You are on page 1of 22
Excellent Weir Floway, Inc. Minerals Solutions Pump Bowls WER IM-106 - 6" Thru 22” - Open Line Shaft Type eel INSTRUCTION MANUAL FOR INSTALLATION, OPERATION AND MAINTENANCE AND LIST OF PARTS 2008, Weir Floway, Inc. Ine. (the Company”) is the owner of the copyright and al confidential information inthis document. The document may contain information hats private, confidential or privileged. The document must not be copied in whole or in part, in any form or by ary meats, and the information in it must not be disclosed to any person, or used for any purpose other than the specific purpose for which il has been provided, without the prior waitin consent ofthe Company.” Excellent Weir Floway, ine. Minerals Solutions 2494 S. Railroad Ave. Tet: (558) 442-4000 P.O. Box 104 Fax (659) 442-2098 Frosro, CA 93707 vv welcleaqud.com ‘TERMS AND CONDITIONS OF SALE & WARRANTY Floway! ‘Quctatans ~ Vii lnay hes pried aoa writen gata using he propose ape o spy. Ou proposal sted in soartance wh te folvirg ams. Sete rosa Bayers ei nao cea ete Salr sp, oles pron, es ecemera in repose o Buyers eget rqcaton, Gvlon we siete Cunge wou ooke, ‘erie tf 20 days ho dat of sun less cbse silty wien aan of Seer TERS OF SALE 1. ane Accerane - ecelance of Boe nei iba Ne Flv, ls edt deparinet appa and nb, musly ares upen phase erent beaten Byer ad ‘Wl Fine re. Ocroniat accptance may nly be fetes an aoraed ox: company cone Uarge, Ven Peed o Penden 2. yok — Pits shat toes fet ol oof chp. Al esr pou a Seles lndod despa en cena ol sds mari oe se change whet ol ad _Bipmons wal be ened al he ein eft a ete of spar ect ha A Bape x mete spn posite pt oven pe charge an ral en belgie leek ces ppoa wba aie pita eft a he ee of ostnat 2 8) pes maybe gots ona re tak wt wiht an aproptaeaaaon dee. Pos ae er osu Seer standard desi and corset lsd aol and ee wl oo edule ha cesion of ay les. Ry reset fv le or design mst be ‘ead to See's cay fn pel pric. Pag oles nt aneredty be Pea ala Book rt eared Set aay. rice plleten on acess il bein czrdncs wh agen byte acesay manatees do mata ert of ay sg osteo Spec nape ner ocean, exe hse romaly primed by Ser ct he afcuig process ee cupping cf any rags pn exp ove ces on ea Seer faery, nas pres sae bev. Pes x proce on non dana eno ao arr ala wil be spr Sels ccs oa 23 sl fon Dace hee ‘PAWN Terms of payment are cash, et 38 days Fon dl of va, plo 1 percent per mont service chrge on ovtdce accounts Fev axdertonacs 318060, idan snppod vain ated Sats, art 3 dof on dol vo, 1 Fororerstantsds bid ard shipped wine Uied Ses pets exoeing $150 000 Wer Foy, e's sana Proess Payment sche wl 99 iv 10% upon mutual) ged cna betes Bye an Soler 1S upon sbrital of enpreseng canteens Arangonat) 28teupon cet of mar pump tar ase) Ni Suge shipment ta. © Foretpotorers, Tes ofPaynen shal be by loveseat Crd res eben approved We layne dopartnert. Lat of Cre wie 1” InevecaiteandCofrned by USA Sank i. Banal mestbe Wet Panay, oe | Contimaton charges shouldbe pall by Hoar. fh, TheUGEipiator Dale should be 21 dys afer et esialed siren de, 1 Paynnt Tes 39 dys ele UC epon ee, gods dered so, wichaers soot. Pamenty Baer lla condor yon Baye! ecg payet fom Omar ora. Pajmoris tobe modo elo WER FLOW, and ocr person or Fon hasauboryo colt mone crvarbha. Prot payenl sh becove dt he dae on wich Stes ld of Pe ely Alors ae bj approval Seles ct pane nb oe dyn of See, be cl canton et Bye at ny te dos ct sly sag r ct patton or =, ‘etems ol payne sete han, Str ry eit left payerin abr ofpeduon eck. Regards ol pce qed ow be lod eb mrmae nt ctargein eft tbo te of putes, Pins moy be atic change sou Bier ely approal of ee sped documento beyond 1S wong day om dle of uti ‘4. GopTsor Couzenon ine evel Buyer eats payment fay sro teoang ot Sse bron, ayesha py Sabet aio oh act oe apse wih iret eren, Stes easreble costs fete cng ate’ es anlepl expats, a wich maybe rode apr cl ny ode erred apo Su, Asx None ae Byars wart iis der ayer seen sal eased by Be Eyer ay fer pren wt De Sel’ rr wen aprovsk. TEs ness my great upon beeen Baer ar Seer poo ode cere, rs dln nes lesa. Ses ce ates imposed cn Be slo gods ‘wie stale spat ned ress Buyec pes Sete wan acetal tk exepton cerca, 7, Reus No epee b reed Ser whut 2 Reuned Nata! Auorzatn (AA) ad siping ists fst hog ben cine om be Selerin weg tbe eer ‘ud eufrizalon gate by Seer, Buyer rs pay te urges nil fx anspor fe Seer om a Buyer an eum sd cary mar eso em whe appeal OKA unde: Retmed goad ar sbje open ad wn scence y Wer Poway, ie po llestenc of aed. Auten wl ob gion roam male wich oe daaged, wor, or wun opinion oe Sele eatin an excess nf amount sok realy cared bye See. Fo exigent rl manfacured by ie Sor, ced ony be ed el ‘naloned byte ofa eaumen spr, ns cae, ced sie kr eqpere wl be isl eh ad ater eparces nouedy he Selernhanding sie cupme. The ano. the ced witb een by 2 na resckg fequt to 10% ole peered foots. 8. Stemi Goods salt sped Exits aster ecm 210), Ne Pony, ne mantle reer oer ruts. Shipment te ae bestest cy at ie of ‘opal and sabe change based on mandating na ad ssp schedules Seles dl of cera hi ase maniac. Upon crpoon maniac, lee ‘sectcalyequsiad in wir, Wa Floor. yaks prt ateesfoqlpont shot spares bo dled by Buyer bya be ese of maroc compen, Sel wit ition ed store be eqapment percig Buyer rates tipmer. Sl fe hier be elaed ore ran (10 wag dys Kom masacurag compen, csr Sage and Imitronce of emer vi apy. Aminina tant sae ee nil pf orge ss an By 2) 8. Lweny~ Seles nat bie fo ay eange eras naod ug deve aisot damon rss apolar cave aks posession sallbe sally on Buyer. Buyer shige shies pon ec om car ard eee Fie ness scan apn cater win be ine peste by owe erred. Sle wl ody prove asstancansecrg li austen upon request. Eyer sho nmedate er roplcemeis oreo Garagederbe_ Suh toms wb abst Buyers equa crore poment. Rebuvamet ‘er garages ore! te mlb Yom carro Buen he bss f Buyer's dn Wh eprd lo fems psy orien a hpner sabe responsi of Buyer pc ‘ich stpent gon ee and nay Sell ay ced rise it (10) ay oes shee NO CLAMS FOR OMATTED TEMS WIL BE ALLONED AFTER TEN (10) ‘DAYS OF RECEIPT OF THe SHIPMENT BY BUYER. 10, Daavoner Ame Seer wile responsible ary dyer inpeomsnce ol ary Batons un his erent icg bd alle eure ometa ser ce asd bycfoartaces yor easral cnr of Seles ces, 1 Belong: cs fod, be governs ee ery, es emerges, ase ows Naren sve Ge, «cote or ze doris tenprson and shtgs fa, pow, rr alo Sls nlrb Det nwa win (1) wong ay alr he begin oy sh Cause fat wu eels poco, Nowa, Ser pertancs dey doe Face Maas, apt ecaaan sy) days am Pe manly eed an Sip «Got Bujer ad Sefer liar Ow fi laminate is aeonen. Bur wllbe as ited mata andor ete posnad op fae. 11. peuey Eyecare Sele shiney, eed andl ach eras om oc epost ary nda lm als, emacs, acess fgets aera ay nak ‘ose, anaes css an exyensas cg what ner, tameys es, sour os andvetgaon ces eee pene by lege ernaed aig et or ‘rg ary opaons a raisons fe eg Paty ay os empoecs, pei adiniesin te eee leiden Pars ets or pecomarceccbenrce ‘ender Pays chines under is Agesert. Prone ocerusb geno at oun ade Pay wlok poking fe tennis wl onl ory dele teen 2 Laem ear NO EVENT SHALL ETHER PARTY BE UAGLE FOR ANY NCDENTAL OR CONSEQUENTAL DAMAGES, SELLER'S LABILITY AND BUYERS EXCLUSNE REI” FORANY CAUSE OF ACTION ARISING CONNECTION VT THIS CONTRACT OR THE SALE OR USE OF THE GOODS, NHETHER BASED ONNEGLIGENCE, STRICT LABILITY BR (OF WARRANTY, BREACH OF CONTRACT, OR EQUITABLE PRACPLES, IS EXPRESSLY LIMITED TO AT SELLERS OPTION, REPLACEMENT OF, OR REPAYMENT OF THE PURCHASE RICE FOR THAT PORTION OFTHE GOODS WITH RESPECT TO WICH DAMAGES ARE CLAVED. ALL CLAMS OF AY KND ARING W CONNECTION VITH THIS CONTRACT OR THE SALE OR USE OF THE GOO0S SHALL BE DEEVED WAVED UNLESS MADE IN WRETNG WITHIN SCT 6} CAYS FROM THE DATE THE CAISE OF CLAM AROSE, OR IF EARLIER THE APPLICABLE WARRANTY PERIOD SPECIFED BELOW riz 18292007 12 19. Isaacs - ach pry apes toni nsuarc incomes reazonbs amour coven cn of ary in rate ar damage rope opal, adn Gah, mae By eye hl mya Fm cis pees orale ys cnc er ese aves opted et onpa).eeateces oye os oom cach caters ranged ct vied py ois apes. 8. NoUtes~ Abas sat boin wing ard stl be dlr puenay, by US. cre orgie ma, pclae pep, en ep equ, by recon oveniht delve enn. ‘Peyote to cero he pet pats lt epee ataes sth on ts Sra: sah be acs sabe Sued ong by eke pany see "ate equerent ce crt. Te di cat hb deed ota bre esol bed of dey, when ceed pcre, Onis elleshcroromgetoaca be emi tery reteset on rear ae fel yer or ogetred ml Zener oc Paes Terabithia Sele ver Bis Arenent sett a manu and he cngany ing be warucver. no mae aegis ‘Aeramet Buyer ad See shart have ay el gow aah ete ny btgaton.exreas ringed ona fy chu ary, Nation fs Aguemees Peeaes te cet or ‘ans aoe yan, panes agency. ett ob asc oy ing betean bs Prise persons eared tne, 1, SSvsanuse- tay prov ct his eres sal be deed ey cote cpt oson be kare vo, or ralaeble, ech prs shel ote ected ba sha ena [feta enc ote. te nonclainor races srs ar unde rroserate sway, ac reiers lt sha need te nasmnumtentas ocr ‘eins estrcng 3 cays afer we have oie te Bue che deel ne vel of sus tation he ayesha remain sponsible el payment bos cateseare ea sake shalpay te Slr foal itd otal ard wk perornd le dae tae 1% Tema roe Couns winnie, ts goer maybefemlo by itor erty win Aen 15) day hn delet oer pce mn. Shel Bayer ia for ‘xoveneree,raseeate crsiaton charg wi xp @ aso Canes = Orders shat ote sje cancelation by Bye uss ard in ring by Sle, No cacti wile Sep by Sal xcept ‘en py Sater oa reasonaie ae, 8 temic by Sle, coo of pocket eral and la damages cue Sle Amino carlaon cage oh ol ees wa i eile fx carestton of any exer on ld fr appa whch has rl ee lease grain. My cre cancaes ater aese a posusion wll Giaon roar ange equa ote ance of mat ad bpm ne der OR 80% lo reve, niches ltr. MnSelonse cargos teeing es asad etneg betoon Bera Sefer ro oes win change and wie seco a msmum senistaten cogs o$10000 ese net oclion dhiandl mete onda 18, Anaarion—Any contenery osm ag ot of ota toms eo warany hn he each hee shel be sited by aon scone ain Ge orl ‘rotaton fles of ha Anazan Aan Aszodton ard jget upon teed enere bye Abia) maybe eld Sy co hanegaaee hose trees elo apsocaty aretha rors of Secon 128 5 te Cote of Cl Pace ofS Caton se henporated hi, nate a pate ed main appease ary storion wurdr whee be aoeyte aur cntovryexees Ter Five Toisand Doar ($25, 00000) excel ets, expenses anes Te presence hat heres ay czozovery rca heuer wines ean by Seles engineers, al whom ae enpojed at Seles fore oe Fes Calflora, The pares Rocke apes bat earner anverot place fr artatins resto Coun, Calfona aa tay sblvaon herender chal bo Fresno Com, Calton 18, Wave Fale of eer pay tot on sie complane win ay be ns, evens, ad codes obs hatamen’ sh be dead a wer sch ems, coma and lis rt ary sn ight of pnes eur at ay Boose, Te ro Seer ef any it ser moy tae eat bo tr and cnaoe rel Cheese ok sot a waive of such gh wih espe fre coca r enxement ero rox sal ay shave alae elisha er vgs TERNS OF WARRANTY 1. Wrenn Each roc marshy Wer Fwy, (Soles nore be fe ol dts mules ac wate peti on) Yara tha pre et pr operon igor (18 moc at dacs wv went pun be ons bw eset ar odes een cod soararn wh oxy setoee aed pees poi at Sle Sale es wii iy 30s tombe eae lan ch on legs ell ol hove bas Gore cd te ta! Hae edetjo reas oeay land oxctsive ened ferreach of any eda waranties wi expt any product sabe replace rp Sel' lection Ex Nos ary, of sch poocs andor parts as prove efecv.Thae sal be no ftir ably, wheter bsad on waranty, negincs or ethrwiae ro cine ov labr consequent anagesstcite po {res tye cel sus it na fe ooung woe 3 aie an alge elt warares oe You (2) Pap ssc aus ober hn ct, sh aon aero wae la lempeate rel econ 5 deen Forte sich ander tps oto ot speed by the We Flay ne. Sees Grr as my eed yon ig between Buyer and Sea 0) pump hastee hercng sasha nea (©) son, do tow vlog er omer ean bye conte Seer, (pun staodin en rea whist suey cig ant lund ands ameter alow pen thang fie and pu (©) _Founp's damaged um dees, gapitatn,covoson eosin, ,Wavorapariealoveds ea he pnp sion, {G) Pas not tuches by Sotr ruse n Bee, tears assent or my (0) ateo vote isusd wine canoer of Sle. Ser Esno an nine esgrabl fr pers sso syson equkeens ret cur defoed po recor ace. 18 Wan Rzans- Sear A tipments anda pres ere FOB. Ser acter or savin ay oval ee cas my bec: ()Canponens and pats (2) _cesotes, cca hon he acess anise of aba Feb rd hore hat sets ace det or sch roche’. Frits at lowed on angen eserbes an ats, canbe pep ad hed on vache apr of eh, Gee stk lnble oy danage os cue i der ch ol anaes profs fcr peossion chal bse on Bue. Byes hed pn po ear en carer ace eet eens Sule a gen ‘eer wan oi peed ye cortn. Slew fy poe ase stoar dam asa gon unt Bie eho wed oer looove eee, amoged ois. Scions Wile Buyers tr afoot er payren. Renée cenagdr lt ens ale Fom cons aaron be aeseat bowreceen tops ots posi nite tam a stp i shal eb espe of ta Eger nspec each shipment von rep an ly Slr of ay clined issn Win en (10 deseo ot such shipment: NO CLAWS FOF OMITED ITEMS WL BE ALLOWED AFTER TEN (10) OAYS OF RECEDT OF THE SHPMENT BY BUYER ‘oy convey ae ing et of ean othe keoig waranty. thread Baro, sabe sted byaioten hazed wh he Capel heir Rs ole Aes ‘bao Assocon_ angen upon he aad ene te Ata) may beeen ary eu heh jedan aes. The ars etl specs gos Uae pogo: Ses 1263.05 te Cae of Cv root le Se of Catena no, nde apart of ra made ale ay atv aon heuer were fe cpteaae amour n cnr ences Twenty Five Tousen Dor (825 60.00 exci of coi pans an eax. Th paz rte Bale esaon oy ater) Gain rade ‘nesta tasty by Sees egies, lof bom are eloyedat Seles hone olca Faso, Clim. The pares etl eee al het eonertet as fr stte s rear County, Cli, and hl ary avafen hearer da bea Frena Caty Caria, 18. Retunvof Eau ecpnetwde warany sabe rebed i Sar wot Rehr Mat atsizon (RUA) and shige ft avg been cine tom the Sal Ihe ewes cuoizatn gras by Sarthe Giemsa crs il or tansoan othe Ste ram i yea rohan nd day mak can tem wh be ‘sopepio RIM ear. Equine reinet or warany coniealon wile sujet orev ardwspecton by Wee vay. Wi achorae peseeel pro werony copeon, Pee eoertnot marty he Seer, nant wif ba hacen accordance wih io mondocuers arr wars paces ele ssa be one be Cadet fu ‘iment minus at lg and ober expenses ncaed by Be Slr hair sch eget ‘ek Poway, ne. crest iho have eqpment under vara cxserahon refered io We Foway, ke: atae rapa yf asec and ep Col fi sent wb OB Seles ry or erie ally ate, Ses i leer removal or esas (uel eared te waranty coricrafon pa, {tan Stout ny cf es pesos of ers net nay way nase te ee nd cons hen he asl ol Ug on Sele an ca ete cxdared ete iota ae No wie, zt, onda ye pots hc shal be Dg ue ting a se by an excel ool tts lane dor fces, he rd wero whom sch pre esl Sc race lo mak town sch en oe a TABLE OF CONTENTS WARRANTY : ‘TABLE OF CONTENTS... IMPORTANT NOTE, pee SECTION | GENERAL INFORMATION & DESCRIPTION .. SECTION I DISASSEMBLY. SECTION Ill INSPECTION AND REPAIR SECTION IV ASSEMBLY .. SECTION V PARTS LIST IMPORTANT NOTE FAILURE TO FOLLOW THESE INSTRUCTIONS MAY CAUSE SERIOUS PER- SONAL INJURY OR PROPERTY DAMAGE. STUDY THIS INSTRUCTION MANUAL, ‘The descriptions and instructions included in this manual cover the standard design of the equipment and any common deviations when possible. This book does not cover all design details and variations nor doesit provide for every possible contingency which may be encountered. When information cannot be found in this book, contact the nearest representative Do not operate this equipment other than in accordance with the instructions contained in this manual. This equipment. (or a prototype) has been shop tested and found satisfactory for the conditions for which it was sold, ‘The following instructions should be read completely before starting to install the pump. This equipment is capable of ‘extended trouble-free operation when properly applied, installed and maintained. These instructions present the basic information and methods required for proper installation and maintenance of turbine pumps ofthe sizeand typeindicated Con the front cover. Floway Pumpsstandard practiceis to ship close coupled pumps assembled. Where long pump lengths, shipping limitations, handling limitations and headroom limitations prevent complete assembly, we will ship the pump subassembled. Itis the responsibility of the installer to ask for assistance should it be required to properly assemble and install the pump. CAUTION: The equipment supplied can cause serious personal injury or death if mishandled and extreme care is not exercised in the operation of the equipment. NO ONE SHOULD EVER BE ALLOWED NEAR THE SUCTION OR OPEN DISCHARGE OF THE PUMP DURING OPERATION. A double custody lock should be installed on circuit breaker before anyone should be allowed to do any checking, maintenance or other work on the equipment. If the unit is supplied from the factory with OSHA approved coupling guards they must be kept installed at all times during operation to prevent injury to personnel. SECTION | GENERAL INFORMATION AND DESCRIPTION 1-1. GENERAL INFORMATION ‘There are two basic methods of lubricating the lineshaft of turbine pumps which alters the bowl assembly arrangement accordingly. These are: 1. Open lineshaft construction uses the pumped fluid for lubrication. ‘The lineshaft and bearings are “open” to the pumped fluid and depend on this fluid for bearing lubrication. This construction is often referred to as, “water lubricated” since waters the most common. lubricant, THIS. MANUAL IS WRITTEN TO COVER THIS TYPE CONSTRUCTION. fig, L1. BOWL ASSEMBLY GENERAL CONSTRUCTION OPEN LINESHAFT TYPE 2. Enclosed fineshaft construction wherein an enclosing tube is placed over the lineshaft and lubricants are supplied to the lineshaft bearings thru the enclosing ube. A SEPARATE INSTRUCTION MANUAL IS. AVAILABLE COVERING THIS CONSTRUCTION, 1-2. GENERAL DESCRIPTION The bowl assembly consists of the following basic ‘components: 1. SUCTION CASE oF SUCTION BELL - is the inlet of the pump. The suction case is provided with tapered threads for connecting a suction pipe or threaded strainer to it. The suction bell has a flared entrance and is preferred for sump applications; clip-on type strainers are available for attaching to the bell. Both ‘ase and bell house a grease packed bearing with a sand collar over the top ofthe bearing to keep out abrasives. SUCTION BELL. SUCTION CASE AIG. 12 TYPES OF BOWL SUCTION PIECES 2, BOWLS Two types of bow! are used in bow! assemblies - intermediate and top. single stage bowl assembly wil utilize atop bowl only, this bow! girects the fluid from the impeller into the discharge case. A multiple stage assembiy.will contain one or more intermediate bows and one top bowl at the top of the “stack”. All bowls contain an impeller mounted on the shaft and a bearing lubricated by the fluid being pumped. The top bow! (throttle) bearing on all models except 18MK and 20MK will extend into the bottom of the discharge case. 3. IMPELLERS - Two types of impellers are available - ‘semi-open” or “enclosed”. The arrangement of the bow! assembly is Klentical with ether type requiring only that the intermediate bowls and suction belt (or case) be designed to provide sealing surfaces for the type impeller used. ‘SEMLOPEN TYPE IMPELLER ENCLOSED TYPE IMPELLER Fig. 3. TYPES OF IMPELLERS 4. DISCHARGE CASE - is the connecting piece between the top bow! and column pipe. All cis charge cases contain a “Discharge Case Bearing” at the top. The 18MK and 20MK units also contain a ‘second bearing at the bottom. 8. BOWL SHAFT -isa one piece shatt extending from the suction bell (or case) thru the intermediate and top bowls and thru the discharge case where itis connected by a threaded coupling to the lineshaft and hence to the surface mounted driver. The impellers are mechanically connected to the umpshaft by means of tapered lock collets. The [pumpshaft is supported above and below each impeller by bearings - extra long bearings being ‘employed at top and bottom. 1-3, CAUSES FOR REDUCED. PERFORMANCE Before pulling the pump bow! from the well the Installa- tion and Operation Manual should be reviewed for causes of reduced performance not related to the condition of the bow! assembly. Some of the possible ‘causes of reduced performance could be: 1, Incorrect lateral adjustment. (This is especially crtical with units utiizing sem-open impellers.) 2. Well conditions such as gas or air in the water. 3. Change in operating conditions such as increased pumping water level or increased discharge head requirements. . 4, Slow motor speed due to overload, low voltage or low ‘frequency. 5. Incorrect direction of rotation. 6. Strainer clogged or suction “sanded in*. 7. Inadequate submergence of pump suction. After the pump bowls have been pulled but before to the shop for repairs, check the bottom impeller for foreign material such as rocks or wood chips. Also check the strainer for obstructions. SECTION I DISASSEMBLY Nel. GENERAL Floway bowl assemblies are designed for mi tenance; frequency of required maintenance will depend on severity of service, accumulate operating hours, and ‘caregiven the unit during operation. Periodic performance. checks are the best method of determining when repairs should be made. A significant change in the sound of the running pump or an increase in vibration may indicate the need for repairs 1-2, SHOP REQUIREMENTS Shop area should be sufficient to lay the parts out in order of disassembiy. Parallel stee! or wooden rails are recom- ‘mended for cradling the bowl assembly although repairs can be effected on a flat bench or floor area of sufficient length to support the complete bowl assembly. The area should be kept clean through-out the repairs - remember this is a close toleranced, high speed machine and should be handled as such, 1-3. TOOLS ‘A good mechanics tool box will supply most ofthe tools required. The following should be available: Hammers (bothhardand soft), screwdriver, allenwrenches, cchain tongs, open or box wrenches, fine flat file, fine triangular file, emery cloth, wire brush, Il-4, SPECIAL TOOLS Acollet driver for installing and removing the impeller lock collets is the only special tool required for bowl assembly repairs. This tool fits snugly over the shaft and is hand ‘operated, the male end being used to seat the collet while the female end is used to knock the impeller off the collet. UI-S. DISASSEMBLY - FLANGED PUMP BOWLS Figure 1-2 illustrates the parts of flanged pump bow! assemblies in sequence of disassembly. CAUTION: Protect machined surfaces from burrs and scrapes which could cause mis-alignment on re-assembly. In dismantling a bow! assembly for repair, itis advisable to ‘mark the parts so they may be re-assembled in the same sequence. vom [ener | ___ DNENSORS RINTES ea 2 © ole ax ox 80 1. | Se eee BRT em |e | FT MT © [ew RES wc | 102 | HA [AB | 6m [1B [ae BBE OTs no) 3G [LOR Tre | BI [ee FRE HOOK [sie | BRE | 28 [oon | [te sex, roe vouw | ave | $0 [2B | MB [aw iN 70K zine | $88 | 348 | v0 | SRB] ste Fig. lel. COLLET DRIVER DIMENSIONS 1. Laycomplete unitin horizontal position and block evenly. 2. Remove suction bell (or case) plug, 3. Measure end play of shaft by pushing the shaft all the way downand marking and then pulling allthe way up ‘ntl the impeller hit. Measure and record the distance traveled. inch end play.) 4. Remove shaft coupling, Threads are left hand 5. Remove discharge case cap screws. 6. Slide discharge case off shaft. construction —==}— =—- Sab ceaee except 1I5DK 1 1 | ' ! 18" tu 20" tension —» LS ey —! includes 150K Fig. N-2. 10" and Larger Pump, Exploded View Refer to section V for ordering parts - 7 do not order from this drawing Certain close coupled units will not use parts #4,17 &19 - throttle bearing #15 would then be replaced by bowl bearing #14 fig. U-2 (cont.). 10* and Larger Pump, Exploded View 18" thru 20" units will use bowl bearing (14) in place of throttle bearing (15) 1, Suction Plug 2. Shaft Coupling 3. Discharge Case Cap Screws 4, Discharge Case 5. Bowl Cap Screws 6. Top Bowl 7. Impeller Collet 8. Impelter 9. intermediate Bow! 10. Suction Case (or Bell) 11. Sand Collar Set Screws 12. Sand Collar 13, Pumpshaft 14. Bowl Bearing 15, Throttle Bearing 16. Suction Bearing 17. Discharge Case Bearing (Top) 18, Discharge Case Bearing (Bottom) 19. Column Adaptor 20, Suction Adaptor 7. Remove bow! cap screws and slide top bow! off shaft NOTE: Do not allow weight of bow! to rest on unsupported shaft. 8, Slide collet driver onto shaft - female end toward impeller. Pull shaft up so that impeller is not against bowl seat. Strike impeller sharply with collet diver Repeat as necessary to loosen impeller - pull shaft up after each biow. 9. Insert screwdriver into the spit in the impeller collet to spread and slide off shaft. 10, Removeimpeller. 11. Repeat steps 7 through 10 untill intermediate bowls ‘and impellershave been removed. 12, Slide suction bell (or case) off over bottom end Of shaft, NOTE: Do not remove sand collar unless the shaft or sand collar are to be replaced. ‘The sand collar left on the shaft will automatically provide the proper impeller location when assembling. 13. ff the sand collar is removed record the distance from the bottom of the shaft to the bottom of the sand collar. (__") 14, To remove sand collar loosen two set screws located 90 degrees apart and slide sand collar offshaft. II-6, ALTERNATE DISASSEMBLY METHOD Occasionally a bow assembly will become “locked” due to foreign materials or seizure of parts in such a way that the above method of disassembly cannot be used. The Floway pump bowl can also be disassembled from the suction end as follows: 1. Follow steps 1 thru 4 above. 2. Remove suction bell (or case) cap screws. 3. Slide suction bell (or case) off shaft. 4. Measure and record sand collar location in relation to end of shaft. (__") 10 5. Loosen two set screws located 90 degrees apart and slide sand collar off shaft. 6. Slide collet driver onto shaft - male end toward impeller. Strike impeller collet sharply with collet driver. Repeat as necessary to loosen. 7. ‘Slideimpeller off shaft, 8 Place blade of screwdriver into the splitin the impelier collet to spread and slide off shaft 9. Remove cap screws from next intermediate bow! flange andslideintermediate bow of shaft. 10, Repeat steps 6 through 9 until all intermediate bowls andimpellers havebeen removed. 11. Side discharge case off shaft. 12, Slide discharge case off shaft. 11-7, _ DISASSEMBLY - THREADED PUMP BOWLS The disassembly of threaded bowls willbe identical to the two methods outlined above except the discharge ‘ease, intermediate bowls and suction bell (or case) are connected by threaded joints rather than cap screws. The threads are right hand. A pair of chain tongs or large pipe wrenches will be required for disassembly. NOTE: Tapping the casting while applying force to the chain tongs will help “break” stubborn joints. Use a light hammer - do not strike heavy blows. II-8. REMOVING BEARINGS Allintermediate bow bearings andthrottle bearing are pressed into their respective bores and can be either pressed out or machined on the inside diameter u walls thin enough to collapse, he ‘The suction bearing must be pressed out from the bottom ‘or machined on the inside diameter until the wallis thin. enough to collapse. See Figure Il-3. | i BEARING MUST BE REMOVED IN THIS DIRECTION STEPPED 1 BEARING Grease ‘vol. i} Fig. 1-3. REMOVING SUCTION BEARING The discharge case bearing must be pressed out from thebottom ormachinedon theinside diameteruntilthe wall is thin enough to collapse on the 6" thru 16" sizes. See Figure Il-4. The top discharge case bearing on the SDK, 18MK and 20MK units is threaded (LEFT hand) and may be unscrewed; the bottom discharge case bearing may be pressed out from either end on 18MK & 20MK. un DISCHARGE CASE Pert EAFING: ‘THES OIRECTION ! orscunecs case Fig. 4. REMOVING DISCHARGE CASE BEARING SECTION III INSPECTION AND REPAIR IIL1. INSPECTION AND CLEANING ‘After disassembly, all components of the bow! assembly should be thoroughly cleaned and examined for physical defects. The following components should be inspected for wear, corrosion and damage: 1. Impellers - check water passageways for signs of ‘damage from abrasion or corrosion, check impeller jrts against “as new” dimension shown in Figure itt. 2. Shaft check shaft for pitting and wear, “as new" dimensions are shown in Figure Ill-1. Check for straightness - shaft must be straight within .005 total indicator reading 3. Bowls - check water passageways for signs of damage from abrasion or corrosion, check impeller seat against “as new" dimension shown in Figure il-t. 4. Bearings - check all bearings for total clearance over the shaft diameter. It is recommended that all bearings indicting wear be replaced. The following indicates suggested maximum diametrical clearance over existing shaft diameter: 1" through 1-3/4" shaft -.020" clearance 1-15/16" through 2-7/16" shaft -.025" clearance ra a [Potemmere marr onan enw Heo" F hee Fig. ill-1. BOWL ASSEMBLY DIMENSIONS AND TOLERANCES R I-2, TROUBLE SHOOTING Trovete sooncks [Pnoasie cause |REveov Taps LCR Cresent [eowinintinn [RGSS apace baits a ren esron | sigarertcanata | APBe® Bae ours [Sood Sk nn | tse repos Warrenton _[Avmiwecton | Repc batro Tippin re Wroronbouseel ot |pyscieecion | ave faamace beoha (Show atonpees natoo gat er onto ones epics bons wor _and outside wal nner |s excessive. Teron sen” | Rees pats F Fig. lll-2. TROUBLE SHOOTING CHART MI-3, REPAIRS Parts showing signs of damage, cracks or excessive wear shouldbe replaced. Use only genuine Floway parts for replacements. Order replacement parts as indicated in Section V. CAUTION: when repairing a bow! assembly that has been in service for several years, the physical condition or strength of all parts such as cap screws, bowls and bow! threads must be carefully checked. CAUTION: when attempting to re-work any part extreme care must be taken to maintain alignment of, mating parts and “as new" tolerances. ‘A. REPLACING BEARINGS. Replacement bearings are furnished “to size” for press {iting into their respective bores with 2 .001" to .003" interference fit if the bearing bore is heavily scarred or corroded the part should be replaced or reworked to provide a true bore for the bearing B. REPLACING SHAFT ‘Shaft damage is usually best corrected by replacing the shaft. If an attempt is made to re-build the shaft, the ‘©.D. must be held within the tolerance shown in Figure lik1 and straight within .005" total indicator reading. Due tothe possibilty of intorim damage, replacement shafts should always be checked for straightness before installing, C. REPAIRING ENCLOSED IMPELLER AND BOWL, ‘SEAL SURFACES. Enclosed impelier skirt and bow! seal surface wear can be corrected by installing wear rings if the damage is not excessive. This is usually accomplished by turing the impelter skirt to obtain a smooth surface and then boring the bow! and installing wear rings on either, or both, surfaces. If the original unit was furnished with either bow or impeller (or both) wear rings, these should be removed completely and replaced, MPELLER IMPELLER Sows or Suction Fig. Ill-3. REPAIRING ENCLOSED IMPELLER AND BOWL SEAL SURFACES When wear rings are installed on the impeller itis recommended that a shrink fit be utilized - the interfer- ‘ence should be heavy to prevent slippage, 0.010" on the ‘smaller units and up to 0.015" to 0.020" on the larger sizes. Sufficient heat is then applied to the wear ring to ‘expand it and allow the wear ring to drop over the impeller. When wear rings ate installed in the bowl a .003" to .005" press fit should be used. The wear ring can be installed by carefully tapping into place. A wooden block should be used to protect the wear ring. B D. REPAIRING SEMI-OPEN IMPELLER SEAT ‘Semi-open impeller and bow! seat wear can be cor- rected by refacing the surfaces if the damage is not, excessive. Depending on the type and extent of wear it may only be necessary to reface one surface. After ‘efacing, the two surfaces must be parallel to each other and concentric to the shaft centerline, Fig. Ill-4, REPAIRING SEMI-OPEN IMPELLER SEAT li. LUBRICATION Re-pack suction bearing with insoluble grease such as Marfax #2. Lubricate all bearings and impeller skirts with clean grease or oil, Thoroughly clean all bolts, nuts, threaded connections, and flanges and paint with white lead and oil, or pipe joint compound. SECTION IV ASSEMBLY Assembly ofthe unit is basically the reverse of disas- sombly. Before proceeding with assembly, clean thoroughly and check all threads, registers and mating faces for burs. Clean up wit file where required. Lubricate as outiined in paragraph ll4, Its important thatthe lower sand collar and first impeller are properly located on the shaft since the shaft projection is deter- mined by this. CAUTION: cieantiness and proper tubrica- ton are very important since one small chip, burr or ‘one dry bearing can be cause for re-doing the whole job. Assembly procedure is as follows: ‘The parts reference numbers refer to Figure 1-2 (Pages 8 and 9). 1. Locate sand collar on shaft and lock in positon with the two set screws. The sand collar should be located in the same position as foundwhendisassembled and recorded (see page 6). Ifthe send collar location was not recorded ‘efer to Figure 1V-1 for standard dimension. SAND COLLAR i 4 a suart ne |] i nn nS NOTE: Add 1/8" to above dimensions for all semi open impeller pumps. Fig. 1V-1. SAND COLLAR SETTING 2. Check shait closely for nicks or burrs - smooth with ‘emery cloth as required 3. Check shait for straightness - shaft must be straight within .005* total indicator reading. Figure IV-2 indicates a recommended method for checking shaft straightness. If the shaft is not straight it must be straightened or replaced. Ifthe deflection is gradual “ ‘over a considerable length the shaftcan usually be straightened by supporting on two blocks straddling the crooked section and applying pressure to the high side to deflect the shaft in the opposite direction. Ifthe shaft has a sharp crook (dog-leg) it is recommended that the shaft be replaced since the shaft will not always remain straight even if satisfactorily straightened. Dial Indicator re shat Shaft Roll mae Fig. 1V-2. CHECKING SHAFT FOR STRAIGHTNESS 4. Insert shaft into suction bearing, sliding ir Until the sand collar rests against the bearing housing. NOTE: Semi-Open impeller pumps require a 1/8" ‘spacer be inserted between the sand collar and bearing housing. Install the ie down bolt (1/2" N.C.) thru the bottom of the ‘suction bell (or case) and thread into tapped hote in end ‘of shaft as illustrated in Figure 1V-3. Tighten the tle «down bolt enough to hold the sand collar firmly against the bearing housing or spacer. Do not tighten enough to ‘move sand collar on shaft ‘ayo couse scare east beans, AEUSING G02 SPmcKR He pown nour. Fuat vasien i ecu. Fig. 1V-3. LOCKING SHAFT FOR ASSEMBLY 5. Slip the first impeller over shaft and seat in suction bell (or case). 6. Opencollet with screwdriver blade and slide over shaft and into tapered impeller bore. 7. Using the male end of the collet driver, drive the ccallet securely into the tapered impeller bore. Remove collet driver. 8. Tighten the tie down bow securely at this time. If the sand collar has been raised slightly off the bearing housing by installation of the fist impeller this is O.K 9. Slide intermediate bow onto shaft and mate with suction bell (or case). On bolted bow! assemblies rotate bow to align ribs with ribs on ‘suction bell (or case). 10. Insert and uniformly tighten cap sorews on flanged bowis; use heavy chain tongs to tighten threadedbowls. Recommended torque values are shown in Figure IV-4 and IV-5, Tashan soe [we [one [58 [yrs [= [ore Tee fs fot far fo foo [orl is ays ae re as ae ah ah Fig. 1V-4. TORQUE VALUES FOR STANDARD FASTNERS [sown sae [auc [EO [SFERS Tin FORGE Fr6)| 7e0| 00 | 00 | 6 ERs wad thon we or saad bis oieted wit a igh sess Ucar (ga a eset, oe) Fig. W-5. TORQUE VALUES FOR STANDARD THREADED BOWLS 11. Repeat steps 6, 7, 8, 9 and 10 until ll bowls are in place, including the top bow! (the top bowl is easily identified by the extra long throtle bearing Which projects out the top on all models except 48MK and 20MK), 15 ‘12, Slide discharge case over pumpshatt. Install and {ighten cap screws, or screw discharge case onto top bow! if threaded, 13, Remove tie down bolt installed in step 4 (and sand collar spacer if used). 14, Grasp shaft and rotate by hand to check for binding, also check and play by pulling all the way up and ‘measuring distance traveled. Check this against ‘end play recorded in paragraph I-5 or nominal dimensions shown in Figure Mt. 16. If the suction bearing cavity was not packed with Grease previously this should be done now. After ‘greasing work shaft up and down several times to remove excess grease, NOTE: Remove enough gre 16. Install suction bell (or case) plug and tighten. 17. Screw column adaptor into place and tighten. 18. Screw shaft coupling onto shaft. 19, (Flanged bowls) Check bolts and nuts for tightness, also check column adaptor and tube adaptor bearing for tightness. (Threaded bowls) Put one chain tong on column adaptor and the other on the suction bell (or case) ‘and check complete bow! assembly for tightness, also check tube adaptor bearing for tightness. SECTION V PARTS. VIl-1, ORDERING PARTS ‘When ordering spare or replacement parts the pump serial number and size and type of pump must be given. ‘This can be found on the nameplate furnished with the tnit. Give the complete name of each part as indicated on. the applicable sectional drawing (Fig. V-1,V-2, or V-3)and, the quantity required, ViL-2. STOCKING SPARE PARTS Spare parts to be Kept in inventory will vary according to service, field maintenance anticipated, allowable down time and number of units. A minimum inventory of one complete set of bearings, gaskets, “O" rings, and packing (or Mechanical seal) and one spare of each moving partis suggested. Who to contact for spare parts VIE3. RETURNING PARTS All materials returned to the factory must be accompanied by a Returned Material Authorization (RMA) number. An RMA number can be obtained directly from the factory or through your local Dealer or local District Manager. The RMA Form must be filed in completely and forwarded as directed thereon, Parts being returned under warranty claim must have a complete written report submitted with the RMA Form. CAUTION: returned materialmustbe carefully packaged to prevent transit damage - factory cannot assume any responsibility for parts damaged in tran- sit, 1. Contact local authorized Floway Dealer or Representative. 2. If unable to locate an authorized Representative, call Floway’s Factory Parts Department for the name of the nearest local contact: Fresno, CA (559) 442-4000 16 Bowl Assembly Parts List 6LK, 6JK, 6JO, BLK, 8JK, 8JO, 8FK & 10HK Series ‘Shaft Coupling __ Bow! Shaft | Discharge Case Bearing (Top) ‘Column Adaptor Discharge Case "an impeller Collet Strainer Clips: ‘Boi Nameplate Strainer Serows Suction Bell Strainer Suction Bearing DETAIL “A” Bowl Wear Ring Wear Ring Detail SUCTION CASE (when furnished) (threaded suction) BOWL ASSEMBLY PARTS LIST 8XK, 10XK, 10LK, 10DK, 10DO, 10FK, 12DK, 12D0, 12LK, 12FK, 14DK, 14DO, 14LK, 14FK, 16MK SERIES ‘Shaft Coupling Bow Sheft Column Adeptor Discharge Case Bearing (Top) Discharge Case Discharge Case Cap Screws Tete Bearing Top Bow Impeter Cot Impeter Bowl Cap Serow fae Bowl Bearing Intermediate Bowl ucton Bl ow Namepiate Sand Cotar Set Serow a —~ sand cotar ‘Suction Bearing ‘Strainer Clips ‘Strainer Screws ALTERNATE CONSTRUCTION Strainer ‘Sucton Plug “mm once” Yon Plug Wear Ring Detail SUCTION CASE (when furnished) (threaded suction) BOWL ASSEMBLY PARTS LIST 15DK, 18MK, 20MK SERIES. ‘Shaft Coupling Bow! Shot Column Adaptor Discharge Case Beating (Top) |___—bischarge Case ——— Discharge Case Bearing (Bottom) Discharge Case Cap Serews Bow! Bearing “Top Bowl Impeller Cotet Impeller Bows Cap Serew Bow Bearing Intermediate Bow! Impeller Cotlet| Impeler “ ‘Sand Collar Set Serow ‘Sand Collar Bow Nameplate ‘Suction Belt Strainer Screws — Suction Bearing ALTERNATE CONSTRUCTION ‘Suction Plug svai DETAIL " Bont Wear Ring Impeller Wear Rin SUCTION CASE Wear Ring Detail (threaded suction) (when furnished) 9 Weir Floway, Inc. 2404S. Railroad Avenue Tet ($59)442-4000 .0.Box 164 Fax: (650)442-2008 Fresno Calfoenia 93707 rw. weirminerias.com Excellent Minerals Solutions In4106 Docember2003, i

You might also like