Pada trase jalan yang direncanakan terdapat tiga tikungan horizontal yaitu:
1.) Lengkung horizontal PI1 = 40,05 º
2.) Lengkung horizontal PI2 = 5,479º
3.) Lengkung horizontal PI3 = 51.19º
Ls 2
p Rc (1 coss)
6Rc
50 2
p 286(1 cos 5,008)
6 286
= 0,365 m
Ls 3
k Ls Rc sin s
40Rc 2
50 3
= 50 286 sin 5,008
40 286 2
= 24,994 m
Ts = (Rc + p) tg ½Δ+ k
= (286 + 0,365) tg ½ 40,05 + 24,995
= 129,371 m
Es = (Rc + p) sec ½ Δ - Rc
= (286 + 0,365) sec ½ 40,05 – 286
= 18.794 m
Kontrol:
L < 2 Ts
249,919 m < (2 129,371) m
249,919 m < 258,741 m ……………………(aman)
(0,02𝑋0,064)×3,75
Landai Relatif = = 0,0063 m
50
Rc=286
5.008° 5.008°
30.036°
k=24.987 Ls=50.000
Lc=149.929
Ts=129.370
Es=18.794
Ls = 50 m Ls = 50 m
TS SC CS ST
Kanan
e = + 6,4 %
en = - 2 % en = - 2 %
Kiri
-2% -2%
e = - 6,4 % -2% -2%
3,75 m 3,75 m
Tc = Rc tan ½ ∆
= 477 . tan ½ . 5,479º
= 22,823 m
Ec = Tc tan ¼ ∆
=22,823 tan ¼ . 5,479º
= 0,546 m
Lc = 0,01745 ∆ Rc
= 0,01745 . 5,479º. 477
= 45,603 m
Superelevasi untuk TC adalah:
3/4 Ls ( x 2)
Ls (4,2 2)
3/4 (50) ( x 2)
50 (4,2 2)
x = 3,65 %
(0,042+0,020)×3,75
Landai relatif = = 0,00465
50
Tc=22.824 Ec=0.546
B=5.823
Lc=45.614
Rc=477
Ls = 50 m Ls = 50 m
3/4 Ls 1/4 Ls 1/4 Ls 3/4 Ls
TC CT
I Kiri
e = +0,042 %
en = - 2 % en = - 2 %
Kanan
I
+ 4,2%
e = - 0,042 % + 4,2 %
-2% -2%
Lc = 45,603 m
Bagian lurus Bagian peralihan Bagian lengkung Bagian peralihan Bagian lurus
V = 60 km/jam
e = 0,091
∆ = 51.19º
Ls = 50 m
Rc = 159 m
Ls 2
p Rc (1 coss)
6Rc
50 2
p 159(1 cos 9,009)
6 159
= 0,659 m
Ls 3
k Ls Rc sin s
40Rc 2
50 3
= 50 159 sin 9,009
40 159 2
= 24,979 m
Ts = (Rc + p) tg ½Δ+ k
= (159 + 0,659) tg ½ 51.19 +24,979
= 101,456 m
Es = (Rc + p) sec ½ Δ - Rc
= (159 + 0,659) sec ½ 51.19 – 159
= 18,030 m
Kontrol:
L < 2 Ts
192,053m < (2 101,456) m
192,053 m < 202,912 m ……………………(aman)
(0,091+0.02)×3,75
Landai Relatif = =0,008325 m
50
+ 9,1 %
h
-2% -2%
+ 9,1%
3,75 m 3,75 m
Ts= 101,456
9,009
Rc=159
Ls = 50 m Ls = 50 m
TS SC CS ST
Kiri
e = + 9,1 %
en = - 2 % en = - 2 %
Kanan
e = - 9,1 %
-2% -2% +2% -2% -2% -2%
STA SC = STA TS + Ls
= 0 + 346,322 m + 50 m
= 0 + 396,322 m atau 396,322 m
STA CS = STA SC + Lc
= 0 + 396,322 m + 149,928 m
= 0 + 546,25 m atau 546,25 m
STA ST = STA CS + Ls
= 0 + 546,25 m + 50 m
= 0 + 596,25 m atau 596,25 m
= 0 + 712,365 m + 182,604 m
= 0 + 894,969 m atau 894,969 m
3. Lengkung Horizontal PI13 (SCS)
Dari perhitungan lengkung horizontal PI3 diperoleh:
STA TS = STA CT + d(PI2-PI3) – Lc – TS
= 0 + 894,969 m+223,575 m– 182,604 m – 177.474 m
= 0 + 758,466 m atau 758,466 m
STA SC = STA TS + Ls
= 0 + 758,466 m + 50 m
= 0 + 808,466 m atau 808,466 m
STA CS = STA SC + Lc
= 0 + 808,466 m + 234.105 m
= 1 + 42,571 m atau 1042,571 m
STA ST = STA CS + Ls
= 1 + 0042,571 m + 50 m
= 1 + 092,571 m atau 1092,571 m