You are on page 1of 13

PEMERINTAH PROVINSI SUMATERA UTARA Tgl.

Dikerjakan :
DINAS BINA MARGA Dikerjakan Oleh :
UPTD. PENGUJIAN DAN PENGENDALIAN MUTU Dihitung Oleh :
Jln. Sakti Lubis No. 7 - R Telp./ Fax. ( 061 ) 7867172 Medan Digambar Oleh :
Diperiksa Oleh :

PERENCANAAN GRADASI CAMPURAN AC - BASE

KONTRAKTOR :
PROYEK :
PAKET :
quarry : PT. Karya Murni Perkasa, Patumbak
Uraian Ukuran Saringan
Inchi 1½" 1" 3/4 " 1/2 " 3/8 " #4 #8 # 16 # 30 # 50 # 100 # 200
mm 37.5 25.4 19 12.7 9.5 4.75 2.36 1.18 0.6 0.3 0.15 0.075
Data Gradasi
C. Agg. 1½" 100.00 60.17 40.07 12.89 5.58 2.48 1.92 0.00 0.00 0.00 0.00 0.00
C. Agg. 3/4" 100.00 100.00 100.00 49.26 16.21 3.41 2.65 1.91 0.00 0.00 0.00 0.00
M. Agg. 100.00 100.00 100.00 100.00 100.00 31.64 9.00 4.49 3.59 2.89 2.20 0.20
Abu Batu 100.00 100.00 100.00 100.00 100.00 100.00 76.87 53.35 38.16 29.25 21.00 15.08
Pasir 100.00 100.00 100.00 100.00 100.00 100.00 97.82 82.79 45.30 16.00 3.47 1.36
Filler Semen 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Combinasi Agregat
C. Agg. 1½" 22.00% 22.00 13.24 8.82 2.84 1.23 0.55 0.42 0.00 0.00 0.00 0.00 0.00
C. Agg. 3/4" 25.00% 25.00 25.00 25.00 12.32 4.05 0.85 0.66 0.48 0.00 0.00 0.00 0.00
M. Agg. 27.10% 27.10 27.10 27.10 27.10 27.10 8.57 2.44 1.22 0.97 0.78 0.60 0.05
Abu Batu 19.00% 19.00 19.00 19.00 19.00 19.00 19.00 14.61 10.14 7.25 5.56 3.99 2.87
Pasir 6.00% 6.00 6.00 6.00 6.00 6.00 6.00 5.87 4.97 2.72 0.96 0.21 0.08
Filler Semen 0.90% 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Total campuran 100.00% 100.00 91.24 86.82 68.15 58.28 35.87 24.90 17.70 11.84 8.20 5.69 3.90
Spec. Gradasi
Max 100.0 100.0 90.0 76.0 66.0 39.5 26.8 18.1 13.6 11.4 10.0 7.0
Min 100.0 90.0 73.0 55.0 45.0 28.0 19.0 12.0 7.0 5.0 4.5 3.0
Persen Berat Lolos ( % )

100.00

90.00

80.00

70.00

60.00

50.00

40.00

30.00

20.00

10.00
20.00

10.00

0.00
0.01 0.1 1 10 100

Ukuran Saringan Row


Gradasi Gabungan. ( mm33) GK. Min.

Perkiraan Aspal ( Pb ) :
CA = 75.10 FA = 21.00 FF = 3.90
Pb = 0,035 x CA + 0,045 x FA + 0,18 x FF + 1 = 5.28%
PEMERINTAH PROVINSI SUMATERA UTARA Tgl. Dikerjakan :
DINAS BINA MARGA Dikerjakan Oleh :
UPTD. PENGUJIAN DAN PENGENDALIAN MUTU Dihitung Oleh :
Jln. Sakti Lubis No. 7 - R Telp./ Fax. ( 061 ) 7867172 Medan Digambar Oleh :
Diperiksa Oleh :

PERENCANAAN GRADASI CAMPURAN AC - WEARING COARSE


( Gradasi Kasar )
KONTRAKTOR :
PROYEK :
PAKET :
quarry :
Uraian Ukuran Saringan
Inchi 1" 3/4 " 1/2 " 3/8 " #4 #8 # 16 # 30 # 50 # 100 # 200
mm 25.4 19 12.7 9.5 4.75 2.36 1.18 0.6 0.3 0.15 0.075
Data Gradasi
C. Agg. 3/4" 100.00 100.00 53.29 24.77 9.90 1.48 0.80 0.55 0.33 0.00 0.00
M. Agg. 100.00 100.00 100.00 94.53 23.28 4.25 3.04 2.09 1.94 1.38 0.97
Abu Batu 100.00 100.00 100.00 100.00 100.00 72.41 46.32 32.00 24.18 15.95 11.42
Pasir 100.00 100.00 100.00 100.00 100.00 86.15 69.56 51.91 29.74 7.65 3.26
Filler Semen 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Combinasi Agregat
C. Agg. 3/4" 15.00% 15.00 15.00 7.99 3.72 1.49 0.22 0.12 0.08 0.05 0.00 0.00
M. Agg. 23.10% 23.10 23.10 23.10 21.84 5.38 0.98 0.70 0.48 0.45 0.32 0.22
Abu Batu 50.00% 50.00 50.00 50.00 50.00 50.00 36.21 23.16 16.00 12.09 7.98 5.71
Pasir 10.00% 10.00 10.00 10.00 10.00 10.00 8.62 6.96 5.19 2.97 0.77 0.33
Filler Semen 1.90% 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90
Total campuran 100.00% 100.00 100.00 92.99 87.45 68.76 47.92 32.84 23.66 17.46 10.96 8.16
Spec. Gradasi
Max 100.0 100.0 100.0 90.0 63.0 39.1 25.6 19.1 15.5 13.0 10.0
Min 100.0 100.0 90.0 72.0 43.0 28.0 19.0 13.0 9.0 6.0 4.0
Persen Berat Lolos ( % )

100.00

90.00

80.00

70.00

60.00

50.00

40.00

30.00

20.00

10.00
20.00

10.00

0.00
0.01 0.1 1 10 100

Ukuran Saringan
Gradasi Gabungan ( mm
GK. Max. ) GK. Min.

Perkiraan Aspal ( Pb ) :
CA = 52.08 FA = 39.76 FF = 8.16
Pb = 0,035 x CA + 0,045 x FA + 0,18 x FF + 1 = 6.08%
PEMERINTAH PROVINSI SUMATERA UTARA
DINAS BINA MARGA
UPTD. PENGUJIAN DAN PENGENDALIAN MUTU
Jln. Sakti Lubis No. 7 - R Telp./ Fax. ( 061 ) 7867172 Medan

PERENCANAAN GRADASI CAMPURAN AC - WEARING COARSE


( Gradasi Halus )
KONTRAKTOR :
PROYEK :
PAKET :
quarry :
Ukuran Saringan
Inchi 1" 3/4 " 1/2 " 3/8 " #4 #8 # 16 # 30 # 50 # 100 # 200
mm 25.4 19 12.7 9.5 4.75 2.36 1.18 0.6 0.3 0.15 0.075
Data Gradasi
C. Agg. 1½"

C. Agg. 3/4"

M. Agg.

Abu Batu

Pasir

Filler Semen
Combinasi Agregat
C. Agg. 1½"

C. Agg. 3/4"

M. Agg.

Abu Batu

Pasir

Filler Semen

Total campuran
Spec. Gradasi
Max 100.0 100.0 100.0 90.0 69.0 53.0 40.0 30.0 22.0 15.0 10.0
Min 100.0 100.0 90.0 72.0 54.0 39.1 31.6 23.1 15.5 9.0 4.0
Persen Berat Lolos ( % )

100

90

80

70

60

50

40

30

20

10
20

10

0
0.01 0.1 1 10 100

Gradasi Gabungan GK.( mm


Ukuran Saringan Maks) GK. Min.

Perkiraan Aspal ( Pb ) :
CA = FA = FF =

Pb = 0,035 x CA + 0,045 x FA + 0,18 x FF + 1 =


PEMERINTAH PROVINSI SUMATERA UTARA Tgl. Dikerjakan :
DINAS BINA MARGA Dikerjakan Oleh :
UPTD. PENGUJIAN DAN PENGENDALIAN MUTU Dihitung Oleh :
Jln. Sakti Lubis No. 7 - R Telp./ Fax. ( 061 ) 7867172 Medan Digambar Oleh :
Diperiksa Oleh :

PERENCANAAN GRADASI CAMPURAN AC - BINDER COARSE


( Gradasi Kasar )
KONTRAKTOR :
PROYEK :
PAKET :
quarry :
Uraian Ukuran Saringan
Inchi 1" 3/4 " 1/2 " 3/8 " #4 #8 # 16 # 30 # 50 # 100 # 200
mm 25.4 19 12.7 9.5 4.75 2.36 1.18 0.6 0.3 0.15 0.075
Data Gradasi
C. Agg. 1" 100.00 64.03 13.89 2.46 0.69 0.00 0.00 0.00 0.00 0.00 0.00
M. Agg. 100.00 100.00 100.00 100.00 31.64 9.00 4.49 3.59 2.89 2.20 0.20
Abu Batu 100.00 100.00 100.00 100.00 100.00 76.87 53.35 38.16 29.25 21.00 15.08
Pasir 100.00 100.00 100.00 100.00 100.00 97.82 82.79 45.30 16.00 3.47 1.36
Filler Semen 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Combinasi Agregat
C. Agg. 1" 24.00% 24.00 15.37 3.33 0.59 0.17 0.00 0.00 0.00 0.00 0.00 0.00
M. Agg. 47.10% 47.10 47.10 47.10 47.10 14.90 4.24 2.11 1.69 1.36 1.04 0.09
Abu Batu 19.00% 19.00 19.00 19.00 19.00 19.00 14.61 10.14 7.25 5.56 3.99 2.87
Pasir 8.00% 8.00 8.00 8.00 8.00 8.00 7.83 6.62 3.62 1.28 0.28 0.11
Filler Semen 1.90% 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90
Total campuran 100.00% 100.00 91.37 79.33 76.59 43.97 28.57 20.77 14.47 10.10 7.20 4.97
Spec. Gradasi
Max 100.0 100.0 90.0 80.0 56.0 34.6 22.3 16.7 13.7 11.0 8.0
Min 100.0 90.0 71.0 58.0 37.0 23.0 15.0 10.0 7.0 5.0 4.0
Persen Berat Lolos ( % )

100.00

90.00

80.00

70.00

60.00

50.00

40.00

30.00

20.00

10.00
20.00

10.00

0.00
0.01 0.1 1 10 100

Ukuran Saringan
Gradasi Gabungan ( mm
GK. Max. ) GK. Min.

Perkiraan Aspal ( Pb ) :
CA = 71.43 FA = 23.60 FF = 4.97
Pb = 0,035 x CA + 0,045 x FA + 0,18 x FF + 1 = 5.46%
PEMERINTAH PROVINSI SUMATERA UTARA Tgl. Dikerjakan :
DINAS BINA MARGA Dikerjakan Oleh :
UPTD. PENGUJIAN DAN PENGENDALIAN MUTU Dihitung Oleh :
Jln. Sakti Lubis No. 7 - R Telp./ Fax. ( 061 ) 7867172 Medan Digambar Oleh :
Diperiksa Oleh :

PERENCANAAN GRADASI CAMPURAN AC - BINDER COARSE


( Gradasi Halus )
KONTRAKTOR :
PROYEK :
PAKET :
quarry :
Uraian Ukuran Saringan
Inchi 1" 3/4 " 1/2 " 3/8 " #4 #8 # 16 # 30 # 50 # 100 # 200
mm 25.4 19 12.7 9.5 4.75 2.36 1.18 0.6 0.3 0.15 0.075
Data Gradasi
C. Agg. 3/4" 100.00 100.00 53.29 24.77 9.90 1.48 0.80 0.55 0.33 0.00 0.00
M. Agg. 100.00 100.00 100.00 94.53 23.28 4.25 3.04 2.09 1.94 1.38 0.97
Abu Batu 100.00 100.00 100.00 100.00 100.00 72.41 46.32 32.00 24.18 15.95 11.42
Pasir 100.00 100.00 100.00 100.00 100.00 86.15 69.56 51.91 29.74 7.65 3.26
Filler Semen 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Combinasi Agregat
C. Agg. 3/4" 15.00% 15.00 15.00 7.99 3.72 1.49 0.22 0.12 0.08 0.05 0.00 0.00
M. Agg. 23.10% 23.10 23.10 23.10 21.84 5.38 0.98 0.70 0.48 0.45 0.32 0.22
Abu Batu 50.00% 50.00 50.00 50.00 50.00 50.00 36.21 23.16 16.00 12.09 7.98 5.71
Pasir 10.00% 10.00 10.00 10.00 10.00 10.00 8.62 6.96 5.19 2.97 0.77 0.33
Filler Semen 1.90% 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90
Total campuran 100.00% 100.00 100.00 92.99 87.45 68.76 47.92 32.84 23.66 17.46 10.96 8.16
Spec. Gradasi
Max 100.0 100.0 90.0 82.0 64.0 49.0 38.0 28.0 20.0 13.0 8.0
Min 100.0 90.0 74.0 64.0 47.0 34.6 28.3 20.7 13.7 4.0 4.0
Persen Berat Lolos ( % )

100.00

90.00

80.00

70.00

60.00

50.00

40.00

30.00

20.00

10.00
20.00

10.00

0.00
0.01 0.1 1 10 100

Ukuran Saringan
Gradasi Gabungan ( mm
GK. Max. ) GK. Min.

Perkiraan Aspal ( Pb ) :
CA = 52.08 FA = 39.76 FF = 8.16
Pb = 0,035 x CA + 0,045 x FA + 0,18 x FF + 1 = 6.08%
PT. Karya Murni Perkasa Pb = 6.0%

AC - WC ( Gradasi Halus )
% Aspal 5.0 5.5 6.0 6.5 7.0 Keterangan
Total Campuran 1200
Aspal 60.00 66.00 72.00 78.00 84.00
Total Aggregate 1140.00 1134.00 1128.00 1122.00 1116.00

Coarse Aggregate 3/4" 0.00% 0.00 0.00 0.00 0.00 0.00


Medium Aggregate 0.00% 0.00 0.00 0.00 0.00 0.00
Abu Batu 0.00% 0.00 0.00 0.00 0.00 0.00
Pasir 0.00% 0.00 0.00 0.00 0.00 0.00
Semen 0.00% 0.00 0.00 0.00 0.00 0.00
Total 0.00% 0.00 0.00 0.00 0.00 0.00

KOMULATIF

% Aspal 5.0 5.5 6.0 6.5 7.0 Keterangan

Coarse Aggregate 3/4" 0.00 0.00 0.00 0.00 0.00


Medium Aggregate 0.00 0.00 0.00 0.00 0.00
Abu Batu 0.00 0.00 0.00 0.00 0.00
Pasir 0.00 0.00 0.00 0.00 0.00
Semen 0.00 0.00 0.00 0.00 0.00
Pan 119

PRD ( Refusal )
% Aspal 5.5 6.0 6.5 Keterangan
Total Campuran 2750
Aspal 151.25 165.00 178.75
Total Aggregate 2598.75 2585.00 2571.25

Coarse Aggregate 3/4" 0.00% 0.00 0.00 0.00


Medium Aggregate 0.00% 0.00 0.00 0.00
Abu Batu 0.00% 0.00 0.00 0.00
Pasir 0.00% 0.00 0.00 0.00
Semen 0.00% 0.00 0.00 0.00
Total 0.00% 0.00 0.00 0.00

KOMULATIF

% Aspal 5.5 6.0 6.5 Keterangan


Coarse Aggregate 3/4" 0.00 0.00 0.00
Medium Aggregate 0.00 0.00 0.00
Abu Batu 0.00 0.00 0.00
Pasir 0.00 0.00 0.00
Semen 0.00 0.00 0.00
Pan

PT. Karya Murni Perkasa Pb = 5.5%

AC - BC ( Gradasi Kasar )
% Aspal 4.5 5.0 5.5 6.0 6.5 Keterangan
Total Campuran 1200
Aspal 54.00 60.00 66.00 72.00 78.00
Total Aggregate 1146.00 1140.00 1134.00 1128.00 1122.00

Coarse Aggregate 3/4" 24.00% 275.04 273.60 272.16 270.72 269.28


Medium Aggregate 47.10% 539.77 536.94 534.11 531.29 528.46
Abu Batu 19.00% 217.74 216.60 215.46 214.32 213.18
Pasir 8.00% 91.68 91.20 90.72 90.24 89.76
Semen 1.90% 21.77 21.66 21.55 21.43 21.32
Total 100.00% 1146.00 1140.00 1134.00 1128.00 1122.00

KOMULATIF

% Aspal 4.5 5.0 5.5 6.0 6.5 Keterangan

Coarse Aggregate 3/4" 275.04 273.60 272.16 270.72 269.28


Medium Aggregate 814.81 810.54 806.27 802.01 797.74
Abu Batu 1032.55 1027.14 1021.73 1016.33 1010.92
Pasir 1124.23 1118.34 1112.45 1106.57 1100.68
Semen 1146.00 1140.00 1134.00 1128.00 1122.00
Pan 119

PRD ( Refusal )
% Aspal 5.0 5.5 6.0 Keterangan
Total Campuran 2750
Aspal 137.5 151.25 165
Total Aggregate 2612.5 2598.75 2585
Coarse Aggregate 3/4" 24.00% 627.00 623.70 620.40
Medium Aggregate 47.10% 1230.49 1224.01 1217.54
Abu Batu 19.00% 496.38 493.76 491.15
Pasir 8.00% 209.00 207.90 206.80
Semen 1.90% 49.64 49.38 49.12
Total 100.00% 2612.50 2598.75 2585.00

KOMULATIF

% Aspal 5.0 5.5 6.0 Keterangan

Coarse Aggregate 3/4" 627.00 623.70 620.40


Medium Aggregate 1857.49 1847.71 1837.94
Abu Batu 2353.86 2341.47 2329.09
Pasir 2562.86 2549.37 2535.89
Semen 2612.50 2598.75 2585.00
Pan

You might also like