAMIM .............................


RINCIAN BIAYA PEKERJA MINGGU KE - V (Lima)
Kegiatan Pembangunan Gedung BKD

NILAI INSENTIF (TK)


NAMA DESA : Budugsidorejo MANDOR : Rp. -
KECAMATAN : Sumobito KEPALA TUKANG : Rp. 110,000.00
KABUPATEN : Jombang TUKANG : Rp. 100,000.00
TANGGAL : 18 September 2017 s/d 23 September 2017 PEKERJA : Rp. 85,000.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
18 19 20 21 22 23 HOK INSENTIF (RP.)
1 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
1 2
2 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
3 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
3 4
4 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
5 Pekerja 1 1 1 1 1 5 Hari 425,000.00
5 6
6 Pekerja 1 1 1 1 1 5 Hari 425,000.00
7 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
7
JUMLAH 3,580,000.00

Mengetahui, Mengetahui, Jombang 23 September 2017


KETUA TIM PENGELOLA KEGIATAN BENDAHARA TIM PENGELOLA KEGIATAN KEPALA TUKANG
DS.Budugsidorejo KEC.Sumobito Kab Jombang DS.Budugsidorejo KEC.Sumobito Kab Jombang

SAMSUL HUDA KHAMIM .............................


RINCIAN BIAYA PEKERJA MINGGU KE - VI (Enam)
Kegiatan Pembangunan Gedung BKD

NILAI INSENTIF (TK)


NAMA DESA : Budugsidorejo MANDOR : Rp. -
KECAMATAN : Sumobito KEPALA TUKANG : Rp. 110,000.00
KABUPATEN : Jombang TUKANG : Rp. 100,000.00
TANGGAL : 25 September 2017 s/d 30 September 2017 PEKERJA : Rp. 85,000.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
25 26 27 28 29 30 HOK INSENTIF (RP.)
1 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
1 2
2 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
3 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
3 4
4 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
5 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
5 6
6 Pekerja 1 1 1 1 1 5 Hari 425,000.00
7 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
7
JUMLAH 3,665,000.00

Mengetahui, Mengetahui, Jombang 30 September 2017


KETUA TIM PENGELOLA KEGIATAN BENDAHARA TIM PENGELOLA KEGIATAN KEPALA TUKANG
DS.Budugsidorejo KEC.Sumobito Kab Jombang DS.Budugsidorejo KEC.Sumobito Kab Jombang

SAMSUL HUDA KHAMIM .............................


RINCIAN BIAYA PEKERJA MINGGU KE - VII (Tujuh)
Kegiatan Pembangunan Gedung BKD

NILAI INSENTIF (TK)


NAMA DESA : Budugsidorejo MANDOR : Rp. -
KECAMATAN : Sumobito KEPALA TUKANG : Rp. 110,000.00
KABUPATEN : Jombang TUKANG : Rp. 100,000.00
TANGGAL : 02 Oktober 2017 s/d 07 Oktober 2017 PEKERJA : Rp. 85,000.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
2 3 4 5 6 7 HOK INSENTIF (RP.)
1 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
1 2
2 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
3 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
3 4
4 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
5 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
5 6
6 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
7 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
7
JUMLAH 3,750,000.00

Mengetahui, Mengetahui, Jombang 07 Oktober 2017


KETUA TIM PENGELOLA KEGIATAN BENDAHARA TIM PENGELOLA KEGIATAN KEPALA TUKANG
DS.Budugsidorejo KEC.Sumobito Kab Jombang DS.Budugsidorejo KEC.Sumobito Kab Jombang

SAMSUL HUDA KHAMIM .............................


RINCIAN BIAYA PEKERJA MINGGU KE - VIII (Delapan)
Kegiatan Pembangunan Gedung BKD

NILAI INSENTIF (TK)


NAMA DESA : Budugsidorejo MANDOR : Rp. -
KECAMATAN : Sumobito KEPALA TUKANG : Rp. 110,000.00
KABUPATEN : Jombang TUKANG : Rp. 100,000.00
TANGGAL : 18 September 2017 s/d 23 September 2016 PEKERJA : Rp. 85,000.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
9 10 11 12 13 14 HOK INSENTIF (RP.)
1 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
1 2
2 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
3 Pekerja 1 1 1 1 1 5 Hari 425,000.00
3 4
4 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
5 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
5 6
6 Pekerja 0 Hari -
7 Pekerja 0 Hari -
7
JUMLAH 2,645,000.00

Mengetahui, Mengetahui, Jombang 23 September 2016


KETUA TIM PENGELOLA KEGIATAN BENDAHARA TIM PENGELOLA KEGIATAN KEPALA TUKANG
DS.Budugsidorejo KEC.Sumobito Kab Jombang DS.Budugsidorejo KEC.Sumobito Kab Jombang

SAMSUL HUDA KHAMIM .............................


RINCIAN BIAYA PEKERJA MINGGU KE - II (DUA)
Kegiatan Peningkatan Jalan Lingkungan Ds. Lebakjabung Kec. Jatirejo Kab. Mojokerto

NILAI INSENTIF (TK)


NAMA DESA : LEBAKJABUNG MANDOR : Rp. -
KECAMATAN : JATIREJO KEPALA TUKANG : Rp. 110,000.00
KABUPATEN : MOJOKERTO TUKANG : Rp. 100,000.00
TANGGAL : 14 Maret 2016 s/d 19 Maret 2016 PEKERJA : Rp. 85,000.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
14 15 16 17 18 19 HOK INSENTIF (RP.)

1 Kepala Tukang 1 1 1 1 1 1 6 Hari 660,000.00


1 2
2 Tukang 1 1 1 1 1 1 6 Hari 600,000.00

3 Tukang 1 1 1 1 1 1 6 Hari 600,000.00


3 4
4 Tukang 1 1 1 1 1 1 6 Hari 600,000.00

5 Tukang 1 1 1 1 1 1 6 Hari 600,000.00


5 6
6 Tukang 1 1 1 1 1 1 6 Hari 600,000.00

7 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00


7 8
8 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

9 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00


9 10
10 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

11 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00


11 12
12 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

13 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00


13 14
14 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

15 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00


15 16
16 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

17 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00


17 18
18 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

19 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00


19 20
20 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

21 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00


21 22
22 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

23 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00


23 24
24 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

JUMLAH 12,840,000.00

Mengetahui, Mojokerto, 19 Maret 2016


KETUA TIM PENGELOLA KEGIATAN BENDAHARA TPK BKD
DS.LEBAKJABUNG KEC.JATIREJO DS.LEBAKJABUNG KEC.JATIREJO

.................... .............................
RINCIAN BIAYA PEKERJA MINGGU KE - III (TIGA)
Kegiatan Peningkatan Jalan Lingkungan Ds. Lebakjabung Kec. Jatirejo Kab. Mojokerto

NILAI INSENTIF (TK)


NAMA DESA : LEBAKJABUNG MANDOR : Rp. -
KECAMATAN : JATIREJO KEPALA TUKANG : Rp. 110,000.00
KABUPATEN : MOJOKERTO TUKANG : Rp. 100,000.00
TANGGAL : 21 Maret 2016 s/d 26 Maret 2016 PEKERJA : Rp. 85,000.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
21 22 23 24 25 26 HOK INSENTIF (RP.)

1 Kepala Tukang 1 1 1 1 1 1 6 Hari 660,000.00


1 2
2 Tukang 1 1 1 1 1 1 6 Hari 660,000.00

3 Tukang 1 1 1 1 1 1 6 Hari 600,000.00


3 4
4 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
5 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
5 6
6 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
7 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
7 8
8 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
9 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
9 10
10 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
11 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
11 12
12 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
13 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
13 14
14 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
15 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
15 16
16 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

JUMLAH 8,820,000.00

Mengetahui, Mojokerto, 26 Maret 2016


KETUA TIM PENGELOLA KEGIATAN BENDAHARA TPK BKD
DS.LEBAKJABUNG KEC.JATIREJO DS.LEBAKJABUNG KEC.JATIREJO

.................... .............................
RINCIAN BIAYA PEKERJA MINGGU KE - IV(EMPAT)
Kegiatan Peningkatan Jalan Lingkungan Ds. Lebakjabung Kec. Jatirejo Kab. Mojokerto

NILAI INSENTIF (TK)


NAMA DESA : LEBAKJABUNG MANDOR : Rp. -
KECAMATAN : JATIREJO KEPALA TUKANG : Rp. 110,000.00
KABUPATEN : MOJOKERTO TUKANG : Rp. 100,000.00
TANGGAL : 28 Maret 2016 s/d 02 April 2016 PEKERJA : Rp. 85,000.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
28 29 30 31 1 2 HOK INSENTIF (RP.)

1 Kepala Tukang 1 1 1 1 1 1 6 Hari 660,000.00


1 2
2 Tukang 1 1 1 1 1 1 6 Hari 660,000.00

3 Tukang 1 1 1 1 1 1 6 Hari 600,000.00


3 4
4 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
5 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
5 6
6 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
7 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
7 8
8 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
9 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
9 10
10 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
11 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
11 12
12 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
13 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
13 14
14 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
15 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
15 16
16 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

JUMLAH 8,820,000.00

Mengetahui, Mojokerto, 02 April 2016


KETUA TIM PENGELOLA KEGIATAN BENDAHARA TPK BKD
DS.LEBAKJABUNG KEC.JATIREJO DS.LEBAKJABUNG KEC.JATIREJO

.................... .............................
RINCIAN BIAYA PEKERJA MINGGU KE -V (LIMA)
Kegiatan Peningkatan Jalan Lingkungan Ds. Lebakjabung Kec. Jatirejo Kab. Mojokerto (BETON)

NILAI INSENTIF (TK)


NAMA DESA : LEBAKJABUNG MANDOR : Rp. -
KECAMATAN : JATIREJO KEPALA TUKANG : Rp. 110,000.00
KABUPATEN : MOJOKERTO TUKANG : Rp. 100,000.00
TANGGAL : 28 Maret 2016 s/d 02 April 2016 PEKERJA : Rp. 85,000.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
28 29 30 31 1 2 HOK INSENTIF (RP.)

1 Kepala Tukang 1 1 1 1 1 1 6 Hari 660,000.00


1 2
2 Tukang 1 1 1 1 1 1 6 Hari 600,000.00

3 Tukang 1 1 1 1 1 1 6 Hari 600,000.00


3 4
4 Tukang 1 1 1 1 1 1 6 Hari 600,000.00

5 Tukang 1 1 1 1 1 1 6 Hari 600,000.00


5 6
6 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

7 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00


7 8
8 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

9 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00


9 10
10 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

11 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00


11 12
12 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

13 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00


13 14
14 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

15 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00


15 16
16 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

JUMLAH 8,670,000.00

Mengetahui, Mojokerto, 02 April 2016


KETUA TIM PENGELOLA KEGIATAN BENDAHARA TPK BKD
DS.LEBAKJABUNG KEC.JATIREJO DS.LEBAKJABUNG KEC.JATIREJO

................... ....................
K W I T A N S I
Kwitansi No. 001

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Lima Ratus Sembilan Puluh Lima Ribu Rupiah

UNTUK PEMBAYARAN : Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan Musyawarah I
Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG Rp 1,625,000.00

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, 02 November 2015


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, 02 November 2015

ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Tiga Ratus Empat Puluh Dua Ribu Lima Ratus Rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!
ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. 003

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Lima Ratus Sembilan Puluh Lima Ribu Rupiah

UNTUK PEMBAYARAN : Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan Musyawarah II
Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG Rp 1,625,000.00

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, 06 November 2015


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, 06 November 2015

ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Lima Juta Empat Ratus Empat Puluh Lima Ribu Rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. 004

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Tiga Ratus Lima Puluh Ribu Rupiah

UNTUK PEMBAYARAN : Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan Musyawarah III
Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG Rp 552,500.00

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, 03 Desember 2015


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, 03 Desember 2015

ANTON KURNIAWAN SUTRISNO WINARJO ........................................


K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Dua Juta Dua Ratus Dua Puluh Empat Dua Ratus Lima Puluh Empat Rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Empat belas Juta Enam Ratus Tiga Puluh Ribu Rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Tiga Juta Tujuh Ratus Enam Puluh Tiga Ribu Rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................


K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Lima Belas Juta Lima Ratus Sembilan Puluh Enam Ribu Tiga Ratus Empat Puluh Lima Rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Tujuh Belas Juta Sembilan Ratus Sembilan Puluh Dua Ribu Sembilan Ratus Rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!
ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Sembilan Belas Juta Lima Ratus Ribu Rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Tiga Belas Juta Sembilan Ratus Lima Puluh Enam Ribu Rupiah
UNTUK PEMBAYARAN : #REF!
Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Dua Juta Lima Ratus Tiga Puluh Tujuh Ribu Lima Ratus Rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................


K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Dua Puluh Dua Juta Tujuh Ratus Lima Puluh Ribu Rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Dua Juta Seratus Tujuh Puluh Lima Ribu Rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Sembilan Belas Juta Lima Ratus Ribu Rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................


K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Dua Juta Seratus Tujuh Puluh Lima Ribu Rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Sembilan Belas Juta Lima Ratus Ribu Rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!
ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Tiga Belas Juta Sembilan Ratus Lima Puluh Enam Ribu Rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Satu Juta Dua Ratus Tiga Puluh Delapan Ribu Lima Ratus Rupiah
UNTUK PEMBAYARAN : #REF!
Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Dua Juta Lima Puluh Ribu Rupiah

UNTUK PEMBAYARAN : Pembayaran Honorarium Tim


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................


K W I T A N S I
Kwitansi No. 026

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Lima Ratus Sembilan Puluh Lima Ribu Rupiah

UNTUK PEMBAYARAN : Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan Musyawarah IV
Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG Rp 1,950,000.00

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, 30 Desember 2015


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, 30 Desember 2015

ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Kab. Mojokerto

JUMLAH UANG : Dua Puluh Sembilan Ribu Rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojoke
Kab. Mojokerto

JUMLAH UANG : Seratus delapan puluh satu ribu rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................


K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojoke
Kab. Mojokerto

JUMLAH UANG : Empat ratus ribu rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojoke
Kab. Mojokerto

JUMLAH UANG : Lima ratus dua puluh lima tibu rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!
ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojoke
Kab. Mojokerto

JUMLAH UANG : Lima ratus ribu rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................

K W I T A N S I
Kwitansi No. #REF!

SUDAH TERIMA DARI : Tim Pelaksana Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojoke
Kab. Mojokerto
JUMLAH UANG : Tiga ratus tiga puluh ribu rupiah

UNTUK PEMBAYARAN : #REF!


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

TERBILANG #REF!

Mengetahui Menyetujui Di Bayar Lunas Mojokerto, #REF!


Kepala Ketua Tim. Pelaksana Bendahara Yang Menerima
Desa Kesemen Tanggal, #REF!

ANTON KURNIAWAN SUTRISNO WINARJO ........................................


Total #REF!
RINCIAN BIAYA PEKERJA MINGGU KE - I (SATU)
Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

NILAI INSENTIF (TK)


NAMA DESA : KESEMEN MANDOR : Rp. 85,000.00
KECAMATAN : NGORO KEPALA TUKANG : Rp. -
KABUPATEN : MOJOKERTO TUKANG : Rp. 85,000.00
TANGGAL : 13 Januari 2014 s/d 18 Januari 2014 PEKERJA : Rp. 75,000.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
17 18 19 20 21 22 HOK INSENTIF (RP.)

1 Mandor 1 1 1 1 1 1 6 Hari 510,000.00 1

### Tukang Besi 1 1 1 1 1 1 6 Hari 510,000.00


3
### Tukang Besi 1 1 1 1 1 1 6 Hari 510,000.00
Tukang Besi 1 1 1 1 1 1 6 Hari 510,000.00

### Tukang Kayu 1 1 1 1 1 1 6 Hari 510,000.00


5
### Tukang Kayu 1 1 1 1 1 1 6 Hari 510,000.00

### Tukang Batu 1 1 1 1 1 1 6 Hari 510,000.00


7
### Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

### Pekerja 1 1 1 1 1 1 6 Hari 7,650,000.00


9
### Pekerja 1 1 1 1 1 1 6 Hari

### Pekerja 1 1 1 1 1 1 6 Hari


11
### Pekerja 1 1 1 1 1 1 6 Hari

### Pekerja 1 1 1 1 1 1 6 Hari


13
### Pekerja 1 1 1 1 1 1 6 Hari

### Pekerja 1 1 1 1 1 1 6 Hari


15
### Pekerja 1 1 1 1 1 1 6 Hari

### Pekerja 1 1 1 1 1 1 6 Hari


17
### Pekerja 1 1 1 1 1 1 6 Hari

JUMLAH 11,220,000.00

Mengetahui, Mojokerto, 18 Januari 2014


KEPALA DESA KESEMEN KETUA PANITIA PELAKSANA PEMBANGUNAN

89,760,000.00
ANTON KURNIAWAN SUTRISNO
RINCIAN BIAYA PEKERJA MINGGU KE - I ( SATU )
Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

NILAI INSENTIF (TK)


NAMA DESA : KESEMEN MANDOR : Rp. -
KECAMATAN : NGORO KEPALA TUKANG : Rp. 78,000.00
KABUPATEN : MOJOKERTO TUKANG : Rp. 76,000.00
TANGGAL : 13 Januari 2014 s/d 18 Januari 2014 PEKERJA : Rp. 66,000.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
13 14 15 16 17 18 HOK INSENTIF (RP.)

1 Tukang 1 1 1 1 1 1 6 Hari Rp 456,000.00


1
2 Tukang 1 1 1 1 1 1 6 Hari Rp 456,000.00
3 Tukang 1 1 1 1 1 1 6 Hari Rp 456,000.00
3
4 Tukang 1 1 1 1 1 1 6 Hari Rp 456,000.00
5 Tukang 1 1 1 1 1 1 6 Hari Rp 456,000.00
5
6 Tukang 1 1 1 1 1 1 6 Hari Rp 456,000.00
7 Tukang 1 1 1 1 1 1 6 Hari Rp 456,000.00
7
8 Kepala Tukang 1 1 1 1 1 1 6 Hari Rp 468,000.00
9 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
9
10 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
11 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
11
12 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
13 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
13
14 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
15 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
15
16 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
17 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
17
18 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
19 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
19
20 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
21 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
21
22 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
23 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
23
24 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
25 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
25
25
26 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
27 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
27
28 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
29 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
29
30 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
31 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
31
32 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
33 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00
33
34 Pekerja 1 1 1 1 1 1 6 Hari Rp 396,000.00

JUMLAH Rp 13,956,000.00

Mengetahui, Mojokerto, 18 Januari 2014


KEPALA DESA KESEMEN KETUA PANITIA PELAKSANA PEMBANGUNAN

ANTON KURNIAWAN SUTRISNO

RINCIAN BIAYA PEKERJA MINGGU KE - III (TIGA)


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

NILAI INSENTIF (TK)


NAMA DESA : KESEMEN MANDOR : Rp. 55,000.00
KECAMATAN : NGORO KEPALA TUKANG : Rp. 50,000.00
KABUPATEN : MOJOKERTO TUKANG : Rp. 45,000.00
TANGGAL : 20 Januari 2014 s/d 25 Januari 2014 PEKERJA : Rp. 37,500.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
20 1 2 3 4 5 HOK INSENTIF (RP.)

1 Mandor 1 1 1 1 1 1 6 Hari 330,000.00


1
2 Kepala Tukang 1 1 1 1 1 1 6 Hari -

3 Tukang Besi 1 1 1 1 1 1 6 Hari 510,000.00


3
4 Tukang Besi 1 1 1 1 1 1 6 Hari 510,000.00

5 Tukang Kayu 1 1 1 1 1 1 6 Hari 510,000.00


5
6 Tukang Kayu 1 1 1 1 1 1 6 Hari 510,000.00

7 Tukang Batu 1 1 1 1 1 1 6 Hari 510,000.00


7
7
8 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

9 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00


9
10 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

11 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00


11
12 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

13 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00


13
14 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

15 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00


15
16 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

17 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00


17
18 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

JUMLAH 7,830,000.00

Mengetahui, Mojokerto, 25 Januari 2014


KEPALA DESA KESEMEN KETUA PANITIA PELAKSANA PEMBANGUNAN

ANTON KURNIAWAN SUTRISNO

RINCIAN BIAYA PEKERJA MINGGU KE - IV (EMPAT)


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

NILAI INSENTIF (TK)


NAMA DESA : KESEMEN MANDOR : Rp. 55,000.00
KECAMATAN : NGORO KEPALA TUKANG : Rp. 50,000.00
KABUPATEN : MOJOKERTO TUKANG : Rp. 45,000.00
TANGGAL : 27 Januari 2014 s/d 01 Februari 2014 PEKERJA : Rp. 37,500.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
7 8 9 10 11 12 HOK INSENTIF (RP.)

1 Mandor 1 1 1 1 1 1 6 Hari 330,000.00


1
2 Kepala Tukang 1 1 1 1 1 1 6 Hari -

3 Tukang Besi 1 1 1 1 1 1 6 Hari 510,000.00


3
4 Tukang Besi 1 1 1 1 1 1 6 Hari 510,000.00

5 Tukang Kayu 1 1 1 1 1 1 6 Hari 510,000.00


5
6 Tukang Kayu 1 1 1 1 1 1 6 Hari 510,000.00
7 Tukang Batu 1 1 1 1 1 1 6 Hari 510,000.00
7
8 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

9 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00


9
10 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

11 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00


11
12 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

13 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00


13
14 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

15 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00


15
16 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

17 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00


17
18 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

JUMLAH 7,830,000.00

Mengetahui, Mojokerto, 01 Februari 2014


KEPALA DESA KESEMEN KETUA PANITIA PELAKSANA PEMBANGUNAN

ANTON KURNIAWAN SUTRISNO

RINCIAN BIAYA PEKERJA MINGGU KE - V (LIMA)


Kegiatan Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto

NILAI INSENTIF (TK)


NAMA DESA : KESEMEN MANDOR : Rp. 55,000.00
KECAMATAN : NGORO KEPALA TUKANG : Rp. 50,000.00
KABUPATEN : MOJOKERTO TUKANG : Rp. 45,000.00
TANGGAL : 03 Februari 2014 s/d 08 Februari 2014 PEKERJA : Rp. 37,500.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
14 15 16 17 18 19 HOK INSENTIF (RP.)

1 Mandor 1 1 1 1 1 1 6 Hari 330,000.00


1
2 Kepala Tukang 1 1 1 1 1 1 6 Hari -

3 Tukang Besi 1 1 1 1 1 1 6 Hari 510,000.00


3
4 Tukang Besi 1 1 1 1 1 1 6 Hari 510,000.00

5 Tukang Kayu 1 1 1 1 1 1 6 Hari 510,000.00


5
6 Tukang Kayu 1 1 1 1 1 1 6 Hari 510,000.00
7 Tukang Batu 1 1 1 1 1 1 6 Hari 510,000.00
7
8 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

9 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00


9
10 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

11 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00


11
12 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

13 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00


13
14 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

15 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00


15
16 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

17 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00


17
18 Pekerja 1 1 1 1 1 1 6 Hari 450,000.00

JUMLAH 7,830,000.00

Mengetahui, Mojokerto, 08 Februari 2014


KEPALA DESA KESEMEN KETUA PANITIA PELAKSANA PEMBANGUNAN

ANTON KURNIAWAN SUTRISNO


TANDA TANGAN

10

12

14

16

18

NA PEMBANGUNAN

NO
TANDA TANGAN

10

12

14

16

18

20

22

24

26
26

28

30

32

34

8 Januari 2014
KSANA PEMBANGUNAN

RISNO

TANDA TANGAN

8
8

10

12

14

16

18

NA PEMBANGUNAN

NO

TANDA TANGAN

6
8

10

12

14

16

18

NA PEMBANGUNAN

NO

TANDA TANGAN

6
8

10

12

14

16

18

NA PEMBANGUNAN

NO
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto KEGIATAN
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto LOKASI
MINGGU KE : I (SATU) MINGGU KE
TANGGAL : 13 Januari 2014 s/d 18 Januari 2014 TANGGAL

PROGRESS BOBOT
BOBOT PEK. THD
NO URAIAN PEKERJAAN PEKERJAAN PROGRESS NO
TOTAL NILAI
(%) (%)

I
I PEKERJAAN PERSIAPAN 1.29 65.91 0.85 1
2
II PEKERJAAN JALAN BETON RIGIT L = 2,5 M, P = 300 M 81.52 13.85 11.29 3

III PEKERJAAN JALAN BETON RIGIT L = 2,2 M, P = 70 M 17.19 - - II


1
2
3
4
5
6
JUMLAH 100.00 12.14 7

PROGRESS LAPANGAN 12.14 III


PROGRESS RENCANA 7.45 1
PEKERJAAN MAJU 4.69 2
PEKERJAAN MUNDUR - 3
4
5
Mojokerto, 18 Januari 2014 6
7
Mengetahui / Menyetujui Dibuat Oleh,
Kepala Desa Tim Pelaksana Kegiatan
Ds. Kesemen Kec. Ngoro Kab. Mojokerto Ds. Kesemen Kec. Ngoro Kab. Mojokerto

Ds. Kesemen

ANTON KURNIAWAN SUTRISNO


Ketua
LAPORAN MINGGUAN

KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto
MINGGU KE : I (SATU)
TANGGAL : ### s/d 18 Januari 2014

HARGA SATUAN JUMLAH HARGA BOBOT PEK.


URAIAN PEKERJAAN VOLUME SAT. THD TOTAL
Rp. Rp. NILAI

PEKERJAAN PERSIAPAN
Uitzet Pengukuran 1.00 ls 350,000.00 350,000.00 0.20
Pembersihan Lokasi Awal dan Akhir 1.00 ls 1,500,000.00 1,500,000.00 0.88
Papan Nama 1.00 ls 350,000.00 350,000.00 0.20
1.29
PEKERJAAN JALAN BETON RIGIT L = 2,5 M, P = 300 M
Urugan Pasir 37.50 m3 129,850.00 4,869,375.00 2.85
Urugan Tanah Berm 22.50 m3 98,800.00 2,223,000.00 1.30
Plastik 0.8 micron 750.00 m2 12,000.00 9,000,000.00 5.27
Beton K-225 t = 15 cm 112.50 m3 682,524.62 76,784,019.89 44.96
Expantion Joint Dowel dia. 16 - 50 cm 487.50 kg 19,769.00 9,637,387.50 5.64
Balok Kopel 10/10 cm 3,030.00 kg 8,744.00 26,494,320.00 15.51
Begesting 90.00 m2 113,565.00 10,220,850.00 5.98
81.52
PEKERJAAN JALAN BETON RIGIT L = 2,2 M, P = 70 M
Urugan Pasir 8.90 m3 129,850.00 1,155,665.00 0.68
Urugan Tanah Berm 7.92 m3 98,800.00 782,496.00 0.46
Plastik 0.8 micron 154.00 m2 12,000.00 1,848,000.00 1.08
Beton K-225 t = 15 cm 23.10 m3 682,524.62 15,766,318.75 9.23
Expantion Joint Dowel dia. 16 - 50 cm 100.10 kg 19,769.00 1,978,876.90 1.16
Balok Kopel 10/10 cm 622.16 kg 8,744.00 5,440,167.04 3.19
Begesting 21.00 m2 113,565.00 2,384,865.00 1.40
17.19
Jumlah Total 170,785,341.08 100.00
#REF!
Mojokerto,

Mengetahui / Menyetujui Dibuat Oleh,


Kepala Desa Tim Pelaksana Kegiatan
Ds. Kesemen Kec. Ngoro Kab. Mojokerto Ds. Kesemen Kec. Ngoro Kab. Mojokerto

ANTON KURNIAWAN SUTRISNO


Ketua
TIME SCHEDULE

KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto
MINGGU KE : I (SATU)
TANGGAL : 13 Januari 2014 s/d 18 Januari 2014

PROGRESS BOBOT BULAN KE I BULAN KE II


BOBOT
PEKERJAAN PROGRESS NO. URAIAN PEKERJAAN
(%) MG. I MG. II MG. III MG. IV MG. V MG. VI
(%) (%)

I PEKERJAAN PERSIAPAN
100 0.20 1 Uitzet Pengukuran 0.205 0.205
50 0.44 2 Pembersihan Lokasi Awal dan Akhir 0.878 0.439
100 0.20 3 Papan Nama 0.205 0.205
0.85
II PEKERJAAN JALAN BETON RIGIT L = 2,5 M, P = 300 M
100 2.85 1 Urugan Pasir 2.851 2.851
- 2 Urugan Tanah Berm 1.302 1.302
75 3.95 3 Plastik 0.8 micron 5.270 1.757 1.757 1.757
- 4 Beton K-225 t = 15 cm 44.959 22.480 22.480
- 5 Expantion Joint Dowel dia. 16 - 50 cm 5.643 1.881 1.881 1.881
- 6 Balok Kopel 10/10 cm 15.513 5.171 5.171 5.171
75 4.49 7 Begesting 5.985 1.995 1.995 1.995
11.29
III PEKERJAAN JALAN BETON RIGIT L = 2,2 M, P = 70 M
- 1 Urugan Pasir 0.677 0.677
- 2 Urugan Tanah Berm 0.458
- 3 Plastik 0.8 micron 1.082 0.541
- 4 Beton K-225 t = 15 cm 9.232
- 5 Expantion Joint Dowel dia. 16 - 50 cm 1.159 0.579
- 6 Balok Kopel 10/10 cm 3.185 1.593
- 7 Begesting 1.396 0.698
-
12.14 Jumlah Total 82.81
RENCANA Mingguan - 7.45 10.80 10.80 29.53 22.48 5.39
18 Januari 2014 Komulatif - 7.45 18.26 29.06 58.59 81.07 86.46
REALISASI Mingguan - 12.14
Komulatif - 12.14
Pelaksana Kegiatan DEVIASI 4.69
Kec. Ngoro Kab. Mojokerto

Mojokerto,

Mengetahui / Menyetujui Dibuat Oleh,


Kepala Desa Tim Pelaksana Kegiatan
Ds. Kesemen Kec. Ngoro Kab. Mojokerto Ds. Kesemen Kec. Ngoro Kab. Mojokert
###
###
###
###
###
ANTON KURNIAWAN SUTRISNO
Ketua
BULAN KE II
KET.
MG. VII MG. VIII

100

0.439

75

50

0.458 25
0.541
4.616 4.616
0.579
1.593
0.698 0

8.03 5.51
94.49 100.00 RENCANA

REALISASI

18 Januari 2014

Dibuat Oleh,
Tim Pelaksana Kegiatan
emen Kec. Ngoro Kab. Mojokerto

SUTRISNO
Ketua
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto KEGIATAN
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto LOKASI
MINGGU KE : II (DUA) MINGGU KE
TANGGAL : 20 Januari 2014 s/d 25 Januari 2014 TANGGAL

PROGRESS BOBOT
BOBOT PEK. THD
NO URAIAN PEKERJAAN PEKERJAAN PROGRESS NO
TOTAL NILAI
(%) (%)

I
I PEKERJAAN PERSIAPAN 1.29 65.91 0.85 1
2
II PEKERJAAN JALAN BETON RIGIT L = 2,5 M, P = 300 M 81.52 36.77 29.97 3

III PEKERJAAN JALAN BETON RIGIT L = 2,2 M, P = 70 M 17.19 - - II


1
2
3
4
5
6
JUMLAH 100.00 30.82 7

PROGRESS LAPANGAN 30.82 III


PROGRESS RENCANA 18.26 1
PEKERJAAN MAJU 12.57 2
PEKERJAAN MUNDUR - 3
4
5
Mojokerto, 25 Januari 2014 6
7
Mengetahui / Menyetujui Dibuat Oleh,
Kepala Desa Tim Pelaksana Kegiatan
Ds. Kesemen Kec. Ngoro Kab. Mojokerto Ds. Kesemen Kec. Ngoro Kab. Mojokerto

Ds. Kesemen

ANTON KURNIAWAN SUTRISNO


Ketua
LAPORAN MINGGUAN

KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto
MINGGU KE : II (DUA)
TANGGAL : ### s/d 25 Januari 2014

HARGA SATUAN JUMLAH HARGA BOBOT PEK.


URAIAN PEKERJAAN VOLUME SAT. THD TOTAL
Rp. Rp. NILAI

PEKERJAAN PERSIAPAN
Uitzet Pengukuran 1.00 ls 350,000.00 350,000.00 0.20
Pembersihan Lokasi Awal dan Akhir 1.00 ls 1,500,000.00 1,500,000.00 0.88
Papan Nama 1.00 ls 350,000.00 350,000.00 0.20
1.29
PEKERJAAN JALAN BETON RIGIT L = 2,5 M, P = 300 M
Urugan Pasir 37.50 m3 129,850.00 4,869,375.00 2.85
Urugan Tanah Berm 22.50 m3 98,800.00 2,223,000.00 1.30
Plastik 0.8 micron 750.00 m2 12,000.00 9,000,000.00 5.27
Beton K-225 t = 15 cm 112.50 m3 682,524.62 76,784,019.89 44.96
Expantion Joint Dowel dia. 16 - 50 cm 487.50 kg 19,769.00 9,637,387.50 5.64
Balok Kopel 10/10 cm 3,030.00 kg 8,744.00 26,494,320.00 15.51
Begesting 90.00 m2 113,565.00 10,220,850.00 5.98
81.52
PEKERJAAN JALAN BETON RIGIT L = 2,2 M, P = 70 M
Urugan Pasir 8.90 m3 129,850.00 1,155,665.00 0.68
Urugan Tanah Berm 7.92 m3 98,800.00 782,496.00 0.46
Plastik 0.8 micron 154.00 m2 12,000.00 1,848,000.00 1.08
Beton K-225 t = 15 cm 23.10 m3 682,524.62 15,766,318.75 9.23
Expantion Joint Dowel dia. 16 - 50 cm 100.10 kg 19,769.00 1,978,876.90 1.16
Balok Kopel 10/10 cm 622.16 kg 8,744.00 5,440,167.04 3.19
Begesting 21.00 m2 113,565.00 2,384,865.00 1.40
17.19
Jumlah Total 170,785,341.08 100.00
#REF!
Mojokerto,

Mengetahui / Menyetujui Dibuat Oleh,


Kepala Desa Tim Pelaksana Kegiatan
Ds. Kesemen Kec. Ngoro Kab. Mojokerto Ds. Kesemen Kec. Ngoro Kab. Mojokerto
TIME SCHEDULE

KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto
MINGGU KE : II (DUA)
TANGGAL : 20 Januari 2014 s/d 25 Januari 2014

PROGRESS BOBOT BULAN KE I BULAN KE II


BOBOT
PEKERJAAN PROGRESS NO. URAIAN PEKERJAAN
(%) MG. I MG. II MG. III MG. IV MG. V MG. VI
(%) (%)

I PEKERJAAN PERSIAPAN
100 0.20 1 Uitzet Pengukuran 0.205 0.205
50 0.44 2 Pembersihan Lokasi Awal dan Akhir 0.878 0.439
100 0.20 3 Papan Nama 0.205 0.205
0.85
II PEKERJAAN JALAN BETON RIGIT L = 2,5 M, P = 300 M
100 2.85 1 Urugan Pasir 2.851 2.851
- 2 Urugan Tanah Berm 1.302 1.302
100 5.27 3 Plastik 0.8 micron 5.270 1.757 1.757 1.757
- 4 Beton K-225 t = 15 cm 44.959 22.480 22.480
75 4.23 5 Expantion Joint Dowel dia. 16 - 50 cm 5.643 1.881 1.881 1.881
75 11.63 6 Balok Kopel 10/10 cm 15.513 5.171 5.171 5.171
100 5.98 7 Begesting 5.985 1.995 1.995 1.995
29.97
III PEKERJAAN JALAN BETON RIGIT L = 2,2 M, P = 70 M
- 1 Urugan Pasir 0.677 0.677
- 2 Urugan Tanah Berm 0.458
- 3 Plastik 0.8 micron 1.082 0.541
- 4 Beton K-225 t = 15 cm 9.232
- 5 Expantion Joint Dowel dia. 16 - 50 cm 1.159 0.579
- 6 Balok Kopel 10/10 cm 3.185 1.593
- 7 Begesting 1.396 0.698
-
30.82 Jumlah Total 82.81
RENCANA Mingguan - 7.45 10.80 10.80 29.53 22.48 5.39
25 Januari 2014 Komulatif - 7.45 18.26 29.06 58.59 81.07 86.46
REALISASI Mingguan - 12.14 18.68
Komulatif - 12.14 30.82
Pelaksana Kegiatan DEVIASI 4.69 12.57
Kec. Ngoro Kab. Mojokerto

Mojokerto,

Mengetahui / Menyetujui Dibuat Oleh,


Kepala Desa Tim Pelaksana Kegiatan
BULAN KE II
KET.
MG. VII MG. VIII

100

0.439

75

50

0.458 25
0.541
4.616 4.616
0.579
1.593
0.698 0

8.03 5.51
94.49 100.00 RENCANA

REALISASI

25 Januari 2014

Dibuat Oleh,
Tim Pelaksana Kegiatan
LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto KEGIATAN
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto LOKASI
MINGGU KE : III (TIGA) MINGGU KE
TANGGAL : 27 Januari 2014 s/d 01 Februari 2014 TANGGAL

PROGRESS BOBOT
BOBOT PEK. THD
NO URAIAN PEKERJAAN PEKERJAAN PROGRESS NO
TOTAL NILAI
(%) (%)

I
I PEKERJAAN PERSIAPAN 1.29 65.91 0.85 1
2
II PEKERJAAN JALAN BETON RIGIT L = 2,5 M, P = 300 M 81.52 76.34 62.24 3

III PEKERJAAN JALAN BETON RIGIT L = 2,2 M, P = 70 M 17.19 - - II


1
2
3
4
5
6
JUMLAH 100.00 63.09 7

PROGRESS LAPANGAN 63.09 III


PROGRESS RENCANA 29.06 1
PEKERJAAN MAJU 34.03 2
PEKERJAAN MUNDUR - 3
4
5
ANTON KURNIAWAN SUTRISNO
Ketua

LAPORAN MINGGUAN

KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto
MINGGU KE : III (TIGA)
TANGGAL : ### s/d 01 Februari 2014

HARGA SATUAN JUMLAH HARGA BOBOT PEK.


URAIAN PEKERJAAN VOLUME SAT. THD TOTAL
Rp. Rp. NILAI

PEKERJAAN PERSIAPAN
Uitzet Pengukuran 1.00 ls 350,000.00 350,000.00 0.20
Pembersihan Lokasi Awal dan Akhir 1.00 ls 1,500,000.00 1,500,000.00 0.88
Papan Nama 1.00 ls 350,000.00 350,000.00 0.20
1.29
PEKERJAAN JALAN BETON RIGIT L = 2,5 M, P = 300 M
Urugan Pasir 37.50 m3 129,850.00 4,869,375.00 2.85
Urugan Tanah Berm 22.50 m3 98,800.00 2,223,000.00 1.30
Plastik 0.8 micron 750.00 m2 12,000.00 9,000,000.00 5.27
Beton K-225 t = 15 cm 112.50 m3 682,524.62 76,784,019.89 44.96
Expantion Joint Dowel dia. 16 - 50 cm 487.50 kg 19,769.00 9,637,387.50 5.64
Balok Kopel 10/10 cm 3,030.00 kg 8,744.00 26,494,320.00 15.51
Begesting 90.00 m2 113,565.00 10,220,850.00 5.98
81.52
PEKERJAAN JALAN BETON RIGIT L = 2,2 M, P = 70 M
Urugan Pasir 8.90 m3 129,850.00 1,155,665.00 0.68
Urugan Tanah Berm 7.92 m3 98,800.00 782,496.00 0.46
Plastik 0.8 micron 154.00 m2 12,000.00 1,848,000.00 1.08
Beton K-225 t = 15 cm 23.10 m3 682,524.62 15,766,318.75 9.23
Expantion Joint Dowel dia. 16 - 50 cm 100.10 kg 19,769.00 1,978,876.90 1.16
Ds. Kesemen Kec. Ngoro Kab. Mojokerto Ds. Kesemen Kec. Ngoro Kab. Mojokert
###
###
###
###
###
ANTON KURNIAWAN SUTRISNO
Ketua

TIME SCHEDULE

KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto
MINGGU KE : III (TIGA)
TANGGAL : 27 Januari 2014 s/d 01 Februari 2014

PROGRESS BOBOT BULAN KE I BULAN KE II


BOBOT
PEKERJAAN PROGRESS NO. URAIAN PEKERJAAN
(%) MG. I MG. II MG. III MG. IV MG. V MG. VI
(%) (%)

I PEKERJAAN PERSIAPAN
100 0.20 1 Uitzet Pengukuran 0.205 0.205
50 0.44 2 Pembersihan Lokasi Awal dan Akhir 0.878 0.439
100 0.20 3 Papan Nama 0.205 0.205
0.85
II PEKERJAAN JALAN BETON RIGIT L = 2,5 M, P = 300 M
100 2.85 1 Urugan Pasir 2.851 2.851
- 2 Urugan Tanah Berm 1.302 1.302
100 5.27 3 Plastik 0.8 micron 5.270 1.757 1.757 1.757
60 26.98 4 Beton K-225 t = 15 cm 44.959 22.480 22.480
100 5.64 5 Expantion Joint Dowel dia. 16 - 50 cm 5.643 1.881 1.881 1.881
100 15.51 6 Balok Kopel 10/10 cm 15.513 5.171 5.171 5.171
100 5.98 7 Begesting 5.985 1.995 1.995 1.995
62.24
III PEKERJAAN JALAN BETON RIGIT L = 2,2 M, P = 70 M
- 1 Urugan Pasir 0.677 0.677
- 2 Urugan Tanah Berm 0.458
- 3 Plastik 0.8 micron 1.082 0.541
- 4 Beton K-225 t = 15 cm 9.232
- 5 Expantion Joint Dowel dia. 16 - 50 cm 1.159 0.579
emen Kec. Ngoro Kab. Mojokerto

SUTRISNO
Ketua

BULAN KE II
KET.
MG. VII MG. VIII

100

0.439

75

50

0.458 25
0.541
4.616 4.616
0.579
Mojokerto, 01 Februari 2014 6
7
Mengetahui / Menyetujui Dibuat Oleh,
Kepala Desa Tim Pelaksana Kegiatan
Ds. Kesemen Kec. Ngoro Kab. Mojokerto Ds. Kesemen Kec. Ngoro Kab. Mojokerto

Ds. Kesemen

ANTON KURNIAWAN SUTRISNO


Ketua

LAPORAN KEMAJUAN PEKERJAAN

KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto KEGIATAN
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto LOKASI
MINGGU KE : IV (EMPAT) MINGGU KE
TANGGAL : 03 Februari 2014 s/d 08 Februari 2014 TANGGAL

PROGRESS BOBOT
BOBOT PEK. THD
NO URAIAN PEKERJAAN PEKERJAAN PROGRESS NO
TOTAL NILAI
(%) (%)

I
I PEKERJAAN PERSIAPAN 1.29 65.91 0.85 1
2
II PEKERJAAN JALAN BETON RIGIT L = 2,5 M, P = 300 M 81.52 100.00 81.52 3
Balok Kopel 10/10 cm 622.16 kg 8,744.00 5,440,167.04 3.19
Begesting 21.00 m2 113,565.00 2,384,865.00 1.40
17.19
Jumlah Total 170,785,341.08 100.00
#REF!
Mojokerto,

Mengetahui / Menyetujui Dibuat Oleh,


Kepala Desa Tim Pelaksana Kegiatan
Ds. Kesemen Kec. Ngoro Kab. Mojokerto Ds. Kesemen Kec. Ngoro Kab. Mojokerto

ANTON KURNIAWAN SUTRISNO


Ketua

LAPORAN MINGGUAN

KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto
MINGGU KE : IV (EMPAT)
TANGGAL : ### s/d 08 Februari 2014

HARGA SATUAN JUMLAH HARGA BOBOT PEK.


URAIAN PEKERJAAN VOLUME SAT. THD TOTAL
Rp. Rp. NILAI

PEKERJAAN PERSIAPAN
Uitzet Pengukuran 1.00 ls 350,000.00 350,000.00 0.20
Pembersihan Lokasi Awal dan Akhir 1.00 ls 1,500,000.00 1,500,000.00 0.88
Papan Nama 1.00 ls 350,000.00 350,000.00 0.20
1.29
- 6 Balok Kopel 10/10 cm 3.185 1.593
- 7 Begesting 1.396 0.698
-
63.09 Jumlah Total 82.81
RENCANA Mingguan - 7.45 10.80 10.80 29.53 22.48 5.39
01 Februari 2014 Komulatif - 7.45 18.26 29.06 58.59 81.07 86.46
REALISASI Mingguan - 12.14 18.68 32.26
Komulatif - 12.14 30.82 63.09
Pelaksana Kegiatan DEVIASI 4.69 12.57 34.03
Kec. Ngoro Kab. Mojokerto

Mojokerto,

Mengetahui / Menyetujui Dibuat Oleh,


Kepala Desa Tim Pelaksana Kegiatan
Ds. Kesemen Kec. Ngoro Kab. Mojokerto Ds. Kesemen Kec. Ngoro Kab. Mojokert
###
###
###
###
###
ANTON KURNIAWAN SUTRISNO
Ketua

TIME SCHEDULE

KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto
MINGGU KE : IV (EMPAT)
TANGGAL : 03 Februari 2014 s/d 08 Februari 2014

PROGRESS BOBOT BULAN KE I BULAN KE II


BOBOT
PEKERJAAN PROGRESS NO. URAIAN PEKERJAAN
(%) MG. I MG. II MG. III MG. IV MG. V MG. VI
(%) (%)

I PEKERJAAN PERSIAPAN
100 0.20 1 Uitzet Pengukuran 0.205 0.205
50 0.44 2 Pembersihan Lokasi Awal dan Akhir 0.878 0.439
100 0.20 3 Papan Nama 0.205 0.205
0.85
1.593
0.698 0

8.03 5.51
94.49 100.00 RENCANA

REALISASI

01 Februari 2014

Dibuat Oleh,
Tim Pelaksana Kegiatan
emen Kec. Ngoro Kab. Mojokerto

SUTRISNO
Ketua

BULAN KE II
KET.
MG. VII MG. VIII

100

0.439
III PEKERJAAN JALAN BETON RIGIT L = 2,2 M, P = 70 M 17.19 22.15 3.81 II
1
2
3
4
5
6
JUMLAH 100.00 86.18 7

PROGRESS LAPANGAN 86.18 III


PROGRESS RENCANA 58.59 1
PEKERJAAN MAJU 27.59 2
PEKERJAAN MUNDUR - 3
4
5
Mojokerto, 08 Februari 2014 6
7
Mengetahui / Menyetujui Dibuat Oleh,
Kepala Desa Tim Pelaksana Kegiatan
Ds. Kesemen Kec. Ngoro Kab. Mojokerto Ds. Kesemen Kec. Ngoro Kab. Mojokerto

Ds. Kesemen

ANTON KURNIAWAN SUTRISNO


Ketua

LAPORAN KEMAJUAN PEKERJAAN


PEKERJAAN JALAN BETON RIGIT L = 2,5 M, P = 300 M
Urugan Pasir 37.50 m3 129,850.00 4,869,375.00 2.85
Urugan Tanah Berm 22.50 m3 98,800.00 2,223,000.00 1.30
Plastik 0.8 micron 750.00 m2 12,000.00 9,000,000.00 5.27
Beton K-225 t = 15 cm 112.50 m3 682,524.62 76,784,019.89 44.96
Expantion Joint Dowel dia. 16 - 50 cm 487.50 kg 19,769.00 9,637,387.50 5.64
Balok Kopel 10/10 cm 3,030.00 kg 8,744.00 26,494,320.00 15.51
Begesting 90.00 m2 113,565.00 10,220,850.00 5.98
81.52
PEKERJAAN JALAN BETON RIGIT L = 2,2 M, P = 70 M
Urugan Pasir 8.90 m3 129,850.00 1,155,665.00 0.68
Urugan Tanah Berm 7.92 m3 98,800.00 782,496.00 0.46
Plastik 0.8 micron 154.00 m2 12,000.00 1,848,000.00 1.08
Beton K-225 t = 15 cm 23.10 m3 682,524.62 15,766,318.75 9.23
Expantion Joint Dowel dia. 16 - 50 cm 100.10 kg 19,769.00 1,978,876.90 1.16
Balok Kopel 10/10 cm 622.16 kg 8,744.00 5,440,167.04 3.19
Begesting 21.00 m2 113,565.00 2,384,865.00 1.40
17.19
Jumlah Total 170,785,341.08 100.00
#REF!
Mojokerto,

Mengetahui / Menyetujui Dibuat Oleh,


Kepala Desa Tim Pelaksana Kegiatan
Ds. Kesemen Kec. Ngoro Kab. Mojokerto Ds. Kesemen Kec. Ngoro Kab. Mojokerto

ANTON KURNIAWAN SUTRISNO


Ketua

LAPORAN MINGGUAN
II PEKERJAAN JALAN BETON RIGIT L = 2,5 M, P = 300 M
100 2.85 1 Urugan Pasir 2.851 2.851
100 1.30 2 Urugan Tanah Berm 1.302 1.302
100 5.27 3 Plastik 0.8 micron 5.270 1.757 1.757 1.757
100 44.96 4 Beton K-225 t = 15 cm 44.959 22.480 22.480
100 5.64 5 Expantion Joint Dowel dia. 16 - 50 cm 5.643 1.881 1.881 1.881
100 15.51 6 Balok Kopel 10/10 cm 15.513 5.171 5.171 5.171
100 5.98 7 Begesting 5.985 1.995 1.995 1.995
81.52
III PEKERJAAN JALAN BETON RIGIT L = 2,2 M, P = 70 M
100 0.68 1 Urugan Pasir 0.677 0.677
- 2 Urugan Tanah Berm 0.458
100 1.08 3 Plastik 0.8 micron 1.082 0.541
- 4 Beton K-225 t = 15 cm 9.232
15 0.17 5 Expantion Joint Dowel dia. 16 - 50 cm 1.159 0.579
15 0.48 6 Balok Kopel 10/10 cm 3.185 1.593
100 1.40 7 Begesting 1.396 0.698
3.81
86.18 Jumlah Total 82.81
RENCANA Mingguan - 7.45 10.80 10.80 29.53 22.48 5.39
08 Februari 2014 Komulatif - 7.45 18.26 29.06 58.59 81.07 86.46
REALISASI Mingguan - 12.14 18.68 32.26 23.09
Komulatif - 12.14 30.82 63.09 86.18
Pelaksana Kegiatan DEVIASI 4.69 12.57 34.03 27.59
Kec. Ngoro Kab. Mojokerto

Mojokerto,

Mengetahui / Menyetujui Dibuat Oleh,


Kepala Desa Tim Pelaksana Kegiatan
Ds. Kesemen Kec. Ngoro Kab. Mojokerto Ds. Kesemen Kec. Ngoro Kab. Mojokert
###
###
###
###
###
ANTON KURNIAWAN SUTRISNO
Ketua

TIME SCHEDULE
75

50

0.458 25
0.541
4.616 4.616
0.579
1.593
0.698 0

8.03 5.51
94.49 100.00 RENCANA

REALISASI

08 Februari 2014

Dibuat Oleh,
Tim Pelaksana Kegiatan
emen Kec. Ngoro Kab. Mojokerto

SUTRISNO
Ketua
KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto KEGIATAN
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto LOKASI
MINGGU KE : V (LIMA) MINGGU KE
TANGGAL : 10 Februari 2014 s/d 15 Februari 2014 TANGGAL

PROGRESS BOBOT
BOBOT PEK. THD
NO URAIAN PEKERJAAN PEKERJAAN PROGRESS NO
TOTAL NILAI
(%) (%)

I
I PEKERJAAN PERSIAPAN 1.29 100.00 1.29 1
2
II PEKERJAAN JALAN BETON RIGIT L = 2,5 M, P = 300 M 81.52 100.00 81.52 3

III PEKERJAAN JALAN BETON RIGIT L = 2,2 M, P = 70 M 17.19 100.00 17.19 II


1
2
3
4
5
6
JUMLAH 100.00 100.00 7

PROGRESS LAPANGAN 100.00 III


PROGRESS RENCANA 81.07 1
PEKERJAAN MAJU 18.93 2
PEKERJAAN MUNDUR - 3
4
5
Mojokerto, 15 Februari 2014 6
7
Mengetahui / Menyetujui Dibuat Oleh,
Kepala Desa Tim Pelaksana Kegiatan
Ds. Kesemen Kec. Ngoro Kab. Mojokerto Ds. Kesemen Kec. Ngoro Kab. Mojokerto

Ds. Kesemen

ANTON KURNIAWAN SUTRISNO


Ketua
KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto
MINGGU KE : V (LIMA)
TANGGAL : ### s/d 15 Februari 2014

HARGA SATUAN JUMLAH HARGA BOBOT PEK.


URAIAN PEKERJAAN VOLUME SAT. THD TOTAL
Rp. Rp. NILAI

PEKERJAAN PERSIAPAN
Uitzet Pengukuran 1.00 ls 350,000.00 350,000.00 0.20
Pembersihan Lokasi Awal dan Akhir 1.00 ls 1,500,000.00 1,500,000.00 0.88
Papan Nama 1.00 ls 350,000.00 350,000.00 0.20
1.29
PEKERJAAN JALAN BETON RIGIT L = 2,5 M, P = 300 M
Urugan Pasir 37.50 m3 129,850.00 4,869,375.00 2.85
Urugan Tanah Berm 22.50 m3 98,800.00 2,223,000.00 1.30
Plastik 0.8 micron 750.00 m2 12,000.00 9,000,000.00 5.27
Beton K-225 t = 15 cm 112.50 m3 682,524.62 76,784,019.89 44.96
Expantion Joint Dowel dia. 16 - 50 cm 487.50 kg 19,769.00 9,637,387.50 5.64
Balok Kopel 10/10 cm 3,030.00 kg 8,744.00 26,494,320.00 15.51
Begesting 90.00 m2 113,565.00 10,220,850.00 5.98
81.52
PEKERJAAN JALAN BETON RIGIT L = 2,2 M, P = 70 M
Urugan Pasir 8.90 m3 129,850.00 1,155,665.00 0.68
Urugan Tanah Berm 7.92 m3 98,800.00 782,496.00 0.46
Plastik 0.8 micron 154.00 m2 12,000.00 1,848,000.00 1.08
Beton K-225 t = 15 cm 23.10 m3 682,524.62 15,766,318.75 9.23
Expantion Joint Dowel dia. 16 - 50 cm 100.10 kg 19,769.00 1,978,876.90 1.16
Balok Kopel 10/10 cm 622.16 kg 8,744.00 5,440,167.04 3.19
Begesting 21.00 m2 113,565.00 2,384,865.00 1.40
17.19
Jumlah Total 170,785,341.08 100.00
#REF!
Mojokerto,

Mengetahui / Menyetujui Dibuat Oleh,


Kepala Desa Tim Pelaksana Kegiatan
Ds. Kesemen Kec. Ngoro Kab. Mojokerto Ds. Kesemen Kec. Ngoro Kab. Mojokerto

ANTON KURNIAWAN SUTRISNO


Ketua
KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto
MINGGU KE : V (LIMA)
TANGGAL : 10 Februari 2014 s/d 15 Februari 2014

PROGRESS BOBOT BULAN KE I BULAN KE II


BOBOT
PEKERJAAN PROGRESS NO. URAIAN PEKERJAAN
(%) MG. I MG. II MG. III MG. IV MG. V MG. VI
(%) (%)

I PEKERJAAN PERSIAPAN
100 0.20 1 Uitzet Pengukuran 0.205 0.205
100 0.88 2 Pembersihan Lokasi Awal dan Akhir 0.878 0.439
100 0.20 3 Papan Nama 0.205 0.205
1.29
II PEKERJAAN JALAN BETON RIGIT L = 2,5 M, P = 300 M
100 2.85 1 Urugan Pasir 2.851 2.851
100 1.30 2 Urugan Tanah Berm 1.302 1.302
100 5.27 3 Plastik 0.8 micron 5.270 1.757 1.757 1.757
100 44.96 4 Beton K-225 t = 15 cm 44.959 22.480 22.480
100 5.64 5 Expantion Joint Dowel dia. 16 - 50 cm 5.643 1.881 1.881 1.881
100 15.51 6 Balok Kopel 10/10 cm 15.513 5.171 5.171 5.171
100 5.98 7 Begesting 5.985 1.995 1.995 1.995
81.52
III PEKERJAAN JALAN BETON RIGIT L = 2,2 M, P = 70 M
100 0.68 1 Urugan Pasir 0.677 0.677
100 0.46 2 Urugan Tanah Berm 0.458
100 1.08 3 Plastik 0.8 micron 1.082 0.541
100 9.23 4 Beton K-225 t = 15 cm 9.232
100 1.16 5 Expantion Joint Dowel dia. 16 - 50 cm 1.159 0.579
100 3.19 6 Balok Kopel 10/10 cm 3.185 1.593
100 1.40 7 Begesting 1.396 0.698
17.19
100.00 Jumlah Total 82.81
RENCANA Mingguan - 7.45 10.80 10.80 29.53 22.48 5.39
15 Februari 2014 Komulatif - 7.45 18.26 29.06 58.59 81.07 86.46
REALISASI Mingguan - 12.14 18.68 32.26 23.09 13.82
Komulatif - 12.14 30.82 63.09 86.18 100.00
Pelaksana Kegiatan DEVIASI 4.69 12.57 34.03 27.59 18.93
Kec. Ngoro Kab. Mojokerto

Mojokerto,

Mengetahui / Menyetujui Dibuat Oleh,


Kepala Desa Tim Pelaksana Kegiatan
Ds. Kesemen Kec. Ngoro Kab. Mojokerto Ds. Kesemen Kec. Ngoro Kab. Mojokert
###
###
###
###
###
ANTON KURNIAWAN SUTRISNO
Ketua
BULAN KE II
KET.
MG. VII MG. VIII

100

0.439

75

50

0.458 25
0.541
4.616 4.616
0.579
1.593
0.698 0

8.03 5.51
94.49 100.00 RENCANA

REALISASI

15 Februari 2014

Dibuat Oleh,
Tim Pelaksana Kegiatan
emen Kec. Ngoro Kab. Mojokerto

SUTRISNO
Ketua
PEMERINTAH KABUPATEN MOJOKERTO
KEGIATAN BANTUAN KEUANGAN DESA TAHUN 2015
DESA POHJEJER KECAMATAN GONDANG KABUPATEN MOJOKERTO

LAPORAN MINGGUAN

MINGGU KE : I (SATU)
S/D ###
TANGGAL :
###
PEKERJAAN : Pembangunan Jalan Beton
KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto
PEMERINTAH KABUPATEN MOJOKERTO
KEGIATAN BANTUAN KEUANGAN DESA TAHUN 2015
DESA POHJEJER KECAMATAN GONDANG KABUPATEN MOJOKERTO
LAPORAN MINGGUAN

MINGGU KE : II (DUA)
S/D ###
TANGGAL :
###
PEKERJAAN : Pembangunan Jalan Beton
KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto

PEMERINTAH KABUPATEN MOJOKERTO


KEGIATAN BANTUAN KEUANGAN DESA TAHUN 2015
DESA POHJEJER KECAMATAN GONDANG KABUPATEN MOJOKERTO
LAPORAN MINGGUAN

MINGGU KE : III (TIGA)


S/D ###
TANGGAL :
###
PEKERJAAN : Pembangunan Jalan Beton
KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto

PEMERINTAH KABUPATEN MOJOKERTO


KEGIATAN BANTUAN KEUANGAN DESA TAHUN 2015
DESA POHJEJER KECAMATAN GONDANG KABUPATEN MOJOKERTO
LAPORAN MINGGUAN

MINGGU KE : IV (EMPAT)
S/D ###
TANGGAL :
###
PEKERJAAN : Pembangunan Jalan Beton
KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto
PEMERINTAH KABUPATEN MOJOKERTO
KEGIATAN BANTUAN KEUANGAN DESA TAHUN 2015
DESA POHJEJER KECAMATAN GONDANG KABUPATEN MOJOKERTO

LAPORAN MINGGUAN

MINGGU KE : V (LIMA)
S/D ###
TANGGAL :
###
PEKERJAAN : Pembangunan Jalan Beton
KEGIATAN : Peningkatan Jalan Lingkungan Ds. Kesemen Kec. Ngoro Kab. Mojokerto
LOKASI : Ds. Kesemen Kec. Ngoro Kab. Mojokerto
Peningkatan Jalan Lingkungan Ds.Kenanten
Pembangunan Jalan Aspalt
Ds.Kenanten Kec.Puri Kab.Mojokerto
2012

Rincian Pekerjaan Peningkatan Jalan Lingkungan Ds.Pugeran Kec.Gondang


No. Uraian Volume Sat Harga Sat Jumlah
1 Batu Pecah 10 - 15 - m3 145,000.00 -
2 Batu Pecah 3 - 5 4.00 m3 135,000.00 540,000.00
3 Batu Pecah 2 - 3 Cm 3.00 m3 145,000.00 435,000.00
4 Batu Pecah 1 - 2 Cm 3.00 m3 145,000.00 435,000.00
5 Aspal - Drum 1,275,000.00 -
6 Aspal Cair /Emulsi 1.00 Drum 1,400,000.00 1,400,000.00
7 Minyak Bakar 10.00 ltr 8,500.00 85,000.00
8 Solar - ltr 4,500.00 -
9 Mesin gilas roda karet 8 ton(TR) - hari 525,000.00 -
10 Mesin Gilas Getar 10 ton 4.00 hari 450,000.00 1,800,000.00
11 Aspal Spreyer - hari 350,000.00 -
12 set alat hampar 1.00 set 3,500,000.00 3,500,000.00
13 alat Ukur (roll meter) - bh 127,500.00 -
14 cat pilok 1.00 bh 29,000.00 29,000.00
15 Papan Nama 1.00 bh 300,000.00 300,000.00
16 HRS 6.03 ton 845,000.00 5,091,125.00
17 HRS 6.12 ton 845,000.00 5,167,175.00
18 HRS 6.10 ton 845,000.00 5,154,500.00
19 HRS 6.20 ton 845,000.00 5,239,000.00
20 HRS 6.15 ton 845,000.00 5,196,750.00
21 HRS 6.11 ton 845,000.00 5,158,725.00
22 HRS 3.11 ton 845,000.00 2,623,725.00
23 HRS - ton 845,000.00 -
24 mandor 1 org 18.00 hari 55,000.00 990,000.00
25 Tukang 2 org 18.00 hari 45,000.00 1,620,000.00
26 buruh trampil 2 org 18.00 hari 40,000.00 1,440,000.00
27 buruh tak trampil 1 org 18.00 hari 35,000.00 630,000.00
Jumlah 46,835,000.00

Wajib Pajak
No. Uraian PPN PPH psl 4 (2) PPh psl 23 Jumlah
1 PPN dan PPh psl 4 (2) 136,363.64 54,545.45 - 190,909.09
2 PPh psl 23 - - 118,000.00 118,000.00
3 PPN Aspalt - - - -
4 PPN Emulsi 140,000.00 - - 140,000.00
5 PPN Aspalt HRS 509,112.50 - - 509,112.50
6 PPN Aspalt HRS 516,717.50 - - 516,717.50
7 PPN Aspalt HRS 515,450.00 - - 515,450.00
8 PPN Aspalt HRS 523,900.00 - - 523,900.00
9 PPN Aspalt HRS 519,675.00 - - 519,675.00
10 PPN Aspalt HRS 515,872.50 - - 515,872.50
11 PPN Aspalt HRS 262,372.50 - - 262,372.50
12 PPN Aspalt HRS - - - -
Jumlah 3,639,463.64 54,545.45 118,000.00 3,812,009.09
Rincian BOP Pekerjaan Peningkatan Jalan Lingkungan Ds.Pugeran Kec.Gondang
No. Uraian Volume Sat Harga Sat Jumlah
1 Biaya Perencanaan 1.00 - 1,500,000.00 1,500,000.00
2 Biaya Rapat Musyawarah Desa
- Makan 25.00 dos 16,800.00 420,000.00
- Minum 25.00 botol 1,500.00 37,500.00
3 Belanja ATK 1
- Kertas HVS 70 gr 3.00 pack 35,500.00 106,500.00
- Tinta Printer 2.00 Bh 27,500.00 55,000.00
- Bolpoint 2.00 Bh 12,500.00 25,000.00
- Pensil 2.00 Bh 6,300.00 12,600.00
- buku tulis 2.00 Bh 5,500.00 11,000.00
4 Biaya Rapat Musyawarah Desa
- Makan 25.00 dos 16,800.00 420,000.00
- Minum 25.00 botol 1,500.00 37,500.00
5 Belanja ATK 2
- Stopmap 8.00 Bh 1,500.00 12,000.00
- Snellhecter plastik 3.00 Bh 6,500.00 19,500.00
- staples 1.00 Bh 9,000.00 9,000.00
- Paper Clip 1.00 Bh 8,000.00 8,000.00
6 Belanja Foto copy
- Foto Copy 98.00 lmbr 175.00 17,150.00
7 Belanja Materai 1
- Materai 6000 12.00 - 6,500.00 78,000.00
- Materai 3000 10.00 - 3,500.00 35,000.00
8 Belanja ATK 3
- Isi Stapler 1.00 bh 8,600.00 8,600.00
- Bolpoint - bh 12,500.00 -
- kertas poto 1.00 bh 22,500.00 22,500.00
9 Biaya Rapat Musyawarah Desa
- Makan 25.00 dos 16,800.00 420,000.00
- Minum 25.00 botol 1,500.00 37,500.00
10 Belanja ATK 4
- Kertas HVS 70 gr 1.00 pack 35,500.00 35,500.00
- Tinta Printer 1.00 pack 27,500.00 27,500.00
11 Belanja Foto copy & Jilid -
- Foto Copy 150.00 lmbr 175.00 26,250.00
- jilid berkas 3.00 - 18,500.00 55,500.00
12 Belanja Materai 2
- Materai 6000 12.00 - 3,500.00 42,000.00
- Materai 3000 7.00 - 6,500.00 45,500.00
JUMLAH 3,524,600.00
REKAPITULASI PENERIMAAN DAN PENYETORAN PAJAK
KEGIATAN BANTUAN KEUANGAN DESA TAHUN 2015
DESA POHJEJER KECAMATAN GONDANG KABUPATEN MOJOKERTO

Penerimaan:
No Uraian Tanggal PPN PPh psl 4(2) PPh psl 23 Jumlah
1 PPh Psl 4(2) #REF! - -
4 PPN #REF! #REF! #REF!
6 PPN #REF! #REF! #REF!

No Uraian Tanggal PPN PPh psl 4(2) PPh psl 23 Jumlah


Jumlah Penyetoran Pajak #REF! #REF! #REF! #REF!
BUKU KAS UMUM
KEGIATAN BANTUAN KEUANGAN DESA TAHUN 2015
DESA POHJEJER KECAMATAN GONDANG KABUPATEN MOJOKERTO

Bukti Penerimaan Pengeluaran


No. Uraian Transaksi
Nomor Tanggal (Rp) (Rp)
1 2 3 4 5 6
1 001 02 November 2015 Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan Musyawarah I Rp 1,625,000.00
2 002 05 November 2015 Biaya Pembelian ATK I Rp 5,809,000.00
3 003 06 November 2015 Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan Musyawarah II Rp 1,625,000.00
20 Oktober 2014 Menerima Dana Bantuan Keuangan Desa Rp 500,000,000.00
4 004 03 Desember 2015 Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan Musyawarah III Rp 552,500.00
5 005 02 Desember 2015 Pembayaran Biaya Perencanaan teknis kegiatan Rp 13,400,000.00
05 September -30284 PPN 10% Rp 1,218,181.82
PPH 4% Rp 487,272.73
6 006 18 Desember 2015 Tenaga Perampingan /Pembersihan Lokasi Rp 400,000.00
7 007 18 Desember 2015 Biaya Pembelian Base Coarse Rp 36,168,440.00
23 Juni 26387 PPN 10% Rp 3,288,040.00
PPH 1,5% Pasal 22 Rp 493,206.00
8 008 19 Desember 2015 Biaya Pembelian Base Coarse Rp 46,016,740.00
41,833,400.00 PPN 10% Rp 4,183,340.00
PPH 1,5% Pasal 22 Rp 627,501.00
9 009 21 Desember 2015 Biaya Pembelian Base Coarse Rp 19,360,880.00
07 Mei -15447 PPN 10% Rp 1,760,080.00
PPH 1,5% Pasal 22 Rp 264,012.00
10 010 23 Desember 2015 Biaya Ongkos Pekerja Base Coarse (Mandor,Kepala Tukang,dan Pekerja) Minggu I Rp 8,670,000.00
11 011 25 Desember 2015 Biaya Pembelian Base Coarse Rp 3,666,740.00
15 Juli 11026 PPN 10% Rp 333,340.00
PPH 1,5% Pasal 22 Rp 50,001.00
12 012 25 Desember 2015 Biaya Mob-Tendem (Untuk Pemadatan Base Coarse) Rp 1,000,000.00
31 Desember 4388 PPN 10% Rp 90,909.09
PPH 2% Pasal 23 Rp 13,636.36
13 013 26 Desember 2015 Biaya Pembelian Base Coarse Rp 8,816,500.00
27 April 23844 PPN 10% Rp 801,500.00
PPH 1,5% Pasal 22 Rp 120,225.00
14 014 26 Desember 2015 Biaya Sewa Tendem Untuk Pemadatan Base Coarse Rp 900,000.00
06 Februari 4140 PPN 10% Rp 81,818.18
PPH 2% Pasal 23 Rp 12,272.73
Bukti Penerimaan Pengeluaran
No. Uraian Transaksi
Nomor Tanggal (Rp) (Rp)
15 015 26 Desember 2015 Biaya Mob-Demob Alat HRS Rp 5,000,000.00
10 Januari 14345 PPN 10% Rp 454,545.45
PPH 2% Pasal 23 Rp 68,181.82
16 016 26 Desember 2015 Biaya Pembelian Emulsi Rp 14,000,000.00
31 Januari -28790 PPN 10% Rp 1,272,727.27
PPH 1,5% Pasal 22 Rp 190,909.09
17 017 26 Desember 2015 Biaya Sewa Alat Untuk Penggelaran Hrs Rp 3,300,000.00
19 September 10113 PPN 10% Rp 300,000.00
PPH 2% Pasal 23 Rp 45,000.00
18 018 26 Desember 2015 Biaya Pembelian HRS Rp 257,724,000.00
02 September -11984 PPN 10% Rp 23,429,454.55
PPH 1,5% Pasal 22 Rp 3,514,418.18
19 019 27 Desember 2015 Biaya Ongkos Pekerja Base Coarse (Mandor,Kepala Tukang,dan Pekerja) Minggu II #REF!
20 020 28 Desember 2015 Biaya Pembelian HRS Rp 17,496,000.00
26 Agustus -20089 PPN 10% Rp 1,590,545.45
PPH 1,5% Pasal 22 Rp 238,581.82
21 021 29 Desember 2015 Biaya Pembelian Tanah Untuk Berm Rp -
22 022 29 Desember 2015 Pembuatan Banner ,Kayu Papan Rp 350,000.00
23 023 29 Desember 2015 Biaya Pembayaran Konsultan Pengawas Rp 5,500,000.00
24 024 29 Desember 2015 Biaya Pembayaran Honor Tim Rp 8,950,000.00
25 025 29 Desember 2015 Biaya Pembelian ATK II Rp 488,500.00
26 026 30 Desember 2015 Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan Musyawarah IV Rp 1,950,000.00

01 Januari 2016 Disetor Pajak PPn Dan PPh


PPN 10% Rp 38,804,481.82
PPH 1,5% (PASAL 22) Rp 6,125,217.73

JUMLAH Rp 500,000,000.00 #REF!


TOTAL SALDO

Mojokerto, 30 De
Dibuat Ole
Mengetahui Menyetujui: Menyetujui: Bendahar
Kepala Desa Ketua Tim Pengelola Kegiatan BKD Ketua Tim Pengawas Kegiatan BKD Tim Pengelola Kegi
Ds.Pohjejer Kec.Gondang Kab.Mojokerto Ds. Pohjejer Kec.Gondang Kab.Mojokerto Ds. Pohjejer Kec.Gondang Kab.Mojokerto Ds.Pohjejer Kec.Gondan

SIS EMAW

SUHARTO SUYONO EKO SUKARIYANTO


Dibuat Ole
Mengetahui Menyetujui: Menyetujui: Bendahar
Kepala Desa Ketua Tim Pengelola Kegiatan BKD Ketua Tim Pengawas Kegiatan BKD Tim Pengelola Kegi
Ds.Pohjejer Kec.Gondang Kab.Mojokerto Ds. Pohjejer Kec.Gondang Kab.Mojokerto Ds. Pohjejer Kec.Gondang Kab.Mojokerto Ds.Pohjejer Kec.Gondan

Bukti Penerimaan Pengeluaran


No. Uraian Transaksi
Nomor Tanggal (Rp) (Rp) SIS EMAW

SUHARTO SUYONO EKO SUKARIYANTO


UKU KAS UMUM
AN KEUANGAN DESA TAHUN 2015
TAN GONDANG KABUPATEN MOJOKERTO

Saldo
(Rp)
7
Rp (1,625,000.00)
Rp (7,434,000.00)
Rp (9,059,000.00)
Rp 490,941,000.00
Rp 490,388,500.00
Rp 476,988,500.00
Rp 476,988,500.00
Rp 476,988,500.00
Rp 476,588,500.00
Rp 440,420,060.00
Rp 440,420,060.00
Rp 440,420,060.00
Rp 394,403,320.00
Rp 394,403,320.00
Rp 394,403,320.00
Rp 375,042,440.00
Rp 375,042,440.00
Rp 375,042,440.00
Rp 366,372,440.00
Rp 362,705,700.00
Rp 362,705,700.00
Rp 362,705,700.00
Rp 361,705,700.00
Rp 361,705,700.00
Rp 361,705,700.00
Rp 352,889,200.00
Rp 352,889,200.00
Rp 352,889,200.00
Rp 351,989,200.00
Rp 351,989,200.00
Rp 351,989,200.00
Saldo
(Rp)
Rp 346,989,200.00
Rp 346,989,200.00
Rp 346,989,200.00
Rp 332,989,200.00
Rp 332,989,200.00
Rp 332,989,200.00
Rp 329,689,200.00
Rp 329,689,200.00
Rp 329,689,200.00
Rp 71,965,200.00
Rp 71,965,200.00
Rp 71,965,200.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

Mojokerto, 30 Desember 2015


Dibuat Oleh,
Bendahara
Tim Pengelola Kegiatan BKD
Ds.Pohjejer Kec.Gondang Kab.Mojokerto

SIS EMAWATI
Dibuat Oleh,
Bendahara
Tim Pengelola Kegiatan BKD
Ds.Pohjejer Kec.Gondang Kab.Mojokerto

Saldo
SIS EMAWATI (Rp)
Rincian Kegiatan BK-Desa Pohjejer Tahun 2015
Bukti Harga Satuan
Jumlah rekap Uraian Transaksi Volume Satuan
Nomor Tanggal (Rp)
001 02 November 2015 Rp 1,625,000.00 Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan Musyawarah I
Pembelian Makan 50 Kotak Rp 24,000.00
Pembelian Minum 50 Botol Rp 2,500.00
Pembelian Kue 50 Dus Rp 6,000.00
002 05 November 2015 Rp 5,809,000.00 Biaya Pembelian ATK I
Meteran 50 m 1 Bh 60,000
Meteran Kecil 2 Bh 10,000
Kertas HVS 70 Gram 3 Rim Rp 36,000.00
Bolpoint 12 Bh Rp 2,500.00
Camera Digital 1 Unit Rp 1,700,000.00
Tipe X 5 Bh Rp 5,100.00
Pensil 4 Bh Rp 2,000.00
Stop Map 10 Bh Rp 500.00
Printer 2 Unit Rp 1,800,000.00
Buku Tulis Sedang 5 Bh Rp 5,000.00
Buku Folio 5 Bh Rp 11,000.00
Snellhecter plastik 5 Bh Rp 6,000.00
Staples 3 Bh Rp 12,000.00
Paper Clip 10 Bh Rp 3,000.00
Foto Copy 510 Lmbar Rp 150.00
003 06 November 2015 Rp 1,625,000.00 Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan Musyawarah II
Pembelian Makan 50 Kotak Rp 24,000.00
Pembelian Minum 50 Botol Rp 2,500.00
Pembelian Kue 50 Dus Rp 6,000.00
09 November 2015 Undangan Permintaan Penawaran Jasa Perencanaan
Undangan Permintaan Penawaran Jasa Perencanaan
12 November 2015 Pemasukan / Pembukaan Penawaran Jasa Perencanaan
Pemasukan / Pembukaan Penawaran Jasa Perencanaan
12 November 2015 Negosiasi Penawaran Jasa Perencanaan
Negosiasi Penawaran Jasa Perencanaan
17 November 2015 Penetapan Penyedia Jasa Perencanaan
Penetapan Penyedia Jasa Perencanaan
17 November 2015 Penunjukan Penyedia Jasa Perencanaan
Penunjukan Penyedia Jasa Perencanaan
20 November 2015 Penanda Tanganan Kontrak Perencanaan
Penanda Tanganan Kontrak Perencanaan
02 Desember 2015 Dana Bkd Masuk Rekening
Dana Bkd Masuk Rekening
02 Desember 2015 Berita Acara Pemeriksaan Dokumen Perencanaan
Berita Acara Pemeriksaan Dokumen Perencanaan
02 Desember 2015 Berita Acara Penyerahan Dokumen Perencanaan
Berita Acara Penyerahan Dokumen Perencanaan
005 02 Desember 2015 Rp 13,400,000.00 Pembayaran Biaya Perencanaan teknis kegiatan
Pembayaran Biaya Perencanaan teknis kegiatan 1 Set Rp 13,400,000.00
004 03 Desember 2015 Rp 552,500.00 Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan Musyawarah III
Pembelian Makan 17 Kotak Rp 24,000.00
Pembelian Minum 17 Botol Rp 2,500.00
Pembelian Kue 17 Dus Rp 6,000.00
04 Desember 2015 Undangan Permintaan Penawaran Barang/Material
Undangan Permintaan Penawaran Barang/Material
10 Desember 2015 Pemasukan / Pembukaan Penawaran Barang/Material
Pemasukan / Pembukaan Penawaran Barang/Material
10 Desember 2015 Negosiasi Penawaran Barang/Material
Negosiasi Penawaran Barang/Material
14 Desember 2015 Penetapan Penyedia Barang/Material
Penetapan Penyedia Barang/Material
14 Desember 2015 Penunjukan Penyedia Barang/Material
Penunjukan Penyedia Barang/Material
17 Desember 2015 Penanda Tanganan Kontrak Kerja Fisik
Penanda Tanganan Kontrak Kerja Fisik
006 18 Desember 2015 Rp 400,000.00 Tenaga Perampingan /Pembersihan Lokasi
Tenaga Perampingan Lokasi 1 Ls Rp 400,000.00
007 18 Desember 2015 Rp 36,168,440.00 Biaya Pembelian Base Coarse
Pembelian Base Coarse 234.860 Ton Rp 154,000.00
008 19 Desember 2015 Rp 46,016,740.00 Biaya Pembelian Base Coarse
Pembelian Base Coarse 298.810 Ton Rp 154,000.00
009 21 Desember 2015 Rp 19,360,880.00 Biaya Pembelian Base Coarse
Pembelian Base Coarse 125.720 Ton Rp 154,000.00
010 23 Desember 2015 Rp 8,670,000.00 Biaya Ongkos Pekerja Base Coarse (Mandor,Kepala Tukang,dan Pekerja) Minggu I
Biaya Ongkos Pekerja (Kepala Tukang, Tukang dan Pekerja) 6 Hari Rp 8,670,000.00
011 25 Desember 2015 Rp 3,666,740.00 Biaya Pembelian Base Coarse
Pembelian Base Coarse 23.810 Ton Rp 154,000.00
012 25 Desember 2015 Rp 1,000,000.00 Biaya Mob-Tendem (Untuk Pemadatan Base Coarse)
Biaya Mob-Tendem (Untuk Pemadatan Base Coarse) 1 PP Rp 1,000,000.00
013 26 Desember 2015 Rp 8,816,500.00 Biaya Pembelian Base Coarse
Pembelian Base Coarse 57.250 Ton Rp 154,000.00
014 26 Desember 2015 Rp 900,000.00 Biaya Sewa Tendem Untuk Pemadatan Base Coarse
Biaya Sewa Tendem Untuk Pemadatan Base Coarse 2 Hari Rp 450,000.00
015 26 Desember 2015 Rp 5,000,000.00 Biaya Mob-Demob Alat HRS
Biaya Mob-Demob 1 PP Rp 5,000,000.00
016 26 Desember 2015 Rp 14,000,000.00 Biaya Pembelian Emulsi
Biaya Pembelian Emulsi 1400.00 Liter Rp 10,000.00
017 26 Desember 2015 Rp 3,300,000.00 Biaya Sewa Alat Untuk Penggelaran Hrs
Biaya Sewa Finisher 2 Hari Rp 700,000.00
Biaya Sewa Tendem 2 Hari Rp 400,000.00
Biaya Sewa Tire Roller 2 Hari Rp 400,000.00
Biaya Sewa Kompressor 2 Hari Rp 150,000.00
018 26 Desember 2015 Rp 257,724,000.00 Biaya Pembelian HRS
Biaya Pembelian HRS 214.77 Ton Rp 1,200,000.00
019 27 Desember 2015 #REF! Biaya Ongkos Pekerja Base Coarse (Mandor,Kepala Tukang,dan Pekerja) Minggu II
Biaya Ongkos Pekerja (Kepala Tukang, Tukang dan Pekerja) 6 Hari #REF!
020 28 Desember 2015 Rp 17,496,000.00 Biaya Pembelian HRS
Biaya Pembelian HRS 14.58 Ton Rp 1,200,000.00
021 29 Desember 2015 Rp - Biaya Pembelian Tanah Untuk Berm
Biaya Pembelian Tanah Untuk Berm - m3 Rp -
022 29 Desember 2015 Rp 350,000.00 Pembuatan Banner ,Kayu Papan
Pembuatan Banner Dan Kayu Papan 1 Ls Rp 350,000.00
023 29 Desember 2015 Rp 5,500,000.00 Biaya Pembayaran Konsultan Pengawas
Biaya Pembayaran Konsultan Pengawas 1 Ls Rp 5,500,000.00
024 29 Desember 2015 Rp 8,950,000.00 Biaya Pembayaran Honor Tim
Honor Ketua TPK 1 Orang Rp 1,500,000.00
Honor Sekretaris 1 Orang Rp 1,200,000.00
Honor Bendahara 1 Orang Rp 1,000,000.00
Honor Ketua Perencana 1 Orang Rp 750,000.00
Anggota Perencana 1 Orang Rp 500,000.00
Anggota Perencana 1 Orang Rp 500,000.00
Honor Ketua Pelaksana 1 Orang Rp 750,000.00
Anggota Pelaksana 1 Orang Rp 500,000.00
Anggota Pelaksana 1 Orang Rp 500,000.00
Honor Ketua Pengawas 1 Orang Rp 750,000.00
Anggota Pengawas 1 Orang Rp 500,000.00
Anggota Pengawas 1 Orang Rp 500,000.00
025 29 Desember 2015 Rp 488,500.00 Biaya Pembelian ATK II
Materai 50 Lmbar Rp 6,000.00
Materai 10 Lmbar Rp 3,000.00
Lem Kertas 5 Bh Rp 1,700.00
Jilid Kertas 6 Bh Rp 25,000.00
026 30 Desember 2015 Rp 1,950,000.00 Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan Musyawarah IV
Pembelian Makan 60 Kotak Rp 24,000.00
Pembelian Minum 60 Botol Rp 2,500.00
Pembelian Kue 60 Dus Rp 6,000.00
Total #REF! Total

Mojokerto,30 Desember 2

Dibuat Oleh,
Mengetahui Menyetujui: Menyetujui: Bendahara
Kepala Desa Ketua Tim Pengelola Kegiatan BKD Ketua Tim Pengawas Kegiatan BKD Tim Pengelola Kegiatan BKD
Ds.Pohjejer Kec.Gondang Kab.Mojokerto Ds. Pohjejer Kec.Gondang Kab.Mojokerto Ds. Pohjejer Kec.Gondang Kab.Mojokerto Ds.Pohjejer Kec.Gondang Kab.Moj

SIS EMAWATI

SUHARTO SUYONO EKO SUKARIYANTO


Mengetahui Menyetujui: Menyetujui: Bendahara
Kepala Desa Ketua Tim Pengelola Kegiatan BKD Ketua Tim Pengawas Kegiatan BKD Tim Pengelola Kegiatan BKD
Ds.Pohjejer Kec.Gondang Kab.Mojokerto Ds. Pohjejer Kec.Gondang Kab.Mojokerto Ds. Pohjejer Kec.Gondang Kab.Mojokerto Ds.Pohjejer Kec.Gondang Kab.Moj

SIS EMAWATI

SUHARTO SUYONO EKO SUKARIYANTO


n BK-Desa Pohjejer Tahun 2015
Jumlah Biaya
(Rp)

Rp 1,200,000.00
Rp 125,000.00
Rp 300,000.00

Rp 60,000.00
Rp 20,000.00
Rp 108,000.00
Rp 30,000.00
Rp 1,700,000.00
Rp 25,500.00
Rp 8,000.00
Rp 5,000.00
Rp 3,600,000.00
Rp 25,000.00
Rp 55,000.00
Rp 30,000.00
Rp 36,000.00
Rp 30,000.00
Rp 76,500.00

Rp 1,200,000.00
Rp 125,000.00
Rp 300,000.00
Rp 13,400,000.00

Rp 408,000.00
Rp 42,500.00
Rp 102,000.00

Rp 400,000.00

Rp 36,168,440.00

Rp 46,016,740.00

Rp 19,360,880.00

Rp 8,670,000.00

Rp 3,666,740.00

Rp 1,000,000.00

Rp 8,816,500.00

Rp 900,000.00

Rp 5,000,000.00

Rp 14,000,000.00

Rp 1,400,000.00
Rp 800,000.00
Rp 800,000.00
Rp 300,000.00

Rp 257,724,000.00

#REF!

Rp 17,496,000.00

Rp 350,000.00

Rp 5,500,000.00

Rp 1,500,000.00
Rp 1,200,000.00
Rp 1,000,000.00
Rp 750,000.00
Rp 500,000.00
Rp 500,000.00
Rp 750,000.00
Rp 500,000.00
Rp 500,000.00
Rp 750,000.00
Rp 500,000.00
Rp 500,000.00

Rp 300,000.00
Rp 30,000.00
Rp 8,500.00
Rp 150,000.00

Rp 1,440,000.00
Rp 150,000.00
Rp 360,000.00
#REF!

Mojokerto,30 Desember 2015

Dibuat Oleh,
Bendahara
Tim Pengelola Kegiatan BKD
Ds.Pohjejer Kec.Gondang Kab.Mojokerto

SIS EMAWATI
Bendahara
Tim Pengelola Kegiatan BKD
Ds.Pohjejer Kec.Gondang Kab.Mojokerto

SIS EMAWATI
RINCIAN BIAYA PEKERJA MINGGU KE - VI (ENAM)
Kegiatan Peningkatan Jalan Lingkungan Ds. Lebakjabung Kec. Jatirejo Kab. Mojokerto

NILAI INSENTIF (TK)


NAMA DESA : LEBAKJABUNG MANDOR : Rp. -
KECAMATAN : JATIREJO KEPALA TUKANG : Rp. 110,000.00
KABUPATEN : MOJOKERTO TUKANG : Rp. 100,000.00
TANGGAL : 04 April 2016 s/d 09 April 2016 PEKERJA : Rp. 85,000.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
4 5 6 7 8 9 HOK INSENTIF (RP.)

1 Kepala Tukang 1 1 1 1 1 1 6 Hari 660,000.00


1 2
2 Tukang 1 1 1 1 1 1 6 Hari 660,000.00

3 Tukang 1 1 1 1 1 1 6 Hari 600,000.00


3 4
4 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
5 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
5 6
6 Tukang 1 1 1 1 1 1 6 Hari 600,000.00
7 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
7 8
8 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
9 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
9 10
10 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
11 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00
11 12
12 Pekerja 1 1 1 1 1 1 6 Hari 510,000.00

JUMLAH 6,780,000.00

Mengetahui, Mojokerto, 09 April 2016


KETUA TIM PENGELOLA KEGIATAN BENDAHARA TPK BKD
DS.LEBAKJABUNG KEC.JATIREJO DS.LEBAKJABUNG KEC.JATIREJO

.................... .............................
RINCIAN BIAYA PEKERJA MINGGU KE -VII (TUJUH)
Kegiatan Peningkatan Jalan Lingkungan Ds. Lebakjabung Kec. Jatirejo Kab. Mojokerto (BETON)

NILAI INSENTIF (TK)


NAMA DESA : LEBAKJABUNG MANDOR : Rp. -
KECAMATAN : JATIREJO KEPALA TUKANG : Rp. 110,000.00
KABUPATEN : MOJOKERTO TUKANG : Rp. 100,000.00
TANGGAL : 11 April 2016 s/d 14 April 2016 PEKERJA : Rp. 85,000.00

HARI ORANG KERJA MENURUT TANGGAL JUMLAH JUMLAH


NO NAMA JABATAN TANDA TANGAN
11 12 13 14 15 16 HOK INSENTIF (RP.)

1 Kepala Tukang 1 1 1 1 4 Hari 440,000.00


1 2
2 Tukang 1 1 1 1 4 Hari 400,000.00

3 Tukang 1 1 1 1 4 Hari 400,000.00


3 4
4 Pekerja 1 1 1 1 4 Hari 340,000.00

5 Pekerja 0 1 1 1 3 Hari 255,000.00


5 6
6 Pekerja 1 1 1 1 4 Hari 340,000.00

JUMLAH 2,175,000.00

Mengetahui, Mojokerto, 14 April 2016


KETUA TIM PENGELOLA KEGIATAN BENDAHARA TPK BKD
DS.LEBAKJABUNG KEC.JATIREJO DS.LEBAKJABUNG KEC.JATIREJO

................... ....................
SURAT PERMINTAAN PEMBAYARAN ( SPP )
DS TRAWASAN,KEC. SUMOBITO,KAB,JOMBANG
TAHUN ANGGARAN 2017
NOMOR: /SPP/416-68.8/II.2017
1. Bidang : 2.3
2. Kegiatan : 2.2.1
3. Waktu Pelaksanaan : 2017
Rincian Pendanaan 29,367,417.4

PERMINTAAN JUMLAH SAMPAI


PAGU PENCAIRAN SEKARANG SAAT INI SISA DANA
NO. URAIAN ANGGARAN S.D. LALU

(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)


Biaya Pembelian Nasi Kotak,
1 Minuman, untuk Kegiatan
Musyawarah Rapat Pertama 600,000 - 600,000
2 Biaya AtK 150,000 150,000
3 Biaya Perencanaan Tim Pembangun 6,050,000 6,050,000

4 Biaya Pembelian Semen Portand


340,000 340,000
5 Besi Beton 10 mm 2,500,000 2,500,000

6 Kayu 4/6
962,500 962,500
7 Paku Campur 216,417 216,417
8 Pembelian Bata Merah 4,812,500 4,812,500
9 Biaya Pemasangan Atap Garvalum 4,500,000 4,500,000
10 Biaya Pembelian Ramyen Dinding
2,430,000 2,430,000
11 Biaya Pemasangan Plafond 3,750,000 3,750,000
Biaya Pembelian Keramik Lantai 2,646,000
12
2,646,000
Biaya Pembelian Kyusen -
13 Alumunium
-
14 Pembelian Prasasti 170,000
170,000
Pembelian Papan Nama 240,000
240,000
15 0 - -
16 0 - -
17 0 - -
18 0 - -
0 -
19
-
0 -
20
-
0 -
21
-
Silpa -
22
-
JUMLAH 29,367,417 - - 29,367,417

Trawasan 04 Agustus 2017


Telah dilakukan verifikasi Pelaksana Kegiatan
Sekretaris Desa

ANITA MAULIDIYAH IMAM HAMBALI

Setujui untuk dibayarkan Telah dibayar lunas


Kepala Desa Bendahara

TOHA KUSEN EMI WULANDARI


SURAT PERMINTAAN PEMBAYARAN ( SPP )
DS TRAWASAN,KEC. SUMOBITO,KAB,JOMBANG
TAHUN ANGGARAN 2017
NOMOR: /SPP/416-315/II.2015
1. Bidang : 2.3
2. Kegiatan : 2.2.5
3. Waktu Pelaksanaan : 2017
Rincian Pendanaan :119.981.217,-

PERMINTAAN JUMLAH SAMPAI


PAGU PENCAIRAN SEKARANG SAAT INI SISA DANA
NO. URAIAN ANGGARAN S.D. LALU

(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)


29,367,417 - 29,367,417 - -
1 Biaya Pembelian Nasi Kotak, Minum 600,000 600,000 - -
2 Biaya AtK 150,000 150,000 -
3 Biaya Perencanaan Tim Pembangun 6,050,000 6,050,000 -

4 Biaya Pembelian Semen Portand


340,000 340,000 -
5 Besi Beton 10 mm 2,500,000 2,500,000 -
6 Kayu 4/6 962,500 962,500 -
7 Paku Campur 216,417 216,417 -
8 Pembelian Bata Merah 4,812,500 4,812,500 -
9 Biaya Pemasangan Atap Garvalum 4,500,000 4,500,000 -
10 Biaya Pembelian Ramyen Dinding 2,430,000 2,430,000 -
11 Biaya Pemasangan Plafond 3,750,000 3,750,000 -
12 Biaya Pembelian Keramik Lantai 2,646,000 2,646,000 -
Biaya Pembelian Kyusen
13
Alumunium - -
14 Pembelian Prasasti 170,000 170,000
Pembelian Papan Nama 240,000 240,000
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
0 - -
Silpa - -
JUMLAH 29,367,417 29,367,417 - -

Trawasan 04 Agustus 2017


Telah dilakukan verifikasi Pelaksana Kegiatan
Sekretaris Desa

ANITA MAULIDIYAH IMAM HAMBALI

Setujui untuk dibayarkan Telah dibayar lunas


Kepala Desa Bendahara

TOHA KUSEN EMI WULANDARI


SURAT PERTANGGUNG JAWABAN
KEGIATAN PEMBANGUNAN GEDUNG BKD
Ds.Budugsidorejo Kec. Sumobito. Kab. Jombang Tahun 2017

NO Penerimaan Belanja Penerimaan Pajak Pengeluaran Saldo


TANGGAL No Bukti URAIAN TRANSAKSI
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 8
14-Aug-17 00085/kwt/II.08/2017 Terima dari Bendahara Desa Rp 25,892,417.35 Rp 25,892,417.35
16-Aug-17 DD/2017/001 Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan Musyawarah Rapat Pertama Rp 300,000.00 Rp 25,592,417.35
21-Jun-17 DD/2017/002 Biaya Uitzet Rp - Rp 25,592,417.35
3-Jul-17 DD/2017/003 Biaya Pembelian Nasi Kotak, Minuman, untuk Kegiatan Musyawarah Rapat Kedua Rp 300,000.00 Rp 25,292,417.35
16-Aug-17 DD/2017/004 Biaya AtK Rp 150,000.00 Rp 25,142,417.35
16-Aug-17 DD/2017/005 Biaya Pembelian Semen Portand Rp 340,000.00 Rp 24,802,417.35
19-Aug-17 DD/2017/006 Biaya Pembelian Batu Kali Rp 2,300,000.00 Rp 22,502,417.35
19-Aug-17 DD/2017/007 Besi Beton 10 mm Rp 2,500,000.00 Rp 20,002,417.35
19-Aug-17 DD/2017/008 Kayu 4/6 Rp 962,500.00 Rp 19,039,917.35
22-Aug-17 DD/2017/009 Paku Campur Rp 216,417.35 Rp 18,823,500.00
22-Aug-17 DD/2017/010 Pembelian Bata Merah Rp 4,812,500.00 Rp 14,011,000.00
22-Aug-17 DD/2017/011 Biaya Pemasangan Atap Garvalum Rp 4,500,000.00 Rp 9,511,000.00
27-Aug-17 DD/2017/012 HOK Pekerja Mingguan Ke I Rp 2,646,000.00 Rp 6,865,000.00
DD/2017/013 Biaya Pembelian Ramyen Dinding Rp 1,250,000.00 Rp 5,615,000.00
DD/2017/014 Biaya Pembelian Ramyen Dinding Rp 1,455,000.00 Rp 4,160,000.00
DD/2017/015 Biaya Pemasangan Plafond Rp 3,750,000.00 Rp 410,000.00
15-Oct-17 DD/2017/017 Biaya Pembelian Kyusen Alumunium Rp - Rp 410,000.00
15-Oct-17 DD/2017/018 Pembelian Prasasti Rp 170,000.00 Rp 240,000.00
NO Penerimaan Belanja Penerimaan Pajak Pengeluaran Saldo
TANGGAL No Bukti URAIAN TRANSAKSI
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 8
Pembelian Papan Nama Rp 240,000.00 Rp 240,000.00
DD/2017/019 Rp - Rp - Rp 240,000.00
DD/2017/020 Rp - Rp - Rp 240,000.00
DD/2017/021 Rp - Rp - Rp 240,000.00
DD/2017/022 Rp - Rp - Rp 240,000.00
DD/2017/023 Rp - Rp - Rp 240,000.00
DD/2017/024 Rp - Rp - Rp 240,000.00
DD/2017/025 Rp - Rp - Rp 240,000.00
DD/2017/026 Silpa Rp 0.00 Rp 0
JUMLAH Rp 25,892,417.35 Rp 0.00 Rp 25,892,417.35 Rp 0.00
Budugsidorejo.............................. 2017

Mengetahui Menyetujui: Dibuat Oleh,


Kepala Desa Ketua Tim Pembangunan Desa Bendahara
Ds Trawasan Kec.Sumobito Ds Trawasan Kec.Sumobito Kab.Jombang Ds Trawasan Kec.Sumobito Kab.Jombang
Kab.Jombang

IMAM HAMBALI
TOHA KUSEN
EMI WULANDARI