You are on page 1of 2

Education

B.TECH (Instrumentation & Control Engineering)


Nirma University from 2009 till 2013(7.3/10)
SSC and HSC (Science)
Atul Vidyalaya, Valsad 2007(85%) and 2009(91%)

/////////////////////////////////////////////////////////////////////////////////////////////////
Work Experience
Dipesh B Thakur Total 53 months
Executive Engineer
BTECH - Instrumentation and Control Executive Engineer-Hardware/Software engineer
dipeshthakur66@gmail.com for Safety system
Bangalore, India Yokogawa India Limited from July’13 till Present
+91 9538231758 /////////////////////////////////////////////////////////////////////////////////////////////////
Current Role & Responsibilities
///////////////////////////////////////////////////// Role Summary
Profile Summary Executing all activities related to hardware and software engineering
for Safety Systems in stages right from basic to detail engineering,
Key Responsibilities
I’m an Instrumentation and control  Site activity related to safety system (ESD/PSD/FGS)
Engineer. Working for Yokogawa India  Typical software module design
Limited.  I/O database handling, I/O allocation based on project
segregation philosophy and specifications
I have 4.5+ years of experience  Hardware and software detail design
working as an automation engineer  Testing of application during Factory acceptance test
for Oil and Gas industry  Generation of system, marshalling, network and server
cabinet drawings using E-plan tool.
 Preparation of Functional design specification
Currently I’m looking for
opportunities in Industrial
/////////////////////////////////////////////////////////////////////////////////////////////////
automation sector for
Instrumentation Engineer
Achievements
 Successfully completed FAT/IFAT activity for YAMAL Phase 1
//////////////////////////////////////////////////
and Phase 2
Skills  Appreciation by customers for smart utilization of E-plan
drawing tool for cabinet generation.
Safety system (ProSafe-RS)
Typical design for Engineering /////////////////////////////////////////////////////////////////////////////////////////////////
E-plan/EECone tool expert
Function design Specification
Interests
 Football
Multitasking with quality
 Cross country
Hardware Architecture
 Cooking
MS-Excel Power user
 Exploration
/////////////////////////////////////////////////////////////////////////////////////////////////
Projects

YAMAL LNG Phase 1, Russia


Hardware and Software core-engineering from the basic design phase of the project and carried out activities
with the Project team throughout the course of the project including detail design, Pre-FAT,FAT,IFAT,SAT.

Responsibilities:

 As executive hardware engineer, responsible for hardware engineering for DCS and safety
system. (CENTUM VP -Yokogawa DCS, ProSafe-RS -Yokogawa PLC).
 Support to lead engineer for preparing hardware architecture during basic design phase.
 Was actively involved with lead engineer and engineering manager for planning engineering
activities throughout the project.
 Generation of all types of typical cabinet drawings in E-plan, for large-scale implementation of
drawing and layout diagram for the plant.
 Was given responsibility of managing E-plan activity and led a team of four E-plan engineers who
were actively involved in the generation of cabinet drawings on a large scale.
 Conducted hardware proto-type FAT and typical loop testing with customers during basic design.
 Site activity as Safety sub-lead related to Train 1 commissioning in Sabetta, Russia.

YAMAL LNG Phase 2, Russia


Hardware and software engineering activity related to train 2 and Train 3, and carried out FAT and IFAT for the
same

Responsibilities:

 As safety sub-lead engineer, was responsible for duplication of application logic from Train1 to
Train2 and Train 3.
 Duplication of Hardware related documents and manufacture of cabinets for Train 2 and Train3.
 Conducted hardware and software FAT for Train-2 and Train-3
 Supporting Documentation for handover the responsibilities to Site team

YAMAL LNG Site activity, Sabetta, Russia


All Safety related activity for Pre-commissioning and commissioning for Train-1 on 40-40 days rotation period.

Responsibilities:
 As safety sub-lead at site currently responsible for troubleshooting activities faced during pre-
commission and commissioning.

ARAMCO Fadhili Gas Plant, Saudi Arabia


Was responsible for detail engineering for software(ESD) related to Fadhili Gas plant package-1 which consisted
CCB and Utilities area, Pre-FAT,FAT activities were carried out with EPC and End-user

////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////

Personal Details
Date of Birth: 21st May 1990
Nationality: Indian
Country of Residence: Bangalore, India
Marital Status: Single
Languages known: English, Hindi and Gujarati

////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////

You might also like