ITEM AREA

1 General
2 General
3 General
4 General
5 General
6 General
7 General
8 General
9 General
10 General
11 General
12 C1-Canopy
13 C1-Canopy
14 C1-Canopy
15 C1-Canopy
16 C1-Canopy
17 C1-Canopy
18 C1-Canopy
19 C1-Canopy
20 C1-Window
21 C1-Walls
22 C1-Walls
23 C1-MEPS
24 C1-MEPS
25 C2-Roof
26 C2-trellis
27 C2-MEPS
28 C2-MEPS
29 C2-Canopy
30 C3-Roof
31 C3-Canopy
32 C3-Canopy
33 C3-Canopy
34 C3-Canopy
35 C3-Canopy
36 C3-Canopy
37 C3-Windows
38 C3-Windows
39 C3-MEPS
40 C3-MEPS
41 C3-MEPS
42 C3-Handrails
43 C3-stair
44 C3-Stair
45 C3-Landscape
46 C3-Landscape
PUNCH LIST ITEM DATE of COMPLETION

Clearing of all glass canopies March 8, 2018


Holes on canoy frame members February 27, 2018
leaks on canopy February 18, 2018
Application of sealant at gaps between canopy frame & metal/glass sheet March 9, 2018
Application of sealant at canopy frame-to-wall connectios (topside) March 9, 2018
uneven / inconsistent paint on canopy frames March 6, 2018
Window sealants (application & rectification) March 9, 2018
Pending mullion covers March 12, 2018
Cleaning of all storefronts (windows & doors) March 6, 2018
Pending drain cover (gratings,Monoslots) February 24, 2018
Pending glass canopies & trellis March 14, 2018
Remove angle bar March 1, 2018
Hole at corner of canopy frame February 28, 2018
Cutting/termination of metal sheets pending
width of glass panels not exact with frame March 15, 2018
end cap for muntin bars March 10, 2018
Crooked edge of glass sheets March 1, 2018
Unlevelled underside of frame March 3, 2018
Stainless gutter to be painted brown February 24, 2018
Chipped paint of mullions March 1, 2018
Unpainted portions of Wall March 7, 2018
Retouch paint March 7, 2018
Exposed pipes (for Pest Control) March 15, 2018
Cleanout Covers Rusted and unlevelled with finished floor March 7, 2018
Loose Gutter parts March 7, 2018
Splintered pedestal of trellis column February 28, 2018
Rust on monoslot drains March 8, 2018
holes on junction box cover March 9, 2018
Sealant too thick March 12, 2018
Corner of roof not at right angle March 17, 2018
loose angle support for metal sheet March 1, 2018
Pending angle supports for metal sheets March 1, 2018
Width of glass panels not exact with frame; spacing between glass panels pending
Pending Muntin bars March 9, 2018
Gap Between Canopy Frame & Building Wall March 10, 2018
Unpainted underside of metal sheet March 2, 2018
Chipped paint of mullions March 5, 2018
Pending replacement of glass March 11, 2018
Pending Pullbox Cover February 28, 2018
Pending Trench Drain February 24, 2018
Termination of trench grating February 24, 2018
Connection of Handrail to wall February 28, 2018
Termination of stair to Wall March 9, 2018
Pending Replacement of Stair Nosing Tiles pending
Broom Finish on driveway March 8, 2018
Removal of curb February 23, 2018
RECTIFIED BY: 25
CONTRACTOR - HSP 54.34783
March 17, 2018

March 5, 2018 1
March 11, 2018 1

February 24, 2018 1

March 1, 2018 1

- 1

March 10, 2018 1

February 24, 2018 1


March 1, 2018 1
-
March 7, 2017 1

-
-
March 8, 2018 1
March 9, 2018 1
March 12, 2018 1
-
March 1, 2018 1
-
- 1
-
-
March 5, 2018 1
March 5, 2018 1
March 11, 2018 1
February 28, 2018 1
February 24, 2018 1
February 24, 2018 1
February 28, 2018 1
March 6, 2018 1
- 1
February 28, 2018 1
February 22, 2018 1