You are on page 1of 229

PEMERINTAH KOTA SALATIGA

BADAN PEMBERDAYAAN MASYARAKAT, PEREMPUAN,


KELUARGA BERENCANA DAN KETAHANAN PANGAN
Jl. Hasanudin No. 110 B Salatiga Telp (0298) 326063
Faks. (0298) 326063 Website www.pemkot-salatiga.go.id
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PAVINGISASI
TH. ANGGARAN : 2015
LOKASI : KOTA SALATIGA
HARGA JUMLAH
NO URAIAN PEKERJAAN ANALISA SAT. VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6 7

LOKASI KEC TINGKIR


A PEKERJAAN PAVING
1 Pek. Perataan tanah dihit m2 72.35 3,350.00 242,372.50
Pekerja 0.80 0.80 193,898.00
Mandor 0.20 0.20 48,474.50
2 Pek. Pasang paving holand press mesin dihit m2 72.35 111,650.00 8,077,877.50
Pekerja 0.40 28.94 55,000.00
Tukang Batu 0.20 14.47 60,000.00
Kepala Tukang batu 0.02 1.45 65,000.00
Mandor 0.02 1.45 67,500.00

Paving holand K-175 1.00 72.35 55,000.00


Pasir Pasang 0.10 7.24 200,000.00
3 Pek. Pasang Kanstin 1/2 batubata camp 1 : 6 A.4.4.1.11. m2 8.60 94,402.50 811,861.50
Pekerja 0.30 2.58 55,000.00
Tukang batu 0.10 0.86 60,000.00
Kepala Tukang 0.01 0.09 65,000.00
Mandor 0.02 0.13 67,500.00
- -
BAHAN - -
Bata merah 70.00 602.00 700.00
Semen portland 8.32 71.55 1,375.00
Pasir Pasang 0.05 0.42 200,000.00
4 Pek. Pasang plesteran dinding 1:6 A.4.4.2.6. m2 15.76 38,959.50 614,001.72
Pekerja 0.30 4.73 55,000.00
Tukang Batu 0.15 2.36 60,000.00
Kepala Tukang 0.02 0.24 65,000.00
Mandor 0.02 0.24 67,500.00
-
BAHAN - -
Semen portland 4.42 69.60 1,375.00
Pasir Pasang 0.03 0.43 200,000.00
5 Pek. acian A.4.4.2.27. m2 15.76 22,793.75 359,229.50
Pekerja 0.20 3.15 55,000.00
Tukang Batu 0.10 1.58 60,000.00
Kepala Tukang 0.01 0.16 65,000.00
Mandor 0.01 0.16 67,500.00

Hal 1/229
HARGA JUMLAH
NO URAIAN PEKERJAAN ANALISA SAT. VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6 7

BAHAN -
Semen portland 3.25 51.22 1,375.00
Sub Jumlah A 10,105,342.72
B PEKERJAAN PERBAIKAN SALURAN
1 Pek. Pasangan dinding 1/2bata cmp 1:6 A.4.4.1.11. m2 1.98 94,402.50 186,916.95
Pekerja 0.30 0.59 55,000.00
Tukang batu 0.10 0.20 60,000.00
Kepala Tukang 0.01 0.02 65,000.00
Mandor 0.02 0.03 67,500.00
- -
BAHAN - -
Bata merah 70.00 138.60 700.00
Semen portland 8.32 16.47 1,375.00
Pasir Pasang 0.05 0.10 200,000.00
2 Pek. Pasang plesteran dinding 1:6 A.4.4.2.6. m3 3.63 38,959.50 141,422.99
Pekerja 0.30 1.09 55,000.00
Tukang Batu 0.15 0.54 60,000.00
Kepala Tukang 0.02 0.05 65,000.00
Mandor 0.02 0.05 67,500.00
- - -
BAHAN - - -
Semen portland 4.42 16.03 1,375.00
Pasir Pasang 0.03 0.10 200,000.00

3 Pek. acian A.4.4.2.27. m2 3.63 22,793.75 82,741.31


Pekerja 0.20 0.73 55,000.00
Tukang Batu 0.10 0.36 60,000.00
Kepala Tukang 0.01 0.04 65,000.00
Mandor 0.01 0.04 67,500.00
-
BAHAN -
Semen portland 3.25 11.80 1,375.00
Sub Jumlah B 411,081.25
JUMLAH LOKASI KEC. TINGKIR 10,516,423.97
LOKASI KEC ARGOMULYO
C PEKERJAAN PAVING
1 Pek. Perataan tanah dihit m2 189.06 3,350.00 633,351.00
Pekerja 0.80 0.80 506,680.80
Mandor 0.20 0.20 126,670.20
2 Pek. Pasang paving holand press mesin dihit m2 189.06 111,650.00 21,108,549.00
Pekerja 0.40 75.62 55,000.00
Tukang Batu 0.20 37.81 60,000.00
Kepala Tukang batu 0.02 3.78 65,000.00
Mandor 0.02 3.78 67,500.00
-
Paving holand K-175 1.00 189.06 55,000.00
Pasir Pasang 0.10 18.91 200,000.00

Hal 2/229
HARGA JUMLAH
NO URAIAN PEKERJAAN ANALISA SAT. VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6 7

3 Pek. Pasang Kanstin 1/2 batubata camp 1 : 6 A.4.4.1.11. m2 3.59 94,402.50 338,904.98
Pekerja 0.30 1.08 55,000.00
Tukang batu 0.10 0.36 60,000.00
Kepala Tukang 0.01 0.04 65,000.00
Mandor 0.02 0.05 67,500.00
- -
BAHAN - -
Bata merah 70.00 251.30 700.00
Semen portland 8.32 29.87 1,375.00
Pasir Pasang 0.05 0.42 200,000.00
4 Pek. Pasang plesteran dinding 1:6 A.4.4.2.6. m2 6.57 38,959.50 255,963.92
Pekerja 0.30 1.97 55,000.00
Tukang Batu 0.15 0.99 60,000.00
Kepala Tukang 0.02 0.10 65,000.00
Mandor 0.02 0.10 67,500.00
- - -
BAHAN - - -
Semen portland 4.42 29.01 1,375.00
Pasir Pasang 0.03 0.18 200,000.00

Hal 3/229
HARGA JUMLAH
NO URAIAN PEKERJAAN ANALISA SAT. VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6 7

5 Pek. acian A.4.4.2.27. m2 6.57 22,793.75 149,754.94


Pekerja 0.20 1.31 55,000.00
Tukang Batu 0.10 0.66 60,000.00
Kepala Tukang 0.01 0.07 65,000.00
Mandor 0.01 0.07 67,500.00
- -
BAHAN - -
Semen portland 3.25 21.35 1,375.00
Sub Jumlah C 22,486,523.83
D PEKERJAAN SALURAN BIS U-20
1 Pek. Pasangan Bis -U 20 dihit m1 12.50 116,000.00 1,450,000.00
Pekerja 1.00 12.50 55,000.00

BAHAN
Bata merah 15.0000 187.50 700.00
Semen portland 4.9900 62.38 1,375.00
Pasir Pasang 0.0432 0.54 200,000.00
Buis beton U 20 cm 1.0000 12.50 35,000.00
Sub Jumlah D 1,450,000.00
JUMLAH LOKASI KEC. ARGOMULYO 23,936,523.83
Jumlah 34,452,947.80
Terbilang : PPN 10% 3,445,294.78
TERErr:511 Jumlah Total 37,898,242.57
Dibulatkan 37,890,000.00

Hal 4/229
PEKERJAAN PAVING
KEBUTUHAN MATERIAL
NO MATERIAL VOLUME SAT HARGA JUMLAH KETERANGAN
LOKASI KEC TINGKIR
1 Bata merah 740.60 bh 770.00 570,262.00
2 Pasir Pasang 8.28 m3 220,000.00 1,820,929.00
3 Paving holand K-175 73.00 m2 60,500.00 4,416,500.00
4 Semen portland 6.00 sak 60,500.00 363,000.00
JUMLAH 7,170,691.00

LOKASI KEC ARGOMULYO


1 Bata merah 438.80 bh 770.00 337,876.00
2 Buis beton U 20 cm 12.50 bh 38,500.00 481,250.00
3 Pasir Pasang 20.04 m3 220,000.00 4,409,853.80
4 Paving holand K-175 190.00 m2 60,500.00 11,495,000.00
5 Semen portland 4.00 sak 60,500.00 242,000.00
JUMLAH 16,965,979.80
JUMLAH TOTAL 24,136,670.80

RAB 37,890,000.00
MATERIAL 24,136,670.80 64%
UPAH 13,753,329.20 36%
PEMERINTAH KOTA SALATIGA
BADAN PEMBERDAYAAN MASYARAKAT, PEREMPUAN,
KELUARGA BERENCANA DAN KETAHANAN PANGAN
Jl. Hasanudin No. 110 B Salatiga Telp (0298) 326063
Faks. (0298) 326063 Website www.pemkot-salatiga.go.id
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PAVINGISASI
TH. ANGGARAN : 2015
LOKASI : KOTA SALATIGA
HARGA JUMLAH
NO URAIAN PEKERJAAN ANALISA SAT. VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6 7

LOKASI KEC TINGKIR


A PEKERJAAN PAVING
1 Pek. Perataan tanah dihit m2 72.35 3,350.00 242,372.50
2 Pek. Pasang paving holand press mesin dihit m2 72.35 111,650.00 8,077,877.50
3 Pek. Pasang Kanstin 1/2 batubata camp 1 : 6 A.4.4.1.11. m2 8.60 94,402.50 811,861.50
4 Pek. Pasang plesteran dinding 1:6 A.4.4.2.6. m2 15.76 38,959.50 614,001.72
5 Pek. acian A.4.4.2.27. m2 15.76 22,793.75 359,229.50
Sub Jumlah A 10,105,342.72
B PEKERJAAN SALURAN
1 Pek. Pasangan dinding 1/2bata cmp 1:6 A.4.4.1.11. m2 1.98 94,402.50 186,916.95
2 Pek. Pasang plesteran dinding 1:6 A.4.4.2.6. m3 3.63 38,959.50 141,422.99
3 Pek. acian A.4.4.2.27. m2 3.63 22,793.75 82,741.31
Sub Jumlah B 411,081.25
LOKASI KEC ARGOMULYO
C PEKERJAAN PAVING
1 Pek. Perataan tanah dihit m2 189.06 3,350.00 633,351.00
2 Pek. Pasang paving holand press mesin dihit m2 189.06 111,650.00 21,108,549.00
3 Pek. Pasang Kanstin 1/2 batubata camp 1 : 6 A.4.4.1.11. m2 3.59 94,402.50 338,904.98
4 Pek. Pasang plesteran dinding 1:6 A.4.4.2.6. m2 6.57 38,959.50 255,963.92
5 Pek. acian A.4.4.2.27. m2 6.57 22,793.75 149,754.94
Sub Jumlah C 22,486,523.83
D PEKERJAAN SALURAN BIS U-20
1 Pek. Pasangan Bis -U 20 dihit m1 12.50 116,000.00 1,450,000.00
Sub Jumlah D 1,450,000.00
Jumlah 34,452,947.80
Terbilang : PPN 10% 3,445,294.78
TERTIGA PULUH TUJUH JUTA DELAPAN RATUS SEMBILAN Jumlah Total 37,898,242.57
PULUH RIBU RUPIAH Dibulatkan 37,890,000.00

Salatiga, 2015

MENYETUJUI
KEPALA BAPERMAS
PEREMPUAN KB DAN KETAHANAN PANGAN
KOTA SALATIGA

Hal 6/229
HARGA JUMLAH
NO URAIAN PEKERJAAN ANALISA SAT. VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6 7

AFIF ZUFRONINGDYAH, SH, MH


NIP. 19590927 198703 2 003

Hal 7/229
7.38 144.70 1068.398
Perataan tanah 72.35
6.60 x 4.00 x 1.00 x 1.00 26.40 26.40
3.20 x 1.00 x 1.00 x 1.00 3.20 3.20
4.00 x 2.00 x 1.00 x 1.00 8.00 8.00
5.43 x 3.20 x 2.00 x 1.00 34.75 34.75
Pasang paving holand press mesin 72.35
6.60 x 4.00 x 1.00 x 1.00 26.40 26.40
3.20 x 1.00 x 1.00 x 1.00 3.20 3.20
4.00 x 2.00 x 1.00 x 1.00 8.00 8.00
5.43 x 3.20 x 2.00 x 1.00 34.75 34.75
Pasang Kanstin 1/2 batubata camp 1 : 6 8.60
4.00 x 0.30 x 1.00 1.20 1.20
1.00 x 0.30 x 1.00 0.30 0.30
5.43 x 0.30 x 2.00 3.26 3.26
3.20 x 0.30 x 4.00 3.84 3.84
Pasang plesteran dinding 1:6 15.76
4.00 x 0.55 x 1.00 2.20 2.20
1.00 x 0.55 x 1.00 0.55 0.55
5.43 x 0.55 x 2.00 5.97 5.97
3.20 x 0.55 x 4.00 7.04 7.04
acian 15.76
4.00 x 0.55 x 1.00 2.20 2.20
1.00 x 0.55 x 1.00 0.55 0.55
5.43 x 0.55 x 2.00 5.97 5.97
3.20 x 0.55 x 4.00 7.04 7.04
PEKERJAAN SALURAN
Pasangan dinding 1/2bata cmp 1:6
6.60 x 0.30 x 1.00 1.98 1.98
Pasang plesteran dinding 1:6
6.60 x 0.55 x 1.00 3.63 3.63
acian
6.60 x 0.55 x 1.00 3.63 3.63

LOKASI KEC ARGOMULYO


Perataan tanah 189.06
13.25 + 12.25 x 11.95 x 1.00 152.36 152.36
2
0.89 + 0.65 x 7.85 x 1.00 6.04 6.04
2
3.50 x 8.76 x 1.00 30.66 30.66
Pasang paving holand press mesin 189.06
13.25 + 12.25 x 11.95 x 1.00 152.36 152.36
2
0.89 + 0.65 x 7.85 x 1.00 6.04 6.04
2
3.50 x 8.76 x 1.00 30.66 30.66
Pasang Kanstin 1/2 batubata camp 1 : 6
11.95 x 0.30 x 1.00 3.59 3.59
Pasang plesteran dinding 1:6
11.95 x 0.55 x 1.00 6.57 6.57
acian
11.95 x 0.55 x 1.00 6.57 6.57
PEMERINTAH KOTA SALATIGA
BADAN PEMBERDAYAAN MASYARAKAT, PEREMPUAN,
KELUARGA BERENCANA DAN KETAHANAN PANGAN
Jl. Hasanudin No. 110 B Salatiga Telp (0298) 326063
Faks. (0298) 326063 Website www.pemkot-salatiga.go.id

DAFTAR KUANTITAS DAN HARGA


KEGIATAN : Pemeliharaan Rutin / Berkala Gedung kantor
PEKERJAAN : Perbaikan jalan dan halaman kantor
TH. ANGGARAN : 2015
LOKASI : KOTA SALATIGA
HARGA JUMLAH
NO URAIAN PEKERJAAN ANALISA SAT. VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6 7

A PEKERJAAN BONGKARAN
1 Pek. Bongkar beton lama (jalan masuk & keluar) dihit m2 6.37 77,832.50 495,793.03
Pekerja 1.33 8.49 55,000.00
Mandor 0.07 0.42 67,500.00

2 Pek. Bongkar Tiang bendera dihit ls 1.00 150,000.00 150,000.00


Pekerja 2.73 2.73 55,000.00
Sub Jumlah A 645,793.03
B PEKERJAAN BETON
1 Pek. Pasang Wiremesh M8 dihit lbr 6.00 605,000.00 3,630,000.00
Pekerja 1.00 6.37 -

Wiremesh M8 1.00 6.00 605,000.00


2 Pek. Pengecoran beton K200 A.4.1.1.6 m3 7.30 915,527.00 6,683,347.08
Pekerja 1.65 12.05 55,000.00
Tukang Batu 0.28 2.01 60,000.00
Kepala Tukang 0.03 0.20 65,000.00
Mandor 0.08 0.61 67,500.00
-
BAHAN
Semen portland 352.00 2,569.60 1,375.00
Pasir Beton 731.00 5,336.30 142.86
Kerikil(Maks 30mm) 1,031.00 7,526.30 185.19
Air 215.00 1,569.50 100.00
3 Pek. Pasang besi siku 50.50.5+angkur A.4.2.1.1. btg 3.00 22,017.50 66,052.50
Pekerja 0.06 0.18 55,000.00
Tukang Las Konstruksi 0.06 0.18 62,500.00
Kepala tukang 0.006 0.02 65,000.00
Mandor 0.003 0.01 67,500.00
BAHAN - -
Besi Profil 1.15 3.45 12,500.00
Sub Jumlah B 10,379,399.58
C PEKERJAAN TIANG BENDERA
1 Pek. Galian tanah keras A.2.3.1.4. m3 0.20 57,160.00 11,432.00
Pekerja 1.00 0.20 55,000.00

Hal 9/229
HARGA JUMLAH
NO URAIAN PEKERJAAN ANALISA SAT. VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6 7

Mandor 0.03 0.01 67,500.00


2 Pek. Pasang beton dudukan tiang bendera A.4.1.1.6 m3 0.20 915,527.00 183,105.40
Pekerja 1.65 0.33 55,000.00
Tukang Batu 0.28 0.06 60,000.00
Kepala Tukang 0.03 0.01 65,000.00
Mandor 0.08 0.02 67,500.00
- -
BAHAN - -
Semen portland 352.00 70.40 1,375.00
Pasir Beton 731.00 146.20 142.86
Kerikil(Maks 30mm) 1,031.00 206.20 185.19
Air 215.00 43.00 100.00
1 Pek. Pasang tiang bendera besi dia 2"+cat dihit m1 8.00 53,333.33 426,666.67
Pekerja 1.00 8.00 7,500.00

BAHAN
Pipa besi dia 2' 1.00 8.00 45,833.33
3 Pek. Rabat beton area tiang bendera A.4.1.1.3 m3 0.45 849,773.69 382,398.16
Pekerja 1.65 0.74 55,000.00
Tukang batu 0.275 0.12 60,000.00
Kepala Tukang 0.028 0.01 65,000.00
Mandor 0.083 0.04 67,500.00
- -
BAHAN - -
Semen portland 299 134.55 1,375.00
Pasir Beton 799 359.55 142.86
Kerikil(Maks 30mm) 1,017.00 457.65 185.19
Air 215 96.75 100.00
4 Pek. Pasang dinding 1/2 batu bata camp 1:5 A.4.4.1.10. m2 1.00 95,472.50 95,472.50
Pekerja 0.30 0.30 55,000.00
Tukang batu 0.10 0.10 60,000.00
Kepala Tukang 0.01 0.01 65,000.00
Mandor 0.02 0.02 67,500.00
- -
BAHAN - -
Bata merah 70.00 70.00 700.00
Semen portland 9.68 9.68 1,375.00
Pasir Pasang 0.05 0.05 200,000.00

5 Pek. Pasang plesteran dinding 1:6 A.4.4.2.6. m2 1.00 38,959.50 38,959.50


Pekerja 0.30 0.30 55,000.00
Tukang Batu 0.15 0.15 60,000.00
Kepala Tukang 0.02 0.02 65,000.00
Mandor 0.02 0.02 67,500.00
- -
BAHAN - -

Hal 10/229
HARGA JUMLAH
NO URAIAN PEKERJAAN ANALISA SAT. VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6 7

Semen portland 4.42 4.42 1,375.00


Pasir pasang 0.03 0.03 200,000.00

6 Pek. Acian dinding A.4.4.2.27. m2 1.00 22,793.75 22,793.75


Pekerja 0.20 0.20 55,000.00
Tukang Batu 0.10 0.10 60,000.00
Kepala Tukang 0.01 0.01 65,000.00
Mandor 0.01 0.01 67,500.00
- -
BAHAN - -
Semen portland 3.25 3.25 1,375.00

7 Pek. Pengecatan tiang bendera A.4.7.1.10.a m2 1.00 26,061.26 26,061.26


Pekerja 0.02 0.02 55,000.00
Tukang cat 0.06 0.06 62,500.00
Kepala tukang 0.01 0.01 65,000.00
Mandor 0.00 0.00 67,500.00
-
BAHAN -
Plamuur 0.10 0.10 40,000.00
Cat dasar mowilex 0.10 0.10 45,588.24
Cat dasar mowilex 0.26 0.26 45,588.24

Sub Jumlah C 1,186,889.24


D PEKERJAAN TAMAN
1 Pek. Pemasangan batu sikat dihit m2 12.60 165,000.00 2,079,000.00
Pekerja 1.00 12.60 55,000.00

batu sikat 1.00 12.60 110,000.00


Sub Jumlah D 2,079,000.00
Jumlah 14,291,081.85
Terbilang : PPN 10% 1,429,108.18
TER Jumlah Total 15,720,190.03
Err:511
Dibulatkan 15,720,000.00

Hal 11/229
Perbaikan jalan dan halaman kantor
KEBUTUHAN MATERIAL
NO MATERIAL VOLUME SAT HARGA JUMLAH KETERANGAN

1 Pasir pasang 0.07 m3 220,000.00 15,840.00


2 Bata merah 70.00 bh 770.00 53,900.00
3 batu sikat 12.60 m2 121,000.00 1,524,600.00
4 Besi Profil 3.45 kg 13,750.00 47,437.50
5 Cat dasar mowilex 0.36 kg 50,147.06 18,052.94
6 Kerikil(Maks 30mm) 6.00 m3 250,000.00 1,500,000.00
7 Pasir Beton 4.50 m3 200,000.00 900,000.00
8 Pipa besi dia 2' 8.00 m1 50,416.67 403,333.33
9 Plamuur 0.10 kg 44,000.00 4,400.00
10 Semen portland 60.00 sak 60,500.00 3,630,000.00
11 Wiremesh M8 6.00 lbr 665,500.00 3,993,000.00

JUMLAH 12,090,563.77

RAB 15,720,000.00
MATERIAL 12,090,563.77 77%
UPAH 3,629,436.23 23%
PEMERINTAH KOTA SALATIGA
BADAN PEMBERDAYAAN MASYARAKAT, PEREMPUAN,
KELUARGA BERENCANA DAN KETAHANAN PANGAN
Jl. Hasanudin No. 110 B Salatiga Telp (0298) 326063
Faks. (0298) 326063 Website www.pemkot-salatiga.go.id

DAFTAR KUANTITAS DAN HARGA


KEGIATAN : Pemeliharaan Rutin / Berkala Gedung kantor
PEKERJAAN : Perbaikan jalan dan halaman kantor
TH. ANGGARAN : 2015
LOKASI : KOTA SALATIGA
HARGA JUMLAH
NO URAIAN PEKERJAAN ANALISA SAT. VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6 7

A PEKERJAAN BONGKARAN
1 Pek. Bongkar beton lama (jalan masuk & keluar) dihit m2 6.37 77,832.50 495,793.03
2 Pek. Bongkar Tiang bendera dihit ls 1.00 150,000.00 150,000.00
Sub Jumlah A 645,793.03
B PEKERJAAN BETON
1 Pek. Pasang Wiremesh M8 dihit lbr 6.00 605,000.00 3,630,000.00
2 Pek. Pengecoran beton K200 A.4.1.1.6 m3 7.30 915,527.00 6,683,347.08
3 Pek. Pasang besi siku 50.50.5+angkur A.4.2.1.1. btg 3.00 22,017.50 66,052.50
Sub Jumlah B 10,379,399.58
C PEKERJAAN TIANG BENDERA
1 Pek. Galian tanah keras A.2.3.1.4. m3 0.20 57,160.00 11,432.00
2 Pek. Pasang beton dudukan tiang bendera A.4.1.1.6 m3 0.20 915,527.00 183,105.40
1 Pek. Pasang tiang bendera besi dia 2"+cat dihit m1 8.00 53,333.33 426,666.67
3 Pek. Rabat beton area tiang bendera A.4.1.1.3 m3 0.45 849,773.69 382,398.16
4 Pek. Pasang dinding 1/2 batu bata camp 1:5 A.4.4.1.10. m2 1.00 95,472.50 95,472.50
5 Pek. Pasang plesteran dinding 1:6 A.4.4.2.6. m2 1.00 38,959.50 38,959.50
6 Pek. Acian dinding A.4.4.2.27. m2 1.00 22,793.75 22,793.75
7 Pek. Pengecatan tiang bendera A.4.7.1.10.a m2 1.00 26,061.26 26,061.26
Sub Jumlah C 1,186,889.24
D PEKERJAAN TAMAN
1 Pek. Pemasangan batu sikat dihit m2 12.60 165,000.00 2,079,000.00
Sub Jumlah D 2,079,000.00
Jumlah 14,291,081.85
Terbilang : PPN 10% 1,429,108.18
TER Jumlah Total 15,720,190.03
Err:511
Dibulatkan 15,720,000.00

Salatiga, 2015
MENYETUJUI
KEPALA BAPERMAS
PEREMPUAN KB DAN KETAHANAN PANGAN
KOTA SALATIGA

Hal 13/229
HARGA JUMLAH
NO URAIAN PEKERJAAN ANALISA SAT. VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6 7

AFIF ZUFRONINGDYAH, SH, MH


NIP. 19590927 198703 2 003

Hal 14/229
Bongkar beton lama (jalan masuk & keluar) 6.37
34.53 x 0.10 x 1.00 x 1.00 3.45 3.45
29.18 x 0.10 x 1.00 x 1.00 2.92 2.92
Bongkar Tiang bendera 72.35
6.60 x 4.00 x 1.00 x 1.00 26.40 26.40
3.20 x 1.00 x 1.00 x 1.00 3.20 3.20
4.00 x 2.00 x 1.00 x 1.00 8.00 8.00
5.43 x 3.20 x 2.00 x 1.00 34.75 34.75
Pasang Wiremesh M8 63.71 11.34
34.53 x 1.00 x 1.00 34.53 34.53
29.18 x 1.00 x 1.00 29.18 29.18
Pengecoran beton K200 7.30
1.06 x 5.00 x 1.00 5.30 5.30
0.40 x 5.00 x 1.00 2.00 2.00
Rabat beton area tiang bendera 0.45
1.50 x 1.50 x 0.20 0.45 0.45
Pasang besi siku 50.50.5+angkur
19.20 x 4.60 x 1.00 88.26 88.26
PEKERJAAN TIANG BENDERA
Pasang tiang bendera besi dia 2"+cat
12.00 x 1.00 x 1.00 12.00 12.00
Pasang beton dudukan tiang bendera
0.50 x 0.50 x 0.80 0.20 0.20
Pasang dinding 1/2 batu bata camp 1:5
0.50 x 0.50 x 4.00 1.00 1.00
Pasang plesteran dinding 1:6
0.50 x 0.50 x 4.00 1.00 1.00
Acian dinding
0.50 x 0.50 x 4.00 1.00 1.00
Pengecatan tiang bendera
0.50 x 0.50 x 4.00 1.00 1.00
5.618166
REKAPITULASI HARGA SATUAN PEKERJAAN 2014
BIDANG CIPTA KARYA SESUAI PERMEN NO.11/PRT/M/2013
Kode Harga Keuntungan Harga Total
No. Uraian Pekerjaan
Analisa (Rp) 10% (Rp)
A.2.2.1 A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
1 A.2.2.1.1. Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter 398,475.00 39,847.50 438,322.50
2 A.2.2.1.2. Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter 463,437.50 46,343.75 509,781.25
3 A.2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter 85,300.00 8,530.00 93,830.00
4 A.2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank 521,037.50 52,103.75 573,141.25
5 A.2.2.1.5. Pembuatan 1 m2 kantor sementara lantai plesteran 1,296,800.00 129,680.00 1,426,480.00
6 A.2.2.1.6. Pembuatan 1 m2 rumah jaga (konstruksi kayu ) 1,493,875.00 149,387.50 1,643,262.50
7 A.2.2.1.7. Pembuatan 1 m2 gudang semen dan peralatan 1,238,512.50 123,851.25 1,362,363.75
8 A.2.2.1.8. Pembuatan 1 m2 bedeng pekerja 1,219,625.00 121,962.50 1,341,587.50
9 A.2.2.1.9. Pembersihan 1 m2 lapangan dan perataan 8,875.00 887.50 9,762.50
10 A.2.2.1.10. Pembuatan 1 m2 steger/perancah dari bambu 208,927.00 20,892.70 229,819.70
11 A.2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm 205,900.00 20,590.00 226,490.00
12 A.2.2.1.12. Pembuatan 1 m2 jalan sementara 111,337.50 11,133.75 122,471.25
13 A.2.2.1.13. Pembongkaran 1 m3 beton bertulang 778,325.00 77,832.50 856,157.50
14 A.2.2.1.14. Pembongkaran 1 m3 dinding tembok bata 389,162.50 38,916.25 428,078.75
15 A.2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm 8,106.20 810.62 8,916.82
16 A.2.2.1.16. Pemasangan 1 m2 panel beton pracetak 5x50x213 cm 143,362.50 14,336.25 157,698.75

A.2.3.1 A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m 42,937.50 4,293.75 47,231.25
2 A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m 52,537.50 5,253.75 57,791.25
3 A.2.3.1.3. Penggalian 1 m3 tanah biasa sedalam 3 m 62,272.50 6,227.25 68,499.75
4 A.2.3.1.4. Penggalian 1 m3 tanah keras sedalam 1 m 57,160.00 5,716.00 62,876.00
5 A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m 86,550.00 8,655.00 95,205.00
6 A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m 69,037.50 6,903.75 75,941.25
7 A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter 3,087.50 308.75 3,396.25
8 A.2.3.1.8. Pembuangan 1 m3 tanah sejauh 30 meter 18,825.00 1,882.50 20,707.50
9 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah 30,875.00 3,087.50 33,962.50
10 A.2.3.1.10. Pemadatan tanah 1 m3 tanah (per 20 cm) 30,875.00 3,087.50 33,962.50
11 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug 125,175.00 12,517.50 137,692.50
12 A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP:3PP:7TL 205,020.00 20,502.00 225,522.00
13 A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan 51,262.50 5,126.25 56,388.75
14 A.2.3.1.14. Pengurugan 1 m3 sirtu padat 75,437.50 7,543.75 82,981.25

A.3.2.1 A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP 764,187.50 76,418.75 840,606.25
2 A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP 717,562.50 71,756.25 789,318.75
3 A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP 685,237.50 68,523.75 753,761.25
4 A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP 662,512.50 66,251.25 728,763.75
5 A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP 631,362.50 63,136.25 694,498.75
6 A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP 459,711.25 45,971.13 505,682.38
7 A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3KP : 10PP 573,476.50 57,347.65 630,824.15
8 A.3.2.1.8. Pemasangan 1 m3 pondasi batu belah campuran 1/2SP : 1KP : 4PP 551,984.50 55,198.45 607,182.95
9 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) 362,347.50 36,234.75 398,582.25
10 A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah 2,407,550.00 240,755.00 2,648,305.00
11 A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm 867,650.00 86,765.00 954,415.00

A.4.1.1 A.4.1.1 HARGA SATUAN PEKERJAAN BETON


1 A.4.1.1.1 Membuat 1 m3 beton mutu f’c± = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87 784,940.36 78,494.04 863,434.39
2 A.4.1.1.2 Membuat 1 m3 beton mutu f’c± = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78 821,365.62 82,136.56 903,502.18
3 A.4.1.1.3 Membuat 1 m3 beton mutu f’c± = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72 849,773.69 84,977.37 934,751.06
4 A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100),slump (3-6) cm, w/c = 0,87 737,356.61 73,735.66 811,092.28
5 A.4.1.1.5. Membuat 1 m3 beton mutu f’c± = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66 883,549.48 88,354.95 971,904.43
6 A.4.1.1.6 Membuat 1 m3 beton mutu f’c± = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61 915,527.00 91,552.70 1,007,079.70
7 A.4.1.1.7. Membuat 1 m3 beton mutu f’c± = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58 939,900.67 93,990.07 1,033,890.74
8 A.4.1.1.8. Membuat 1 m3 beton mutu f’c± = 19,3 MPa (K 250), slump (12 2) cm, w/c = 0,58 955,437.05 95,543.71 1,050,980.76
9 A.4.1.1.9. Membuat 1 m3 beton mutu f’c± = 19,3 MPa (K 275), slump (12 2) cm, w/c = 0,58 982,136.79 98,213.68 1,080,350.46
10 A.4.1.1.10. Membuat 1 m3 beton mutu f’c± = 19,3 MPa (K 300), slump (12 2) cm, w/c = 0,58 982,136.79 98,213.68 1,080,350.46
11 A.4.1.1.11. Membuat 1 m3 beton mutu f’c± = 19,3 MPa (K 325), slump (12 2) cm, w/c = 0,58 1,021,808.08 102,180.81 1,123,988.89
12 A.4.1.1.12. Membuat 1 m3 beton mutu f’c± = 19,3 MPa (K 350), slump (12 2) cm, w/c = 0,58 1,032,643.40 103,264.34 1,135,907.74
13 A.4.1.1.13. Membuat 1 m3 beton kedap air dengan strorox – 100 991,862.50 99,186.25 1,091,048.75
14 A.4.1.1.14. Pemasangan 1 m PVC waterstop lebar 150 mm 5,497.50 549.75 6,047.25

17
Kode Harga Keuntungan Harga Total
No. Uraian Pekerjaan
Analisa (Rp) 10% (Rp)
15 A.4.1.1.15. Pemasangan 1 m PVC waterstop lebar 200 mm 6,682.50 668.25 7,350.75
16 A.4.1.1.16. Pemasangan 1 m PVC waterstop lebar 230 mm - 320 mm 7,330.00 733.00 8,063.00
17 A.4.1.1.17. Pembesian 10 kg dengan besi polos atau besi ulir 142,750.00 14,275.00 157,025.00
18 A.4.1.1.18. Pemasangan 10 kg kabel presstressed polos/strands 139,352.50 13,935.25 153,287.75
19 A.4.1.1.19. Pemasangan 10 kg jaring kawat baja (wiremesh) 117,680.00 11,768.00 129,448.00
20 A.4.1.1.20. Pemasangan 1 m2 bekisting untuk pondasi 87,295.00 8,729.50 96,024.50
21 A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof 91,295.00 9,129.50 100,424.50
22 A.4.1.1.22. Pemasangan 1 m2 bekisting untuk kolom 280,797.50 28,079.75 308,877.25
23 A.4.1.1.23. Pemasangan 1 m3 bekisting untuk balok 292,797.50 29,279.75 322,077.25
24 A.4.1.1.24. Pemasangan 1 m3 bekisting untuk lantai 365,797.50 36,579.75 402,377.25
25 A.4.1.1.25. Pemasangan 1 m3 bekisting untuk dinding 338,797.50 33,879.75 372,677.25
26 A.4.1.1.26. Pemasangan 1 m3 bekisting untuk tangga 271,547.50 27,154.75 298,702.25
27 A.4.1.1.27. Pemasangan 1 m3 jembatan untuk pengecoran beton 65,360.00 6,536.00 71,896.00
28 A.4.1.1.28. Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) 3,461,792.50 346,179.25 3,807,971.75
29 A.4.1.1.29. Membuat 1 m3 sloof beton bertulang (200 kg besi +bekisting) 4,261,847.50 426,184.75 4,688,032.25
30 A.4.1.1.30. Membuat 1 m3 kolom beton bertulang (300 kg besi +bekisting) 7,451,397.50 745,139.75 8,196,537.25
31 A.4.1.1.31. Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) 5,652,985.00 565,298.50 6,218,283.50
32 A.4.1.1.32. Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) 5,586,487.50 558,648.75 6,145,136.25
33 A.4.1.1.33. Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) 5,202,292.50 520,229.25 5,722,521.75
34 A.4.1.1.34. Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) 5,364,597.50 536,459.75 5,901,057.25
35 A.4.1.1.35. Membuat 1 m3 kolom praktis beton bertulang (11 x 11 cm) 70,447.50 7,044.75 77,492.25
36 A.4.1.1.36. Membuat 1 m3 ring balok beton bertulang (10 x 15 cm) 71,063.50 7,106.35 78,169.85

A.4.1.2 A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


1 A.4.1.2.1. Pembuatan 1 m2 lahan produksi tebal 8cm beton f'c 14,5 Mpa (K175) slump (12 ± 2) cm 46,762.50 4,676.25 51,438.75
2 A.4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10cm beton f'c 14,5 Mpa (K175) slump (12 ± 2) cm 58,465.00 5,846.50 64,311.50
3 A.4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12cm beton f'c 14,5 Mpa (K175) slump (12 ± 2) cm 60,375.00 6,037.50 66,412.50
4 A.4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15cm beton f'c 14,5 Mpa (K175) slump (12 ± 2) cm 87,700.00 8,770.00 96,470.00
5 A.4.1.2.5. Pembuatan 1 m2 bekistig untuk plat beton pracetak ( 5 kali pakai) 22,178.50 2,217.85 24,396.35
6 A.4.1.2.6. Pembuatan 1 m2 bekistig untuk balok beton pracetak ( 10 - 12 kali pakai) 7,827.50 782.75 8,610.25
7 A.4.1.2.7. Pembuatan 1 m2 bekistig untukkolom beton pracetak ( 10 - 12 kali pakai) 8,517.50 851.75 9,369.25
8 A.4.1.2 8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak 4,377.50 437.75 4,815.25
9 A.4.1.2 9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak 7,107.50 710.75 7,818.25
10 A.4.1.2 10. Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak 5,742.50 574.25 6,316.75
11 A.4.1.2 11. Penuangan/menebar beton untuk 1 buah komponen plat pracetak 25,297.50 2,529.75 27,827.25
12 A.4.1.2 12. Penuangan/menebar beton untuk 1 buah komponen balok pracetak 25,647.50 2,564.75 28,212.25
13 A.4.1.2 13. Penuangan/menebar beton untuk 1 buah komponen kolom pracetak 23,207.50 2,320.75 25,528.25
14 A.4.1.2 14. Mendirikan 1 buah komponen plat pracetak 53,300.50 5,330.05 58,630.55
15 A.4.1.2 15. Mendirikan 1 buah komponen balok pracetak 48,702.50 4,870.25 53,572.75
16 A.4.1.2 16. Mendirikan 1 buah komponen kolom pracetak 66,066.00 6,606.60 72,672.60
17 A.4.1.2 17. Melangsir 1 buah komponen plat pracetak ( ± 20 m) 13,758.50 1,375.85 15,134.35
18 A.4.1.2 18. Melangsir 1 buah komponen balok pracetak ( ± 20 m) 13,758.50 1,375.85 15,134.35
19 A.4.1.2 19. Melangsir 1 buah komponen kolom pracetak ( ± 20 m) 13,758.50 1,375.85 15,134.35
20 A.4.1.2 20. Bahan 1 m3 grouting campuran 35,000.00 3,500.00 38,500.00
21 A.4.1.2 21. Bahan 1 m3 grouting tidak campuran 40,000.00 4,000.00 44,000.00
22 A.4.1.2 22. Upah melakukan 1 titik grouting pada join pracetak 29,327.50 2,932.75 32,260.25
23 A.4.1.2 23. Pemasangan 1 titik Bekisting join pracetak 22,545.00 2,254.50 24,799.50
24 A.4.1.2 24. Upah 1 titik Join dengan Sling 40,342.50 4,034.25 44,376.75

A.4.2.1 A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


1 A.4.2.1.1. Pemasangan 1 kg besi profil 22,017.50 2,201.75 24,219.25
2 A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF 22,017.50 2,201.75 24,219.25
3 A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan 20,652.50 2,065.25 22,717.75
4 A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku 646,260.00 64,626.00 710,886.00
5 A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik 20,565.00 2,056.50 22,621.50
6 A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm 82,760.00 8,276.00 91,036.00
7 A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi 149,205.00 14,920.50 164,125.50
8 A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC 28,545.00 2,854.50 31,399.50
9 A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium 82,870.00 8,287.00 91,157.00
10 A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium 354,875.00 35,487.50 390,362.50
11 A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium 87,081.25 8,708.13 95,789.38
12 A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm 450,436.00 45,043.60 495,479.60
13 A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium 369,072.50 36,907.25 405,979.75
14 A.4.2.1.14. Pemasangan 1 m2 venetions blinds dan Vertical blinds 189,615.00 18,961.50 208,576.50
15 A.4.2.1.15. Pemasangan 1 m2 terali besi strip (2 x 3) mm 268,275.50 26,827.55 295,103.05
16 A.4.2.1.16. Pemasangan 1 m2 kawat nyamuk 12,400.00 1,240.00 13,640.00

18
Kode Harga Keuntungan Harga Total
No. Uraian Pekerjaan
Analisa (Rp) 10% (Rp)
17 A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis 99,867.50 9,986.75 109,854.25
18 A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm 69,752.50 6,975.25 76,727.75
19 A.4.2.1.19. Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm 54,130.00 5,413.00 59,543.00
20 A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi 31,877.50 3,187.75 35,065.25
21 A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon 68,855.00 6,885.50 75,740.50

A.4.4.1 A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 A.4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP 222,137.50 22,213.75 244,351.25
2 A.4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP 209,831.25 20,983.13 230,814.38
3 A.4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP 201,431.25 20,143.13 221,574.38
4 A.4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP 197,250.00 19,725.00 216,975.00
5 A.4.4.1.5. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP 196,162.50 19,616.25 215,778.75
6 A.4.4.1.6. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP 179,015.00 17,901.50 196,916.50
7 A.4.4.1.7. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP 106,818.75 10,681.88 117,500.63
8 A.4.4.1.8. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP 100,921.25 10,092.13 111,013.38
9 A.4.4.1.9. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP 97,575.00 9,757.50 107,332.50
10 A.4.4.1.10. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :5PP 95,472.50 9,547.25 105,019.75
11 A.4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP 94,402.50 9,440.25 103,842.75
12 A.4.4.1.12. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP 92,100.00 9,210.00 101,310.00
13 A.4.4.1.13. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP 89,530.00 8,953.00 98,483.00
14 A.4.4.1.14. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP 76,978.50 7,697.85 84,676.35
15 A.4.4.1.15. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP 78,930.50 7,893.05 86,823.55
16 A.4.4.1.16. Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP 217,527.50 21,752.75 239,280.25
17 A.4.4.1.17. Pemasangan 1m2 dinding conblock HB20 campuran 1SP :4PP 218,197.50 21,819.75 240,017.25
18 A.4.4.1.18. Pemasangan 1m2 dinding conblock HB15 campuran 1SP :3PP 167,927.50 16,792.75 184,720.25
19 A.4.4.1.19. Pemasangan 1 cm2 dinding conblock HB15 campuran 1SP :4PP 168,085.00 16,808.50 184,893.50
20 A.4.4.1.20. Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :3PP 117,807.50 11,780.75 129,588.25
21 A.4.4.1.21. Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :4PP 118,441.25 11,844.13 130,285.38
22 A.4.4.1.22. Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP 46,287.50 4,628.75 50,916.25
23 A.4.4.1.23. Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP 46,287.50 4,628.75 50,916.25
24 A.4.4.1.24. Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP 53,137.50 5,313.75 58,451.25

A.4.4.2 A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm. 52,005.50 5,200.55 57,206.05
2 A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm. 45,545.50 4,554.55 50,100.05
3 A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. 42,779.50 4,277.95 47,057.45
4 A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm 40,867.50 4,086.75 44,954.25
5 A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm 39,815.50 3,981.55 43,797.05
6 A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. 38,959.50 3,895.95 42,855.45
7 A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm 38,499.50 3,849.95 42,349.45
8 A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm 38,039.50 3,803.95 41,843.45
9 A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm 39,551.00 3,955.10 43,506.10
10 A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm 37,180.00 3,718.00 40,898.00
11 A.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm 28,995.00 2,899.50 31,894.50
12 A.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm 28,995.00 2,899.50 31,894.50
13 A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm 60,929.00 6,092.90 67,021.90
14 A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm 48,933.50 4,893.35 53,826.85
15 A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm. 54,625.00 5,462.50 60,087.50
16 A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm 53,289.00 5,328.90 58,617.90
17 A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm 52,081.00 5,208.10 57,289.10
18 A.4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 20 mm 36,785.00 3,678.50 40,463.50
19 A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm 26,138.00 2,613.80 28,751.80
20 A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm 34,557.50 3,455.75 38,013.25
21 A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm 55,047.50 5,504.75 60,552.25
22 A.4.4.2.22. Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm 55,047.50 5,504.75 60,552.25
23 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP 31,302.50 3,130.25 34,432.75
24 A.4.4.2.24. Pemasangan 1 m2 finishing siar pasangan bata merah 18,083.50 1,808.35 19,891.85
25 A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose 8,680.00 868.00 9,548.00
26 A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP. 38,605.00 3,860.50 42,465.50
27 A.4.4.2.27. Pemasangan 1 m2 acian. 22,793.75 2,279.38 25,073.13

A.4.4.3 A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 A.4.4.3.1. Pemasangan 1m2 lantai ubin PC abu-abu ukuran 40cm x40cm 45,447.50 4,544.75 49,992.25
2 A.4.4.3.2 Pemasangan 1m2 lantai ubin PC abu-abu ukuran 30cm x30 cm 45,722.50 4,572.25 50,294.75
3 A.4.4.3.3 Pemasangan 1m2 lantai ubin PC abu-abu ukuran 20cm x20 cm 48,105.00 4,810.50 52,915.50
4 A.4.4.3.4 Pemasangan 1m2 lantai ubin warna ukuran 40cm x40 cm 49,347.50 4,934.75 54,282.25

19
Kode Harga Keuntungan Harga Total
No. Uraian Pekerjaan
Analisa (Rp) 10% (Rp)
5 A.4.4.3.5 Pemasangan 1m2 lantai ubin warna ukuran 30cm x30cm 51,072.50 5,107.25 56,179.75
6 A.4.4.3.6 Pemasangan 1m2 lantai ubin warna ukuran 20cm x20cm 52,965.00 5,296.50 58,261.50
7 A.4.4.3.7 Pemasangan 1m2 lantai ubin teraso ukuran 40cm x40cm 49,347.50 4,934.75 54,282.25
8 A.4.4.3.8. Pemasangan 1m2 lantai ubin teraso ukuran 30cm x30cm 51,072.50 5,107.25 56,179.75
9 A.4.4.3.9. Pemasangan 1m2 lantai ubin granit ukuran 40cm x40cm 259,297.50 25,929.75 285,227.25
10 A.4.4.3.10. Pemasangan 1m2 lantai ubin granit ukuran 30cm x30cm 51,072.50 5,107.25 56,179.75
11 A.4.4.3.11. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm 49,347.50 4,934.75 54,282.25
12 A.4.4.3.12. Pemasangan 1m2 lantai ubin teralux ukuran 30cm x30cm 51,072.50 5,107.25 56,179.75
13 A.4.4.3.13. Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm 48,690.00 4,869.00 53,559.00
14 A.4.4.3.14. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm 49,347.50 4,934.75 54,282.25
15 A.4.4.3.15. Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm 51,072.50 5,107.25 56,179.75
16 A.4.4.3.16. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 15cm x 20cm 14,341.25 1,434.13 15,775.38
17 A.4.4.3.17. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 30cm 13,577.50 1,357.75 14,935.25
18 A.4.4.3.18. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm 13,577.50 1,357.75 14,935.25
19 A.4.4.3.19. Pemasangan 1 m’ plint ubin warna ukuran 10cm x 20cm 13,740.00 1,374.00 15,114.00
20 A.4.4.3.20. Pemasangan 1 m’ plint ubin warna ukuran 10cm x 30cm 13,740.00 1,374.00 15,114.00
21 A.4.4.3.21. Pemasangan 1 m’ plint ubin warna ukuran 10cm x 40cm 13,740.00 1,374.00 15,114.00
22 A.4.4.3.22. Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 30cm 13,740.00 1,374.00 15,114.00
23 A.4.4.3.23. Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 40cm 13,740.00 1,374.00 15,114.00
24 A.4.4.3.24. Pemasangan 1 m’ plint ubin granit ukuran 10cm x 40cm 13,740.00 1,374.00 15,114.00
25 A.4.4.3.25. Pemasangan 1 m’ plint ubin granit ukuran 10cm x 30cm 13,740.00 1,374.00 15,114.00
26 A.4.4.3.26. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm 13,740.00 1,374.00 15,114.00
27 A.4.4.3.27. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 30cm 13,740.00 1,374.00 15,114.00
28 A.4.4.3.28. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 60cm 13,740.00 1,374.00 15,114.00
29 A.4.4.3.29. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 40cm 13,740.00 1,374.00 15,114.00
30 A.4.4.3.30. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm 13,740.00 1,374.00 15,114.00
31 A.4.4.3.31. Pemasangan 1m2 lantai teraso cor di tempat, tebal 3cm 33,285.00 3,328.50 36,613.50
32 A.4.4.3.32. Pemasangan 1m2 lantai keramik artistik 10cm x 20cm 92,648.75 9,264.88 101,913.63
33 A.4.4.3.33. Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm 93,673.75 9,367.38 103,041.13
34 A.4.4.3.34. Pemasangan 1m2 lantai keramik ukuran 33cm x 33cm 88,933.75 8,893.38 97,827.13
35 A.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm 145,017.05 14,501.70 159,518.75
36 A.4.4.3.35.a Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm 145,229.17 14,522.92 159,752.08
37 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm 142,297.50 14,229.75 156,527.25
38 A.4.4.3.37. Pemasangan 1m2 lantai keramik ukuran 10cm x 33cm untuk variasi/border 131,857.50 13,185.75 145,043.25
39 A.4.4.3.38. Pemasangan 1m2 lantai keramik mozaik ukuran 30cm x 30cm 97,068.75 9,706.88 106,775.63
40 A.4.4.3.39. Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm 15,205.00 1,520.50 16,725.50
41 A.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10cm x 10cm 15,280.00 1,528.00 16,808.00
42 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm 14,085.25 1,408.53 15,493.78
43 A.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5cm x 5cm x 20cm 96,157.50 9,615.75 105,773.25
44 A.4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm 616,348.75 61,634.88 677,983.63
45 A.4.4.3.44. Pemasangan 1 m2 lantai karpet 21,687.50 2,168.75 23,856.25
46 A.4.4.3.45. Pemasangan 1 m2 underlayer (pelapis bawah karpet) 15,285.00 1,528.50 16,813.50
47 A.4.4.3.46. Pemasangan 1 m2 lantai parquet kayu 65,012.50 6,501.25 71,513.75
48 A.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor 65,012.50 6,501.25 71,513.75
49 A.4.4.3.48. Pemasangan 1 m2 dinding porslen 11cm x 11cm 112,512.50 11,251.25 123,763.75
50 A.4.4.3.49. Pemasangan 1 m2 dinding porslen 10cm x 20cm 107,100.00 10,710.00 117,810.00
51 A.4.4.3.50. Pemasangan 1 m2 dinding porslen 20cm x 20cm 124,070.00 12,407.00 136,477.00
52 A.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm 134,600.00 13,460.00 148,060.00
53 A.4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm 136,550.00 13,655.00 150,205.00
54 A.4.4.3.53. Pemasangan 1 m2 dinding keramik 10cm x 20cm 134,600.00 13,460.00 148,060.00
55 A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20cm x 20cm 177,070.00 17,707.00 194,777.00
56 A.4.4.3.54A. Pemasangan 1 m2 dinding keramik 20cm x 25cm 176,070.00 17,607.00 193,677.00
57 A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100cm x 100cm 149,667.50 14,966.75 164,634.25
58 A.4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm 149,480.00 14,948.00 164,428.00
59 A.4.4.3.57. Pemasangan 1 m2 dinding batu paras 87,293.75 8,729.38 96,023.13
60 A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam 174,193.75 17,419.38 191,613.13
61 A.4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm 18,765.00 1,876.50 20,641.50
62 A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm 30,990.00 3,099.00 34,089.00
63 A.4.4.3.61. Pemasangan 1m2 floor harderner 14,985.00 1,498.50 16,483.50
64 A.4.4.3.62. Pemasangan 1 m’ plint vynil 15cm x 30cm 9,990.00 999.00 10,989.00
65 A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm 15,685.00 1,568.50 17,253.50

A.4.5.1 A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


1 A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm 29,550.00 2,955.00 32,505.00
2 A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm 24,785.00 2,478.50 27,263.50
3 A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm 16,235.00 1,623.50 17,858.50

20
Kode Harga Keuntungan Harga Total
No. Uraian Pekerjaan
Analisa (Rp) 10% (Rp)
4 A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm 13,687.50 1,368.75 15,056.25
2 A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm 33,932.50 3,393.25 37,325.75
3 A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm 162,090.00 16,209.00 178,299.00
4 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm 35,697.50 3,569.75 39,267.25
5 A.4.5.1.7. a Pemasangan 1 m2 langit-langit kalsiboardboard ukuran (120x240x9) mm, tebal 4 mm 39,267.25 3,926.73 43,193.98
5 A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium 65,787.50 6,578.75 72,366.25
6 A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil 17,052.50 1,705.25 18,757.75
7 A.4.5.1.9.a Pemasangan 1 m’ list langit-langit gypsum 17,590.00 1,759.00 19,349.00
7 A.4.5.1.10. Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40 0.00 0.00

A.4.5.2. A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil 71,465.00 7,146.50 78,611.50
2 A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur 78,997.50 7,899.75 86,897.25
3 A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super 52,397.50 5,239.75 57,637.25
4 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong 84,335.00 8,433.50 92,768.50
5 A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur 93,335.00 9,333.50 102,668.50
6 A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar 78,135.00 7,813.50 85,948.50
7 A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90x180 13,765.00 1,376.50 15,141.50
8 A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,5m x 5mm 13,447.50 1,344.75 14,792.25
9 A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,25m x 5mm 13,447.50 1,344.75 14,792.25
10 A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,00m x 5mm 13,002.50 1,300.25 14,302.75
11 A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92mx1.80m x 5mm 13,002.50 1,300.25 14,302.75
12 A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1.05mx3.00m x 4mm 45,402.50 4,540.25 49,942.75
13 A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.70m x 4mm 13,002.50 1,300.25 14,302.75
14 A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.40m x 4mm 45,922.50 4,592.25 50,514.75
15 A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.10m x 4mm 46,092.50 4,609.25 50,701.75
16 A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1.05mx1.50m x 4mm 50,402.50 5,040.25 55,442.75
17 A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1.08mx3.00m x 6mm 13,002.50 1,300.25 14,302.75
18 A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.70m x 6mm 13,002.50 1,300.25 14,302.75
19 A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.40m x 6mm 13,002.50 1,300.25 14,302.75
20 A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.10m x 6mm 13,002.50 1,300.25 14,302.75
21 A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1.08mx1.80m x 6mm 13,002.50 1,300.25 14,302.75
22 A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92m 13,547.50 1,354.75 14,902.25
23 A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05m 94,247.50 9,424.75 103,672.25
24 A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08m 20,747.50 2,074.75 22,822.25
25 A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92m 20,747.50 2,074.75 22,822.25
26 A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05m 20,747.50 2,074.75 22,822.25
27 A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08m 20,747.50 2,074.75 22,822.25
28 A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92m 23,190.00 2,319.00 25,509.00
29 A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05m 20,747.50 2,074.75 22,822.25
30 A.4.5.2.30. Pemasangan 1 m2 genteng beton 46,525.00 4,652.50 51,177.50
31 A.4.5.2.31. Pemasangan 1 m2 genteng aspal 31,070.00 3,107.00 34,177.00
32 A.4.5.2.32. Pemasangan 1 m2 genteng metal 71,967.50 7,196.75 79,164.25
33 A.4.5.2.33. Pemasangan 1 m2 atap sirap kayu 30,720.00 3,072.00 33,792.00
34 A.4.5.2.34. Pemasangan 1 m’ nok genteng beton 100,850.00 10,085.00 110,935.00
35 A.4.5.2.35. Pemasangan 1 m’ nok genteng aspal 25,480.00 2,548.00 28,028.00
36 A.4.5.2.36. Pemasangan 1 m’ nok genteng metal 80,927.50 8,092.75 89,020.25
37 A.4.5.2.37. Pemasangan 1 m’ nok sirap 26,230.00 2,623.00 28,853.00
38 A.4.5.2.38. Pemasangan 1 m2 atap seng gelombang 11,525.00 1,152.50 12,677.50
39 A.4.5.2.39. Pemasangan 1 m’nok atap seng 14,085.00 1,408.50 15,493.50
40 A.4.5.2.40. Pemasangan 1 m2 atap alumunium 60,730.00 6,073.00 66,803.00
41 A.4.5.2.41. Pemasangan 1 m’ nok alumunium 77,875.00 7,787.50 85,662.50
42 A.4.5.2.42. Pemasangan 1 m2 alumunium foil/sisalation 12,240.00 1,224.00 13,464.00

A.4.6.1 A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


1 A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I 12,342,375.00 1,234,237.50 13,576,612.50
2 A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III 8,667,000.00 866,700.00 9,533,700.00
3 A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II 349,665.00 34,966.50 384,631.50
4 A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III 333,665.00 33,366.50 367,031.50
5 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II 529,375.00 52,937.50 582,312.50
6 A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II 370,700.00 37,070.00 407,770.00
7 A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II 682,975.00 68,297.50 751,272.50
8 A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 424,332.50 42,433.25 466,765.75
9 A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II 454,710.00 45,471.00 500,181.00
10 A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II 584,312.50 58,431.25 642,743.75
11 A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I 562,670.00 56,267.00 618,937.00

21
Kode Harga Keuntungan Harga Total
No. Uraian Pekerjaan
Analisa (Rp) 10% (Rp)
12 A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II 468,972.50 46,897.25 515,869.75
13 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter 8,320,500.00 832,050.00 9,152,550.00
14 A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I 13,397,012.50 1,339,701.25 14,736,713.75
15 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II 8,998,012.50 899,801.25 9,897,813.75
16 A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II 123,367.50 12,336.75 135,704.25
17 A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II 140,647.50 14,064.75 154,712.25
18 A.4.6.1.17.a Pemasangan 1 m2 rangka atap palenthong atau vlampers, kayu kelas II 93,607.50 9,360.75 102,968.25
19 A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II 105,740.00 10,574.00 116,314.00
20 A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III 135,572.50 13,557.25 149,129.75
21 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III 140,445.00 14,044.50 154,489.50
22 A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II 90,257.50 9,025.75 99,283.25
23 A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II 90,787.50 9,078.75 99,866.25
24 A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III 221,290.00 22,129.00 243,419.00
25 A.4.6.1.24. Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II 290,450.00 29,045.00 319,495.00
26 A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II 303,685.00 30,368.50 334,053.50
27 A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I 241,775.00 24,177.50 265,952.50
28 A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm 35,600.00 3,560.00 39,160.00
29 A.4.6.1.28. Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV 9,515.50 951.55 10,467.05

A.4.6.2 A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1 A.4.6.2.1. Pemasangan 1 buah kunci tanam antik 44,902.50 4,490.25 49,392.75
1 A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa 100,387.50 10,038.75 110,426.25
2 A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi 79,977.50 7,997.75 87,975.25
3 A.4.6.2.4. Pemasangan 1 buah kunci silinder 34,977.50 3,497.75 38,475.25
3 A.4.6.2.5. Pemasangan 1 buah engsel pintu 32,229.00 3,222.90 35,451.90
4 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu 23,483.75 2,348.38 25,832.13
5 A.4.6.2.7. Pemasangan 1 buah engsel angin 35,333.75 3,533.38 38,867.13
6 A.4.6.2.8. Pemasangan 1 buah spring knip 11,715.00 1,171.50 12,886.50
6 A.4.6.2.9. Pemasangan 1 buah kait angin 24,215.00 2,421.50 26,636.50
7 A.4.6.2.10. Pemasangan 1 buah door closer 172,452.50 17,245.25 189,697.75
8 A.4.6.2.11. Pemasangan 1 buah kunci slot 89,967.50 8,996.75 98,964.25
9 A.4.6.2.12. Pemasangan 1 buah Door holder 82,452.50 8,245.25 90,697.75
10 A.4.6.2.13. Pemasangan 1 buah door stop 42,787.50 4,278.75 47,066.25
11 A.4.6.2.14. Pemasangan 1 buah Rrel pintu sorong 164,902.50 16,490.25 181,392.75
12 A.4.6.2.15. Pemasangan 1 buah kunci lemari 43,712.75 4,371.28 48,084.03
13 A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm 84,479.00 8,447.90 92,926.90
14 A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm 106,479.00 10,647.90 117,126.90
15 A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm 218,675.75 21,867.58 240,543.33
16 A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm 18,712.75 1,871.28 20,584.03
16 A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm 231,715.00 23,171.50 254,886.50
17 A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 3 mm 145,272.50 14,527.25 159,799.75
18 A.4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm 11,715.00 1,171.50 12,886.50
19 A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm 14,745.00 1,474.50 16,219.50

A.4.7.1 A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


1 A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama 9,552.50 955.25 10,507.75
2 A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat 8,902.50 890.25 9,792.75
3 A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual 9,240.00 924.00 10,164.00
4 A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 39,565.00 3,956.50 43,521.50
5 A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) 50,835.00 5,083.50 55,918.50
6 A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil 21,235.00 2,123.50 23,358.50
7 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur 48,078.50 4,807.85 52,886.35
8 A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter 10,105.00 1,010.50 11,115.50
9 A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis 28,692.50 2,869.25 31,561.75
10 A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 16,489.50 1,648.95 18,138.45
11 A.4.7.1.10.a Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) mowilex 26,061.26 2,606.13 28,667.39
12 A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) 10,340.50 1,034.05 11,374.55
13 A.4.7.1.11.a Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) mowilex 18,316.97 1,831.70 20,148.67
13 A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium 4,640.50 464.05 5,104.55
14 A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih 10,312.75 1,031.28 11,344.03
15 A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan) 5,613.75 561.38 6,175.13
16 A.4.7.1.15. Pemasangan 1 m2 wallpaper 558,268.75 55,826.88 614,095.63
17 A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi 18,168.75 1,816.88 19,985.63
18 A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah 33,051.25 3,305.13 36,356.38
19 A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis 42,157.75 4,215.78 46,373.53
20 A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir 26,302.50 2,630.25 28,932.75

22
Kode Harga Keuntungan Harga Total
No. Uraian Pekerjaan
Analisa (Rp) 10% (Rp)
21 A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis 100,420.00 10,042.00 110,462.00
22 A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir 89,820.00 8,982.00 98,802.00

A.5.1.1 A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1. Pemasangan 1 buah closet duduk/monoblock 1,636,950.00 163,695.00 1,800,645.00
2 A.5.1.1 2. Pemasangan 1 buah closet jongkok porslen 315,800.00 31,580.00 347,380.00
3 A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso 313,275.00 31,327.50 344,602.50
4 A.5.1.1 4. Pemasangan 1 buah urinoir 1,675,125.00 167,512.50 1,842,637.50
5 A.5.1.1 5. Pemasangan 1 buah wastafel 566,810.00 56,681.00 623,491.00
6 A.5.1.1 6. Pemasangan 1 buah bathcuip porselen 54,202.50 5,420.25 59,622.75
6 A.5.1.1 7. Pemasangan 1 buah bak fibreglass vol 1 m3 756,600.00 75,660.00 832,260.00
7 A.5.1.1 8. Pemasangan 1 buah bak mandi batu bata vol 0,30 m3 1,149,525.00 114,952.50 1,264,477.50
8 A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3 499,000.00 49,900.00 548,900.00
9 A.5.1.1 10. Pemasangan 1 buah bak air fibreglass vol 1 m3 47,437.50 4,743.75 52,181.25
10 A.5.1.1 11. Pemasangan 1 buah bak beton volume 1 m3 466,965.00 46,696.50 513,661.50
11 A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel 22,612.50 2,261.25 24,873.75
8 A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso 305,187.50 30,518.75 335,706.25
9 A.5.1.1 14. Pemasangan 1 buah floor drain 27,537.50 2,753.75 30,291.25
10 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm 319,422.50 31,942.25 351,364.75
11 A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm 483,170.00 48,317.00 531,487.00
12 A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm 619,320.00 61,932.00 681,252.00
13 A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½” 37,777.50 3,777.75 41,555.25
14 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4” 54,075.00 5,407.50 59,482.50
15 A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter 3/4” 44,527.50 4,452.75 48,980.25
16 A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1” 51,277.50 5,127.75 56,405.25
17 A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½” 80,347.50 8,034.75 88,382.25
18 A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3” 107,892.50 10,789.25 118,681.75
19 A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4” 22,892.50 2,289.25 25,181.75
19 A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2” 13,800.00 1,380.00 15,180.00
20 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” 16,635.00 1,663.50 18,298.50
21 A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1” 18,660.00 1,866.00 20,526.00
22 A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2” 31,432.50 3,143.25 34,575.75
23 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” 39,532.50 3,953.25 43,485.75
24 A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2” 54,202.50 5,420.25 59,622.75
25 A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” 72,427.50 7,242.75 79,670.25
26 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” 13,702.50 1,370.25 15,072.75
27 A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm 59,515.00 5,951.50 65,466.50
28 A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm 10,022.50 1,002.25 11,024.75
29 A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 – 20 cm 31,577.50 3,157.75 34,735.25
30 A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm 67,390.00 6,739.00 74,129.00
A.8.4.1 A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA
1 A.8.4.1.1. Pemasangan 1 m pipa PVC Ø 63 mm 4,995.00 499.50 5,494.50
2 A.8.4.1.2. Pemasangan 1 m pipa PVC Ø 90 mm 5,777.50 577.75 6,355.25
3 A.8.4.1.3. Pemasangan 1 m pipa PVC Ø 110 mm 6,517.50 651.75 7,169.25
4 A.8.4.1.4. Pemasangan 1 m pipa PVC Ø 150 mm 7,300.00 730.00 8,030.00
5 A.8.4.1.5. Pemasangan 1 m pipa PVC Ø 200 mm 11,677.50 1,167.75 12,845.25
6 A.8.4.1.6. Pemasangan 1 m pipa PVC Ø 250 mm 15,835.00 1,583.50 17,418.50
7 A.8.4.1.7. Pemasangan 1 m pipa PVC Ø 300 mm 18,127.50 1,812.75 19,940.25
8 A.8.4.1.8. Pemasangan 1 m pipa PVC Ø 400 mm 33,565.00 3,356.50 36,921.50
9 A.8.4.1.9. Pemasangan 1 m pipa PVC Ø 450 mm 41,317.50 4,131.75 45,449.25
10 A.8.4.1.10. Pemasangan 1 m pipa PVC Ø 500 mm 49,962.50 4,996.25 54,958.75
11 A.8.4.1.11. Pemasangan 1 m pipa PVC Ø 600 mm 59,115.00 5,911.50 65,026.50
12 A.8.4.1.12. Pemasangan 1 m pipa PVC Ø 800 mm 99,925.00 9,992.50 109,917.50
13 A.8.4.1.13. Pemasangan 1 m pipa PVC Ø 900 mm 104,412.50 10,441.25 114,853.75
14 A.8.4.1.14. Pemasangan 1 m pipa PVC Ø 1000 mm 117,050.00 11,705.00 128,755.00
15 A.8.4.1.15. Pemasangan 1 m pipa PVC Ø 1100 mm 129,620.00 12,962.00 142,582.00
16 A.8.4.1.16. Pemasangan 1 m pipa PVC Ø 1200 mm 142,190.00 14,219.00 156,409.00
17 A.8.4.1.17. Pemasangan 1 m pipa HDPE Ø 63 mm 2,127.50 212.75 2,340.25
18 A.8.4.1.18. Pemasangan 1 m pipa HDPE Ø 100 mm 2,470.00 247.00 2,717.00
19 A.8.4.1.19. Pemasangan 1 m pipa HDPE Ø 125 mm 2,812.50 281.25 3,093.75
20 A.8.4.1.20. Pemasangan 1 m pipa HDPE Ø 150 mm 3,815.00 381.50 4,196.50
21 A.8.4.1.21. Pemasangan 1 m pipa HDPE Ø 200 mm 6,285.00 628.50 6,913.50
22 A.8.4.1.22. Pemasangan 1 m pipa HDPE Ø 250 mm 8,192.50 819.25 9,011.75
23 A.8.4.1.23. Pemasangan 1 m pipa HDPE Ø 300 mm 10,497.50 1,049.75 11,547.25
24 A.8.4.1.24. Pemasangan 1 m pipa HDPE Ø 400 mm 17,907.50 1,790.75 19,698.25
25 A.8.4.1.25. Pemasangan 1 m pipa HDPE Ø 450 mm 22,175.00 2,217.50 24,392.50

23
Kode Harga Keuntungan Harga Total
No. Uraian Pekerjaan
Analisa (Rp) 10% (Rp)
26 A.8.4.1.26. Pemasangan 1 m pipa HDPE Ø 500 mm 26,717.50 2,671.75 29,389.25
27 A.8.4.1.27. Pemasangan 1 m pipa HDPE Ø 600 mm 31,602.50 3,160.25 34,762.75
28 A.8.4.1.28. Pemasangan 1 m pipa HDPE Ø 800 mm 55,122.50 5,512.25 60,634.75
29 A.8.4.1.29. Pemasangan 1 m pipa HDPE Ø 900 mm 83,527.50 8,352.75 91,880.25
30 A.8.4.1.30. Pemasangan 1 m pipa HDPE Ø 1000 mm 102,450.00 10,245.00 112,695.00
31 A.8.4.1.31. Pemasangan 1 m pipa HDPE Ø 1100 mm 112,275.00 11,227.50 123,502.50
32 A.8.4.1.32. Pemasangan 1 m pipa HDPE Ø 1200 mm 146,347.50 14,634.75 160,982.25
33 A.8.4.1.33. Pemasangan 1 m pipa GIP Ø 63 mm 21,270.00 2,127.00 23,397.00
34 A.8.4.1.34. Pemasangan 1 m pipa GIP Ø 100 mm 24,700.00 2,470.00 27,170.00
35 A.8.4.1.35. Pemasangan 1 m pipa GIP Ø 125 mm 27,677.50 2,767.75 30,445.25
36 A.8.4.1.36. Pemasangan 1 m pipa GIP Ø 150 mm 31,272.50 3,127.25 34,399.75
37 A.8.4.1.37. Pemasangan 1 m pipa GIP Ø 200 mm 49,180.00 4,918.00 54,098.00
38 A.8.4.1.38. Pemasangan 1 m pipa GIP Ø 250 mm 58,607.50 5,860.75 64,468.25
39 A.8.4.1.39. Pemasangan 1 m pipa GIP Ø 300 mm 59,170.00 5,917.00 65,087.00
40 A.8.4.1.40. Pemasangan 1 m pipa GIP Ø 400 mm 74,827.50 7,482.75 82,310.25
41 A.8.4.1.41. Pemasangan 1 m pipa GIP Ø 450 mm 83,527.50 8,352.75 91,880.25
42 A.8.4.1.42. Pemasangan 1 m pipa GIP Ø 500 mm 90,717.50 9,071.75 99,789.25
43 A.8.4.1.43. Pemasangan 1 m pipa GIP Ø 600 mm 81,962.50 8,196.25 90,158.75
44 A.8.4.1.44. Pemasangan 1 m pipa GIP Ø 800 mm 143,712.50 14,371.25 158,083.75
45 A.8.4.1.45. Pemasangan 1 m pipa GIP Ø 900 mm 161,950.00 16,195.00 178,145.00
46 A.8.4.1.46. Pemasangan 1 m pipa GIP Ø 1000 mm 179,747.50 17,974.75 197,722.25
47 A.8.4.1.47. Pemasangan 1 m pipa GIP Ø 1100 mm 197,600.00 19,760.00 217,360.00
48 A.8.4.1.48. Pemasangan 1 m pipa GIP Ø 1200 mm 215,397.50 21,539.75 236,937.25
49 A.8.4.1.49. Pemasangan 1 m pipa DCI Ø 100 mm 30,202.50 3,020.25 33,222.75
50 A.8.4.1.50. Pemasangan 1 m pipa DCI Ø 125 mm 33,797.50 3,379.75 37,177.25
51 A.8.4.1.51. Pemasangan 1 m pipa DCI Ø 150 mm 37,832.50 3,783.25 41,615.75
52 A.8.4.1.52. Pemasangan 1 m pipa DCI Ø 200 mm 52,762.50 5,276.25 58,038.75
53 A.8.4.1.53. Pemasangan 1 m pipa DCI Ø 250 mm 58,717.50 5,871.75 64,589.25
54 A.8.4.1.54. Pemasangan 1 m pipa DCI Ø 300 mm 60,062.50 6,006.25 66,068.75
55 A.8.4.1.55. Pemasangan 1 m pipa DCI Ø 400 mm 95,370.00 9,537.00 104,907.00
56 A.8.4.1.56. Pemasangan 1 m pipa DCI Ø 450 mm 111,932.50 11,193.25 123,125.75
57 A.8.4.1.57. Pemasangan 1 m pipa DCI Ø 500 mm 126,422.50 12,642.25 139,064.75
58 A.8.4.1.58. Pemasangan pipa 1 m DCI Ø 600 mm 124,172.50 12,417.25 136,589.75
59 A.8.4.1.59. Pemasangan 1 m pipa DCI Ø800 mm 238,300.00 23,830.00 262,130.00
60 A.8.4.1.60. Pemasangan 1 m pipa DCI Ø900 mm 308,407.50 30,840.75 339,248.25
61 A.8.4.1.61. Pemasangan 1 m pipa DCI Ø1000 mm 372,982.50 37,298.25 410,280.75
62 A.8.4.1.62. Pemasangan 1 m pipa DCI Ø1100 mm 429,107.50 42,910.75 472,018.25
63 A.8.4.1.63. Pemasangan 1 m pipa DCI Ø1200 mm 497,485.00 49,748.50 547,233.50
64 A.8.4.1.64. Pemasangan 1 m pipa baja Ø 63 mm 30,820.00 3,082.00 33,902.00
65 A.8.4.1.65. Pemasangan 1 m pipa baja Ø 100 mm 35,760.00 3,576.00 39,336.00
66 A.8.4.1.66. Pemasangan 1 m pipa baja Ø 125 mm 40,027.50 4,002.75 44,030.25
67 A.8.4.1.67. Pemasangan 1 m pipa baja Ø 150 mm 43,732.50 4,373.25 48,105.75
68 A.8.4.1.68. Pemasangan 1 m pipa baja Ø 200 mm 68,707.50 6,870.75 75,578.25
69 A.8.4.1.69. Pemasangan pipa baja Ø 250 mm 81,852.50 8,185.25 90,037.75
70 A.8.4.1.70. Pemasangan 1 m pipa baja Ø 300 mm 87,342.50 8,734.25 96,076.75
71 A.8.4.1.71. Pemasangan 1 m pipa baja Ø 400 mm 146,127.50 14,612.75 160,740.25
72 A.8.4.1.72. Pemasangan 1 m pipa baja Ø 450 mm 137,757.50 13,775.75 151,533.25
73 A.8.4.1.73. Pemasangan 1 m pipa baja Ø 500 mm 150,162.50 15,016.25 165,178.75
74 A.8.4.1.74. Pemasangan 1 m pipa baja Ø 600 mm 136,357.50 13,635.75 149,993.25
75 A.8.4.1.75. Pemasangan 1 m pipa baja Ø 800 mm 240,660.00 24,066.00 264,726.00
76 A.8.4.1.76. Pemasangan 1 m pipa baja Ø 900 mm 271,865.00 27,186.50 299,051.50
77 A.8.4.1.77. Pemasangan 1 m pipa baja Ø 1000 mm 302,232.50 30,223.25 332,455.75
78 A.8.4.1.78. Pemasangan 1 m pipa baja Ø 1100 mm 332,667.50 33,266.75 365,934.25
79 A.8.4.1.79. Pemasangan 1 m pipa baja Ø 1200 mm 364,025.00 36,402.50 400,427.50

A.8.4.2 A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA


1 A.8.4.2.1. Pemotongan 1 buah pipa PVC Ø 63 mm 308.75 30.88 339.63
2 A.8.4.2.2. Pemotongan 1 m pipa PVC Ø 90 mm 837.50 83.75 921.25
3 A.8.4.2.3. Pemotongan 1 buah pipa PVC Ø 110 mm 1,345.00 134.50 1,479.50
4 A.8.4.2.4. Pemotongan 1 buah pipa PVC Ø 150 mm 1,907.50 190.75 2,098.25
5 A.8.4.2.5. Pemotongan 1 buah pipa PVC Ø 200 mm 4,995.00 499.50 5,494.50
6 A.8.4.2.6. Pemotongan 1 buah pipa PVC Ø 250 mm 7,917.50 791.75 8,709.25
7 A.8.4.2.7. Pemotongan 1 buah pipa PVC Ø 300 mm 9,537.50 953.75 10,491.25
8 A.8.4.2.8. Pemotongan 1 buah pipa PVC Ø 400 mm 20,432.50 2,043.25 22,475.75
9 A.8.4.2.9. Pemotongan 1 buah pipa PVC Ø 450 mm 25,935.00 2,593.50 28,528.50
10 A.8.4.2.10. Pemotongan 1 buah pipa PVC Ø 500 mm 32,000.00 3,200.00 35,200.00

24
Kode Harga Keuntungan Harga Total
No. Uraian Pekerjaan
Analisa (Rp) 10% (Rp)
11 A.8.4.2.11. Pemotongan 1 buah pipa PVC Ø 600 mm 38,450.00 3,845.00 42,295.00
12 A.8.4.2.12. Pemotongan 1 buah pipa PVC Ø 800 mm 67,252.50 6,725.25 73,977.75
13 A.8.4.2.13. Pemotongan 1 buah pipa PVC Ø 900 mm 70,450.00 7,045.00 77,495.00
14 A.8.4.2.14. Pemotongan 1 buah pipa PVC Ø 1000 mm 79,382.50 7,938.25 87,320.75
15 A.8.4.2.15. Pemotongan 1 buah pipa PVC Ø 1100 mm 88,247.50 8,824.75 97,072.25
16 A.8.4.2.16. Pemotongan 1 buah pipa PVC Ø 1200 mm 97,112.50 9,711.25 106,823.75
17 A.8.4.2.17. Pemotongan 1 buah pipa HDPE Ø 63 mm 123.50 12.35 135.85
18 A.8.4.2.18. Pemotongan 1 buah pipa HDPE Ø 100 mm 397.50 39.75 437.25
19 A.8.4.2.19. Pemotongan 1 buah pipa HDPE Ø 125 mm 562.50 56.25 618.75
20 A.8.4.2.20. Pemotongan 1 buah pipa HDPE Ø 150 mm 1,015.00 101.50 1,116.50
21 A.8.4.2.21. Pemotongan 1 buah pipa HDPE Ø 200 mm 2,690.00 269.00 2,959.00
22 A.8.4.2.22. Pemotongan 1 buah pipaHDPE Ø 250 mm 4,157.50 415.75 4,573.25
23 A.8.4.2.23. Pemotongan 1 buah pipa HDPE Ø 300 mm 5,557.50 555.75 6,113.25
24 A.8.4.2.24. Pemotongan 1 buah pipa HDPE Ø 400 mm 10,950.00 1,095.00 12,045.00
25 A.8.4.2.25. Pemotongan 1 buah pipa HDPE Ø 450 mm 13,927.50 1,392.75 15,320.25
26 A.8.4.2.26. Pemotongan 1 buah pipa HDPE Ø 500 mm 17,125.00 1,712.50 18,837.50
27 A.8.4.2.27. Pemotongan 1 buah pipa HDPE Ø 600 mm 20,542.50 2,054.25 22,596.75
28 A.8.4.2.28. Pemotongan 1 buah pipa HDPE Ø 800 mm 37,105.00 3,710.50 40,815.50
29 A.8.4.2.29. Pemotongan 1 buah pipa HDPE Ø 900 mm 56,357.50 5,635.75 61,993.25
30 A.8.4.2.30. Pemotongan 1 buah pipa HDPE Ø 1000 mm 69,435.00 6,943.50 76,378.50
31 A.8.4.2.31. Pemotongan 1 buah pipa HDPE Ø 1100 mm 76,460.00 7,646.00 84,106.00
32 A.8.4.2.32. Pemotongan 1 buah pipa HDPE Ø 1200 mm 99,980.00 9,998.00 109,978.00
33 A.8.4.2.33. Pemotongan 1 buah pipa GIP Ø 63 mm 361,180.00 36,118.00 397,298.00
34 A.8.4.2.34. Pemotongan 1 buah pipa GIP Ø 100 mm 3,595.00 359.50 3,954.50
35 A.8.4.2.35. Pemotongan 1 buah pipa GIP Ø 125 mm 5,667.50 566.75 6,234.25
36 A.8.4.2.36. Pemotongan 1 buah pipa GIP Ø 150 mm 8,082.50 808.25 8,890.75
37 A.8.4.2.37. Pemotongan 1 buah pipa GIP Ø 200 mm 20,995.00 2,099.50 23,094.50
38 A.8.4.2.38. Pemotongan 1 buah pipa GIP Ø 250 mm 29,297.50 2,929.75 32,227.25
39 A.8.4.2.39. Pemotongan 1 buah pipa GIP Ø 300 mm 31,095.00 3,109.50 34,204.50
40 A.8.4.2.40. Pemotongan 1 buah pipa GIP Ø 400 mm 45,585.00 4,558.50 50,143.50
41 A.8.4.2.41. Pemotongan 1 buah pipa GIP Ø 450 mm 52,377.50 5,237.75 57,615.25
42 A.8.4.2.42. Pemotongan 1 buah pipa GIP Ø 500 mm 58,100.00 5,810.00 63,910.00
43 A.8.4.2.43. Pemotongan1 buah pipa GIP Ø 600 mm 53,325.00 5,332.50 58,657.50
44 A.8.4.2.44. Pemotongan 1 buah pipa GIP Ø 800 mm 96,782.50 9,678.25 106,460.75
45 A.8.4.2.45. Pemotongan 1 buah pipa GIP Ø 900 mm 109,297.50 10,929.75 120,227.25
46 A.8.4.2.46. Pemotongan 1 buah pipa GIP Ø 1000 mm 121,867.50 12,186.75 134,054.25
47 A.8.4.2.47. Pemotongan 1 buah pipa GIP Ø 1100 mm 134,505.00 13,450.50 147,955.50
48 A.8.4.2.48. Pemotongan 1 buah pipa GIP Ø 1200 mm 147,075.00 14,707.50 161,782.50
49 A.8.4.2.49. Pemotongan 1 buah pipa DCI Ø 100 mm 4,377.50 437.75 4,815.25
50 A.8.4.2.50. Pemotongan 1 buah pipa DCI Ø 125 mm 6,902.50 690.25 7,592.75
51 A.8.4.2.51. Pemotongan 1 buah pipa DCI Ø 150 mm 9,825.00 982.50 10,807.50
52 A.8.4.2.52. Pemotongan 1 buah pipa DCI Ø 200 mm 22,627.50 2,262.75 24,890.25
53 A.8.4.2.53. Pemotongan 1 buah pipa DCI Ø 250 mm 29,420.00 2,942.00 32,362.00
54 A.8.4.2.54. Pemotongan 1 buah pipa DCI Ø 300 mm 31,602.50 3,160.25 34,762.75
55 A.8.4.2.55. Pemotongan 1 buah pipa DCI Ø 400 mm 58,100.00 5,810.00 63,910.00
56 A.8.4.2.56. Pemotongan 1 buah pipa DCI Ø 450 mm 70,230.00 7,023.00 77,253.00
57 A.8.4.2.57. Pemotongan 1 buah pipa DCI Ø 500 mm 81,002.50 8,100.25 89,102.75
58 A.8.4.2.58. Pemotongan 1 buah pipa DCI Ø 600 mm 80,837.50 8,083.75 88,921.25
59 A.8.4.2.59. Pemotongan 1 buah pipa DCI Ø 800 mm 160,440.00 16,044.00 176,484.00
60 A.8.4.2.60. Pemotongan 1 buah pipa DCI Ø 900 mm 208,097.50 20,809.75 228,907.25
61 A.8.4.2.61. Pemotongan 1 buah pipa DCI Ø 1000 mm 248,290.00 24,829.00 273,119.00
62 A.8.4.2.62. Pemotongan 1 buah pipa DCI Ø 1100 mm 292,132.50 29,213.25 321,345.75
63 A.8.4.2.63. Pemotongan 1 buah pipa DCI Ø 1200 mm 339,735.00 33,973.50 373,708.50
64 A.8.4.2.64. Pemotongan 1 buah pipa baja Ø 63 mm 1,742.50 174.25 1,916.75
65 A.8.4.2.65. Pemotongan 1 buah pipa baja Ø 100 mm 5,215.00 521.50 5,736.50
66 A.8.4.2.66. Pemotongan 1 buah pipa baja Ø 125 mm 8,192.50 819.25 9,011.75
67 A.8.4.2.67. Pemotongan 1 buah pipa baja Ø 150 mm 11,335.00 1,133.50 12,468.50
68 A.8.4.2.68. Pemotongan 1 buah pipa baja Ø 200 mm 29,420.00 2,942.00 32,362.00
69 A.8.4.2.69. Pemotongan 1 buah pipa baja Ø 250 mm 40,920.00 4,092.00 45,012.00
70 A.8.4.2.70. Pemotongan 1 buah pipa baja Ø 300 mm 45,970.00 4,597.00 50,567.00
71 A.8.4.2.71. Pemotongan 1 buah pipa baja Ø 400 mm 88,920.00 8,892.00 97,812.00
72 A.8.4.2.72. Pemotongan 1 buah pipa baja Ø 450 mm 86,395.00 8,639.50 95,034.50
73 A.8.4.2.73. Pemotongan 1 buah pipa baja Ø 500 mm 96,220.00 9,622.00 105,842.00
74 A.8.4.2.74. Pemotongan 1 buah pipa baja Ø 600 mm 88,755.00 8,875.50 97,630.50
75 A.8.4.2.75. Pemotongan 1 buah pipa baja Ø 800 mm 162,005.00 16,200.50 178,205.50
76 A.8.4.2.76. Pemotongan 1 buah pipa baja Ø 900 mm 183,452.50 18,345.25 201,797.75

25
Kode Harga Keuntungan Harga Total
No. Uraian Pekerjaan
Analisa (Rp) 10% (Rp)
77 A.8.4.2.77. Pemotongan 1 buah pipa baja Ø 1000 mm 204,955.00 20,495.50 225,450.50
78 A.8.4.2.78. Pemotongan 1 buah pipa baja Ø 1100 mm 226,457.50 22,645.75 249,103.25
79 A.8.4.2.79. Pemotongan 1 buah pipa baja Ø 1200 mm 247,960.00 24,796.00 272,756.00

A.8.4.3 A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA


1 A.8.4.3.1. Pemasangan 1 buah Valve Ø 150 mm 88,247.50 8,824.75 97,072.25
2 A.8.4.3.2. Pemasangan 1 buah Valve Ø 200 mm 105,812.50 10,581.25 116,393.75
3 A.8.4.3.3. Pemasangan 1 buah Valve Ø 250 mm 105,812.50 10,581.25 116,393.75
4 A.8.4.3.4. Pemasangan 1 buah Valve Ø 300 mm 123,500.00 12,350.00 135,850.00
5 A.8.4.3.5. Pemasangan 1 buah Valve Ø 400 mm 211,747.50 21,174.75 232,922.25
6 A.8.4.3.6. Pemasangan 1 buah Valve Ø 450 mm 211,747.50 21,174.75 232,922.25
7 A.8.4.3.7. Pemasangan 1 buah Valve Ø 500 mm 247,000.00 24,700.00 271,700.00
8 A.8.4.3.8. Pemasangan 1 buah Valve Ø 600 mm 87,740.00 8,774.00 96,514.00
9 A.8.4.3.9. Pemasangan 1 buah Valve Ø 700 mm 88,247.50 8,824.75 97,072.25
10 A.8.4.3.10. Pemasangan 1 buah Valve Ø 800 mm 110,312.50 11,031.25 121,343.75
11 A.8.4.3.11. Pemasangan 1 buah Valve Ø 900 mm 105,812.50 10,581.25 116,393.75
12 A.8.4.3.12. Pemasangan 1 buah Valve Ø 1000 mm 158,752.50 15,875.25 174,627.75
13 A.8.4.3.13. Pemasangan 1 buah Valve Ø 1100 mm 185,250.00 18,525.00 203,775.00
14 A.8.4.3.14. Pemasangan 1 buah Valve Ø 1200 mm 185,250.00 18,525.00 203,775.00
15 A.8.4.3.15. Pemasangan 1 buah Tee Ø 150 mm 6,572.50 657.25 7,229.75
16 A.8.4.3.16. Pemasangan 1 buah Tee Ø 200 mm 13,365.00 1,336.50 14,701.50
17 A.8.4.3.17. Pemasangan 1 buah Tee Ø 250 mm 20,157.50 2,015.75 22,173.25
18 A.8.4.3.18. Pemasangan 1 buah Tee Ø 300 mm 26,950.00 2,695.00 29,645.00
19 A.8.4.3.19. Pemasangan 1 buah Tee Ø 400 mm 40,535.00 4,053.50 44,588.50
20 A.8.4.3.20. Pemasangan 1 buah Tee Ø 450 mm 47,327.50 4,732.75 52,060.25
21 A.8.4.3.21. Pemasangan 1 buah Tee Ø 500 mm 54,120.00 5,412.00 59,532.00
22 A.8.4.3.22. Pemasangan 1 buah Tee Ø 600 mm 67,705.00 6,770.50 74,475.50
23 A.8.4.3.23. Pemasangan 1 buah Tee Ø 700 mm 116,795.00 11,679.50 128,474.50
24 A.8.4.3.24. Pemasangan 1 buah Tee Ø 800 mm 94,875.00 9,487.50 104,362.50
25 A.8.4.3.25. Pemasangan 1 buah Tee Ø 900 mm 108,460.00 10,846.00 119,306.00
26 A.8.4.3.26. Pemasangan 1 buah Tee Ø 1000 mm 122,045.00 12,204.50 134,249.50
27 A.8.4.3.27. Pemasangan 1 buah Tee Ø 1100 mm 135,630.00 13,563.00 149,193.00
28 A.8.4.3.28. Pemasangan 1 buah Tee Ø 1200 mm 149,215.00 14,921.50 164,136.50

A.8.4.4 A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA
1 A.8.4.4.1. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm 90,552.50 9,055.25 99,607.75
2 A.8.4.4.2. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm 101,667.50 10,166.75 111,834.25
3 A.8.4.4.3. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm 129,455.00 12,945.50 142,400.50
4 A.8.4.4.4. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm 157,242.50 15,724.25 172,966.75
5 A.8.4.4.5. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm 185,030.00 18,503.00 203,533.00
6 A.8.4.4.6. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm 212,817.50 21,281.75 234,099.25
7 A.8.4.4.7. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm 268,392.50 26,839.25 295,231.75
8 A.8.4.4.8. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm 296,180.00 29,618.00 325,798.00
9 A.8.4.4.9. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm 323,967.50 32,396.75 356,364.25
10 A.8.4.4.10. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm 379,542.50 37,954.25 417,496.75
11 A.8.4.4.11. Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm 435,117.50 43,511.75 478,629.25
12 A.8.4.4.12. Penyambungan 1 buah 1 buah pipa baru ke pipa yang ada Ø 800 mm 490,692.50 49,069.25 539,761.75

HARGA SATUAN PEKERJAAN PAVING


1 1 M2 Pasang paving block - Holland/Hexagonal Pres Mesin - (K-175) 121,650.00 12,165.00 133,815.00
2 1 M2 Pasang paving block - Holland/Hexagonal Pres Mesin 111,650.00 11,165.00 122,815.00

26
ANALISA HARGA SATUAN
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A. 2.2.1.1 Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4000 55,000.00 22,000.00
Tukang Kayu L.0.02 OH 0.2000 62,500.00 12,500.00
Kepala Tukang L.0.03 OH 0.0200 65,000.00 1,300.00
Mandor L.0.04 OH 0.0200 67,500.00 1,350.00
JUMLAH TENAGA KERJA 37,150.00
B BAHAN
Dolken kayu ɸ 8-10/400 cm Batang 1.2500 46,000.00 57,500.00
Semen portland Kg 5.0000 1,375.00 6,875.00
Pasir beton m3 0.0050 200,000.00 1,000.00
Koral beton m3 0.0090 250,000.00 2,250.00
Kayu 5/7 m3 0.0720 4,000,000.00 288,000.00
Paku biasa 2” – 5” Kg 0.0600 15,000.00 900.00
Residu Liter 0.4000 12,000.00 4,800.00
JUMLAH HARGA BAHAN 361,325.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 398,475.00
E Overhead & Profit 10% x D 10% 39,847.50
F Harga Satuan Pekerjaan (D+E) 438,322.50

A. 2.2.1.2 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2000 55,000.00 11,000.00
Tukang Kayu L.0.02 OH 0.4000 62,500.00 25,000.00
Kepala Tukang L.0.03 OH 0.0200 65,000.00 1,300.00
Mandor L.0.04 OH 0.0200 67,500.00 1,350.00
JUMLAH TENAGA KERJA 38,650.00
B BAHAN
Dolken kayu φ 8-10/400 cm Batang 1.2500 46000 57,500.00
Semen portland Kg 2.5000 1375 3,437.50
Seng gelombang Lbr 1.2000 53000 63,600.00
Pasir beton m3 0.0050 200000 1,000.00
Koral beton m3 0.0090 250000 2,250.00
Kayu 5/7 m3 0.0720 4000000 288,000.00
Paku biasa 2” – 5” Kg 0.0600 15000 900.00
Meni besi Liter 0.4500 18,000.00 8,100.00
JUMLAH HARGA BAHAN 424,787.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 463,437.50
E Overhead & Profit 10% x D 10% 46,343.75
F Harga Satuan Pekerjaan (D+E) 509,781.25

A. 2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2000 55,000.00 11,000.00
Tukang Kayu L.0.02 OH 0.3000 62,500.00 18,750.00
Kepala Tukang L.0.03 OH 0.0200 65,000.00 1,300.00
Mandor L.0.04 OH 0.0200 67,500.00 1,350.00

Hal 27/229
JUMLAH TENAGA KERJA 32,400.00
B BAHAN
Dolken kayu φ 8-10/400 cm Batang 1.0000 46,000.00 46,000.00
Semen portland Kg 2.0000 1,375.00 2,750.00
Kawat duri M’ 25.0000 - -
Pasir beton m3 0.0050 200,000.00 1,000.00
Koral beton m3 0.0090 250,000.00 2,250.00
Paku biasa 2” – 5” Kg 0.0600 15,000.00 900.00
JUMLAH HARGA BAHAN 52,900.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 85,300.00
E Overhead & Profit 10% x D 10% 8,530.00
F Harga Satuan Pekerjaan (D+E) 93,830.00

A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1000 55,000.00 5,500.00
Tukang Kayu L.0.02 OH 0.1000 62,500.00 6,250.00
Kepala Tukang L.0.03 OH 0.0100 65,000.00 650.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 12,737.50
B BAHAN
Kayu balok 5/7 m3 0.1200 4,000,000.00 480,000.00
Paku 2”-3” Kg 0.0200 15,000.00 300.00
Kayu papan 3/20 m3 0.0070 4,000,000.00 28,000.00
JUMLAH HARGA BAHAN 508,300.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 521,037.50
E Overhead & Profit 10% x D 10% 52,103.75
F Harga Satuan Pekerjaan (D+E) 573,141.25

A. 2.2.1.5. Pembuatan 1 m2 kantor sementara lantai plesteran


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.0000 55,000.00 110,000.00
Tukang Kayu L.0.02 OH 2.0000 62,500.00 125,000.00
Tukang batu L.0.02 OH 1.0000 60,000.00 60,000.00
Kepala Tukang L.0.03 OH 0.3000 65,000.00 19,500.00
Mandor L.0.04 OH 0.0500 67,500.00 3,375.00
JUMLAH TENAGA KERJA 317,875.00
B BAHAN
Dolken kayu φ 8-10/400 cm Batang 1.2500 46,000.00 57,500.00
Kayu m3 0.1800 4,000,000.00 720,000.00
Paku biasa Kg 0.0800 15,000.00 1,200.00
Besi strip Kg 1.1000 11,000.00 12,100.00
Semen portland Kg 35.0000 1,375.00 48,125.00
Pasir pasang m3 0.1500 200,000.00 30,000.00
Pasir beton m3 0.1000 200,000.00 20,000.00
Koral beton m3 0.1500 250,000.00 37,500.00
Bata merah Bh 30.0000 700.00 21,000.00
Seng plat Lbr 0.2500 28,000.00 7,000.00
Jendela naco Bh 0.2000 15,000.00 3,000.00
Kaca polos m2 0.0800 85,000.00 6,800.00
Kunci tanam Bh 0.1500 70,000.00 10,500.00

Hal 28/229
Plywood 4mm Lbr 0.0600 70,000.00 4,200.00
JUMLAH HARGA BAHAN 978,925.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,296,800.00
E Overhead & Profit 10% x D 10% 129,680.00
F Harga Satuan Pekerjaan (D+E) 1,426,480.00

A. 2.2.1.6. Pembuatan 1 m2 rumah jaga (konstruksi kayu )


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.0000 55,000.00 55,000.00
Tukang Kayu L.0.02 OH 1.5000 62,500.00 93,750.00
Kepala tukang L.0.03 OH 0.1500 65,000.00 9,750.00
Mandor L.0.04 OH 0.0500 67,500.00 3,375.00
JUMLAH TENAGA KERJA 161,875.00
B BAHAN
Dolken kayu φ 8-10/400 cm Batang 3.0000 46,000.00 138,000.00
Kayu m3 0.2760 4,000,000.00 1,104,000.00
Paku biasa Kg 0.7000 15,000.00 10,500.00
Seng gelombang Kg 1.5000 53,000.00 79,500.00
JUMLAH HARGA BAHAN 1,332,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,493,875.00
E Overhead & Profit 10% x D 10% 149,387.50
F Harga Satuan Pekerjaan (D+E) 1,643,262.50

A. 2.2.1.7. Pembuatan 1 m2 gudang semen dan peralatan


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.0000 55,000.00 55,000.00
Tukang Kayu L.0.02 OH 2.0000 62,500.00 125,000.00
Kepala Tukang L.0.03 OH 0.2000 65,000.00 13,000.00
Mandor L.0.04 OH 0.0500 67,500.00 3,375.00
JUMLAH TENAGA KERJA 196,375.00
B BAHAN
Dolken kayu φ 8-10/400 cm Batang 1.7000 46,000.00 78,200.00
Kayu m3 0.2100 4,000,000.00 840,000.00
Paku biasa Kg 0.3000 15,000.00 4,500.00
Semen portland Kg 10.5000 1,375.00 14,437.50
Pasir beton m3 0.0300 200,000.00 6,000.00
Koral beton m3 0.0500 250,000.00 12,500.00
Seng gelombang Lbr 1.5000 53,000.00 79,500.00
Seng plat Lbr 0.2500 28,000.00 7,000.00
JUMLAH HARGA BAHAN 1,042,137.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,238,512.50
E Overhead & Profit 10% x D 10% 123,851.25
F Harga Satuan Pekerjaan (D+E) 1,362,363.75

A. 2.2.1.8. Pembuatan 1 m2 bedeng pekerja


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.0000 55,000.00 55,000.00
Tukang Kayu L.0.02 OH 2.0000 62,500.00 125,000.00

Hal 29/229
Kepala Tukang L.0.03 OH 0.2000 65,000.00 13,000.00
Mandor L.0.04 OH 0.0500 67,500.00 3,375.00
JUMLAH TENAGA KERJA 196,375.00
B BAHAN
Dolken kayu φ 8-10/400 cm Batang 1.2500 46,000.00 57,500.00
Kayu m3 0.1860 4,000,000.00 744,000.00
Paku biasa Kg 0.3000 15,000.00 4,500.00
Semen portland Kg 18.0000 1,375.00 24,750.00
Pasir beton m3 0.0300 200,000.00 6,000.00
Koral beton m3 0.0500 250,000.00 12,500.00
Seng gelombang Lbr 1.5000 53,000.00 79,500.00
Plywood 4mm Lbr 1.3500 70,000.00 94,500.00
JUMLAH HARGA BAHAN 1,023,250.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,219,625.00
E Overhead & Profit 10% x D 10% 121,962.50
F Harga Satuan Pekerjaan (D+E) 1,341,587.50

A. 2.2.1.9. Pembersihan 1 m2 lapangan dan perataan


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1000 55,000.00 5,500.00
Mandor L.0.04 OH 0.0500 67,500.00 3,375.00
JUMLAH TENAGA KERJA 8,875.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 8,875.00
E Overhead & Profit 10% x D 10% 887.50
F Harga Satuan Pekerjaan (D+E) 9,762.50

Hal 30/229
A. 2.2.1.10. Pembuatan 1 m2 steger/perancah dari bambu
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.0000 55,000.00 55,000.00
Tukang Kayu L.0.02 OH 2.0000 62,500.00 125,000.00
Kepala Tukang L.0.03 OH 0.2000 65,000.00 13,000.00
Mandor L.0.04 OH 0.0500 67,500.00 3,375.00
JUMLAH TENAGA KERJA 196,375.00
B BAHAN
Bambu diameter 6- 8/600 cm Batang 1.2500 9,000.00 11,250.00
Tali ijuk m3 0.1860 7,000.00 1,302.00
JUMLAH HARGA BAHAN 12,552.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 208,927.00
E Overhead & Profit 10% x D 10% 20,892.70
F Harga Satuan Pekerjaan (D+E) 229,819.70

A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Tukang Kayu L.0.02 OH 0.3000 62,500.00 18,750.00
Kepala Tukang L.0.03 OH 0.0300 65,000.00 1,950.00
JUMLAH TENAGA KERJA 20,700.00
B BAHAN
Kayu papan kelas III m3 0.0360 4,000,000.00 144,000.00
Kayu balok 5/7 kelas III m3 0.0100 4,000,000.00 40,000.00
Paku biasa kg 0.0800 15,000.00 1,200.00
JUMLAH HARGA BAHAN 185,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 205,900.00
E Overhead & Profit 10% x D 10% 20,590.00
F Harga Satuan Pekerjaan (D+E) 226,490.00

A. 2.2.1.12. Pembuatan 1 m2 jalan sementara


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.0000 55,000.00 55,000.00
Mandor L.0.04 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 55,337.50
B BAHAN
Batu belah m3 0.1500 210000 31,500.00
Batu pecah m3 0.0900 250000 22,500.00
Pasir pasang m3 0.0100 200000 2,000.00
JUMLAH HARGA BAHAN 56,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 111,337.50
E Overhead & Profit 10% x D 10% 11,133.75
F Harga Satuan Pekerjaan (D+E) 122,471.25

A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 13.3340 55,000.00 733,370.00
Mandor L.0.04 0.6660 67,500.00 44,955.00

Hal 31/229
JUMLAH TENAGA KERJA 778,325.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 778,325.00
E Overhead & Profit 10% x D 10% 77,832.50
F Harga Satuan Pekerjaan (D+E) 856,157.50

Hal 32/229
A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 6.6670 55,000.00 366,685.00
Mandor L.0.04 0.3330 67,500.00 22,477.50
JUMLAH TENAGA KERJA 389,162.50
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 389,162.50
E Overhead & Profit 10% x D 10% 38,916.25
F Harga Satuan Pekerjaan (D+E) 428,078.75

A. 2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0420 55,000.00 2,310.00
Tukang L.0.02 0.0040 62,500.00 250.00
Kepala Tukang L.0.03 OH 0.0020 65,000.00 130.00
Mandor L.0.04 0.0420 67,500.00 2,835.00
JUMLAH TENAGA KERJA 5,525.00
B BAHAN
Kawat jaring Lbr 0.1434 18,000.00 2,581.20
JUMLAH HARGA BAHAN 2,581.20
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 8,106.20
E Overhead & Profit 10% x D 10% 810.62
F Harga Satuan Pekerjaan (D+E) 8,916.82

A.2.2.1.16. Pemasangan 1 m2 panel beton pracetak 5x50x213 cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3750 55,000.00 20,625.00
Tukang L.0.02 0.1250 60,000.00 7,500.00
Kepala Tukang L.0.03 OH 0.0120 65,000.00 780.00
Mandor L.0.04 0.0190 67,500.00 1,282.50
JUMLAH TENAGA KERJA 30,187.50
B BAHAN
Panel beton pracetak Lbr 0.9860 - -
Kolom beton
Batang 0.5250 - -
pracetak
Semen portland Kg 45.0000 1,375.00 61,875.00
Pasir beton m3 0.0740 200,000.00 14,800.00
Koral m3 0.1460 250,000.00 36,500.00
JUMLAH HARGA BAHAN 113,175.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 143,362.50
E Overhead & Profit 10% x D 10% 14,336.25
F Harga Satuan Pekerjaan (D+E) 157,698.75

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
A.2.3.1.4. Peng Pekerja L.0.01 OH 0.7500 55,000.00 41,250.00
Hal 33/229
A.2.3.1.5. Meng Mandor L.0.04 OH 0.0250 67,500.00 1,687.50
A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m JUMLAH TENAGA KERJA 42,937.50
B BAHAN
A.2.3.1.8. Pembuangan 1 m3 tanah sejauh 30 meter JUMLAH HARGA BAHAN -
C PERALATAN
A.2.3.1.10. Pemadatan tanah 1 m3 tanah (per 20 cm) JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 42,937.50
E Overhead & Profit 10% x D 10% 4,293.75
F Harga Satuan Pekerjaan (D+E) 47,231.25
A.2.3.1.14. Pengurugan 1 m3 sirtu padat
A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9000 55,000.00 49,500.00
Mandor L.0.04 OH 0.0450 67,500.00 3,037.50
JUMLAH TENAGA KERJA 52,537.50
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 52,537.50
E Overhead & Profit 10% x D 10% 5,253.75
F Harga Satuan Pekerjaan (D+E) 57,791.25

A.2.3.1.3. Penggalian 1 m3 tanah biasa sedalam 3 m


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.0500 55,000.00 57,750.00
Mandor L.0.04 OH 0.0670 67,500.00 4,522.50
JUMLAH TENAGA KERJA 62,272.50
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 62,272.50
E Overhead & Profit 10% x D 10% 6,227.25
F Harga Satuan Pekerjaan (D+E) 68,499.75

A.2.3.1.4. Penggalian 1 m3 tanah keras sedalam 1 m


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.0000 55,000.00 55,000.00
Mandor L.0.04 OH 0.0320 67,500.00 2,160.00
JUMLAH TENAGA KERJA 57,160.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 57,160.00
E Overhead & Profit 10% x D 10% 5,716.00
F Harga Satuan Pekerjaan (D+E) 62,876.00

A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5000 55,000.00 82,500.00
Mandor L.0.04 OH 0.0600 67,500.00 4,050.00
Hal 34/229
JUMLAH TENAGA KERJA 86,550.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 86,550.00
E Overhead & Profit 10% x D 10% 8,655.00
F Harga Satuan Pekerjaan (D+E) 95,205.00

A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.2000 55,000.00 66,000.00
Mandor L.0.04 OH 0.0450 67,500.00 3,037.50
JUMLAH TENAGA KERJA 69,037.50
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 69,037.50
E Overhead & Profit 10% x D 10% 6,903.75
F Harga Satuan Pekerjaan (D+E) 75,941.25

A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0500 55,000.00 2,750.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 3,087.50
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 3,087.50
E Overhead & Profit 10% x D 10% 308.75
F Harga Satuan Pekerjaan (D+E) 3,396.25

A.2.3.1.8. Pembuangan 1 m3 tanah sejauh 30 meter


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3300 55,000.00 18,150.00
Mandor L.0.04 OH 0.0100 67,500.00 675.00
JUMLAH TENAGA KERJA 18,825.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 18,825.00
E Overhead & Profit 10% x D 10% 1,882.50
F Harga Satuan Pekerjaan (D+E) 20,707.50

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.5000 55,000.00 27,500.00
Mandor L.0.04 OH 0.0500 67,500.00 3,375.00
Hal 35/229
JUMLAH TENAGA KERJA 30,875.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 30,875.00
E Overhead & Profit 10% x D 10% 3,087.50
F Harga Satuan Pekerjaan (D+E) 33,962.50

A.2.3.1.10. Pemadatan tanah 1 m3 tanah (per 20 cm)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.5000 55,000.00 27,500.00
Mandor L.0.04 OH 0.0500 67,500.00 3,375.00
JUMLAH TENAGA KERJA 30,875.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 30,875.00
E Overhead & Profit 10% x D 10% 3,087.50
F Harga Satuan Pekerjaan (D+E) 33,962.50

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3000 55,000.00 16,500.00
Mandor L.0.04 OH 0.0100 67,500.00 675.00
JUMLAH TENAGA KERJA 17,175.00
B BAHAN
Pasir urug 1.2000 90,000.00 108,000.00
JUMLAH HARGA BAHAN 108,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 125,175.00
E Overhead & Profit 10% x D 10% 12,517.50
F Harga Satuan Pekerjaan (D+E) 137,692.50

A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP:3PP:7TL


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.8000 55,000.00 44,000.00
O
Tukang L.0.02 0.4000 60,000.00 24,000.00
H
Kepala Tukang L.0.03 OH 0.0400 65,000.00 2,600.00
O
Mandor L.0.04 0.0800 67,500.00 5,400.00
H
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
m
Kapur Padam 0.1350 12,000.00 1,620.00
3
Pasir Pasang m3 0.4000 200,000.00 80,000.00
Tanah Liat m3 0.9480 50,000.00 47,400.00
JUMLAH HARGA BAHAN 129,020.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 205,020.00
E Overhead & Profit 10% x D 10% 20,502.00
F Harga Satuan Pekerjaan (D+E) 225,522.00

Hal 36/229
A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1500 55,000.00 8,250.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 9,262.50
B BAHAN
m
Ijuk 6.0000 7,000.00 42,000.00
3
JUMLAH HARGA BAHAN 42,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 51,262.50
E Overhead & Profit 10% x D 10% 5,126.25
F Harga Satuan Pekerjaan (D+E) 56,388.75

A.2.3.1.14. Pengurugan 1 m3 sirtu padat


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2500 55,000.00 13,750.00
O
Mandor L.0.04 0.0250 67,500.00 1,687.50
H
JUMLAH TENAGA KERJA 15,437.50
B BAHAN
Sirtu m3 1.2000 50,000.00 60,000.00
JUMLAH HARGA BAHAN 60,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 75,437.50
E Overhead & Profit 10% x D 10% 7,543.75
F Harga Satuan Pekerjaan (D+E) 82,981.25

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5000 55,000.00 82,500.00
Tukang batu L.0.02 OH 0.7500 60,000.00 45,000.00
Kepala Tukang L.0.03 OH 0.0750 65,000.00 4,875.00
Mandor L.0.04 OH 0.0750 67,500.00 5,062.50
JUMLAH TENAGA KERJA 137,437.50
B BAHAN
Batu belah m3 1.2000 210,000.00 252,000.00
Semen portland Kg 202.0000 1,375.00 277,750.00
Pasir Pasang m3 0.4850 200,000.00 97,000.00
JUMLAH HARGA BAHAN 626,750.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 764,187.50
E Overhead & Profit 10% x D 10% 76,418.75
F Harga Satuan Pekerjaan (D+E) 840,606.25

A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5000 55,000.00 82,500.00
Tukang batu L.0.02 OH 0.7500 60,000.00 45,000.00
Kepala Tukang L.0.03 OH 0.0750 65,000.00 4,875.00
O
Mandor L.0.04 0.0750 67,500.00 5,062.50
H
Hal 37/229
JUMLAH TENAGA KERJA 137,437.50
B BAHAN
Batu belah m3 1.2000 210,000.00 252,000.00
Semen portland Kg 163.0000 1,375.00 224,125.00
m
Pasir Pasang 0.5200 200,000.00 104,000.00
3
JUMLAH HARGA BAHAN 580,125.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 717,562.50
E Overhead & Profit 10% x D 10% 71,756.25
F Harga Satuan Pekerjaan (D+E) 789,318.75

A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5000 55,000.00 82,500.00
Tukang batu L.0.02 OH 0.7500 60,000.00 45,000.00
Kepala Tukang L.0.03 OH 0.0750 65,000.00 4,875.00
O
Mandor L.0.04 0.0750 67,500.00 5,062.50
H
JUMLAH TENAGA KERJA 137,437.50
B BAHAN
Batu belah m3 1.2000 210,000.00 252,000.00
Semen portland Kg 136.0000 1,375.00 187,000.00
m
Pasir Pasang 0.5440 200,000.00 108,800.00
3
JUMLAH HARGA BAHAN 547,800.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 685,237.50
E Overhead & Profit 10% x D 10% 68,523.75
F Harga Satuan Pekerjaan (D+E) 753,761.25

A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5000 55,000.00 82,500.00
Tukang batu L.0.02 OH 0.7500 60,000.00 45,000.00
Kepala Tukang L.0.03 OH 0.0750 65,000.00 4,875.00
O
Mandor L.0.04 0.0750 67,500.00 5,062.50
H
JUMLAH TENAGA KERJA 137,437.50
B BAHAN
Batu belah m3 1.2000 210,000.00 252,000.00
Semen portland Kg 117.0000 1,375.00 160,875.00
m
Pasir Pasang 0.5610 200,000.00 112,200.00
3
JUMLAH HARGA BAHAN 525,075.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 662,512.50
E Overhead & Profit 10% x D 10% 66,251.25
F Harga Satuan Pekerjaan (D+E) 728,763.75

Hal 38/229
A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5000 55,000.00 82,500.00
Tukang batu L.0.02 OH 0.7500 60,000.00 45,000.00
Kepala Tukang L.0.03 OH 0.0750 65,000.00 4,875.00
O
Mandor L.0.04 0.0750 67,500.00 5,062.50
H
JUMLAH TENAGA KERJA 137,437.50
B BAHAN
Batu belah m3 1.2000 210,000.00 252,000.00
Semen portland Kg 91.0000 1,375.00 125,125.00
m
Pasir Pasang 0.5840 200,000.00 116,800.00
3
JUMLAH HARGA BAHAN 493,925.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 631,362.50
E Overhead & Profit 10% x D 10% 63,136.25
F Harga Satuan Pekerjaan (D+E) 694,498.75

A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5000 55,000.00 82,500.00
Tukang batu L.0.02 OH 0.7500 60,000.00 45,000.00
Kepala Tukang L.0.03 OH 0.0750 65,000.00 4,875.00
O
Mandor L.0.04 0.0750 67,500.00 5,062.50
H
JUMLAH TENAGA KERJA 137,437.50
B BAHAN
Batu belah m3 1.2000 210,000.00 252,000.00
Kapur m3 0.1700 12,000.00 2,040.00
Semen portland Kg 0.1700 1,375.00 233.75
m
Pasir Pasang 0.3400 200,000.00 68,000.00
3
JUMLAH HARGA BAHAN 322,273.75
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 459,711.25
E Overhead & Profit 10% x D 10% 45,971.13
F Harga Satuan Pekerjaan (D+E) 505,682.38

A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3KP : 10PP


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5000 55,000.00 82,500.00
Tukang batu L.0.02 OH 0.7500 60,000.00 45,000.00
Kepala Tukang L.0.03 OH 0.0750 65,000.00 4,875.00
O
Mandor L.0.04 0.0750 67,500.00 5,062.50
H
JUMLAH TENAGA KERJA 137,437.50
B BAHAN
Batu belah m3 1.2000 210,000.00 252,000.00
Kapur m3 0.1470 12,000.00 1,764.00
Semen portland Kg 61.0000 1,375.00 83,875.00
m
Pasir Pasang 0.4920 200,000.00 98,400.00
3
JUMLAH HARGA BAHAN 436,039.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 573,476.50
E Overhead & Profit 10% x D 10% 57,347.65

Hal 39/229
F Harga Satuan Pekerjaan (D+E) 630,824.15

A.3.2.1.8. Pemasangan 1 m3 pondasi batu belah campuran 1/2SP : 1KP : 4PP


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5000 55,000.00 82,500.00
Tukang batu L.0.02 OH 0.7500 60,000.00 45,000.00
Kepala Tukang L.0.03 OH 0.0750 65,000.00 4,875.00
O
Mandor L.0.04 0.0750 67,500.00 5,062.50
H
JUMLAH TENAGA KERJA 137,437.50

Hal 40/229
B BAHAN
Batu belah m3 1.2000 210,000.00 252,000.00
Kapur m3 0.1310 12,000.00 1,572.00
Semen portland Kg 41.0000 1,375.00 56,375.00
m
Pasir Pasang 0.5230 200,000.00 104,600.00
3
JUMLAH HARGA BAHAN 414,547.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 551,984.50
E Overhead & Profit 10% x D 10% 55,198.45
F Harga Satuan Pekerjaan (D+E) 607,182.95

A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7800 55,000.00 42,900.00
Tukang batu L.0.02 OH 0.3900 60,000.00 23,400.00
Kepala Tukang L.0.03 OH 0.0390 65,000.00 2,535.00
O
Mandor L.0.04 0.0390 67,500.00 2,632.50
H
JUMLAH TENAGA KERJA 71,467.50
B BAHAN
Batu belah m3 1.2000 210,000.00 252,000.00
m
Pasir urug 0.4320 90,000.00 38,880.00
3
JUMLAH HARGA BAHAN 290,880.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 362,347.50
E Overhead & Profit 10% x D 10% 36,234.75
F Harga Satuan Pekerjaan (D+E) 398,582.25

A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.4000 55,000.00 187,000.00
Tukang batu L.0.02 OH 0.8500 60,000.00 51,000.00
Kepala Tukang L.0.03 OH 0.0850 65,000.00 5,525.00
O
Mandor L.0.04 0.1700 67,500.00 11,475.00
H
JUMLAH TENAGA KERJA 255,000.00
B BAHAN
Batu belah m3 0.4800 210,000.00 100,800.00
Semen portland Kg 194.0000 1,375.00 266,750.00
Pasir Beton m3 0.3120 200,000.00 62,400.00
m
Kerikil 0.4680 250,000.00 117,000.00
K3
Besi beton 126.0000 12,500.00 1,575,000.00
Kg
Kawat beton 1.8000 17,000.00 30,600.00
g
JUMLAH HARGA BAHAN 2,152,550.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,407,550.00
E Overhead & Profit 10% x D 10% 240,755.00
F Harga Satuan Pekerjaan (D+E) 2,648,305.00

A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.4000 55,000.00 132,000.00
Tukang batu L.0.02 OH 0.8000 60,000.00 62,500.00
Hal 41/229
Kepala Tukang L.0.03 OH 0.0800 65,000.00 65,000.00
O
Mandor L.0.04 0.1190 67,500.00 67,500.00
H
JUMLAH TENAGA KERJA 327,000.00
B BAHAN
m
Batu belah 0.4500 210,000.00 94,500.00
3
Semen portland Kg 194.0000 1,375.00 266,750.00
m
Pasir Beton 0.3120 200,000.00 62,400.00
m3
Kerikil 0.4680 250,000.00 117,000.00
3
JUMLAH HARGA BAHAN 540,650.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 867,650.00
E Overhead & Profit 10% x D 10% 86,765.00
F Harga Satuan Pekerjaan (D+E) 954,415.00

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A.4.1.1.1 Membuat 1 m3 beton mutu f’c± = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6500 55,000.00 90,750.00
Tukang batu L.0.02 OH 0.2750 60,000.00 16,500.00
Kepala Tukang L.0.03 OH 0.0280 65,000.00 1,820.00
Mandor L.0.04 OH 0.0830 67,500.00 5,602.50
JUMLAH TENAGA KERJA 114,672.50
B BAHAN
Semen portland Kg 247.0000 1,375.00 339,625.00
Pasir Beton kg 869.0000 142.86 124,142.86
Kerikil (Maks 30mm) kg 999.0000 185.19 185,000.00
Air Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 670,267.86
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 784,940.36
E Overhead & Profit 10% x D 10% 78,494.04
F Harga Satuan Pekerjaan (D+E) 863,434.39

A.4.1.1.2 Membuat 1 m3 beton mutu f’c± = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6500 55,000.00 90,750.00
Tukang batu L.0.02 OH 0.2750 60,000.00 16,500.00
Kepala Tukang L.0.03 OH 0.0280 65,000.00 1,820.00
Mandor L.0.04 OH 0.0830 67,500.00 5,602.50
JUMLAH TENAGA KERJA 114,672.50
B BAHAN
Semen portland Kg 276.0000 1,375.00 379,500.00
2.Pasir Beton kg 828.0000 142.86 118,285.71
3. Kerikil(Maks 30mm) kg 1,012.0000 185.19 187,407.41
4. Air Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 706,693.12
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 821,365.62
E Overhead & Profit 10% x D 10% 82,136.56
F Harga Satuan Pekerjaan (D+E) 903,502.18

A.4.1.1.3 Membuat 1 m3 beton mutu f’c± = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72

Hal 42/229
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6500 55,000.00 90,750.00
Tukang batu L.0.02 OH 0.2750 60,000.00 16,500.00
Kepala Tukang L.0.03 OH 0.0280 65,000.00 1,820.00
Mandor L.0.04 OH 0.0830 67,500.00 5,602.50
JUMLAH TENAGA KERJA 114,672.50
B BAHAN
Semen portland Kg 299.0000 1,375.00 411,125.00
Pasir Beton kg 799.0000 142.86 114,142.86
Kerikil(Maks 30mm) kg 1,017.0000 185.19 188,333.33
Air Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 735,101.19
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 849,773.69
E Overhead & Profit 10% x D 10% 84,977.37
F Harga Satuan Pekerjaan (D+E) 934,751.06

A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100),slump (3-6) cm, w/c = 0,87
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.2000 55,000.00 66,000.00
Tukang Batu L.0.02 OH 0.2000 60,000.00 12,000.00
Kepala Tukang L.0.03 OH 0.0200 65,000.00 1,300.00
Mandor L.0.04 OH 0.0600 67,500.00 4,050.00
JUMLAH TENAGA KERJA 83,350.00
B BAHAN
Semen portland Kg 230.0000 1,375.00 316,250.00
Pasir Beton kg 893.0000 142.86 127,571.43
Kerikil(Maks 30mm) kg 1,027.0000 185.19 190,185.19
Air Liter 200.0000 100.00 20,000.00
JUMLAH HARGA BAHAN 654,006.61
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 737,356.61
E Overhead & Profit 10% x D 10% 73,735.66
F Harga Satuan Pekerjaan (D+E) 811,092.28

A.4.1.1.5. Membuat 1 m3 beton mutu f’c± = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6500 55,000.00 90,750.00
Tukang Batu L.0.02 OH 0.2750 60,000.00 16,500.00
Kepala Tukang L.0.03 OH 0.0280 65,000.00 1,820.00
Mandor L.0.04 OH 0.0830 67,500.00 5,602.50
JUMLAH TENAGA KERJA 114,672.50
B BAHAN
Semen portland Kg 326.0000 1,375.00 448,250.00
Pasir Beton kg 760.0000 142.86 108,571.43
Kerikil(Maks 30mm) kg 1,029.0000 185.19 190,555.56
Air Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 768,876.98
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 883,549.48
E Overhead & Profit 10% x D 10% 88,354.95

Hal 43/229
F Harga Satuan Pekerjaan (D+E) 971,904.43

A.4.1.1.6 Membuat 1 m3 beton mutu f’c± = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6500 55,000.00 90,750.00
Tukang Batu L.0.02 OH 0.2750 60,000.00 16,500.00
Kepala Tukang L.0.03 OH 0.0280 65,000.00 1,820.00
Mandor L.0.04 OH 0.0830 67,500.00 5,602.50
JUMLAH TENAGA KERJA 114,672.50
B BAHAN
Semen portland Kg 352.0000 1,375.00 484,000.00
Pasir Beton kg 731.0000 142.86 104,428.57
Kerikil(Maks 30mm) kg 1,031.0000 185.19 190,925.93
Air Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 800,854.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 915,527.00
E Overhead & Profit 10% x D 10% 91,552.70
F Harga Satuan Pekerjaan (D+E) 1,007,079.70

A.4.1.1.7. Membuat 1 m3 beton mutu f’c± = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6500 55,000.00 90,750.00
Tukang Batu L.0.02 OH 0.2750 60,000.00 16,500.00
Kepala Tukang L.0.03 OH 0.0280 65,000.00 1,820.00
Mandor L.0.04 OH 0.0830 67,500.00 5,602.50
JUMLAH TENAGA KERJA 114,672.50
B BAHAN
Semen portland Kg 371.0000 1,375.00 510,125.00
Pasir Beton kg 698.0000 142.86 99,714.29
Kerikil (Maks 30mm) kg 1,047.0000 185.19 193,888.89
Air Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 825,228.17
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 939,900.67
E Overhead & Profit 10% x D 10% 93,990.07
F Harga Satuan Pekerjaan (D+E) 1,033,890.74

A.4.1.1.8. Membuat 1 m3 beton mutu f’c± = 19,3 MPa (K 250), slump (12 2) cm, w/c = 0,58
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6500 55,000.00 90,750.00
Tukang Batu L.0.02 OH 0.2750 60,000.00 16,500.00
Kepala Tukang L.0.03 OH 0.0280 65,000.00 1,820.00
Mandor L.0.04 OH 0.0830 67,500.00 5,602.50
JUMLAH TENAGA KERJA 114,672.50
B BAHAN
Semen portland Kg 384.0000 1,375.00 528,000.00
Pasir Beton kg 692.0000 142.86 98,857.14
Kerikil (Maks 30mm) kg 1,039.0000 185.19 192,407.41
Air Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 840,764.55
C PERALATAN

Hal 44/229
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 955,437.05
E Overhead & Profit 10% x D 10% 95,543.71
F Harga Satuan Pekerjaan (D+E) 1,050,980.76

A.4.1.1.9. Membuat 1 m3 beton mutu f’c± = 19,3 MPa (K 275), slump (12 2) cm, w/c = 0,58
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6500 55,000.00 90,750.00
Tukang Batu L.0.02 OH 0.2750 60,000.00 16,500.00
Kepala Tukang L.0.03 OH 0.0280 65,000.00 1,820.00
Mandor L.0.04 OH 0.0830 67,500.00 5,602.50
JUMLAH TENAGA KERJA 114,672.50
B BAHAN
Semen portland Kg 406.0000 1,375.00 558,250.00
Pasir Beton kg 684.0000 142.86 97,714.29
Kerikil (Maks 30mm) kg 1,026.0000 185.19 190,000.00
Air Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 867,464.29
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 982,136.79
E Overhead & Profit 10% x D 10% 98,213.68
F Harga Satuan Pekerjaan (D+E) 1,080,350.46

A.4.1.1.10. Membuat 1 m3 beton mutu f’c± = 19,3 MPa (K 300), slump (12 2) cm, w/c = 0,58
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6500 55,000.00 90,750.00
Tukang Batu L.0.02 OH 0.2750 60,000.00 16,500.00
Kepala Tukang L.0.03 OH 0.0280 65,000.00 1,820.00
Mandor L.0.04 OH 0.0830 67,500.00 5,602.50
JUMLAH TENAGA KERJA 114,672.50
B BAHAN
Semen portland Kg 406.0000 1,375.00 558,250.00
Pasir Beton kg 684.0000 142.86 97,714.29
Kerikil (Maks 30mm) kg 1,026.0000 185.19 190,000.00
Air Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 867,464.29
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 982,136.79
E Overhead & Profit 10% x D 10% 98,213.68
F Harga Satuan Pekerjaan (D+E) 1,080,350.46

A.4.1.1.11. Membuat 1 m3 beton mutu f’c± = 19,3 MPa (K 325), slump (12 2) cm, w/c = 0,58
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6500 55,000.00 90,750.00
Tukang Batu L.0.02 OH 0.2750 60,000.00 16,500.00
Kepala Tukang L.0.03 OH 0.0280 65,000.00 1,820.00
Mandor L.0.04 OH 0.0830 67,500.00 5,602.50
JUMLAH TENAGA KERJA 114,672.50
B BAHAN
Semen portland Kg 439.0000 1,375.00 603,625.00
Pasir Beton kg 670.0000 142.86 95,714.29
Kerikil (Maks 30mm) kg 1,006.0000 185.19 186,296.30
Hal 45/229
Air Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 907,135.58
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,021,808.08
E Overhead & Profit 10% x D 10% 102,180.81
F Harga Satuan Pekerjaan (D+E) 1,123,988.89

A.4.1.1.12. Membuat 1 m3 beton mutu f’c± = 19,3 MPa (K 350), slump (12 2) cm, w/c = 0,58
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6500 55,000.00 90,750.00
Tukang Batu L.0.02 OH 0.2750 60,000.00 16,500.00
Kepala Tukang L.0.03 OH 0.0280 65,000.00 1,820.00
Mandor L.0.04 OH 0.0830 67,500.00 5,602.50
JUMLAH TENAGA KERJA 114,672.50
B BAHAN
Semen portland Kg 448.0000 1,375.00 616,000.00
Pasir Beton kg 667.0000 142.86 95,285.71
Kerikil (Maks 30mm) kg 1,000.0000 185.19 185,185.19
Air Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 917,970.90
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,032,643.40
E Overhead & Profit 10% x D 10% 103,264.34
F Harga Satuan Pekerjaan (D+E) 1,135,907.74

A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox – 100


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 2.1000 55,000.00 115,500.00
H
Tukang batu L.0.02 OH 0.3500 60,000.00 21,000.00
Kepala Tukang L.0.03 OH 0.0350 65,000.00 2,275.00
O
Mandor L.0.04 0.1050 67,500.00 7,087.50
H
JUMLAH TENAGA KERJA 145,862.50
B BAHAN
Semen portland Kg 400.0000 1,375.00 550,000.00
Pasir Beton m3 0.4800 200,000.00 96,000.00
Kerikil (2cm/3cm) m3k 0.8000 250,000.00 200,000.00
Strorox – 100 1.2000 - -
g
JUMLAH HARGA BAHAN 846,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 991,862.50
E Overhead & Profit 10% x D 10% 99,186.25
F Harga Satuan Pekerjaan (D+E) 1,091,048.75

A.4.1.1.14 Pemasangan 1 m PVC waterstop lebar 150 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0600 55,000.00 3,300.00
Tukang Batu/Pipa L.0.02 OH 0.0300 60,000.00 1,800.00
Kepala Tukang L.0.03 OH 0.0030 65,000.00 195.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 5,497.50
B BAHAN

Hal 46/229
Waterstop lebar 150 mm m 1.05 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 5,497.50
E Overhead & Profit 10% x D 10% 549.75
F Harga Satuan Pekerjaan (D+E) 6,047.25

A.4.1.1.15 Pemasangan 1 m PVC waterstop lebar 200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0700 55,000.00 3,850.00
Tukang Batu/Pipa L.0.02 OH 0.0350 60,000.00 2,100.00
Kepala Tukang L.0.03 OH 0.0040 65,000.00 260.00
Mandor L.0.04 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 6,682.50
B BAHAN
Waterstop lebar 200 mm m 1.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 6,682.50
E Overhead & Profit 10% x D 10% 668.25
F Harga Satuan Pekerjaan (D+E) 7,350.75

A.4.1.1.16 Pemasangan 1 m PVC waterstop lebar 230 mm - 320 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0800 55,000.00 4,400.00
Tukang Batu L.0.02 OH 0.0400 60,000.00 2,400.00
Kepala Tukang L.0.03 OH 0.0040 65,000.00 260.00
Mandor L.0.04 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 7,330.00
B BAHAN
Waterstop lebar 230 mm - 320 mm m 1.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 7,330.00
E Overhead & Profit 10% x D 10% 733.00
F Harga Satuan Pekerjaan (D+E) 8,063.00

A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0700 55,000.00 3,850.00
Tukang Besi L.0.02 OH 0.0700 62,500.00 4,375.00
Kepala Tukang L.0.03 OH 0.0070 65,000.00 455.00
Mandor L.0.04 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 8,950.00
B BAHAN
Besi beton (polos/ulir) kg 10.5000 12,500.00 131,250.00
Kawat beton kg 0.1500 17,000.00 2,550.00
JUMLAH HARGA BAHAN 133,800.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 142,750.00

Hal 47/229
E Overhead & Profit 10% x D 10% 14,275.00
F Harga Satuan Pekerjaan (D+E) 157,025.00

A.4.1.1.18 Pemasangan 10 kg kabel presstressed polos/ strands


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0500 55,000.00 2,750.00
Tukang Besi L.0.02 OH 0.0500 62,500.00 3,125.00
Kepala Tukang L.0.03 OH 0.0050 65,000.00 325.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 6,402.50
B BAHAN
Besi beton (polos/ulir) kg 10.5000 12,500.00 131,250.00
Kawat beton kg 0.1000 17,000.00 1,700.00
JUMLAH HARGA BAHAN 132,950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 139,352.50
E Overhead & Profit 10% x D 10% 13,935.25
F Harga Satuan Pekerjaan (D+E) 153,287.75

A.4.1.1.19 Pemasangan 10 kg jaring kawat baja ( wiremesh )


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0250 55,000.00 1,375.00
Tukang Besi L.0.02 OH 0.0250 62,500.00 1,562.50
Kepala Tukang L.0.03 OH 0.0250 65,000.00 1,625.00
Mandor L.0.04 OH 0.0010 67,500.00 67.50
JUMLAH TENAGA KERJA 4,630.00
B BAHAN
1.Jaring kawat baja dilas kg 10.2000 11,000.00 112,200.00
2.Kawat beton kg 0.0500 17,000.00 850.00
JUMLAH HARGA BAHAN 113,050.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 117,680.00
E Overhead & Profit 10% x D 10% 11,768.00
F Harga Satuan Pekerjaan (D+E) 129,448.00

A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.5200 55,000.00 28,600.00
H
Tukang Kayu L.0.02 OH 0.2600 62,500.00 16,250.00
Kepala Tukang L.0.03 OH 0.0260 65,000.00 1,690.00
O
Mandor L.0.04 0.0260 67,500.00 1,755.00
H
JUMLAH TENAGA KERJA 48,295.00
B BAHAN
Kayu kelas III m3 0.0400 800,000.00 32,000.00
Paku 5 – 10 cm kg 0.3000 15,000.00 4,500.00
Minyak bekisting Liter 0.1000 25,000.00 2,500.00
JUMLAH HARGA BAHAN 39,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 87,295.00
E Overhead & Profit 10% x D 10% 8,729.50
F Harga Satuan Pekerjaan (D+E) 96,024.50

Hal 48/229
A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.5200 55,000.00 28,600.00
Tukang Kayu L.0.02 OH 0.2600 62,500.00 16,250.00
Kepala Tukang L.0.03 OH 0.0260 65,000.00 1,690.00
Mandor L.0.04 OH 0.0260 67,500.00 1,755.00
JUMLAH TENAGA KERJA 48,295.00
B BAHAN
Kayu kelas III m3 0.0450 800,000.00 36,000.00
Paku 5 cm – 10 cm kg 0.3000 15,000.00 4,500.00
Minyak bekisting Liter 0.1000 25,000.00 2,500.00
JUMLAH HARGA BAHAN 43,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 91,295.00
E Overhead & Profit 10% x D 10% 9,129.50
F Harga Satuan Pekerjaan (D+E) 100,424.50

A.4.1.1.22 Pemasangan 1 m2 bekisting untuk kolom


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.6600 55,000.00 36,300.00
H
Tukang Kayu L.0.02 OH 0.3300 62,500.00 20,625.00
Kepala Tukang L.0.03 OH 0.0330 65,000.00 2,145.00
O
Mandor L.0.04 0.0330 67,500.00 2,227.50
H
JUMLAH TENAGA KERJA 61,297.50
B BAHAN
Kayu kelas III m3 0.0400 800,000.00 32,000.00
Paku 5 cm – 12 cm kg 0.4000 15,000.00 6,000.00
Minyak bekisting Liter 0.2000 25,000.00 5,000.00
Balok kayu kelas II m3 0.0150 4,000,000.00 60,000.00
Plywood tebal 9 mm Lbr 0.3500 70,000.00 24,500.00
Dolken kayu φ 8- 10cm –panj 4 m Batang 2.0000 46,000.00 92,000.00
JUMLAH HARGA BAHAN 219,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 280,797.50
E Overhead & Profit 10% x D 10% 28,079.75
F Harga Satuan Pekerjaan (D+E) 308,877.25

A.4.1.1.23 Pemasangan 1 m3 bekisting untuk balok


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O 0.6600 55,000.00
Pekerja L.0.01 36,300.00
H 0.3300 62,500.00
Tukang Kayu L.0.02 OH 20,625.00
Kepala Tukang L.0.03 OH 0.0330 65,000.00 2,145.00
O 0.0330 67,500.00
Mandor L.0.04 2,227.50
H
JUMLAH TENAGA KERJA 61,297.50
B BAHAN
Kayu kelas III m3k 0.0400 800,000.00 32,000.00
Paku 5 cm – 12 cm 0.4000 15,000.00 6,000.00
g
Minyak bekisting Liter 0.2000 25,000.00 5,000.00
m
Balok kayu kelas II L 0.0180 4,000,000.00 72,000.00
3
Plywood tebal 9 mm b 0.3500 70,000.00 24,500.00
Dolken kayu g φ 8– 1 0)cm panj4 m r
Batang 2.0000 46,000.00 92,000.00

Hal 49/229
JUMLAH HARGA BAHAN 231,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 292,797.50
E Overhead & Profit 10% x D 10% 29,279.75
F Harga Satuan Pekerjaan (D+E) 322,077.25

A.4.1.1.24 Pemasangan 1 m3 bekisting untuk lantai


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.6600 55,000.00 36,300.00
Tukang Kayu L.0.02 OH 0.3300 62,500.00 20,625.00
Kepala Tukang L.0.03 OH 0.0330 65,000.00 2,145.00
Mandor L.0.04 OH 0.0330 67,500.00 2,227.50
JUMLAH TENAGA KERJA 61,297.50
B BAHAN
Kayu kelas III m3 0.0400 800,000.00 32,000.00
Paku 5 cm – 12 cm kg 0.4000 15,000.00 6,000.00
Minyak bekisting Liter 0.2000 25,000.00 5,000.00
Balok kayu kelas II m3 0.0150 4,000,000.00 60,000.00
Plywood tebal 9 mm Lbr 0.3500 70,000.00 24,500.00
Dolken kayu galam, 8–10 cm panj4 m Batang 6.0000 29,500.00 177,000.00
JUMLAH HARGA BAHAN 304,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 365,797.50
E Overhead & Profit 10% x D 10% 36,579.75
F Harga Satuan Pekerjaan (D+E) 402,377.25

A.4.1.1.25 Pemasangan 1 m3 bekisting untuk dinding


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.6600 55,000.00 36,300.00
Tukang Kayu L.0.02 OH 0.3300 62,500.00 20,625.00
Kepala Tukang L.0.03 OH 0.0330 65,000.00 2,145.00
Mandor L.0.04 OH 0.0330 67,500.00 2,227.50
JUMLAH TENAGA KERJA 61,297.50
B BAHAN
Kayu kelas III m3 0.0300 800,000.00 24,000.00
Paku 5 cm – 12 cm kg 0.4000 15,000.00 6,000.00
Minyak bekisting Liter 0.2000 25,000.00 5,000.00
Balok kayu kelas II m3 0.0200 4,000,000.00 80,000.00
Plywood tebal 9 mm Lbr 0.3500 70,000.00 24,500.00
Dolken kayu , φ 8–10 cm, panj4 m Batang 3.0000 46,000.00 138,000.00
Penjaga jarak bekisting/spacer Buah 4.0000 -
JUMLAH HARGA BAHAN 277,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 338,797.50
E Overhead & Profit 10% x D 10% 33,879.75
F Harga Satuan Pekerjaan (D+E) 372,677.25

A.4.1.1.26 Pemasangan 1 m3 bekisting untuk tangga


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.6600 55,000.00 36,300.00
Tukang Kayu L.0.02 OH 0.3300 62,500.00 20,625.00

Hal 50/229
Kepala Tukang L.0.03 OH 0.0330 65,000.00 2,145.00
Mandor L.0.04 OH 0.0330 67,500.00 2,227.50
JUMLAH TENAGA KERJA 61,297.50
B BAHAN
Kayu kelas III m3 0.0300 800,000.00 24,000.00
Paku 5 cm – 12 cm kg 0.4000 15,000.00 6,000.00
Minyak bekisting Liter 0.1500 25,000.00 3,750.00
Balok kayu kelas II m3 0.0150 4,000,000.00 60,000.00
Plywood tebal 9 mm Lbr 0.3500 70,000.00 24,500.00
Dolken kayu, φ 8–10 cm,panj4 m Batang 2.0000 46,000.00 92,000.00
JUMLAH HARGA BAHAN 210,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 271,547.50
E Overhead & Profit 10% x D 10% 27,154.75
F Harga Satuan Pekerjaan (D+E) 298,702.25

A.4.1.1.27 Pemasangan 1 m3 jembatan untuk pengecoran beton


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1500 55,000.00 8,250.00
Tukang Kayu L.0.02 OH 0.0500 62,500.00 3,125.00
Kepala Tukang L.0.03 OH 0.0050 65,000.00 325.00
Mandor L.0.04 OH 0.0080 67,500.00 540.00
JUMLAH TENAGA KERJA 12,240.00
B BAHAN
Kayu kelas III (papan) m3k 0.0264 800,000.00 21,120.00
Paku 5 cm – 12 cm 0.6000 15,000.00 9,000.00
g
Dolken kayu , φ 8–10 panj 4m Batang 0.5000 46,000.00 23,000.00
JUMLAH HARGA BAHAN 53,120.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 65,360.00
E Overhead & Profit 10% x D 10% 6,536.00
F Harga Satuan Pekerjaan (D+E) 71,896.00

A.4.1.1.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 5.3000 55,000.00 291,500.00
Tukang batu L.0.02 OH 0.2750 60,000.00 16,500.00
Tukang Kayu L.0.02 OH 1.3000 62,500.00 81,250.00
Tukang besi L.0.02 OH 1.0500 62,500.00 65,625.00
Kepala tukang L.0.03 OH 0.2620 65,000.00 17,030.00
Mandor L.0.04 OH 0.2650 67,500.00 17,887.50
JUMLAH TENAGA KERJA 489,792.50
B BAHAN
Kayu kelas III m3 0.2000 800,000.00 160,000.00
Paku 5 cm – 12 cm kg 1.5000 15,000.00 22,500.00
Minyak bekisting Liter 0.4000 25,000.00 10,000.00
Besi beton polos kg 157.5000 12,500.00 1,968,750.00
Kawat beton kg 2.2500 17,000.00 38,250.00
Semen portland Kg 336.0000 1,375.00 462,000.00
Pasir Beton m3 0.5400 200,000.00 108,000.00
Kerikil m3 0.8100 250,000.00 202,500.00
JUMLAH HARGA BAHAN 2,972,000.00
C PERALATAN

Hal 51/229
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 3,461,792.50
E Overhead & Profit 10% x D 10% 346,179.25
F Harga Satuan Pekerjaan (D+E) 3,807,971.75

A.4.1.1.29 Membuat 1 m3 sloof beton bertulang (200 kg besi +bekisting)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 5.6500 55,000.00 310,750.00
Tukang batu L.0.02 OH 0.2750 60,000.00 16,500.00
Tukang Kayu L.0.02 OH 1.5600 62,500.00 97,500.00
Tukang besi L.0.02 OH 1.4000 62,500.00 87,500.00
Kepala tukang L.0.03 OH 0.3230 65,000.00 20,995.00
Mandor L.0.04 OH 0.2830 67,500.00 19,102.50
JUMLAH TENAGA KERJA 552,347.50
B BAHAN
Kayu kelas III m3 0.2700 800,000.00 216,000.00
Paku 5 cm – 12 cm kg 2.0000 15,000.00 30,000.00
Minyak bekisting Liter 0.6000 25,000.00 15,000.00
Besi beton polos kg 210.0000 12,500.00 2,625,000.00
Kawat beton kg 3.0000 17,000.00 51,000.00
Semen portland Kg 336.0000 1,375.00 462,000.00
Pasir Beton m3 0.5400 200,000.00 108,000.00
Kerikil m3 0.8100 250,000.00 202,500.00
JUMLAH HARGA BAHAN 3,709,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 4,261,847.50
E Overhead & Profit 10% x D 10% 426,184.75
F Harga Satuan Pekerjaan (D+E) 4,688,032.25

A.4.1.1.30 Membuat 1 m3 kolom beton bertulang (300 kg besi +bekisting)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 7.0500 55,000.00 387,750.00
H
Tukang batu L.0.02 OH 0.2750 60,000.00 16,500.00
Tukang Kayu L.0.02 OH 1.6500 62,500.00 103,125.00
O
Tukang besi L.0.02 2.1000 62,500.00 131,250.00
H
Kepala tukang L.0.03 OH 0.4030 65,000.00 26,195.00
O
Mandor L.0.04 0.3530 67,500.00 23,827.50
H
JUMLAH TENAGA KERJA 688,647.50
B BAHAN
Kayu kelas III m3 0.4000 800,000.00 320,000.00
Paku 5 cm – 12cm kg 4.0000 15,000.00 60,000.00
Minyak bekisting Liter 2.0000 25,000.00 50,000.00
Besi beton polos kg 315.0000 12,500.00 3,937,500.00
Kawat beton kg 4.5000 17,000.00 76,500.00
Semen portland Kg 336.0000 1,375.00 462,000.00
Pasir Beton m3 0.5400 200,000.00 108,000.00
Kerikil m3 0.8100 250,000.00 202,500.00
Kayu kelas II balok m3 0.1500 1,200,000.00 180,000.00
Plywood 9 mm Lbr 3.5000 127,500.00 446,250.00
Dolken kayu φ(8-10) cm, panj4 m Batang 20.0000 46,000.00 920,000.00
JUMLAH HARGA BAHAN 6,762,750.00
C PERALATAN

Hal 52/229
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 7,451,397.50
E Overhead & Profit 10% x D 10% 745,139.75
F Harga Satuan Pekerjaan (D+E) 8,196,537.25

A.4.1.1.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 6.3500 55,000.00 349,250.00
Tukang batu L.0.02 OH 0.2750 60,000.00 16,500.00
Tukang Kayu L.0.02 OH 1.6500 62,500.00 103,125.00
Tukang besi L.0.02 OH 1.4000 62,500.00 87,500.00
Kepala tukang L.0.03 OH 0.3330 65,000.00 21,645.00
Mandor L.0.04 OH 0.3180 67,500.00 21,465.00
JUMLAH TENAGA KERJA 599,485.00
B BAHAN
Kayu kelas III m3 0.3200 800,000.00 256,000.00
Paku 5 cm – 12 cm kg 3.2000 15,000.00 48,000.00
Minyak bekisting Liter 1.6000 25,000.00 40,000.00
Besi beton polos kg 210.0000 12,500.00 2,625,000.00
Kawat beton kg 3.0000 17,000.00 51,000.00
Semen portland Kg 336.0000 1,375.00 462,000.00
Pasir Beton m3 0.5400 200,000.00 108,000.00
Kerikil m3 0.8100 250,000.00 202,500.00
Kayu kelas II balok m3 0.1400 1,200,000.00 168,000.00
Lemba
Plywood 9 mm 2.8000 127,500.00 357,000.00
r
Dolken kayu φ(8-10) cm, panj 4 m Batang 16.0000 46,000.00 736,000.00
JUMLAH HARGA BAHAN 5,053,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 5,652,985.00
E Overhead & Profit 10% x D 10% 565,298.50
F Harga Satuan Pekerjaan (D+E) 6,218,283.50

A.4.1.1.32 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 5.3000 55,000.00 291,500.00
Tukang batu L.0.02 OH 0.2750 60,000.00 16,500.00
Tukang Kayu L.0.02 OH 1.3000 62,500.00 81,250.00
Tukang besi L.0.02 OH 1.0500 62,500.00 65,625.00
Kepala tukang L.0.03 OH 0.2650 65,000.00 17,225.00
Mandor L.0.04 OH 0.2650 67,500.00 17,887.50
JUMLAH TENAGA KERJA 489,987.50
B BAHAN
Kayu kelas III m3 0.3200 800,000.00 256,000.00
Paku 5 cm – 12 cm kg 3.2000 15,000.00 48,000.00
Minyak bekisting Liter 1.6000 25,000.00 40,000.00
Besi beton polos kg 157.5000 12,500.00 1,968,750.00
Kawat beton kg 2.2500 17,000.00 38,250.00
Semen portland Kg 336.0000 1,375.00 462,000.00
Pasir Beton m3 0.5400 200,000.00 108,000.00
Kerikil m3 0.8100 250,000.00 202,500.00
Kayu kelas II balok m3 0.1200 1,200,000.00 144,000.00
Lemba
Plywood 9 mm 2.8000 127,500.00 357,000.00
r
Dolken kayu φ(8-10) cm, panjang 4 m Batang 32.0000 46,000.00 1,472,000.00

Hal 53/229
JUMLAH HARGA BAHAN 5,096,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 5,586,487.50
E Overhead & Profit 10% x D 10% 558,648.75
F Harga Satuan Pekerjaan (D+E) 6,145,136.25

A.4.1.1.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 5.3000 55,000.00 291,500.00
Tukang batu L.0.02 OH 0.2750 60,000.00 16,500.00
Tukang Kayu L.0.02 OH 1.3000 62,500.00 81,250.00
Tukang besi L.0.02 OH 1.0500 62,500.00 65,625.00
Kepala tukang L.0.03 OH 0.2620 65,000.00 17,030.00
Mandor L.0.04 OH 0.2650 67,500.00 17,887.50
JUMLAH TENAGA KERJA 489,792.50
B BAHAN
Kayu kelas III m3 0.2400 800,000.00 192,000.00
Paku 5 cm – 12 cm kg 3.2000 15,000.00 48,000.00
Minyak bekisting Liter 1.6000 25,000.00 40,000.00
Besi beton polos kg 157.5000 12,500.00 1,968,750.00
Kawat beton kg 2.2500 17,000.00 38,250.00
Semen portland Kg 336.0000 1,375.00 462,000.00
Pasir Beton m3 0.5400 200,000.00 108,000.00
Kerikil m3 0.8100 250,000.00 202,500.00
Kayu kelas II balok m3 0.1600 1,200,000.00 192,000.00
Lemba
Plywood 9 mm 2.8000 127,500.00 357,000.00
r
Dolken kayu φ(8-10) cm, panjang 4 m Batang 24.0000 46,000.00 1,104,000.00
JUMLAH HARGA BAHAN 4,712,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 5,202,292.50
E Overhead & Profit 10% x D 10% 520,229.25
F Harga Satuan Pekerjaan (D+E) 5,722,521.75

A.4.1.1.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 5.6500 55,000.00 310,750.00
Tukang batu L.0.02 OH 0.2750 60,000.00 16,500.00
Tukang Kayu L.0.02 OH 1.5600 62,500.00 97,500.00
Tukang besi L.0.02 OH 1.4000 62,500.00 87,500.00
Kepala tukang L.0.03 OH 0.3230 65,000.00 20,995.00
Mandor L.0.04 OH 0.2830 67,500.00 19,102.50
JUMLAH TENAGA KERJA 552,347.50
B BAHAN
Kayu kelas III m3 0.2500 800,000.00 200,000.00
Paku 5 cm – 12 cm kg 3.0000 15,000.00 45,000.00
Minyak bekisting Liter 1.2000 25,000.00 30,000.00
Besi beton polos kg 210.0000 12,500.00 2,625,000.00
Kawat beton kg 3.0000 17,000.00 51,000.00
Semen portland Kg 336.0000 1,375.00 462,000.00
Pasir Beton m3 0.5400 200,000.00 108,000.00
Kerikil m3 0.8100 250,000.00 202,500.00
Kayu kelas II balok m3 0.1050 1,200,000.00 126,000.00
Lemba
Plywood 9 mm 2.5000 127,500.00 318,750.00
r
Hal 54/229
Dolken kayu φ(8-10) cm, panj 4 m Batang 14.0000 46,000.00 644,000.00
JUMLAH HARGA BAHAN 4,812,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 5,364,597.50
E Overhead & Profit 10% x D 10% 536,459.75
F Harga Satuan Pekerjaan (D+E) 5,901,057.25

A.4.1.1.35 Membuat 1 m3 kolom praktis beton bertulang (11 x 11 cm)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1800 55,000.00 9,900.00
Tukang batu L.0.02 OH 0.0200 60,000.00 1,200.00
Tukang Kayu L.0.02 OH 0.0200 62,500.00 1,250.00
Tukang besi L.0.02 OH 0.0200 62,500.00 1,250.00
Kepala tukang L.0.03 OH 0.0060 65,000.00 390.00
Mandor L.0.04 OH 0.0090 67,500.00 607.50
JUMLAH TENAGA KERJA 14,597.50
B BAHAN
Kayu kelas III m3 0.0020 800,000.00 1,600.00
Paku 5 cm – 12 cm kg 0.0100 15,000.00 150.00
Minyak bekisting Liter -
Besi beton polos kg 3.0000 12,500.00 37,500.00
Kawat beton kg 0.4500 17,000.00 7,650.00
Semen portland Kg 4.0000 1,375.00 5,500.00
Pasir Beton m3 0.0060 200,000.00 1,200.00
Kerikil m3 0.0090 250,000.00 2,250.00
JUMLAH HARGA BAHAN 55,850.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 70,447.50
E Overhead & Profit 10% x D 10% 7,044.75
F Harga Satuan Pekerjaan (D+E) 77,492.25
A.4.1.1.36 Membuat 1 m3 ring balok beton bertulang (10 x 15 cm)
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0297 55,000.00 1,633.50
Tukang batu L.0.02 OH 0.0330 60,000.00 1,980.00
Tukang Kayu L.0.02 OH 0.0330 62,500.00 2,062.50
Tukang besi L.0.02 OH 0.0330 62,500.00 2,062.50
Kepala tukang L.0.03 OH 0.0100 65,000.00 650.00
Mandor L.0.04 OH 0.0150 67,500.00 1,012.50
JUMLAH TENAGA KERJA 9,401.00
B BAHAN
Kayu kelas III m3 0.0030 800,000.00 2,400.00
Paku 5 cm – 12 cm kg 0.0200 15,000.00 300.00
Minyak bekisting Liter 25,000.00 -
Besi beton polos kg 3.6000 12,500.00 45,000.00
Kawat beton kg 0.0500 17,000.00 850.00
Semen portland Kg 5.5000 1,375.00 7,562.50
Pasir Beton m3 0.0090 200,000.00 1,800.00
Kerikil m3 0.0150 250,000.00 3,750.00
JUMLAH HARGA BAHAN 61,662.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 71,063.50
E Overhead & Profit 10% x D 10% 7,106.35

Hal 55/229
F Harga Satuan Pekerjaan (D+E) 78,169.85

A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


A.4.1.2.1 Pembuatan 1 m2 lahan produksi tebal 8cm beton f'c 14,5 Mpa (K175) slump (12 ± 2) cm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja L.0.01 OH 0.1320 55,000.00 7,260.00
Tukang batu L.0.02 OH 0.0220 60,000.00 1,320.00
Kepala tukang L.0.03 OH 0.0020 65,000.00 130.00
Mandor L.0.04 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 9,182.50
B BAHAN
Semen portland Kg 26.0800 1,375.00 35,860.00
Pasir beton Kg 60.8000 -
Kerikil (maks 30mm) Kg 82.3200 -
Air L 17.2000 100.00 1,720.00
JUMLAH HARGA ALAT 37,580.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 46,762.50
E Overhead & Profit 10% x D 10% 4,676.25
F Harga Satuan Pekerjaan (D+E) 51,438.75

A.4.1.2.2 Pembuatan 1 m2 lahan produksi tebal 10cm beton f'c 14,5 Mpa (K175) slump (12 ± 2) cm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja L.0.01 OH 0.1650 55,000.00 9,075.00
Tukang batu L.0.02 OH 0.0280 60,000.00 1,680.00
Kepala tukang L.0.03 OH 0.0030 65,000.00 195.00
Mandor L.0.04 OH 0.0080 67,500.00 540.00
JUMLAH TENAGA KERJA 11,490.00
B BAHAN
Semen portland Kg 32.6000 1,375.00 44,825.00
Pasir beton Kg 76.0000 -
Kerikil (maks 30mm) Kg 102.9000 -
Air L 21.5000 100.00 2,150.00
JUMLAH HARGA BAHAN 46,975.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 58,465.00
E Overhead & Profit 10% x D 10% 5,846.50
F Harga Satuan Pekerjaan (D+E) 64,311.50

A.4.1.2.3 Pembuatan 1 m2 lahan produksi tebal 12cm beton f'c 14,5 Mpa (K175) slump (12 ± 2) cm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja L.0.01 OH 0.1960 55,000.00 10,780.00
Tukang batu L.0.02 OH 0.0330 60,000.00 1,980.00
Kepala tukang L.0.03 OH 0.0030 65,000.00 195.00
Mandor L.0.04 OH 0.0100 67,500.00 675.00
JUMLAH TENAGA KERJA 13,630.00
B BAHAN
Semen portland Kg 32.1200 1,375.00 44,165.00
Pasir beton Kg 91.2000 -
Kerikil (maks 30mm) Kg 123.4800 -
Air L 25.8000 100.00 2,580.00

Hal 56/229
JUMLAH HARGA BAHAN 46,745.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 60,375.00
E Overhead & Profit 10% x D 10% 6,037.50
F Harga Satuan Pekerjaan (D+E) 66,412.50

A.4.1.2.4 Pembuatan 1 m2 lahan produksi tebal 15cm beton f'c 14,5 Mpa (K175) slump (12 ± 2) cm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja L.0.01 OH 0.2480 55,000.00 13,640.00
Tukang batu L.0.02 OH 0.0410 60,000.00 2,460.00
Kepala tukang L.0.03 OH 0.0040 65,000.00 260.00
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 17,237.50
B BAHAN
Semen portland Kg 48.9000 1,375.00 67,237.50
Pasir beton Kg 114.0000 -
Kerikil (maks 30mm) Kg 154.3500 -
Air L 32.2500 100.00 3,225.00
JUMLAH HARGA BAHAN 70,462.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 87,700.00
E Overhead & Profit 10% x D 10% 8,770.00
F Harga Satuan Pekerjaan (D+E) 96,470.00

A.4.1.2.5 Pembuatan 1 m2 bekistig untuk plat beton pracetak ( 5 kali pakai)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
O
Pekerja L.0.01 0.0070 55,000.00 385.00
H
Tukang batu L.0.02 OH 0.0760 60,000.00 4,560.00
Kepala tukang L.0.03 OH 0.0080 65,000.00 520.00
O
Mandor L.0.04 0.0010 67,500.00 67.50
H
JUMLAH TENAGA KERJA 5,532.50
B BAHAN
Lantai kerja tebal 10cm m3 0.0800 -
Besi hollow 50.50.3 Kg 9.3940 -
Kayu kaso 5/7 m3 0.0050 -
Phenol film 12mm Lbr 0.0800 -
Minyak bekisting L 0.2000 25,000.00 5,000.00
Dinabolt dia 12mm (10-15cm) Bh 3.8820 3,000.00 11,646.00
JUMLAH HARGA BAHAN 16,646.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 22,178.50
E Overhead & Profit 10% x D 10% 2,217.85
F Harga Satuan Pekerjaan (D+E) 24,396.35

A.4.1.2.6 Pembuatan 1 m2 bekistig untuk balok beton pracetak ( 10 - 12 kali pakai)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
O
Pekerja L.0.01 0.0040 55,000.00 220.00
H
Tukang batu L.0.02 OH 0.0380 60,000.00 2,280.00
Kepala tukang L.0.03 OH 0.0040 65,000.00 260.00
O
Mandor L.0.04 0.0010 67,500.00 67.50
H
JUMLAH TENAGA KERJA 2,827.50

Hal 57/229
B BAHAN
Kayu kaso 5/7 m3 0.0050 -
Phenol film 12mm Lbr 0.0430 -
Minyak bekisting L 0.2000 25,000.00 5,000.00
Dinabolt dia 12mm (10-15cm) Bh 0.6930 -
JUMLAH HARGA BAHAN 5,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 7,827.50
E Overhead & Profit 10% x D 10% 782.75
F Harga Satuan Pekerjaan (D+E) 8,610.25

A.4.1.2.7 Pembuatan 1 m2 bekistig untukkolom beton pracetak ( 10 - 12 kali pakai)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja L.0.01 OH 0.0040 55,000.00 220.00
Tukang batu L.0.02 OH 0.0380 60,000.00 2,280.00
Kepala tukang L.0.03 OH 0.0040 65,000.00 260.00
Mandor L.0.04 OH 0.0010 67,500.00 67.50
JUMLAH TENAGA KERJA 2,827.50
B BAHAN
Kayu kaso 5/7 3 0.0040 -
Phenol film 12mm Lbr 0.0480 -
Minyak bekisting L 0.2000 25,000.00 5,000.00
Paku 5-7cm Kg 0.0460 15,000.00 690.00
Dinabolt dia 12mm (10-15cm) Bh 0.6930 -
JUMLAH HARGA BAHAN 5,690.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 8,517.50
E Overhead & Profit 10% x D 10% 851.75
F Harga Satuan Pekerjaan (D+E) 9,369.25

A.4.1.2 8 Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja L.0.01 OH 0.0530 55,000.00 2,915.00
Tukang Kayu L.0.02 OH 0.0180 62,500.00 1,125.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 4,377.50
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 4,377.50
E Overhead & Profit 10% x D 10% 437.75
F Harga Satuan Pekerjaan (D+E) 4,815.25

A.4.1.2 9 Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja L.0.01 OH 0.0890 55,000.00 4,895.00
Tukang Kayu L.0.02 OH 0.0300 62,500.00 1,875.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 7,107.50
B BAHAN
JUMLAH HARGA BAHAN

Hal 58/229
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 7,107.50
E Overhead & Profit 10% x D 10% 710.75
F Harga Satuan Pekerjaan (D+E) 7,818.25

A.4.1.2 10 Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja L.0.01 OH 0.0710 55,000.00 3,905.00
Tukang Kayu L.0.02 OH 0.0240 62,500.00 1,500.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 5,742.50
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 5,742.50
E Overhead & Profit 10% x D 10% 574.25
F Harga Satuan Pekerjaan (D+E) 6,316.75

A.4.1.2 11 Penuangan/menebar beton untuk 1 buah komponen plat pracetak


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja L.0.01 OH 0.0640 55,000.00 3,520.00
Tukang batu L.0.02 OH 0.2440 60,000.00 14,640.00
Tukang vibrator L.0.02 OH 0.1280 -
Kepala Tukang L.0.03 OH 0.0340 65,000.00 2,210.00
Mandor L.0.04 OH 0.0730 67,500.00 4,927.50
JUMLAH TENAGA KERJA 25,297.50
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 25,297.50
E Overhead & Profit 10% x D 10% 2,529.75
F Harga Satuan Pekerjaan (D+E) 27,827.25

A.4.1.2 12 Penuangan/menebar beton untuk 1 buah komponen balok pracetak


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja L.0.01 OH 0.0690 55,000.00 3,795.00
Tukang batu L.0.02 OH 0.2420 60,000.00 14,520.00
Tukang vibrator L.0.02 OH 0.1380 -
Kepala Tukang L.0.03 OH 0.0370 65,000.00 2,405.00
Mandor L.0.04 OH 0.0730 67,500.00 4,927.50
JUMLAH TENAGA KERJA 25,647.50
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 25,647.50
E Overhead & Profit 10% x D 10% 2,564.75
F Harga Satuan Pekerjaan (D+E) 28,212.25

A.4.1.2 13 Penuangan/menebar beton untuk 1 buah komponen kolom pracetak

Hal 59/229
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja L.0.01 OH 0.0610 55,000.00 3,355.00
Tukang batu L.0.02 OH 0.2130 60,000.00 12,780.00
Tukang vibrator L.0.02 OH 0.1220 -
Kepala Tukang L.0.03 OH 0.0330 65,000.00 2,145.00
Mandor L.0.04 OH 0.0730 67,500.00 4,927.50
JUMLAH TENAGA KERJA 23,207.50
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 23,207.50
E Overhead & Profit 10% x D 10% 2,320.75
F Harga Satuan Pekerjaan (D+E) 25,528.25

A.4.1.2 14 Mendirikan 1 buah komponen plat pracetak


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja L.0.01 OH 0.0670 55,000.00 3,685.00
Tukang batu L.0.02 OH 0.0670 60,000.00 4,020.00
Tukang erection L.0.02 OH 0.1340 -
Kepala Tukang L.0.03 OH 0.0670 65,000.00 4,355.00
Mandor L.0.04 OH 0.0670 67,500.00 4,522.50
JUMLAH TENAGA KERJA 16,582.50
B BAHAN
Solar L 6.6760 5,500.00 36,718.00
JUMLAH HARGA BAHAN 36,718.00
C PERALATAN
Sewa crane UH 0.0670 -
Sewa pipe support UH 1.1000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 53,300.50
E Overhead & Profit 10% x D 10% 5,330.05
F Harga Satuan Pekerjaan (D+E) 58,630.55

A.4.1.2 15 Mendirikan 1 buah komponen balok pracetak


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja L.0.01 OH 0.0610 55,000.00 3,355.00
Tukang batu L.0.02 OH 0.0610 60,000.00 3,660.00
Tukang erection L.0.02 OH 0.1220 -
Operator crane OH 0.0610 -
Pembantu operator crane OH 0.0610 -
Kepala Tukang L.0.03 OH 0.0610 65,000.00 3,965.00
Mandor L.0.04 OH 0.0610 67,500.00 4,117.50
JUMLAH TENAGA KERJA 15,097.50
B BAHAN
Solar L 6.1100 5,500.00 33,605.00
JUMLAH HARGA BAHAN 33,605.00
C PERALATAN
Sewa crane UH 0.0610 -
Sewa chaffolding UH 1.1000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 48,702.50
E Overhead & Profit 10% x D 10% 4,870.25
F Harga Satuan Pekerjaan (D+E) 53,572.75

Hal 60/229
A.4.1.2 16 Mendirikan 1 buah komponen kolom pracetak
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja L.0.01 OH 0.0830 55,000.00 4,565.00
Tukang batu L.0.02 OH 0.0830 60,000.00 4,980.00
Tukang erection L.0.02 OH 0.1660 -
Operator crane OH 0.0830 -
Pembantu operator crane OH 0.0830 -
Kepala Tukang L.0.03 OH 0.0830 65,000.00 5,395.00
Mandor L.0.04 OH 0.0830 67,500.00 5,602.50
JUMLAH TENAGA KERJA 20,542.50
B BAHAN
Solar L 8.2770 5,500.00 45,523.50
JUMLAH HARGA BAHAN 45,523.50
C PERALATAN
Sewa crane UH 0.0830 -
Sewa pipe support UH 2.2000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 66,066.00
E Overhead & Profit 10% x D 10% 6,606.60
F Harga Satuan Pekerjaan (D+E) 72,672.60

A.4.1.2 17 Melangsir 1 buah komponen plat pracetak ( ± 20 m)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja L.0.01 OH 0.0190 55,000.00 1,045.00
Tukang batu L.0.02 OH 0.0380 60,000.00 2,280.00
Operator crane OH 0.0190 -
Pembantu operator crane OH 0.0190 -
JUMLAH TENAGA KERJA 3,325.00
B BAHAN
Solar L 1.8970 5,500.00 10,433.50
JUMLAH HARGA BAHAN 10,433.50
C PERALATAN
Sewa crane UH 0.0190 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 13,758.50
E Overhead & Profit 10% x D 10% 1,375.85
F Harga Satuan Pekerjaan (D+E) 15,134.35

A.4.1.2 18 Melangsir 1 buah komponen balok pracetak ( ± 20 m)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja L.0.01 OH 0.0190 55,000.00 1,045.00
Tukang batu L.0.02 OH 0.0380 60,000.00 2,280.00
Operator crane OH 0.0190 -
Pembantu operator crane OH 0.0190 -
JUMLAH TENAGA KERJA 3,325.00
B BAHAN
Solar L 1.8970 5,500.00 10,433.50
JUMLAH HARGA BAHAN 10,433.50
C PERALATAN
Sewa crane UH 0.0190 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 13,758.50
E Overhead & Profit 10% x D 10% 1,375.85

Hal 61/229
F Harga Satuan Pekerjaan (D+E) 15,134.35

A.4.1.2 19 Melangsir 1 buah komponen kolom pracetak ( ± 20 m)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja L.0.01 OH 0.0190 55,000.00 1,045.00
Tukang batu L.0.02 OH 0.0380 60,000.00 2,280.00
Operator crane OH 0.0190 -
Pembantu operator crane OH 0.0190 -
JUMLAH TENAGA KERJA 3,325.00
B BAHAN
Solar L 1.8970 5,500.00 10,433.50
JUMLAH HARGA BAHAN 10,433.50
C PERALATAN
Sewa crane UH 0.0190 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 13,758.50
E Overhead & Profit 10% x D 10% 1,375.85
F Harga Satuan Pekerjaan (D+E) 15,134.35

A.4.1.2 20 Bahan 1 m3 grouting campuran


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
JUMLAH TENAGA KERJA
B BAHAN
Semen grout Kg 1,200.0000 -
Screening Kg 650.0000 -
Air L 350.0000 100.00 35,000.00
JUMLAH HARGA BAHAN 35,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 35,000.00
E Overhead & Profit 10% x D 10% 3,500.00
F Harga Satuan Pekerjaan (D+E) 38,500.00

A.4.1.2 21 Bahan 1 m3 grouting tidak campuran


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
JUMLAH TENAGA KERJA
B BAHAN
Semen grout Kg 1,850.0000 -
Air L 400.0000 100.00 40,000.00
JUMLAH HARGA BAHAN 40,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 40,000.00
E Overhead & Profit 10% x D 10% 4,000.00
F Harga Satuan Pekerjaan (D+E) 44,000.00

A.4.1.2 22 Upah melakukan 1 titik grouting pada join pracetak


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Tukang batu L.0.02 OH 0.3670 60,000.00 22,020.00
Kepala tukang L.0.03 OH 0.0740 65,000.00 4,810.00
Mandor L.0.04 OH 0.0370 67,500.00 2,497.50
JUMLAH TENAGA KERJA 29,327.50
B BAHAN

Hal 62/229
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 29,327.50
E Overhead & Profit 10% x D 10% 2,932.75
F Harga Satuan Pekerjaan (D+E) 32,260.25

A.4.1.2 23 Pemasangan 1 titik Bekisting join pracetak


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja 0.1470 55,000.00 8,085.00
Tukang Kayu L.0.02 OH 0.1470 62,500.00 9,187.50
Kepala tukang L.0.03 OH 0.0150 65,000.00 975.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 18,585.00
B BAHAN
Kayu kaso 5/7 m3 0.0120 -
Papan cor m3 0.0040 -
Paku 5-7cm Kg 0.2640 15,000.00 3,960.00
JUMLAH HARGA BAHAN 3,960.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 22,545.00
E Overhead & Profit 10% x D 10% 2,254.50
F Harga Satuan Pekerjaan (D+E) 24,799.50

A.4.1.2 24 Upah 1 titik Join dengan Sling


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
A TENAGA n (Rp) (Rp)
Pekerja 0.2200 55,000.00 12,100.00
Tukang Kayu L.0.02 OH 0.2200 62,500.00 13,750.00
Tukang besi L.0.02 OH 0.2200 62,500.00 13,750.00
Mandor L.0.04 OH 0.0110 67,500.00 742.50
JUMLAH TENAGA KERJA 40,342.50
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 40,342.50
E Overhead & Profit 10% x D 10% 4,034.25
F Harga Satuan Pekerjaan (D+E) 44,376.75

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


A.4.2.1.1 Pemasangan 1 kg besi profil
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0600 55,000.00 3,300.00
Tukang Las Konstruksi L.0.03 OH 0.0600 62,500.00 3,750.00
Kepala tukang L.0.03 OH 0.0060 65,000.00 390.00
Mandor L.0.04 OH JUMLAH0.0030 67,500.00 202.50
TENAGA 7,642.50
B BAHAN KERJA
Besi Profil Kg 1.1500 12,500.00 14,375.00
JUMLAH HARGA BAHAN 14,375.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 22,017.50

Hal 63/229
E Overhead & Profit 10% x D 10% 2,201.75
F Harga Satuan Pekerjaan (D+E) 24,219.25

A.4.2.1.2 Pemasangan 1 kg rangka kuda-kuda baja IWF


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0600 55,000.00 3,300.00
Tukang Las Konstruksi L.0.03 OH 0.0600 62,500.00 3,750.00
Kepala tukang L.0.03 OH 0.0060 65,000.00 390.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 7,642.50
B BAHAN
Besi Baja IWF Kg 1.1500 12,500.00 14,375.00
JUMLAH HARGA BAHAN 14,375.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 22,017.50
E Overhead & Profit 10% x D 10% 2,201.75
F Harga Satuan Pekerjaan (D+E) 24,219.25

A.4.2.1.3 Pengerjaan 100 kg pekerjaan perakitan


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1000 55,000.00 5,500.00
Tukang Besi Konstruksi L.0.03 OH 0.1000 62,500.00 6,250.00
Kepala tukang L.0.03 OH 0.0010 65,000.00 65.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 12,152.50
B BAHAN
Solar Liter 1.0000 5,500.00 5,500.00
Minyak pelumas Liter 0.1000 30,000.00 3,000.00
JUMLAH HARGA BAHAN 8,500.00
C PERALATAN
1. Sewa alat Jam 0.8000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 20,652.50
E Overhead & Profit 10% x D 10% 2,065.25
F Harga Satuan Pekerjaan (D+E) 22,717.75

A.4.2.1.4 Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.0500 55,000.00 57,750.00
Tukang Las Biasa L.0.03 OH 1.0500 62,500.00 65,625.00
Kepala tukang L.0.03 OH 0.1050 65,000.00 6,825.00
Mandor L.0.04 OH 0.0520 67,500.00 3,510.00
JUMLAH TENAGA KERJA 133,710.00
B BAHAN
Besi siku L 30.30.3 Kg 15.0000 10,000.00 150,000.00
Besi plat baja Kg 32.8000 11,000.00 360,800.00
Kawat las Kg 0.0500 35,000.00 1,750.00
JUMLAH HARGA BAHAN 512,550.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 646,260.00
E Overhead & Profit 10% x D 10% 64,626.00
F Harga Satuan Pekerjaan (D+E) 710,886.00

Hal 64/229
A.4.2.1.5 Pengerjaan 10 cm pengelasan dengan las listrik
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0400 55,000.00 2,200.00
Tukang Besi Konstruksi L.0.03 OH 0.0200 62,500.00 1,250.00
Kepala tukang L.0.03 OH 0.0020 65,000.00 130.00
Mandor L.0.04 OH 0.0020 67,500.00 135.00
JUMLAH TENAGA KERJA 3,715.00
B BAHAN
Kawat las listrik Kg 0.4000 35,000.00 14,000.00
Solar Liter 0.3000 5,500.00 1,650.00
Minyak pelumas Liter 0.0400 30,000.00 1,200.00
JUMLAH HARGA BAHAN 16,850.00
C PERALATAN
Sewa alat Jam 0.1700 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 20,565.00
E Overhead & Profit 10% x D 10% 2,056.50
F Harga Satuan Pekerjaan (D+E) 22,621.50

A.4.2.1.6 Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.6500 55,000.00 35,750.00
Tukang Las Biasa L.0.03 OH 0.6500 62,500.00 40,625.00
Kepala tukang L.0.03 OH 0.0650 65,000.00 4,225.00
Mandor L.0.04 OH 0.0320 67,500.00 2,160.00
JUMLAH TENAGA KERJA 82,760.00
B BAHAN
Besi scuare tube m 4.7600 -
Besi lis kaca (1 x 1) cm m 20.0000 -
Pengelasan cm 0.0200 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 82,760.00
E Overhead & Profit 10% x D 10% 8,276.00
F Harga Satuan Pekerjaan (D+E) 91,036.00

A.4.2.1.7 Pemasangan 1 m2 pintu rolling door besi


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 1.2000 55,000.00 66,000.00
H
O
Tukang Las Biasa L.0.03 1.2000 62,500.00 75,000.00
H
Kepala tukang L.0.03 OH 0.1200 65,000.00 7,800.00
O
Mandor L.0.04 0.0060 67,500.00 405.00
H
JUMLAH TENAGA KERJA 149,205.00
B BAHAN
Pintu gulung besi m2 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 149,205.00
E Overhead & Profit 10% x D 10% 14,920.50
F Harga Satuan Pekerjaan (D+E) 164,125.50

Hal 65/229
A.4.2.1.8 Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.4400 55,000.00 24,200.00
H
O
Tukang las biasa L.0.03 0.4400 -
H
Kepala tukang L.0.03 OH 0.0440 65,000.00 2,860.00
O
Mandor L.0.04 0.0220 67,500.00 1,485.00
H
JUMLAH TENAGA KERJA 28,545.00
B BAHAN
Pintu lipat m2 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 28,545.00
E Overhead & Profit 10% x D 10% 2,854.50
F Harga Satuan Pekerjaan (D+E) 31,399.50

A.4.2.1.9 Pemasangan 1 m2 sunscreen alluminium


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.0800 55,000.00 4,400.00
H
O
Tukang L.0.03 0.8000 62,500.00 50,000.00
H
Kepala tukang L.0.03 OH 0.0800 65,000.00 5,200.00
O
Mandor L.0.04 0.0040 67,500.00 270.00
H
JUMLAH TENAGA KERJA 59,870.00
B BAHAN
Sunscreen alluminium m2 1.0000 23,000.00 23,000.00
JUMLAH HARGA BAHAN 23,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 82,870.00
E Overhead & Profit 10% x D 10% 8,287.00
F Harga Satuan Pekerjaan (D+E) 91,157.00

A.4.2.1.10 Pemasangan 1 m2 rolling door alluminium


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 1.0000 55,000.00 55,000.00
H
O
Tukang Khusus Alumunium L.0.03 1.0000 -
H
Kepala tukang L.0.03 OH 0.1000 65,000.00 6,500.00
O
Mandor L.0.04 0.0500 67,500.00 3,375.00
H
JUMLAH TENAGA KERJA 64,875.00
B BAHAN
Rolling dor alluminium m2 1.0000 290,000.00 290,000.00
JUMLAH HARGA BAHAN 290,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 354,875.00
E Overhead & Profit 10% x D 10% 35,487.50
F Harga Satuan Pekerjaan (D+E) 390,362.50

A.4.2.1.11 Pemasangan 1 m kusen pintu alluminium


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0430 55,000.00 2,365.00
Tukang Khusus Alumunium L.0.03 OH 0.0430 65,000.00 2,795.00
Kepala tukang L.0.03 OH 0.0043 65,000.00 279.50

Hal 66/229
Mandor L.0.04 OH 0.0021 67,500.00 141.75
JUMLAH TENAGA KERJA 5,581.25
B BAHAN
Profil alluminium m 1.1000 70,000.00 77,000.00
Skrup fixer buah 2.0000 1,200.00 2,400.00
Sealant Tube 0.0600 35,000.00 2,100.00
JUMLAH HARGA BAHAN 81,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 87,081.25
E Overhead & Profit 10% x D 10% 8,708.13
F Harga Satuan Pekerjaan (D+E) 95,789.38

A.4.2.1.12 Pemasangan 1 m2 pintu alluminium strip lebar 8 cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0850 55,000.00 4,675.00
Tukang Khusus Allumunium L.0.03 OH 0.0850 65,000.00 5,525.00
Kepala tukang L.0.03 OH 0.0085 65,000.00 552.50
Mandor L.0.04 OH 0.0042 67,500.00 283.50
JUMLAH TENAGA KERJA 11,036.00
B BAHAN
Profil alluminium m 4.4000 70,000.00 308,000.00
Alluminium strip m 14.6000 9,000.00 131,400.00
JUMLAH HARGA BAHAN 439,400.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 450,436.00
E Overhead & Profit 10% x D 10% 45,043.60
F Harga Satuan Pekerjaan (D+E) 495,479.60

A.4.2.1.13 Pemasangan 1 m2 pintu kaca rangka alluminium


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0850 55,000.00 4,675.00
Tukang Allumunium/Kaca L.0.03 OH 0.0850 65,000.00 5,525.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 11,122.50
B BAHAN
Pintu alluminium m 4.4000 70,000.00 308,000.00
Profil kaca m 4.5000 9,000.00 40,500.00
Sealant Tube 0.2700 35,000.00 9,450.00
JUMLAH HARGA BAHAN 357,950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 369,072.50
E Overhead & Profit 10% x D 10% 36,907.25
F Harga Satuan Pekerjaan (D+E) 405,979.75

A.4.2.1.14 Pemasangan 1 m2 venetions blinds dan Vertical blinds


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3500 55,000.00 19,250.00
H
O
Tukang L.0.03 0.3500 62,500.00 21,875.00
H
Kepala tukang L.0.03 OH 0.0350 65,000.00 2,275.00
O
Mandor L.0.04 0.0180 67,500.00 1,215.00
H
Hal 67/229
JUMLAH TENAGA KERJA 44,615.00
B BAHAN
1. Venetions blinds dan
m2 1.0000 145,000.00 145,000.00
vertical blinds (tirai)
JUMLAH HARGA BAHAN 145,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 189,615.00
E Overhead & Profit 10% x D 10% 18,961.50
F Harga Satuan Pekerjaan (D+E) 208,576.50

A.4.2.1.15 Pemasangan 1 m2 terali besi strip (2 x 3) mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6700 55,000.00 91,850.00
Tukang Las L.0.03 OH 1.6700 62,500.00 104,375.00
Kepala tukang L.0.03 OH 0.1670 65,000.00 10,855.00
Mandor L.0.04 OH 0.0830 67,500.00 5,602.50
JUMLAH TENAGA KERJA 212,682.50
B BAHAN
Besi strip kg 6.1770 9,000.00 55,593.00
Pengelasan cm 27.0800 -
JUMLAH HARGA BAHAN 55,593.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 268,275.50
E Overhead & Profit 10% x D 10% 26,827.55
F Harga Satuan Pekerjaan (D+E) 295,103.05

A.4.2.1.16 Pemasangan 1 m2 kawat nyamuk


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1000 55,000.00 5,500.00
Tukang L.0.03 OH 0.1000 62,500.00 6,250.00
Kepala tukang L.0.03 OH 0.0100 65,000.00 650.00
Mandor L.0.04 OH 0.0050 -
JUMLAH TENAGA KERJA 12,400.00
B BAHAN
Kawat nyamuk m2 1.1000 -
Pengelasan cm 11.1100 -
Baja strip (0,2 x 2) cm kg 1.7160 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 12,400.00
E Overhead & Profit 10% x D 10% 1,240.00
F Harga Satuan Pekerjaan (D+E) 13,640.00

A.4.2.1.17 Pemasangan 1 m2 jendela nako & tralis


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2000 55,000.00 11,000.00
Tukang L.0.03 OH 0.2000 62,500.00 12,500.00
Kepala tukang L.0.03 OH 0.0200 65,000.00 1,300.00
Mandor L.0.04 OH 0.0010 67,500.00 67.50
JUMLAH TENAGA KERJA 24,867.50
B BAHAN
Jendela nako
m2 1.1000 -
(rangka + kaca 5 mm)
Hal 68/229
Paku skrup
buah 10.0000 1,200.00 12,000.00
1 cm – 2,5 cm
Besi strip m 7.0000 9,000.00 63,000.00
JUMLAH HARGA BAHAN 75,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 99,867.50
E Overhead & Profit 10% x D 10% 9,986.75
F Harga Satuan Pekerjaan (D+E) 109,854.25

A.4.2.1.18 Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2000 55,000.00 11,000.00
Tukang L.0.03 OH 0.2000 62,500.00 12,500.00
Kepala tukang L.0.03 OH 0.0200 65,000.00 1,300.00
Mandor L.0.04 OH 0.0010 67,500.00 67.50
JUMLAH TENAGA KERJA 24,867.50
B BAHAN
Seng plat m 1.0500 28,000.00 29,400.00
k
Paku 1 cm - 2,5 cm 0.0150 19,000.00 285.00
g
Papan kayu kelas II atau III m3 0.0190 800,000.00 15,200.00
JUMLAH HARGA BAHAN 44,885.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 69,752.50
E Overhead & Profit 10% x D 10% 6,975.25
F Harga Satuan Pekerjaan (D+E) 76,727.75

A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1500 55,000.00 8,250.00
Tukang L.0.03 OH 0.3000 62,500.00 18,750.00
Kepala tukang L.0.03 OH 0.0300 65,000.00 1,950.00
Mandor L.0.04 OH 0.0080 67,500.00 540.00
JUMLAH TENAGA KERJA 29,490.00
B BAHAN
Seng plat m 1.0500 19,000.00 19,950.00
Paku 1 cm – 2,5 cm kg 0.0100 19,000.00 190.00
Besi strip kg 0.5000 9,000.00 4,500.00
JUMLAH HARGA BAHAN 24,640.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 54,130.00
E Overhead & Profit 10% x D 10% 5,413.00
F Harga Satuan Pekerjaan (D+E) 59,543.00

A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2500 55,000.00 13,750.00
Tukang Besi L.0.02 OH 0.2500 62,500.00 15,625.00
Kepala Tukang L.0.03 OH 0.0250 65,000.00 1,625.00
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 31,877.50
B BAHAN
Rangka metal hollow 40.40.2 mm M1 3.5000 -

Hal 69/229
Assesoris (perkuatan, las dll) Ls 1 00%xrangka -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 31,877.50
E Overhead & Profit 10% x D 10% 3,187.75
F Harga Satuan Pekerjaan (D+E) 35,065.25

A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3500 55,000.00 19,250.00
Tukang Besi L.0.02 OH 0.3500 62,500.00 21,875.00
Kepala Tukang L.0.03 OH 0.0350 65,000.00 2,275.00
Mandor L.0.04 OH 0.0180 67,500.00 1,215.00
JUMLAH TENAGA KERJA 44,615.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 4.0000 6,000.00 24,000.00
Assesoris (perkuatan, las dll) Ls 1%xrangka 24,000.00 240.00
JUMLAH HARGA BAHAN 24,240.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 68,855.00
E Overhead & Profit 10% x D 10% 6,885.50
F Harga Satuan Pekerjaan (D+E) 75,740.50

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A.4.4.1.1 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.6000 55,000.00 33,000.00
H
Tukang batu L.0.02 OH 0.2000 60,000.00 12,000.00
Kepala Tukang L.0.03 OH 0.0200 65,000.00 1,300.00
O
Mandor L.0.04 0.0300 67,500.00 2,025.00
H
JUMLAH TENAGA KERJA 48,325.00
B BAHAN
Bata merah m3 140.0000 700.00 98,000.00
Semen portland Kg 43.5000 1,375.00 59,812.50
Pasir Pasang m3 0.0800 200,000.00 16,000.00
JUMLAH HARGA BAHAN 173,812.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 222,137.50
E Overhead & Profit 10% x D 10% 22,213.75
F Harga Satuan Pekerjaan (D+E) 244,351.25

A.4.4.1.2 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.6000 55,000.00 33,000.00
H
Tukang batu L.0.02 OH 0.2000 60,000.00 12,000.00
Kepala Tukang L.0.03 OH 0.0200 65,000.00 1,300.00
O
Mandor L.0.04 0.0300 67,500.00 2,025.00
H
JUMLAH TENAGA KERJA 48,325.00
B BAHAN
Bata merah m3 140.0000 700.00 98,000.00

Hal 70/229
Semen portland Kg 32.9500 1,375.00 45,306.25
m
Pasir Pasang 0.0910 200,000.00 18,200.00
3
JUMLAH HARGA BAHAN 161,506.25
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 209,831.25
E Overhead & Profit 10% x D 10% 20,983.13
F Harga Satuan Pekerjaan (D+E) 230,814.38

A.4.4.1.3 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.6000 55,000.00 33,000.00
H
Tukang batu L.0.02 OH 0.2000 60,000.00 12,000.00
Kepala Tukang L.0.03 OH 0.0200 65,000.00 1,300.00
O
Mandor L.0.04 0.0300 67,500.00 2,025.00
H
JUMLAH TENAGA KERJA 48,325.00
B BAHAN
Bata merah m3 140.0000 700.00 98,000.00
Semen portland Kg 26.5500 1,375.00 36,506.25
Pasir Pasang m3 0.0930 200,000.00 18,600.00
JUMLAH HARGA BAHAN 153,106.25
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 201,431.25
E Overhead & Profit 10% x D 10% 20,143.13
F Harga Satuan Pekerjaan (D+E) 221,574.38

A.4.4.1.4 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.6000 55,000.00 33,000.00
H
Tukang batu L.0.02 OH 0.2000 60,000.00 12,000.00
Kepala Tukang L.0.03 OH 0.0200 65,000.00 1,300.00
O
Mandor L.0.04 0.0300 67,500.00 2,025.00
H
JUMLAH TENAGA KERJA 48,325.00
B BAHAN
Bata merah m3 140.0000 700.00 98,000.00
Semen portland Kg 22.2000 1,375.00 30,525.00
m
Pasir Pasang 0.1020 200,000.00 20,400.00
3
JUMLAH HARGA BAHAN 148,925.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 197,250.00
E Overhead & Profit 10% x D 10% 19,725.00
F Harga Satuan Pekerjaan (D+E) 216,975.00

A.4.4.1.5 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.6000 55,000.00 33,000.00
H
Tukang batu L.0.02 OH 0.2000 60,000.00 12,000.00
Kepala Tukang L.0.03 OH 0.0200 65,000.00 1,300.00
O
Mandor L.0.04 0.0300 67,500.00 2,025.00
H
JUMLAH TENAGA KERJA 48,325.00
B BAHAN
Bata merah m3 140.0000 700.00 98,000.00

Hal 71/229
Semen portland Kg 18.5000 1,375.00 25,437.50
m
Pasir Pasang 0.1220 200,000.00 24,400.00
3
JUMLAH HARGA BAHAN 147,837.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 196,162.50
E Overhead & Profit 10% x D 10% 19,616.25
F Harga Satuan Pekerjaan (D+E) 215,778.75

A.4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.6000 55,000.00 33,000.00
H
Tukang batu L.0.02 OH 0.2000 60,000.00 12,000.00
Kepala Tukang L.0.03 OH 0.0200 65,000.00 1,300.00
O
Mandor L.0.04 0.0300 67,500.00 2,025.00
H
JUMLAH TENAGA KERJA 48,325.00
B BAHAN
Bata merah m3 140.0000 700.00 98,000.00
Semen portland Kg 10.0800 1,375.00 13,860.00
Kapur Padam m3 0.0275 12,000.00 330.00
m
Pasir Pasang 0.0925 200,000.00 18,500.00
3
JUMLAH HARGA BAHAN 130,690.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 179,015.00
E Overhead & Profit 10% x D 10% 17,901.50
F Harga Satuan Pekerjaan (D+E) 196,916.50

A.4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3000 55,000.00 16,500.00
Tukang Batu L.0.02 OH 0.1000 60,000.00 6,000.00
Kepala Tukang L.0.03 OH 0.0100 65,000.00 650.00
Mandor L.0.04 OH 0.0150 67,500.00 1,012.50
JUMLAH TENAGA KERJA 24,162.50
B BAHAN
Bata merah m3 70.0000 700.00 49,000.00
Semen portland Kg 18.9500 1,375.00 26,056.25
Pasir Pasang m3 0.0380 200,000.00 7,600.00
JUMLAH HARGA BAHAN 82,656.25
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 106,818.75
E Overhead & Profit 10% x D 10% 10,681.88
F Harga Satuan Pekerjaan (D+E) 117,500.63

A.4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1000 60,000.00 6,000.00
Kepala Tukang L.0.03 OH 0.0100 65,000.00 650.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 24,162.50
B BAHAN

Hal 72/229
Bata merah m3 70.0000 700.00 49,000.00
Semen portland Kg 14.3700 1,375.00 19,758.75
m
Pasir Pasang 0.0400 200,000.00 8,000.00
3
JUMLAH HARGA BAHAN 76,758.75
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 100,921.25
E Overhead & Profit 10% x D 10% 10,092.13
F Harga Satuan Pekerjaan (D+E) 111,013.38

A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1000 60,000.00 6,000.00
Kepala Tukang L.0.03 OH 0.0100 65,000.00 650.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 24,162.50
B BAHAN
Bata merah m3 70.0000 700.00 49,000.00
Semen portland Kg 11.5000 1,375.00 15,812.50
m
Pasir Pasang 0.0430 200,000.00 8,600.00
3
JUMLAH HARGA BAHAN 73,412.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 97,575.00
E Overhead & Profit 10% x D 10% 9,757.50
F Harga Satuan Pekerjaan (D+E) 107,332.50

A.4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :5PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1000 60,000.00 6,000.00
Kepala Tukang L.0.03 OH 0.0100 65,000.00 650.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 24,162.50
B BAHAN
Bata merah m3 70.0000 700.00 49,000.00
Semen portland Kg 9.6800 1,375.00 13,310.00
m
Pasir Pasang 0.0450 200,000.00 9,000.00
3
JUMLAH HARGA BAHAN 71,310.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 95,472.50
E Overhead & Profit 10% x D 10% 9,547.25
F Harga Satuan Pekerjaan (D+E) 105,019.75

A.4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1000 60,000.00 6,000.00
Kepala Tukang L.0.03 OH 0.0100 65,000.00 650.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 24,162.50
B BAHAN

Hal 73/229
Bata merah m3 70.0000 700.00 49,000.00
Semen portland Kg 8.3200 1,375.00 11,440.00
m
Pasir Pasang 0.0490 200,000.00 9,800.00
3
JUMLAH HARGA BAHAN 70,240.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 94,402.50
E Overhead & Profit 10% x D 10% 9,440.25
F Harga Satuan Pekerjaan (D+E) 103,842.75

A.4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1000 60,000.00 6,000.00
Kepala Tukang L.0.03 OH 0.0100 65,000.00 650.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 24,162.50
B BAHAN
Bata merah m3 70.0000 700.00 49,000.00
Semen portland Kg 6.5000 1,375.00 8,937.50
m
Pasir Pasang 0.0500 200,000.00 10,000.00
3
JUMLAH HARGA BAHAN 67,937.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 92,100.00
E Overhead & Profit 10% x D 10% 9,210.00
F Harga Satuan Pekerjaan (D+E) 101,310.00

A.4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1000 60,000.00 6,000.00
Kepala Tukang L.0.03 OH 0.0100 65,000.00 650.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 24,162.50
B BAHAN
Bata merah m3 70.0000 700.00 49,000.00
Semen portland Kg 4.5000 1,375.00 6,187.50
Kapur Padam m3 0.0150 12,000.00 180.00
Pasir Pasang m3 0.0500 200,000.00 10,000.00
JUMLAH HARGA BAHAN 65,367.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 89,530.00
E Overhead & Profit 10% x D 10% 8,953.00
F Harga Satuan Pekerjaan (D+E) 98,483.00

A.4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1000 60,000.00 6,000.00
Kepala Tukang L.0.03 OH 0.0100 65,000.00 650.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 24,162.50

Hal 74/229
B BAHAN
Bata merah m3 70.0000 700.00 49,000.00
K
Semen Merah 0.0180 -
mg
Kapur Padam 0.0180 12,000.00 216.00
m3
Pasir Pasang 0.0180 200,000.00 3,600.00
3
JUMLAH HARGA BAHAN 52,816.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 76,978.50
E Overhead & Profit 10% x D 10% 7,697.85
F Harga Satuan Pekerjaan (D+E) 84,676.35

A.4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1000 60,000.00 6,000.00
Kepala Tukang L.0.03 OH 0.0100 65,000.00 650.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 24,162.50
B BAHAN
Bata merah m3 70.0000 700.00 49,000.00
K
Semen Merah 0.0140 -
g
Kapur Padam m3 0.0140 12,000.00 168.00
Pasir Pasang m3 0.0280 200,000.00 5,600.00
JUMLAH HARGA BAHAN 54,768.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 78,930.50
E Overhead & Profit 10% x D 10% 7,893.05
F Harga Satuan Pekerjaan (D+E) 86,823.55

A.4.4.1.16 Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3500 55,000.00 19,250.00
H
Tukang batu L.0.02 OH 0.1500 60,000.00 9,000.00
Kepala Tukang L.0.03 OH 0.0150 65,000.00 975.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 30,237.50
B BAHAN
m
HB-20 12.5000 -
3
Semen portland Kg 30.3200 1,375.00 41,690.00
Pasir Pasang m3 0.7280 200,000.00 145,600.00
K
Besi angker diameter 8 0.2800 -
g
JUMLAH HARGA BAHAN 187,290.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 217,527.50
E Overhead & Profit 10% x D 10% 21,752.75
F Harga Satuan Pekerjaan (D+E) 239,280.25

A.4.4.1.17 Pemasangan 1m2 dinding conblock HB20 campuran 1SP :4PP


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3500 55,000.00 19,250.00
H
Tukang batu L.0.02 OH 0.1500 60,000.00 9,000.00

Hal 75/229
Kepala Tukang L.0.03 OH 0.0150 65,000.00 975.00
O
Mandor L.0.04 0.0180 67,500.00 1,215.00
H
JUMLAH TENAGA KERJA 30,440.00
B BAHAN
HB-20 m3 12.5000 -
Semen portland Kg 24.2600 1,375.00 33,357.50
m
Pasir Pasang 0.7720 200,000.00 154,400.00
K3
Besi angker dia 8 0.2800 -
g
JUMLAH HARGA BAHAN 187,757.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 218,197.50
E Overhead & Profit 10% x D 10% 21,819.75
F Harga Satuan Pekerjaan (D+E) 240,017.25

A.4.4.1.18 Pemasangan 1m2 dinding conblock HB15 campuran 1SP :3PP


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3200 55,000.00 17,600.00
H
Tukang batu L.0.02 OH 0.1200 60,000.00 7,200.00
Kepala Tukang L.0.03 OH 0.0120 65,000.00 780.00
O
Mandor L.0.04 0.0160 67,500.00 1,080.00
H
JUMLAH TENAGA KERJA 26,660.00
B BAHAN
HB-15 m3 12.5000 -
Semen portland Kg 22.7400 1,375.00 31,267.50
Pasir Pasang m3 0.5500 200,000.00 110,000.00
K
Besi angker dia 8 0.2800 -
g
JUMLAH HARGA BAHAN 141,267.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 167,927.50
E Overhead & Profit 10% x D 10% 16,792.75
F Harga Satuan Pekerjaan (D+E) 184,720.25

A.4.4.1.19 Pemasangan 1 cm2 dinding conblock HB15 campuran 1SP :4PP


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3200 55,000.00 17,600.00
H
Tukang batu L.0.02 OH 0.1200 60,000.00 7,200.00
Kepala Tukang L.0.03 OH 0.0120 65,000.00 780.00
O
Mandor L.0.04 0.0160 67,500.00 1,080.00
H
JUMLAH TENAGA KERJA 26,660.00
B BAHAN
HB-15 m3 12.5000 -
Semen portland Kg 18.2000 1,375.00 25,025.00
m
Pasir Pasang 0.5820 200,000.00 116,400.00
K3
Besi angker dia 8 0.2800 -
g
JUMLAH HARGA BAHAN 141,425.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 168,085.00
E Overhead & Profit 10% x D 10% 16,808.50
F Harga Satuan Pekerjaan (D+E) 184,893.50

A.4.4.1.20 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :3PP


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
Hal 76/229
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1000 60,000.00 6,000.00
Kepala Tukang L.0.03 OH 0.0100 65,000.00 650.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 24,162.50
B BAHAN
m
HB-10 12.5000 -
3
Semen portland Kg 15.1600 1,375.00 20,845.00
Pasir Pasang m3 0.3640 200,000.00 72,800.00
K
Besi angker dia 8 0.2800 -
g
JUMLAH HARGA BAHAN 93,645.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 117,807.50
E Overhead & Profit 10% x D 10% 11,780.75
F Harga Satuan Pekerjaan (D+E) 129,588.25

A.4.4.1.21 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :4PP


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1000 60,000.00 6,000.00
Kepala Tukang L.0.03 OH 0.0100 65,000.00 650.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 24,162.50
B BAHAN
HB-10 m3 12.5000 -
Semen portland Kg 12.1300 1,375.00 16,678.75
m
Pasir Pasang 0.3880 200,000.00 77,600.00
K3
Besi angker dia 8 0.2800 -
g
JUMLAH HARGA BAHAN 94,278.75
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 118,441.25
E Overhead & Profit 10% x D 10% 11,844.13
F Harga Satuan Pekerjaan (D+E) 130,285.38

A.4.4.1.22 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1000 60,000.00 6,000.00
Kepala Tukang L.0.03 OH 0.0100 65,000.00 650.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 24,162.50
B BAHAN
m
Bata rooster 30.0000 -
3
Semen portland Kg 11.0000 1,375.00 15,125.00
m
Pasir Pasang 0.0350 200,000.00 7,000.00
3
JUMLAH HARGA BAHAN 22,125.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 46,287.50
E Overhead & Profit 10% x D 10% 4,628.75
F Harga Satuan Pekerjaan (D+E) 50,916.25

Hal 77/229
A.4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1000 60,000.00 6,000.00
Kepala Tukang L.0.03 OH 0.0100 65,000.00 650.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 24,162.50
B BAHAN
Bata berongga m3 30.0000 -
Semen portland Kg 11.0000 1,375.00 15,125.00
m
Pasir Pasang 0.0350 200,000.00 7,000.00
3
JUMLAH HARGA BAHAN 22,125.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 46,287.50
E Overhead & Profit 10% x D 10% 4,628.75
F Harga Satuan Pekerjaan (D+E) 50,916.25

A.4.4.1.24 Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1500 60,000.00 9,000.00
Kepala Tukang L.0.03 OH 0.0150 65,000.00 975.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 27,487.50
B BAHAN
m
Bata rooster 70.0000 -
3
Semen portland Kg 14.0000 1,375.00 19,250.00
m
Pasir Pasang 0.0320 200,000.00 6,400.00
3
JUMLAH HARGA BAHAN 25,650.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 53,137.50
E Overhead & Profit 10% x D 10% 5,313.75
F Harga Satuan Pekerjaan (D+E) 58,451.25

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


A.4.4.2.1 Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm.
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1500 60,000.00 9,000.00
Kepala Tukang L.0.03 OH 0.0150 65,000.00 975.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 27,487.50
B BAHAN
Semen portland Kg 15.5040 1,375.00 21,318.00
m
2.PP 0.0160 200,000.00 3,200.00
3
JUMLAH HARGA BAHAN 24,518.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 52,005.50
E Overhead & Profit 10% x D 10% 5,200.55
F Harga Satuan Pekerjaan (D+E) 57,206.05

Hal 78/229
A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm.
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1500 60,000.00 9,000.00
Kepala Tukang L.0.03 OH 0.0150 65,000.00 975.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 27,487.50
B BAHAN
Semen portland Kg 10.2240 1,375.00 14,058.00
2.PP m3 0.0200 200,000.00 4,000.00
JUMLAH HARGA BAHAN 18,058.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 45,545.50
E Overhead & Profit (Contoh 15%) 10% x D 4,554.55
F Harga Satuan Pekerjaan (D+E) 50,100.05

A.4.4.2.3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1500 60,000.00 9,000.00
Kepala Tukang L.0.03 OH 0.0150 65,000.00 975.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 27,487.50
B BAHAN
Semen portland Kg 7.7760 1,375.00 10,692.00
2.PP m 0.0230 200,000.00 4,600.00
3 JUMLAH HARGA BAHAN 15,292.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 42,779.50
E Overhead & Profit (Contoh 15%) 10% x D 4,277.95
F Harga Satuan Pekerjaan (D+E) 47,057.45

A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1500 60,000.00 9,000.00
Kepala Tukang L.0.03 OH 0.0150 65,000.00 975.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 27,487.50
B BAHAN
Semen portland Kg 6.2400 1,375.00 8,580.00
2.PP m3 0.0240 200,000.00 4,800.00
JUMLAH HARGA BAHAN 13,380.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 40,867.50
E Overhead & Profit (Contoh 15%) 10% x D 4,086.75
F Harga Satuan Pekerjaan (D+E) 44,954.25

A.4.4.2.5 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA

Hal 79/229
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang batu L.0.02 OH 0.1500 60,000.00 9,000.00
Kepala Tukang L.0.03 OH 0.0150 65,000.00 975.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 27,487.50
B BAHAN
Semen portland Kg 5.1840 1,375.00 7,128.00
2.PP m 0.0260 200,000.00 5,200.00
3 JUMLAH HARGA BAHAN 12,328.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 39,815.50
E Overhead & Profit (Contoh 15%) 10% x D 3,981.55
F Harga Satuan Pekerjaan (D+E) 43,797.05

A.4.4.2.6 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm.


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang Batu L.0.03 OH 0.1500 60,000.00 9,000.00
Kepala Tukang L.0.03 OH 0.0150 65,000.00 975.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 27,487.50
B BAHAN
Semen portland Kg 4.4160 1,375.00 6,072.00
2.PP m3 0.0270 200,000.00 5,400.00
JUMLAH HARGA BAHAN 11,472.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 38,959.50
E Overhead & Profit (Contoh 15%) 10% x D 3,895.95
F Harga Satuan Pekerjaan (D+E) 42,855.45

A.4.4.2.7 Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang Batu L.0.03 OH 0.1500 60,000.00 9,000.00
Kepala Tukang L.0.03 OH 0.0150 65,000.00 975.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 27,487.50
B BAHAN
Semen portland Kg 3.9360 1,375.00 5,412.00
2.PP m 0.0280 200,000.00 5,600.00
3 JUMLAH HARGA BAHAN 11,012.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 38,499.50
E Overhead & Profit (Contoh 15%) 10% x D 3,849.95
F Harga Satuan Pekerjaan (D+E) 42,349.45

A.4.4.2.8 Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang Batu L.0.03 OH 0.1500 60,000.00 9,000.00
Kepala Tukang L.0.03 OH 0.0150 65,000.00 975.00

Hal 80/229
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 27,487.50
B BAHAN
Semen portland Kg 3.4560 1,375.00 4,752.00
2.PP m3 0.0290 200,000.00 5,800.00
JUMLAH HARGA BAHAN 10,552.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 38,039.50
E Overhead & Profit (Contoh 15%) 10% x D 3,803.95
F Harga Satuan Pekerjaan (D+E) 41,843.45

A.4.4.2.9 Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3600 55,000.00 19,800.00
H
Tukang Batu L.0.03 OH 0.1200 60,000.00 7,200.00
Kepala Tukang L.0.03 OH 0.0120 65,000.00 780.00
O
Mandor L.0.04 0.0180 67,500.00 1,215.00
H
JUMLAH TENAGA KERJA 28,995.00
B BAHAN
Semen portland Kg 5.7600 1,375.00 7,920.00
2.KP m 0.0030 12,000.00 36.00
3. PP m33 0.0130 200,000.00 2,600.00
JUMLAH HARGA BAHAN 10,556.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 39,551.00
E Overhead & Profit (Contoh 15%) 10% x D 3,955.10
F Harga Satuan Pekerjaan (D+E) 43,506.10

A.4.4.2.10 Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3600 55,000.00 19,800.00
H
Tukang Batu L.0.03 OH 0.1200 60,000.00 7,200.00
Kepala Tukang L.0.03 OH 0.0120 65,000.00 780.00
O
Mandor L.0.04 0.0180 67,500.00 1,215.00
H
JUMLAH TENAGA KERJA 28,995.00
B BAHAN
Semen portland Kg 3.0000 1,375.00 4,125.00
2.KP m 0.0050 12,000.00 60.00
3. PP m3 0.0200 200,000.00 4,000.00
3 JUMLAH HARGA BAHAN 8,185.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 37,180.00
E Overhead & Profit (Contoh 15%) 10% x D 3,718.00
F Harga Satuan Pekerjaan (D+E) 40,898.00

A.4.4.2.11 Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3600 55,000.00 19,800.00
H
Tukang Batu L.0.03 OH 0.1200 60,000.00 7,200.00
Kepala Tukang L.0.03 OH 0.0120 65,000.00 780.00
O
Mandor L.0.04 0.0180 67,500.00 1,215.00
H
Hal 81/229
JUMLAH TENAGA KERJA 28,995.00
B BAHAN
1.SM m3 0.0090 -
2.KP m 0.0090 -
3. PP m3 0.0090 -
3 JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 28,995.00
E Overhead & Profit (Contoh 15%) 10% x D 2,899.50
F Harga Satuan Pekerjaan (D+E) 31,894.50

A.4.4.2.12 Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3600 55,000.00 19,800.00
H
Tukang Batu L.0.03 OH 0.1200 60,000.00 7,200.00
Kepala Tukang L.0.03 OH 0.0120 65,000.00 780.00
O
Mandor L.0.04 0.0180 67,500.00 1,215.00
H
JUMLAH TENAGA KERJA 28,995.00
B BAHAN
1.SM m3 0.0070 -
2.KP m 0.0070 -
3. PP m3 0.0150 -
3 JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 28,995.00
E Overhead & Profit (Contoh 15%) 10% x D 2,899.50
F Harga Satuan Pekerjaan (D+E) 31,894.50

A.4.4.2.13 Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.4000 55,000.00 22,000.00
H
Tukang Batu L.0.03 OH 0.2000 60,000.00 12,000.00
Kepala Tukang L.0.03 OH 0.0200 65,000.00 1,300.00
O
Mandor L.0.04 0.0220 67,500.00 1,485.00
H
JUMLAH TENAGA KERJA 36,785.00
B BAHAN
Semen portland Kg 13.6320 1,375.00 18,744.00
2.PP m 0.0270 200,000.00 5,400.00
3 JUMLAH HARGA BAHAN 24,144.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 60,929.00
E Overhead & Profit (Contoh 15%) 10% x D 6,092.90
F Harga Satuan Pekerjaan (D+E) 67,021.90

A.4.4.2.14 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.2600 55,000.00 14,300.00
H
Tukang Batu L.0.03 OH 0.2000 60,000.00 12,000.00
Kepala Tukang L.0.03 OH 0.0200 65,000.00 1,300.00
O
Mandor L.0.04 0.0130 67,500.00 877.50
H
JUMLAH TENAGA KERJA 28,477.50

Hal 82/229
B BAHAN
Semen portland Kg 10.3680 1,375.00 14,256.00
2.PP m3 0.0310 200,000.00 6,200.00
JUMLAH HARGA BAHAN 20,456.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 48,933.50


E Overhead & Profit (Contoh 15%) 10% x D 4,893.35
F Harga Satuan Pekerjaan (D+E) 53,826.85

A.4.4.2.15 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm.


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.4000 55,000.00 22,000.00
H
Tukang Batu L.0.03 OH 0.2000 60,000.00 12,000.00
Kepala Tukang L.0.03 OH 0.0200 65,000.00 1,300.00
O
Mandor L.0.04 0.0220 67,500.00 1,485.00
H
JUMLAH TENAGA KERJA 36,785.00
B BAHAN
Semen portland Kg 8.3200 1,375.00 11,440.00
2.PP m3 0.0320 200,000.00 6,400.00
JUMLAH HARGA BAHAN 17,840.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 54,625.00
E Overhead & Profit (Contoh 15%) 10% x D 5,462.50
F Harga Satuan Pekerjaan (D+E) 60,087.50

A.4.4.2.16 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.4000 55,000.00 22,000.00
H
Tukang Batu L.0.03 OH 0.2000 60,000.00 12,000.00
Kepala Tukang L.0.03 OH 0.0200 65,000.00 1,300.00
O
Mandor L.0.04 0.0220 67,500.00 1,485.00
H
JUMLAH TENAGA KERJA 36,785.00
B BAHAN
Semen portland Kg 6.9120 1,375.00 9,504.00
2.PP m3 0.0350 200,000.00 7,000.00
JUMLAH HARGA BAHAN 16,504.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 53,289.00
E Overhead & Profit (Contoh 15%) 10% x D 5,328.90
F Harga Satuan Pekerjaan (D+E) 58,617.90

A.4.4.2.17 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.4000 55,000.00 22,000.00
H
Tukang Batu L.0.03 OH 0.2000 60,000.00 12,000.00
Kepala Tukang L.0.03 OH 0.0200 65,000.00 1,300.00
O
Mandor L.0.04 0.0220 67,500.00 1,485.00
H
JUMLAH TENAGA KERJA 36,785.00

Hal 83/229
B BAHAN
Semen portland Kg 5.8880 1,375.00 8,096.00
2.PP m 0.0360 200,000.00 7,200.00
3 JUMLAH HARGA BAHAN 15,296.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 52,081.00
E Overhead & Profit (Contoh 15%) 10% x D 5,208.10
F Harga Satuan Pekerjaan (D+E) 57,289.10

A.4.4.2.18 Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 20 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.4000 55,000.00 22,000.00
H
Tukang Batu L.0.03 OH 0.2000 60,000.00 12,000.00
Kepala Tukang L.0.03 OH 0.0200 65,000.00 1,300.00
O
Mandor L.0.04 0.0220 67,500.00 1,485.00
H
JUMLAH TENAGA KERJA 36,785.00
B BAHAN
1.SM m 0.0090 -
2.KP m33 0.0090 -
3. PP m3 0.0180 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 36,785.00
E Overhead & Profit (Contoh 15%) 10% x D 3,678.50
F Harga Satuan Pekerjaan (D+E) 40,463.50

A.4.4.2.19 Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.1500 55,000.00 8,250.00
H
Tukang Batu L.0.03 OH 0.0750 60,000.00 4,500.00
Kepala Tukang L.0.03 OH 0.0080 65,000.00 520.00
O
Mandor L.0.04 0.0080 67,500.00 540.00
H
JUMLAH TENAGA KERJA 13,810.00
B BAHAN
K
PC 5.1840 1,375.00 7,128.00
g
PP m 0.0260 200,000.00 5,200.00
3 JUMLAH HARGA BAHAN 12,328.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 26,138.00
E Overhead & Profit (Contoh 15%) 10% x D 2,613.80
F Harga Satuan Pekerjaan (D+E) 28,751.80

A.4.4.2.20 Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.0800 55,000.00 4,400.00
H
Tukang Batu L.0.03 OH 0.4000 60,000.00 24,000.00
Kepala Tukang L.0.03 OH 0.0400 65,000.00 2,600.00
O
Mandor L.0.04 0.0040 67,500.00 270.00
H
JUMLAH TENAGA KERJA 31,270.00
B BAHAN
Semen portland Kg 0.5000 1,375.00 687.50

Hal 84/229
Pasir pasang m 0.0130 200,000.00 2,600.00
3 JUMLAH HARGA BAHAN 3,287.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 34,557.50
E Overhead & Profit (Contoh 15%) 10% x D 3,455.75
F Harga Satuan Pekerjaan (D+E) 38,013.25

A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4500 55,000.00 24,750.00
Tukang Batu L.0.03 OH 0.2250 60,000.00 13,500.00
Kepala Tukang L.0.03 OH 0.0230 65,000.00 1,495.00
Mandor L.0.04 OH 0.0230 67,500.00 1,552.50
JUMLAH TENAGA KERJA 41,297.50
B BAHAN
Semen portland Kg 10.0000 1,375.00 13,750.00
Batu granit Kg 15.0000 -
JUMLAH HARGA BAHAN 13,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 55,047.50
E Overhead & Profit (Contoh 15%) 10% x D 5,504.75
F Harga Satuan Pekerjaan (D+E) 60,552.25

A.4.4.2.22 Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4500 55,000.00 24,750.00
Tukang Batu L.0.03 OH 0.2250 60,000.00 13,500.00
Kepala Tukang L.0.03 OH 0.0230 65,000.00 1,495.00
Mandor L.0.04 OH 0.0230 67,500.00 1,552.50
JUMLAH TENAGA KERJA 41,297.50
B BAHAN
Semen portland Kg 10.0000 1,375.00 13,750.00
Batu traso Kg 15.0000 -
JUMLAH HARGA BAHAN 13,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 55,047.50
E Overhead & Profit (Contoh 15%) 10% x D 5,504.75
F Harga Satuan Pekerjaan (D+E) 60,552.25

A.4.4.2.23 Pemasangan 1 m2 plesteran ciprat 1SP : 2PP


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3000 55,000.00 16,500.00
Tukang Batu L.0.03 OH 0.1000 60,000.00 6,000.00
Kepala Tukang L.0.03 OH 0.0100 65,000.00 650.00
Mandor L.0.04 OH 0.0150 67,500.00 1,012.50
JUMLAH TENAGA KERJA 24,162.50
B BAHAN
Semen portland Kg 4.3200 1,375.00 5,940.00
Pasir pasang Kg 0.0060 200,000.00 1,200.00
JUMLAH HARGA BAHAN 7,140.00
C PERALATAN

Hal 85/229
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 31,302.50
E Overhead & Profit (Contoh 15%) 10% x D 3,130.25
F Harga Satuan Pekerjaan (D+E) 34,432.75

A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1500 55,000.00 8,250.00
Tukang Batu L.0.03 OH 0.0750 60,000.00 4,500.00
Kepala Tukang L.0.03 OH 0.0080 65,000.00 520.00
Mandor L.0.04 OH 0.0080 67,500.00 540.00
JUMLAH TENAGA KERJA 13,810.00
B BAHAN
Semen portland Kg 3.1080 1,375.00 4,273.50
JUMLAH HARGA BAHAN 4,273.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 18,083.50
E Overhead & Profit (Contoh 15%) 10% x D 1,808.35
F Harga Satuan Pekerjaan (D+E) 19,891.85

A.4.4.2.25 Pemasangan 1 m2 finishing siar pasangan conblock ekspose


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0700 55,000.00 3,850.00
Tukang Batu L.0.03 OH 0.0350 60,000.00 2,100.00
Kepala Tukang L.0.03 OH 0.0040 65,000.00 260.00
Mandor L.0.04 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 6,480.00
B BAHAN
Semen portland Kg 1.6000 1,375.00 2,200.00
JUMLAH HARGA BAHAN 2,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 8,680.00
E Overhead & Profit (Contoh 15%) 10% x D 868.00
F Harga Satuan Pekerjaan (D+E) 9,548.00

A.4.4.2.26 Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3000 55,000.00 16,500.00
H
Tukang Batu L.0.03 OH 0.1500 60,000.00 9,000.00
Kepala Tukang L.0.03 OH 0.0150 65,000.00 975.00
O
Mandor L.0.04 0.0150 67,500.00 1,012.50
H
JUMLAH TENAGA KERJA 27,487.50
B BAHAN
Semen portland Kg 6.3400 1,375.00 8,717.50
Pasir pasang m3 0.0120 200,000.00 2,400.00
JUMLAH HARGA BAHAN 11,117.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 38,605.00
E Overhead & Profit (Contoh 15%) 10% x D 3,860.50
F Harga Satuan Pekerjaan (D+E) 42,465.50

Hal 86/229
A.4.4.2.27 Pemasangan 1 m2 acian.
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2000 55,000.00 11,000.00
Tukang Batu L.0.03 OH 0.1000 60,000.00 6,000.00
Kepala Tukang L.0.03 OH 0.0100 65,000.00 650.00
Mandor L.0.04 OH 0.0100 67,500.00 675.00
JUMLAH TENAGA KERJA 18,325.00
B BAHAN
Semen portland Kg 3.2500 1,375.00 4,468.75
JUMLAH HARGA BAHAN 4,468.75
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 22,793.75
E Overhead & Profit (Contoh 15%) 10% x D 2,279.38
F Harga Satuan Pekerjaan (D+E) 25,073.13

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


A.4.4.3.1.Pemasangan 1m2 lantai ubin PC abu-abu ukuran 40cm x40cm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2500 55,000.00 13,750.00
Tukang Batu L.0.02 OH 0.1250 60,000.00 7,500.00
Kepala tukang L.0.03 OH 0.0130 65,000.00 845.00
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 22,972.50
B BAHAN
Ubin abu-abu Bh 6.6300 -
Semen portland Kg 9.8000 1,375.00 13,475.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 22,475.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 45,447.50
E Overhead & Profit 10% x D 10% 4,544.75
F Harga Satuan Pekerjaan (D+E) 49,992.25

A.4.4.3.2 Pemasangan 1m2 lantai ubin PC abu-abu ukuran 30cm x30 cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2500 55,000.00 13,750.00
Tukang Batu L.0.02 OH 0.1250 60,000.00 7,500.00
Kepala tukang L.0.03 OH 0.0130 65,000.00 845.00
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 22,972.50
B BAHAN
Ubin abu-abu Bh 11.9700 -
Semen portland Kg 10.0000 1,375.00 13,750.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 22,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 45,722.50
E Overhead & Profit 10% x D 10% 4,572.25
F Harga Satuan Pekerjaan (D+E) 50,294.75

A.4.4.3.3 Pemasangan 1m2 lantai ubin PC abu-abu ukuran 20cm x20 cm

Hal 87/229
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2700 55,000.00 14,850.00
Tukang Batu L.0.02 OH 0.1350 60,000.00 8,100.00
Kepala tukang L.0.03 OH 0.0140 65,000.00 910.00
Mandor L.0.04 OH 0.0140 67,500.00 945.00
JUMLAH TENAGA KERJA 24,805.00
B BAHAN
Ubin abu-abu Bh 26.5000 -
Semen portland Kg 10.4000 1,375.00 14,300.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 23,300.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 48,105.00
E Overhead & Profit 10% x D 10% 4,810.50
F Harga Satuan Pekerjaan (D+E) 52,915.50

A.4.4.3.4 Pemasangan 1m2 lantai ubin warna ukuran 40cm x40 cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2500 55,000.00 13,750.00
Tukang Batu L.0.02 OH 0.1250 60,000.00 7,500.00
Kepala tukang L.0.03 OH 0.0130 65,000.00 845.00
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 22,972.50
B BAHAN
Ubin warna Bh 6.6300 -
Semen portland Kg 9.8000 1,375.00 13,475.00
Semen warna Kg 1.3000 3,000.00 3,900.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 26,375.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 49,347.50
E Overhead & Profit 10% x D 10% 4,934.75
F Harga Satuan Pekerjaan (D+E) 54,282.25

A.4.4.3.5 Pemasangan 1m2 lantai ubin warna ukuran 30cm x30cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2600 55,000.00 14,300.00
Tukang Batu L.0.02 OH 0.1300 60,000.00 7,800.00
Kepala tukang L.0.03 OH 0.0130 65,000.00 845.00
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 23,822.50
B BAHAN
Ubin warna Bh 11.8700 -
Semen portland Kg 10.0000 1,375.00 13,750.00
Semen warna Kg 1.5000 3,000.00 4,500.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 27,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 51,072.50
E Overhead & Profit 10% x D 10% 5,107.25
F Harga Satuan Pekerjaan (D+E) 56,179.75

Hal 88/229
A.4.4.3.6 Pemasangan 1m2 lantai ubin warna ukuran 20cm x20cm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2700 55,000.00 14,850.00
Tukang Batu L.0.02 OH 0.1350 60,000.00 8,100.00
Kepala tukang L.0.03 OH 0.0140 65,000.00 910.00
Mandor L.0.04 OH 0.0140 67,500.00 945.00
JUMLAH TENAGA KERJA 24,805.00
B BAHAN
Ubin warna Bh 26.5000 -
Semen portland Kg 10.4000 1,375.00 14,300.00
Semen warna Kg 1.6200 3,000.00 4,860.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 28,160.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 52,965.00
E Overhead & Profit 10% x D 10% 5,296.50
F Harga Satuan Pekerjaan (D+E) 58,261.50

A.4.4.3.7 Pemasangan 1m2 lantai ubin teraso ukuran 40cm x40cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2500 55,000.00 13,750.00
Tukang Batu L.0.02 OH 0.1250 60,000.00 7,500.00
Kepala tukang L.0.03 OH 0.0130 65,000.00 845.00
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 22,972.50
B BAHAN
Ubin teraso Bh 6.6300 -
Semen portland Kg 9.8000 1,375.00 13,475.00
Semen warna Kg 1.3000 3,000.00 3,900.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 26,375.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 49,347.50
E Overhead & Profit 10% x D 10% 4,934.75
F Harga Satuan Pekerjaan (D+E) 54,282.25

A.4.4.3.8. Pemasangan 1m2 lantai ubin teraso ukuran 30cm x30cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2600 55,000.00 14,300.00
Tukang Batu L.0.02 OH 0.1300 60,000.00 7,800.00
Kepala tukang L.0.03 OH 0.0130 65,000.00 845.00
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 23,822.50
B BAHAN
Ubin teraso Bh 11.8700 -
Semen portland Kg 10.0000 1,375.00 13,750.00
Semen warna Kg 1.5000 3,000.00 4,500.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 27,250.00
C PERALATAN
JUMLAH HARGA ALAT

Hal 89/229
D Jumlah (A+B+C) 51,072.50
E Overhead & Profit 10% x D 10% 5,107.25
F Harga Satuan Pekerjaan (D+E) 56,179.75

A.4.4.3.9.Pemasangan 1m2 lantai ubin granit ukuran 40cm x40cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2500 55,000.00 13,750.00
Tukang Batu L.0.02 OH 0.1250 60,000.00 7,500.00
Kepala tukang L.0.03 OH 0.0130 65,000.00 845.00
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 22,972.50
B BAHAN
Ubin granit Bh 6.6300 31,666.67 209,950.00
Semen portland Kg 9.8000 1,375.00 13,475.00
Semen warna Kg 1.3000 3,000.00 3,900.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 236,325.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 259,297.50
E Overhead & Profit 10% x D 10% 25,929.75
F Harga Satuan Pekerjaan (D+E) 285,227.25

A.4.4.3.10.Pemasangan 1m2 lantai ubin granit ukuran 30cm x30cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2600 55,000.00 14,300.00
Tukang Batu L.0.02 OH 0.1300 60,000.00 7,800.00
Kepala tukang L.0.03 OH 0.0130 65,000.00 845.00
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 23,822.50
B BAHAN
Ubin granit Bh 11.8700 -
Semen portland Kg 10.0000 1,375.00 13,750.00
Semen warna Kg 1.5000 3,000.00 4,500.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 27,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 51,072.50
E Overhead & Profit 10% x D 10% 5,107.25
F Harga Satuan Pekerjaan (D+E) 56,179.75

A.4.4.3.9A.Pemasangan 1m2 lantai granit " PLATINUM "ukuran 40cm x40cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2500 55,000.00 13,750.00
Tukang Batu L.0.02 OH 0.1250 60,000.00 7,500.00
Kepala tukang L.0.03 OH 0.0130 65,000.00 845.00
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 22,972.50
B BAHAN
Ubin granit Bh 6.6300 -
Semen portland Kg 9.8000 1,375.00 13,475.00
Semen warna Kg 1.3000 3,000.00 3,900.00
Pasir pasang M3 0.0450 200,000.00 9,000.00

Hal 90/229
JUMLAH HARGA BAHAN 26,375.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 49,347.50
E Overhead & Profit 10% x D 10% 4,934.75
F Harga Satuan Pekerjaan (D+E) 54,282.25

A.4.4.3.10A.Pemasangan 1m2 lantai ubin granit ukuran 30cm x30cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2600 - -
Tukang Batu L.0.02 OH 0.1300 60,000.00 7,800.00
Kepala tukang L.0.03 OH 0.0130 65,000.00 845.00
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 9,522.50
B BAHAN
Ubin granit Bh 11.8700 -
Semen portland Kg 10.0000 1,375.00 13,750.00
Semen warna Kg 1.5000 3,000.00 4,500.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 27,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 36,772.50
E Overhead & Profit 10% x D 10% 3,677.25
F Harga Satuan Pekerjaan (D+E) 40,449.75

A.4.4.3.11.Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2500 55,000.00 13,750.00
Tukang Batu L.0.02 OH 0.1250 60,000.00 7,500.00
Kepala tukang L.0.03 OH 0.0130 65,000.00 845.00
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 22,972.50
B BAHAN
Ubin teralux Bh 6.6300 -
Semen portland Kg 9.8000 1,375.00 13,475.00
Semen warna Kg 1.3000 3,000.00 3,900.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 26,375.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 49,347.50
E Overhead & Profit 10% x D 10% 4,934.75
F Harga Satuan Pekerjaan (D+E) 54,282.25

A.4.4.3.12.Pemasangan 1m2 lantai ubin teralux ukuran 30cm x30cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2600 55,000.00 14,300.00
Tukang Batu L.0.02 OH 0.1300 60,000.00 7,800.00
Kepala tukang L.0.03 OH 0.0130 65,000.00 845.00
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 23,822.50
B BAHAN
Ubin teralux Bh 11.8700 -

Hal 91/229
Semen portland Kg 10.0000 1,375.00 13,750.00
Semen warna Kg 1.5000 3,000.00 4,500.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 27,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 51,072.50
E Overhead & Profit 10% x D 10% 5,107.25
F Harga Satuan Pekerjaan (D+E) 56,179.75

A.4.4.3.13.Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2400 55,000.00 13,200.00
Tukang Batu L.0.02 OH 0.1200 60,000.00 7,200.00
Kepala tukang L.0.03 OH 0.0120 65,000.00 780.00
Mandor L.0.04 OH 0.0120 67,500.00 810.00
JUMLAH TENAGA KERJA 21,990.00
B BAHAN
Ubin teralux marmer Bh 3.1000 -
Semen portland Kg 9.6000 1,375.00 13,200.00
Semen warna Kg 1.5000 3,000.00 4,500.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 26,700.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 48,690.00
E Overhead & Profit 10% x D 10% 4,869.00
F Harga Satuan Pekerjaan (D+E) 53,559.00

A.4.4.3.14.Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2500 55,000.00 13,750.00
Tukang Batu L.0.02 OH 0.1250 60,000.00 7,500.00
Kepala tukang L.0.03 OH 0.0130 65,000.00 845.00
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 22,972.50
B BAHAN
Ubin teralux marmer Bh 6.6300 -
Semen portland Kg 9.8000 1,375.00 13,475.00
Semen warna Kg 1.3000 3,000.00 3,900.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 26,375.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 49,347.50
E Overhead & Profit 10% x D 10% 4,934.75
F Harga Satuan Pekerjaan (D+E) 54,282.25

A.4.4.3.15.Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2600 55,000.00 14,300.00
Tukang Batu L.0.02 OH 0.1300 60,000.00 7,800.00
Kepala tukang L.0.03 OH 0.0130 65,000.00 845.00
Mandor L.0.04 OH 0.0130 67,500.00 877.50

Hal 92/229
JUMLAH TENAGA KERJA 23,822.50
B BAHAN
Ubin teralux marmer Bh 11.8700 -
Semen portland Kg 10.0000 1,375.00 13,750.00
Semen warna Kg 1.5000 3,000.00 4,500.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 27,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 51,072.50
E Overhead & Profit 10% x D 10% 5,107.25
F Harga Satuan Pekerjaan (D+E) 56,179.75

A.4.4.3.16.Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 15cm x 20cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0900 55,000.00 4,950.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 11,272.50
B BAHAN
Plint ubin PC Bh 5.3000 -
Semen portland Kg 1.6500 1,375.00 2,268.75
Pasir pasang M3 0.0040 200,000.00 800.00
JUMLAH HARGA BAHAN 3,068.75
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 14,341.25
E Overhead & Profit 10% x D 10% 1,434.13
F Harga Satuan Pekerjaan (D+E) 15,775.38

A.4.4.3.17.Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 30cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.0900 55,000.00 4,950.00
H
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 11,272.50
B BAHAN
B
Plint ubin PC 3.5300 -
h
Semen portland Kg 1.2400 1,375.00 1,705.00
m
Pasir pasang 0.0030 200,000.00 600.00
3
JUMLAH HARGA BAHAN 2,305.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,577.50
E Overhead & Profit 10% x D 10% 1,357.75
F Harga Satuan Pekerjaan (D+E) 14,935.25

A.4.4.3.18.Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.0900 55,000.00 4,950.00
H
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00

Hal 93/229
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 11,272.50
B BAHAN
B
Plint ubin PC 2.6500 -
h
Semen portland Kg 1.2400 1,375.00 1,705.00
m
Pasir pasang 0.0030 200,000.00 600.00
3
JUMLAH HARGA BAHAN 2,305.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,577.50
E Overhead & Profit 10% x D 10% 1,357.75
F Harga Satuan Pekerjaan (D+E) 14,935.25

A.4.4.3.19.Pemasangan 1 m’ plint ubin warna ukuran 10cm x 20cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0900 55,000.00 4,950.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 11,272.50
B BAHAN
Plint ubin warna Bh 2.6500 -
Semen portland Kg 1.1400 1,375.00 1,567.50
Semen warna Kg 0.1000 3,000.00 300.00
Pasir pasang M3 0.0030 200,000.00 600.00
JUMLAH HARGA BAHAN 2,467.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,740.00
E Overhead & Profit 10% x D 10% 1,374.00
F Harga Satuan Pekerjaan (D+E) 15,114.00

A.4.4.3.20.Pemasangan 1 m’ plint ubin warna ukuran 10cm x 30cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0900 55,000.00 4,950.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 11,272.50
B BAHAN
Plint ubin warna Bh 3.5300 -
Semen portland Kg 1.1400 1,375.00 1,567.50
Semen warna Kg 0.1000 3,000.00 300.00
Pasir pasang M3 0.0030 200,000.00 600.00
JUMLAH HARGA BAHAN 2,467.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,740.00
E Overhead & Profit 10% x D 10% 1,374.00
F Harga Satuan Pekerjaan (D+E) 15,114.00

A.4.4.3.21.Pemasangan 1 m’ plint ubin warna ukuran 10cm x 40cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0900 55,000.00 4,950.00

Hal 94/229
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 11,272.50
B BAHAN
Plint ubin warna Bh 2.6500 -
Semen portland Kg 1.1400 1,375.00 1,567.50
Semen warna Kg 0.1000 3,000.00 300.00
Pasir pasang M3 0.0030 200,000.00 600.00
JUMLAH HARGA BAHAN 2,467.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,740.00
E Overhead & Profit 10% x D 10% 1,374.00
F Harga Satuan Pekerjaan (D+E) 15,114.00

A.4.4.3.22.Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 30cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0900 55,000.00 4,950.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 11,272.50
B BAHAN
Plint ubin teraso Bh 3.5300 -
Semen portland Kg 1.1400 1,375.00 1,567.50
Semen warna Kg 0.1000 3,000.00 300.00
Pasir pasang M3 0.0030 200,000.00 600.00
JUMLAH HARGA BAHAN 2,467.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,740.00
E Overhead & Profit 10% x D 10% 1,374.00
F Harga Satuan Pekerjaan (D+E) 15,114.00

A.4.4.3.23.Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 40cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0900 55,000.00 4,950.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 11,272.50
B BAHAN
Plint ubin teraso Bh 2.6500 -
Semen portland Kg 1.1400 1,375.00 1,567.50
Semen warna Kg 0.1000 3,000.00 300.00
Pasir pasang M3 0.0030 200,000.00 600.00
JUMLAH HARGA BAHAN 2,467.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,740.00
E Overhead & Profit 10% x D 10% 1,374.00
F Harga Satuan Pekerjaan (D+E) 15,114.00

A.4.4.3.24.Pemasangan 1 m’ plint ubin granit ukuran 10cm x 40cm

Hal 95/229
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0900 55,000.00 4,950.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 11,272.50
B BAHAN
Plint ubin granit Bh 2.6500 -
Semen portland Kg 1.1400 1,375.00 1,567.50
Semen warna Kg 0.1000 3,000.00 300.00
Pasir pasang M3 0.0030 200,000.00 600.00
JUMLAH HARGA BAHAN 2,467.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,740.00
E Overhead & Profit 10% x D 10% 1,374.00
F Harga Satuan Pekerjaan (D+E) 15,114.00

A.4.4.3.25.Pemasangan 1 m’ plint ubin granit ukuran 10cm x 30cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0900 55,000.00 4,950.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 11,272.50
B BAHAN
Plint ubin granit Bh 3.5300 -
Semen portland Kg 1.1400 1,375.00 1,567.50
Semen warna Kg 0.1000 3,000.00 300.00
Pasir pasang M3 0.0030 200,000.00 600.00
JUMLAH HARGA BAHAN 2,467.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,740.00
E Overhead & Profit 10% x D 10% 1,374.00
F Harga Satuan Pekerjaan (D+E) 15,114.00

A.4.4.3.26.Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0900 55,000.00 4,950.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 11,272.50
B BAHAN
Plint teralux kerang Bh 2.6300 -
Semen portland Kg 1.1400 1,375.00 1,567.50
Semen warna Kg 0.1000 3,000.00 300.00
Pasir pasang M3 0.0030 200,000.00 600.00
JUMLAH HARGA BAHAN 2,467.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,740.00
E Overhead & Profit 10% x D 10% 1,374.00

Hal 96/229
F Harga Satuan Pekerjaan (D+E) 15,114.00

A.4.4.3.27.Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 30cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0900 55,000.00 4,950.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 11,272.50
B BAHAN
Plint teralux kerang Bh 3.5300 -
Semen portland Kg 1.1400 1,375.00 1,567.50
Semen warna Kg 0.1000 3,000.00 300.00
Pasir pasang M3 0.0030 200,000.00 600.00
JUMLAH HARGA BAHAN 2,467.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,740.00
E Overhead & Profit 10% x D 10% 1,374.00
F Harga Satuan Pekerjaan (D+E) 15,114.00

A.4.4.3.28.Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 60cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0900 55,000.00 4,950.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 11,272.50
B BAHAN
Plint teralux marmer Bh 1.7000 -
Semen portland Kg 1.1400 1,375.00 1,567.50
Semen warna Kg 0.1000 3,000.00 300.00
Pasir pasang M3 0.0030 200,000.00 600.00
JUMLAH HARGA BAHAN 2,467.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,740.00
E Overhead & Profit 10% x D 10% 1,374.00
F Harga Satuan Pekerjaan (D+E) 15,114.00

A.4.4.3.29.Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 40cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0900 55,000.00 4,950.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 11,272.50
B BAHAN
Plint teralux marmer Bh 2.6500 -
Semen portland Kg 1.1400 1,375.00 1,567.50
Semen warna Kg 0.1000 3,000.00 300.00
Pasir pasang M3 0.0030 200,000.00 600.00
JUMLAH HARGA BAHAN 2,467.50
C PERALATAN

Hal 97/229
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,740.00
E Overhead & Profit 10% x D 10% 1,374.00
F Harga Satuan Pekerjaan (D+E) 15,114.00

A.4.4.3.30.Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0900 55,000.00 4,950.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 11,272.50
B BAHAN
Plint teralux marmer Bh 3.5300 -
Semen portland Kg 1.1400 1,375.00 1,567.50
Semen warna Kg 0.1000 3,000.00 300.00
Pasir pasang M3 0.0030 200,000.00 600.00
JUMLAH HARGA BAHAN 2,467.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,740.00
E Overhead & Profit 10% x D 10% 1,374.00
F Harga Satuan Pekerjaan (D+E) 15,114.00

A.4.4.3.31.Pemasangan 1m2 lantai teraso cor di tempat, tebal 3cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3600 55,000.00 19,800.00
Tukang Batu L.0.02 OH 0.1800 60,000.00 10,800.00
Kepala tukang L.0.03 OH 0.0180 65,000.00 1,170.00
Mandor L.0.04 OH 0.0180 67,500.00 1,215.00
JUMLAH TENAGA KERJA 32,985.00
B BAHAN
Teraso cor M3 0.0360 -
Semen warna Kg 0.1000 3,000.00 300.00
JUMLAH HARGA BAHAN 300.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 33,285.00
E Overhead & Profit 10% x D 10% 3,328.50
F Harga Satuan Pekerjaan (D+E) 36,613.50

A.4.4.3.32.Pemasangan 1m2 lantai keramik artistik 10cm x 20cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.7000 55,000.00 38,500.00
H
Tukang Batu L.0.02 OH 0.3500 60,000.00 21,000.00
Kepala tukang L.0.03 OH 0.0350 65,000.00 2,275.00
O
Mandor L.0.04 0.0350 67,500.00 2,362.50
H
JUMLAH TENAGA KERJA 64,137.50
B BAHAN
B
Ubin keramik 53.0000 -
h
Semen portland Kg 8.1900 1,375.00 11,261.25
m
Pasir pasang 0.0450 200,000.00 9,000.00
K3
Semen warna 2.7500 3,000.00 8,250.00
g
JUMLAH HARGA BAHAN 28,511.25

Hal 98/229
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 92,648.75
E Overhead & Profit 10% x D 10% 9,264.88
F Harga Satuan Pekerjaan (D+E) 101,913.63

A.4.4.3.33.Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.7000 55,000.00 38,500.00
H
Tukang Batu L.0.02 OH 0.3500 60,000.00 21,000.00
Kepala tukang L.0.03 OH 0.0300 65,000.00 1,950.00
Mandor L.0.04 OH 0.0350 67,500.00 2,362.50
JUMLAH TENAGA KERJA 63,812.50
B BAHAN
B
Ubin keramik 106.0000 -
h
Semen portland Kg 8.1900 1,375.00 11,261.25
m
Pasir pasang 0.0450 200,000.00 9,000.00
K3
Semen warna 3.2000 3,000.00 9,600.00
g
JUMLAH HARGA BAHAN 29,861.25
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 93,673.75
E Overhead & Profit 10% x D 10% 9,367.38
F Harga Satuan Pekerjaan (D+E) 103,041.13

A.4.4.3.34.Pemasangan 1m2 lantai keramik ukuran 33cm x 33cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7000 55,000.00 38,500.00
Tukang Batu L.0.02 OH 0.3500 60,000.00 21,000.00
Kepala tukang L.0.03 OH 0.0300 65,000.00 1,950.00
Mandor L.0.04 OH 0.0350 67,500.00 2,362.50
JUMLAH TENAGA KERJA 63,812.50
B BAHAN
Ubin keramik Bh 10.0000 -
Semen portland Kg 8.1900 1,375.00 11,261.25
Pasir pasang M3 0.0450 200,000.00 9,000.00
Semen warna Kg 1.6200 3,000.00 4,860.00
JUMLAH HARGA BAHAN 25,121.25
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 88,933.75
E Overhead & Profit 10% x D 10% 8,893.38
F Harga Satuan Pekerjaan (D+E) 97,827.13

A.4.4.3.34A.Pemasangan 1m2 lantai keramik ukuran 60cm x 60cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7000 55,000.00 38,500.00
Tukang Batu L.0.02 OH 0.3500 60,000.00 21,000.00
Kepala tukang L.0.03 OH 0.0300 65,000.00 1,950.00
Mandor L.0.04 OH 0.0350 67,500.00 2,362.50
JUMLAH TENAGA KERJA 63,812.50
B BAHAN
Ubin keramik Bh 3.1000 -
Semen portland Kg 9.6000 1,375.00 13,200.00

Hal 99/229
Pasir pasang M3 0.0500 200,000.00 10,000.00
Semen warna Kg 1.50 3,000.00 4,500.00
JUMLAH HARGA BAHAN 27,700.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 91,512.50
E Overhead & Profit 10% x D 10% 9,151.25
F Harga Satuan Pekerjaan (D+E) 100,663.75

A.4.4.3.34B.Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7000 55,000.00 38,500.00
Tukang Batu L.0.02 OH 0.3500 60,000.00 21,000.00
Kepala tukang L.0.03 OH 0.0300 65,000.00 1,950.00
Mandor L.0.04 OH 0.0350 67,500.00 2,362.50
JUMLAH TENAGA KERJA 63,812.50
B BAHAN
Ubin keramik Bh 6.6300 8,666.67 57,460.00
Semen portland Kg 9.8000 1,375.00 13,475.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
Semen warna Kg 1.3000 3,000.00 3,900.00
JUMLAH HARGA BAHAN 83,835.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 147,647.50
E Overhead & Profit 10% x D 10% 14,764.75
F Harga Satuan Pekerjaan (D+E) 162,412.25

A.4.4.3.35.Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7000 55,000.00 38,500.00
Tukang Batu L.0.02 OH 0.3500 60,000.00 21,000.00
Kepala tukang L.0.03 OH 0.0300 65,000.00 1,950.00
Mandor L.0.04 OH 0.0350 67,500.00 2,362.50
JUMLAH TENAGA KERJA 63,812.50
B BAHAN
Ubin keramik Bh 11.8700 4,545.45 53,954.55
Semen portland Kg 10.0000 1,375.00 13,750.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
Semen warna Kg 1.5000 3,000.00 4,500.00
JUMLAH HARGA BAHAN 81,204.55
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 145,017.05
E Overhead & Profit 10% x D 10% 14,501.70
F Harga Satuan Pekerjaan (D+E) 159,518.75

A.4.4.3.35.Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7000 55,000.00 38,500.00
Tukang Batu L.0.02 OH 0.3500 60,000.00 21,000.00
Kepala tukang L.0.03 OH 0.0300 65,000.00 1,950.00
Mandor L.0.04 OH 0.0350 67,500.00 2,362.50
JUMLAH TENAGA KERJA 63,812.50

Hal 100/229
B BAHAN
Ubin keramik Bh 6.2500 8,666.67 54,166.67
Semen portland Kg 10.0000 1,375.00 13,750.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
Semen warna Kg 1.5000 3,000.00 4,500.00
JUMLAH HARGA BAHAN 81,416.67
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 145,229.17
E Overhead & Profit 10% x D 10% 14,522.92
F Harga Satuan Pekerjaan (D+E) 159,752.08
A.4.4.3.36.Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7000 55,000.00 38,500.00
Tukang Batu L.0.02 OH 0.3500 60,000.00 21,000.00
Kepala tukang L.0.03 OH 0.0350 65,000.00 2,275.00
Mandor L.0.04 OH 0.0350 67,500.00 2,362.50
JUMLAH TENAGA KERJA 64,137.50
B BAHAN
Ubin keramik Bh 26.5000 1,886.79 50,000.00
Semen portland Kg 10.4000 1,375.00 14,300.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
Semen warna Kg 1.6200 3,000.00 4,860.00
JUMLAH HARGA BAHAN 78,160.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 142,297.50
E Overhead & Profit 10% x D 10% 14,229.75
F Harga Satuan Pekerjaan (D+E) 156,527.25

A.4.4.3.37.Pemasangan 1m2 lantai keramik ukuran 10cm x 33cm untuk variasi/border


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.0500 55,000.00 57,750.00
Tukang Batu L.0.02 OH 0.5250 60,000.00 31,500.00
Kepala tukang L.0.03 OH 0.0530 65,000.00 3,445.00
Mandor L.0.04 OH 0.0530 67,500.00 3,577.50
JUMLAH TENAGA KERJA 96,272.50
B BAHAN
Ubin keramik Bh 33.0000 -
Semen portland Kg 9.8000 1,375.00 13,475.00
Pasir pasang M3 0.0450 200,000.00 9,000.00
Semen warna Kg 4.3700 3,000.00 13,110.00
JUMLAH HARGA BAHAN 35,585.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 131,857.50
E Overhead & Profit 10% x D 10% 13,185.75
F Harga Satuan Pekerjaan (D+E) 145,043.25

A.4.4.3.38.Pemasangan 1m2 lantai keramik mozaik ukuran 30cm x 30cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7000 55,000.00 38,500.00
Tukang Batu L.0.02 OH 0.3500 60,000.00 21,000.00
Kepala tukang L.0.03 OH 0.0300 65,000.00 1,950.00

Hal 101/229
Mandor L.0.04 OH 0.0350 67,500.00 2,362.50
JUMLAH TENAGA KERJA 63,812.50
B BAHAN
Ubin keramik Bh 11.8700 -
Semen portland Kg 14.1500 1,375.00 19,456.25
Pasir pasang M3 0.0390 200,000.00 7,800.00
Semen warna Kg 2.0000 3,000.00 6,000.00
JUMLAH HARGA BAHAN 33,256.25
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 97,068.75
E Overhead & Profit 10% x D 10% 9,706.88
F Harga Satuan Pekerjaan (D+E) 106,775.63

A.4.4.3.39.Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0900 55,000.00 4,950.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0350 65,000.00 2,275.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 12,962.50
B BAHAN
Plint keramik Bh 5.3000 -
Semen portland Kg 1.1400 1,375.00 1,567.50
Pasir pasang M3 0.0030 200,000.00 600.00
Semen warna Kg 0.0250 3,000.00 75.00
JUMLAH HARGA BAHAN 2,242.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 15,205.00
E Overhead & Profit 10% x D 10% 1,520.50
F Harga Satuan Pekerjaan (D+E) 16,725.50

A.4.4.3.40.Pemasangan 1 m’ plint keramik ukuran 10cm x 10cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0900 55,000.00 4,950.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0350 65,000.00 2,275.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 12,962.50
B BAHAN
Plint keramik Bh 10.6000 -
Semen portland Kg 1.1400 1,375.00 1,567.50
Pasir pasang M3 0.0030 200,000.00 600.00
Semen warna Kg 0.0500 3,000.00 150.00
JUMLAH HARGA BAHAN 2,317.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 15,280.00
E Overhead & Profit 10% x D 10% 1,528.00
F Harga Satuan Pekerjaan (D+E) 16,808.00

A.4.4.3.41.Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA

Hal 102/229
Pekerja L.0.01 OH 0.0900 55,000.00 4,950.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0350 65,000.00 2,275.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 12,962.50
B BAHAN
Plint keramik Bh 5.3000 -
Semen portland Kg 0.5700 1,375.00 783.75
Pasir pasang M3 0.0015 200,000.00 300.00
Semen warna Kg 0.0130 3,000.00 39.00
JUMLAH HARGA BAHAN 1,122.75
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 14,085.25
E Overhead & Profit 10% x D 10% 1,408.53
F Harga Satuan Pekerjaan (D+E) 15,493.78

A.4.4.3.42.Pemasangan 1 m’ plint internal cove artistik 5cm x 5cm x 20cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7500 55,000.00 41,250.00
Tukang Batu L.0.02 OH 0.7500 60,000.00 45,000.00
Kepala tukang L.0.03 OH 0.0750 65,000.00 4,875.00
Mandor L.0.04 OH 0.0380 67,500.00 2,565.00
JUMLAH TENAGA KERJA 93,690.00
B BAHAN
Internal cove Bh 5.3000 -
Semen portland Kg 1.1400 1,375.00 1,567.50
Pasir pasang M3 0.0030 200,000.00 600.00
Semen warna Kg 0.1000 3,000.00 300.00
JUMLAH HARGA BAHAN 2,467.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 96,157.50
E Overhead & Profit 10% x D 10% 9,615.75
F Harga Satuan Pekerjaan (D+E) 105,773.25

A.4.4.3.43.Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7000 55,000.00 38,500.00
Tukang Batu L.0.02 OH 0.3500 60,000.00 21,000.00
Kepala tukang L.0.03 OH 0.0350 65,000.00 2,275.00
Mandor L.0.04 OH 0.0350 67,500.00 2,362.50
JUMLAH TENAGA KERJA 64,137.50
B BAHAN
Marmer Bh 1.0600 500,000.00 530,000.00
Semen portland Kg 8.1900 1,375.00 11,261.25
Pasir pasang M3 0.0450 200,000.00 9,000.00
Semen warna Kg 0.6500 3,000.00 1,950.00
JUMLAH HARGA BAHAN 552,211.25
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 616,348.75
E Overhead & Profit 10% x D 10% 61,634.88
F Harga Satuan Pekerjaan (D+E) 677,983.63

Hal 103/229
A.4.4.3.44.Pemasangan 1 m2 lantai karpet
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.1700 55,000.00 9,350.00
H
Tukang Kayu L.0.02 OH 0.1700 62,500.00 10,625.00
Kepala tukang L.0.03 OH 0.0170 65,000.00 1,105.00
Mandor L.0.04 OH 0.0090 67,500.00 607.50
JUMLAH TENAGA KERJA 21,687.50
B BAHAN
Karpet m2 1.0500 -
K
Lem 0.3500 -
g
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 21,687.50
E Overhead & Profit 10% x D 10% 2,168.75
F Harga Satuan Pekerjaan (D+E) 23,856.25

A.4.4.3.45.Pemasangan 1 m2 underlayer (pelapis bawah karpet)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.1200 55,000.00 6,600.00
H
Tukang Kayu L.0.02 OH 0.1200 62,500.00 7,500.00
Kepala tukang L.0.03 OH 0.0120 65,000.00 780.00
Mandor L.0.04 OH 0.0060 67,500.00 405.00
JUMLAH TENAGA KERJA 15,285.00
B BAHAN
Underlayer m2 1.0500 -
K
Lem 0.3500 -
g
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 15,285.00
E Overhead & Profit 10% x D 10% 1,528.50
F Harga Satuan Pekerjaan (D+E) 16,813.50

A.4.4.3.46.Pemasangan 1 m2 lantai parquet kayu


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.7000 55,000.00 38,500.00
H
Tukang Kayu L.0.02 OH 0.3500 62,500.00 21,875.00
Kepala tukang L.0.03 OH 0.0350 65,000.00 2,275.00
Mandor L.0.04 OH 0.0350 67,500.00 2,362.50
JUMLAH TENAGA KERJA 65,012.50
B BAHAN
Parquet m2 1.0500 -
K
Lem 0.6000 -
g
JUMLAH HARGA BAHAN -
C PERALATAN
D Jumlah (A+B+C) 65,012.50
E Overhead & Profit 10% x D 10% 6,501.25
F Harga Satuan Pekerjaan (D+E) 71,513.75

A.4.4.3.47.Pemasangan 1 m2 lantai kayu gymfloor


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.7000 55,000.00 38,500.00
H
Hal 104/229
Tukang Kayu L.0.02 OH 0.3500 62,500.00 21,875.00
Kepala tukang L.0.03 OH 0.0350 65,000.00 2,275.00
Mandor L.0.04 OH 0.0350 67,500.00 2,362.50
JUMLAH TENAGA KERJA 65,012.50
B BAHAN
Parquet m2 1.0500 -
K
Lem 0.6000 -
g
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 65,012.50
E Overhead & Profit 10% x D 10% 6,501.25
F Harga Satuan Pekerjaan (D+E) 71,513.75

A.4.4.3.48.Pemasangan 1 m2 dinding porslen 11cm x 11cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.0000 55,000.00 55,000.00
Tukang Batu L.0.02 OH 0.5000 60,000.00 30,000.00
Kepala tukang L.0.03 OH 0.0500 65,000.00 3,250.00
Mandor L.0.04 OH 0.0500 67,500.00 3,375.00
JUMLAH TENAGA KERJA 91,625.00
B BAHAN
Porslen Bh 86.0000 -
Semen portland Kg 9.3000 1,375.00 12,787.50
Pasir pasang M3 0.0180 200,000.00 3,600.00
Semen warna Kg 1.5000 3,000.00 4,500.00
JUMLAH HARGA BAHAN 20,887.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 112,512.50
E Overhead & Profit 10% x D 10% 11,251.25
F Harga Satuan Pekerjaan (D+E) 123,763.75

A.4.4.3.49.Pemasangan 1 m2 dinding porslen 10cm x 20cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9000 55,000.00 49,500.00
Tukang Batu L.0.02 OH 0.4500 60,000.00 27,000.00
Kepala tukang L.0.03 OH 0.0450 65,000.00 2,925.00
Mandor L.0.04 OH 0.0450 67,500.00 3,037.50
JUMLAH TENAGA KERJA 82,462.50
B BAHAN
Porslen Bh 53.0000 -
Semen portland Kg 9.3000 1,375.00 12,787.50
Pasir Pasang M3 0.0180 200,000.00 3,600.00
Semen warna Kg 2.7500 3,000.00 8,250.00
JUMLAH HARGA BAHAN 24,637.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 107,100.00
E Overhead & Profit 10% x D 10% 10,710.00
F Harga Satuan Pekerjaan (D+E) 117,810.00

A.4.4.3.50.Pemasangan 1 m2 dinding porslen 20cm x 20cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA

Hal 105/229
Pekerja L.0.01 OH 0.9000 55,000.00 49,500.00
Tukang Batu L.0.02 OH 0.4500 60,000.00 27,000.00
Kepala tukang L.0.03 OH 0.0450 65,000.00 2,925.00
Mandor L.0.04 OH 0.0450 67,500.00 3,037.50
JUMLAH TENAGA KERJA 82,462.50
B BAHAN
Porslen Bh 26.0000 -
Semen portland Kg 9.3000 1,375.00 12,787.50
Pasir Pasang M3 0.0180 200,000.00 3,600.00
Semen warna Kg 1.9400 13,000.00 25,220.00
JUMLAH HARGA BAHAN 41,607.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 124,070.00
E Overhead & Profit 10% x D 0.10 12,407.00
F Harga Satuan Pekerjaan (D+E) 136,477.00

A.4.4.3.51.Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9000 55,000.00 49,500.00
Tukang Batu L.0.02 OH 0.4500 60,000.00 27,000.00
Kepala tukang L.0.03 OH 0.0450 65,000.00 2,925.00
Mandor L.0.04 OH 0.0450 67,500.00 3,037.50
JUMLAH TENAGA KERJA 82,462.50
B BAHAN
Keramik artistik Bh 53.0000 -
Semen portland Kg 9.3000 1,375.00 12,787.50
Pasir Pasang M3 0.0180 200,000.00 3,600.00
Semen warna Kg 2.7500 13,000.00 35,750.00
JUMLAH HARGA BAHAN 52,137.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 134,600.00
E Overhead & Profit 10% x D 0.10 13,460.00
F Harga Satuan Pekerjaan (D+E) 148,060.00

A.4.4.3.52.Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9000 55,000.00 49,500.00
Tukang Batu L.0.02 OH 0.4500 60,000.00 27,000.00
Kepala tukang L.0.03 OH 0.0450 65,000.00 2,925.00
Mandor L.0.04 OH 0.0450 67,500.00 3,037.50
JUMLAH TENAGA KERJA 82,462.50
B BAHAN
Keramik artistik Bh 106.0000 -
Semen portland Kg 9.3000 1,375.00 12,787.50
Pasir Pasang M3 0.0180 200,000.00 3,600.00
Semen warna Kg 2.9000 13,000.00 37,700.00
JUMLAH HARGA BAHAN 54,087.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 136,550.00
E Overhead & Profit 10% x D 0.10 13,655.00
F Harga Satuan Pekerjaan (D+E) 150,205.00

Hal 106/229
A.4.4.3.53.Pemasangan 1 m2 dinding keramik 10cm x 20cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9000 55,000.00 49,500.00
Tukang Batu L.0.02 OH 0.4500 60,000.00 27,000.00
Kepala tukang L.0.03 OH 0.0450 65,000.00 2,925.00
Mandor L.0.04 OH 0.0450 67,500.00 3,037.50
JUMLAH TENAGA KERJA 82,462.50
B BAHAN
Keramik artistik Bh 53.0000 -
Semen portland Kg 9.3000 1,375.00 12,787.50
Pasir Pasang M3 0.0180 200,000.00 3,600.00
Semen warna Kg 2.7500 13,000.00 35,750.00
JUMLAH HARGA BAHAN 52,137.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 134,600.00
E Overhead & Profit 10% x D 0.10 13,460.00
F Harga Satuan Pekerjaan (D+E) 148,060.00

A.4.4.3.54A.Pemasangan 1 m2 dinding keramik 20cm x 25cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9000 55,000.00 49,500.00
Tukang Batu L.0.02 OH 0.4500 60,000.00 27,000.00
Kepala tukang L.0.03 OH 0.0450 65,000.00 2,925.00
Mandor L.0.04 OH 0.0450 67,500.00 3,037.50
JUMLAH TENAGA KERJA 82,462.50
B BAHAN
Keramik artistik Bh 25.0000 2,080.00 52,000.00
Semen portland Kg 9.3000 1,375.00 12,787.50
Pasir Pasang M3 0.0180 200,000.00 3,600.00
Semen warna Kg 1.9400 13,000.00 25,220.00
JUMLAH HARGA BAHAN 93,607.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 176,070.00
E Overhead & Profit 10% x D 0.10 17,607.00
F Harga Satuan Pekerjaan (D+E) 193,677.00

A.4.4.3.54.Pemasangan 1 m2 dinding keramik 20cm x 20cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9000 55,000.00 49,500.00
Tukang Batu L.0.02 OH 0.4500 60,000.00 27,000.00
Kepala tukang L.0.03 OH 0.0450 65,000.00 2,925.00
Mandor L.0.04 OH 0.0450 67,500.00 3,037.50
JUMLAH TENAGA KERJA 82,462.50
B BAHAN
Keramik artistik Bh 26.5000 2,000.00 53,000.00
Semen portland Kg 9.3000 1,375.00 12,787.50
Pasir Pasang M3 0.0180 200,000.00 3,600.00
Semen warna Kg 1.9400 13,000.00 25,220.00
JUMLAH HARGA BAHAN 94,607.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 177,070.00

Hal 107/229
E Overhead & Profit 10% x D 0.10 17,707.00
F Harga Satuan Pekerjaan (D+E) 194,777.00

A.4.4.3.55.Pemasangan 1 m2 dinding marmer 100cm x 100cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.3000 55,000.00 71,500.00
Tukang Batu L.0.02 OH 0.6500 60,000.00 39,000.00
Kepala tukang L.0.03 OH 0.0650 65,000.00 4,225.00
Mandor L.0.04 OH 0.0650 67,500.00 4,387.50
JUMLAH TENAGA KERJA 119,112.50
B BAHAN
Marmer Bh 1.0600 -
Semen portland Kg 12.4400 1,375.00 17,105.00
Pasir Pasang M3 0.0250 200,000.00 5,000.00
Semen warna Kg 0.6500 13,000.00 8,450.00
Paku 12cm Bh 3.0300 -
JUMLAH HARGA BAHAN 30,555.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 149,667.50
E Overhead & Profit 10% x D 0.10 14,966.75
F Harga Satuan Pekerjaan (D+E) 164,634.25

A.4.4.3.56.Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.0000 55,000.00 55,000.00
Tukang Batu L.0.02 OH 0.5000 60,000.00 30,000.00
Kepala tukang L.0.03 OH 0.0500 65,000.00 3,250.00
Mandor L.0.04 OH 0.0500 67,500.00 3,375.00
JUMLAH TENAGA KERJA 91,625.00
B BAHAN
Bata pelapis Bh 63.0000 -
Semen portland Kg 12.4400 1,375.00 17,105.00
Pasir Pasang M3 0.0250 200,000.00 5,000.00
Semen warna Kg 2.7500 13,000.00 35,750.00
JUMLAH HARGA BAHAN 57,855.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 149,480.00
E Overhead & Profit 10% x D 0.10 14,948.00
F Harga Satuan Pekerjaan (D+E) 164,428.00

A.4.4.3.57.Pemasangan 1 m2 dinding batu paras


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7000 55,000.00 38,500.00
Tukang Batu L.0.02 OH 0.3500 60,000.00 21,000.00
Kepala tukang L.0.03 OH 0.0350 65,000.00 2,275.00
Mandor L.0.04 OH 0.0350 67,500.00 2,362.50
JUMLAH TENAGA KERJA 64,137.50
B BAHAN
Batu paras Bh 1.1000 -
Semen portland Kg 11.7500 1,375.00 16,156.25
Pasir Pasang M3 0.0350 200,000.00 7,000.00
JUMLAH HARGA BAHAN 23,156.25

Hal 108/229
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 87,293.75
E Overhead & Profit 10% x D 0.10 8,729.38
F Harga Satuan Pekerjaan (D+E) 96,023.13

A.4.4.3.58.Pemasangan 1 m2 dinding batu tempel hitam


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7000 55,000.00 38,500.00
Tukang Batu L.0.02 OH 0.3500 60,000.00 21,000.00
Kepala tukang L.0.03 OH 0.0350 65,000.00 2,275.00
Mandor L.0.04 OH 0.0350 67,500.00 2,362.50
JUMLAH TENAGA KERJA 64,137.50
B BAHAN
Batu temple hitam Bh 1.1000 79,000.00 86,900.00
Semen portland Kg 11.7500 1,375.00 16,156.25
Pasir Pasang M3 0.0350 200,000.00 7,000.00
JUMLAH HARGA BAHAN 110,056.25
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 174,193.75
E Overhead & Profit 10% x D 0.10 17,419.38
F Harga Satuan Pekerjaan (D+E) 191,613.13

A.4.4.3.58A.Pemasangan 1 m2 dinding batu tempel hitam


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7000 55,000.00 38,500.00
Tukang Batu L.0.02 OH 0.3500 60,000.00 21,000.00
Kepala tukang L.0.03 OH 0.0350 65,000.00 2,275.00
Mandor L.0.04 OH 0.0350 67,500.00 2,362.50
JUMLAH TENAGA KERJA 64,137.50
B BAHAN
Batu temple hitam Bh 1.1000 79,000.00 86,900.00
Semen portland Kg 11.7500 -
Pasir Pasang M3 0.0350 200,000.00 7,000.00
JUMLAH HARGA BAHAN 93,900.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 158,037.50
E Overhead & Profit 10% x D 0.10 15,803.75
F Harga Satuan Pekerjaan (D+E) 173,841.25

A.4.4.3.59.Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1500 55,000.00 8,250.00
Tukang Batu L.0.02 OH 0.1500 60,000.00 9,000.00
Kepala tukang L.0.03 OH 0.0150 65,000.00 975.00
Mandor L.0.04 OH 0.0080 67,500.00 540.00
JUMLAH TENAGA KERJA 18,765.00
B BAHAN
Vynil Bh 11.8700 -
Lem Kg 0.3500 -
JUMLAH HARGA BAHAN -
C PERALATAN

Hal 109/229
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 18,765.00
E Overhead & Profit 10% x D 0.10 1,876.50
F Harga Satuan Pekerjaan (D+E) 20,641.50

A.4.4.3.60.Pemasangan 1 m2 wallpaper lebar 50 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3500 55,000.00 19,250.00
Tukang Batu L.0.02 OH 0.1750 60,000.00 10,500.00
Kepala tukang L.0.03 OH 0.0170 65,000.00 1,105.00
Mandor L.0.04 OH 0.0020 67,500.00 135.00
JUMLAH TENAGA KERJA 30,990.00
B BAHAN
Wallpaper m 2.2000 -
Lem Kg 0.2500 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 30,990.00
E Overhead & Profit 10% x D 0.10 3,099.00
F Harga Satuan Pekerjaan (D+E) 34,089.00

A.4.4.3.61.Pemasangan 1m2 floor harderner


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1200 55,000.00 6,600.00
Tukang Batu L.0.02 OH 0.1200 60,000.00 7,200.00
Kepala tukang L.0.03 OH 0.0120 65,000.00 780.00
Mandor L.0.04 OH 0.0060 67,500.00 405.00
JUMLAH TENAGA KERJA 14,985.00
B BAHAN
Floor harderner Kg 5.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 14,985.00
E Overhead & Profit 10% x D 0.10 1,498.50
F Harga Satuan Pekerjaan (D+E) 16,483.50

A.4.4.3.62.Pemasangan 1 m’ plint vynil 15cm x 30cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0800 55,000.00 4,400.00
Tukang Batu L.0.02 OH 0.0800 60,000.00 4,800.00
Kepala tukang L.0.03 OH 0.0080 65,000.00 520.00
Mandor L.0.04 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 9,990.00
B BAHAN
Vynil Bh 1.7600 -
Lem Kg 0.0800 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 9,990.00
E Overhead & Profit 10% x D 0.10 999.00
F Harga Satuan Pekerjaan (D+E) 10,989.00

Hal 110/229
A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1200 55,000.00 6,600.00
Tukang Batu L.0.02 OH 0.1200 60,000.00 7,200.00
Kepala tukang L.0.03 OH 0.0120 65,000.00 780.00
Mandor L.0.04 OH 0.0060 67,500.00 405.00
JUMLAH TENAGA KERJA 14,985.00
B BAHAN
Papan kayu kelas 1 M3 0.0030 -
Paku/skrup 5cm Kg 0.0500 14,000.00 700.00
JUMLAH HARGA BAHAN 700.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 15,685.00
E Overhead & Profit 10% x D 10% 1,568.50
F Harga Satuan Pekerjaan (D+E) 17,253.50

A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0300 55,000.00 1,650.00
Tukang Kayu L.0.02 OH 0.0700 62,500.00 4,375.00
Kepala tukang L.0.03 OH 0.0070 65,000.00 455.00
Mandor L.0.04 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 6,750.00
B BAHAN
Asbes semen m2 1.1000 19,000.00 20,900.00
Paku tripleks kg 0.1000 19,000.00 1,900.00
JUMLAH HARGA BAHAN 22,800.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 29,550.00
E Overhead & Profit 10% x D 10% 2,955.00
F Harga Satuan Pekerjaan (D+E) 32,505.00

A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1200 55,000.00 6,600.00
Tukang Kayu L.0.02 OH 0.1200 62,500.00 7,500.00
Kepala tukang L.0.03 OH 0.0120 65,000.00 780.00
Mandor L.0.04 OH 0.0060 67,500.00 405.00
JUMLAH TENAGA KERJA 15,285.00
B BAHAN
Lemba
Akustik 12.0000 -
r
Paku tripleks kg 0.5000 19,000.00 9,500.00
JUMLAH HARGA BAHAN 9,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 24,785.00
E Overhead & Profit 10% x D 10% 2,478.50
F Harga Satuan Pekerjaan (D+E) 27,263.50

A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm

Hal 111/229
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1200 55,000.00 6,600.00
Tukang Kayu L.0.02 OH 0.1200 62,500.00 7,500.00
Kepala tukang L.0.03 OH 0.0120 65,000.00 780.00
Mandor L.0.04 OH 0.0060 67,500.00 405.00
JUMLAH TENAGA KERJA 15,285.00
B BAHAN
Lemba
Akustik 5.8000 -
r
Paku tripleks kg 0.0500 19,000.00 950.00
JUMLAH HARGA BAHAN 950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 16,235.00
E Overhead & Profit 10% x D 10% 1,623.50
F Harga Satuan Pekerjaan (D+E) 17,858.50

A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1000 55,000.00 5,500.00
Tukang Kayu L.0.02 OH 0.1000 62,500.00 6,250.00
Kepala tukang L.0.03 OH 0.0100 65,000.00 650.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 12,737.50
B BAHAN
Lem
Akustik 1.5000 -
bar
Paku tripleks kg 0.0500 19,000.00 950.00
JUMLAH HARGA BAHAN 950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,687.50
E Overhead & Profit 10% x D 10% 1,368.75
F Harga Satuan Pekerjaan (D+E) 15,056.25

A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1000 55,000.00 5,500.00
Tukang Kayu L.0.02 OH 0.1000 62,500.00 6,250.00
Kepala tukang L.0.03 OH 0.0100 65,000.00 650.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 12,737.50
B BAHAN
Lemba
Tripleks 0.3750 55,000.00 20,625.00
r
Paku tripleks kg 0.0300 19,000.00 570.00
JUMLAH HARGA BAHAN 21,195.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 33,932.50
E Overhead & Profit 10% x D 10% 3,393.25
F Harga Satuan Pekerjaan (D+E) 37,325.75

A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.8000 55,000.00 44,000.00

Hal 112/229
Tukang Kayu L.0.02 OH 0.8000 62,500.00 50,000.00
Kepala tukang L.0.03 OH 0.0800 65,000.00 5,200.00
Mandor L.0.04 OH 0.0400 67,500.00 2,700.00
JUMLAH TENAGA KERJA 101,900.00
B BAHAN
Kayu papan m3 0.0150 4,000,000.00 60,000.00
Paku tripleks kg 0.0100 19,000.00 190.00
JUMLAH HARGA BAHAN 60,190.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 162,090.00
E Overhead & Profit 10% x D 10% 16,209.00
F Harga Satuan Pekerjaan (D+E) 178,299.00

A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1000 55,000.00 5,500.00
Tukang Kayu L.0.02 OH 0.0500 62,500.00 3,125.00
Kepala tukang L.0.03 OH 0.0050 65,000.00 325.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 9,287.50
B BAHAN
Lemba
Gypsum board Elephant 0.3640 65,000.00 23,660.00
r
Paku skrup kg 0.1100 25,000.00 2,750.00
JUMLAH HARGA BAHAN 26,410.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 35,697.50
E Overhead & Profit 10% x D 10% 3,569.75
F Harga Satuan Pekerjaan (D+E) 39,267.25

A.4.5.1.7a. Pemasangan 1 m2 langit-langit Kalboard ukuran (120x240x9) mm, tebal 4 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1000 55,000.00 5,500.00
Tukang Kayu L.0.02 OH 0.0500 62,500.00 3,125.00
Kepala tukang L.0.03 OH 0.0050 65,000.00 325.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 9,287.50
B BAHAN
Lemba
Kalboard 0.3640 65,000.00 23,660.00
r
Paku skrup kg 0.1100 25,000.00 2,750.00
JUMLAH HARGA BAHAN 26,410.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 35,697.50
E Overhead & Profit 10% x D 10% 3,569.75
F Harga Satuan Pekerjaan (D+E) 39,267.25

A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.5000 55,000.00 27,500.00
Tukang Besi L.0.02 OH 0.5000 62,500.00 31,250.00
Kepala tukang L.0.03 OH 0.0500 65,000.00 3,250.00
Mandor L.0.04 OH 0.0250 67,500.00 1,687.50

Hal 113/229
JUMLAH TENAGA KERJA 63,687.50
B BAHAN
Profil Allum"T" m 3.6000 -
Kawat dia 4 mm kg 0.1500 -
Ramset Buah 1.0500 2,000.00 2,100.00
Lemba
Akustik60 x 120 1.5000 -
r
JUMLAH HARGA BAHAN 2,100.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 65,787.50
E Overhead & Profit 10% x D 10% 6,578.75
F Harga Satuan Pekerjaan (D+E) 72,366.25

A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0500 55,000.00 2,750.00
Tukang Kayu L.0.02 OH 0.0500 62,500.00 3,125.00
Kepala tukang L.0.03 OH 0.0050 65,000.00 325.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 6,402.50
B BAHAN
List kayu profil m 1.0500 10,000.00 10,500.00
Paku kg 0.0100 15,000.00 150.00
JUMLAH HARGA BAHAN 10,650.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 17,052.50
E Overhead & Profit 10% x D 10% 1,705.25
F Harga Satuan Pekerjaan (D+E) 18,757.75

Pemasangan 1 m’ list langit-langit gypsum


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0500 55,000.00 2,750.00
Tukang Kayu L.0.02 OH 0.0500 62,500.00 3,125.00
Kepala tukang L.0.03 OH 0.0050 65,000.00 325.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 6,402.50
B BAHAN
List gypsum m 1.0500 10,000.00 10,500.00
Comis kg 0.1250 5,500.00 687.50
JUMLAH HARGA BAHAN 11,187.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 17,590.00
E Overhead & Profit 10% x D 10% 1,759.00
F Harga Satuan Pekerjaan (D+E) 19,349.00

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP


A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1500 55,000.00 8,250.00
Tukang Kayu L.0.02 OH 0.0750 62,500.00 4,687.50
Kepala tukang L.0.11 OH 0.0075 65,000.00 487.50
Mandor L.0.15 OH 0.0080 67,500.00 540.00
Hal 114/229
JUMLAH TENAGA KERJA 13,965.00
B BAHAN
Genteng palentong Bh 25.0000 2,300.00 57,500.00
JUMLAH HARGA BAHAN 57,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 71,465.00
E Overhead & Profit 10% x D 10% 7,146.50
F Harga Satuan Pekerjaan (D+E) 78,611.50

A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1500 55,000.00 8,250.00
Tukang Kayu L.0.02 OH 0.0750 62,500.00 4,687.50
Kepala tukang L.0.11 OH 0.0080 65,000.00 520.00
Mandor L.0.15 OH 0.0080 67,500.00 540.00
JUMLAH TENAGA KERJA 13,997.50
B BAHAN
Genteng kodok Bh 25.0000 2,600.00 65,000.00
JUMLAH HARGA BAHAN 65,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 78,997.50
E Overhead & Profit 10% x D 10% 7,899.75
F Harga Satuan Pekerjaan (D+E) 86,897.25

A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1500 55,000.00 8,250.00
Tukang Kayu L.0.02 OH 0.0750 62,500.00 4,687.50
Kepala tukang L.0.11 OH 0.0080 65,000.00 520.00
Mandor L.0.15 OH 0.0080 67,500.00 540.00
JUMLAH TENAGA KERJA 13,997.50
B BAHAN
Genteng kodok Bh 12.0000 3,200.00 38,400.00
JUMLAH HARGA BAHAN 38,400.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 52,397.50
E Overhead & Profit 10% x D 10% 5,239.75
F Harga Satuan Pekerjaan (D+E) 57,637.25

A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4000 55,000.00 22,000.00
Tukang Kayu L.0.02 OH 0.2000 62,500.00 12,500.00
Kepala tukang L.0.11 OH 0.0200 65,000.00 1,300.00
Mandor L.0.15 OH 0.0020 67,500.00 135.00
JUMLAH TENAGA KERJA 35,935.00
B BAHAN
Genteng bubung Bh 5.0000 6,200.00 31,000.00
Semen portland Kg 8.0000 1,375.00 11,000.00
Pasir pasang M3 0.0320 200,000.00 6,400.00
JUMLAH HARGA BAHAN 48,400.00
Hal 115/229
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 84,335.00
E Overhead & Profit 10% x D 10% 8,433.50
F Harga Satuan Pekerjaan (D+E) 92,768.50

A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4000 55,000.00 22,000.00
Tukang Kayu L.0.02 OH 0.2000 62,500.00 12,500.00
Kepala tukang L.0.11 OH 0.0200 65,000.00 1,300.00
Mandor L.0.15 OH 0.0020 67,500.00 135.00
JUMLAH TENAGA KERJA 35,935.00
B BAHAN
Genteng bubung Bh 5.0000 8,000.00 40,000.00
Semen portland Kg 8.0000 1,375.00 11,000.00
Pasir pasang M3 0.0320 200,000.00 6,400.00
JUMLAH HARGA BAHAN 57,400.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 93,335.00
E Overhead & Profit 10% x D 10% 9,333.50
F Harga Satuan Pekerjaan (D+E) 102,668.50

A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4000 55,000.00 22,000.00
Tukang Kayu L.0.02 OH 0.2000 62,500.00 12,500.00
Kepala tukang L.0.11 OH 0.0200 65,000.00 1,300.00
Mandor L.0.15 OH 0.0020 67,500.00 135.00
JUMLAH TENAGA KERJA 35,935.00
B BAHAN
Genteng bubung Bh 4.0000 6,200.00 24,800.00
Semen portland Kg 8.0000 1,375.00 11,000.00
Pasir pasang M3 0.0320 200,000.00 6,400.00
JUMLAH HARGA BAHAN 42,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 78,135.00
E Overhead & Profit 10% x D 10% 7,813.50
F Harga Satuan Pekerjaan (D+E) 85,948.50

A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90x180


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1400 55,000.00 7,700.00
Tukang Kayu L.0.02 OH 0.0670 62,500.00 4,187.50
Kepala tukang L.0.11 OH 0.0070 65,000.00 455.00
Mandor L.0.15 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 12,815.00
B BAHAN
Rooflight 90x180 Lbr 0.6000 -
Paku biasa W”-1” Kg 0.0500 19,000.00 950.00
JUMLAH HARGA BAHAN 950.00
C PERALATAN

Hal 116/229
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,765.00
E Overhead & Profit 10% x D 10% 1,376.50
F Harga Satuan Pekerjaan (D+E) 15,141.50

A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,5m x 5mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1400 55,000.00 7,700.00
Tukang Kayu L.0.02 OH 0.0750 62,500.00 4,687.50
Kepala tukang L.0.11 OH 0.0080 65,000.00 520.00
Mandor L.0.15 OH 0.0080 67,500.00 540.00
JUMLAH TENAGA KERJA 13,447.50
B BAHAN
Asbes gel 92x250 Lbr 0.5000 -
Paku pancing 6x23 Kg 0.1200 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,447.50
E Overhead & Profit 10% x D 10% 1,344.75
F Harga Satuan Pekerjaan (D+E) 14,792.25

A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,25m x 5mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1400 55,000.00 7,700.00
Tukang Kayu L.0.02 OH 0.0750 62,500.00 4,687.50
Kepala tukang L.0.11 OH 0.0080 65,000.00 520.00
Mandor L.0.15 OH 0.0080 67,500.00 540.00
JUMLAH TENAGA KERJA 13,447.50
B BAHAN
Asbes gel 92x250 Lbr 0.6000 -
Paku pancing 6x23 Kg 0.1200 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,447.50
E Overhead & Profit 10% x D 10% 1,344.75
F Harga Satuan Pekerjaan (D+E) 14,792.25

A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,00m x 5mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1400 55,000.00 7,700.00
Tukang Kayu L.0.02 OH 0.0700 62,500.00 4,375.00
Kepala tukang L.0.11 OH 0.0070 65,000.00 455.00
Mandor L.0.15 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 13,002.50
B BAHAN
Asbes gel 92x250 Lbr 0.6000 -
Paku pancing 6x23 Kg 0.1200 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,002.50
E Overhead & Profit 10% x D 10% 1,300.25

Hal 117/229
F Harga Satuan Pekerjaan (D+E) 14,302.75

A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92mx1.80m x 5mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1400 55,000.00 7,700.00
Tukang Kayu L.0.02 OH 0.0700 62,500.00 4,375.00
Kepala tukang L.0.11 OH 0.0070 65,000.00 455.00
Mandor L.0.15 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 13,002.50
B BAHAN
Asbes gel 92x250 Lbr 0.7500 -
Paku pancing 6x23 Kg 0.1200 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,002.50
E Overhead & Profit 10% x D 10% 1,300.25
F Harga Satuan Pekerjaan (D+E) 14,302.75

A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1.05mx3.00m x 4mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1400 55,000.00 7,700.00
Tukang Kayu L.0.02 OH 0.0700 62,500.00 4,375.00
Kepala tukang L.0.11 OH 0.0070 65,000.00 455.00
Mandor L.0.15 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 13,002.50
B BAHAN
Asbes gel 92x250 Lbr 0.3500 84,000.00 29,400.00
Paku pancing 6x23 Kg 0.1200 25,000.00 3,000.00
JUMLAH HARGA BAHAN 32,400.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 45,402.50
E Overhead & Profit 10% x D 10% 4,540.25
F Harga Satuan Pekerjaan (D+E) 49,942.75

A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.70m x 4mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1400 55,000.00 7,700.00
Tukang Kayu L.0.02 OH 0.0700 62,500.00 4,375.00
Kepala tukang L.0.11 OH 0.0070 65,000.00 455.00
Mandor L.0.15 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 13,002.50
B BAHAN
Asbes gel 92x250 Lbr 0.4200 -
Paku pancing 6x23 Kg 0.1200 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,002.50
E Overhead & Profit 10% x D 10% 1,300.25
F Harga Satuan Pekerjaan (D+E) 14,302.75

A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.40m x 4mm

Hal 118/229
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1400 55,000.00 7,700.00
Tukang Kayu L.0.02 OH 0.0700 62,500.00 4,375.00
Kepala tukang L.0.11 OH 0.0070 65,000.00 455.00
Mandor L.0.15 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 13,002.50
B BAHAN
Asbes gel 92x250 Lbr 0.4400 68,000.00 29,920.00
Paku pancing 6x23 Kg 0.1200 25,000.00 3,000.00
JUMLAH HARGA BAHAN 32,920.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 45,922.50
E Overhead & Profit 10% x D 10% 4,592.25
F Harga Satuan Pekerjaan (D+E) 50,514.75

A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.10m x 4mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1400 55,000.00 7,700.00
Tukang Kayu L.0.02 OH 0.0700 62,500.00 4,375.00
Kepala tukang L.0.11 OH 0.0070 65,000.00 455.00
Mandor L.0.15 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 13,002.50
B BAHAN
Asbes gel 92x250 Lbr 0.5100 59,000.00 30,090.00
Paku pancing 6x23 Kg 0.1200 25,000.00 3,000.00
JUMLAH HARGA BAHAN 33,090.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 46,092.50
E Overhead & Profit 10% x D 10% 4,609.25
F Harga Satuan Pekerjaan (D+E) 50,701.75

A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1.05mx1.50m x 4mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1400 55,000.00 7,700.00
Tukang Kayu L.0.02 OH 0.0700 62,500.00 4,375.00
Kepala tukang L.0.11 OH 0.0070 65,000.00 455.00
Mandor L.0.15 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 13,002.50
B BAHAN
Asbes gel 92x250 Lbr 0.8000 43,000.00 34,400.00
Paku pancing 6x23 Kg 0.1200 25,000.00 3,000.00
JUMLAH HARGA BAHAN 37,400.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 50,402.50
E Overhead & Profit 10% x D 10% 5,040.25
F Harga Satuan Pekerjaan (D+E) 55,442.75

A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1.08mx3.00m x 6mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1400 55,000.00 7,700.00
Hal 119/229
Tukang Kayu L.0.02 OH 0.0700 62,500.00 4,375.00
Kepala tukang L.0.11 OH 0.0070 65,000.00 455.00
Mandor L.0.15 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 13,002.50
B BAHAN
Asbes gel 92x250 Lbr 0.3700 -
Paku pancing 6x23 Kg 0.1200 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,002.50
E Overhead & Profit 10% x D 10% 1,300.25
F Harga Satuan Pekerjaan (D+E) 14,302.75

A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.70m x 6mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1400 55,000.00 7,700.00
Tukang Kayu L.0.02 OH 0.0700 62,500.00 4,375.00
Kepala tukang L.0.11 OH 0.0070 65,000.00 455.00
Mandor L.0.15 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 13,002.50
B BAHAN
Asbes gel 92x250 Lbr 0.3800 -
Paku pancing 6x23 Kg 0.1200 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,002.50
E Overhead & Profit 10% x D 10% 1,300.25
F Harga Satuan Pekerjaan (D+E) 14,302.75

A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.40m x 6mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1400 55,000.00 7,700.00
Tukang Kayu L.0.02 OH 0.0700 62,500.00 4,375.00
Kepala tukang L.0.11 OH 0.0070 65,000.00 455.00
Mandor L.0.15 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 13,002.50
B BAHAN
Asbes gel 92x250 Lbr 0.4600 -
Paku pancing 6x23 Kg 0.1200 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,002.50
E Overhead & Profit 10% x D 10% 1,300.25
F Harga Satuan Pekerjaan (D+E) 14,302.75

A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.10m x 6mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1400 55,000.00 7,700.00
Tukang Kayu L.0.02 OH 0.0700 62,500.00 4,375.00
Kepala tukang L.0.11 OH 0.0070 65,000.00 455.00
Mandor L.0.15 OH 0.0070 67,500.00 472.50
Hal 120/229
JUMLAH TENAGA KERJA 13,002.50
B BAHAN
Asbes gel 92x250 Lbr 0.4900 -
Paku pancing 6x23 Kg 0.1200 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,002.50
E Overhead & Profit 10% x D 10% 1,300.25
F Harga Satuan Pekerjaan (D+E) 14,302.75

A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1.08mx1.80m x 6mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1400 55,000.00 7,700.00
Tukang Kayu L.0.02 OH 0.0700 62,500.00 4,375.00
Kepala tukang L.0.11 OH 0.0070 65,000.00 455.00
Mandor L.0.15 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 13,002.50
B BAHAN
Asbes gel 92x250 Lbr 0.5700 -
Paku pancing 6x23 Kg 0.1200 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,002.50
E Overhead & Profit 10% x D 10% 1,300.25
F Harga Satuan Pekerjaan (D+E) 14,302.75

A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92m


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0840 55,000.00 4,620.00
Tukang Kayu L.0.02 OH 0.1250 62,500.00 7,812.50
Kepala tukang L.0.11 OH 0.0130 65,000.00 845.00
Mandor L.0.15 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 13,547.50
B BAHAN
Bubung stel gel. Lbr 2.4000 -
Paku skrup 3,5” Bh 6.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,547.50
E Overhead & Profit 10% x D 10% 1,354.75
F Harga Satuan Pekerjaan (D+E) 14,902.25

A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05m


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0840 55,000.00 4,620.00
Tukang Kayu L.0.02 OH 0.1250 62,500.00 7,812.50
Kepala tukang L.0.11 OH 0.0130 65,000.00 845.00
Mandor L.0.15 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 13,547.50
B BAHAN
Bubung stel gel. Lbr 2.1000 35,000.00 73,500.00
Hal 121/229
Paku skrup 3,5” Bh 6.0000 1,200.00 7,200.00
JUMLAH HARGA BAHAN 80,700.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 94,247.50
E Overhead & Profit 10% x D 10% 9,424.75
F Harga Satuan Pekerjaan (D+E) 103,672.25

A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08m


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0840 55,000.00 4,620.00
Tukang Kayu L.0.02 OH 0.1250 62,500.00 7,812.50
Kepala tukang L.0.11 OH 0.0130 65,000.00 845.00
Mandor L.0.15 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 13,547.50
B BAHAN
Bubung stel gel. Lbr 2.0500 -
Paku skrup 3,5” Bh 6.0000 1,200.00 7,200.00
JUMLAH HARGA BAHAN 7,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 20,747.50
E Overhead & Profit 10% x D 10% 2,074.75
F Harga Satuan Pekerjaan (D+E) 22,822.25

A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92m


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0840 55,000.00 4,620.00
Tukang Kayu L.0.02 OH 0.1250 62,500.00 7,812.50
Kepala tukang L.0.11 OH 0.0130 65,000.00 845.00
Mandor L.0.15 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 13,547.50
B BAHAN
Nok paten 92cm Lbr 1.2000 -
Paku skrup 3,5” Bh 6.0000 1,200.00 7,200.00
JUMLAH HARGA BAHAN 7,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 20,747.50
E Overhead & Profit 10% x D 10% 2,074.75
F Harga Satuan Pekerjaan (D+E) 22,822.25

A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05m


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0840 55,000.00 4,620.00
Tukang Kayu L.0.02 OH 0.1250 62,500.00 7,812.50
Kepala tukang L.0.11 OH 0.0130 65,000.00 845.00
Mandor L.0.15 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 13,547.50
B BAHAN
Nok paten 92cm Lbr 1.2000 -
Paku skrup 3,5” Bh 6.0000 1,200.00 7,200.00
JUMLAH HARGA BAHAN 7,200.00
C PERALATAN

Hal 122/229
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 20,747.50
E Overhead & Profit 10% x D 10% 2,074.75
F Harga Satuan Pekerjaan (D+E) 22,822.25

A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08m


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0840 55,000.00 4,620.00
Tukang Kayu L.0.02 OH 0.1250 62,500.00 7,812.50
Kepala tukang L.0.11 OH 0.0130 65,000.00 845.00
Mandor L.0.15 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 13,547.50
B BAHAN
Nok paten 92cm Lbr 1.2000 -
Paku skrup 3,5” Bh 6.0000 1,200.00 7,200.00
JUMLAH HARGA BAHAN 7,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 20,747.50
E Overhead & Profit 10% x D 10% 2,074.75
F Harga Satuan Pekerjaan (D+E) 22,822.25

A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92m


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1000 55,000.00 5,500.00
Tukang Kayu L.0.02 OH 0.1500 62,500.00 9,375.00
Kepala tukang L.0.11 OH 0.0130 65,000.00 845.00
Mandor L.0.15 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 15,990.00
B BAHAN
Nok paten 92cm Lbr 1.1000 -
Paku skrup 3,5” Bh 6.0000 1,200.00 7,200.00
JUMLAH HARGA BAHAN 7,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 23,190.00
E Overhead & Profit 10% x D 10% 2,319.00
F Harga Satuan Pekerjaan (D+E) 25,509.00

A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05m


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0840 55,000.00 4,620.00
Tukang Kayu L.0.02 OH 0.1250 62,500.00 7,812.50
Kepala tukang L.0.11 OH 0.0130 65,000.00 845.00
Mandor L.0.15 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 13,547.50
B BAHAN
Nok paten 92cm Lbr 1.1000 -
Paku skrup 3,5” Bh 6.0000 1,200.00 7,200.00
JUMLAH HARGA BAHAN 7,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 20,747.50
E Overhead & Profit 10% x D 10% 2,074.75

Hal 123/229
F Harga Satuan Pekerjaan (D+E) 22,822.25

A.4.5.2.30. Pemasangan 1 m2 genteng beton


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2000 55,000.00 11,000.00
Tukang Kayu L.0.02 OH 0.1000 62,500.00 6,250.00
Kepala tukang L.0.11 OH 0.0100 65,000.00 650.00
Mandor L.0.15 OH 0.0100 67,500.00 675.00
JUMLAH TENAGA KERJA 18,575.00
B BAHAN
Genteng beton Bh 11.0000 2,500.00 27,500.00
Paku biasa 2”-5” Kg 0.0300 15,000.00 450.00
JUMLAH HARGA BAHAN 27,950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 46,525.00
E Overhead & Profit 10% x D 10% 4,652.50
F Harga Satuan Pekerjaan (D+E) 51,177.50

A.4.5.2.31. Pemasangan 1 m2 genteng aspal


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2000 55,000.00 11,000.00
Tukang Kayu L.0.02 OH 0.3000 62,500.00 18,750.00
Kepala tukang L.0.11 OH 0.0030 65,000.00 195.00
Mandor L.0.15 OH 0.0100 67,500.00 675.00
JUMLAH TENAGA KERJA 30,620.00
B BAHAN
Genteng aspal Bh 6.9000 -
Plywood 6mm Lbr 0.3500 -
Paku biasa 1/2”-1” Kg 0.0300 15,000.00 450.00
Plastic aerator Bh 0.5000 -
JUMLAH HARGA BAHAN 450.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 31,070.00
E Overhead & Profit 10% x D 10% 3,107.00
F Harga Satuan Pekerjaan (D+E) 34,177.00

A.4.5.2.32. Pemasangan 1 m2 genteng metal


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2000 55,000.00 11,000.00
Tukang Kayu L.0.02 OH 0.1000 62,500.00 6,250.00
Kepala tukang L.0.11 OH 0.0100 65,000.00 650.00
Mandor L.0.15 OH 0.0010 67,500.00 67.50
JUMLAH TENAGA KERJA 17,967.50
B BAHAN
Genteng metal Bh 1.0200 50,000.00 51,000.00
Paku biasa 1/2”-1” Kg 0.2000 15,000.00 3,000.00
JUMLAH HARGA BAHAN 54,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 71,967.50
E Overhead & Profit 10% x D 10% 7,196.75
F Harga Satuan Pekerjaan (D+E) 79,164.25
Hal 124/229
A.4.5.2.33. Pemasangan 1 m2 atap sirap kayu
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1660 55,000.00 9,130.00
Tukang Kayu L.0.02 OH 0.2500 62,500.00 15,625.00
Kepala tukang L.0.11 OH 0.0250 65,000.00 1,625.00
Mandor L.0.15 OH 0.0080 67,500.00 540.00
JUMLAH TENAGA KERJA 26,920.00
B BAHAN
Sirap kayu Bh 30.0000 -
Paku biasa 1/2”-1” Kg 0.2000 19,000.00 3,800.00
JUMLAH HARGA BAHAN 3,800.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 30,720.00
E Overhead & Profit 10% x D 10% 3,072.00
F Harga Satuan Pekerjaan (D+E) 33,792.00

A.4.5.2.34. Pemasangan 1 m’ nok genteng beton


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4000 55,000.00 22,000.00
Tukang Kayu L.0.02 OH 0.2000 62,500.00 12,500.00
Kepala tukang L.0.11 OH 0.0200 65,000.00 1,300.00
Mandor L.0.15 OH 0.0200 67,500.00 1,350.00
JUMLAH TENAGA KERJA 37,150.00
B BAHAN
Nok genteng beton Bh 3.5000 11,000.00 38,500.00
Paku biasa 1/2”-1” Kg 0.0500 19,000.00 950.00
Semen portland Kg 10.8000 1,375.00 14,850.00
Pasir pasang M3 0.0320 200,000.00 6,400.00
Semen warna Kg 1.0000 3,000.00 3,000.00
JUMLAH HARGA BAHAN 63,700.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 100,850.00
E Overhead & Profit 10% x D 10% 10,085.00
F Harga Satuan Pekerjaan (D+E) 110,935.00

A.4.5.2.35. Pemasangan 1 m’ nok genteng aspal


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1250 55,000.00 6,875.00
Tukang Kayu L.0.02 OH 0.2500 62,500.00 15,625.00
Kepala tukang L.0.11 OH 0.0250 65,000.00 1,625.00
Mandor L.0.15 OH 0.0060 67,500.00 405.00
JUMLAH TENAGA KERJA 24,530.00
B BAHAN
Nok genteng aspal Bh 2.0000 -
Paku biasa 1/2”-1” Kg 0.0500 19,000.00 950.00
Kayu balok borneo M3 0.0035 -
JUMLAH HARGA BAHAN 950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 25,480.00
E Overhead & Profit 10% x D 10% 2,548.00

Hal 125/229
F Harga Satuan Pekerjaan (D+E) 28,028.00

A.4.5.2.36. Pemasangan 1 m’ nok genteng metal


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2500 55,000.00 13,750.00
Tukang Kayu L.0.02 OH 0.1500 62,500.00 9,375.00
Kepala tukang L.0.11 OH 0.0150 65,000.00 975.00
Mandor L.0.15 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 24,977.50
B BAHAN
Nok genteng metal Bh 1.1000 50,000.00 55,000.00
Paku biasa 1/2”-1” Kg 0.0500 19,000.00 950.00
JUMLAH HARGA BAHAN 55,950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 80,927.50
E Overhead & Profit 10% x D 10% 8,092.75
F Harga Satuan Pekerjaan (D+E) 89,020.25

A.4.5.2.37. Pemasangan 1 m’ nok sirap


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1250 55,000.00 6,875.00
Tukang Kayu L.0.02 OH 0.2500 62,500.00 15,625.00
Kepala tukang L.0.11 OH 0.0250 65,000.00 1,625.00
Mandor L.0.15 OH 0.0060 67,500.00 405.00
JUMLAH TENAGA KERJA 24,530.00
B BAHAN
Seng plat 3 x 6” Lbr 0.4000 -
Paku biasa 1/2”-1” Kg 0.0500 19,000.00 950.00
Paku biasa 2”-5” Kg 0.0500 15,000.00 750.00
JUMLAH HARGA BAHAN 1,700.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 26,230.00
E Overhead & Profit 10% x D 10% 2,623.00
F Harga Satuan Pekerjaan (D+E) 28,853.00

A.4.5.2.38. Pemasangan 1 m2 atap seng gelombang


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1200 55,000.00 6,600.00
Tukang Kayu L.0.02 OH 0.0600 62,500.00 3,750.00
Kepala tukang L.0.11 OH 0.0060 65,000.00 390.00
Mandor L.0.15 OH 0.0060 67,500.00 405.00
JUMLAH TENAGA KERJA 11,145.00
B BAHAN
Seng gel 3”x6” Lbr 0.7000 -
Paku biasa 1/2”-1” Kg 0.0200 19,000.00 380.00
JUMLAH HARGA BAHAN 380.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 11,525.00
E Overhead & Profit 10% x D 10% 1,152.50
F Harga Satuan Pekerjaan (D+E) 12,677.50

Hal 126/229
A.4.5.2.39. Pemasangan 1 m’nok atap seng
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1500 55,000.00 8,250.00
Tukang Kayu L.0.02 OH 0.0700 62,500.00 4,375.00
Kepala tukang L.0.11 OH 0.0070 65,000.00 455.00
Mandor L.0.15 OH 0.0060 67,500.00 405.00
JUMLAH TENAGA KERJA 13,485.00
B BAHAN
Seng plat 3”x6”bjls28 Lbr 0.3000 -
Paku biasa 1/2”-1” Kg 0.0400 15,000.00 600.00
JUMLAH HARGA BAHAN 600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 14,085.00
E Overhead & Profit 10% x D 10% 1,408.50
F Harga Satuan Pekerjaan (D+E) 15,493.50

A.4.5.2.40. Pemasangan 1 m2 atap alumunium


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1500 55,000.00 8,250.00
Tukang Kayu L.0.02 OH 0.7500 62,500.00 46,875.00
Kepala tukang L.0.11 OH 0.0800 65,000.00 5,200.00
Mandor L.0.15 OH 0.0060 67,500.00 405.00
JUMLAH TENAGA KERJA 60,730.00
B BAHAN
Almn gel tbl0,55 Lbr 1.0500 -
Paku hak panj 15cm Kg 0.0200 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 60,730.00
E Overhead & Profit 10% x D 10% 6,073.00
F Harga Satuan Pekerjaan (D+E) 66,803.00

A.4.5.2.41. Pemasangan 1 m’ nok alumunium


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1000 55,000.00 5,500.00
Tukang Kayu L.0.02 OH 1.0000 62,500.00 62,500.00
Kepala tukang L.0.11 OH 0.1000 65,000.00 6,500.00
Mandor L.0.15 OH 0.0500 67,500.00 3,375.00
JUMLAH TENAGA KERJA 77,875.00
B BAHAN
Nok standar 40x1 8 Bh 1.2000 -
Paku hak panj 15cm Kg 0.0400 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 77,875.00
E Overhead & Profit 10% x D 10% 7,787.50
F Harga Satuan Pekerjaan (D+E) 85,662.50

A.4.5.2.42. Pemasangan 1 m2 alumunium foil/sisalation


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA

Hal 127/229
Pekerja L.0.01 OH 0.1500 55,000.00 8,250.00
Tukang Kayu L.0.02 OH 0.0500 62,500.00 3,125.00
Kepala tukang L.0.11 OH 0.0050 65,000.00 325.00
Mandor L.0.15 OH 0.0080 67,500.00 540.00
JUMLAH TENAGA KERJA 12,240.00
B BAHAN
Alumunium foil M2 1.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 12,240.00
E Overhead & Profit 10% x D 10% 1,224.00
F Harga Satuan Pekerjaan (D+E) 13,464.00

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 7.0000 55,000.00 385,000.00
H
Tukang Kayu L.0.02 OH 21.0000 62,500.00 1,312,500.00
Kepala tukang L.0.03 OH 2.1000 65,000.00 136,500.00
O
Mandor L.0.04 0.3500 67,500.00 23,625.00
H
JUMLAH TENAGA KERJA 1,857,625.00
B BAHAN
Balok kayu m3 1.1000 9,500,000.00 10,450,000.00
K
Paku 10 cm 1.2500 15,000.00 18,750.00
Kg
Lem kayu 1.0000 16,000.00 16,000.00
g
JUMLAH HARGA BAHAN 10,484,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 12,342,375.00
E Overhead & Profit 10% x D 10% 1,234,237.50
F Harga Satuan Pekerjaan (D+E) 13,576,612.50

A.4.6.1.2.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 6.0000 55,000.00 330,000.00
H
Tukang Kayu L.0.02 OH 18.0000 62,500.00 1,125,000.00
Kepala tukang L.0.03 OH 1.8000 65,000.00 117,000.00
O
Mandor L.0.04 0.3000 67,500.00 20,250.00
H
JUMLAH TENAGA KERJA 1,592,250.00
B BAHAN
Balok kayu m3 1.1000 6,400,000.00 7,040,000.00
K
Paku 10 cm 1.2500 15,000.00 18,750.00
Kg
Lem kayu 1.0000 16,000.00 16,000.00
g
JUMLAH HARGA BAHAN 7,074,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 8,667,000.00
E Overhead & Profit 10% x D 10% 866,700.00
F Harga Satuan Pekerjaan (D+E) 9,533,700.00

A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3500 55,000.00 19,250.00
H
Hal 128/229
Tukang Kayu L.0.02 OH 1.0500 62,500.00 65,625.00
Kepala tukang L.0.03 OH 0.1050 65,000.00 6,825.00
O
Mandor L.0.04 0.0180 67,500.00 1,215.00
H
JUMLAH TENAGA KERJA 92,915.00
B BAHAN
Papan kayu m3 0.0400 6,400,000.00 256,000.00
K
Paku 5 – 7 cm 0.0500 15,000.00 750.00
g
JUMLAH HARGA BAHAN 256,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 349,665.00
E Overhead & Profit 10% x D 10% 34,966.50
F Harga Satuan Pekerjaan (D+E) 384,631.50

A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.3500 55,000.00 19,250.00
H
Tukang Kayu L.0.02 OH 1.0500 62,500.00 65,625.00
Kepala tukang L.0.03 OH 0.1050 65,000.00 6,825.00
O
Mandor L.0.04 0.0180 67,500.00 1,215.00
H
JUMLAH TENAGA KERJA 92,915.00
B BAHAN
Papan kayu m3 0.0400 6,000,000.00 240,000.00
K
Paku 5 – 7 cm 0.0500 15,000.00 750.00
g
JUMLAH HARGA BAHAN 240,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 333,665.00
E Overhead & Profit 10% x D 10% 33,366.50
F Harga Satuan Pekerjaan (D+E) 367,031.50

A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 1.0000 55,000.00 55,000.00
H
Tukang Kayu L.0.02 OH 3.0000 62,500.00 187,500.00
Kepala tukang L.0.03 OH 0.3000 65,000.00 19,500.00
O
Mandor L.0.04 0.0500 67,500.00 3,375.00
H
JUMLAH TENAGA KERJA 265,375.00
B BAHAN
Papan kayu m3 0.0400 6,400,000.00 256,000.00
K
Lem kayu 0.5000 16,000.00 8,000.00
g
JUMLAH HARGA BAHAN 264,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 529,375.00
E Overhead & Profit 10% x D 10% 52,937.50
F Harga Satuan Pekerjaan (D+E) 582,312.50

A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.8000 55,000.00 44,000.00
H
Tukang Kayu L.0.02 OH 2.4000 62,500.00 150,000.00
Kepala tukang L.0.03 OH 0.2400 65,000.00 15,600.00
O
Mandor L.0.04 0.0400 67,500.00 2,700.00
H
Hal 129/229
JUMLAH TENAGA KERJA 212,300.00
B BAHAN
Papan kayu m3 0.0240 6,400,000.00 153,600.00
K
Lem kayu 0.3000 16,000.00 4,800.00
g
JUMLAH HARGA BAHAN 158,400.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 370,700.00
E Overhead & Profit 10% x D 10% 37,070.00
F Harga Satuan Pekerjaan (D+E) 407,770.00

A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 1.0000 55,000.00 55,000.00
H
Tukang Kayu L.0.02 OH 3.0000 62,500.00 187,500.00
Kepala tukang L.0.03 OH 0.3000 65,000.00 19,500.00
O
Mandor L.0.04 0.0500 67,500.00 3,375.00
H
JUMLAH TENAGA KERJA 265,375.00
B BAHAN
Papan kayu m3 0.0640 6,400,000.00 409,600.00
K
Lem kayu 0.5000 16,000.00 8,000.00
g
JUMLAH HARGA BAHAN 417,600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 682,975.00
E Overhead & Profit 10% x D 10% 68,297.50
F Harga Satuan Pekerjaan (D+E) 751,272.50

A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7000 55,000.00 38,500.00
Tukang Kayu L.0.02 OH 2.1000 62,500.00 131,250.00
Kepala tukang L.0.03 OH 0.2100 65,000.00 13,650.00
Mandor L.0.04 OH 0.0350 67,500.00 2,362.50
JUMLAH TENAGA KERJA 185,762.50
B BAHAN
Papan kayu m3 0.0250 6,400,000.00 160,000.00
Paku 1 cm – 2,5 cm kg 0.0300 19,000.00 570.00
Lem kayu kg 0.5000 16,000.00 8,000.00
Lemba
Plywood tebal 4 mm Ukuran (90 x 220) cm 1.0000 70,000.00 70,000.00
r
JUMLAH HARGA BAHAN 238,570.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 424,332.50
E Overhead & Profit 10% x D 10% 42,433.25
F Harga Satuan Pekerjaan (D+E) 466,765.75

A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.8000 55,000.00 44,000.00
Tukang Kayu L.0.02 OH 2.4000 62,500.00 150,000.00
Kepala tukang L.0.03 OH 0.2400 65,000.00 15,600.00
Mandor L.0.04 OH 0.0400 67,500.00 2,700.00
JUMLAH TENAGA KERJA 212,300.00
Hal 130/229
B BAHAN
Papan kayu m3 0.0256 6,400,000.00 163,840.00
Paku 1 cm – 2,5 cm kg 0.0300 19,000.00 570.00
Lem kayu kg 0.5000 16,000.00 8,000.00
Lemba
Plywood 4 mm (90 x 220) cm 1.0000 70,000.00 70,000.00
r
JUMLAH HARGA BAHAN 242,410.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 454,710.00
E Overhead & Profit 10% x D 10% 45,471.00
F Harga Satuan Pekerjaan (D+E) 500,181.00

A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.6700 55,000.00 36,850.00
H
Tukang Kayu L.0.02 OH 2.0000 62,500.00 125,000.00
Kepala tukang L.0.03 OH 0.2000 65,000.00 13,000.00
O
Mandor L.0.04 0.3350 67,500.00 22,612.50
H
JUMLAH TENAGA KERJA 197,462.50
B BAHAN
Papan kayu 0.0600
k m3 6,400,000.00 384,000.00
Paku 1 – 2,5 cm 0.1500 19,000.00 2,850.00
g
JUMLAH HARGA BAHAN 386,850.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 584,312.50
E Overhead & Profit 10% x D 10% 58,431.25
F Harga Satuan Pekerjaan (D+E) 642,743.75

A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.8000 55,000.00 44,000.00
Tukang Kayu L.0.02 OH 2.4000 62,500.00 150,000.00
Kepala tukang L.0.03 OH 0.2400 65,000.00 15,600.00
Mandor L.0.04 OH 0.0400 67,500.00 2,700.00
JUMLAH TENAGA KERJA 212,300.00
B BAHAN
Papan kayu m3 0.0250 11,000,000.00 275,000.00
Paku 1 – 2,5 cm kg 0.0300 19,000.00 570.00
Lem kayu kg 0.3000 16,000.00 4,800.00
Lemba
Teakwood 4 mm 90 x 220 cm 1.0000 70,000.00 70,000.00
r
JUMLAH HARGA BAHAN 350,370.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 562,670.00
E Overhead & Profit 10% x D 10% 56,267.00
F Harga Satuan Pekerjaan (D+E) 618,937.00

A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.8500 55,000.00 46,750.00
Tukang Kayu L.0.02 OH 2.5500 62,500.00 159,375.00
3. Kepala tukang L.0.03 OH 0.2550 65,000.00 16,575.00
4. Mandor L.0.04 OH 0.0430 67,500.00 2,902.50
Hal 131/229
JUMLAH TENAGA KERJA 225,602.50
B BAHAN
Papan kayu m3 0.0250 6,400,000.00 160,000.00
Paku 1 – 2,5 cm kg 0.0300 19,000.00 570.00
Lem kayu kg 0.8000 16,000.00 12,800.00
Teakwood 4 mm Lemba
1.0000 70,000.00 70,000.00
90 x 220 cm r
Lemba
Formika 0.5000 -
r
JUMLAH HARGA BAHAN 243,370.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 468,972.50
E Overhead & Profit 10% x D 10% 46,897.25
F Harga Satuan Pekerjaan (D+E) 515,869.75

A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 4.0000 55,000.00 220,000.00
H
Tukang Kayu L.0.02 OH 12.0000 62,500.00 750,000.00
Kepala tukang L.0.03 OH 1.2000 65,000.00 78,000.00
O
Mandor L.0.04 0.2000 67,500.00 13,500.00
H
JUMLAH TENAGA KERJA 1,061,500.00
B BAHAN
Balok kayu 1.1000
k m3 6,400,000.00 7,040,000.00
Besi strip tebal 5mm 15.0000 9,000.00 135,000.00
gk
Paku 12 cm 5.6000 15,000.00 84,000.00
g
JUMLAH HARGA BAHAN 7,259,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 8,320,500.00
E Overhead & Profit 10% x D 10% 832,050.00
F Harga Satuan Pekerjaan (D+E) 9,152,550.00

A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 6.7000 55,000.00 368,500.00
Tukang Kayu L.0.02 OH 20.1000 62,500.00 1,256,250.00
Kepala tukang L.0.03 OH 2.0100 65,000.00 130,650.00
Mandor L.0.04 OH 0.3350 67,500.00 22,612.50
JUMLAH TENAGA KERJA 1,778,012.50
B BAHAN
Balok kayu m3 1.2000 9,500,000.00 11,400,000.00
Besi strip tebal 5mm kg 15.0000 9,000.00 135,000.00
Paku 12 cm kg 5.6000 15,000.00 84,000.00
JUMLAH HARGA BAHAN 11,619,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,397,012.50
E Overhead & Profit 10% x D 10% 1,339,701.25
F Harga Satuan Pekerjaan (D+E) 14,736,713.75

A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 6.7000 55,000.00 368,500.00
H
Tukang Kayu L.0.02 OH 20.1000 62,500.00 1,256,250.00
Hal 132/229
Kepala tukang L.0.03 OH 2.0100 65,000.00 130,650.00
O
Mandor L.0.04 0.3350 67,500.00 22,612.50
H
JUMLAH TENAGA KERJA 1,778,012.50
B BAHAN
Balok kayu m3 1.1000 6,400,000.00 7,040,000.00
Besi strip tebal 5 mm kk 15.0000 9,000.00 135,000.00
Paku 12 cm gg 3.0000 15,000.00 45,000.00
JUMLAH HARGA BAHAN 7,220,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 8,998,012.50
E Overhead & Profit 10% x D 10% 899,801.25
F Harga Satuan Pekerjaan (D+E) 9,897,813.75

A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1000 55,000.00 5,500.00
Tukang Kayu L.0.02 OH 0.1000 62,500.00 6,250.00
3. Kepala tukang L.0.03 OH 0.0100 65,000.00 650.00
O
4. Mandor L.0.04 0.0050 67,500.00 337.50
H
JUMLAH TENAGA KERJA 12,737.50
B BAHAN
1.Kaso-kaso 5 x 7cm m3 0.0140 6,400,000.00 89,600.00
2.Reng 2 x 3 cm 0.0027
k m3 6,400,000.00 17,280.00
3. Paku 5 dan 10 cm 0.2500 15,000.00 3,750.00
g
JUMLAH HARGA BAHAN 110,630.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 123,367.50
E Overhead & Profit 10% x D 10% 12,336.75
F Harga Satuan Pekerjaan (D+E) 135,704.25

A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1000 55,000.00 5,500.00
Tukang Kayu L.0.02 OH 0.1000 62,500.00 6,250.00
Kepala tukang L.0.03 OH 0.0100 65,000.00 650.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 12,737.50
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0140 6,400,000.00 89,600.00
Reng (3 x 4) cm 0.0054
k m3 6,400,000.00 34,560.00
Paku 5 dan 10 cm 0.2500 15,000.00 3,750.00
g
JUMLAH HARGA BAHAN 127,910.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 140,647.50
E Overhead & Profit 10% x D 10% 14,064.75
F Harga Satuan Pekerjaan (D+E) 154,712.25

A.4.6.1.17.a Pemasangan 1 m2 rangka atap palentong atau vlampers, kayu kelas II


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1000 55,000.00 5,500.00
Tukang Kayu L.0.02 OH 0.1000 62,500.00 6,250.00
Hal 133/229
Kepala tukang L.0.03 OH 0.0100 65,000.00 650.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 12,737.50
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0088 6,400,000.00 56,000.00
Reng (2 x3) cm 0.0033
k m3 6,400,000.00 21,120.00
Paku 5 dan 10 cm 0.2500 15,000.00 3,750.00
g
JUMLAH HARGA BAHAN 80,870.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 93,607.50
E Overhead & Profit 10% x D 10% 9,360.75
F Harga Satuan Pekerjaan (D+E) 102,968.25

A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1200 55,000.00 6,600.00
Tukang Kayu L.0.02 OH 0.1200 62,500.00 7,500.00
Kepala tukang L.0.03 OH 0.0120 65,000.00 780.00
Mandor L.0.04 OH 0.0060 67,500.00 405.00
JUMLAH TENAGA KERJA 15,285.00
B BAHAN
Kayu kelas II m3 0.0140 6,400,000.00 89,600.00
Paku 5 - 10 cm m3 0.0570 15,000.00 855.00
JUMLAH HARGA BAHAN 90,455.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 105,740.00
E Overhead & Profit 10% x D 10% 10,574.00
F Harga Satuan Pekerjaan (D+E) 116,314.00

A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.1500 55,000.00 8,250.00
H
Tukang Kayu L.0.02 OH 0.3000 62,500.00 18,750.00
Kepala tukang L.0.03 OH 0.0300 65,000.00 1,950.00
O
Mandor L.0.04 0.0750 67,500.00 5,062.50
H
JUMLAH TENAGA KERJA 34,012.50
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0154 6,400,000.00 98,560.00
Paku 7 cm – 10 cm kg 0.2000 15,000.00 3,000.00
JUMLAH HARGA BAHAN 101,560.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 135,572.50
E Overhead & Profit 10% x D 10% 13,557.25
F Harga Satuan Pekerjaan (D+E) 149,129.75

A.4.6.1.20.Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.2000 55,000.00 11,000.00
H
Tukang Kayu L.0.02 OH 0.3000 62,500.00 18,750.00
Kepala tukang L.0.03 OH 0.0300 65,000.00 1,950.00
O
Mandor L.0.04 0.0100 67,500.00 675.00
H
Hal 134/229
JUMLAH TENAGA KERJA 32,375.00
B BAHAN
Kaso-kaso
0.0163
5 x 7 cm k m3 6,400,000.00 104,320.00
Paku 7 – 10 cm 0.2500 15,000.00 3,750.00
g
JUMLAH HARGA BAHAN 108,070.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 140,445.00
E Overhead & Profit 10% x D 10% 14,044.50
F Harga Satuan Pekerjaan (D+E) 154,489.50

A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.1000 55,000.00 5,500.00
H
Tukang Kayu L.0.02 OH 0.2000 62,500.00 12,500.00
Kepala tukang L.0.03 OH 0.0200 65,000.00 1,300.00
O
Mandor L.0.04 0.0050 67,500.00 337.50
H
JUMLAH TENAGA KERJA 19,637.50
B BAHAN
Papan kayu m3 0.0108 6,400,000.00 69,120.00
Paku 5 dan 7 cm kg 0.1000 15,000.00 1,500.00
JUMLAH HARGA BAHAN 70,620.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 90,257.50
E Overhead & Profit 10% x D 10% 9,025.75
F Harga Satuan Pekerjaan (D+E) 99,283.25

A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.1000 55,000.00 5,500.00
H
Tukang Kayu L.0.02 OH 0.2000 62,500.00 12,500.00
Kepala tukang L.0.03 OH 0.0200 65,000.00 1,300.00
O
Mandor L.0.04 0.0050 67,500.00 337.50
H
JUMLAH TENAGA KERJA 19,637.50
B BAHAN
Papan kayu 0.0110
k m3 6,400,000.00 70,400.00
Paku 5 dan 7 cm 0.0500 15,000.00 750.00
g
JUMLAH HARGA BAHAN 71,150.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 90,787.50
E Overhead & Profit 10% x D 10% 9,078.75
F Harga Satuan Pekerjaan (D+E) 99,866.25

A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.1500 55,000.00 8,250.00
H
Tukang Kayu L.0.02 OH 0.4500 62,500.00 28,125.00
Kepala tukang L.0.03 OH 0.0450 65,000.00 2,925.00
O
Mandor L.0.04 0.0080 67,500.00 540.00
H
JUMLAH TENAGA KERJA 39,840.00
B BAHAN
Balok kayu m3 0.0280 6,400,000.00 179,200.00
Hal 135/229
k
Paku 5 dan 7 cm 0.1500 15,000.00 2,250.00
g
JUMLAH HARGA BAHAN 181,450.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 221,290.00
E Overhead & Profit 10% x D 10% 22,129.00
F Harga Satuan Pekerjaan (D+E) 243,419.00

A.4.6.1.24. Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1500 55,000.00 8,250.00
Tukang Kayu L.0.02 OH 0.4500 62,500.00 28,125.00
Kepala tukang L.0.03 OH 0.0450 65,000.00 2,925.00
Mandor L.0.04 OH 0.0080 67,500.00 540.00
JUMLAH TENAGA KERJA 39,840.00
B BAHAN
Balok kayu, 6 x 12 m3 0.0280 6,400,000.00 179,200.00
Paku 5 dan 10 kg 0.1500 15,000.00 2,250.00
Lemba
Teakwood 4 mm, 120 x 240 0.8600 70,000.00 60,200.00
r
Lem kayu kg 0.5600 16,000.00 8,960.00
JUMLAH HARGA BAHAN 250,610.00
C PERALATAN
JUMLAH HARGA PERALATAN
D Jumlah (A+B+C) 290,450.00
E Overhead & Profit 10% x D 10% 29,045.00
F Harga Satuan Pekerjaan (D+E) 319,495.00

A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.2000 55,000.00 11,000.00
H
Tukang Kayu L.0.02 OH 0.6000 62,500.00 37,500.00
Kepala tukang L.0.03 OH 0.0600 65,000.00 3,900.00
O
Mandor L.0.04 0.0100 67,500.00 675.00
H
JUMLAH TENAGA KERJA 53,075.00
B BAHAN
Balok kayu, 6 x 12 m3 0.0280 6,400,000.00 179,200.00
Paku 5 dan 10 kg 0.1500 15,000.00 2,250.00
Lemba
Plywood 4 mm, 120 x 240 0.8600 70,000.00 60,200.00
r
Lem kayu kg 0.5600 16,000.00 8,960.00
JUMLAH HARGA BAHAN 250,610.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 303,685.00
E Overhead & Profit 10% x D 10% 30,368.50
F Harga Satuan Pekerjaan (D+E) 334,053.50

A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.6000 55,000.00 33,000.00
H
Tukang Kayu L.0.02 OH 1.8000 62,500.00 112,500.00
Kepala tukang L.0.03 OH 0.1800 65,000.00 11,700.00
O
Mandor L.0.04 0.0300 67,500.00 2,025.00
H
JUMLAH TENAGA KERJA 159,225.00
B BAHAN

Hal 136/229
Papan kayu 0.0070
k m3 11,000,000.00 77,000.00
Paku 5 dan 10 0.1000 15,000.00 1,500.00
gk
Paku skrup 10 cm 0.1500 27,000.00 4,050.00
g
JUMLAH HARGA BAHAN 82,550.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 241,775.00
E Overhead & Profit 10% x D 10% 24,177.50
F Harga Satuan Pekerjaan (D+E) 265,952.50

A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.0250 55,000.00 1,375.00
H
Tukang Kayu L.0.02 OH 0.0750 62,500.00 4,687.50
Kepala tukang L.0.03 OH 0.0080 65,000.00 520.00
O
Mandor L.0.04 0.0010 67,500.00 67.50
H
JUMLAH TENAGA KERJA 6,650.00
B BAHAN
Plywood 4 mm 0.4000
k m3 70,000.00 28,000.00
Paku 1 dan 2,5 0.0500 19,000.00 950.00
g
JUMLAH HARGA BAHAN 28,950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 35,600.00
E Overhead & Profit 10% x D 10% 3,560.00
F Harga Satuan Pekerjaan (D+E) 39,160.00

A.4.6.1.28. Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1000 55,000.00 5,500.00
Tukang Kayu L.0.02 OH 0.0500 62,500.00 3,125.00
3. Kepala tukang L.0.03 OH 0.0050 65,000.00 325.00
O
4. Mandor L.0.04 0.0050 67,500.00 337.50
H
JUMLAH TENAGA KERJA 9,287.50
B BAHAN
Bilik bambu m2 1.5000 -
Kaso-kaso 5 x 7 0.0140
k m3 -
Paku 0.0120 19,000.00 228.00
g
List kayu 2/4 m3 0.0030 -
JUMLAH HARGA BAHAN 228.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 9,515.50
E Overhead & Profit 10% x D 10% 951.55
F Harga Satuan Pekerjaan (D+E) 10,467.05

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


A.4.6.2.1. Pemasangan 1 buah kunci tanam antik
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA KERJA
Pekerja L.0.01 OH 0.0600 55,000.00 3,300.00
Tukang Kayu L.0.02 OH 0.6000 62,500.00 37,500.00
Kepala tukang L.0.03 OH 0.0600 65,000.00 3,900.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 44,902.50
Hal 137/229
B BAHAN
Kunci tanam antik Bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 44,902.50
E Overhead & Profit 10% x D 10% 4,490.25
F Harga Satuan Pekerjaan (D+E) 49,392.75

A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA KERJA
Pekerja L.0.01 OH 0.0100 55,000.00 550.00
Tukang Kayu L.0.02 OH 0.5000 62,500.00 31,250.00
Kepala tukang L.0.03 OH 0.0500 65,000.00 3,250.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 35,387.50
B BAHAN
Kunci tanam biasa Bh 1.0000 65,000.00 65,000.00
JUMLAH HARGA BAHAN 65,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 100,387.50
E Overhead & Profit 10% x D 10% 10,038.75
F Harga Satuan Pekerjaan (D+E) 110,426.25

A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA KERJA
Pekerja L.0.01 OH 0.0050 55,000.00 275.00
Tukang Kayu L.0.02 OH 0.5000 62,500.00 31,250.00
Kepala tukang L.0.03 OH 0.0500 65,000.00 3,250.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 34,977.50
B BAHAN
Kunci tanam KM Bh 1.0000 45,000.00 45,000.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 79,977.50
E Overhead & Profit 10% x D 10% 7,997.75
F Harga Satuan Pekerjaan (D+E) 87,975.25

A.4.6.2.4. Pemasangan 1 buah kunci silinder


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA KERJA
Pekerja L.0.01 OH 0.0050 55,000.00 275.00
Tukang Kayu L.0.02 OH 0.5000 62,500.00 31,250.00
Kepala tukang L.0.03 OH 0.0500 65,000.00 3,250.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 34,977.50
B BAHAN
Kunci silinder Bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 34,977.50
Hal 138/229
E Overhead & Profit 10% x D 10% 3,497.75
F Harga Satuan Pekerjaan (D+E) 38,475.25

A.4.6.2.5. Pemasangan 1 buah engsel pintu


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0150 55,000.00 825.00
Tukang Kayu L.0.02 OH 0.1500 62,500.00 9,375.00
Kepala tukang L.0.03 OH 0.0150 65,000.00 975.00
Mandor L.0.04 OH 0.0008 67,500.00 54.00
JUMLAH TENAGA KERJA 11,229.00
B BAHAN
Engsel pintu Bh 1.0000 21,000.00 21,000.00
JUMLAH HARGA BAHAN 21,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 32,229.00
E Overhead & Profit 10% x D 10% 3,222.90
F Harga Satuan Pekerjaan (D+E) 35,451.90

A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0100 55,000.00 550.00
Tukang Kayu L.0.02 OH 0.1000 62,500.00 6,250.00
Kepala tukang L.0.03 OH 0.0100 65,000.00 650.00
Mandor L.0.04 OH 0.0005 67,500.00 33.75
JUMLAH TENAGA KERJA 7,483.75
B BAHAN
Engsel kupu-kupu Bh 1.0000 16,000.00 16,000.00
JUMLAH HARGA BAHAN 16,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 23,483.75
E Overhead & Profit 10% x D 10% 2,348.38
F Harga Satuan Pekerjaan (D+E) 25,832.13

A.4.6.2.7. Pemasangan 1 buah engsel angin


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1000 55,000.00 5,500.00
Tukang Kayu L.0.02 OH 0.2000 62,500.00 12,500.00
Kepala tukang L.0.03 OH 0.0200 65,000.00 1,300.00
Mandor L.0.04 OH 0.0005 67,500.00 33.75
JUMLAH TENAGA KERJA 19,333.75
B BAHAN
Engsel angin Bh 1.0000 16,000.00 16,000.00
JUMLAH HARGA BAHAN 16,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 35,333.75
E Overhead & Profit 10% x D 10% 3,533.38
F Harga Satuan Pekerjaan (D+E) 38,867.13

A.4.6.2.8. Pemasangan 1 buah spring knip


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA

Hal 139/229
Pekerja L.0.01 OH 0.0150 55,000.00 825.00
Tukang Kayu L.0.02 OH 0.1500 62,500.00 9,375.00
Kepala tukang L.0.03 OH 0.0150 65,000.00 975.00
Mandor L.0.04 OH 0.0080 67,500.00 540.00
JUMLAH TENAGA KERJA 11,715.00
B BAHAN
Spring knip Bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 11,715.00
E Overhead & Profit 10% x D 10% 1,171.50
F Harga Satuan Pekerjaan (D+E) 12,886.50

A.4.6.2.9. Pemasangan 1 buah kait angin


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0150 55,000.00 825.00
Tukang Kayu L.0.02 OH 0.1500 62,500.00 9,375.00
Kepala tukang L.0.03 OH 0.0150 65,000.00 975.00
Mandor L.0.04 OH 0.0080 67,500.00 540.00
JUMLAH TENAGA KERJA 11,715.00
B BAHAN
Kait angin Bh 1.0000 12,500.00 12,500.00
JUMLAH HARGA BAHAN 12,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 24,215.00
E Overhead & Profit 10% x D 10% 2,421.50
F Harga Satuan Pekerjaan (D+E) 26,636.50

A.4.6.2.10. Pemasangan 1 buah door closer


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.0500 55,000.00 2,750.00
H
Tukang Kayu L.0.02 OH 0.5000 62,500.00 31,250.00
Kepala tukang L.0.03 OH 0.0500 65,000.00 3,250.00
O
Mandor L.0.04 0.0030 67,500.00 202.50
H
JUMLAH TENAGA KERJA 37,452.50
B BAHAN s
Door closer e 1.0000 135,000.00 135,000.00
t JUMLAH HARGA BAHAN 135,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 172,452.50
E Overhead & Profit 10% x D 10% 17,245.25
F Harga Satuan Pekerjaan (D+E) 189,697.75

A.4.6.2.11. Pemasangan 1 buah kunci slot


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0200 55,000.00 1,100.00
Tukang Kayu L.0.02 OH 0.2000 62,500.00 12,500.00
Kepala tukang L.0.03 OH 0.0200 65,000.00 1,300.00
Mandor L.0.04 OH 0.0010 67,500.00 67.50
JUMLAH TENAGA KERJA 14,967.50
B BAHAN

Hal 140/229
Kunci slot Bh 1.0000 75,000.00 75,000.00
JUMLAH HARGA BAHAN 75,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 89,967.50
E Overhead & Profit 10% x D 10% 8,996.75
F Harga Satuan Pekerjaan (D+E) 98,964.25

A.4.6.2.12. Pemasangan 1 buah Door holder


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0500 55,000.00 2,750.00
Tukang Kayu L.0.02 OH 0.5000 62,500.00 31,250.00
Kepala tukang L.0.03 OH 0.0500 65,000.00 3,250.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 37,452.50
B BAHAN
Door holder Bh 1.0000 45,000.00 45,000.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 82,452.50
E Overhead & Profit 10% x D 10% 8,245.25
F Harga Satuan Pekerjaan (D+E) 90,697.75

A.4.6.2.13. Pemasangan 1 buah door stop


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0100 55,000.00 550.00
Tukang Kayu L.0.02 OH 0.1000 62,500.00 6,250.00
Kepala tukang L.0.03 OH 0.0100 65,000.00 650.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 7,787.50
B BAHAN
Door stop Bh 1.0000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 35,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 42,787.50
E Overhead & Profit 10% x D 10% 4,278.75
F Harga Satuan Pekerjaan (D+E) 47,066.25

A.4.6.2.14. Pemasangan 1 buah Rrel pintu sorong


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.0600 55,000.00 3,300.00
H
Tukang Kayu L.0.02 OH 0.6000 62,500.00 37,500.00
Kepala tukang L.0.03 OH 0.0600 65,000.00 3,900.00
O
Mandor L.0.04 0.0030 67,500.00 202.50
H
JUMLAH TENAGA KERJA 44,902.50
B BAHAN S
Rel pintu sorong e 1.0000 120,000.00 120,000.00
t JUMLAH HARGA BAHAN 120,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 164,902.50
E Overhead & Profit 10% x D 10% 16,490.25

Hal 141/229
F Harga Satuan Pekerjaan (D+E) 181,392.75

A.4.6.2.15. Pemasangan 1 buah kunci lemari


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.0250 55,000.00 1,375.00
H
Tukang Kayu L.0.02 OH 0.2500 62,500.00 15,625.00
Kepala tukang L.0.03 OH 0.0250 65,000.00 1,625.00
O
Mandor L.0.04 0.0013 67,500.00 87.75
H
JUMLAH TENAGA KERJA 18,712.75
B BAHAN S
Kunci lemari e 1.0000 25,000.00 25,000.00
t JUMLAH HARGA BAHAN 25,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 43,712.75
E Overhead & Profit 10% x D 10% 4,371.28
F Harga Satuan Pekerjaan (D+E) 48,084.03

A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.0150 55,000.00 825.00
H
Tukang Kayu L.0.02 OH 0.1500 62,500.00 9,375.00
Kepala tukang L.0.03 OH 0.0150 65,000.00 975.00
O
Mandor L.0.04 0.0008 67,500.00 54.00
H
JUMLAH TENAGA KERJA 11,229.00
B BAHAN
m
Kaca tebal 3mm 1.1000 65,000.00 71,500.00
2K
SEalant 0.0500 35,000.00 1,750.00
g
JUMLAH HARGA BAHAN 73,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 84,479.00
E Overhead & Profit 10% x D 10% 8,447.90
F Harga Satuan Pekerjaan (D+E) 92,926.90

A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.0150 55,000.00 825.00
H
Tukang Kayu L.0.02 OH 0.1500 62,500.00 9,375.00
Kepala tukang L.0.03 OH 0.0150 65,000.00 975.00
O
Mandor L.0.04 0.0008 67,500.00 54.00
H
JUMLAH TENAGA KERJA 11,229.00
B BAHAN
m
Kaca tebal 5 mm 1.1000 85,000.00 93,500.00
2K
SEalant 0.0500 35,000.00 1,750.00
g
JUMLAH HARGA BAHAN 95,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 106,479.00
E Overhead & Profit 10% x D 10% 10,647.90
F Harga Satuan Pekerjaan (D+E) 117,126.90

A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
Hal 142/229
A TENAGA
O
Pekerja L.0.01 0.0170 55,000.00 935.00
H
Tukang Kayu L.0.02 OH 0.1700 62,500.00 10,625.00
Kepala tukang L.0.03 OH 0.0170 65,000.00 1,105.00
O
Mandor L.0.04 0.0009 67,500.00 60.75
H
JUMLAH TENAGA KERJA 12,725.75
B BAHAN
m
Kaca tebal 8 mm 1.1000 185,000.00 203,500.00
2K
SEalant 0.0700 35,000.00 2,450.00
g
JUMLAH HARGA BAHAN 205,950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 218,675.75
E Overhead & Profit 10% x D 10% 21,867.58
F Harga Satuan Pekerjaan (D+E) 240,543.33

A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.0250 55,000.00 1,375.00
H
Tukang Kayu L.0.02 OH 0.2500 62,500.00 15,625.00
Kepala tukang L.0.03 OH 0.0250 65,000.00 1,625.00
O
Mandor L.0.04 0.0013 67,500.00 87.75
H
JUMLAH TENAGA KERJA 18,712.75
B BAHAN
m
Kaca buram 12 mm 1.1000 -
2K
SEalant 0.0700 -
g
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 18,712.75
E Overhead & Profit 10% x D 10% 1,871.28
F Harga Satuan Pekerjaan (D+E) 20,584.03

A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.0150 55,000.00 825.00
H
Tukang Kayu L.0.02 OH 0.1500 62,500.00 9,375.00
Kepala tukang L.0.03 OH 0.0150 65,000.00 975.00
O
Mandor L.0.04 0.0080 67,500.00 540.00
H
JUMLAH TENAGA KERJA 11,715.00
B BAHAN
m
Kaca cermin 5 mm 1.1000 200,000.00 220,000.00
2
JUMLAH HARGA BAHAN 220,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 231,715.00
E Overhead & Profit 10% x D 10% 23,171.50
F Harga Satuan Pekerjaan (D+E) 254,886.50

A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 3 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.0170 55,000.00 935.00
H
Tukang Kayu L.0.02 OH 0.1700 62,500.00 10,625.00
Kepala tukang L.0.03 OH 0.0170 65,000.00 1,105.00
Hal 143/229
O
Mandor L.0.04 0.0090 67,500.00 607.50
H
JUMLAH TENAGA KERJA 13,272.50
B BAHAN
m
Kaca cermin 3mm 1.1000 120,000.00 132,000.00
2
JUMLAH HARGA BAHAN 132,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 145,272.50
E Overhead & Profit 10% x D 10% 14,527.25
F Harga Satuan Pekerjaan (D+E) 159,799.75

A.4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.0150 55,000.00 825.00
H
Tukang Kayu L.0.02 OH 0.1500 62,500.00 9,375.00
Kepala tukang L.0.03 OH 0.0150 65,000.00 975.00
O
Mandor L.0.04 0.0080 67,500.00 540.00
H
JUMLAH TENAGA KERJA 11,715.00
B BAHAN
Kaca wireglassed 5
m2 1.1000 -
mm
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 11,715.00
E Overhead & Profit 10% x D 10% 1,171.50
F Harga Satuan Pekerjaan (D+E) 12,886.50

A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
O
Pekerja L.0.01 0.0750 55,000.00 4,125.00
H
Tukang Kayu L.0.02 OH 0.1500 62,500.00 9,375.00
Kepala tukang L.0.03 OH 0.0150 65,000.00 975.00
O
Mandor L.0.04 0.0040 67,500.00 270.00
H
JUMLAH TENAGA KERJA 14,745.00
B BAHAN
m
Kaca patri 5mm 1.1000 -
2K
Sealant 0.0500 -
g
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 14,745.00
E Overhead & Profit 10% x D 10% 1,474.50
F Harga Satuan Pekerjaan (D+E) 16,219.50

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1500 55,000.00 8,250.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 8,452.50
B BAHAN
Soda api Kg 0.0500 22,000.00 1,100.00
JUMLAH HARGA BAHAN 1,100.00
C PERALATAN

Hal 144/229
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 9,552.50
E Overhead & Profit 10% x D 10% 955.25
F Harga Satuan Pekerjaan (D+E) 10,507.75

A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1500 55,000.00 8,250.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 8,452.50
B BAHAN
Sabun Kg 0.0500 9,000.00 450.00
JUMLAH HARGA BAHAN 450.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 8,902.50
E Overhead & Profit 10% x D 10% 890.25
F Harga Satuan Pekerjaan (D+E) 9,792.75

A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1500 55,000.00 8,250.00
Mandor L.0.04 OH 0.0080 67,500.00 540.00
JUMLAH TENAGA KERJA 8,790.00
B BAHAN
Sabun Kg 0.0500 9,000.00 450.00
JUMLAH HARGA BAHAN 450.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 9,240.00
E Overhead & Profit 10% x D 10% 924.00
F Harga Satuan Pekerjaan (D+E) 10,164.00

A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0700 55,000.00 3,850.00
Tukang cat L.0.02 OH 0.0090 62,500.00 562.50
Kepala tukang L.0.03 OH 0.0060 65,000.00 390.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 5,005.00
B BAHAN
Cat menie Kg 0.2000 30,000.00 6,000.00
Plamuur Kg 0.1500 9,000.00 1,350.00
Cat dasar Kg 0.1700 60,000.00 10,200.00
Cat penutup Kg 0.2600 60,000.00 15,600.00
Kuas Bh 0.0100 10,000.00 100.00
Pengencer Kg 0.0300 17,000.00 510.00
Ampelas Lbr 0.2000 4,000.00 800.00
JUMLAH HARGA BAHAN 34,560.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 39,565.00
E Overhead & Profit 10% x D 10% 3,956.50
F Harga Satuan Pekerjaan (D+E) 43,521.50

Hal 145/229
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0700 55,000.00 3,850.00
Tukang cat L.0.02 OH 0.1050 62,500.00 6,562.50
Kepala tukang L.0.03 OH 0.0040 65,000.00 260.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 10,875.00
B BAHAN
Cat menie Kg 0.2000 30,000.00 6,000.00
Plamuur Kg 0.1500 9,000.00 1,350.00
Cat dasar Kg 0.1700 60,000.00 10,200.00
Cat penutup Kg 0.3500 60,000.00 21,000.00
Kuas Bh 0.0100 10,000.00 100.00
Pengencer Kg 0.0300 17,000.00 510.00
Ampelas Lbr 0.2000 4,000.00 800.00
JUMLAH HARGA BAHAN 39,960.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 50,835.00
E Overhead & Profit 10% x D 10% 5,083.50
F Harga Satuan Pekerjaan (D+E) 55,918.50

A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0400 55,000.00 2,200.00
Tukang cat L.0.02 OH 0.0630 62,500.00 3,937.50
Kepala tukang L.0.03 OH 0.0630 65,000.00 4,095.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 10,435.00
B BAHAN
Teak oil L 0.3600 30,000.00 10,800.00
JUMLAH HARGA BAHAN 10,800.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 21,235.00
E Overhead & Profit 10% x D 10% 2,123.50
F Harga Satuan Pekerjaan (D+E) 23,358.50

A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0400 55,000.00 2,200.00
Tukang cat L.0.02 OH 0.0600 62,500.00 3,750.00
Kepala tukang L.0.03 OH 0.0160 65,000.00 1,040.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 7,192.50
B BAHAN
Politur L 0.1500 63,000.00 9,450.00
Politur jadi L 0.3720 63,000.00 23,436.00
Ampelas Lbr 2.0000 4,000.00 8,000.00
JUMLAH HARGA BAHAN 40,886.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 48,078.50

Hal 146/229
E Overhead & Profit 10% x D 10% 4,807.85
F Harga Satuan Pekerjaan (D+E) 52,886.35

A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1000 55,000.00 5,500.00
Mandor L.0.04 OH 0.0060 67,500.00 405.00
JUMLAH TENAGA KERJA 5,905.00
B BAHAN
Residu atau ter L 0.3500 12,000.00 4,200.00
JUMLAH HARGA BAHAN 4,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 10,105.00
E Overhead & Profit 10% x D 10% 1,010.50
F Harga Satuan Pekerjaan (D+E) 11,115.50

A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1600 55,000.00 8,800.00
Tukang cat L.0.02 OH 0.1600 62,500.00 10,000.00
Kepala tukang L.0.03 OH 0.0160 65,000.00 1,040.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 20,042.50
B BAHAN
Vernis L 0.1500 52,000.00 7,800.00
Dempul Kg 0.0500 9,000.00 450.00
Ampelas Lbr 0.1000 4,000.00 400.00
JUMLAH HARGA BAHAN 8,650.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 28,692.50
E Overhead & Profit 10% x D 10% 2,869.25
F Harga Satuan Pekerjaan (D+E) 31,561.75

A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0200 55,000.00 1,100.00
Tukang cat L.0.02 OH 0.0630 62,500.00 3,937.50
Kepala tukang L.0.03 OH 0.0063 65,000.00 409.50
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 5,649.50
B BAHAN
Plamuur Kg 0.1000 40,000.00 4,000.00
Cat dasar Kg 0.1000 19,000.00 1,900.00
Cat penutup Kg 0.2600 19,000.00 4,940.00
JUMLAH HARGA BAHAN 10,840.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 16,489.50
E Overhead & Profit 10% x D 10% 1,648.95
F Harga Satuan Pekerjaan (D+E) 18,138.45

A.4.7.1.10a. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) mowilex

Hal 147/229
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0200 55,000.00 1,100.00
Tukang cat L.0.02 OH 0.0630 62,500.00 3,937.50
Kepala tukang L.0.03 OH 0.0063 65,000.00 409.50
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 5,649.50
B BAHAN
Plamuur Kg 0.1000 40,000.00 4,000.00
Cat dasar mowilex Kg 0.1000 45,588.24 4,558.82
Cat dasar mowilex Kg 0.2600 45,588.24 11,852.94
JUMLAH HARGA BAHAN 20,411.76
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 26,061.26
E Overhead & Profit 10% x D 10% 2,606.13
F Harga Satuan Pekerjaan (D+E) 28,667.39

A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0280 55,000.00 1,540.00
Tukang cat L.0.02 OH 0.0420 62,500.00 2,625.00
Kepala tukang L.0.03 OH 0.0042 65,000.00 273.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 4,640.50
B BAHAN
Cat dasar Kg 0.1200 19,000.00 2,280.00
Cat penutup Kg 0.1800 19,000.00 3,420.00
JUMLAH HARGA BAHAN 5,700.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 10,340.50
E Overhead & Profit 10% x D 10% 1,034.05
F Harga Satuan Pekerjaan (D+E) 11,374.55

A.4.7.1.11.a Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) mowilex
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0280 55,000.00 1,540.00
Tukang cat L.0.02 OH 0.0420 62,500.00 2,625.00
Kepala tukang L.0.03 OH 0.0042 65,000.00 273.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 4,640.50
B BAHAN
Cat dasar mowilex Kg 0.1200 45,588.24 5,470.59
Cat penutup mowilex Kg 0.1800 45,588.24 8,205.88
JUMLAH HARGA BAHAN 13,676.47
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 18,316.97
E Overhead & Profit 10% x D 10% 1,831.70
F Harga Satuan Pekerjaan (D+E) 20,148.67

A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA

Hal 148/229
Pekerja L.0.01 OH 0.0280 55,000.00 1,540.00
Tukang cat L.0.02 OH 0.0420 62,500.00 2,625.00
Kepala tukang L.0.03 OH 0.0042 65,000.00 273.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 4,640.50
B BAHAN
Kalkarium Kg 0.1000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 4,640.50
E Overhead & Profit 10% x D 10% 464.05
F Harga Satuan Pekerjaan (D+E) 5,104.55

A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1500 55,000.00 8,250.00
Tukang cat L.0.02 OH 0.0010 62,500.00 62.50
Kepala tukang L.0.03 OH 0.0001 65,000.00 6.50
Mandor L.0.04 OH 0.0025 67,500.00 168.75
JUMLAH TENAGA KERJA 8,487.75
B BAHAN
Kapur sirih Kg 0.1500 4,500.00 675.00
Ampelas Lbr 0.1000 4,000.00 400.00
Alang-alang Ikat 0.2500 3,000.00 750.00
JUMLAH HARGA BAHAN 1,825.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 10,312.75
E Overhead & Profit 10% x D 10% 1,031.28
F Harga Satuan Pekerjaan (D+E) 11,344.03

A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan)


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0400 55,000.00 2,200.00
Tukang cat L.0.02 OH 0.0050 62,500.00 312.50
Kepala tukang L.0.03 OH 0.0005 65,000.00 32.50
Mandor L.0.04 OH 0.0025 67,500.00 168.75
JUMLAH TENAGA KERJA 2,713.75
B BAHAN
Kapur sirih Kg 0.3000 4,500.00 1,350.00
Ampelas Lbr 0.2000 4,000.00 800.00
Alang-alang Ikat 0.2500 3,000.00 750.00
JUMLAH HARGA BAHAN 2,900.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 5,613.75
E Overhead & Profit 10% x D 10% 561.38
F Harga Satuan Pekerjaan (D+E) 6,175.13

A.4.7.1.15. Pemasangan 1 m2 wallpaper


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0200 55,000.00 1,100.00
Tukang cat L.0.02 OH 0.2000 62,500.00 12,500.00

Hal 149/229
Kepala tukang L.0.03 OH 0.0200 65,000.00 1,300.00
Mandor L.0.04 OH 0.0025 67,500.00 168.75
JUMLAH TENAGA KERJA 15,068.75
B BAHAN
Wall paper m2 1.2000 450,000.00 540,000.00
Lem Kg 0.2000 16,000.00 3,200.00
JUMLAH HARGA BAHAN 543,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 558,268.75
E Overhead & Profit 10% x D 10% 55,826.88
F Harga Satuan Pekerjaan (D+E) 614,095.63

A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0200 55,000.00 1,100.00
Tukang cat L.0.02 OH 0.2000 62,500.00 12,500.00
Kepala tukang L.0.03 OH 0.0200 65,000.00 1,300.00
Mandor L.0.04 OH 0.0025 67,500.00 168.75
JUMLAH TENAGA KERJA 15,068.75
B BAHAN
Menie besi Kg 0.1000 30,000.00 3,000.00
Kwas Bh 0.0100 10,000.00 100.00
JUMLAH HARGA BAHAN 3,100.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 18,168.75
E Overhead & Profit 10% x D 10% 1,816.88
F Harga Satuan Pekerjaan (D+E) 19,985.63

A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2500 55,000.00 13,750.00
Tukang cat L.0.02 OH 0.2250 62,500.00 14,062.50
Kepala tukang L.0.02 OH 0.0225 65,000.00 1,462.50
Mandor L.0.04 OH 0.0075 67,500.00 506.25
JUMLAH TENAGA KERJA 29,781.25
B BAHAN
Menie besi Kg 0.1000 30,000.00 3,000.00
Pengencer L 0.0100 17,000.00 170.00
Kwas Bh 0.0100 10,000.00 100.00
Perancah kayu m3 0.0020 -
JUMLAH HARGA BAHAN 3,270.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 33,051.25
E Overhead & Profit 10% x D 10% 3,305.13
F Harga Satuan Pekerjaan (D+E) 36,356.38

A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2500 55,000.00 13,750.00
Tukang cat L.0.02 OH 0.2500 62,500.00 15,625.00
Kepala tukang L.0.03 OH 0.0250 65,000.00 1,625.00

Hal 150/229
Mandor L.0.04 OH 0.0013 67,500.00 87.75
JUMLAH TENAGA KERJA 31,087.75
B BAHAN
Menie A Kg 0.1000 30,000.00 3,000.00
Menie B Kg 0.1000 30,000.00 3,000.00
Cat Kg 0.0800 60,000.00 4,800.00
Kwas Bh 0.0100 10,000.00 100.00
Pengencer L 0.0100 17,000.00 170.00
JUMLAH HARGA BAHAN 11,070.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 42,157.75
E Overhead & Profit 10% x D 10% 4,215.78
F Harga Satuan Pekerjaan (D+E) 46,373.53

A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0600 55,000.00 3,300.00
Tukang cat L.0.02 OH 0.0600 62,500.00 3,750.00
Kepala tukang L.0.03 OH 0.0120 65,000.00 780.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 8,032.50
B BAHAN
Cat Kg 0.3000 60,000.00 18,000.00
Kwas Bh 0.0100 10,000.00 100.00
Pengencer L 0.0100 17,000.00 170.00
JUMLAH HARGA BAHAN 18,270.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 26,302.50
E Overhead & Profit 10% x D 10% 2,630.25
F Harga Satuan Pekerjaan (D+E) 28,932.75

A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4000 55,000.00 22,000.00
Tukang cat L.0.02 OH 0.8000 62,500.00 50,000.00
Kepala tukang L.0.03 OH 0.0800 65,000.00 5,200.00
Mandor L.0.04 OH 0.0200 67,500.00 1,350.00
JUMLAH TENAGA KERJA 78,550.00
B BAHAN
Cat dasar Kg 0.1100 60,000.00 6,600.00
Cat antara Kg 0.1700 60,000.00 10,200.00
Cat penutup Kg 0.0800 60,000.00 4,800.00
Kwas Bh 0.0100 10,000.00 100.00
Pengencer L 0.0100 17,000.00 170.00
JUMLAH HARGA BAHAN 21,870.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 100,420.00
E Overhead & Profit 10% x D 10% 10,042.00
F Harga Satuan Pekerjaan (D+E) 110,462.00

A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
Hal 151/229
A TENAGA
Pekerja L.0.01 OH 0.4000 55,000.00 22,000.00
Tukang cat L.0.02 OH 0.7000 62,500.00 43,750.00
Kepala tukang L.0.03 OH 0.0700 65,000.00 4,550.00
Mandor L.0.04 OH 0.0200 67,500.00 1,350.00
JUMLAH TENAGA KERJA 71,650.00
B BAHAN
Cat dasar Kg 0.3000 60,000.00 18,000.00
Pengencer L 0.0100 17,000.00 170.00
JUMLAH HARGA BAHAN 18,170.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 89,820.00
E Overhead & Profit 10% x D 10% 8,982.00
F Harga Satuan Pekerjaan (D+E) 98,802.00

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A.5.1.1.1. Pemasangan 1 buah closet duduk/monoblock
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.3000 55,000.00 181,500.00
Tukang Batu L.0.02 OH 1.1000 60,000.00 66,000.00
Kepala tukang L.0.03 OH 0.0100 65,000.00 650.00
Mandor L.0.04 OH 0.1600 67,500.00 10,800.00
JUMLAH TENAGA KERJA 258,950.00
B BAHAN
Closet duduk Unit 1.0000 1,300,000.00 1,300,000.00
Perlengkapan Ls 6% x closet 1,300,000.00 78,000.00
JUMLAH HARGA BAHAN 1,378,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,636,950.00
E Overhead & Profit 10% x D 10% 163,695.00
F Harga Satuan Pekerjaan (D+E) 1,800,645.00

A.5.1.1 2. Pemasangan 1 buah closet jongkok porslen


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
TENAGA
Pekerja L.0.01 OH 1.0000 55,000.00 55,000.00
Tukang Batu L.0.02 OH 1.5000 60,000.00 90,000.00
Kepala tukang L.0.03 OH 0.1500 65,000.00 9,750.00
Mandor L.0.04 OH 0.1600 67,500.00 10,800.00
JUMLAH TENAGA KERJA 165,550.00
B BAHAN
Closet jongkok Unit 1.0000 140,000.00 140,000.00
Semen portland Kg 6.0000 1,375.00 8,250.00
Pasir pasang M3 0.0100 200,000.00 2,000.00
JUMLAH HARGA BAHAN 150,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 315,800.00
E Overhead & Profit 10% x D 10% 31,580.00
F Harga Satuan Pekerjaan (D+E) 347,380.00

A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA

Hal 152/229
Pekerja L.0.01 OH 1.0000 55,000.00 55,000.00
Tukang Batu L.0.02 OH 1.5000 60,000.00 90,000.00
Kepala tukang L.0.03 OH 0.1500 65,000.00 9,750.00
Mandor L.0.04 OH 0.0500 67,500.00 3,375.00
JUMLAH TENAGA KERJA 158,125.00
B BAHAN
Closet jongkok Unit 1.0000 140,000.00 140,000.00
Semen portland Kg 6.0000 1,375.00 8,250.00
Pasir pasang M3 0.0100 200,000.00 2,000.00
Bata merah Bh 7.0000 700.00 4,900.00
JUMLAH HARGA BAHAN 155,150.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 313,275.00
E Overhead & Profit 10% x D 10% 31,327.50
F Harga Satuan Pekerjaan (D+E) 344,602.50

A.5.1.1 4. Pemasangan 1 buah urinoir


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.0000 55,000.00 55,000.00
Tukang Batu L.0.02 OH 1.0000 60,000.00 60,000.00
Kepala tukang L.0.03 OH 0.1000 65,000.00 6,500.00
Mandor L.0.04 OH 0.0500 67,500.00 3,375.00
JUMLAH TENAGA KERJA 124,875.00
B BAHAN
Urinoir Unit 1.0000 1,400,000.00 1,400,000.00
Semen portland Kg 6.0000 1,375.00 8,250.00
Pasir pasang M3 0.0100 200,000.00 2,000.00
Perlengkapan % 10.0000 140,000.00
JUMLAH HARGA BAHAN 1,550,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,675,125.00
E Overhead & Profit 10% x D 10% 167,512.50
F Harga Satuan Pekerjaan (D+E) 1,842,637.50

A.5.1.1 5. Pemasangan 1 buah wastafel


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.2000 55,000.00 66,000.00
Tukang Batu L.0.02 OH 1.4500 60,000.00 87,000.00
Kepala tukang L.0.03 OH 0.1500 65,000.00 9,750.00
Mandor L.0.04 OH 0.0600 67,500.00 4,050.00
JUMLAH TENAGA KERJA 166,800.00
B BAHAN
Wastafel INA Unit 1.2000 290,000.00 348,000.00
Semen portland Kg 6.0000 1,375.00 8,250.00
Pasir pasang M3 0.0100 200,000.00 2,000.00
Perlengkapan % 12.0000 41,760.00
JUMLAH HARGA BAHAN 400,010.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 566,810.00
E Overhead & Profit 10% x D 10% 56,681.00
F Harga Satuan Pekerjaan (D+E) 623,491.00

Hal 153/229
A.5.1.1 6. Pemasangan 1 buah bathcuip porselen
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0750 55,000.00 4,125.00
Tukang Batu L.0.02 OH 0.7500 60,000.00 45,000.00
Kepala tukang L.0.03 OH 0.0750 65,000.00 4,875.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 54,202.50
B BAHAN
Bathcuip Unit 1.0000 -
Perlengkapan % 20.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 54,202.50
E Overhead & Profit 10% x D 10% 5,420.25
F Harga Satuan Pekerjaan (D+E) 59,622.75

A.5.1.1 7. Pemasangan 1 buah bak fibreglass vol 1 m3


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.0000 55,000.00 165,000.00
Tukang Batu L.0.02 OH 4.5000 60,000.00 270,000.00
Kepala tukang L.0.03 OH 0.0500 65,000.00 3,250.00
Mandor L.0.04 OH 0.9000 67,500.00 60,750.00
JUMLAH TENAGA KERJA 499,000.00
B BAHAN
Bak fibreglass Unit 1.0000 230,000.00 230,000.00
Perlengkapan Ls 12%xbak 27,600.00
JUMLAH HARGA BAHAN 257,600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 756,600.00
E Overhead & Profit 10% x D 10% 75,660.00
F Harga Satuan Pekerjaan (D+E) 832,260.00

A.5.1.1 8. Pemasangan 1 buah bak mandi batu bata vol 0,30 m3


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 6.0000 55,000.00 330,000.00
Tukang Batu L.0.02 OH 3.0000 60,000.00 180,000.00
Kepala tukang L.0.03 OH 0.3000 65,000.00 19,500.00
Mandor L.0.04 OH 0.0300 67,500.00 2,025.00
JUMLAH TENAGA KERJA 531,525.00
B BAHAN
Bata merah M3 150.0000 700.00 105,000.00
Semen portland Kg 120.0000 1,375.00 165,000.00
Pasir pasang M3 0.3000 200,000.00 60,000.00
Porselen 11x11 bh 360.0000 750.00 270,000.00
Semen warna Kg 6.0000 3,000.00 18,000.00
JUMLAH HARGA BAHAN 618,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,149,525.00
E Overhead & Profit 10% x D 10% 114,952.50
F Harga Satuan Pekerjaan (D+E) 1,264,477.50

Hal 154/229
A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.0000 55,000.00 165,000.00
Tukang Batu L.0.02 OH 4.5000 60,000.00 270,000.00
Kepala tukang L.0.03 OH 0.0500 65,000.00 3,250.00
Mandor L.0.04 OH 0.9000 67,500.00 60,750.00
JUMLAH TENAGA KERJA 499,000.00
B BAHAN
Bak fibreglass Unit 1.0000 -
Perlengkapan Ls 1 2%xbak -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 499,000.00
E Overhead & Profit 10% x D 10% 49,900.00
F Harga Satuan Pekerjaan (D+E) 548,900.00

A.5.1.1 10. Pemasangan 1 buah bak air fibreglass vol 1 m3


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3000 55,000.00 16,500.00
Tukang Batu L.0.02 OH 0.4500 60,000.00 27,000.00
Kepala tukang L.0.03 OH 0.0450 65,000.00 2,925.00
Mandor L.0.04 OH 0.0150 67,500.00 1,012.50
JUMLAH TENAGA KERJA 47,437.50
B BAHAN
Bak air fibreglass Unit 1.0000 -
Perlengkapan % 12.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 47,437.50
E Overhead & Profit 10% x D 10% 4,743.75
F Harga Satuan Pekerjaan (D+E) 52,181.25

A.5.1.1 11. Pemasangan 1 buah bak beton volume 1 m3


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.5000 55,000.00 192,500.00
Tukang Batu L.0.02 OH 4.5000 60,000.00 270,000.00
Kepala tukang L.0.03 OH 0.0500 65,000.00 3,250.00
Mandor L.0.04 OH 0.0180 67,500.00 1,215.00
JUMLAH TENAGA KERJA 466,965.00
B BAHAN
Beton 1:2:3 M3 0.9000 -
Baja tulangan Kg 180.0000 -
Kayu bekisting M2 8.0000 -
Ubin porselen Bh 500.0000 -
Perlengkapan % 10.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 466,965.00
E Overhead & Profit 10% x D 10% 46,696.50
F Harga Satuan Pekerjaan (D+E) 513,661.50

Hal 155/229
A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0300 55,000.00 1,650.00
Tukang Batu L.0.02 OH 0.3000 60,000.00 18,000.00
Kepala tukang L.0.03 OH 0.0300 65,000.00 1,950.00
Mandor L.0.04 OH 0.0150 67,500.00 1,012.50
JUMLAH TENAGA KERJA 22,612.50
B BAHAN
Bak cuci piring Unit 1.0000 -
Waterdrain Bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 22,612.50
E Overhead & Profit 10% x D 10% 2,261.25
F Harga Satuan Pekerjaan (D+E) 24,873.75

A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0500 55,000.00 2,750.00
Tukang Batu L.0.02 OH 0.5000 60,000.00 30,000.00
Kepala tukang L.0.03 OH 0.0500 65,000.00 3,250.00
Mandor L.0.04 OH 0.0250 67,500.00 1,687.50
JUMLAH TENAGA KERJA 37,687.50
B BAHAN
Bak cuci piring Unit 1.0000 205,000.00 205,000.00
Waterdrain Bh 1.0000 25,000.00 25,000.00
Semen portland Kg 20.0000 1,375.00 27,500.00
Pasir pasang M3 0.0500 200,000.00 10,000.00
JUMLAH HARGA BAHAN 267,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 305,187.50
E Overhead & Profit 10% x D 10% 30,518.75
F Harga Satuan Pekerjaan (D+E) 335,706.25

A.5.1.1 14. Pemasangan 1 buah floor drain


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0100 55,000.00 550.00
Tukang Batu L.0.02 OH 0.1000 60,000.00 6,000.00
Kepala tukang L.0.03 OH 0.0100 65,000.00 650.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 7,537.50
B BAHAN
Floor drain Unit 1.0000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 27,537.50
E Overhead & Profit 10% x D 10% 2,753.75
F Harga Satuan Pekerjaan (D+E) 30,291.25

A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
Hal 156/229
A TENAGA
Pekerja L.0.01 OH 2.1600 55,000.00 118,800.00
Tukang Batu L.0.02 OH 0.7200 60,000.00 43,200.00
Kepala tukang L.0.03 OH 0.0720 65,000.00 4,680.00
Mandor L.0.04 OH 0.0110 67,500.00 742.50
JUMLAH TENAGA KERJA 167,422.50
B BAHAN
Bata merah bh 40.0000 700.00 28,000.00
Semen portland Kg 44.0000 1,375.00 60,500.00
Pasir pasang M3 0.0700 200,000.00 14,000.00
Pasir beton M3 0.0600 200,000.00 12,000.00
Kerikil M3 0.0700 250,000.00 17,500.00
Baja tulangan Kg 1.6000 12,500.00 20,000.00
JUMLAH HARGA BAHAN 152,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 319,422.50
E Overhead & Profit 10% x D 10% 31,942.25
F Harga Satuan Pekerjaan (D+E) 351,364.75

A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.2000 55,000.00 176,000.00
Tukang Batu L.0.02 OH 1.1500 60,000.00 69,000.00
Kepala tukang L.0.03 OH 0.0110 65,000.00 715.00
Mandor L.0.04 OH 0.0160 67,500.00 1,080.00
JUMLAH TENAGA KERJA 246,795.00
B BAHAN
Bata merah bh 70.0000 700.00 49,000.00
Semen portland Kg 77.0000 1,375.00 105,875.00
Pasir pasang M3 0.1300 200,000.00 26,000.00
Pasir beton M3 0.0900 200,000.00 18,000.00
Kerikil M3 0.0200 250,000.00 5,000.00
Baja tulangan Kg 2.6000 12,500.00 32,500.00
JUMLAH HARGA BAHAN 236,375.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 483,170.00
E Overhead & Profit 10% x D 10% 48,317.00
F Harga Satuan Pekerjaan (D+E) 531,487.00

A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.2000 55,000.00 176,000.00
Tukang Batu L.0.02 OH 1.1500 60,000.00 69,000.00
Kepala tukang L.0.03 OH 0.0110 65,000.00 715.00
Mandor L.0.04 OH 0.0160 67,500.00 1,080.00
JUMLAH TENAGA KERJA 246,795.00
B BAHAN
Bata merah bh 123.0000 700.00 86,100.00
Semen portland Kg 114.0000 1,375.00 156,750.00
Pasir pasang M3 0.1840 200,000.00 36,800.00
Pasir beton M3 0.1200 200,000.00 24,000.00
Kerikil M3 0.0330 250,000.00 8,250.00
Baja tulangan Kg 4.8500 12,500.00 60,625.00
Hal 157/229
JUMLAH HARGA BAHAN 372,525.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 619,320.00
E Overhead & Profit 10% x D 10% 61,932.00
F Harga Satuan Pekerjaan (D+E) 681,252.00

A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½”


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0540 55,000.00 2,970.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0270 67,500.00 1,822.50
JUMLAH TENAGA KERJA 10,777.50
B BAHAN
Pipa galvanis 1/2” M 1.2000 16,666.67 20,000.00
Perlengkapan Ls 35%xpipa 7,000.00
JUMLAH HARGA BAHAN 27,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 37,777.50
E Overhead & Profit 10% x D 10% 3,777.75
F Harga Satuan Pekerjaan (D+E) 41,555.25

A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4”


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA KERJA
Pekerja L.0.01 OH 0.0100 55,000.00 550.00
Tukang Batu L.0.02 OH 0.4000 60,000.00 24,000.00
Kepala tukang L.0.03 OH 0.0400 65,000.00 2,600.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 27,487.50
B BAHAN
Kran air M 1.0000 26,500.00 26,500.00
Sealtape Buah 0.0250 3,500.00 87.50
JUMLAH HARGA BAHAN 26,587.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 54,075.00
E Overhead & Profit 10% x D 10% 5,407.50
F Harga Satuan Pekerjaan (D+E) 59,482.50

A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter 3/4”


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0540 55,000.00 2,970.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0270 67,500.00 1,822.50
JUMLAH TENAGA KERJA 10,777.50
B BAHAN
Pipa galvanis 3/4” M 1.2000 20,833.33 25,000.00
Perlengkapan % 35.0000 8,750.00
JUMLAH HARGA BAHAN 33,750.00
C PERALATAN
JUMLAH HARGA ALAT

Hal 158/229
D Jumlah (A+B+C) 44,527.50
E Overhead & Profit 10% x D 10% 4,452.75
F Harga Satuan Pekerjaan (D+E) 48,980.25

A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1”


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0540 55,000.00 2,970.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0270 67,500.00 1,822.50
JUMLAH TENAGA KERJA 10,777.50
B BAHAN
Pipa galvanis 1” M 1.2000 25,000.00 30,000.00
Perlengkapan % 35.0000 10,500.00
JUMLAH HARGA BAHAN 40,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 51,277.50
E Overhead & Profit 10% x D 10% 5,127.75
F Harga Satuan Pekerjaan (D+E) 56,405.25

A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½”


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1080 55,000.00 5,940.00
Tukang Batu L.0.02 OH 0.1800 60,000.00 10,800.00
Kepala tukang L.0.03 OH 0.0180 65,000.00 1,170.00
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 18,247.50
B BAHAN
Pipa galvanis 11/2” M 1.2000 38,333.33 46,000.00
Perlengkapan % 35.0000 16,100.00
JUMLAH HARGA BAHAN 62,100.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 80,347.50
E Overhead & Profit 10% x D 10% 8,034.75
F Harga Satuan Pekerjaan (D+E) 88,382.25

A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3”


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1350 55,000.00 7,425.00
Tukang Batu L.0.02 OH 0.2250 60,000.00 13,500.00
Kepala tukang L.0.03 OH 0.0230 65,000.00 1,495.00
Mandor L.0.04 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 22,892.50
B BAHAN
Pipa galvanis 3” M 1.2000 70,833.33 85,000.00
Perlengkapan % 35.0000 -
JUMLAH HARGA BAHAN 85,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 107,892.50
E Overhead & Profit 10% x D 10% 10,789.25
F Harga Satuan Pekerjaan (D+E) 118,681.75

Hal 159/229
A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4”
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1350 55,000.00 7,425.00
Tukang Batu L.0.02 OH 0.2250 60,000.00 13,500.00
Kepala tukang L.0.03 OH 0.0230 65,000.00 1,495.00
Mandor L.0.04 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 22,892.50
B BAHAN
Pipa galvanis 4” M 1.2000 -
Perlengkapan % 35.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 22,892.50
E Overhead & Profit 10% x D 10% 2,289.25
F Harga Satuan Pekerjaan (D+E) 25,181.75

A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2”


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0360 55,000.00 1,980.00
Tukang Batu L.0.02 OH 0.0600 60,000.00 3,600.00
Kepala tukang L.0.03 OH 0.0060 65,000.00 390.00
Mandor L.0.04 OH 0.0020 67,500.00 135.00
JUMLAH TENAGA KERJA 6,105.00
B BAHAN
Pipa PVC 1/2” M 1.2000 4,750.00 5,700.00
Perlengkapan % 35.0000 1,995.00
JUMLAH HARGA BAHAN 7,695.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,800.00
E Overhead & Profit 10% x D 10% 1,380.00
F Harga Satuan Pekerjaan (D+E) 15,180.00

A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4”


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0360 55,000.00 1,980.00
Tukang Batu L.0.02 OH 0.0600 60,000.00 3,600.00
Kepala tukang L.0.03 OH 0.0060 65,000.00 390.00
Mandor L.0.04 OH 0.0020 67,500.00 135.00
JUMLAH TENAGA KERJA 6,105.00
B BAHAN
Pipa PVC 1/2” M 1.2000 6,500.00 7,800.00
Perlengkapan % 35.0000 2,730.00
JUMLAH HARGA BAHAN 10,530.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 16,635.00
E Overhead & Profit 10% x D 10% 1,663.50
F Harga Satuan Pekerjaan (D+E) 18,298.50

A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1”


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
Hal 160/229
A TENAGA
Pekerja L.0.01 OH 0.0360 55,000.00 1,980.00
Tukang Batu L.0.02 OH 0.0600 60,000.00 3,600.00
Kepala tukang L.0.03 OH 0.0060 65,000.00 390.00
Mandor L.0.04 OH 0.0020 67,500.00 135.00
JUMLAH TENAGA KERJA 6,105.00
B BAHAN
Pipa PVC 1” M 1.2000 7,750.00 9,300.00
Perlengkapan % 35.0000 3,255.00
JUMLAH HARGA BAHAN 12,555.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 18,660.00
E Overhead & Profit 10% x D 10% 1,866.00
F Harga Satuan Pekerjaan (D+E) 20,526.00

A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2”


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0540 55,000.00 2,970.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 9,157.50
B BAHAN
Pipa PVC 11/2” M 1.2000 13,750.00 16,500.00
Perlengkapan % 35.0000 5,775.00
JUMLAH HARGA BAHAN 22,275.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 31,432.50
E Overhead & Profit 10% x D 10% 3,143.25
F Harga Satuan Pekerjaan (D+E) 34,575.75

A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2”


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0540 55,000.00 2,970.00
Tukang Batu L.0.02 OH 0.0900 60,000.00 5,400.00
Kepala tukang L.0.03 OH 0.0090 65,000.00 585.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 9,157.50
B BAHAN
Pipa PVC 2” M 1.2000 18,750.00 22,500.00
Perlengkapan % 35.0000 7,875.00
JUMLAH HARGA BAHAN 30,375.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 39,532.50
E Overhead & Profit 10% x D 10% 3,953.25
F Harga Satuan Pekerjaan (D+E) 43,485.75

A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2”


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0810 55,000.00 4,455.00
Tukang Batu L.0.02 OH 0.1350 60,000.00 8,100.00

Hal 161/229
Kepala tukang L.0.03 OH 0.0135 65,000.00 877.50
Mandor L.0.04 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 13,702.50
B BAHAN
Pipa PVC 21/2” M 1.2000 25,000.00 30,000.00
Perlengkapan % 35.0000 10,500.00
JUMLAH HARGA BAHAN 40,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 54,202.50
E Overhead & Profit 10% x D 10% 5,420.25
F Harga Satuan Pekerjaan (D+E) 59,622.75

A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0810 55,000.00 4,455.00
Tukang Batu L.0.02 OH 0.1350 60,000.00 8,100.00
Kepala tukang L.0.03 OH 0.0135 65,000.00 877.50
Mandor L.0.04 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 13,702.50
B BAHAN
Pipa PVC 3” M 1.2000 36,250.00 43,500.00
Perlengkapan % 35.0000 15,225.00
JUMLAH HARGA BAHAN 58,725.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 72,427.50
E Overhead & Profit 10% x D 10% 7,242.75
F Harga Satuan Pekerjaan (D+E) 79,670.25

A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4”


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0810 55,000.00 4,455.00
Tukang Batu L.0.02 OH 0.1350 60,000.00 8,100.00
Kepala tukang L.0.03 OH 0.0135 65,000.00 877.50
Mandor L.0.04 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 13,702.50
B BAHAN
Pipa PVC 3” M 1.2000 -
Perlengkapan % 35.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,702.50
E Overhead & Profit 10% x D 10% 1,370.25
F Harga Satuan Pekerjaan (D+E) 15,072.75

A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0800 55,000.00 4,400.00
Tukang Batu L.0.02 OH 0.0400 60,000.00 2,400.00
Kepala tukang L.0.03 OH 0.0040 65,000.00 260.00
Mandor L.0.04 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 7,330.00

Hal 162/229
B BAHAN
Pipa tanah Bh 1.6000 -
Semen portland Kg 35.0000 1,375.00 48,125.00
Pasir pasang M3 0.0140 200,000.00 2,800.00
Pasir urug M3 0.0140 90,000.00 1,260.00
JUMLAH HARGA BAHAN 52,185.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 59,515.00
E Overhead & Profit 10% x D 10% 5,951.50
F Harga Satuan Pekerjaan (D+E) 65,466.50

A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0600 55,000.00 3,300.00
Tukang Batu L.0.02 OH 0.0300 60,000.00 1,800.00
Kepala tukang L.0.03 OH 0.0030 65,000.00 195.00
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 5,497.50
B BAHAN
Pipa tanah dia 15 Bh 1.6000 -
Semen portland Kg 0.6800 1,375.00 935.00
Pasir pasang M3 0.0130 200,000.00 2,600.00
Pasir urug M3 0.0110 90,000.00 990.00
JUMLAH HARGA BAHAN 4,525.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 10,022.50
E Overhead & Profit 10% x D 10% 1,002.25
F Harga Satuan Pekerjaan (D+E) 11,024.75

A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 – 20 cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1400 55,000.00 7,700.00
Tukang Batu L.0.02 OH 0.0700 60,000.00 4,200.00
Kepala tukang L.0.03 OH 0.0070 65,000.00 455.00
Mandor L.0.04 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 12,827.50
B BAHAN
Pipa tanah dia 15 Bh 1.1000 -
Bata merah M3 0.0270 -
Semen portland Kg 3.9200 1,375.00 5,390.00
Pasir pasang M3 0.0560 200,000.00 11,200.00
Pasir urug M3 0.0240 90,000.00 2,160.00
JUMLAH HARGA BAHAN 18,750.00
C PERALATAN JUMLAH HARGA PERALATAN
D Jumlah (A+B+C) 31,577.50
E Overhead & Profit 10% x D 10% 3,157.75
F Harga Satuan Pekerjaan (D+E) 34,735.25

A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3800 55,000.00 20,900.00
Tukang Batu L.0.02 OH 0.1900 60,000.00 11,400.00

Hal 163/229
Kepala tukang L.0.03 OH 0.0190 65,000.00 1,235.00
Mandor L.0.04 OH 0.0190 67,500.00 1,282.50
JUMLAH TENAGA KERJA 34,817.50
B BAHAN
Pipa tanah dia 15 Bh 1.1000 -
Bata merah M3 0.5500 -
Semen portland Kg 10.3000 1,375.00 14,162.50
Pasir pasang M3 0.0610 200,000.00 12,200.00
Pasir urug M3 0.0690 90,000.00 6,210.00
JUMLAH HARGA BAHAN 32,572.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 67,390.00
E Overhead & Profit 10% x D 10% 6,739.00
F Harga Satuan Pekerjaan (D+E) 74,129.00

HARGA SATUAN PEKERJAAN PAVING


1 M2 Pasang paving block - Holland/Hexagonal Pres Mesin - (K-175)
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4000 55,000.00 22,000.00
Tukang Batu L.0.02 OH 0.2000 60,000.00 12,000.00
Kepala Tukang batu L.0.03 OH 0.0200 65,000.00 1,300.00
Mandor L.0.04 OH 0.0200 67,500.00 1,350.00
JUMLAH TENAGA KERJA 36,650.00
B BAHAN
Paving holand K-175 m2 1.0000 65,000.00 65,000.00
Pasir pasang (kaliworo) liter 0.1000 200,000.00 20,000.00
JUMLAH HARGA BAHAN 85,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 121,650.00
E Overhead & Profit 10% x D 10% 12,165.00
F Harga Satuan Pekerjaan (D+E) 133,815.00

1 M2 Pasang paving block - Holland/Hexagonal Pres Mesin


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4000 55,000.00 22,000.00
Tukang Batu L.0.02 OH 0.2000 60,000.00 12,000.00
Kepala Tukang batu L.0.03 OH 0.0200 65,000.00 1,300.00
Mandor L.0.04 OH 0.0200 67,500.00 1,350.00
JUMLAH TENAGA KERJA 36,650.00
B BAHAN
Paving holand K-175 m2 1.0000 55,000.00 55,000.00
Pasir pasang (kaliworo) liter 0.1000 200,000.00 20,000.00
JUMLAH HARGA BAHAN 75,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 111,650.00
E Overhead & Profit 10% x D 10% 11,165.00
F Harga Satuan Pekerjaan (D+E) 122,815.00

A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA


A.8.4.1.1 Pemasangan 1 m pipa PVC Ø 63 mm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA

Hal 164/229
Pekerja L.0.01 OH 0.0810 55,000.00 4,455.00
Tukang pipa L.0.02 OH 0.0410 -
Mandor L.0.04 OH 0.0080 67,500.00 540.00

JUMLAH TENAGA KERJA 4,995.00


B BAHAN
Pipa PVC Ø 63 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0060 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 4,995.00
E Overhead & Profit 10% x D 10% 499.50
F Harga Satuan Pekerjaan (D+E) 5,494.50

A.8.4.1.2 Pemasangan 1 m pipa PVC Ø 90 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0940 55,000.00 5,170.00
Tukang pipa L.0.02 OH 0.0470 -
Mandor L.0.04 OH 0.0090 67,500.00 607.50

JUMLAH TENAGA KERJA 5,777.50


B BAHAN
Pipa PVC Ø 90 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0080 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 5,777.50
E Overhead & Profit 10% x D 10% 577.75
F Harga Satuan Pekerjaan (D+E) 6,355.25

A.8.4.1.3 Pemasangan 1 m pipa PVC Ø 110 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1050 55,000.00 5,775.00
Tukang pipa L.0.02 OH 0.0530 -
Mandor L.0.04 OH 0.0110 67,500.00 742.50

JUMLAH TENAGA KERJA 6,517.50


B BAHAN
Pipa PVC Ø 110 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0100 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 6,517.50
E Overhead & Profit 10% x D 10% 651.75
F Harga Satuan Pekerjaan (D+E) 7,169.25

A.8.4.1.4 Pemasangan 1 m pipa PVC Ø 150 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1180 55,000.00 6,490.00
Tukang pipa L.0.02 OH 0.0590 -

Hal 165/229
Mandor L.0.04 OH 0.0120 67,500.00 810.00

JUMLAH TENAGA KERJA 7,300.00


B BAHAN
Pipa PVC Ø 150 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0120 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 7,300.00
E Overhead & Profit 10% x D 10% 730.00
F Harga Satuan Pekerjaan (D+E) 8,030.00

A.8.4.1.5 Pemasangan 1 m pipa PVC Ø 200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1890 55,000.00 10,395.00
Tukang pipa L.0.02 OH 0.0950 -
Mandor L.0.04 OH 0.0190 67,500.00 1,282.50

JUMLAH TENAGA KERJA 11,677.50


B BAHAN
Pipa PVC Ø 200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0240 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 11,677.50
E Overhead & Profit 10% x D 10% 1,167.75
F Harga Satuan Pekerjaan (D+E) 12,845.25

A.8.4.1.6 Pemasangan 1 m pipa PVC Ø 250 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2560 55,000.00 14,080.00
Tukang pipa L.0.02 OH 0.1280 -
Mandor L.0.04 OH 0.0260 67,500.00 1,755.00
JUMLAH TENAGA KERJA 15,835.00
B BAHAN
Pipa PVC Ø 250 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0340 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 15,835.00
E Overhead & Profit 10% x D 10% 1,583.50
F Harga Satuan Pekerjaan (D+E) 17,418.50

A.8.4.1.7 Pemasangan 1 m pipa PVC Ø 300 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2940 55,000.00 16,170.00
Tukang pipa L.0.02 OH 0.1470 -
Mandor L.0.04 OH 0.0290 67,500.00 1,957.50
JUMLAH TENAGA KERJA 18,127.50
B BAHAN
Pipa PVC Ø 300 mm m 1.0000 -

Hal 166/229
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0400 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 18,127.50
E Overhead & Profit 10% x D 10% 1,812.75
F Harga Satuan Pekerjaan (D+E) 19,940.25

A.8.4.1.8 Pemasangan 1 m pipa PVC Ø 400 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.5440 55,000.00 29,920.00
Tukang pipa L.0.02 OH 0.2720 -
Mandor L.0.04 OH 0.0540 67,500.00 3,645.00
JUMLAH TENAGA KERJA 33,565.00
B BAHAN
Pipa PVC Ø 400 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0800 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 33,565.00
E Overhead & Profit 10% x D 10% 3,356.50
F Harga Satuan Pekerjaan (D+E) 36,921.50

A.8.4.1.9 Pemasangan 1 m pipa PVC Ø 450 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.6690 55,000.00 36,795.00
Tukang pipa L.0.02 OH 0.3350 -
Mandor L.0.04 OH 0.0670 67,500.00 4,522.50
JUMLAH TENAGA KERJA 41,317.50
B BAHAN
Pipa PVC Ø 450 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.1000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 41,317.50
E Overhead & Profit 10% x D 10% 4,131.75
F Harga Satuan Pekerjaan (D+E) 45,449.25

A.8.4.1.10 Pemasangan 1 m pipa PVC Ø 500 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.8090 55,000.00 44,495.00
Tukang pipa L.0.02 OH 0.4050 -
Mandor L.0.04 OH 0.0810 67,500.00 5,467.50
49,962.50
B BAHAN
Pipa PVC Ø 500 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.1220 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 49,962.50
E Overhead & Profit 10% x D 10% 4,996.25

Hal 167/229
F Harga Satuan Pekerjaan (D+E) 54,958.75

A.8.4.1.11 Pemasangan 1 m pipa PVC Ø 600 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9570 55,000.00 52,635.00
Tukang pipa L.0.02 OH 0.4790 -
Mandor L.0.04 OH 0.0960 67,500.00 6,480.00
JUMLAH TENAGA KERJA 59,115.00
B BAHAN
Pipa PVC Ø 600 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.1450 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 59,115.00
E Overhead & Profit 10% x D 10% 5,911.50
F Harga Satuan Pekerjaan (D+E) 65,026.50

A.8.4.1.12 Pemasangan 1 m pipa PVC Ø 800 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6180 55,000.00 88,990.00
Tukang pipa L.0.02 OH 0.8090 -
Mandor L.0.04 OH 0.1620 67,500.00 10,935.00
JUMLAH TENAGA KERJA 99,925.00
B BAHAN
Pipa PVC Ø 800 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.2500 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 99,925.00
E Overhead & Profit 10% x D 10% 9,992.50
F Harga Satuan Pekerjaan (D+E) 109,917.50

A.8.4.1.13 Pemasangan 1 m pipa PVC Ø 900 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6910 55,000.00 93,005.00
Tukang pipa L.0.02 OH 0.8460 -
Mandor L.0.04 OH 0.1690 67,500.00 11,407.50
JUMLAH TENAGA KERJA 104,412.50
B BAHAN
Pipa PVC Ø 900 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.2620 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 104,412.50
E Overhead & Profit 10% x D 10% 10,441.25
F Harga Satuan Pekerjaan (D+E) 114,853.75

A.8.4.1.14 Pemasangan 1 m pipa PVC Ø 1000 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.8950 55,000.00 104,225.00

Hal 168/229
Tukang pipa L.0.02 OH 0.9480 -
Mandor L.0.04 OH 0.1900 67,500.00 12,825.00
JUMLAH TENAGA KERJA 117,050.00
B BAHAN
Pipa PVC Ø 1000 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.2940 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 117,050.00
E Overhead & Profit 10% x D 10% 11,705.00
F Harga Satuan Pekerjaan (D+E) 128,755.00

A.8.4.1.15 Pemasangan 1 m pipa PVC Ø 1100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.0990 55,000.00 115,445.00
Tukang pipa L.0.02 OH 1.0500 -
Mandor L.0.04 OH 0.2100 67,500.00 14,175.00
JUMLAH TENAGA KERJA 129,620.00
B BAHAN
Pipa PVC Ø 1100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.3270 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 129,620.00
E Overhead & Profit 10% x D 10% 12,962.00
F Harga Satuan Pekerjaan (D+E) 142,582.00

A.8.4.1.16 Pemasangan 1 m pipa PVC Ø 1200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.3030 55,000.00 126,665.00
Tukang pipa L.0.02 OH 1.1520 -
Mandor L.0.04 OH 0.2300 67,500.00 15,525.00
JUMLAH TENAGA KERJA 142,190.00
B BAHAN
Pipa PVC Ø 1200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.3590 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 142,190.00
E Overhead & Profit 10% x D 10% 14,219.00
F Harga Satuan Pekerjaan (D+E) 156,409.00

A.8.4.1.17 Pemasangan 1 m pipa HDPE Ø 63 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0350 55,000.00 1,925.00
Tukang pipa L.0.02 OH 0.0170 -
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 2,127.50
B BAHAN
Pipa HDPE Ø 63 mm m 1.0000 -
JUMLAH HARGA BAHAN -

Hal 169/229
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0190 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,127.50
E Overhead & Profit 10% x D 10% 212.75
F Harga Satuan Pekerjaan (D+E) 452,625.63

A.8.4.1.18 Pemasangan 1 m pipa HDPE Ø 100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0400 55,000.00 2,200.00
Tukang pipa L.0.02 OH 0.0200 -
Mandor L.0.04 OH 0.0040 67,500.00 270.00
JUMLAH TENAGA KERJA 2,470.00
B BAHAN
Pipa HDPE Ø 100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0190 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,470.00
E Overhead & Profit 10% x D 10% 247.00
F Harga Satuan Pekerjaan (D+E) 2,717.00

A.8.4.1.19 Pemasangan 1 m pipa HDPE Ø 125 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0450 55,000.00 2,475.00
Tukang pipa L.0.02 OH 0.0230 -
Mandor L.0.04 OH 0.0050 67,500.00 337.50
JUMLAH TENAGA KERJA 2,812.50
B BAHAN
Pipa HDPE Ø 125 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0190 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,812.50
E Overhead & Profit 10% x D 10% 281.25
F Harga Satuan Pekerjaan (D+E) 3,093.75

A.8.4.1.20 Pemasangan 1 m pipa HDPE Ø 150 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0620 55,000.00 3,410.00
Tukang pipa L.0.02 OH 0.0310 -
Mandor L.0.04 OH 0.0060 67,500.00 405.00
JUMLAH TENAGA KERJA 3,815.00
B BAHAN
Pipa HDPE Ø 150 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0190 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 3,815.00
E Overhead & Profit 10% x D 10% 381.50
F Harga Satuan Pekerjaan (D+E) 4,196.50

Hal 170/229
A.8.4.1.21 Pemasangan 1 m pipa HDPE Ø 200 mm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1020 55,000.00 5,610.00
Tukang pipa L.0.02 OH 0.0510 -
Mandor L.0.04 OH 0.0100 67,500.00 675.00
JUMLAH TENAGA KERJA 6,285.00
B BAHAN
Pipa HDPE Ø 200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0190 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 6,285.00
E Overhead & Profit 10% x D 10% 628.50
F Harga Satuan Pekerjaan (D+E) 6,913.50

A.8.4.1.22 Pemasangan 1 m pipa HDPE Ø 250 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1330 55,000.00 7,315.00
Tukang pipa L.0.02 OH 0.0670 -
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 8,192.50
B BAHAN
Pipa HDPE Ø 250 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0420 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 8,192.50
E Overhead & Profit 10% x D 10% 819.25
F Harga Satuan Pekerjaan (D+E) 9,011.75

A.8.4.1.23 Pemasangan 1 m pipa HDPE Ø 300 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1700 55,000.00 9,350.00
Tukang pipa L.0.02 OH 0.0850 -
Mandor L.0.04 OH 0.0170 67,500.00 1,147.50
JUMLAH TENAGA KERJA 10,497.50
B BAHAN
Pipa HDPE Ø 300 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0650 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 10,497.50
E Overhead & Profit 10% x D 10% 1,049.75
F Harga Satuan Pekerjaan (D+E) 11,547.25

A.8.4.1.24 Pemasangan 1 m pipa HDPE Ø 400 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2900 55,000.00 15,950.00
Tukang pipa L.0.02 OH 0.1450 -

Hal 171/229
Mandor L.0.04 OH 0.0290 67,500.00 1,957.50
JUMLAH TENAGA KERJA 17,907.50
B BAHAN
Pipa HDPE Ø 400 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.1520 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 17,907.50
E Overhead & Profit 10% x D 10% 1,790.75
F Harga Satuan Pekerjaan (D+E) 19,698.25

A.8.4.1.25 Pemasangan 1 m pipa HDPE Ø 450 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3590 55,000.00 19,745.00
Tukang pipa L.0.02 OH 0.1800 -
Mandor L.0.04 OH 0.0360 67,500.00 2,430.00
JUMLAH TENAGA KERJA 22,175.00
B BAHAN
Pipa HDPE Ø 450 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.2000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 22,175.00
E Overhead & Profit 10% x D 10% 2,217.50
F Harga Satuan Pekerjaan (D+E) 24,392.50

A.8.4.1.26 Pemasangan 1 m pipa HDPE Ø 500 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4330 55,000.00 23,815.00
Tukang pipa L.0.02 OH 0.2160 -
Mandor L.0.04 OH 0.0430 67,500.00 2,902.50
JUMLAH TENAGA KERJA 26,717.50
B BAHAN
Pipa HDPE Ø 500 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.2510 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 26,717.50
E Overhead & Profit 10% x D 10% 2,671.75
F Harga Satuan Pekerjaan (D+E) 29,389.25

A.8.4.1.27 Pemasangan 1 m pipa HDPE Ø 600 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.5120 55,000.00 28,160.00
Tukang pipa L.0.02 OH 0.2560 -
Mandor L.0.04 OH 0.0510 67,500.00 3,442.50
JUMLAH TENAGA KERJA 31,602.50
B BAHAN
Pipa HDPE Ø 500 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN

Hal 172/229
Sewa Tripot/Tackel & handle crane 2 T hari 0.3070 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 31,602.50
E Overhead & Profit 10% x D 10% 3,160.25
F Harga Satuan Pekerjaan (D+E) 34,762.75

A.8.4.1.28 Pemasangan 1 m pipa HDPE Ø 800 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.8930 55,000.00 49,115.00
Tukang pipa L.0.02 OH 0.4460 -
Mandor L.0.04 OH 0.0890 67,500.00 6,007.50
JUMLAH TENAGA KERJA 55,122.50
B BAHAN
Pipa HDPE Ø 800 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.5730 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 55,122.50
E Overhead & Profit 10% x D 10% 5,512.25
F Harga Satuan Pekerjaan (D+E) 60,634.75

A.8.4.1.29 Pemasangan 1 m pipa HDPE Ø 900 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.3530 55,000.00 74,415.00
Tukang pipa L.0.02 OH 0.6770 -
Mandor L.0.04 OH 0.1350 67,500.00 9,112.50
JUMLAH TENAGA KERJA 83,527.50
B BAHAN
Pipa HDPE Ø 900 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.8830 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 83,527.50
E Overhead & Profit 10% x D 10% 8,352.75
F Harga Satuan Pekerjaan (D+E) 91,880.25

A.8.4.1.30 Pemasangan 1 m pipa HDPE Ø 1000 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6590 55,000.00 91,245.00
Tukang pipa L.0.02 OH 0.8300 -
Mandor L.0.04 OH 0.1660 67,500.00 11,205.00
JUMLAH TENAGA KERJA 102,450.00
B BAHAN
Pipa HDPE Ø 1000 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 1.0930 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 102,450.00
E Overhead & Profit 10% x D 10% 10,245.00
F Harga Satuan Pekerjaan (D+E) 112,695.00

Hal 173/229
A.8.4.1.31 Pemasangan 1 m pipa HDPE Ø 1100 mm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.8180 55,000.00 99,990.00
Tukang pipa L.0.02 OH 0.9090 -
Mandor L.0.04 OH 0.1820 67,500.00 12,285.00
JUMLAH TENAGA KERJA 112,275.00
B BAHAN
Pipa HDPE Ø 1100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 1.2050 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 112,275.00
E Overhead & Profit 10% x D 10% 11,227.50
F Harga Satuan Pekerjaan (D+E) 123,502.50

A.8.4.1.32 Pemasangan 1 m pipa HDPE Ø 1200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.3700 55,000.00 130,350.00
Tukang pipa L.0.02 OH 1.1850 -
Mandor L.0.04 OH 0.2370 67,500.00 15,997.50
JUMLAH TENAGA KERJA 146,347.50
B BAHAN
Pipa HDPE Ø 1200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 1.5840 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 146,347.50
E Overhead & Profit 10% x D 10% 14,634.75
F Harga Satuan Pekerjaan (D+E) 160,982.25

A.8.4.1.33 Pemasangan 1 m pipa GIP Ø 63 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3450 55,000.00 18,975.00
Tukang pipa L.0.02 OH 0.1720 -
Mandor L.0.04 OH 0.0340 67,500.00 2,295.00
JUMLAH TENAGA KERJA 21,270.00
B BAHAN
Pipa GIP Ø 63 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari -
JUMLAH HARGA ALAT 0
D Jumlah (A+B+C) 21,270.00
E Overhead & Profit 10% x D 10% 2,127.00
F Harga Satuan Pekerjaan (D+E) 23,397.00

A.8.4.1.34 Pemasangan 1 m pipa GIP Ø 100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4000 55,000.00 22,000.00
Tukang pipa L.0.02 OH 0.2000 -
Mandor L.0.04 OH 0.0400 67,500.00 2,700.00

Hal 174/229
JUMLAH TENAGA KERJA 24,700.00
B BAHAN
Pipa GIP Ø 100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 24,700.00
E Overhead & Profit 10% x D 10% 2,470.00
F Harga Satuan Pekerjaan (D+E) 27,170.00

A.8.4.1.35 Pemasangan 1 m pipa GIP Ø 125 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4480 55,000.00 24,640.00
Tukang pipa L.0.02 OH 0.2240 -
Mandor L.0.04 OH 0.0450 67,500.00 3,037.50
JUMLAH TENAGA KERJA 27,677.50
B BAHAN
Pipa GIP Ø 125 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 27,677.50
E Overhead & Profit 10% x D 10% 2,767.75
F Harga Satuan Pekerjaan (D+E) 30,445.25

A.8.4.1.36 Pemasangan 1 m pipa GIP Ø 150 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.5060 55,000.00 27,830.00
Tukang pipa L.0.02 OH 0.2530 -
Mandor L.0.04 OH 0.0510 67,500.00 3,442.50
JUMLAH TENAGA KERJA 31,272.50
B BAHAN
Pipa GIP Ø 150 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 31,272.50
E Overhead & Profit 10% x D 10% 3,127.25
F Harga Satuan Pekerjaan (D+E) 34,399.75

A.8.4.1.37 Pemasangan 1 m pipa GIP Ø 200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7960 55,000.00 43,780.00
Tukang pipa L.0.02 OH 0.3980 -
Mandor L.0.04 OH 0.0800 67,500.00 5,400.00
JUMLAH TENAGA KERJA 49,180.00
B BAHAN
Pipa GIP Ø 200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari -

Hal 175/229
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 49,180.00
E Overhead & Profit 10% x D 10% 4,918.00
F Harga Satuan Pekerjaan (D+E) 54,098.00

A.8.4.1.38 Pemasangan 1 m pipa GIP Ø 250 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9490 55,000.00 52,195.00
Tukang pipa L.0.02 OH 0.4750 -
Mandor L.0.04 OH 0.0950 67,500.00 6,412.50
JUMLAH TENAGA KERJA 58,607.50
B BAHAN
Pipa GIP Ø 250 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 58,607.50
E Overhead & Profit 10% x D 10% 5,860.75
F Harga Satuan Pekerjaan (D+E) 64,468.25

A.8.4.1.39 Pemasangan 1 m pipa GIP Ø 300 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9580 55,000.00 52,690.00
Tukang pipa L.0.02 OH 0.4790 -
Mandor L.0.04 OH 0.0960 67,500.00 6,480.00
JUMLAH TENAGA KERJA 59,170.00
B BAHAN
Pipa GIP Ø 300 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 59,170.00
E Overhead & Profit 10% x D 10% 5,917.00
F Harga Satuan Pekerjaan (D+E) 65,087.00

A.8.4.1.40 Pemasangan 1 m pipa GIP Ø 400 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.2120 55,000.00 66,660.00
Tukang pipa L.0.02 OH 0.6060 -
Mandor L.0.04 OH 0.1210 67,500.00 8,167.50
JUMLAH TENAGA KERJA 74,827.50
B BAHAN
Pipa GIP Ø 400 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 74,827.50
E Overhead & Profit 10% x D 10% 7,482.75
F Harga Satuan Pekerjaan (D+E) 82,310.25

A.8.4.1.41 Pemasangan 1 m pipa GIP Ø 450 mm

Hal 176/229
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.3530 55,000.00 74,415.00
Tukang pipa L.0.02 OH 0.6760 -
Mandor L.0.04 OH 0.1350 67,500.00 9,112.50
JUMLAH TENAGA KERJA 83,527.50
B BAHAN
Pipa GIP Ø 450 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 83,527.50
E Overhead & Profit 10% x D 10% 8,352.75
F Harga Satuan Pekerjaan (D+E) 91,880.25

A.8.4.1.42 Pemasangan 1 m pipa GIP Ø 500 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.4690 55,000.00 80,795.00
Tukang pipa L.0.02 OH 0.7350 -
Mandor L.0.04 OH 0.1470 67,500.00 9,922.50
JUMLAH TENAGA KERJA 90,717.50
B BAHAN
Pipa GIP Ø 500 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari -
JUMLAH HARGA ALAT 0
D Jumlah (A+B+C) 90,717.50
E Overhead & Profit 10% x D 10% 9,071.75
F Harga Satuan Pekerjaan (D+E) 99,789.25

A.8.4.1.43 Pemasangan 1 m pipa GIP Ø 600 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.3270 55,000.00 72,985.00
Tukang pipa L.0.02 OH 0.6640 -
Mandor L.0.04 OH 0.1330 67,500.00 8,977.50
JUMLAH TENAGA KERJA 81,962.50
B BAHAN
Pipa GIP Ø 600 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 81,962.50
E Overhead & Profit 10% x D 10% 8,196.25
F Harga Satuan Pekerjaan (D+E) 90,158.75

A.8.4.1.44 Pemasangan 1 m pipa GIP Ø 800 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.3270 55,000.00 127,985.00
Tukang pipa L.0.02 OH 1.1630 -
Mandor L.0.04 OH 0.2330 67,500.00 15,727.50
JUMLAH TENAGA KERJA 143,712.50

Hal 177/229
B BAHAN
Pipa GIP Ø 800 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 143,712.50
E Overhead & Profit 10% x D 10% 14,371.25
F Harga Satuan Pekerjaan (D+E) 158,083.75

A.8.4.1.45 Pemasangan 1 m pipa GIP Ø 900 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.6230 55,000.00 144,265.00
Tukang pipa L.0.02 OH 1.3120 -
Mandor L.0.04 OH 0.2620 67,500.00 17,685.00
JUMLAH TENAGA KERJA 161,950.00
B BAHAN
Pipa GIP Ø 900 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 161,950.00
E Overhead & Profit 10% x D 10% 16,195.00
F Harga Satuan Pekerjaan (D+E) 178,145.00

A.8.4.1.46 Pemasangan 1 m pipa GIP Ø 1000 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.9110 55,000.00 160,105.00
Tukang pipa L.0.02 OH 1.4560 -
Mandor L.0.04 OH 0.2910 67,500.00 19,642.50
JUMLAH TENAGA KERJA 179,747.50
B BAHAN
Pipa GIP Ø 1000 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 179,747.50
E Overhead & Profit 10% x D 10% 17,974.75
F Harga Satuan Pekerjaan (D+E) 197,722.25

A.8.4.1.47 Pemasangan 1 m pipa GIP Ø 1100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.2000 55,000.00 176,000.00
Tukang pipa L.0.02 OH 1.6000 -
Mandor L.0.04 OH 0.3200 67,500.00 21,600.00
JUMLAH TENAGA KERJA 197,600.00
B BAHAN
Pipa GIP Ø 1100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari -
JUMLAH HARGA ALAT -

Hal 178/229
D Jumlah (A+B+C) 197,600.00
E Overhead & Profit 10% x D 10% 19,760.00
F Harga Satuan Pekerjaan (D+E) 217,360.00

A.8.4.1.48 Pemasangan 1 m pipa GIP Ø 1200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.4880 55,000.00 191,840.00
Tukang pipa L.0.02 OH 1.7440 -
Mandor L.0.04 OH 0.3490 67,500.00 23,557.50
JUMLAH TENAGA KERJA 215,397.50
B BAHAN
Pipa GIP Ø 1200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 215,397.50
E Overhead & Profit 10% x D 10% 21,539.75
F Harga Satuan Pekerjaan (D+E) 236,937.25

A.8.4.1.49 Pemasangan 1 m pipa DCI Ø 100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4890 55,000.00 26,895.00
Tukang pipa L.0.02 OH 0.0980 -
Mandor L.0.04 OH 0.0490 67,500.00 3,307.50
JUMLAH TENAGA KERJA 30,202.50
B BAHAN
Pipa DCI Ø 100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.3800 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 30,202.50
E Overhead & Profit 10% x D 10% 3,020.25
F Harga Satuan Pekerjaan (D+E) 33,222.75

A.8.4.1.50 Pemasangan 1 m pipa DCI Ø 125 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.5470 55,000.00 30,085.00
Tukang pipa L.0.02 OH 0.1090 -
Mandor L.0.04 OH 0.0550 67,500.00 3,712.50
JUMLAH TENAGA KERJA 33,797.50
B BAHAN
Pipa DCI Ø 125 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.3800 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 33,797.50
E Overhead & Profit 10% x D 10% 3,379.75
F Harga Satuan Pekerjaan (D+E) 37,177.25

A.8.4.1.51 Pemasangan 1 m pipa DCI Ø 150 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
Hal 179/229
A TENAGA
Pekerja L.0.01 OH 0.6130 55,000.00 33,715.00
Tukang pipa L.0.02 OH 0.1230 -
Mandor L.0.04 OH 0.0610 67,500.00 4,117.50
JUMLAH TENAGA KERJA 37,832.50
B BAHAN
Pipa DCI Ø 150 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.3800 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 37,832.50
E Overhead & Profit 10% x D 10% 3,783.25
F Harga Satuan Pekerjaan (D+E) 41,615.75

A.8.4.1.52 Pemasangan 1 m pipa DCI Ø 200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.8550 55,000.00 47,025.00
Tukang pipa L.0.02 OH 0.1710 -
Mandor L.0.04 OH 0.0850 67,500.00 5,737.50
JUMLAH TENAGA KERJA 52,762.50
B BAHAN
Pipa DCI Ø 200 mm M 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.3800 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 52,762.50
E Overhead & Profit 10% x D 10% 5,276.25
F Harga Satuan Pekerjaan (D+E) 58,038.75

A.8.4.1.53 Pemasangan 1 m pipa DCI Ø 250 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9510 55,000.00 52,305.00
Tukang pipa L.0.02 OH 0.1900 -
Mandor L.0.04 OH 0.0950 67,500.00 6,412.50
JUMLAH TENAGA KERJA 58,717.50
B BAHAN
Pipa DCI Ø 250 mm M 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0500 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 58,717.50
E Overhead & Profit 10% x D 10% 5,871.75
F Harga Satuan Pekerjaan (D+E) 64,589.25

A.8.4.1.54 Pemasangan 1 m pipa DCI Ø 300 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9730 55,000.00 53,515.00
Tukang pipa L.0.02 OH 0.1950 -
Mandor L.0.04 OH 0.0970 67,500.00 6,547.50
JUMLAH TENAGA KERJA 60,062.50
B BAHAN

Hal 180/229
Pipa DCI Ø 300 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0710 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 60,062.50
E Overhead & Profit 10% x D 10% 6,006.25
F Harga Satuan Pekerjaan (D+E) 66,068.75

A.8.4.1.55 Pemasangan 1 m pipa DCI Ø 400 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5450 55,000.00 84,975.00
Tukang pipa L.0.02 OH 0.3090 -
Operator alat berat L.0.08 OH 0.0930 -
Mandor L.0.04 OH 0.1540 67,500.00 10,395.00
JUMLAH TENAGA KERJA 95,370.00
B BAHAN
Pipa DCI Ø 400 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0230 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.0310 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 95,370.00
E Overhead & Profit 10% x D 10% 9,537.00
F Harga Satuan Pekerjaan (D+E) 104,907.00

A.8.4.1.56 Pemasangan 1 m pipa DCI Ø 450 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.8130 55,000.00 99,715.00
Tukang pipa L.0.02 OH 0.3630 -
Operator alat berat L.0.08 OH 0.1430 -
Mandor L.0.04 OH 0.1810 67,500.00 12,217.50
JUMLAH TENAGA KERJA 111,932.50
B BAHAN
Pipa DCI Ø 450 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0290 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.0390 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 111,932.50
E Overhead & Profit 10% x D 10% 11,193.25
F Harga Satuan Pekerjaan (D+E) 123,125.75

A.8.4.1.57 Pemasangan 1 m pipa DCI Ø 500 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.0470 55,000.00 112,585.00
Tukang pipa L.0.02 OH 0.4090 -
Operator alat berat L.0.08 OH 0.1930 -
Mandor L.0.04 OH 0.2050 67,500.00 13,837.50
JUMLAH TENAGA KERJA 126,422.50
B BAHAN
Pipa DCI Ø 500 mm m 1.0000 -

Hal 181/229
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0340 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.0450 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 126,422.50
E Overhead & Profit 10% x D 10% 12,642.25
F Harga Satuan Pekerjaan (D+E) 139,064.75

A.8.4.1.58 Pemasangan pipa 1 m DCI Ø 600 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.0110 55,000.00 110,605.00
Tukang pipa L.0.02 OH 0.4020 -
Operator alat berat L.0.08 OH 0.2930 -
Mandor L.0.04 OH 0.2010 67,500.00 13,567.50
JUMLAH TENAGA KERJA 124,172.50
B BAHAN
Pipa DCI Ø 600 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0580 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.0770 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 124,172.50
E Overhead & Profit 10% x D 10% 12,417.25
F Harga Satuan Pekerjaan (D+E) 136,589.75

A.8.4.1.59 Pemasangan 1 m pipa DCI Ø800 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.8590 55,000.00 212,245.00
Tukang pipa L.0.02 OH 0.7720 -
Operator alat berat L.0.08 OH 0.4930 -
Mandor L.0.04 OH 0.3860 67,500.00 26,055.00
JUMLAH TENAGA KERJA 238,300.00
B BAHAN
Pipa DCI Ø 800 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0840 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.2250 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 238,300.00
E Overhead & Profit 10% x D 10% 23,830.00
F Harga Satuan Pekerjaan (D+E) 262,130.00

A.8.4.1.60 Pemasangan 1 m pipa DCI Ø900 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 4.9950 55,000.00 274,725.00
Tukang pipa L.0.02 OH 0.9990 -
Operator alat berat L.0.08 OH 0.5930 -
Mandor L.0.04 OH 0.4990 67,500.00 33,682.50
JUMLAH TENAGA KERJA 308,407.50
B BAHAN
Pipa DCI Ø 900 mm m 1.0000 -

Hal 182/229
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0930 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.2480 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 308,407.50
E Overhead & Profit 10% x D 10% 30,840.75
F Harga Satuan Pekerjaan (D+E) 339,248.25

A.8.4.1.61 Pemasangan 1 m pipa DCI Ø1000 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 5.9310 55,000.00 326,205.00
Tukang pipa L.0.02 OH 1.1860 -
Operator alat berat L.0.08 OH 0.7930 -
Mandor L.0.04 OH 0.6930 67,500.00 46,777.50
JUMLAH TENAGA KERJA 372,982.50
B BAHAN
Pipa DCI Ø 1000 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.1120 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.2980 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 372,982.50
E Overhead & Profit 10% x D 10% 37,298.25
F Harga Satuan Pekerjaan (D+E) 410,280.75

A.8.4.1.62 Pemasangan 1 m pipa DCI Ø1100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 6.9490 55,000.00 382,195.00
Tukang pipa L.0.02 OH 1.3900 -
Operator alat berat L.0.08 OH 0.7930 -
Mandor L.0.04 OH 0.6950 67,500.00 46,912.50
JUMLAH TENAGA KERJA 429,107.50
B BAHAN
Pipa DCI Ø 1100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.1520 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.3040 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 429,107.50
E Overhead & Profit 10% x D 10% 42,910.75
F Harga Satuan Pekerjaan (D+E) 472,018.25

A.8.4.1.63 Pemasangan 1 m pipa DCI Ø1200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 8.0560 55,000.00 443,080.00
Tukang pipa L.0.02 OH 1.6110 -
Operator alat berat L.0.08 OH 0.8930 -
Mandor L.0.04 OH 0.8060 67,500.00 54,405.00
JUMLAH TENAGA KERJA 497,485.00
B BAHAN
Pipa DCI Ø 1200 mm m 1.0000 -

Hal 183/229
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.1800 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.3600 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 497,485.00
E Overhead & Profit 10% x D 10% 49,748.50
F Harga Satuan Pekerjaan (D+E) 547,233.50

A.8.4.1.64 Pemasangan 1 m pipa baja Ø 63 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4990 55,000.00 27,445.00
Tukang pipa L.0.02 OH 0.1000 -
Mandor L.0.04 OH 0.0500 67,500.00 3,375.00
JUMLAH TENAGA KERJA 30,820.00
B BAHAN
Pipa Baja Ø 63 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0040 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 30,820.00
E Overhead & Profit 10% x D 10% 3,082.00
F Harga Satuan Pekerjaan (D+E) 33,902.00

A.8.4.1.65 Pemasangan 1 m pipa baja Ø 100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.5790 55,000.00 31,845.00
Tukang pipa L.0.02 OH 0.1160 -
Mandor L.0.04 OH 0.0580 67,500.00 3,915.00
JUMLAH TENAGA KERJA 35,760.00
B BAHAN
Pipa Baja Ø 100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0040 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 35,760.00
E Overhead & Profit 10% x D 10% 3,576.00
F Harga Satuan Pekerjaan (D+E) 39,336.00

A.8.4.1.66 Pemasangan 1 m pipa baja Ø 125 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.6480 55,000.00 35,640.00
Tukang pipa L.0.02 OH 0.1300 -
Mandor L.0.04 OH 0.0650 67,500.00 4,387.50
JUMLAH TENAGA KERJA 40,027.50
B BAHAN
Pipa Baja Ø 125 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0040 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 40,027.50

Hal 184/229
E Overhead & Profit 10% x D 10% 4,002.75
F Harga Satuan Pekerjaan (D+E) 44,030.25

A.8.4.1.67 Pemasangan 1 m pipa baja Ø 150 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7080 55,000.00 38,940.00
Tukang pipa L.0.02 OH 0.1420 -
Mandor L.0.04 OH 0.0710 67,500.00 4,792.50
JUMLAH TENAGA KERJA 43,732.50
B BAHAN
Pipa Baja Ø 150 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0040 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 43,732.50
E Overhead & Profit 10% x D 10% 4,373.25
F Harga Satuan Pekerjaan (D+E) 48,105.75

A.8.4.1.68 Pemasangan 1 m pipa baja Ø 200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.1130 55,000.00 61,215.00
Tukang pipa L.0.02 OH 0.2230 -
Mandor L.0.04 OH 0.1110 67,500.00 7,492.50
JUMLAH TENAGA KERJA 68,707.50
B BAHAN
Pipa Baja Ø 200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0040 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 68,707.50
E Overhead & Profit 10% x D 10% 6,870.75
F Harga Satuan Pekerjaan (D+E) 75,578.25

A.8.4.1.69 Pemasangan pipa baja Ø 250 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.3250 55,000.00 72,875.00
Tukang pipa L.0.02 OH 0.2650 -
Mandor L.0.04 OH 0.1330 67,500.00 8,977.50
JUMLAH TENAGA KERJA 81,852.50
B BAHAN
Pipa Baja Ø 250 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0040 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 81,852.50
E Overhead & Profit 10% x D 10% 8,185.25
F Harga Satuan Pekerjaan (D+E) 90,037.75

A.8.4.1.70 Pemasangan 1 m pipa baja Ø 300 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA

Hal 185/229
Pekerja L.0.01 OH 1.4150 55,000.00 77,825.00
Tukang pipa L.0.02 OH 0.2830 -
Mandor L.0.04 OH 0.1410 67,500.00 9,517.50
JUMLAH TENAGA KERJA 87,342.50
B BAHAN
Pipa Baja Ø 300 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0040 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 87,342.50
E Overhead & Profit 10% x D 10% 8,734.25
F Harga Satuan Pekerjaan (D+E) 96,076.75

A.8.4.1.71 Pemasangan 1 m pipa baja Ø 400 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.3660 55,000.00 130,130.00
Tukang pipa L.0.02 OH 0.4730 -
Mandor L.0.04 OH 0.2370 67,500.00 15,997.50
JUMLAH TENAGA KERJA 146,127.50
B BAHAN
Pipa Baja Ø 400 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0270 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.0390 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 146,127.50
E Overhead & Profit 10% x D 10% 14,612.75
F Harga Satuan Pekerjaan (D+E) 160,740.25

A.8.4.1.72 Pemasangan 1 m pipa baja Ø 450 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.2310 55,000.00 122,705.00
Tukang pipa L.0.02 OH 0.4460 -
Mandor L.0.04 OH 0.2230 67,500.00 15,052.50
JUMLAH TENAGA KERJA 137,757.50
B BAHAN
Pipa Baja Ø 450 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0260 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.0370 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 137,757.50
E Overhead & Profit 10% x D 10% 13,775.75
F Harga Satuan Pekerjaan (D+E) 151,533.25

A.8.4.1.73 Pemasangan 1 m pipa baja Ø 500 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.4320 55,000.00 133,760.00
Tukang pipa L.0.02 OH 0.4860 -
Mandor L.0.04 OH 0.2430 67,500.00 16,402.50
JUMLAH TENAGA KERJA 150,162.50

Hal 186/229
B BAHAN
Pipa Baja Ø 500 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0290 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.0450 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 150,162.50
E Overhead & Profit 10% x D 10% 15,016.25
F Harga Satuan Pekerjaan (D+E) 165,178.75

A.8.4.1.74 Pemasangan 1 m pipa baja Ø 600 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.2080 55,000.00 121,440.00
Tukang pipa L.0.02 OH 0.4420 -
Mandor L.0.04 OH 0.2210 67,500.00 14,917.50
JUMLAH TENAGA KERJA 136,357.50
B BAHAN
Pipa Baja Ø 600 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0270 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.0390 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 136,357.50
E Overhead & Profit 10% x D 10% 13,635.75
F Harga Satuan Pekerjaan (D+E) 149,993.25

A.8.4.1.75 Pemasangan 1 m pipa baja Ø 800 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.8970 55,000.00 214,335.00
Tukang pipa L.0.02 OH 0.7790 -
Mandor L.0.04 OH 0.3900 67,500.00 26,325.00
JUMLAH TENAGA KERJA 240,660.00
B BAHAN
Pipa Baja Ø 800 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0460 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.0980 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 240,660.00
E Overhead & Profit 10% x D 10% 24,066.00
F Harga Satuan Pekerjaan (D+E) 264,726.00

A.8.4.1.76 Pemasangan 1 m pipa baja Ø 900 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 4.4030 55,000.00 242,165.00
Tukang pipa L.0.02 OH 0.0810 -
Mandor L.0.04 OH 0.4400 67,500.00 29,700.00
JUMLAH TENAGA KERJA 271,865.00
B BAHAN
Pipa Baja Ø 900 mm m 1.0000 -
JUMLAH HARGA BAHAN -

Hal 187/229
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0520 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.1150 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 271,865.00
E Overhead & Profit 10% x D 10% 27,186.50
F Harga Satuan Pekerjaan (D+E) 299,051.50

A.8.4.1.77 Pemasangan 1 m pipa baja Ø 1000 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 4.8950 55,000.00 269,225.00
Tukang pipa L.0.02 OH 0.9790 -
Mandor L.0.04 OH 0.4890 67,500.00 33,007.50
JUMLAH TENAGA KERJA 302,232.50
B BAHAN
Pipa Baja Ø 1000 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0580 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.1330 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 302,232.50
E Overhead & Profit 10% x D 10% 30,223.25
F Harga Satuan Pekerjaan (D+E) 332,455.75

A.8.4.1.78 Pemasangan 1 m pipa baja Ø 1100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 5.3870 55,000.00 296,285.00
Tukang pipa L.0.02 OH 1.0770 -
Mandor L.0.04 OH 0.5390 67,500.00 36,382.50
JUMLAH TENAGA KERJA 332,667.50
B BAHAN
Pipa Baja Ø 1100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0640 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.1500 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 332,667.50
E Overhead & Profit 10% x D 10% 33,266.75
F Harga Satuan Pekerjaan (D+E) 365,934.25

A.8.4.1.79 Pemasangan 1 m pipa baja Ø 1200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 5.8970 55,000.00 324,335.00
Tukang pipa L.0.02 OH 1.1760 -
Mandor L.0.04 OH 0.5880 67,500.00 39,690.00
JUMLAH TENAGA KERJA 364,025.00
B BAHAN
Pipa Baja Ø 1200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0700 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.1670 -

Hal 188/229
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 364,025.00
E Overhead & Profit 10% x D 10% 36,402.50
F Harga Satuan Pekerjaan (D+E) 400,427.50

A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA


A.8.4.2.1 Pemotongan 1 buah pipa PVC Ø 63 mm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0050 55,000.00 275.00
Tukang pipa L.0.02 OH 0.0020 -
Mandor L.0.04 OH 0.0005 67,500.00 33.75
JUMLAH TENAGA KERJA 308.75
B BAHAN
Pipa PVC Ø 63 mm bh 1.0000 -
JUMLAH HARGA BAHAN 0
C PERALATAN
Peralatan potong pipa T1/manual (gergaji) /saw hari 0.0030 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 308.75
E Overhead & Profit 10% x D 10% 30.88
F Harga Satuan Pekerjaan (D+E) 339.63

A.8.4.2.2 Pemotongan 1 m pipa PVC Ø 90 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0140 55,000.00 770.00
Tukang pipa L.0.02 OH 0.0140 -
Mandor L.0.04 OH 0.0010 67,500.00 67.50
JUMLAH TENAGA KERJA 837.50
B BAHAN
Pipa PVC Ø 90 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T1/manual (gergaji) /saw hari 0.0030 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 837.50
E Overhead & Profit 10% x D 10% 83.75
F Harga Satuan Pekerjaan (D+E) 921.25

A.8.4.2.3 Pemotongan 1 buah pipa PVC Ø 110 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0220 55,000.00 1,210.00
Tukang pipa L.0.02 OH 0.0110 -
Mandor L.0.04 OH 0.0020 67,500.00 135.00
JUMLAH TENAGA KERJA 1,345.00
B BAHAN
Pipa PVC Ø 110 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T1/manual (gergaji) /saw hari 0.0030 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,345.00
E Overhead & Profit 10% x D 10% 134.50
F Harga Satuan Pekerjaan (D+E) 1,479.50

Hal 189/229
A.8.4.2.4 Pemotongan 1 buah pipa PVC Ø 150 mm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0310 55,000.00 1,705.00
Tukang pipa L.0.02 OH 0.0150 -
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 1,907.50
B BAHAN
Pipa PVC Ø 150 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T1/manual (gergaji) /saw hari 0.0030 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,907.50
E Overhead & Profit 10% x D 10% 190.75
F Harga Satuan Pekerjaan (D+E) 2,098.25

A.8.4.2.5 Pemotongan 1 buah pipa PVC Ø 200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0810 55,000.00 4,455.00
Tukang pipa L.0.02 OH 0.0400 -
Mandor L.0.04 OH 0.0080 67,500.00 540.00
JUMLAH TENAGA KERJA 4,995.00
B BAHAN
Pipa PVC Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T1/manual (gergaji) /saw hari 0.0170 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 4,995.00
E Overhead & Profit 10% x D 10% 499.50
F Harga Satuan Pekerjaan (D+E) 5,494.50

A.8.4.2.6 Pemotongan 1 buah pipa PVC Ø 250 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1280 55,000.00 7,040.00
Tukang pipa L.0.02 OH 0.0640 -
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 7,917.50
B BAHAN
Pipa PVC Ø 250 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T1/manual (gergaji) /saw hari 0.0300 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 7,917.50
E Overhead & Profit 10% x D 10% 791.75
F Harga Satuan Pekerjaan (D+E) 8,709.25

A.8.4.2.7 Pemotongan 1 buah pipa PVC Ø 300 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1550 55,000.00 8,525.00
Tukang pipa L.0.02 OH 0.0770 -
Mandor L.0.04 OH 0.0150 67,500.00 1,012.50

Hal 190/229
JUMLAH TENAGA KERJA 9,537.50
B BAHAN
Pipa PVC Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T1/manual (gergaji) /saw hari 0.0370 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 9,537.50
E Overhead & Profit 10% x D 10% 953.75
F Harga Satuan Pekerjaan (D+E) 10,491.25

A.8.4.2.8 Pemotongan 1 buah pipa PVC Ø 400 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3310 55,000.00 18,205.00
Tukang pipa L.0.02 OH 0.1660 -
Mandor L.0.04 OH 0.0330 67,500.00 2,227.50
JUMLAH TENAGA KERJA 20,432.50
B BAHAN
Pipa PVC Ø 400 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T1/manual (gergaji) /saw hari 0.0860 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 20,432.50
E Overhead & Profit 10% x D 10% 2,043.25
F Harga Satuan Pekerjaan (D+E) 22,475.75

A.8.4.2.9 Pemotongan 1 buah pipa PVC Ø 450 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4200 55,000.00 23,100.00
Tukang pipa L.0.02 OH 0.2100 -
Mandor L.0.04 OH 0.0420 67,500.00 2,835.00
JUMLAH TENAGA KERJA 25,935.00
B BAHAN
Pipa PVC Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0540 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 25,935.00
E Overhead & Profit 10% x D 10% 2,593.50
F Harga Satuan Pekerjaan (D+E) 28,528.50

A.8.4.2.10 Pemotongan 1 buah pipa PVC Ø 500 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.5180 55,000.00 28,490.00
Tukang pipa L.0.02 OH 0.2590 -
Mandor L.0.04 OH 0.0520 67,500.00 3,510.00
JUMLAH TENAGA KERJA 32,000.00
B BAHAN
Pipa PVC Ø 500 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0690 -

Hal 191/229
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 32,000.00
E Overhead & Profit 10% x D 10% 3,200.00
F Harga Satuan Pekerjaan (D+E) 35,200.00

A.8.4.2.11 Pemotongan 1 buah pipa PVC Ø 600 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.6230 55,000.00 34,265.00
Tukang pipa L.0.02 OH 0.3110 -
Mandor L.0.04 OH 0.0620 67,500.00 4,185.00
JUMLAH TENAGA KERJA 38,450.00
B BAHAN
Pipa PVC Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0860 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 38,450.00
E Overhead & Profit 10% x D 10% 3,845.00
F Harga Satuan Pekerjaan (D+E) 42,295.00

A.8.4.2.12 Pemotongan 1 buah pipa PVC Ø 800 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.0890 55,000.00 59,895.00
Tukang pipa L.0.02 OH 0.5450 -
Mandor L.0.04 OH 0.1090 67,500.00 7,357.50
JUMLAH TENAGA KERJA 67,252.50
B BAHAN
Pipa PVC Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.1600 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 67,252.50
E Overhead & Profit 10% x D 10% 6,725.25
F Harga Satuan Pekerjaan (D+E) 73,977.75

A.8.4.2.13 Pemotongan 1 buah pipa PVC Ø 900 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.1410 55,000.00 62,755.00
Tukang pipa L.0.02 OH 0.5710 -
Mandor L.0.04 OH 0.1140 67,500.00 7,695.00
JUMLAH TENAGA KERJA 70,450.00
B BAHAN
Pipa PVC Ø 900 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.1680 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 70,450.00
E Overhead & Profit 10% x D 10% 7,045.00
F Harga Satuan Pekerjaan (D+E) 77,495.00

A.8.4.2.14 Pemotongan 1 buah pipa PVC Ø 1000 mm

Hal 192/229
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.2850 55,000.00 70,675.00
Tukang pipa L.0.02 OH 0.6430 -
Mandor L.0.04 OH 0.1290 67,500.00 8,707.50
JUMLAH TENAGA KERJA 79,382.50
B BAHAN
Pipa PVC Ø 1000 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.1910 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 79,382.50
E Overhead & Profit 10% x D 10% 7,938.25
F Harga Satuan Pekerjaan (D+E) 87,320.75

A.8.4.2.15 Pemotongan 1 buah pipa PVC Ø 1100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.4290 55,000.00 78,595.00
Tukang pipa L.0.02 OH 0.7150 -
Mandor L.0.04 OH 0.1430 67,500.00 9,652.50
JUMLAH TENAGA KERJA 88,247.50
B BAHAN
Pipa PVC Ø 1100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.2130 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 88,247.50
E Overhead & Profit 10% x D 10% 8,824.75
F Harga Satuan Pekerjaan (D+E) 97,072.25

A.8.4.2.16 Pemotongan 1 buah pipa PVC Ø 1200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5730 55,000.00 86,515.00
Tukang pipa L.0.02 OH 0.7870 -
Mandor L.0.04 OH 0.1570 67,500.00 10,597.50
JUMLAH TENAGA KERJA 97,112.50
B BAHAN
Pipa PVC Ø 1200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.2360 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 97,112.50
E Overhead & Profit 10% x D 10% 9,711.25
F Harga Satuan Pekerjaan (D+E) 106,823.75

A.8.4.2.17 Pemotongan 1 buah pipa HDPE Ø 63 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0020 55,000.00 110.00
Tukang pipa L.0.02 OH 0.0010 -
Mandor L.0.04 OH 0.0002 67,500.00 13.50
Operator L.0.08 OH 0.0340 -

Hal 193/229
JUMLAH TENAGA KERJA 123.50
B BAHAN
Pipa HDPE Ø 63 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0040 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 123.50
E Overhead & Profit 10% x D 10% 12.35
F Harga Satuan Pekerjaan (D+E) 135.85

A.8.4.2.18 Pemotongan 1 buah pipa HDPE Ø 100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0060 55,000.00 330.00
Tukang pipa L.0.02 OH 0.0030 -
Mandor L.0.04 OH 0.0010 67,500.00 67.50
Operator L.0.08 OH 0.0710 -
JUMLAH TENAGA KERJA 397.50
B BAHAN
Pipa HDPE Ø 100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0050 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 397.50
E Overhead & Profit 10% x D 10% 39.75
F Harga Satuan Pekerjaan (D+E) 437.25

A.8.4.2.19 Pemotongan 1 buah pipa HDPE Ø 125 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0090 55,000.00 495.00
Tukang pipa L.0.02 OH 0.0050 -
Mandor L.0.04 OH 0.0010 67,500.00 67.50
Operator L.0.08 OH 0.0960 -
JUMLAH TENAGA KERJA 562.50
B BAHAN
Pipa HDPE Ø 125 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0060 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 562.50
E Overhead & Profit 10% x D 10% 56.25
F Harga Satuan Pekerjaan (D+E) 618.75

A.8.4.2.20 Pemotongan 1 buah pipa HDPE Ø 150 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0160 55,000.00 880.00
Tukang pipa L.0.02 OH 0.0080 -
Mandor L.0.04 OH 0.0020 67,500.00 135.00
Operator L.0.08 OH 0.1210 -
JUMLAH TENAGA KERJA 1,015.00
B BAHAN
Pipa HDPE Ø 150 mm bh 1.0000 -

Hal 194/229
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0090 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,015.00
E Overhead & Profit 10% x D 10% 101.50
F Harga Satuan Pekerjaan (D+E) 1,116.50

A.8.4.2.21 Pemotongan 1 buah pipa HDPE Ø 200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0440 55,000.00 2,420.00
Tukang pipa L.0.02 OH 0.0220 -
Mandor L.0.04 OH 0.0040 67,500.00 270.00
Operator L.0.08 OH 0.1710 -
JUMLAH TENAGA KERJA 2,690.00
B BAHAN
Pipa HDPE Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0170 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,690.00
E Overhead & Profit 10% x D 10% 269.00
F Harga Satuan Pekerjaan (D+E) 2,959.00

A.8.4.2.22 Pemotongan 1 buah pipaHDPE Ø 250 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0670 55,000.00 3,685.00
Tukang pipa L.0.02 OH 0.0330 -
Mandor L.0.04 OH 0.0070 67,500.00 472.50
Operator L.0.08 OH 0.2210 -
JUMLAH TENAGA KERJA 4,157.50
B BAHAN
Pipa HDPE Ø 250 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0230 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 4,157.50
E Overhead & Profit 10% x D 10% 415.75
F Harga Satuan Pekerjaan (D+E) 4,573.25

A.8.4.2.23 Pemotongan 1 buah pipa HDPE Ø 300 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0900 55,000.00 4,950.00
Tukang pipa L.0.02 OH 0.0450 -
Mandor L.0.04 OH 0.0090 67,500.00 607.50
Operator L.0.08 OH 0.2710 -
JUMLAH TENAGA KERJA 5,557.50
B BAHAN
Pipa HDPE Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0300 -

Hal 195/229
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 5,557.50
E Overhead & Profit 10% x D 10% 555.75
F Harga Satuan Pekerjaan (D+E) 6,113.25

A.8.4.2.24 Pemotongan 1 buah pipa HDPE Ø 400 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1770 55,000.00 9,735.00
Tukang pipa L.0.02 OH 0.0880 -
Mandor L.0.04 OH 0.0180 67,500.00 1,215.00
Operator L.0.08 OH 0.3710 -
JUMLAH TENAGA KERJA 10,950.00
B BAHAN
Pipa HDPE Ø 400 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0550 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 10,950.00
E Overhead & Profit 10% x D 10% 1,095.00
F Harga Satuan Pekerjaan (D+E) 12,045.00

A.8.4.2.25 Pemotongan 1 buah pipa HDPE Ø 450 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2250 55,000.00 12,375.00
Tukang pipa L.0.02 OH 0.1130 -
Mandor L.0.04 OH 0.0230 67,500.00 1,552.50
Operator L.0.08 OH 0.4210 -
JUMLAH TENAGA KERJA 13,927.50
B BAHAN
Pipa HDPE Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0700 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 13,927.50
E Overhead & Profit 10% x D 10% 1,392.75
F Harga Satuan Pekerjaan (D+E) 15,320.25

A.8.4.2.26 Pemotongan 1 buah pipa HDPE Ø 500 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2770 55,000.00 15,235.00
Tukang pipa L.0.02 OH 0.1390 -
Mandor L.0.04 OH 0.0280 67,500.00 1,890.00
Operator L.0.08 OH 0.4710 -
JUMLAH TENAGA KERJA 17,125.00
B BAHAN
Pipa HDPE Ø 500 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0850 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 17,125.00
E Overhead & Profit 10% x D 10% 1,712.50

Hal 196/229
F Harga Satuan Pekerjaan (D+E) 18,837.50

A.8.4.2.27 Pemotongan 1 buah pipa HDPE Ø 600 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3330 55,000.00 18,315.00
Tukang pipa L.0.02 OH 0.1670 -
Mandor L.0.04 OH 0.0330 67,500.00 2,227.50
Operator L.0.08 OH 0.5710 -
JUMLAH TENAGA KERJA 20,542.50
B BAHAN
Pipa HDPE Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.1010 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 20,542.50
E Overhead & Profit 10% x D 10% 2,054.25
F Harga Satuan Pekerjaan (D+E) 22,596.75

A.8.4.2.28 Pemotongan 1 buah pipa HDPE Ø 800 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.6010 55,000.00 33,055.00
Tukang pipa L.0.02 OH 0.3010 -
Mandor L.0.04 OH 0.0600 67,500.00 4,050.00
Operator L.0.08 OH 0.7710 -
JUMLAH TENAGA KERJA 37,105.00
B BAHAN
Pipa HDPE Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.1790 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 37,105.00
E Overhead & Profit 10% x D 10% 3,710.50
F Harga Satuan Pekerjaan (D+E) 40,815.50

A.8.4.2.29 Pemotongan 1 buah pipa HDPE Ø 900 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9130 55,000.00 50,215.00
Tukang pipa L.0.02 OH 0.4560 -
Mandor L.0.04 OH 0.0910 67,500.00 6,142.50
Operator L.0.08 OH 0.8710 -
JUMLAH TENAGA KERJA 56,357.50
B BAHAN
Pipa HDPE Ø 900 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.2700 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 56,357.50
E Overhead & Profit 10% x D 10% 5,635.75
F Harga Satuan Pekerjaan (D+E) 61,993.25

A.8.4.2.30 Pemotongan 1 buah pipa HDPE Ø 1000 mm

Hal 197/229
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.1250 55,000.00 61,875.00
Tukang pipa L.0.02 OH 0.5620 -
Mandor L.0.04 OH 0.1120 67,500.00 7,560.00
Operator L.0.08 OH 0.9710 -
JUMLAH TENAGA KERJA 69,435.00
B BAHAN
Pipa HDPE Ø 1000 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.3320 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 69,435.00
E Overhead & Profit 10% x D 10% 6,943.50
F Harga Satuan Pekerjaan (D+E) 76,378.50

A.8.4.2.31 Pemotongan 1 buah pipa HDPE Ø 1100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.2380 55,000.00 68,090.00
Tukang pipa L.0.02 OH 0.6190 -
Mandor L.0.04 OH 0.1240 67,500.00 8,370.00
Operator L.0.08 OH 1.0710 -
JUMLAH TENAGA KERJA 76,460.00
B BAHAN
Pipa HDPE Ø 1100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.3650 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 76,460.00
E Overhead & Profit 10% x D 10% 7,646.00
F Harga Satuan Pekerjaan (D+E) 84,106.00

A.8.4.2.32 Pemotongan 1 buah pipa HDPE Ø 1200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6190 55,000.00 89,045.00
Tukang pipa L.0.02 OH 0.8090 -
Mandor L.0.04 OH 0.1620 67,500.00 10,935.00
Operator L.0.08 OH 1.1710 -
JUMLAH TENAGA KERJA 99,980.00
B BAHAN
Pipa HDPE Ø 1200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.4770 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 99,980.00
E Overhead & Profit 10% x D 10% 9,998.00
F Harga Satuan Pekerjaan (D+E) 109,978.00

A.8.4.2.33 Pemotongan 1 buah pipa GIP Ø 63 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0190 55,000.00 1,045.00

Hal 198/229
Tukang pipa L.0.02 OH 0.0100 -
Mandor L.0.04 OH 0.0020 67,500.00 135.00
JUMLAH TENAGA KERJA 1,180.00
B BAHAN
Pipa GIP Ø 63 mm bh 1.0000 360,000.00 360,000.00
JUMLAH HARGA BAHAN 360,000.00
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 361,180.00
E Overhead & Profit 10% x D 10% 36,118.00
F Harga Satuan Pekerjaan (D+E) 397,298.00

A.8.4.2.34 Pemotongan 1 buah pipa GIP Ø 100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0580 55,000.00 3,190.00
Tukang pipa L.0.02 OH 0.0290 -
Mandor L.0.04 OH 0.0060 67,500.00 405.00
JUMLAH TENAGA KERJA 3,595.00
B BAHAN
Pipa GIP Ø 100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 3,595.00
E Overhead & Profit 10% x D 10% 359.50
F Harga Satuan Pekerjaan (D+E) 3,954.50

A.8.4.2.35 Pemotongan 1 buah pipa GIP Ø 125 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0920 55,000.00 5,060.00
Tukang pipa L.0.02 OH 0.0460 -
Mandor L.0.04 OH 0.0090 67,500.00 607.50
JUMLAH TENAGA KERJA 5,667.50
B BAHAN
Pipa GIP Ø 125 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 5,667.50
E Overhead & Profit 10% x D 10% 566.75
F Harga Satuan Pekerjaan (D+E) 6,234.25

A.8.4.2.36 Pemotongan 1 buah pipa GIP Ø 150 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1310 55,000.00 7,205.00
Tukang pipa L.0.02 OH 0.0660 -
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 8,082.50
B BAHAN
Pipa GIP Ø 150 mm bh 1.0000 -
JUMLAH HARGA BAHAN -

Hal 199/229
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 8,082.50
E Overhead & Profit 10% x D 10% 808.25
F Harga Satuan Pekerjaan (D+E) 8,890.75

A.8.4.2.37 Pemotongan 1 buah pipa GIP Ø 200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3400 55,000.00 18,700.00
Tukang pipa L.0.02 OH 0.1700 -
Mandor L.0.04 OH 0.0340 67,500.00 2,295.00
JUMLAH TENAGA KERJA 20,995.00
B BAHAN
Pipa GIP Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 20,995.00
E Overhead & Profit 10% x D 10% 2,099.50
F Harga Satuan Pekerjaan (D+E) 23,094.50

A.8.4.2.38 Pemotongan 1 buah pipa GIP Ø 250 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4750 55,000.00 26,125.00
Tukang pipa L.0.02 OH 0.2370 -
Mandor L.0.04 OH 0.0470 67,500.00 3,172.50
JUMLAH TENAGA KERJA 29,297.50
B BAHAN
Pipa GIP Ø 250 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 29,297.50
E Overhead & Profit 10% x D 10% 2,929.75
F Harga Satuan Pekerjaan (D+E) 32,227.25

A.8.4.2.39 Pemotongan 1 buah pipa GIP Ø 300 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.5040 55,000.00 27,720.00
Tukang pipa L.0.02 OH 0.2520 -
Mandor L.0.04 OH 0.0500 67,500.00 3,375.00
JUMLAH TENAGA KERJA 31,095.00
B BAHAN
Pipa GIP Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 31,095.00
E Overhead & Profit 10% x D 10% 3,109.50
F Harga Satuan Pekerjaan (D+E) 34,204.50

Hal 200/229
A.8.4.2.40 Pemotongan 1 buah pipa GIP Ø 400 mm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7380 55,000.00 40,590.00
Tukang pipa L.0.02 OH 0.3690 -
Mandor L.0.04 OH 0.0740 67,500.00 4,995.00
JUMLAH TENAGA KERJA 45,585.00
B BAHAN
Pipa GIP Ø 400 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 45,585.00
E Overhead & Profit 10% x D 10% 4,558.50
F Harga Satuan Pekerjaan (D+E) 50,143.50

A.8.4.2.41 Pemotongan 1 buah pipa GIP Ø 450 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.8480 55,000.00 46,640.00
Tukang pipa L.0.02 OH 0.4240 -
Mandor L.0.04 OH 0.0850 67,500.00 5,737.50
JUMLAH TENAGA KERJA 52,377.50
B BAHAN
Pipa GIP Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 52,377.50
E Overhead & Profit 10% x D 10% 5,237.75
F Harga Satuan Pekerjaan (D+E) 57,615.25

A.8.4.2.42 Pemotongan 1 buah pipa GIP Ø 500 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9410 55,000.00 51,755.00
Tukang pipa L.0.02 OH 0.4710 -
Mandor L.0.04 OH 0.0940 67,500.00 6,345.00
JUMLAH TENAGA KERJA 58,100.00
B BAHAN
Pipa GIP Ø 500 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 58,100.00
E Overhead & Profit 10% x D 10% 5,810.00
F Harga Satuan Pekerjaan (D+E) 63,910.00

A.8.4.2.43 Pemotongan1 buah pipa GIP Ø 600 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.8640 55,000.00 47,520.00
Tukang pipa L.0.02 OH 0.4320 -

Hal 201/229
Mandor L.0.04 OH 0.0860 67,500.00 5,805.00
JUMLAH TENAGA KERJA 53,325.00
B BAHAN
Pipa GIP Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 53,325.00
E Overhead & Profit 10% x D 10% 5,332.50
F Harga Satuan Pekerjaan (D+E) 58,657.50

A.8.4.2.44 Pemotongan 1 buah pipa GIP Ø 800 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5670 55,000.00 86,185.00
Tukang pipa L.0.02 OH 0.7830 -
Mandor L.0.04 OH 0.1570 67,500.00 10,597.50
JUMLAH TENAGA KERJA 96,782.50
B BAHAN
Pipa GIP Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 96,782.50
E Overhead & Profit 10% x D 10% 9,678.25
F Harga Satuan Pekerjaan (D+E) 106,460.75

A.8.4.2.45 Pemotongan 1 buah pipa GIP Ø 900 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.7700 55,000.00 97,350.00
Tukang pipa L.0.02 OH 0.8850 -
Mandor L.0.04 OH 0.1770 67,500.00 11,947.50
JUMLAH TENAGA KERJA 109,297.50
B BAHAN
Pipa GIP Ø 900 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 109,297.50
E Overhead & Profit 10% x D 10% 10,929.75
F Harga Satuan Pekerjaan (D+E) 120,227.25

A.8.4.2.46 Pemotongan 1 buah pipa GIP Ø 1000 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.9740 55,000.00 108,570.00
Tukang pipa L.0.02 OH 0.9870 -
Mandor L.0.04 OH 0.1970 67,500.00 13,297.50
JUMLAH TENAGA KERJA 121,867.50
B BAHAN
Pipa GIP Ø 1000 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN

Hal 202/229
Peralatan potong pipa T2/mekanik / cilinder saw hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 121,867.50
E Overhead & Profit 10% x D 10% 12,186.75
F Harga Satuan Pekerjaan (D+E) 134,054.25

A.8.4.2.47 Pemotongan 1 buah pipa GIP Ø 1100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.1780 55,000.00 119,790.00
Tukang pipa L.0.02 OH 1.0890 -
Mandor L.0.04 OH 0.2180 67,500.00 14,715.00
JUMLAH TENAGA KERJA 134,505.00
B BAHAN
Pipa GIP Ø 1100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 134,505.00
E Overhead & Profit 10% x D 10% 13,450.50
F Harga Satuan Pekerjaan (D+E) 147,955.50

A.8.4.2.48 Pemotongan 1 buah pipa GIP Ø 1200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.3820 55,000.00 131,010.00
Tukang pipa L.0.02 OH 1.1910 -
Mandor L.0.04 OH 0.2380 67,500.00 16,065.00
JUMLAH TENAGA KERJA 147,075.00
B BAHAN
Pipa GIP Ø 1200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 147,075.00
E Overhead & Profit 10% x D 10% 14,707.50
F Harga Satuan Pekerjaan (D+E) 161,782.50

A.8.4.2.49 Pemotongan 1 buah pipa DCI Ø 100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0710 55,000.00 3,905.00
Tukang pipa L.0.02 OH 0.0140 -
Mandor L.0.04 OH 0.0070 67,500.00 472.50
JUMLAH TENAGA KERJA 4,377.50
B BAHAN
Pipa DCI Ø 100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0030
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 4,377.50
E Overhead & Profit 10% x D 10% 437.75
F Harga Satuan Pekerjaan (D+E) 4,815.25

Hal 203/229
A.8.4.2.50 Pemotongan 1 buah pipa DCI Ø 125 mm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1120 55,000.00 6,160.00
Tukang pipa L.0.02 OH 0.0220 -
Mandor L.0.04 OH 0.0110 67,500.00 742.50
JUMLAH TENAGA KERJA 6,902.50
B BAHAN
Pipa DCI Ø 125 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0100 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 6,902.50
E Overhead & Profit 10% x D 10% 690.25
F Harga Satuan Pekerjaan (D+E) 7,592.75

A.8.4.2.51 Pemotongan 1 buah pipa DCI Ø 150 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1590 55,000.00 8,745.00
Tukang pipa L.0.02 OH 0.0320 -
Mandor L.0.04 OH 0.0160 67,500.00 1,080.00
JUMLAH TENAGA KERJA 9,825.00
B BAHAN
Pipa DCI Ø 150 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0180 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 9,825.00
E Overhead & Profit 10% x D 10% 982.50
F Harga Satuan Pekerjaan (D+E) 10,807.50

A.8.4.2.52 Pemotongan 1 buah pipa DCI Ø 200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3660 55,000.00 20,130.00
Tukang pipa L.0.02 OH 0.0730 -
Mandor L.0.04 OH 0.0370 67,500.00 2,497.50
JUMLAH TENAGA KERJA 22,627.50
B BAHAN
Pipa DCI Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0540 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 22,627.50
E Overhead & Profit 10% x D 10% 2,262.75
F Harga Satuan Pekerjaan (D+E) 24,890.25

A.8.4.2.53 Pemotongan 1 buah pipa DCI Ø 250 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4760 55,000.00 26,180.00
Tukang pipa L.0.02 OH 0.0950 -
Mandor L.0.04 OH 0.0480 67,500.00 3,240.00

Hal 204/229
JUMLAH TENAGA KERJA 29,420.00
B BAHAN
Pipa DCI Ø 250 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0730 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 29,420.00
E Overhead & Profit 10% x D 10% 2,942.00
F Harga Satuan Pekerjaan (D+E) 32,362.00

A.8.4.2.54 Pemotongan 1 buah pipa DCI Ø 300 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.5120 55,000.00 28,160.00
Tukang pipa L.0.02 OH 0.1020 -
Mandor L.0.04 OH 0.0510 67,500.00 3,442.50
JUMLAH TENAGA KERJA 31,602.50
B BAHAN
Pipa DCI Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0790 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 31,602.50
E Overhead & Profit 10% x D 10% 3,160.25
F Harga Satuan Pekerjaan (D+E) 34,762.75

A.8.4.2.55 Pemotongan 1 buah pipa DCI Ø 400 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9410 55,000.00 51,755.00
Tukang pipa L.0.02 OH 0.1880 -
Mandor L.0.04 OH 0.0940 67,500.00 6,345.00
JUMLAH TENAGA KERJA 58,100.00
B BAHAN
Pipa DCI Ø 400 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.1580 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 58,100.00
E Overhead & Profit 10% x D 10% 5,810.00
F Harga Satuan Pekerjaan (D+E) 63,910.00

A.8.4.2.56 Pemotongan 1 buah pipa DCI Ø 450 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.1370 55,000.00 62,535.00
Tukang pipa L.0.02 OH 0.2270 -
Mandor L.0.04 OH 0.1140 67,500.00 7,695.00
JUMLAH TENAGA KERJA 70,230.00
B BAHAN
Pipa DCI Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.1760 -

Hal 205/229
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 70,230.00
E Overhead & Profit 10% x D 10% 7,023.00
F Harga Satuan Pekerjaan (D+E) 77,253.00

A.8.4.2.57 Pemotongan 1 buah pipa DCI Ø 500 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.3120 55,000.00 72,160.00
Tukang pipa L.0.02 OH 0.2620 -
Mandor L.0.04 OH 0.1310 67,500.00 8,842.50
JUMLAH TENAGA KERJA 81,002.50
B BAHAN
Pipa DCI Ø 500 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.1920 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 81,002.50
E Overhead & Profit 10% x D 10% 8,100.25
F Harga Satuan Pekerjaan (D+E) 89,102.75

A.8.4.2.58 Pemotongan 1 buah pipa DCI Ø 600 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.3090 55,000.00 71,995.00
Tukang pipa L.0.02 OH 0.2620 -
Mandor L.0.04 OH 0.1310 67,500.00 8,842.50
JUMLAH TENAGA KERJA 80,837.50
B BAHAN
Pipa DCI Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.1920 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 80,837.50
E Overhead & Profit 10% x D 10% 8,083.75
F Harga Satuan Pekerjaan (D+E) 88,921.25

A.8.4.2.59 Pemotongan 1 buah pipa DCI Ø 800 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.5980 55,000.00 142,890.00
Tukang pipa L.0.02 OH 0.5200 -
Mandor L.0.04 OH 0.2600 67,500.00 17,550.00
JUMLAH TENAGA KERJA 160,440.00
B BAHAN
Pipa DCI Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.3100 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 160,440.00
E Overhead & Profit 10% x D 10% 16,044.00
F Harga Satuan Pekerjaan (D+E) 176,484.00

A.8.4.2.60 Pemotongan 1 buah pipa DCI Ø 900 mm

Hal 206/229
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.3700 55,000.00 185,350.00
Tukang pipa L.0.02 OH 0.6740 -
Mandor L.0.04 OH 0.3370 67,500.00 22,747.50
JUMLAH TENAGA KERJA 208,097.50
B BAHAN
Pipa DCI Ø 900 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.3810 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 208,097.50
E Overhead & Profit 10% x D 10% 20,809.75
F Harga Satuan Pekerjaan (D+E) 228,907.25

A.8.4.2.61 Pemotongan 1 buah pipa DCI Ø 1000 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 4.0210 55,000.00 221,155.00
Tukang pipa L.0.02 OH 0.8040 -
Mandor L.0.04 OH 0.4020 67,500.00 27,135.00
JUMLAH TENAGA KERJA 248,290.00
B BAHAN
Pipa DCI Ø 1000 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.4410 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 248,290.00
E Overhead & Profit 10% x D 10% 24,829.00
F Harga Satuan Pekerjaan (D+E) 273,119.00

A.8.4.2.62 Pemotongan 1 buah pipa DCI Ø 1100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 4.7310 55,000.00 260,205.00
Tukang pipa L.0.02 OH 0.9460 -
Mandor L.0.04 OH 0.4730 67,500.00 31,927.50
JUMLAH TENAGA KERJA 292,132.50
B BAHAN
Pipa DCI Ø 1100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.5060 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 292,132.50
E Overhead & Profit 10% x D 10% 29,213.25
F Harga Satuan Pekerjaan (D+E) 321,345.75

A.8.4.2.63 Pemotongan 1 buah pipa DCI Ø 1200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 5.5020 55,000.00 302,610.00
Tukang pipa L.0.02 OH 1.1000 -
Mandor L.0.04 OH 0.5500 67,500.00 37,125.00
JUMLAH TENAGA KERJA 339,735.00

Hal 207/229
B BAHAN
Pipa DCI Ø 1200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.5760 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 339,735.00
E Overhead & Profit 10% x D 10% 33,973.50
F Harga Satuan Pekerjaan (D+E) 373,708.50

A.8.4.2.64 Pemotongan 1 buah pipa baja Ø 63 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0280 55,000.00 1,540.00
Tukang pipa L.0.02 OH 0.0060 -
Mandor L.0.04 OH 0.0030 67,500.00 202.50
JUMLAH TENAGA KERJA 1,742.50
B BAHAN
Pipa Baja Ø 63 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0370 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,742.50
E Overhead & Profit 10% x D 10% 174.25
F Harga Satuan Pekerjaan (D+E) 1,916.75

A.8.4.2.65 Pemotongan 1 buah pipa baja Ø 100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0850 55,000.00 4,675.00
Tukang pipa L.0.02 OH 0.0170 -
Mandor L.0.04 OH 0.0080 67,500.00 540.00
JUMLAH TENAGA KERJA 5,215.00
B BAHAN
Pipa Baja Ø 100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0400 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 5,215.00
E Overhead & Profit 10% x D 10% 521.50
F Harga Satuan Pekerjaan (D+E) 5,736.50

A.8.4.2.66 Pemotongan 1 buah pipa baja Ø 125 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1330 55,000.00 7,315.00
Tukang pipa L.0.02 OH 0.0270 -
Mandor L.0.04 OH 0.0130 67,500.00 877.50
JUMLAH TENAGA KERJA 8,192.50
B BAHAN
Pipa Baja Ø 125 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0420 -
JUMLAH HARGA ALAT -

Hal 208/229
D Jumlah (A+B+C) 8,192.50
E Overhead & Profit 10% x D 10% 819.25
F Harga Satuan Pekerjaan (D+E) 9,011.75

A.8.4.2.67 Pemotongan 1 buah pipa baja Ø 150 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1840 55,000.00 10,120.00
Tukang pipa L.0.02 OH 0.0370 -
Mandor L.0.04 OH 0.0180 67,500.00 1,215.00
JUMLAH TENAGA KERJA 11,335.00
B BAHAN
Pipa Baja Ø 150 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0450 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 11,335.00
E Overhead & Profit 10% x D 10% 1,133.50
F Harga Satuan Pekerjaan (D+E) 12,468.50

A.8.4.2.68 Pemotongan 1 buah pipa baja Ø 200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4760 55,000.00 26,180.00
Tukang pipa L.0.02 OH 0.0950 -
Mandor L.0.04 OH 0.0480 67,500.00 3,240.00
JUMLAH TENAGA KERJA 29,420.00
B BAHAN
Pipa Baja Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0600 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 29,420.00
E Overhead & Profit 10% x D 10% 2,942.00
F Harga Satuan Pekerjaan (D+E) 32,362.00

A.8.4.2.69 Pemotongan 1 buah pipa baja Ø 250 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.6630 55,000.00 36,465.00
Tukang pipa L.0.02 OH 0.1330 -
Mandor L.0.04 OH 0.0660 67,500.00 4,455.00
JUMLAH TENAGA KERJA 40,920.00
B BAHAN
Pipa Baja Ø 250 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0680 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 40,920.00
E Overhead & Profit 10% x D 10% 4,092.00
F Harga Satuan Pekerjaan (D+E) 45,012.00

A.8.4.2.70 Pemotongan 1 buah pipa baja Ø 300 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
Hal 209/229
A TENAGA
Pekerja L.0.01 OH 0.7450 55,000.00 40,975.00
Tukang pipa L.0.02 OH 0.1490 -
Mandor L.0.04 OH 0.0740 67,500.00 4,995.00
JUMLAH TENAGA KERJA 45,970.00
B BAHAN
Pipa Baja Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0720 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 45,970.00
E Overhead & Profit 10% x D 10% 4,597.00
F Harga Satuan Pekerjaan (D+E) 50,567.00

A.8.4.2.71 Pemotongan 1 buah pipa baja Ø 400 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.4400 55,000.00 79,200.00
Tukang pipa L.0.02 OH 0.2880 -
Mandor L.0.04 OH 0.1440 67,500.00 9,720.00
JUMLAH TENAGA KERJA 88,920.00
B BAHAN
Pipa Baja Ø 400 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.1050 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 88,920.00
E Overhead & Profit 10% x D 10% 8,892.00
F Harga Satuan Pekerjaan (D+E) 97,812.00

A.8.4.2.72 Pemotongan 1 buah pipa baja Ø 450 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.3990 55,000.00 76,945.00
Tukang pipa L.0.02 OH 0.2800 -
Mandor L.0.04 OH 0.1400 67,500.00 9,450.00
JUMLAH TENAGA KERJA 86,395.00
B BAHAN
Pipa Baja Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.1070 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 86,395.00
E Overhead & Profit 10% x D 10% 8,639.50
F Harga Satuan Pekerjaan (D+E) 95,034.50

A.8.4.2.73 Pemotongan 1 buah pipa baja Ø 500 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5580 55,000.00 85,690.00
Tukang pipa L.0.02 OH 0.3120 -
Mandor L.0.04 OH 0.1560 67,500.00 10,530.00
JUMLAH TENAGA KERJA 96,220.00
B BAHAN

Hal 210/229
Pipa Baja Ø 500 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.1070 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 96,220.00
E Overhead & Profit 10% x D 10% 9,622.00
F Harga Satuan Pekerjaan (D+E) 105,842.00

A.8.4.2.74 Pemotongan 1 buah pipa baja Ø 600 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.4370 55,000.00 79,035.00
Tukang pipa L.0.02 OH 0.2870 -
Mandor L.0.04 OH 0.1440 67,500.00 9,720.00
JUMLAH TENAGA KERJA 88,755.00
B BAHAN
Pipa Baja Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.1130 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 88,755.00
E Overhead & Profit 10% x D 10% 8,875.50
F Harga Satuan Pekerjaan (D+E) 97,630.50

A.8.4.2.75 Pemotongan 1 buah pipa baja Ø 800 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.6240 55,000.00 144,320.00
Tukang pipa L.0.02 OH 0.5250 -
Mandor L.0.04 OH 0.2620 67,500.00 17,685.00
JUMLAH TENAGA KERJA 162,005.00
B BAHAN
Pipa Baja Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.1660 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 162,005.00
E Overhead & Profit 10% x D 10% 16,200.50
F Harga Satuan Pekerjaan (D+E) 178,205.50

A.8.4.2.76 Pemotongan 1 buah pipa baja Ø 900 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.9710 55,000.00 163,405.00
Tukang pipa L.0.02 OH 0.5940 -
Mandor L.0.04 OH 0.2970 67,500.00 20,047.50
JUMLAH TENAGA KERJA 183,452.50
B BAHAN
Pipa Baja Ø 900 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.1830 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 183,452.50

Hal 211/229
E Overhead & Profit 10% x D 10% 18,345.25
F Harga Satuan Pekerjaan (D+E) 201,797.75

A.8.4.2.77 Pemotongan 1 buah pipa baja Ø 1000 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.3190 55,000.00 182,545.00
Tukang pipa L.0.02 OH 0.6640 -
Mandor L.0.04 OH 0.3320 67,500.00 22,410.00
JUMLAH TENAGA KERJA 204,955.00
B BAHAN
Pipa Baja Ø 1000 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.2010 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 204,955.00
E Overhead & Profit 10% x D 10% 20,495.50
F Harga Satuan Pekerjaan (D+E) 225,450.50

A.8.4.2.78 Pemotongan 1 buah pipa baja Ø 1100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.6670 55,000.00 201,685.00
Tukang pipa L.0.02 OH 0.7330 -
Mandor L.0.04 OH 0.3670 67,500.00 24,772.50
JUMLAH TENAGA KERJA 226,457.50
B BAHAN
Pipa Baja Ø 1100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.2180 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 226,457.50
E Overhead & Profit 10% x D 10% 22,645.75
F Harga Satuan Pekerjaan (D+E) 249,103.25

A.8.4.2.79 Pemotongan 1 buah pipa baja Ø 1200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 4.0150 55,000.00 220,825.00
Tukang pipa L.0.02 OH 0.8030 -
Mandor L.0.04 OH 0.4020 67,500.00 27,135.00
JUMLAH TENAGA KERJA 247,960.00
B BAHAN
Pipa Baja Ø 1100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.2360 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 247,960.00
E Overhead & Profit 10% x D 10% 24,796.00
F Harga Satuan Pekerjaan (D+E) 272,756.00

A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA


A.8.4.3.1 Pemasangan 1 buah Valve Ø 150 mm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
Hal 212/229
A TENAGA
Pekerja L.0.01 OH 1.4290 55,000.00 78,595.00
Tukang pipa L.0.02 OH 0.7150 -
Mandor L.0.04 OH 0.1430 67,500.00 9,652.50
JUMLAH TENAGA KERJA 88,247.50
B BAHAN
Valve Ø 150 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.1000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 88,247.50
E Overhead & Profit 10% x D 10% 8,824.75
F Harga Satuan Pekerjaan (D+E) 97,072.25

A.8.4.3.2 Pemasangan 1 buah Valve Ø 200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.7140 55,000.00 94,270.00
Tukang pipa L.0.02 OH 0.8570 -
Mandor L.0.04 OH 0.1710 67,500.00 11,542.50
JUMLAH TENAGA KERJA 105,812.50
B BAHAN
Valve Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.3000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 105,812.50
E Overhead & Profit 10% x D 10% 10,581.25
F Harga Satuan Pekerjaan (D+E) 116,393.75

A.8.4.3.3 Pemasangan 1 buah Valve Ø 250 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.7140 55,000.00 94,270.00
Tukang pipa L.0.02 OH 0.8570 -
Mandor L.0.04 OH 0.1710 67,500.00 11,542.50
JUMLAH TENAGA KERJA 105,812.50
B BAHAN
Valve Ø 250 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.4000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 105,812.50
E Overhead & Profit 10% x D 10% 10,581.25
F Harga Satuan Pekerjaan (D+E) 116,393.75

A.8.4.3.4 Pemasangan 1 buah Valve Ø 300 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.0000 55,000.00 110,000.00
Tukang pipa L.0.02 OH 1.0000 -
Mandor L.0.04 OH 0.2000 67,500.00 13,500.00
JUMLAH TENAGA KERJA 123,500.00
B BAHAN

Hal 213/229
Valve Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.5000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 123,500.00
E Overhead & Profit 10% x D 10% 12,350.00
F Harga Satuan Pekerjaan (D+E) 135,850.00

A.8.4.3.5 Pemasangan 1 buah Valve Ø 400 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.4290 55,000.00 188,595.00
Tukang pipa L.0.02 OH 1.7150 -
Mandor L.0.04 OH 0.3430 67,500.00 23,152.50
JUMLAH TENAGA KERJA 211,747.50
B BAHAN
Valve Ø 400 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 1.0000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 211,747.50
E Overhead & Profit 10% x D 10% 21,174.75
F Harga Satuan Pekerjaan (D+E) 232,922.25

A.8.4.3.6 Pemasangan 1 buah Valve Ø 450 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.4290 55,000.00 188,595.00
Tukang pipa L.0.02 OH 1.7150 -
Mandor L.0.04 OH 0.3430 67,500.00 23,152.50
JUMLAH TENAGA KERJA 211,747.50
B BAHAN
Valve Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 1.0000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 211,747.50
E Overhead & Profit 10% x D 10% 21,174.75
F Harga Satuan Pekerjaan (D+E) 232,922.25

A.8.4.3.7 Pemasangan 1 buah Valve Ø 500 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 4.0000 55,000.00 220,000.00
Tukang pipa L.0.02 OH 2.0000 -
Mandor L.0.04 OH 0.4000 67,500.00 27,000.00
JUMLAH TENAGA KERJA 247,000.00
B BAHAN
Valve Ø 500 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 1.0000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 247,000.00

Hal 214/229
E Overhead & Profit 10% x D 10% 24,700.00
F Harga Satuan Pekerjaan (D+E) 271,700.00

A.8.4.3.8 Pemasangan 1 buah Valve Ø 600 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.4210 55,000.00 78,155.00
Tukang pipa L.0.02 OH 0.7110 -
Mandor L.0.04 OH 0.1420 67,500.00 9,585.00
JUMLAH TENAGA KERJA 87,740.00
B BAHAN
Valve Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.6000 -
Mobile crane =< 3 ton hari 0.3000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 87,740.00
E Overhead & Profit 10% x D 10% 8,774.00
F Harga Satuan Pekerjaan (D+E) 96,514.00

A.8.4.3.9 Pemasangan 1 buah Valve Ø 700 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.4290 55,000.00 78,595.00
Tukang pipa L.0.02 OH 0.7150 -
Mandor L.0.04 OH 0.1430 67,500.00 9,652.50
JUMLAH TENAGA KERJA 88,247.50
B BAHAN
Valve Ø 700 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.5000 -
Mobile crane =< 3 ton hari 0.5000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 88,247.50
E Overhead & Profit 10% x D 10% 8,824.75
F Harga Satuan Pekerjaan (D+E) 97,072.25

A.8.4.3.10 Pemasangan 1 buah Valve Ø 800 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.7860 55,000.00 98,230.00
Tukang pipa L.0.02 OH 0.8930 -
Mandor L.0.04 OH 0.1790 67,500.00 12,082.50
JUMLAH TENAGA KERJA 110,312.50
B BAHAN
Valve Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.5000 -
Mobile crane =< 3 ton hari 0.5000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 110,312.50
E Overhead & Profit 10% x D 10% 11,031.25
F Harga Satuan Pekerjaan (D+E) 121,343.75

Hal 215/229
A.8.4.3.11 Pemasangan 1 buah Valve Ø 900 mm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.7140 55,000.00 94,270.00
Tukang pipa L.0.02 OH 0.8570 -
Mandor L.0.04 OH 0.1710 67,500.00 11,542.50
JUMLAH TENAGA KERJA 105,812.50
B BAHAN
Valve Ø 900 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.7500 -
Mobile crane =< 3 ton hari 0.7500 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 105,812.50
E Overhead & Profit 10% x D 10% 10,581.25
F Harga Satuan Pekerjaan (D+E) 116,393.75

A.8.4.3.12 Pemasangan 1 buah Valve Ø 1000 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.5710 55,000.00 141,405.00
Tukang pipa L.0.02 OH 1.2860 -
Mandor L.0.04 OH 0.2570 67,500.00 17,347.50
JUMLAH TENAGA KERJA 158,752.50
B BAHAN
Valve Ø 1000 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 1.0000 -
Mobile crane =< 3 ton hari 1.0000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 158,752.50
E Overhead & Profit 10% x D 10% 15,875.25
F Harga Satuan Pekerjaan (D+E) 174,627.75

A.8.4.3.13 Pemasangan 1 buah Valve Ø 1100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.0000 55,000.00 165,000.00
Tukang pipa L.0.02 OH 1.5000 -
Mandor L.0.04 OH 0.3000 67,500.00 20,250.00
JUMLAH TENAGA KERJA 185,250.00
B BAHAN
Valve Ø 1100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 1.0000 -
Mobile crane =< 3 ton hari 1.0000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 185,250.00
E Overhead & Profit 10% x D 10% 18,525.00
F Harga Satuan Pekerjaan (D+E) 203,775.00

A.8.4.3.14 Pemasangan 1 buah Valve Ø 1200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA

Hal 216/229
Pekerja L.0.01 OH 3.0000 55,000.00 165,000.00
Tukang pipa L.0.02 OH 1.5000 -
Mandor L.0.04 OH 0.3000 67,500.00 20,250.00
JUMLAH TENAGA KERJA 185,250.00
B BAHAN
Valve Ø 1200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 1.0000 -
Mobile crane =< 3 ton hari 1.0000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 185,250.00
E Overhead & Profit 10% x D 10% 18,525.00
F Harga Satuan Pekerjaan (D+E) 203,775.00

A.8.4.3.15 Pemasangan 1 buah Tee Ø 150 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1060 55,000.00 5,830.00
Tukang pipa L.0.02 OH 0.0530 -
Mandor L.0.04 OH 0.0110 67,500.00 742.50
JUMLAH TENAGA KERJA 6,572.50
B BAHAN
Tee Ø 150 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0280 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 6,572.50
E Overhead & Profit 10% x D 10% 657.25
F Harga Satuan Pekerjaan (D+E) 7,229.75

A.8.4.3.16 Pemasangan 1 buah Tee Ø 200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2160 55,000.00 11,880.00
Tukang pipa L.0.02 OH 0.1080 -
Mandor L.0.04 OH 0.0220 67,500.00 1,485.00
JUMLAH TENAGA KERJA 13,365.00
B BAHAN
Tee Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0290 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 13,365.00
E Overhead & Profit 10% x D 10% 1,336.50
F Harga Satuan Pekerjaan (D+E) 14,701.50

A.8.4.3.17 Pemasangan 1 buah Tee Ø 250 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3260 55,000.00 17,930.00
Tukang pipa L.0.02 OH 0.1630 -
Mandor L.0.04 OH 0.0330 67,500.00 2,227.50
JUMLAH TENAGA KERJA 20,157.50
B BAHAN

Hal 217/229
Tee Ø 250 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0390 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 20,157.50
E Overhead & Profit 10% x D 10% 2,015.75
F Harga Satuan Pekerjaan (D+E) 22,173.25

A.8.4.3.18 Pemasangan 1 buah Tee Ø 300 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4360 55,000.00 23,980.00
Tukang pipa L.0.02 OH 0.2180 -
Mandor L.0.04 OH 0.0440 67,500.00 2,970.00
JUMLAH TENAGA KERJA 26,950.00
B BAHAN
Tee Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.5000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 26,950.00
E Overhead & Profit 10% x D 10% 2,695.00
F Harga Satuan Pekerjaan (D+E) 29,645.00

A.8.4.3.19 Pemasangan 1 buah Tee Ø 400 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.6560 55,000.00 36,080.00
Tukang pipa L.0.02 OH 0.3280 -
Mandor L.0.04 OH 0.0660 67,500.00 4,455.00
JUMLAH TENAGA KERJA 40,535.00
B BAHAN
Tee Ø 400 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.5000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 40,535.00
E Overhead & Profit 10% x D 10% 4,053.50
F Harga Satuan Pekerjaan (D+E) 44,588.50

A.8.4.3.20 Pemasangan 1 buah Tee Ø 450 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7660 55,000.00 42,130.00
Tukang pipa L.0.02 OH 0.3830 -
Mandor L.0.04 OH 0.0770 67,500.00 5,197.50
JUMLAH TENAGA KERJA 47,327.50
B BAHAN
Tee Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.5000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 47,327.50

Hal 218/229
E Overhead & Profit 10% x D 10% 4,732.75
F Harga Satuan Pekerjaan (D+E) 52,060.25

A.8.4.3.21 Pemasangan 1 buah Tee Ø 500 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.8760 55,000.00 48,180.00
Tukang pipa L.0.02 OH 0.4380 -
Mandor L.0.04 OH 0.0880 67,500.00 5,940.00
JUMLAH TENAGA KERJA 54,120.00
B BAHAN
Tee Ø 500 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.6000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 54,120.00
E Overhead & Profit 10% x D 10% 5,412.00
F Harga Satuan Pekerjaan (D+E) 59,532.00

A.8.4.3.22 Pemasangan 1 buah Tee Ø 600 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.0960 55,000.00 60,280.00
Tukang pipa L.0.02 OH 0.5480 -
Mandor L.0.04 OH 0.1100 67,500.00 7,425.00
JUMLAH TENAGA KERJA 67,705.00
B BAHAN
Tee Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.1930 -
Mobile crane =< 3 ton hari 0.0960 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 67,705.00
E Overhead & Profit 10% x D 10% 6,770.50
F Harga Satuan Pekerjaan (D+E) 74,475.50

A.8.4.3.23 Pemasangan 1 buah Tee Ø 700 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.3160 55,000.00 72,380.00
Tukang pipa L.0.02 OH 0.6580 -
Mandor L.0.04 OH 0.6580 67,500.00 44,415.00
JUMLAH TENAGA KERJA 116,795.00
B BAHAN
Tee Ø 700 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.2250 -
Mobile crane =< 3 ton hari 0.1130 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 116,795.00
E Overhead & Profit 10% x D 10% 11,679.50
F Harga Satuan Pekerjaan (D+E) 128,474.50

A.8.4.3.24 Pemasangan 1 buah Tee Ø 800 mm

Hal 219/229
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5360 55,000.00 84,480.00
Tukang pipa L.0.02 OH 0.7680 -
Mandor L.0.04 OH 0.1540 67,500.00 10,395.00
JUMLAH TENAGA KERJA 94,875.00
B BAHAN
Tee Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.2570 -
Mobile crane =< 3 ton hari 0.1290 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 94,875.00
E Overhead & Profit 10% x D 10% 9,487.50
F Harga Satuan Pekerjaan (D+E) ###

A.8.4.3.25 Pemasangan 1 buah Tee Ø 900 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.7560 55,000.00 96,580.00
Tukang pipa L.0.02 OH 0.8780 -
Mandor L.0.04 OH 0.1760 67,500.00 11,880.00
JUMLAH TENAGA KERJA 108,460.00
B BAHAN
Tee Ø 900 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.3210 -
Mobile crane =< 3 ton hari 0.1610 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 108,460.00
E Overhead & Profit 10% x D 10% 10,846.00
F Harga Satuan Pekerjaan (D+E) 119,306.00

A.8.4.3.26 Pemasangan 1 buah Tee Ø 1000 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.9760 55,000.00 108,680.00
Tukang pipa L.0.02 OH 0.9880 -
Mandor L.0.04 OH 0.1980 67,500.00 13,365.00
JUMLAH TENAGA KERJA 122,045.00
B BAHAN
Tee Ø 1000 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.3660 -
Mobile crane =< 3 ton hari 0.1830 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 122,045.00
E Overhead & Profit 10% x D 10% 12,204.50
F Harga Satuan Pekerjaan (D+E) 134,249.50

A.8.4.3.27 Pemasangan 1 buah Tee Ø 1100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.1960 55,000.00 120,780.00

Hal 220/229
Tukang pipa L.0.02 OH 1.0980 -
Mandor L.0.04 OH 0.2200 67,500.00 14,850.00
JUMLAH TENAGA KERJA 135,630.00
B BAHAN
Tee Ø 1100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.3860 -
Mobile crane =< 3 ton hari 0.1930 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 135,630.00
E Overhead & Profit 10% x D 10% 13,563.00
F Harga Satuan Pekerjaan (D+E) 149,193.00

A.8.4.3.28 Pemasangan 1 buah Tee Ø 1200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.4160 55,000.00 132,880.00
Tukang pipa L.0.02 OH 1.2080 -
Mandor L.0.04 OH 0.2420 67,500.00 16,335.00
JUMLAH TENAGA KERJA 149,215.00
B BAHAN
Tee Ø 1200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.4500 -
Mobile crane =< 3 ton hari 0.2250 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 149,215.00
E Overhead & Profit 10% x D 10% 14,921.50
F Harga Satuan Pekerjaan (D+E) 164,136.50

A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA


A.8.4.4.1 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.4660 55,000.00 80,630.00
Tukang pipa L.0.02 OH 0.7330 -
Mandor L.0.04 OH 0.1470 67,500.00 9,922.50
JUMLAH TENAGA KERJA 90,552.50
B BAHAN
Pipa Ø 80 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.6060 -
Sewa Genset 1500 watt hari 0.0750 -
Sewa Pompa Submersible 3m 3 /h hari 0.9680 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.8650 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 90,552.50
E Overhead & Profit 10% x D 10% 9,055.25
F Harga Satuan Pekerjaan (D+E) 99,607.75

A.8.4.4.2 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6460 55,000.00 90,530.00

Hal 221/229
Tukang pipa L.0.02 OH 0.8230 -
Mandor L.0.04 OH 0.1650 67,500.00 11,137.50
JUMLAH TENAGA KERJA 101,667.50
B BAHAN
Pipa Ø 100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.6500 -
Sewa Genset 1500 watt hari 0.1590 -
Sewa Pompa Submersible 3m 3 /h hari 1.0780 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.9110 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 101,667.50
E Overhead & Profit 10% x D 10% 10,166.75
F Harga Satuan Pekerjaan (D+E) 111,834.25

A.8.4.4.3 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.0960 55,000.00 115,280.00
Tukang pipa L.0.02 OH 1.0480 -
Mandor L.0.04 OH 0.2100 67,500.00 14,175.00
JUMLAH TENAGA KERJA 129,455.00
B BAHAN
Pipa Ø 150 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.7600 -
Sewa Genset 1500 watt hari 0.3690 -
Sewa Pompa Submersible 3m3 /h hari 1.3530 -
Sewa Tripot/Tackel & handle crane 2 T hari 1.0260 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 129,455.00
E Overhead & Profit 10% x D 10% 12,945.50
F Harga Satuan Pekerjaan (D+E) 142,400.50

A.8.4.4.4 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.5460 55,000.00 140,030.00
Tukang pipa L.0.02 OH 1.2730 -
Mandor L.0.04 OH 0.2550 67,500.00 17,212.50
JUMLAH TENAGA KERJA 157,242.50
B BAHAN
Pipa Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.8700 -
Sewa Genset 1500 watt hari 0.5790 -
Sewa Pompa Submersible 3m 3 /h hari 1.6280 -
Sewa Tripot/Tackel & handle crane 2 T hari 1.1410 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 157,242.50
E Overhead & Profit 10% x D 10% 15,724.25
F Harga Satuan Pekerjaan (D+E) 172,966.75

A.8.4.4.5 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm

Hal 222/229
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.9960 55,000.00 164,780.00
Tukang pipa L.0.02 OH 1.4980 -
Mandor L.0.04 OH 0.3000 67,500.00 20,250.00
JUMLAH TENAGA KERJA 185,030.00
B BAHAN
Pipa Ø 250 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.9800 -
Sewa Genset 1500 watt hari 0.7890 -
Sewa Pompa Submersible 3m 3 /h hari 1.9030 -
Sewa Tripot/Tackel & handle crane 2 T hari 1.2560 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 185,030.00
E Overhead & Profit 10% x D 10% 18,503.00
F Harga Satuan Pekerjaan (D+E) 203,533.00

A.8.4.4.6 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.4460 55,000.00 189,530.00
Tukang pipa L.0.02 OH 1.7230 -
Mandor L.0.04 OH 0.3450 67,500.00 23,287.50
JUMLAH TENAGA KERJA 212,817.50
B BAHAN
Pipa Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.0900 -
Sewa Genset 1500 watt hari 0.9990 -
Sewa Pompa Submersible 3m 3 /h hari 2.1780 -
Sewa Tripot/Tackel & handle crane 2 T hari 1.3710 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 212,817.50
E Overhead & Profit 10% x D 10% 21,281.75
F Harga Satuan Pekerjaan (D+E) 234,099.25

A.8.4.4.7 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 4.3460 55,000.00 239,030.00
Tukang pipa L.0.02 OH 2.1730 -
Mandor L.0.04 OH 0.4350 67,500.00 29,362.50
JUMLAH TENAGA KERJA 268,392.50
B BAHAN
Pipa Ø 400 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.3100 -
Sewa Genset 1500 watt hari 1.4190 -
Sewa Pompa Submersible 3m3 /h hari 2.7280 -
Sewa Tripot/Tackel & handle crane 2 T hari 1.6010 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 268,392.50
E Overhead & Profit 10% x D 10% 26,839.25

Hal 223/229
F Harga Satuan Pekerjaan (D+E) 295,231.75

A.8.4.4.8 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 4.7960 55,000.00 263,780.00
Tukang pipa L.0.02 OH 2.3980 -
Mandor L.0.04 OH 0.4800 67,500.00 32,400.00
JUMLAH TENAGA KERJA 296,180.00
B BAHAN
Pipa Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.4200 -
Sewa Genset 1500 watt hari 1.6290 -
Sewa Pom pa Submersible 3m 3 /h hari 3.0030 -
Sewa Tripot/Tackel & handle crane 2 T hari 1.7160 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 296,180.00
E Overhead & Profit 10% x D 10% 29,618.00
F Harga Satuan Pekerjaan (D+E) 325,798.00

A.8.4.4.9 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 5.2460 55,000.00 288,530.00
Tukang pipa L.0.02 OH 2.6230 -
Mandor L.0.04 OH 0.5250 67,500.00 35,437.50
JUMLAH TENAGA KERJA 323,967.50
B BAHAN
Pipa Ø 500 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.5300 -
Sewa Genset 1500 watt hari 1.8390 -
Sewa Pompa Submersible 3m 3 /h hari 3.2780 -
Sewa Tripot/Tackel & handle crane 2 T hari 1.8310 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 323,967.50
E Overhead & Profit 10% x D 10% 32,396.75
F Harga Satuan Pekerjaan (D+E) 356,364.25

A.8.4.4.10 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 6.1460 55,000.00 338,030.00
Tukang pipa L.0.02 OH 3.0730 -
Mandor L.0.04 OH 0.6150 67,500.00 41,512.50
JUMLAH TENAGA KERJA 379,542.50
B BAHAN
Pipa Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.7500 -
Sewa Genset 1500 watt hari 2.2590 -
Sewa Pompa Submersible 3m 3 /h hari 3.8280 -
Sewa Tripot/Tackel & handle crane 2 T hari 2.0610 -

Hal 224/229
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 379,542.50
E Overhead & Profit 10% x D 10% 37,954.25
F Harga Satuan Pekerjaan (D+E) 417,496.75

A.8.4.4.11 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 7.0460 55,000.00 387,530.00
Tukang pipa L.0.02 OH 3.5230 -
Mandor L.0.04 OH 0.7050 67,500.00 47,587.50
JUMLAH TENAGA KERJA 435,117.50
B BAHAN
Pipa Ø 700 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.9700 -
Sewa Genset 1500 watt hari 2.6790 -
Sewa Pompa Submersible 3m 3 /h hari 4.3780 -
Sewa Tripot/Tackel & handle crane 2 T hari 2.2910 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 435,117.50
E Overhead & Profit 10% x D 10% 43,511.75
F Harga Satuan Pekerjaan (D+E) 478,629.25

A.8.4.4.12 Penyambungan 1 buah 1 buah pipa baru ke pipa yang ada Ø 800 mm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 7.9460 55,000.00 437,030.00
Tukang pipa L.0.02 OH 3.9730 -
Mandor L.0.04 OH 0.7950 67,500.00 53,662.50
JUMLAH TENAGA KERJA 490,692.50
B BAHAN
Pipa Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 2.1900 -
Sewa Genset 1500 watt hari 3.0990 -
Sewa Pompa Submersible 3m 3 /h hari 4.9280 -
Sewa Tripot/Tackel & handle crane 2 T hari 2.5210 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 490,692.50
E Overhead & Profit 10% x D 10% 49,069.25
F Harga Satuan Pekerjaan (D+E) 539,761.75

A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA


A.8.4.5.1 Pengetesan 1 m pipa Ø 50 mm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 55,000.00 440.00
Mandor L.0.04 OH 0.0008 67,500.00 54.00
JUMLAH TENAGA KERJA 494.00
B BAHAN
Air test (air bersih) m3 0.0020 -
Bahan bakar liter 0.0600 5,500.00 330.00
Oli liter 0.0020 30,000.00 60.00
JUMLAH HARGA BAHAN 390.00

Hal 225/229
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 884.00
E Overhead & Profit 10% x D 10% 88.40
F Harga Satuan Pekerjaan (D+E) 972.40

A.8.4.5.2 Pengetesan 1 m pipa Ø 75 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 55,000.00 440.00
Mandor L.0.04 OH 0.0008 67,500.00 54.00
JUMLAH TENAGA KERJA 494.00
B BAHAN
Air test (air bersih) m3 0.0040 -
Bahan bakar liter 0.0600 5,500.00 330.00
Oli liter 0.0020 30,000.00 60.00
JUMLAH HARGA BAHAN 390.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 884.00
E Overhead & Profit 10% x D 10% 88.40
F Harga Satuan Pekerjaan (D+E) 972.40

A.8.4.5.3 Pengetesan 1 m pipa Ø 100 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 55,000.00 440.00
Mandor L.0.04 OH 0.0008 67,500.00 54.00
JUMLAH TENAGA KERJA 494.00
B BAHAN
m
Air test (air bersih) 0.0080 -
3
Bahan bakar liter 0.0600 5,500.00 330.00
Oli liter 0.0020 30,000.00 60.00
JUMLAH HARGA BAHAN 390.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 884.00
E Overhead & Profit 10% x D 10% 88.40
F Harga Satuan Pekerjaan (D+E) 972.40

A.8.4.5.4 Pengetesan 1 m pipa Ø 150 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 55,000.00 440.00
O
Mandor L.0.04 0.0008 67,500.00 54.00
H
JUMLAH TENAGA KERJA 494.00
B BAHAN
Air test (air bersih) m3 0.0180 -
Bahan bakar liter 0.0600 5,500.00 330.00
Oli liter 0.0020 30,000.00 60.00
JUMLAH HARGA BAHAN 390.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 884.00
E Overhead & Profit 10% x D 10% 88.40
F Harga Satuan Pekerjaan (D+E) 972.40

Hal 226/229
A.8.4.5.5 Pengetesan 1 m pipa Ø 200 mm
Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 55,000.00 440.00
O
Mandor L.0.04 0.0008 67,500.00 54.00
H
JUMLAH TENAGA KERJA 494.00
B BAHAN
Air test (air bersih) m3 lit 0.0310 -
Bahan bakar e
lit 0.0600 5,500.00 330.00
Oli er 0.0020 30,000.00 60.00
r JUMLAH HARGA BAHAN 390.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 884.00
E Overhead & Profit 10% x D 10% 88.40
F Harga Satuan Pekerjaan (D+E) 972.40

A.8.4.5.6 Pengetesan 1 m pipa Ø 250 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 55,000.00 440.00
O
Mandor L.0.04 0.0008 67,500.00 54.00
H
JUMLAH TENAGA KERJA 494.00
B BAHAN
Air test (air bersih) m3 lit 0.0490 -
Bahan bakar elit 0.0600 5,500.00 330.00
Oli er 0.0020 30,000.00 60.00
r JUMLAH HARGA BAHAN 390.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 884.00
E Overhead & Profit 10% x D 10% 88.40
F Harga Satuan Pekerjaan (D+E) 972.40

A.8.4.5.7 Pengetesan 1 m pipa Ø 300 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 55,000.00 440.00
O
Mandor L.0.04 0.0008 67,500.00 54.00
H
JUMLAH TENAGA KERJA 494.00
B BAHAN
Air test (air bersih) m3 lit 0.0710 -
Bahan bakar elit 0.0600 5,500.00 330.00
Oli er 0.0020 30,000.00 60.00
r JUMLAH HARGA BAHAN 390.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 884.00
E Overhead & Profit 10% x D 10% 88.40
F Harga Satuan Pekerjaan (D+E) 972.40

A.8.4.5.8 Pengetesan 1 m pipa Ø 400 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 55,000.00 440.00
O
Mandor L.0.04 0.0008 67,500.00 54.00
H
JUMLAH TENAGA KERJA 494.00

Hal 227/229
B BAHAN
Air test (air bersih) m3 lit 0.1260 -
Bahan bakar e
lit 0.0600 5,500.00 330.00
Oli er 0.0020 30,000.00 60.00
r JUMLAH HARGA BAHAN 390.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 884.00
E Overhead & Profit 10% x D 10% 88.40
F Harga Satuan Pekerjaan (D+E) 972.40

A.8.4.5.9 Pengetesan 1 m pipa Ø 500 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 55,000.00 440.00
O
Mandor L.0.04 0.0008 67,500.00 54.00
H
JUMLAH TENAGA KERJA 494.00
B BAHAN
m
Air test (air bersih) lit 0.1580 -
3
Bahan bakar e
lit 0.0600 5,500.00 330.00
Oli er 0.0020 30,000.00 60.00
r JUMLAH HARGA BAHAN 390.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 884.00
E Overhead & Profit 10% x D 10% 88.40
F Harga Satuan Pekerjaan (D+E) 972.40

A.8.4.5.10 Pengetesan 1 m pipa Ø 600 mm


Satua Harga Satuan Jumlah Harga
No Uraian Kode Koefisien
n (Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 55,000.00 440.00
O
Mandor L.0.04 0.0008 67,500.00 54.00
H
JUMLAH TENAGA KERJA 494.00
B BAHAN
m
Air test (air bersih) lit 0.2830 -
3
Bahan bakar e
lit 0.0600 5,500.00 330.00
Oli er 0.0020 30,000.00 60.00
r JUMLAH HARGA BAHAN 390.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 884.00
E Overhead & Profit 10% x D 10% 88.40
F Harga Satuan Pekerjaan (D+E) 972.40

Hal 228/229
DAFTAR HARGA SATUAN UPAH

NO KEAHLIAN SATUAN HARGA (Rp.) KETERANGAN

1 Tukang batu org/hr 60,000.00


2 Tukang kayu org/hr 62,500.00
3 Tukang besi org/hr 62,500.00
4 Tukang cat org/hr 62,500.00
5 Tukang listrik org/hr 62,500.00
6 Kepala tukang org/hr 65,000.00
7 Pekerja org/hr 55,000.00
8 Mandor org/hr 67,500.00

You might also like