You are on page 1of 100

SIEMENS Pakistan

BU Switchboards Engineering & Design Plan Printout Date:05/14/2018


SB - E & D

MV Switchboards

ForApp. ForApp.
By ON Projected
S.No Customer DE E&D S.B.No. Description Start App. Rec. For Prod. Remarks Hours

2 Interloop (Pvt.) Ltd. MYS A0250 4800020535 01 x WIP + 01 VCB Owner's Panel 5/28/2004 6/1/2004 9/8/2004 02-06-04 Modification work
2 Megabird International KR A0263 4800014835 KESC Jr. Panels 2/4/2003 12-03-03 12-03-03 App awaited
1 M/s Packages Ltd. SJA/FB A0276 5100002044 01 No. VCB for existing trolley 4/4/2003 Under clar
02x6.6KV INC./OUT.VCB, 01xCOS
4 WASO - Mianwali ( TD ) SJA A0307 5100002364 6/20/2003 21-08-03 26-04-04 13-10-03 Inspected on 28/29-07
LBS Panels
5 Highland Traders / Shamail MYS A0308 4800016499 03x KESC Jr. Panels 6/23/2003 04-07-03 21-07-03 10-07-03
6 Bahria Town (Pvt.) Ltd., Rawalpindi SJA A0332 4800016903 11 kV Switchgear / PMT 9/29/2003 08-10-03 30-10-03 05-11-03 MV Swgr dispatched

03-12-03 17-05-04
09-03-04 Refer Design Plan / POA &POB 150
16-01-04 08-12-04 dispatched / P1&P2 inspected on 21&22-
1 KCI Chashma (EC) KR A0342 5100002648 11kV Switchgear - 71 Panels 12/11/2003 22-01-04 04-11-
20-01-04 17- 03 / P3, P4, VA inspected on 26-28/04 and
02-08-04 04
01-05 dispatched

5 K.E.S.C. SJA/MR A0356 4800018464 21X4MVAr,11kV Capacitor Banks 12/9/2003 16-01-04 26-02-04 21-01-04 Inspected on 02-08
3 Sialkot Int'l Airport Ltd. (EC) SMY A0357 5100002643 11kV Switchgear (05 Panels) 12/10/2003 16-01-04 12-02-04 01-03-04 Reinspected on 23-11-04
4 K.E.S.C. SJA/MR A0363 4800018961 15kV Switchgear (20 Panels) 1/16/2004 29-01-04 26-02-04 20/29-01 100
PO recd 06-04/App awaited/Qty reduced
7 IESCO SHA A0367 4800018736 37x200KVA PMTs 12/30/2003 09-04-04 09-04-04
29-07/ Inspection on 17-09
09-04-04
7 Pakistan Refinery Ltd. KR A0370 4800018945 3.3 kV Switchgear - Simoprime 1/16/2004 24- 04-05-04 24-05-04 Inspected on 29-9 /Dispatch awaited
05-04
20-05-04
21-05-04
2 Decon Germany MYS A0371 4900000315 24kV Switchgear - 8BK20 1/22/2004 18-03-04 26-04-04 Lot 2.1 Inspection on 21-02
05-11-
04
11kV Switchgear (24xI/C+ CL rel on 13-01/ Inspected on 03/04-
10 WAPDA ADP27 SJA A0372 4800019094 1/7/2004 17-02-04 04-03-04 13-04-04
50xO/G+20xC) 08/Inspected on 07-09

15 Pioneer Multipurpose KR A0373 4800019145 02xKESC Outgg + 21xKESC Jr 2/9/2004 08-03-04 06-03-04 App awaited/KESC Jr Panels dispatched
16-03-04
25.03.04
12 Nishat Chunian Ltd. (Weaving) SJA A0375 4800019386 01xI/C+01xO/G 11kV VCB Panels 3/3/2004 7/1/2004 30- Additional Order on 24-06
13.07.04
01-07-04 06-04
17 Rahman Cotton Mills SJA A0377 4800019444 01x11KV Wapda O/G Grid Panel 3/5/2004 12-03-04 6/16/2004 11-03-04 App awaited/Inspection on 17-06
17 Masood Textile Mills Ltd. KR A0380 4800019596 01x 11kV VCB I/C / O/G Panel 3/25/2004 30-03-04 15-04-04 15-04-04
18 Crystal Spinning (Pvt.) Ltd. MYS A0383 4800019721 01x Wapda Industrial Panel 3/26/2004 31-03-04 NR 29-03-04
20 SUPARCO SJA/ KR A0385 510002843 01x1/C + 01xO/G 11kV Panels 4/20/2004 5/4/2004 11-05-04 11-05-04 CL rel on 30-04/ App awaited
01x 11kV VCB O/G Panel + Adaptor
19 Honda Atlas Cars Pakistan Ltd. KR A0386 4800019839 4/7/2004 19-04-04 5/5/2004 30-04-04 20-04-04 Relay changed to P124S
Panel for Simoprime
27-07-04
05.05.04
20-08- 200
2 General Tyres & Rubber Company MYS A0387 4800019787 04x 3.3kV Reversible Starter Panels 4/9/2004 19-04-04 15.06.04 8/12/2004 5th Panel to be dispatched
04
schematic
09-09-04
11 Abdul Razzak Kamani KR A0388 4800020033 01x KESC Jr with Prot w/o Metering 4/19/2004 29-04-04 29-04-04 CL rel on 23-04 /App awaited

Page1/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

Work
Changes/
Planned Total 10/06 Oct. Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Total Balance in
Additions
Hand

Status GP DESIGN
30 30 13.4 13.4 16.6 Closed MV
0 0 0 0 Closed MV
0 1 1 -1 Closed MV
0 0 0
0 Closed MV
0 0 0 0 Closed MV
0 0 0 0 Closed MV
200 250 450 570 570.1 -120.1
Closed
MV
0 0 0 0 Closed MV
200 150 350 267 266.7 83.35 Closed MV
100 50 150 130 130 20.05 Closed MV
0 0 0 0 Closed MV
125 130 255 280 280 -25 Closed MV
500 450 950 1169 1169 -219.3
Closed 8BK
MV
200 200 233.9 233.9 -33.9 Closed MV
0 0 0 0 Closed MV
0 0 0 0 Closed MV
0 0 0 0 Closed MV
0 0 0 0 Closed MV
0 0 0 0 Closed MV
0 0 0 0 Closed MV
0 0 0 0 Closed MV
50 100 150 216.8 216.8 -66.8
Closed
MV
0 0 0 0 Closed MV

Page2/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

29.04.04 50
25x11KV Capacitor Bank Control 26.05.04
10 NTDC-WAPDA / ADP 29 (LOT III) SJA A0389 4800020047 4/19/2004 7/30/2004 7/22/2004 Inspection on 18-10
Switchgear Panels 08.06.04
14.07.04

01x11KV Wapda Industrial


13 Interloop (Pvt.) Ltd. MYS A0390 4800020046 Panel+01x11KV VCB Owner's 4/20/2004 29-04-04 9/8/2004 29-04-04
Panel
CL rel on 27-04/Relay changed to 2TJM
24 Sitara Chemical Industries KR A0391 4800020056 01x11KV VCB I/C/ O/G Panel 4/20/2004 29-04-04 18-05-04 29-04-04
on 13-07
06x Contact Arm Blades for
25 PTD Services / Fauji CEMENT Ltd MR A0392 5100000394 4/22/2004 NR NR 23-04-04
3AH1115-2
22 Berger Paints Pakistan Ltd. KR A0394 4800020138 01x11KV I/C /O/G Panel Simoprime 4/23/2004 29-04-04 14-05-04 29-04-04 CL rel on 27-04
23 Peoples Steel Mills Ltd. KR A0395 510002827 01xVCB 1250 A, 12KV, 20KA 4/20/2004 27-04-04 7/29/2004 6/3/2004 CL rel on 27-04
01x Wapda Industrial + 01xVCB
11 Sandal Dyestuff Industries Pvt Ltd. MYS A0396 4800020091 4/26/2004 5/4/2004 5/4/2004 9/8/2004 04-05-04
Owner's Panel
07-05-04
17.05.04
-
15 Ibrahim Fibers Ltd. (ITM) KR A0397 4800020148 11KV Switchgear (03 Panels) 4/27/2004 5/5/2004 01.06.04 10-05-04 Inspected on 26-08
13.07.04
03-06-04
16 Olympia Chemicals Ltd. MYS A0398 4800020254 6.3KV Switchgear 4/30/2004 5/12/2004 18-05-04 6/23/2004 6/25/2004 Add.indent on 31-08/Inspected on 14-09
26-07-04
11-05-04
7 PARCO MYS A0399 4800020271 11KV Changeover Panel 5/4/2004 05-07- 18-08-04 Inspection on 18-10 3
13-
04
08-04
27 Shaikh Zayed Bin Sultan Al-Nahyan MYS A0400 4800020465 01X WAPDA Industrial Panel 5/24/2004 28-05-04 28-05-04 Under testing
19 Silver Knits KR A0402 4800020651 01 x KESC Jr with Metering & with P 6/9/2004 6/9/2004 6/29/2004 6/9/2004 CL rel on 07-06
20 Colony Textile Mills Ltd. SJA A0403 4800020635 01xI/C+03xO/G 11kV Panels-8BD4 6/11/2004 11-06-04 6/25/2004 7/1/2004
13 Highland Traders / Askari RA A0404 4800020735 01xKESC Grid+03xKESC Jr Panels 6/9/2004 6/29/2004 7/16/2004 7/5/2004 KESC Jr Panels dispatched 25
15 Noorani Spinning Mills Ltd. RA A0405 4800020634 01 x WAPDA Industrial Panel 6/10/2004 6/18/2004 6/21/2004 7/12/2004 7/28/2004
3 Chashma Sugar Mills Ltd. SJA A0406 4800020867 02x 6.6 KV VCB Panels 6/17/2004 7/19/2004 7/22/2004 8/10/2004 8/13/2004 Changes to be rel on SB S go-ahead 150
9 Roche Pakistan Ltd. MYS A0407 4800020910 01x VCB Phase CO Panel 6/22/2004 7/7/2004 7/16/2004 8/17/2004 7/27/2004 Inspected on 06-10/Changes
25 FESCO SJA/RA A0408 5100002938 04x I/C+15x O/G VCB Trolleys-WAP 6/22/2004 6/29/2004 8/6/2004 8/6/2004

100
25-06-04 Changes recd on 12-08 - qty revised / Qty
23-06-04
16- revised 07-10 / Changes on 27-12 / Go-
30-03- 04-11-04 05-07-04
1 Habib Rafique Pvt. Ltd. SHA/SJA A0409 4800019795 215x 100KVA +242x 200 KVA PMTs 08-04 ahead from SB S on 04-02, Rev CLs to PR
05 22-02-05 15-04-05
04-02-05 on 18-05 / Add indent / partially
19-08-05
15-04-05 dispatched / Rev indent for update

19 Fatima Sugar Mills KR A0410 4800020873 01x 11kV VCB I/C Panel 6/24/2004 7/2/2004 7/2/2004 7/20/2004 7/20/2004
28 Zafar Enterprises RA A0411 4800020754 03x KESC Jr. +01x I/C / O/G Panels 7/1/2004 7/15/2004 7/15/2004 CL rel on 09-07/App awaited
17 Ghazi Fabrics International RA A0412 4800021130 01x 11KV VCB I/C / O/G Panel 7/2/2004 7/7/2004 7/19/2004 7/7/2004
30 Arshad Corporation Pvt. MYS A0413 4800021179 01x WIP + 01 x VCB Owner's Panel 7/7/2004 7/13/2004 9/8/2004 8/19/2004 CL rel on 12-07
18 Maxcorp Hussain Pakistan KR A0414 4800021244 01x FLBS Panel 7/13/2004 7/15/2004 7/22/2004 7/27/2004 7/26/2004
23 Krystalite Products (PTD SE) RA A0416 5100002991 01 x WIP 7/22/2004 8/2/2004 7/29/2004 24-08-04 7/29/2004 CL rel on 26-07

7 LESCO (PTD SE) RA A0417 5100002993


08x I/C + 15xO/G VCB Trolleys
7/22/2004 8/2/2004 7/28/2004 10/28/2004 10/28/2004 20
-WAPDA

35 Islamabad Club MYS A0418 4800021501 01 x 11kV WAPDA Consumer Panel 8/3/2004 8/6/2004 8/6/2004 8/31/2004 24-08-04

7 Bawany Air Products KR A0419 4800021584


11 kV Switchgear-Simoprime(01x
8/5/2004 8/12/2004 8/11/2004 8/25/2004 8/11/2004 25
I/C+03x O/G)

Page3/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

150 150 149.6 149.6 0.4


Closed
MV
25 25 26.6 26.6 -1.6
Closed
MV
0 0 0 0 Closed MV
0 0 0 0 Closed MV
0 0 0 0 Closed MV
0 0 0 0 Closed MV
25 25 14 14 11 Closed MV
0 0 0
0 Closed
MV
75 25 100 105.1 105.1 -5.1 Closed MV
40 20 60 78.8 78.8 -18.8 Closed MV
0 0 0 0 Closed MV
0 0 0 0 Closed MV
0 0 0 0 Closed MV
50 10 60 101.3 101.3 -41.3 Closed MV
25 20 45 66.25 66.25 -21.25 Closed MV
50 15 65 113.5 113.5 -48.5 Closed MV
100 100 148.5 148.5 -48.5 Closed MV
0 0 0 0 Closed MV
100 150 250 261.7 261.7 -11.7

Closed

MV
0 0 0 0 Closed MV
0 0 0 0 Closed MV
25 25 68 68 -43 Closed MV
0 0 0 0 Closed MV
25 25 26 26 -1 Closed MV
0 0 0 0 Closed MV
25 25 63.5 63.5 -38.5 Closed MV
0 0 0 0 Closed MV
60 60 58 58 2 Closed MV

Page4/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

14 Tahir Builders MYS A0420 4800021621 11kV Switchboard 8/5/2004 8/12/2004 8/17/2004 8/30/2004 01-09-04 Voltmeter+SS added in O/G Panel 72
15 Colony Textile Mills Ltd. MYS A0421 4800021612 01 x 11kV VCB O/G Panel 8/6/2004 8/10/2004 8/11/2004 8/23/2004 8/24/2004
13-09-04
01-10-04
17 Ghazi Fabrics International SJA/RA A0422 4800021793 08 x 11kV VCB Panels 8/23/2004 9/3/2004 9/28/2004 10/8/2004 CL rel on 10-09/PTs with secondary 110/3
Schematics
3 Habib Rafique Pvt. Ltd. KR A0423 4800021842 28x 3-Way + 18x 4-Way RMUs 8/24/2004 8/27/2004 9/29/2004 9/23/2004 1862
01xWIP+02x11kV VCB I/C/O/G
7 Haleeb Foods (Pvt.) Ltd. KR A0424 4800021812 8/24/2004 9/3/2004 9/2/2004 9/20/2004 9/2/2004
Panels
Indent/S.O. on 26-08 / Add indent for
2 IESCO SHA A0425 4800021875 (15+3) x 63kVA PMTs 8/6/2004 NR 9/3/2004
03Nos. on 23-02
Indent /S.O.No.on 19-10/Rating plate on 481
9 IESCO SJA A0426 4800022602 37 x 4 - Way RMUs 8/26/2004 NR NR 10/29/2004 21-09/Qty enhanced by 07 Nos. on 15-10 /
30 Nos. dispatched

22 Reckitt Benckiser (PTD SE) KR A0427 5100003059 01x11kV Simoprime I/C/O/G VCB pan 9/3/2004 9/3/2004
11-09-04
9/3/2004 CL rel on 03-09/App drgs recd 21-09 10
24-09-04 e-mail
15-10-
04 03-11-04
28-10-04 18-11-04
7 Maple Leaf Cement KR A0428 5100003131 6.3 kV Switchgear-14 x 8BD4 8/31/2004 9/21/2004 11/30/2004 Indent/S.O. No. on 13-10
05- 03-12-04
11-04 13-12-04

schematics
01 x 11kV WAPDA 16-09-04 23-09-04
CL rel on 02-11/04-11/Consumer panel 30
10 Babar Islam & Co. KR A0429 4800022142 Consumer+02x11kV VCB I/C 9/14/2004 9/16/2004 11- 11/29/2004 11-
dispatched
Panels 11-04 11-04
25 Pakistan Petrolem Ltd. RA A0430 5100003087 01x VCB Trolley with contact arms 9/15/2004 9/16/2004 9/10/2004 9/16/2004 App awaited 85
9 Gulshan Weaving Mills Ltd. MYS A0431 4800022111 01x VCB I/C / O/G Panel 9/15/2004 9/17/2004 9/20/2004 12/15/2004 26-11-04
15 Commodities & Textiles Pvt. Ltd. KR A0432 4800022258 02 x KESC Jr 9/22/2004 10/1/2004 10/7/2004 10/22/2004 10/7/2004 CL rel on 27-09 10
12 ENI Pakistan Ltd. (EC) KR A0433 5100003138 02 x LBS+I/C Cable Connection Pan 9/23/2004 10/1/2004 10/4/2004 10/4/2004 Indent /S.O.No. on 14-10 20
27-09-04
Retrofit for MOCBs/Indent/ S.O.No. on 13-
5 HESCO (PTD SE) RA A0434 5100003126 05xI/C+15xO/G VCB Trolleys - WAP 9/23/2004 12/8/2004 12/8/2004 10/Site Visit on 05-10 / Inspection on 03-
06-10-
03
04
20- 08-10-04
Indent/S.O.No. on 13-10 / CL rel on 18-10 / 55
4 Holcim Cement Srilanka (MES) MYS A0435 5100003122 01x 3.3kV,2000A VCB - 8BK20 + 01x 9/28/2004 10/5/2004 10/25/2004 Rev drgs on 27-10 / Adapter Panel
10-04 28-02-05
dispatched

10 Indus Sugar Mills Ltd. (EC) SJA A0436 5100003139


01 x 6.6 kV VCB Panel with Manual
9/28/2004 10/6/2004 10/19/2004 10/21/2004 10/26/2004 Indent /S.O.No. on 15-10 60
Synchronisation
20 Shahzor Feeds Pvt. Ltd. RA A0437 4800022424 01x WIP + 01x VCB Owner's Panel 10/7/2004 10/11/2004 10/21/2004 10/11/2004 CL rel on 12-10

150
23-02-05
02x 24 kV, 25kA, 800A VCB I/C / D01
20-10-04 23-02-05
3 Barqaab / NTDC (TD) SJA A0438 5100003125 O/G Panels - 8BK20 for NTDC 10/8/2004 10/20/2004 28-04-05 CL rel on 12-10
22-12-04 email
-KESC Interconnection D02
10-05-05E01

5 Highland Traders KR A0439 4800022267 01x 15kV KESC Grid O/G Panel 10/13/2004 10/19/2004 10/18/2004 10/18/2004
CL rel on 15-10/App awaited / Inspected 10
on 20-04
02-11-04
24-12-04 19-01-05
90
KW&SB / NEK Pumping Station (KIII Project) 19-01-05 CL rel on 28-10 / 02x O/Gs put on hold by
4 SJA A0440 5100003135 11 kV Switchgear & Capacitor Panel 10/14/2004 10/27/2004 27-12-04 11-03-05
(MES) e-mail MES - Go-ahead on 07-07
15-07-05
03-01-05
02-11-04
KW&SB / Dhabeji Pumping Station (KIII Project) 27-12- 19-01-05 19-01-05 90
5 SJA A0441 5100003136 11 kV Switchgear & Capacitor Panel 10/14/2004 10/27/2004 CL rel on 28-10
(MES) 04 e-mail 28-03-05
03-01-05

Page5/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

30 30 26.4 26.4 3.6 Closed MV


20 20 18.4 18.4 1.6 Closed MV
100 25 125 147.3 147.3 -22.3
Closed
MV
200 200 43 43 157 Closed MV
40 40 42 42 -2 Closed MV
20 100 120 73.2 73.2 46.8 Closed MV
50 50 61 61 -11
Closed
MV
50 50 24.4 24.4 25.6 Closed MV
100 100 157 157 -57
Closed

MV
50 50 51 51 -1
Closed
MV
20 20 17 17 3 Closed MV
20 20 10.4 10.4 9.6 Closed MV
40 40 33 33 7 Closed MV
50 50 70 70 -20 Closed MV
50 50 92 92 -42
Closed
MV
50 50 104 104 -54
Closed 8BK
MV
0 0 38.5 38.5 -38.5 Closed MV
0 0 25 25 -25 Closed MV
40 50 90 192 25 10 20 12 259 -169

Closed 8BK

MV
30 30 17 17 13 Closed MV
160 50 210 293 6 298.8 -88.75
Closed
MV
135 30 165 221.5 7 228.5 -63.5
Closed
MV

Page6/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

01x 3-Way RMU + 01xWIP + 01x Protection CT revised to 50/5A on 31-03 175
9 British High Commission - Islamabad MYS A0442 4800022636 10/19/2004 10/27/2004 12/1/2004 12/7/2004
Bus PT + 02xVCB O/G Panels after inspection / Work to be done at site

16 SF Engineering Services-EBM RA A0443 3000192078 01xKESC Jr Panel 10/22/2004 10/28/2004 12/17/2004 10/28/2004 Voltage relay added / Inspection on 01-02 10

19 Dewan Farooque Spinning Mills Ltd. KR A0444 3000192068 04 x 11kV I/C/O/G VCB Panels-SA2 10/25/2004 11/2/2004 11/12/2004 12/15/2004 11/12/2004 S.O# recd on 03-11/CL rel on 29-10

12 Rahman Cotton Mills KR A0445 3000193229


01xWIP + 01xI/C+02xO/G 11kV VCB
11/2/2004
13-11-04 22-12-04 23-11-04
CL rel on 12-11 / Changes / Resubmittal 100
Panels 29-12-04 31-01-05 29-12-04

19 Janana De Malucho Textile RFQ/SJA A0446 3000192099


01x WIP + 01 x I/C + 02 x O/G 11kV
11/4/2004 11/18/2004 11/25/2004 12/14/2004 12/15/2004
CL rel on 10-11/WIP CT ratio 40
VCB Panels changed
26-11-04
MV Switchgear incl. NGRs- 08-11-04
21-11-04 17-
18 Ittehad Chemicals Ltd. SJA/RA A0447 4800022821 11&13.8kV (09 x 11kV + 12 x 11/5/2004 09-12-04 Inspected on 12-01
22-12-04 12-04
13.8kV) Schematics
29-12-04
6 State Life Building-Islamabad RA A0448 5100003149 01x WIP + 01x VCB Owner's Panel 11/4/2004
12-11-04 19-11-04
12/8/2004
CL rel on 10-11/CT revision FCT-15 PM on 50
24-11-04 03-12-04 22-02

4 ESS ESS Associates (EC) KR A0449 3000188690


11 kV Switchgear (06 Panels) + 01x 18-11-04
5/25/2005
24-12-04
6/28/2005 6/28/2005 CL rel on 10-12 / Add Indent 340
11kV Gen I/C Panel 23-05-05 01-06-05
15 Bahria Town (Pvt.) Ltd. KR A0450 3000192035 11 x 4-way RMU's 29-11-04 11/29/2004 12/1/2004
16 QESCO KR A0451 3000197089 05 x WIP 12/7/2004 12/22/2004 12/7/2004 25
01x WIP + 02x 11kV VCB I/C/O/G 23-12-04 8BD4 instead of SA2 03-01 /Inspection on
13 Bismillah Textile Mills Ltd. KR A0452 3000196666 12/7/2004 1/6/2005 1/11/2005
Panels 03-01-05 28-03
21-12-04email
16-12-04
20-12-04
01x 11kV VCB I/C Panel + 01x 09-12-04 10-01-05 CL rel on 13-12 / Add indent / CL rel on
7 Sapphire Power Gen. Ltd. RA A0453 3000199555 03-01-
Adapter Panel + 01x O/G Panel 23-02-05 24-12-04 17-03-05 02-03
05
12-01-05
09-03-05
15-03-05
01 x WIP+ 01 x11 kV VCB Owner's Comments/Changes/Indent recd on 27-
27 Bahria University MYS A0454 3000204975 12/14/2004 12/14/2004 12/27/2004 12/29/2004
Panel 12/Inspection on 16-02
30 M. Talib Enterprises KR A0455 3000200218 03x KESC Jr. Panels 12/13/2004 12/21/2004 1/7/2005 App awaited 40
14-01-05(8BK)
07-02-05 (SA2)
19-01- 01-02-05
6.3 kV Switchgear (09 x 8BK20 + 28 16-12-04 05(SA2) As per Design Plan/ CL rel on 07-01 / Add
5 Pioneer Cement MYS/KR A0456 3000200950 email 09-02-05(8BK)
x SA2) 13-04-05 21-04- 20-04-05 indent / Changes in App
06-05-05
05 (Add scope)
(Add scope)
18-01-05
28-12-04 11-01-05
12 KSB / Pak Arab Fertilizers SJA/RFQ A0457 3000201240 01x 6.3kV VCB I/C/O/G Panel-8BD4 12/22/2004 03-03- Changes 08-02 11kV to 6.3 kV
10-02-05 10-02-05
05e-mail
13 Chawla Spinning Mills Ltd. SJA/RFQ A0458 3000202527 01x WCP + 01 x WIP 12/22/2004 12/31/2004 12/27/2004 1/11/2005 TCS Relay changed on 06-04

Relay change on 28-01, rel in Prod on 14-


11-01-2005 04 / Inspected on 09-06 / Drgs revised &
01x WIP + 01x I/C + 02x O/G VCB
6 Kidney Center, Peshawar MYS A0459 3000205185 12/27/2004 1/4/2005 1/5/2005 2/28/2005 12-07- released based on inspection points/Re-
Panels
05 inspected / Fuji make CTUs replaced with
Elabs make

28-01-05 24-02-05email CL rel on 28-01 rev 09-02 / Inspected on


10 Crescent Bahuman Ltd. KR A0460 3000207654 01x 11kV I/C + 01x Adapter Panel 1/6/2005 1/25/2005 2/25/2005
15-02-05 07-03-05 18-05
CL rel on & 19-01 & 07-02 / Clar Meeting
11 Civil Works Organisation SJA/RA A0461 3000204995 01x 11kV I/C/O/G + 01xO/G Panels 1/12/2005 1/19/2005 2/18/2005 3/30/2005 4/1/2005
02-02 / Inspected on 20-05

Page7/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

0 0 48 48 -48
Closed
MV
0 0 39 39 -39 Closed MV
0 0 39.4 39.4 -39.4 Closed MV
0 0 50 50 -50 Closed MV
0 0 34.4 34.4 -34.4 Closed MV
0 0 370.5 370.5 -370.5
Closed
MV
0 0 32 32 -32 Closed MV
100 100 37 37 63 Closed MV
0 0 5.5 5.5 -5.5 Closed MV
0 0 10 10 -10 Closed MV
0 0 24 24 -24 Closed MV
40 20 60 102 102 -42
Closed
MV
0 0 42 42 -42 Closed MV
0 0 25 25 -25 Closed MV
200 100 300 442.3 442.3 -142.3

Closed 8BK

MV
23 23 30 30 -7 Closed MV
52 52 58 58 -6 Closed MV
51 51 68.7 68.7 -17.7

Closed

MV
100 30 130 129.5 129.5 0.5 Closed MV
65 65 168 168.3 -103.3 Closed MV

Page8/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

Email SB D 200
09-
02-05
11kV Switchgear - 25xI/C + 14-02-05 01-04-05 NOA recd on 11-01 / CL rel on 14-01/
7 WAPDA ADP-43 (Lot-1) SJA A0462 3000209980 1/14/2005 1/14/2005 1/14/2005
172xO/G + 07xB/C Panels 04-05-05 O/G 125xO/G+13xI/C+07xB/C inspected
07-04-05
B/C
11-04-05 I/C
28-01-05e-mail
18 Nestle Milkpak Ltd. SJA/RFQ A0463 3000209208 01x WIP 1/14/2005 1/18/2005 1/18/2005 1/31/2005

24-02-05
Clar recd 15-02 / CL for add comps on 25-
07-04-05
03 / App comments replied 30-06 /
03-02-05 27-05-05 11-03-05
Meeting with Alstom 08-07 / Rev CL on
Auto changeover scheme in 06- 21-07-05 26-04-05
8 Alstom Pakistan (Pvt) Ltd. MYS/SJA A0464 3000212008 1/24/2005 NR 21-07 / App comments recd 04-08, replied
existing MV Panels 04-05 09-08-05 10-06-05
on 09-08 with rev drgs / Comments on 26-
25-05-05 20-10-05 11-11-05
08 replied & incorp in drgs / App with
01-11-05
minor changes
16-11-05

14 Pakistan Air Force KR A0465 3000216361 01x 11kV VCB I/C / O/G Panel 1/27/2005 2/23/2005 3/31/2005 4/1/2005 Fresh indent on 14-02 / CL rel on 23-02

21 Resham Textile Mills Ltd. RA A0466 3000215233 11kV Switchgear-8BD4 (06 Panels) 2/1/2005 2/11/2005 2/23/2005 2/23/2005 Changes in CT ratios on 25-02

24 M. K. Sons (Pvt.) Ltd. SJA/RFQ A0467 3000217198 01 x WAPDA Consumer Panel 2/11/2005 2/11/2005 3/10/2005 3/7/2005 CL rel on 15-02 / TCSR changed on 07-04

Hold by SB S on 25-02/Cancelled on 07-


25 Bahria Town (Pvt.) Ltd., Islamabad SJA/RFQ A0468 3000218803 60 x 200kVA PMTs 2/11/2005 2/16/2005 2/24/2005
04
15 Haleeb Foods (Pvt.) Ltd. SJA/RFQ A0469 3000218813 01x WCP 2/11/2005 2/15/2005 3/10/2005 4/11/2005

Changes in specs on 18-02 / CL rel on 21-


11kV Switchgear (07xVCB +
9 Mughal Steel SJA/RA A0470 3000221388 2/11/2005 2/18/2005 3/3/2005 3/25/2005 4/18/2005 02 / SB S go-ahead for SA2 on 14-04 / Bus
01xBPT + 01xNGR)
PT panel revised (600mm)

CL rel on 14-03/CT mtg arrangement


10 Maple Leaf Cement KR A0471 3000221895 MV Panel + Adaptor Panel 2/16/2005 3/4/2005 3/18/2005 4/6/2005 4/6/2005
revised
6.3kV Switchgear - 8BD4 (03 Nos) +
22-02-05 14-03-05
11 Thatta Cement Co. Ltd. (MES) KR A0472 3000222460 01x 6.3kV, 450kVAr Capacitor 3/10/2005 4/4/2005 4/11/2005 Add indent / CL on 21-03, rev on 31-03
10-03-05 21-03-05
Panel 110
18-03-05
25-03-05 I/C
12 Nestle Milkpak Ltd. SJA/RFQ A0473 3000221408 01x I/C + 1xO/G 11kV VCB Panels 2/22/2005 3/5/2005 21-03-05 3/31/2005 CL rel on 08-03
Schematics
13 Loadstar (Pvt.) Ltd. MYS/RFQ A0474 3000224965 01x 7.2kV O/G Panel 2/25/2005 3/4/2005 3/10/2005 3/18/2005 3/22/2005 A1326 Old order/CL rel on 25-02
18-03-05
03x11kV VCB Panels + Loose 30-03-05 28-03-05
14 D. S. Textile Ltd. KR A0475 3000215568 2/22/2005 3/9/2005 3/31/2005 Changes in App / Rev CL on 06-04
Components 05-04-05
Schematics
18-03-05
02x 11kV VCB Panels + Loose 24-03-05 28-03-05
15 D. S. Industries Ltd. MYS A0476 3000216345 2/22/2005 3/12/2005 3/28/2005
Components 05-04-05
Schematics
23 Coca Cola Beverages Pakistan Ltd. SJA/RFQ A0477 3000222996 01xWCP + 06xLoose CTs 2/25/2005 3/1/2005 3/1/2005 3/8/2005 App awaited
02-03-05 02-03-05
31 Arshad Textile Mills Ltd. MYS/RFQ A0478 3000223443 02x 11kV I/C / O/G Panels 2/25/2005 3/2/2005 3/30/2005 Interlocking reqmt on 04-03
11-03-05 11-03-05
14 Karachi Export Processing Zone KR/RFQ A0479 3000222933 01x 11kV O/G Panel 3/7/2005 3/16/2005 3/16/2005 3/30/2005 4/20/2005 CL rel on 14-03 125
01x 11kV VCB I/C/O/G (8BD4) + 14-03-05 16-03-05 CL rel on 14-03 /Add indent for WIP - Go
17 Technical Associates Pakistan MYS A0480 3000225691 3/15/2005 3/15/2005 3/25/2005
01x WIP Panel 24-03-05 25-03-05 ahead on 21-04 29
31-03-2005
26 Muhammad Mushtaq, Muhammad Naseer & Co. MYS/RA A0481 3000228851 02x 11kV VCB I/C/O/G Panels 3/11/2005 3/16/2005 3/17/2005 3/17/2005 CL rel on 14-03/App drgs on 08-04
email

Page9/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

125 50 175 259.2 259.2 -84.2

Closed

MV
21 21 17 17 4 Closed MV
300 300 275.8 275.8 24.2

Closed

MV
21 20 41 43.8 43.8 -2.8 Closed MV
50 50 49.75 49.75 0.25 Closed MV
35 35 32 32 3 Closed MV
12.5 12.5 14 14 -1.5 Closed MV
35 35 29 29 6 Closed MV
94 10 104 148 148 -44
Closed
MV
40 50 90 106.5 106.5 -16.5 Closed MV
50 50 100 85 85 15
Closed
MV
41 25 66 80.75 80.75 -14.75
Closed
MV
25 25 35 35 -10 Closed MV
70 70 87 87 -17
Closed
MV
46 46 62 62 -16
Closed
MV
35 30 65 15 15 50 Closed MV
41 41 19.4 19.4 21.6 Closed MV
35 35 64 64 -29 Closed MV
41 41 10 10 31 Closed MV
41 41 18.4 18.4 22.6 Closed MV

Page10/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D
21-03-05
12- TCS Relay deleted / CL rel on 21-03 /
11 kV Switchgear (06xSA2 + 18-03-05
15 Lucky Energy, Karachi SJA/RA A0482 3000230152 3/11/2005 04-05 4/29/2005 5/6/2005 Changes on 20-04 & 29-04 / Trip circuit
01xBPT Panels) 06-04-05
28-04-05 Supervision changes to be done
02-05-05 30
20-05-05 Clar Meeting with EC on 04-04 / CL rel on
16 DHA Lahore - Phase VI SHA A0483 3000231988 01x 4-way RMU + 04x 100kVA PMTs 3/18/2005 4/7/2005 5/24/2005
19-07-05 07-04 / App with changes 30

11kV Switchgear 15-04-05


22-03-05 30-03-05 06-04-05 20-04-05 CL rel on 01-04 / Add indent / Changes on
17 Nishat Chunian Ltd. - I KR A0484 3000231561 03xI/C+01xB/C+04xO/G+01xBPT email
17-06-05 20-06-05 30-06-05 30-06-05 24-06
Panel + 01x11kV VCB Synch. Panel 12-07-05

18 State Life of Pakistan MYS A0485 3000233483 01x 11KV I/C /O/G Panel 3/24/2005 3/25/2005 3/29/2005 4/4/2005 3/29/2005 CL on 29-03 20
11kV Switchgear (02xI/C / O/G
19 Janana De Malucho Textile MYS A0486 3000234193 3/25/2005 3/31/2005 4/1/2005 NR 4/4/2005
Panels)
CL rel on 08-04 rev 28-04 / App with
08-04-05 Changes/ CT ratio changed to 1200/5A on
20 Cherat Cement MYS A0487 3000215827 6.3kV Switchgear-8BK (08 Panels) 3/29/2005 4/6/2005 4/19/2005 5/17/2005
28-04-05 07/05/05 / O/G VCBs changed to 1250A by
PTSI

18-04-05 26-05-05 04- CL rel on 18-04 / Meeting with Customer


11kV Switchgear (09xSA2+01xBPT 20-04-05
21 International Industries Ltd. KR A0488 3000238904 4/6/2005 20-05-05 07-05 12-07- 7/7/2005 & Consultants on 18-05 / Rev CL on 20-05
Panels) 20-05-05
08-06-05 05 / Meeting with customer 28-06

15-04-05
RMUs
19-04-05 20-04-05
11kVSwitchgear
WIP+11kV WIP+11kV+
(01xWIP+01xI/C+02xO/G Panels + 08-04-05 19-04-05
22 Glamour Developers (Pvt.) Ltd. MYS/SHA A0489 3000240107 27-04- 5/10/2005 RMU CL for RMUs on 15-04 / Add indent
11x200kVA & 01x100kVA PMTs + 07-06-05 09-06-05
05 16-05-05
02x4-Way RMUs) +01xWCP
PMT PMTs
10-06-05
WCP

04-05-2005
23 Chenab Engineering RFQ/SJA A0490 3000240259 01xWIP + 01xWCP 4/8/2005 4/11/2005 4/14/2005 5/5/2005
WCP

CL rel on 13-04 / Changes as per


inspection by KESC on 14-11 /
25x KESC Jr Panels - I/C w/o Successfully type-tested at Rawat on 12-
24 K.E.S.C. KR A0491 3000253966 4/12/2005 4/13/2005 4/13/2005 4/13/2005
Metering 12 & 13-12 for BIL, PF, SC & at SB works
from 28-30/12 for Temp rise & Mech
endurance

25 Karachi Golf Club SHA A0492 3000253969 01x 400kVA PMT 4/13/2005 4/25/2005 4/26/2005 6/3/2005
26 IESCO KR A0493 3000254703 37x 4-Way RMUs 4/14/2005 NR 4/15/2005 NR 4/15/2005
01xI/C+02xO/G 11kV VCB Panels -
27 Azgard Nine Ltd. KR A0494 3000256591 4/21/2005 4/27/2005 4/26/2005 4/27/2005 4/27/2005 CL rel on 26-04/As-built sent
8BD4

28 Pakistan Mineral Development Corporation KR A0495 3000257090 01x WIP 4/21/2005 NR 4/21/2005 NR 4/21/2005 CL rel on 21-04

29 Ashfaq Textile Mills Ltd. KR/RFQ A0496 3000257651 01x WIP + 01x VCB Owner's Panel 4/27/2005 4/29/2005 4/29/2005 5/11/2005 5/23/2005 CL rel on 29-04/CT changed

03-05-05
28-04-05 04-05-05 11-05-05 03-05-05 CL rel on 03-05 / CT ratio for WIP on 11-05
30 Bhanero Textile Mills Ltd. KR A0497 3000257527 11kV Switchgear + 01xWCP 5/10/2005
08-06-05 13-06-05 09-06-05 09-06-05 / Add indent / WCP deleted
WCP
Al Noor MDF Board Industries
31 MYS/RA A0498 3000262987 11kV & 3.3kV Switchgear 5/3/2005 5/10/2005 5/31/2005 6/16/2005 6/20/2005 Meters shall be provided by PTD-SE
(PTD SE)
01x WCP + 01x WIP + 01x VCB
32 Citropak Ltd. MYS A0499 3000262516 5/5/2005 5/11/2005 5/10/2005 5/18/2005 5/18/2005
Owner's Panel

Page11/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

150 150 161 160.8 -10.75


Closed
MV
36 36 36.5 36.5 -0.5 Closed MV
117 25 142 101 101 41
Closed
MV
23 23 9 9 14 Closed MV
41 41 32.4 32.4 8.6 Closed MV
103 103 262 261.9 -158.9
Closed 8BK
MV
116 116 160 160 -44
Closed
MV
125 125 98.4 98.4 26.6

Closed

MV
51 51 20 20 31 Closed MV
21 65 86 92.25 92.25 -6.25

Closed

MV
20 20 34.5 34.5 -14.5 Closed MV
20 20 18 18 2 Closed MV
41 41 27 27 14 Closed MV
21 21 10 10 11 Closed MV
41 41 12 12 29 Closed MV
115 19 96
115 19 Closed
MV
50 50 85.3 85.3 -35.3 Closed MV
72 72 18.4 18.4 53.6 Closed MV

Page12/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

16-05-05
M/s Rousing Engg Services / M/s A. A. Spinning 01x I/C + 04xO/G Panels - WAPDA 10-05-05 Formal Indent on 12-05 / Changes as per
33 RFQ/SJA A0500 3000267773 5/9/2005 5/10/2005 5/16/2005 10-06-05
Mills Ltd. P44:96 09-06-05 meeting with Customer
21-06-05
11-05-05
01x 11kV VCB O/G Panel + 01x Add indent / Rev indent - 01xO/G panel
34 Bismillah Textile Mills Ltd. MYS A0501 3000264770 24-05-05 5/13/2005 6/10/2005 6/22/2005 6/23/2005
VCB Trolley reqd instead of owner's panel
07-06-05
35 AJK Electricity Dept. RFQ/SJA A0502 3000266732 01x WCP 5/11/2005 5/13/2005 5/13/2005 NR 5/24/2005 Inspected on 08-08
27-05-05
36 Century Paper & Boards Mills Ltd. KR A0503 3000269891 01x 11kV VCB I/C / O/G Panel 5/20/2005 5/24/2005 6/1/2005 6/7/2005 CL rel on 27-05
07-06-05
01x KESC Jr with Prot w/o
37 Babar Metal Industries KR A0504 3000272953 5/23/2005 5/24/2005 5/24/2005 5/24/2005
Metering
04x 6.6kV, 200kVAr Capacitor 04-07-05
38 PARCO / PS1 Korangi KR A0505 3000268318 5/23/2005 5/26/2005 5/30/2005 7/1/2005
Banks 29-07-05
02x KESC Jr Panels (with & w/o
39 Rohaan Enterprises / Kidney Centre Karachi KR A0506 3000273034 5/25/2005 5/26/2005 5/25/2005 NR 5/25/2005
metering)
40 Lucky Textile Mills Ltd. MYS A0507 3000267718 02x 11kV VCB I/C/O/G Panels 5/25/2005 5/27/2005 6/1/2005 6/7/2005 6/10/2005
CDG-61 instead of 2TJM11 - confirmed by
44 CPC, DG Khan MYS A0508 3000276806 02xI/C+04xO/G 11kV VCB Panels 6/1/2005 6/8/2005 6/10/2005 7/18/2005 7/27/2005
PTD ISB
01xI/C / O/G + 01xI/C + 02xO/G
45 Tayyeb Textile Mills KR A0509 3000276293 6/7/2005 6/7/2005 6/14/2005 6/15/2005
11kV Panels
01xKESC Jr. with Prot w/o
46 Al-Pak Ghee Mills KR A0510 3000278107 6/7/2005 6/8/2005 6/22/2005 6/22/2005 Inputs recd 22-06
Metering
05xI/C+15xO/G VCB trolleys as per 01-07-05 Resubmitted for approval / w-coil+acc
47 HESCO MYS/RA A0511 3000285529 6/16/2005 6/27/2005 9/26/2005
WAPDA specs P44:96 05-09-05 added on 24-10 in O/G VCBs
48 Tariq Glass Industry (PTD SE) MYS A0512 3000286314 01xI/C VCB trolley - 8BD4 6/20/2005 6/21/2005 6/24/2005 7/22/2005 7/26/2005

01-07-05
04-07-05 11-07-05 05-08-05
11kV Switchgear - 16x8BD4 + 13-07-05SLD J1,J2&J3
22-06-05 04-07-05 03-08-05JI&J2 CL rel on 04-07 / CL for add indent on 16-
26-07-05J1&J2
12x8BK Additional 05xI/C + 25xO/G 15-08-05J3 27-09-05
49 M/s Packages Ltd. / Bulleh Shah Paper Mills Project KR A0513 3000287128 01-09-05 15-09-05 02-08-05J3
15-09-05 09 / Change of CT ratio in 02xO/Gs on 18-
(8BD4) Additional 04xI/C + 16xO/G 22-08-05 02-11-05
21-02-06 28-02-06 J3(PTSI) 05
(8BD4) 16-09-05 J3
Add indent 26-09-05 20-03-06
16-03-06

11kV Switchgear - 8BD4


50 Saif Textile Mills KR A0514 3000288439 6/23/2005 6/30/2005 7/12/2005 08-08-05email 8/9/2005 Clar recd 08-07
03xI/Cs+04xO/Gs+BPT
12-07-05
51 M/s Honda Atlas Cars (Pakistan) Ltd. MYS/RA A0515 3000288772 11kV Switchgear - 01xI/C+03xO/G 6/24/2005 6/30/2005 6/30/2005 7/13/2005
02-08-05
M/s The Thal Industries Corp. Ltd. / Layyah
RA A0516 3000288538 01x6.6kV I/C / O/G VCB Panel - 8BD 6/27/2005 7/7/2005 7/12/2005 8/2/2005 8/3/2005
Sugar Mills
06-07-05
M/s Victor Pipe Industries - Afghanistan SJA A0517 3000292427 01x2-way 24kV RMU, Scheme 20 6/29/2005 7/4/2005 8/30/2005 8/16/2005 Dim updated
08-07-05
Pioneer Cement KR A0518 3000294434 6.3kV Switchgear - 04xSA2 7/1/2005 7/7/2005 7/4/2005 7/7/2005 7/8/2005

Customer comments recd on 22-08


clarified on 22-08, Go-ahead for release in
29-07-05 prod / 01xO/G to be aligned with 6.3kV
11kV Switchgear - 01xWIP + 12-08-05 switchgear, S. O. No. 3-347560 - A0552
FFC MYS/RA A0519 3000288778 7/4/2005 7/20/2005 9/1/2005 9/1/2005
08xSA2 + Loose Components 02-09-05 with new CT ratio / Relay changed to
Schematics CDG61 from P124 / Informal meeting @
SB with customer dtd 02-11 / Earthing
switches reqd as per email dtd 17-01

Page13/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

60 66 -6
60 66 Closed
MV
40 22.3 17.7
30 10 22.3 Closed
MV
21 21 10 10 11 Closed MV
21 21 40 40 -19 Closed MV
21 21 15 15 6 Closed MV
21 21 83.25 83.25 -62.25 Closed MV
42 42 17 17 25 Closed MV
21 21 33.4 33.4 -12.4 Closed MV
42 42 64 64 -22 Closed MV
63 63 20 20 43 Closed MV
21 21 10 10 11 Closed MV
20 20 59 59 -39 Closed MV
10 10 10 10 0 Closed MV
510 576.3 -66.25

250 260 576.3 Closed 8BK

MV
0 51 51 -51 Closed MV
0 57 57 -57 Closed MV
0 26 26 -26 Closed MV
0 49.75 49.75 -49.75 Closed MV
0 16 16 -16 Closed MV
112 183.3 -71.13

112.13 183.3 Closed

MV

Page14/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

Formal indent on 24-10, S. O. # on 21-10 /


05-07-05
PESCO RFQ A0520 3000354645 03x11kV O/G Panels - WAPDA 7/4/2005 12/27/2005 10/21/2005 Customer P.O. recd on 17-10, Qty
21-07-05
changed to 03Nos.
22.07.05
(Item 1)
01xWCP+01xWIP+01xI/C+02xO/G -
Blessed Textile Mills Ltd. - Unit No. 3 MYS A0521 3000289586 7/5/2005 7/8/2005 7/12/2005 7/19/2005
8BD4
19-07-05
(Item 2)
30/08/2005
Formal indent & S. O. # on 10-11 / Drgs
23-09-05
approved during meeting with customer
SP&EW KR A0522 3000348466 6.6kV Switchgear - 28xSA2 8/17/2005 8/30/2005
SLD/FV/CLs/
24-11-05
05-09 to 09-09, resubmitted for formal app 300
SB D
FPs / CL rel on 12-09
12-09-05
SUPARCO MYS A0523 3000296423 01x I/C / O/G VCB Panel 7/12/2005 7/15/2005 7/14/2005 8/2/2005 8/3/2005
PSM KR A0524 3000287792 03x VCBs 7/12/2005 7/13/2005 7/15/2005 7/27/2005 7/27/2005 CL on 15-07-05

11kV Switchgear - 01xKESC Grid


O/G+03xKESC Jr+01xI/C+04xO/G - 18-07-05 Meeting with consultants on 28-07 / CL rel
Siddiqsons Tin Plate Ltd. KR A0525 3000297394 7/25/2005 8/11/2005 26-08-05Email 8/26/2005
SA2 + 01xAdapter Panel for KESC 24-01-06 on 05-08 / Energy Meter changed
Grid S/S

CL rel on 28-07 / Relay changed to CDG


D. S. Industries Ltd. RFQ A0526 3000302535 01xI/C+01xO/G 11kV VCB Panels 7/19/2005 7/26/2005 7/28/2005 8/9/2005 8/9/2005
61 on 22-08 / CC box added on 18-10

HESCO RFQ A0527 3000303957 16xI/C+48xO/G WAPDA P44:96 7/19/2005 7/22/2005 7/21/2005 10/3/2005 9/26/2005 CL rel on 21-07
CL rel on 21-07 / Approved drgs recd on
Bahria Town (Pvt.) Ltd., Rawalpindi KR A0528 3000304924 04x 4-Way RMUs 7/21/2005 7/21/2005 7/26/2005 12-08-05email 8/23/2005
17-08
01x 11kV VCB I/C Panel for
Nagina Cotton Mills - Kotri KR A0529 3000304609 7/21/2005 7/28/2005 8/4/2005 8/16/2005 8/16/2005 Site visit on 01-08 / CL rel on 04-08
Jenbacher Generator

01x I/C + 05xO/G Panels - WAPDA PMT CL rel on 04-08 / EM Communciation


02-08-05
P44:96 + 01x100kVA PMT Standard 27-07-05 09-08-05 13-09-05email 15-09-05 matter to be considered by SB-LHR /
M/s Rousing Engg Services / M/s Dost Steel (Pvt.) Ltd.RFQ A0530 3000302543 04-08-05
w/o metering + 01xCapacitor O/G 21-06-06 26-06-06 13-07-06 17-07-06 Changes on 09-06 (ES, meters) / Add
29-06-06
Panel indent

DHA Lahore / Electrification Works of DHA Phase V SHA A0531 3000303414 02x 400kVA PMTs 7/27/2005 NR 8/12/2005 8/12/2005 CL rel on 10-08

28-07-05
See (Item1) 02-09-05
CL rel on 28-07(KESC Grid Panel) & 08-08
01xKESC Grid O/G + remarks 05-08-05 10-11-05 08-09-05
M/s Abbott Laboratories (EC) SJA/RA A0532 3000304671 7/27/2005 (Bal) / Site visit on 30-08 / All equipment
01xI/C+01xB/C KESC Jr Panels 05 -08- (Item 2&3) KESC Grid 21-10-05
except KESC Grid panel dispatched
05 26-10-05 Panel
BC+Adaptor

11-08-05
01xWIP + 02x11kV VCB CT ratio 100/5A reqd for WIP as per letter
PAEC / NMC-1 RFQ A0533 3000309035 7/28/2005 8/11/2005 06-10-05 9/13/2005 9/14/2005
O/G+01xBPT Panels recd 03-10
WIP
01xWIP + 01x11kV VCB 13-09-05
Pakistan Railways Carriage Factory, Islamabad RA A0534 3000309089 7/28/2005 8/13/2005 8/10/2005 9/14/2005
I/C+04xFLBS O/G Panels 26-09-05WIP
Revised indent / CLs on 08-09 / PMT
03-08-05 order cancelled / Surge Arr type changed
Maple Leaf Cement Factory KR A0535 3000298506 02xI/C+06xO/G+2xO/G 8/24/2005 9/8/2005 21-10-05email 10/25/2005
19-08-05 to Siemens/ Cu work revision for Cable
mounting

U. S. Embassy, Islamabad RFQ A0536 3000310158 01xWIP 8/3/2005 NR 8/5/2005 8/17/2005 CL rel on 05-08
FESCO SHA A0537 3000310190 21x100+24x200kVA PMTs 8/3/2005 NR 8/8/2005 CL rel on 09-08
S. O. # on 15-08, Formal indent recd on
M/s Muhammad Aslam RFQ A0538 3000317305 01xWIP 8/1/2005 8/5/2005 08-08-05email 8/17/2005
16-08

Page15/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

33 39 -6
33 39 Closed
MV
0 43 -43
43 Closed
MV
117 260.5 -143.6
116.88 260.5 Closed

MV
20 20 13 13 7 Closed MV
10 10 17 17 -7 Closed MV
133.6 100 33.6
83.6 50 100 Closed

MV
0 36 -36
36 Closed
MV
68.75 50 119 82.75 82.75 36 Closed MV
0 28 28 -28 Closed MV
0 55.75 55.75 -55.75 Closed MV
80 104.5 -24.5
65 15 53 5 31.5 15 Closed
MV
0 66.8 66.8 -66.8 Closed MV
0 165.8 -165.8

165.8 Closed

MV
18.7 36 -17.3
18.7 36 Closed
MV
60 60 47 47 13 Closed MV
192.5 257.8 -65.25
82.5 110 257.8 Closed
MV
20.6 20.6 28.75 28.75 -8.15 Closed MV
12 12 9.75 9.75 2.25 Closed MV PMT
20.6 20.6 11 11 9.6 Closed MV

Page16/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

Formal indent recd on 16-08 / CL rel on


Technical Associates Pakistan / Abu Dhabi
RFQ A0539 3000315161 01xWIP + 01xOwner's Panel 8/15/2005 8/16/2005 9/16/2005 9/20/2005 16-08 / On-Hold since 23-08, go-ahead on
Palace Rahimyar Khan
13-09 with trafo rating changed

01xWIP + 01x11kV VCB CO Panel + 17-08-05 26-08-05 25-08-05 01-09-05 CL rel on 25-08 / Energy meter reqd in
Gadoon Textile Mills Ltd. RA A0540 3000315535 9/2/2005
01x11kV I/C / O/G Panel 06-09-05 08-09-05 08-09-05 12-09-05 WIP as per App comments / Add indent

Olympia Chemicals Ltd. SJA/KZ A0541 3000316684 01x 6.3kV VCB O/G Panel-8BD4 8/17/2005 8/29/2005 8/25/2005 12-09-05email 9/13/2005 CL rel on 23-08

17-08-05 30-08-05 Formal indent on 10-10 / S.O. # on 07-10 /


IESCO SHA A0542 3000346543 31x 63kVA PMT NR NR
16-02-06 01-03-06 CL rel on 23-08 / Add indent for 06Nos.

17-08-05 30-08-05 Formal indent on 11-10 / S. O. # on 07-10 /


IESCO SHA A0543 3000346560 19x 100kVA PMT NR NR
16-02-06 01-03-06 CL rel on 19-08 / Add indent for 04Nos.

24-10-05 11-11-05 Formal indent & S. O. # on 10-11 / Trafo


IESCO SHA A0544 3000349209 15x 400kVA PMT 8/17/2005 Prototype Prototype drg recd on 07-09 / WAPDA inspection on
03-04-06 26-04-06 27-28/03
24-10-05 11-11-05 Formal indent & S. O. # on 10-11 / Trafo
IESCO SHA A0545 3000349180 05x 630kVA PMT 8/17/2005 Prototype Prototype drg recd on 07-09 / WAPDA inspection on
03-04-06 26-04-06 27-28/03
Formal indent recd on 24-08 / CL rel on
01xWIP + 01x11kV VCB I/C / O/G 22-08-05 19-09-05
Wood World Plywood Industries SJA/RFQ A0546 3000320476 6/30/2006 8/31/2005 9/16/2005 26-08 / Rev indent - modif reqd in I/C / O/G
Panel 28-06-06 30-06-06
Panel (SA2 to 8BD4)
MV Switchgear - 03x11kV 23-09-05
Drgs resubmitted to SB S for review &
Peoples Steel Mills Ltd. / Extension SJA/KZ A0547 3000322766 VCB+02x5kV VC Panels + Cable 8/24/2005 9/24/2005 12-10-05 10/29/2005 11/28/2005
release for App / CL rel on 12-10
Connection Box 28-10-05
15-09-05email
Gulistan Textile Mills Ltd. - Unit 4 RA A0548 3000327455 02x11kV VCB Manual CO Panels 8/24/2005 9/6/2005 9/6/2005 29-09-05 9/7/2005 Based on earlier order

15-09-05email
Gulshan Weaving Mills Ltd. - Unit 2 RA A0549 3000326254 02x11kV VCB Manual CO Panels 8/24/2005 9/6/2005 9/7/2005 29-09-05 9/7/2005 Based on earlier order

Components finalised with S / Meeting


with customer on 22-09 / Site visit on 21-
02xI/C+05xO/G(MT)+3xO/G(TR)
PARCO - Shikarpur Revamp Project KR A0550 3000327376
+01xBC
9/6/2005 9/24/2005 10/6/2005 11/7/2005 11/13/2005 /
11 Differential CT conf recd on 27-02 /
Buchholz+Schematics+TP+WL+LT
comptt+Assembly on 24.04.06

16-09-05 05-01-06 CT ratio changed on 05-01, Resubmitted,


Umar Spinning Mills (Pvt.) Ltd. KR A0551 3000332848 01xWIP+01xI/C&O/G SA2 Panel 9/12/2005 9/16/2005 1/6/2006
05-01-06 email Approved
6.3kV Switchgear - 01xI/C + 03xO/G Earthing Switches reqd as per email dtd
FFC SJA/RA A0552 3000347560 9/16/2005 9/21/2005 9/23/2005 12/20/2005 12/27/2005
Panels 17-01
30-09-05
26-10-05
11kV Switchgear - 07xSA2+BPT 19-09-05 06-10-05 20-10-2005
M/s Interloop (Pvt.) Ltd. SJA/RA A0553 3000336251 9/28/2005 07-04-06 Changes in App/Additonal Indent
Panels + Additional Indent 06.03.06 Schematics 27.03.06
07-04-06
27.03.06

Punjab Industrial Estate (Sunder Industrial 62x4-Way+29x3-Way RMUs + S. O. # on 14-11 / Qty of RMUs revised by
KR/KZ A0554 3000348705 21-09-05 9/27/2005 9/23/2005 10/28/2005 11/2/2005
State) 01xWIP + 01xWCP EC on 24-09
11kV Switchgear - 10xI/C + 20xO/G
WAPDA ADP-43 Variation Order RFQ A0555 T-011 9/21/2005 9/23/2005 NR 9/27/2005
Panels
01xWIP + 01x11kV VCB I/C / O/G
Zulfiqar industries Ltd. KR A0556 3000335402 9/22/2005 9/30/2005 9/27/2005 10/20/2005 10/24/2005 CT, Ammeter ratio recd in App
Panel
01xI/C / O/G + 01xI/C + 02xO/G
Interloop (Pvt.) Ltd. RFQ A0557 3000337622 Panels 9/27/2005 9/30/2005 10/4/2005 10/24/2005 10/25/2005 Minor changes in App
8BD

Page17/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

40 26 14
40 26 Closed
MV
40 41 -1
40 41 Closed
MV
20.6 20.6 24 24 -3.4 Closed MV
13 18.8 -5.8
13 18.8 Closed PMT
MV
17 24.8 -7.8
12 5 24.8 Closed PMT
MV
12 11 1
12 11 Closed PMT
MV
11 3 8
11 3 Closed PMT
MV
37.4 36 1.4
37.4 36 Closed
MV
118.5 140.8 -22.25
93.5 25 140.8 Closed
MV
40 40 41 41 -1 Closed MV
40 40 26 26 14 Closed MV
143.5 192 -48.5

93.5 50 192 Closed

MV
37.4 37.4 35 35 2.4 Closed MV
46.75 40 86.75 109 109 -22.25 Closed MV
125 156 -31
60 65 156 Closed
MV
101.2 101.2 93 93 8.2 Closed MV
65 65 84 84 -19 Closed MV
40 40 39 39 1 Closed MV
40 68.75 -28.75
40 68.75 Closed
MV

Page18/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

08-11-05
05-10-05 21-11-05 S. O. # on 14-11 / CL for Kiosk rel on 11-11
HT Panel
HT Panel HT Panel / SB D Details for HT Panel & Kiosk /
01xO/G Panel + 03x25kVA Kiosk 02-01-06
Sialkot Int'l Airport Ltd. (EC) SJA/RFQ A0558 3000345661 9/27/2005 10/5/2005 08-11-05 01-03-06 Kiosk drgs resubmitted / Meeting with
with RMU Scheme 10 Kiosk
28-02-06 Kiosk NESPAK on 03-05-06/Change received on
10-05-06
17.08.06 17.08.06 21.07.06
21.07.06

10-10-05 14-10-05
01xWIP + 01xI/C+02xO/G 11kV VCB CL rel on 11-10 / Go-ahead for
Al-Rahim Textile Industries KR A0559 3000336850 10/10/2005 10/12/2005 FP, FV FP, FV 10/18/2005
Panels manufacturing on 17-10
11-10-05 19-10-05

01xI/C+04xO/G+2xB/C WAPDA Grid 19-10-05 SLD/FV/Assembly/FP submitted to TD on


Sitara Chemical Industries RA A0560 3000346424 10/12/2005 10/14/2005 21-11-05 01-11-05email 12/12/2005
Panels Schematics/TPs
14-10

24-11-05
29-06-06
11kV Switchgear - 113x15kV 01-12-05 26-06-06
K.E.S.C. / 2480-02 SJA A0561 3000403028 10/13/2005 11/1/2005 07-12-06 Formal indent, S. O. # recd on 28-03
Simoprime Panels 09-01-06 email
RCP
05-05-06

??
HT Panel 24-04-06
02x11kV O/G VCB Panels (8BD4) + PMT Alternative I reqd as per email from
NTDC-WAPDA (TD) / Sahiwal S/S RFQ/SHA A0562 3000352782 10/19/2005 10/27/2005 22-11-05 25-04-06
02x630kVA PMTs SB S Ex on 22-11 / NESPAK comments
PMTs PMT
20-01-06

03xKESC Jr +
Innovative Engineering / Hilton Pharma Ltd. KZ A0563 3000352299 10/24/2005 10/27/2005 10/31/2005 11/30/2005 11/7/2005 CL rel on 24-10
01x11kV I/C/O/G Panel-8BD4
21-11-05 P124 instead of CDG 61 relay, Fuji instead
M/s Royal Palm Golf & Country Club RFQ A0564 3000352861 01x11kV I/C/O/G Panel-8BD4 10/24/2005 10/27/2005 10/28/2005 11/23/2005
05-12-05 of Elabs CTU reqd in App

2x(1000:2000/5/5A)+
11kV Switchgear - 15xI/C + 68xO/G 01-11-05
WAPDA ADP-61 SJA/RFQ A0565 3000359838 10/25/2005 10/28/2005 11/1/2005 12/7/2005 13x(1600:800/5/5A) / Formal indent & S.O.
+ 12xCoupler Panels 29-12-05
No. on 08-11 / Approval through letter

08-12-05
03-01-06 Changes in App, Resubmitted / App with
15-11-05
Prefab Systems (Pvt.) Ltd. (Expo Centre) RA A0566 3000356489 01xI/C+02xO/G 11kV VCB Panels 11/2/2005 11/10/2005 16-01-06 26.01.06 comments in Meeting with NESPAK on
18-01-06
17-01-06 02- 17-01
02-06

09-12-05 Site visit on 21-11 / CL for KESC Grid I/C


Annoud Power Plant SJA A0567 3000361720 03xKESC Grid I/C Panels 11/7/2005 11/15/2005 12/30/2005 1/20/2006
02-01-06 rel on 09-12/Spares ordered
01x11kV O/G Panel+01x11kV O/G
Black Gold Industries KZ A0568 3000363899 11/14/2005 11/18/2005 11/18/2005 NR 11/21/2005
VCB Trolley - WAPDA
Lucky Cement Ltd / KHI Project RA A0569 3000354588 02x6.3kV I/C / O/G Panels 11/14/2005 11/23/2005 12/13/2005 12/14/2005 App drgs recd on 16-01

01x11kV I/C & O/G Panel - 8BD4 + 30-11-05


Nestle Pakistan Ltd., Sheikhupura KR A0570 3000370942 11/24/2005 11/30/2005 11/28/2005 11/30/2005 Revised drgs for existing Panel pending
Loose Components email

27-12-05
CL rel on 07-12 / Additional Indent
01xWIP + 01xI/C+02xO/G 11kV 30-11-05 02-12-05 06-01-06
Qaim Automative (Mfg) Pvt. Ltd. KR/MAB A0571 3000373634 12/12/2005 3/15/2006 received on 02-02/FIT Report Received
Panels + 01x I/C Panel 06-02-06 08-02-06 email
19.06.06
13-03-06

01x15kV KESC Grid O/G + 16-12-05


Bolan Castings Ltd. KR/RA A0572 3000377286 03xKESC Jr + 01x 11kV I/C/O/G - 12/1/2005 12/9/2005 12/9/2005 Letter 12/12/2005 CL rel on 02-12
SA2 Panels 03-01-06
11kV Switchgear (14x8BD+01xBPT)
Azgard Nine Ltd. KZ A0573 3000378126 + 12/2/2005 12/12/2005 12/19/2005 1/16/2006 12/26/2005 CL rel on 06-12 rev. 08-12
Loose Components
01x3-Way RMU (WAPDA Specs. Formal indent & S.O. # recd on 27-12 / CL
M/s Khayaban Enterprises KR A0574 3000388845 12/7/2005 12/9/2005 1/23/2006 12/14/2005
DDS-46:90) rel on 09-12

Page19/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

408.7 450.3 -41.6

318.7 90 418.3 10 5 4 13 Closed KIOSK

MV
40 51 -11
40 51 Closed
MV
27.5 174.8 -147.3
27.5 174.8 Closed
MV
828 1008 -179.8
678.13 150 444 46 32.75 127 83.8 68.5 77.8 20 15 69.8 23.3 Running
MV
27.5 178 -150.5
27.5 178 Closed PMT

MV
37.4 37.4 39 39 -1.6 Closed MV
18.7 18.7 42 42 -23.3 Closed MV
135 182 -47
110 25 182 Closed
MV
86.75 101 -14.25
46.75 40 101 Closed

MV
34.375 100 134 209 209 -74.63 Closed MV
33 33 61 61 -28 Closed MV
20.57 20.57 13 13 7.57 Closed MV
20.6 28 -7.4
20.6 28 Closed
MV
80.57 114 -33.43
20.57 60 104 10 Closed
MV
64.9 85.75 -20.85
64.9 85.75 Closed
MV
187 171.8 15.25
187 171.8 Closed
MV
20 20 10 10 10 Closed MV

Page20/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

01xWIP + 01x11kV I/C/O/G Panel - 20-12-05


M/s Riffino Rice Mills Pvt. Ltd. KR/MAB A0575 3000380597 12/9/2005 12/13/2005 12/14/2005 12/14/2005 CL rel on 09-12
8BD4 email
01x6.3kV, 1250A, 31.5kA VCB 16-12-05 03-01-06
Fauji Cement Company Ltd. KR/MAB A0576 3000379552 12/8/2005 12/10/2005 2/15/2006 CL rel on 16-12
trolley + Fixed contacts 05-01-06 05-01-06

3.3kV Switchgear - 26-12-05


06xI/C+09xO/G+01xCO+01xI/C/O/G 15-12-05 email
+01xBC+05xContactor Panels + 14-12-05 16-12-05 06-01-06 CL rel on 15-12 rev. 16-12 / Changes in
M/s Honda Atlas Cars Extension Project KR/RA A0577 3000380721 12/22/2005 2/3/2006
05x60kVAr Capacitor Bank + 04-01-06 03-01-06 email App / Add indent
Modifications in existing panels of 06-01-06 27-01-06
SS-1 + 01x I/C / O/G Panel email

02x11kV FLBS Panels with CC Box


Coca Cola Beverages Pakistan Ltd. RA A0578 3000381961 12/15/2005 12/23/2005 12/26/2005 1/17/2006 1/20/2006 CL rel on 26-12
& Loose CTs
(20+20)x 11kV WAPDA O/G VCB 03-01-06
M/s Perfect Electromek Pakistan RFQ A0579 3000386861 12/19/2005 12/22/2005 12/23/2005 1/3/2006 Add indent
Trolleys 21-03-06
07x KESC Jr Panels + 01xKESC Jr 26-12-05
Highland Traders KR/MAB A0580 3000388647 12/28/2005 1/18/2006 NR 1/18/2006 CLs rel 0n 21-12, 05-01 & 06-01
+ 01x15kV KESC Grid Panels 29-12-05
07-04-06
CL rel on 27-12, 30-12, revised 02-01/PT
Clariant Pakistan KR/MAB A0581 3000387324 01x11kV Panel-8BD4 12/26/2005 12/29/2005 1/3/2006 Email 20-04- 4/7/2006
mounting arrangement provided by SB-D
2006
01xWIP + 01x 11kV I/C / O/G Panel- 19-01-06
M/s Super Tech Feeds KR/MAB A0582 3000390122 12/29/2005 1/2/2006 12/30/2005 12/30/2005 CL rel on 28-12, revised 29-12
8BD4 email
11kV Switchgear - 06xSA2+01xBPT 06-01-06 19-01-06 CT ratio changed in App from 400/5/5 to
M/s Suraj Cotton Mills Ltd. KR/MAB A0583 3000391920 1/4/2006 1/6/2006 1/27/2006
Panels 27-01-06 email 300/5/5 in 02xO/Gs

Dewan Cement MR/SJA A0584 3000389045 6.3kV VCB Trolley Contact Arms 12/27/2005 12/30/2005 12/30/2005 Handled by SB-D/Site visit on 15-16/02

04x Mounting of Earthing Switches


British High Commission - Islamabad SJA A0585 3000393131 1/2/2006 1/25/2006 1/25/2006 Site Modification Work
in existing Switchgear

CL rel on 06-01 / Resubmitted / CT


01xI/C / O/G Panel with Outdoor 18-01-06 17-02-06
PARCO RFQ A0586 3000393145 1/3/2006 1/18/2006 3/13/2006 approved with 300/5/5/5A , 5P10/PT re-
Housing ?? 24-03-06
ordered
Platinum Pharmaceuticals (Pvt.) Ltd. KR/MAB A0587 3000394366 03x KESC Jr Panels 1/5/2006 1/17/2006 1/18/2006 1/18/2006 CL rel on 06-01
01x11kV I/C Panel-8BD4 +
Blessed Textile Mills Ltd. KZ A0588 3000390206 Accessories for mofifications in 1/6/2006 * 1/31/2006 2/22/2006 2/24/2006
existing panels

18-04-06
07x5-Way (Sch. 82)+01x3-Way (MDS)
18-01-2006 24.03.06 Meeting with Consultant on 21-03 / CLs
K.E.P.Z. / Phase II SJA/RFQ A0589 3000394334 (Sch. 32) RMUs + 02x11kV Panels 1/4/2006 * 26-04-06
17-04-06 25-04-06 (Partial) rel on 24-03 / SS6 deleted
(KESC Grid Design) 27-04-06
FLBS, RMUs

01x11kV I/C (8BD4) + 01xBPT


Bhanero Textile Mills Ltd. MAB A0590 3000390102 Panels + Accessories for 1/6/2006 2/6/2006 2/20/2006 Assembly, LT Comptt, WL to be made
mofifications in existing panels

Rahimbux Group of Cos. - Arain Mills Ltd. (PTD SE) RFQ A0591 3000396628 01x11kV O/G Panel - 8BD4 1/16/2006 1/19/2006 1/27/2006 3/10/2006 3/13/2006

Gadoon Textile Mills Ltd. RA A0592 3000401019 01x11kV CO Panel - 8BD4 1/20/2006 1/25/2006 1/27/2006 2/15/2006 2/15/2006 CL rel on 27-01

01x24kV, 800A I/C / O/G Panel


07-02-06
Siemens Afghanistan / Gardez Province RFQ A0593 3000394277 (SA4) + 1/20/2006 2/2/2006 2/22/2006 3/13/2006 C/L on 03.02.06
01-03-06
24kV Pole-mounted FLBS (Loose)

Page21/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

37.4 37.4 21 21 16.4 Closed MV


22 22 32.75 32.75 -10.75 Closed MV
199 295 -96.13

116.88 82 295 Closed

MV
37.4 10 47.4 75 75 -27.6 Closed MV
22 8 30 42 42 -12 Closed MV
37.4 37.4 74.8 65.05 65.05 9.75 Closed MV
38.38 49.5 -11.13
23.375 15 49.5 Closed
MV
46.75 46.75 10 10 36.75 Closed MV
70.125 10 80.13 94.75 94.75 -14.63 Closed MV
40 40 15.75 15.75 24.25 Closed MV
17 11 6
17 11 Closed
MV
103 74.75 28.625
103.38 74.75 Closed
MV
18.7 18.7 16.5 16.5 2.2 Closed MV
20.57 26 -5.43
20.57 26 Closed
MV
191 201.5 -10.68
112.13 78.7 201.5 Closed RMU
MV
93.5 106.3 -12.75
93.5 106.3 Closed
MV
20.57 5 25.57 33 33 -7.43 Closed MV
20.57 8 28.57 27 27 1.57 Closed MV
65.25 72 -6.75
30.25 35 72 Closed
MV

Page22/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

M/s Hussain Mills Ltd. RFQ A0594 3000403721 01x11kV I/C / O/G Panel - 8BD4 1/25/2006 1/31/2006 1/27/2006 2/27/2006 3/13/2006 CL rel on 27-01
Highland Traders KR A0595 3000403725 06x KESC Jr. Panels 1/26/2006 1/31/2006 1/30/2006 1/30/2006
Rating Plate approval awaited / Formal
03-02-2006
IESCO SJA A0596 3000418118 50x4-WAY RMUs + 13x4-WAY 2/1/2006 4/6/2006 indent & S.O. # on 21-02 / Additonal
15-08-06
Indent

09xI/C+01xBC+01xBPT+01xCab.Co
23-02-06 20-03-06 CL rel on 21-02 rev 15-03 / Drgs
Colony Textile Mills Ltd. KR/RA A0597 3000409827 n.+16xC/O+1xC/OAT+2xAux. Trafo 2/10/2006 2/20/2006 3/20/2006
15-03-06 email resubmitted against rev indent
11kV Panels
01-03-2006
Rafique Spinning mills RFQ/KZ A0598 3000412072 1xLBS+2xOG VCB + 1xI/CO/G LBS 2/13/2006 2/17/2006 2/21/2006 3/20/2006
Letter
02 KESC Grid O/G + 27-02-06
Highland Traders / Naval Housing Scheme KR/MAB A0599 3000412156 2/13/2006 2/17/2006 6/30/2006 Jrs. Dispatched; Grid panels remain
26x8BD4(600mm) SLD, FV

Dewan Salman Fiber Ltd. MAB A0600 3000410001 05xGen I/C+02xO/G+01xBC Panels 2/10/2006 2/21/2006 3/8/2006 3/15/2006 3/23/2006

29-03-06 CT ratios recd on 24-02 / CL rel on 01-03 /


16-02-06 01-03-06
Lucky Energy, Karachi SJA/RA A0601 3000418226 03xGen I/C+ 03xO/G 2/23/2006 29-05-06 4/10/2006 Add indent / Meeting with customer on
13-03-06 20-03-06
09-06-06 05-05
Perfect Electromek RFQ A0602 3000418523 01x11kV I/C / O/G VCB Panel 2/20/2006 2/20/2006 2/22/2006
01xWIP + 01x11kV I/C/O/G Panel -
Citropak Ltd. / Unit-II KZ/RA A0603 3000423546 3/1/2006 3/7/2006 3/31/2006 3/7/2006 CL rel on 02-03
8BD4
M/s Gulshan Spinning Mills Ltd. - 1 KZ/RA A0604 3000423564 01xWIP 3/1/2006 3/5/2006 3/7/2006 3/7/2006 CL rel on 02-03
03xKESC Jr + 01x15kV KESC Grid
Highland Traders / Diamond Metal Industries KR/MAB A0605 3000412158 2/20/2006 2/28/2006 3/9/2006 3/9/2006
Panel
03xKESC Jr + 01x15kV KESC Grid
Highland Traders MAB/KR A0606 3000416975 2/20/2006 2/28/2006 3/9/2006 3/9/2006
Panel
Ordering done by SB S / Resubmitted
100x11kV, 450kVAr Capacitor 28-02-06
K.E.S.C. MR/SJA A0607 3000419185 2/20/2006 2/27/2006 3/20/2006 3/21/2006 based on fresh inputs from SB S & site
Racks 15-03-06
visit on 08-03
02 KESC Jr With Metering + 08 W/o 21-02-06
K.E.S.C. KR/MAB A0608 3000420033 2/21/2006 2/24/2006 2/21/2006 CLs rel on 21-02 & 23-02
M 27-02-06
CT ratio changed in App from 50/5/5 to
Paramount Spinning Mills RFQ A0609 3000411852 01xWIP+01x11kV Owner's Panel 2/23/2006 2/27/2006 2/23/2006 2/24/2006 2/27/2006
100/5/5 in Owner's Panel
15-03-06
Hassan Spinning Mills (Pvt.) Ltd. KZ A0610 3000421051 01x11kV Owner's Panel 2/27/2006 2/28/2006 2/28/2006 3/13/2006
email
M/s Gulistan Spinning Mills Ltd. - 2 RA A0611 3000423607 01xWIP 3/1/2006 3/5/2006 3/7/2006 3/7/2006 CL rel on 02-03
04-05-06
M/s Sitara Hamza (Pvt.) Ltd. SJA A0612 3000425986 01x3-Way + 01x4-Way RMUs 3/6/2006 3/7/2006 3/10/2006 5/4/2006
Fax

M/s Independent Newspapers Corp. (Pvt.) Ltd. / CL rel on 22-03, 05-04 / Order put on-hold
RFQ A0613 3000430110 01x KESC Jr+ 01xI/C / O/G Panels 3/8/2006 3/16/2006 4/5/2006
Jang Building, I. I. Chundigar Road (EC) on 10-04

M/s J & S Enterprises (Pvt.) Ltd. / Jang Press, CL rel on 22-03 / Order put on-hold on 10-
RFQ A0614 3000430115 01x KESC Jr+ 01xI/C / O/G Panels 3/8/2006 3/16/2006 4/4/2006
Sultanabad (EC) 04
05-04-06
20-04-06
Chashma Sugar Mills Ltd. SJA/MAB A0615 3000430049 6.6kV Switchgear - 06xSA2+BPT 3/14/2006 3/22/2006 21-04-06 5/3/2006
10-05-06
Schematics
Perfect Electro Mek / M/s. Khalid Shafique
RFQ A0616 3000436427 01xWCP 3/24/2006 3/20/2006 3/30/2006
Spinning Mills Ltd.

01x11kV WAPDA Ring Main Panel


Zaver PC Hotel Gwadar (EC) SJA A0617 3000435737 3/21/2006 3/29/2006 4/4/2006 4/10/2006 4/20/2006
(P44:96)+01x11kV I/C / O/G Panel

Page23/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

20.57 8 28.57 40 40 -11.43 Closed MV


37.4 37.4 20 20 17.4 Closed MV
60 71.5 -11.5
33 27 71.5 Closed RMU
MV
229 289 -60
164 65 282 7 Closed
MV
56 56 48 48 8 Closed MV
144 144 249.5 5 19 273.5 -129.5 Closed MV
70 70 74 74 -4 Closed MV
77 128.8 -51.75
41 36 128.8 Closed
MV
20.6 20.6 14 14 6.6 Closed MV
37.4 37.4 15 15 22.4 Closed MV
17 17 14 14 3 Closed MV
40 10 50 23 23 27 Closed MV
40 40 19 19 21 Closed MV
50 38.25 11.75
50 38.25 Closed
MV
18 18 22 22 -4 Closed MV
37.4 37.4 16 16 21.4 Closed MV
18 7 25 39 39 -14 Closed MV
18 18 9 9 9 Closed MV
20 20 12 12 8 Closed RMU
MV
37 32 5
37 32 Closed
MV
37 37 30 30 7 Closed MV
70 97.25 -27.25
70 97.25 Closed
MV
25 25 18 18 7 Closed MV
95 108.5 -13.5
45 50 107.5 1 Closed
MV

Page24/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

S.O. # on 03-04 / App vide NTDC letter dtd


11kV Switchgear - 09xI/C + 33xO/G 22-03-06 06-04-06
NTDC-WAPDA / STG-6-26 (LOT-I) SJA/RFQ A0618 3000446558 NR NR 4/10/2006 04-04 / CL rel on 13-04 / Rev indent - Qty
+ 03xCoupler Panels 26-06-06 email
of I/C & O/G changed

Bahria Town (Pvt.) Ltd., Rawalpindi RFQ A0619 3000436465 03x11kV O/G Panels - WAPDA 3/22/2006 3/31/2006 4/3/2006 4/13/2006 4/17/2006

03-04-06
01x11kV VCB Capacitor O/G
VCB Panels Cap make, ES confirmation recd on 29-05
Bahria Town (Pvt.) Ltd., Rawalpindi SJA/MR/RFQ A0620 3000436481 Panel+ 3/22/2006 4/7/2006 6/26/2006 6/29/2006
29-05-06 from SB S / CL rel on 02-06
01x11kV, 4800kVAr Capacitor Bank
Cap Bank

04x63+04x100+05x200+34x400+
M/s Technical Associates Pakistan (Pvt.) Ltd. /
SHA A0621 3000435675 01x630kVA PMTs+03x3-Way+ 3/22/2006 3/29/2006 4/25/2006
Sukh Chayn Gardens
06x4-Way RMUs

29-03-06 04-04-06 07-04-06


11kV Switchgear-
Item 4-6 Item 4-6 Item 4-6 CL for items 1-3 rel on 12-04/SA
Sunlight Wood Industries KR/RA A0622 3000435774 04xI/C+03xO/G+01xBPT+03xI/C / 3/24/2006 4/4/2006
12-04-06 26-05-06 24-05-06 arrangement revised
O/G Panels
Item 1-3 Item 1-3 Item 1-3

Drawings released in production


01xI/C + 01xO/G VCB Trolleys for
BOC (PTD SE) RFQ A0623 3000444016 3/31/2006 4/5/2006 4/28/2006 8/4/2006 considering the production. Delivery
KESC Grid
required as per Indent
Cambridge School-Islamabad MR A0624 3000443999 01x630kVA PMT 3/31/2006 NR 4/27/2006 4/27/2006 As per approved prototype

Medipharm (Pvt.) Ltd. SJA/MAB A0625 3000437228 01xWIP+01x11kV Owner's Panel 3/30/2006 4/4/2006 4/13/2006 4/7/2006

Kay & Emms (Pvt.) Ltd. RA A0626 300044441 01xWIP+01x11kV Owner's Panel 3/30/2006 4/5/2006 4/13/2006 4/17/2006

Brookes Pharmaceutical Laboratories (Pakistan)


KR A0627 3000439054 01xKESC Jr with P&M 3/31/2006 4/6/2006 NR NR 4/3/2006
Ltd.
Contech International (Pvt.) Ltd. RFQ A0628 3000447413 01xWCP + 01x3-Way RMU 4/4/2006 4/7/2006 4/6/2006 5/16/2006 5/17/2006 CL rel on 06-04
M. Ashiq SHA A0629 3000448785 01x400kVA PMT 4/6/2006 NR 4/25/2006
27-04-06
(Consumer)
01xWCP+(11x200+01x100)PMTs+0
Green City Housing Scheme RFQ/SHA A0630 3000447858 4/5/2006 4/26/2006 28- NR 6/27/2006 Former order Glamour developers A
2x4Way RMUs
04-2006
(PMTs)
17-04-06
Punjab Industrial Estate/Sunder MR/SHA A0631 3000477583 05x500+45x750+10x1250 kVA PMTs
16-05-06
5/16/2006 5/11/2006 Drgs rel based on Design indent 350
11kV Switchgear-01xI/C+04xO/G- CL rel on 26-04 / Heater revised to 01no.
M/s Service Industries Ltd. KZ/RA A0632 3000451501 4/17/2006 4/20/2006 4/26/2006 5/10/2006 5/11/2006
8BD4 as per SB-Lhr email
03xI/C+06xO/G VCB Trolleys +
K.E.S.C. (PTD SE) RFQ A0633 3000417800 4/20/2006 4/21/2006 4/21/2006 NR 4/21/2006
Finger Contacts
19-04-06
IESCO SHA A0634 3000454750 22x4-Way RMUs NR 5/12/2006 Add indent for 08Nos.
18-05-06
15-05-06
Gulshan Weaving Mills Ltd. - Unit 2 RFQ A0635 3000453930 01xWIP 4/26/2006 5/12/2006 5/12/2006 CL rel on 11-05
email

Grey Builders KR/RA A0636 3000460706 03xKESC Jr. Panels w/o Metering 5/2/2006 5/3/2006 5/3/2006 5/3/2006

02xO/G + 01xI/C / O/G 11kV Panels


Umar Spinning Mills (Pvt.) Ltd. RA A0637 3000464309 5/4/2006 5/11/2006 5/22/2006 6/5/2006 6/6/2006 CL rel on 11-05
- 8BD4
30-05-06 CL rel on 10-05 / CT ratio for I/C changed
Pakistan Tobacco Company (MES) SJA/MAB A0638 3000464188 11kV Switchgear - 01xI/C+03xO/G 5/4/2006 5/11/2006 5/15/2006 6/19/2006
email to 300/5/5A in App
22-05-06
M/s Sapphire Power Generation - Unit 1 RA A0639 3000464296 01xI/C + 01xAdapter 11kV Panels 5/5/2006 5/11/2006 5/16/2006 6/13/2006 App with comments
email
Pakistan Navy (PTD SE) KZ/KR A0640 3000464745 01x 11kV I/C / O/G Panel 5/4/2006 5/15/2006 6/8/2006 7/18/2006

Page25/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

85 68 17
85 68 Closed
MV
25 8 33 52.75 52.75 -19.75 Closed MV
175 172.1 2.9
175 149 17.3 5.8 Closed
MV
95 59 36
95 44.5 14.5 Closed PMT/RMU
MV
117.8 129.8 -11.95
74.8 43 129.8 Closed
MV
37.4 19 18.4
37.4 19 Closed
MV
10 10 4 4 6 Closed MV PMT
37.4 37.4 13.75 13.75 23.65 Closed MV
37.4 37.4 29 29 8.4 Closed MV
12.1 12.1 10 10 2.1 Closed MV
41.14 41.14 22 22 19.14 Closed MV
10 10 9.75 9.75 0.25 Closed MV PMT
50 21.75 28.25
50 21.75 Closed MV RMU

236.3 236.3 219.8 3 222.8 13.55 Closed MV PMT

37.4 37.4 55 55 -17.6 Closed MV

37.4 37.4 31.75 5 36.75 0.65 Closed MV

20 20 47.5 47.5 -27.5 Closed RMU


MV
18 18 17 17 1 Closed MV
18 18 31 31 -13 Closed MV
46.75 46.75 29 29 17.75 Closed MV
46.75 46.75 48.5 48.5 -1.75 Closed MV
53.375 53.38 52.5 52.5 0.875 Closed MV
20.57 10 30.57 32 32 -1.43 Closed MV

Page26/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

Pakistan Cement (OLM) SJA/MAB A0641 3000469372 02x6.3kV LBS Panels 5/16/2006 5/16/2006 5/19/2006 5/22/2006 6/2/2006 Changes as per App and resubmitted

Babar Islam & Co. RA A0642 3000474344 01x11kV I/C / O/G Panel - 8BD4 5/22/2006 5/31/2006 6/22/2006
11kV Switchgear - 04xI/C + 40xO/G
IESCO RFQ A0643 3000565152 5/23/2006 NR 7/1/2006 7/26/2006 Add indent
+ 02xCoupler Panels
K.E.S.C. (PTD SE) KR A0644 3000478610 22xVCB Trolleys (Jr) 5/26/2006 7/5/2006 7/7/2006
Highland Traders KR/MAB A0645 3000473669 07xKESC Jr. Panels 5/30/2006 6/2/2006 6/2/2006 6/2/2006
Prelim Trafo Drgs recd on 09-06 / CL rel
Technical Associates Pakistan / Abu Dhabi 31-05-06 19-06-06
A0646 3000485471 15xKiosk Substations
RFQ/SHA/SJA/SMY 6/2/2006 6/27/2006 on 14-06 rev 21-06 / Add indent - Qty inc
Palace 15-06-06 20-06-06
from 11 to 15
11kV Switchgear - 01x VCB Manual
31-05-06 02-06-06 CL rel on 02-06 / Order put on-hold on 29-
M/s Sapphire Textile Mills Ltd. (Weaving Unit) KR/RA A0647 3000480079 CO + 01xCC + 01xLBS CO Panels - 6/2/2006 8/2/2006
06-07-06 13-07-06 06 / Rev indent
8BD4
01x11kV I/C (Gen) + 19-06-06
M/s Prosperity Weaving Mills Ltd. KR/RA A0648 3000480258 5/31/2006 6/7/2006 6/8/2006 6/9/2006 Go-ahead for rel in prod on 09-06
01x Adapter Panels email
6.3kV Switchgear + Trafo
Army Welfare Trust (PWT) / Nizampur Cement KR A0649 3000482465 5/31/2006 6/8/2006 6/16/2006 7/14/2006 7/18/2006 Changes in App & on 17-07
Protection & Metering Panel
11kV (03) & 6.6kV(28) Switchgear -
M/s Etihad Sugar Mills MAB/RFQ A0650 3000481616 6/9/2006 6/10/2006 6/16/2006 6/30/2006 7/24/2006 Prelim indent on 31-05 / CL rel on 16-06
31 Panels

Sitara Hamza SHA A0651 3000496296 1x100kVA PMT + 1x400kVA PMT 6/12/2006 7/6/2006 7/5/2006 CL rel on 06-07-06

FESCO SHA A0652 3000484330 07x200kVA PMT Alternate III 6/15/2006 6/20/2006
IESCO RFQ A0653 3000532382 02x200kVA PMT 6/15/2006 NR CL rel on 23-06
Lakson Tobacco Company RFQ A0654 3000493560 01x11kV O/G Panel 6/20/2006 6/23/2006 6/29/2006 7/13/2006 7/14/2006 CL rel on 29-06
6.3kV, 40kA Switchgear - 21-11-06
Maple Leaf Cement KR A0655 3000501466 7/12/2006 7/19/2006 8/3/2006 8/23/2006
01xI/C+02xO/G (8BK20) 27-12-06

02xI/C+08xO/G 11kV VCB Trolleys


MEPCO (PTD SE) RFQ A0656 3000494276 6/21/2006 6/26/2006 7/4/2006 7/26/2006
as per WAPDA Specs. P44:96

01x13.8kV I/C Panel - 8BD4


M/s Ittehad Chemicals Ltd. SJA/TAK A0657 3000494486 (WAPDA) w/o VCB Trolley + 6/22/2006 6/28/2006 7/11/2006 7/25/2006 7/11/2006 CL rel on 29-06
01xNGR
Maple Leaf Cement Factory Ltd. (OLM) KR A0658 3000495971 01x5.5kV I/C / O/G Panel 6/22/2006 6/27/2006 7/11/2006 8/2/2006 8/2/2006
Faisal Spinning Mills Ltd. - 2 RFQ A0659 3000499040 01x11kV I/C / O/G Panel 6/30/2006 6/27/2006 6/26/2006 Drgs rel on prior info recd on 26-06
11kV Switchgear - 01xI/C+02xO/G
CPC, DG Khan SJA/TAK A0660 3000276806 6/28/2006 7/3/2006 7/10/2006 8/28/2006
(8BD4)
03-07-2006
Faisal Spinning Mills Ltd. - Nooriabad KR/RFQ A0661 3000499100 01x11kV FLBS Panel 6/29/2006 7/5/2006 7/10/2006 7/5/2006 CDG-31 relay wiring diagram awaited
13-07-06
05-07-06
Indus Motor Co. Ltd. KR A0662 3000506779 02x11kV O/G Panels 7/12/2006 7/12/2006 7/24/2006 7/12/2006 Rev indent - 8BD4 O/G Panels reqd
11-07-06
01xWIP + 01x11kV I/C + 01x11kV
Hoosen Cotton Industries & Oil Mills RFQ A0663 3000500540 7/4/2006 7/12/2006 7/25/2006 8/1/2006 8/1/2006 CDG-31 relay wiring diagram awaited
FLBS Panels - 8BD4
01xWIP+01x11kV Owner's Panel -
M/s Pace Pakistan Ltd. SJA/TAK A0664 3000505905 7/6/2006 7/12/2006 7/13/2006 7/18/2006 7/17/2006 App recd on offer drgs / CL rel on 13-07
8BD4
01xWIP+11kV Switchgear - Indent rel against SB Stores, S.O. #
SB-Stores - Tahir Rafiq SJA/TAK A0665 3000489851 7/4/2006 7/13/2006 7/18/2006 11/22/2006
01xI/C+02xO/G awaited / CL rel on 17-07
Star Paper Mills TAK A0666 3000505372 01xWIP 7/12/2006 7/25/2006 7/25/2006 8/1/2006 7/25/2006 CT ratio awaited from SB-Sales
11kV Switchgear - 01xI/C+03xO/G
Rafi Group (Defence Shopping Mall) RA A0667 3000509409 7/17/2006 7/21/2006 7/28/2006
(FLBS)
Gelcaps (Pakistan) Ltd. TAK A0668 3000511179 01x11kV I/C / O/G Panel 7/18/2006 7/21/2006 8/2/2006 8/3/2006

Page27/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

43.375 43.38 43.75 43.75 -0.375 Closed MV


20.57 20.57 29 29 -8.43 Closed
93.5 93.5 41 5 10 20 76 17.5 Closed MV
22.44 22.44 14 14 8.44 Closed
20.57 20.57 12.75 12.75 7.82 Closed MV
1060 962.9 97.1
760 300 849.8 106.2 7 Closed
MV
93.5 77 16.5
93.5 77 Closed
MV
53.375 53.38 56.75 56.75 -3.375 Closed MV
337.5 337.5 243.5 35.25 20 56.25 355 -17.5 Closed MV
123.42 50 173 145.8 16 161.8 11.67 Closed MV
22 22 11 5 16 6 Closed MV
11 11 27.75 1 28.75 -17.75 Closed MV
10 10 22 22 -12 Closed MV
20.57 20.57 35 35 -14.43 Closed
68.75 68.75 67 5 5 10 5 92 -23.25 Closed 8BK
MV
24.2 21 3.2
24.2 21 Closed
MV
38.38 39.75 -1.375
33.375 5 30 9.75 Closed MV

55.57 55.57 48 48 7.57 Closed MV


20.57 5 25.57 37 10.75 47.75 -22.18 Closed MV
41.14 41.14 16 3 2 21 20.14 Closed MV
45.57 40 5.57
20.57 25 40 Closed MV

20.57 15 35.57 64 64 -28.43 Closed MV

61.71 61.71 35 10 45 16.71 Closed MV

37.4 37.4 17 17 20.4 Closed MV

61.71 61.71 42 42 19.71 Closed MV


20.57 20.57 14 1 15 5.57 Closed MV
41.14 41.14 26 26 15.14 Closed MV
20.57 20.57 18 18 2.57 Closed MV

Page28/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

Baluchistan Wheels Ltd. SJA/TAK A0669 3000514729 11kV Switchgear - 01xI/C+01xO/G 7/20/2006 7/25/2006 7/25/2006 8/7/2006 8/7/2006

01x11kV I/C O/G Panel + 11kV


Dewan Automotive Engg. Ltd. KR A0670 3000516051 7/24/2006 8/2/2006 8/2/2006
Switchboard - 01xI/C + 03xO/G

M/s Packages Ltd. / Bulleh Shah Paper Mills Advance ordering to be


KR A0671 3000518196 02xMV Motor Starters 8/1/2006 8/9/2006 8/24/2006 9/4/2006 9/11/2006
Project done/Clarifications from S'AG Awaited

PPW RA A0672 3000516016 7.2kV Switchgear 7/26/2006 8/3/2006 8/4/2006 11/27/2006


11kV Switchgear -
11-08-06 16-11-06
Sialkot International Airport RA A0673 3000517348 2xI/C+6xO/G+1xBC+03x315kVA 7/28/2006 8/9/2006
21-08-06 07-02-07
PMTs
Power Professionals & Engineers (Bahria 02x Add Panels reqd as per App, indent
RFQ A0674 3000519756 02x11kV I/C / O/G Panel 7/31/2006 8/3/2006 8/3/2006 8/28/2006 8/29/2006
Complex III) requested

Hussain Builders TAK A0675 3000521768 03xKESC Jr. Panels w/o Metering 8/1/2006 8/3/2006 8/4/2006 NR 8/4/2006

04-08-06
EPN/Upgradation of Electrical Network RFQ A0676 3000523164 01x11kV I/C & O/G Panel - 8BD4 8/2/2006 8/4/2006 NR 8/4/2006
24-08-06
Diamond Fabrics Ltd. RFQ A0677 3000524043 01x11kV I/C & O/G Panel - 8BD4 8/4/2006 8/8/2006 8/11/2006 8/21/2006 8/29/2006
Kidney Foundation TAK A0678 3000526221 01x11kV I/C & O/G Panel - 8BD4 8/8/2006 8/10/2006 8/9/2006 8/18/2006 8/22/2006
01xI/C & O/G, 02xTrafo O/G +
Idrees Textile Mills Ltd. SJA/TAK A0679 3000527956 01xI/C + 01xBus PT / Cable 8/15/2006 8/25/2006 8/23/2006 11/3/2006
Connection Panel
6.36kV Switchgear-8BK20
Maple Leaf Cement (Upgradation Job) KR A0680 3000525337 8/15/2006 01.09.06 2/15/2007 2/13/2007 Drgs. Received from PTSI
02xI/C + 01xO/G -
03+02xKESC Jr. Panels with 23-08-06 Revised indent, 02xPanels changed to
Highland Traders RFQ A0681 3000532207 8/25/2006 8/25/2006 8/25/2006
Metering + 04x w/o Metering 13-02-07 metering type

Babar Islam & Co. TAK A0682 3000536774 02x11kV I/C & O/G Panels -8BD4 8/30/2006 NR

Sarfaraz Textile Mills (Pvt.) Ltd. TAK A0683 3000538341 01XWAPDA


01xI/C + 08xO/G - Finger
K.E.S.C. (PTD SE) FB A0684 3000539527 Contacts+Contact Arms + Fixed 8/30/2006
Contacts
01XWIP + 01x11kV I/C & O/G -
Shahtaj Sugar Mills Ltd. TAK A0685 3000540136 9/4/2006
8BD4
M/s Packages Ltd. / Bulleh Shah Paper Mills
RA/KR A0686 3000541789 02x11kV I/C + 12X11kV O/G 9/4/2006 9/5/2006 9/5/2006 9/8/2006
Project
16x3-Way RMUs (Scheme 32) as
K.E.S.C. TAK A0687 3000562602 8/29/2006 11/28/2006
per KESC Specs. 78
Highland Traders / Naval Housing Scheme RA/KR A0688 3000543166 01X15kV KESC Grid O/G Panel 9/6/2006 9/11/2006 10/5/2006 10/9/2006
Maple Leaf Cement Factory ltd. / Upgradation 04X6.3kV , 31.5 kA Switchgear - 08-02-07
SJA A0689 3000540075 9/6/2006
Job NXPLUS C Design Phase I
Tritex Cotton Mills RFQ A0690 3000545203 01xWAPDA Consumer Panel 9/13/2006 9/17/2006 9/18/2006 10/2/2006 10/2/2006
App comments clarified & Go-ahead recd
International Construction Services/SUPARCO RFQ A0691 3000550675 01x250kVA KIOSK 9/20/2006 10/11/2006 10/13/2006 12/11/2006 4/5/2007
for Prod on 14-03
66x3-Way RMUs (Scheme 32) as
K.E.S.C. TAK A0692 3000562609 9/27/2006
per KESC Specs. 78
01xKESC Jr. with Protection W/O
Millac Food RJ A0693 3000529373 10/4/2006 NR 10/2/2006
Metering
03x11kV I/C Panels - 8BD +
Din Textile Mills Ltd, Patoki KR A0694 3000567349 10/4/2006 10/15/2006 11/1/2006 11/23/2006
02xDummy Panels
02x11kV LBS + 01X11kV VCB
Coca Cola Beverages Pakistan Ltd., Gujranwala TAK A0695 3000561709 10/5/2006 10/10/2006 11/1/2006
Panels

Page29/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

41.14 41.14 35 5 40 1.14 Closed MV

61.71 61.71 18 18 43.71 Closed MV


118 161.5 -43.13
98.375 20 128.8 2 30.75 Closed MV

70.125 70.13 40 5 22.5 17 84.5 -14.38 Closed MV


170 248 -77.88
170.13 52 25 37.75 4.25 116 13 Closed MV

41.14 41.14 17 17 24.14 Closed MV

20.57 20.57 13 13 7.57 Closed MV

20.57 20.57 32 1 1 34 -13.43 Closed MV


41.14 20 61.14 51 13.75 64.75 -3.61 Closed MV
20.57 20.57 12 3 15 5.57 Closed MV
212 159 52.875
166.88 45 90 32 13 12 12 Closed MV

73.375 73.38 63 10 10 7 90 -16.63 Closed MV 8BK

41.14 10 51.14 0 8 8 16 35.14 Closed MV

20.57 20.57 10 10 10.57 Closed MV


17 17 5 5 12 Closed MV
25 27.75 -2.75
25 10 17.75 Closed MV

40 40 10 3 2 2 17 23 Closed MV

50 50 25.5 5 30.5 19.5 Closed MV

22 22 7 12 19 3 Closed MV
30 30 0 5 6 11 19 Closed MV
70 70 140 30 15 52 10 4 53 35.5 199.5 -59.5 Closed MV
20.6 20.6 7 5 12 8.6 Closed MV
180 180 12 20 9 66.3 23 10 140.3 39.7 Closed MV

22 22 0 6 11 2 8.8 23 5 55.8 -33.8 Closed MV

20.57 20.57 0 16 16 4.57 Closed MV

91.14 91.14 0 20 79 8 107 -15.86 Closed MV

40 40 0 11 3 2 16 24 Closed MV

Page30/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

01xWIP + 02x11kV O/G + 01xBPT


NMC-1, D.G. Khan TAK A0696 3000564083 10/10/2006 10/15/2006 11/27/2006 11/30/2006
Panel - 8BD4
Sheraton Hotel, Karachi (OLM) TAK A0697 3000565714 01x11kV I/C / O/G LBS Panel 10/10/2006 11/22/2006
Ittehad Chemicals Ltd. TAK A0698 3000567626 03xVCBs 10/19/2006 10/21/2006 2/1/2007
01xWIP+01x11kV I/C / O/G Panel -
Punjab Beverages Co. Ltd. RFQ A0699 3000573695 10/18/2006 10/19/2006 10/20/2006 11/8/2006 3/9/2007
8BD4
Bahria Town (Pvt.) Ltd., Lahore RJ A0700 3000568400 01x4-Way RMU-WAPDASpecs. 10/19/2006 10/30/2006 11/3/2006 11/14/2006 11/3/2006

01xWIP+
Sitara Per Oxide TAK A0701 3000587675 11kV Switchgear-01xI/C+02xO/G 11/1/2006 11/7/2006 11/16/2006 Formal indent & S.O. # recd on 08-11
01x6.6kV I/C / O/G Panel - 8BD4

19-03-07
11kV Switchgear-WAPDA
GEPCO (TD) / Wazirababad Road, 132/11kV PMT 8BD Design to be supplied as per earlier
RFQ A0702 3000584703 02xI/C+16xO/G+01xBC Panels + 11/3/2006 11/20/2006 11/22/2006 3/21/2007
Cantt. G/S - Gujranwala 23-04-07 submittal & approval
01x200kVA PMT
MV

Zafar & Company/SUPARCO TAK/KR A0703 3000587492 11kV Switchgear-01xI/C+02xO/G 11/7/2006 11/11/2006 11/13/2006 11/22/2006 11/27/2006

18xVCB Trolleys (06xI/C+12xO/G) -


LESCO (PTD SE) RJ A0704 3000589166 11/10/2006 11/14/2006 11/17/2006 1/3/2007 1/5/2007
WAPDA
HESCO (PTD SE) RJ A0705 3000589170 14xO/G VCB Trolleys - WAPDA 11/10/2006 11/14/2006 11/17/2006 12/8/2006 12/8/2006

Javedan Cement TAK A0706 3000594854 01No. 11kV Outgoing Panel - SA2 11/20/2006 11/22/2006 12/29/2006 2/14/2007 3/16/2007

02-11-07
MV
DHA Karachi (HSS)/DHA Phase VIII G/S No.1 KR/SHR A0707 3000581497 17.5kV Switchgear 11/20/2006 1/26/2007
30-11-07
RCP

Bahria Town (Pvt.) Ltd. RFQ A0708 3000595808 02x200kVA PMT 11/20/2006 11/22/2006 11/29/2006 12/14/2006
FESCO SJA A0709 3000601627 7.2MVAr Capacitor bank 11/27/2006 12/26/2006 5/7/2007
Gadoon Textile Mills Ltd. TAK A0710 3000601665 01xChangeover Panels 11/28/2006 12/1/2006
20-02-07
Unicol Ltd. KR/RJ A0711 3000603543 02xI/C / O/G Panel - SA2 11/28/2006 11/30/2006
email
01xWIP + 01xI/C & O/G Panel - 28-11-06
Fast Feed (Pvt.) Ltd. KR/RJ A0712 300061184 NR 1/4/2007 Formal indent & S.O. # recd on 07-12
8BD4 email
Prime Crete (Pvt.) Ltd. TAK A0713 3000607827 01x11kV I/C / O/G Panel - 8BD4 12/1/2006 12/5/2006 12/5/2006 12/12/2006 12/6/2006

11kV Switchgear - WAPDA Specs.


P44:96
MEPCO / 6th STG Project, Tender No. 28 RFQ A0714 3000623538 12/8/2006 12/10/2006 12/13/2006 2/1/2007 2/13/2007 Prelim Indent based on LOI recd on 01-12
07xI/C+37xO/G+04xB/C

02x3-Way RMUs (WAPDA Specs.


M/s Abdullah Gardens RFQ A0715 3000568170 12/5/2006 12/6/2006 NR 12/6/2006
DDS-46:90)

PECT Engineering (Pvt.) Ltd. RJ A0716 3000611667 01xI/C / O/G Panel - 8BD4 12/8/2006 12/8/2006 12/8/2006 1/18/2007 2/1/2007 U/V relay reqd as per App comments

K.E.S.C. / LPO/FIP/313/06 KR/SJA A0717 3000621821 201 KESC Jr Panels 12/20/2006 12/20/2006 12/21/2006 1/3/2007 12/27/2006
Gulshan Weaving Mills Ltd. RFQ A0718 3000618720 01xI/C / O/G Panel - 8BD4 12/20/2006 12/28/2006 1/12/2007
12x11kV O/G VCB trolleys with
Perfect Electro Mek SJA A0719 3000618315 12/21/2006 12/28/2006
Plug Sockets & Contact Arms
27-12-06
06x1000kVA Kiosks + 04x750kVA
K.E.S.C. SJA/RFQ A0720 3000624816 12/22/2006 1/24/2007 D01
PMTs
04-01-07
Hussain Mills Ltd. RFQ A0721 3000624407 01xI/C / O/G VCB Panel - SA2 1/4/2007 1/5/2007

Page31/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

40 40 0 18 8 1 6 3 36 4 Closed MV
20.6 20.6 0 15 17.5 2 2 36.5 -15.9 Closed MV
12 12 0 9 7 2 18 -6 Closed MV
40 40 0 15 13 28 12 Closed MV
5 5 0 0 5 Closed MV
60 24 36
60 0 3 1 20 Closed MV

107 113 -6
107 0 1 50 10 20 24 5 3 Closed MV

40 40 0 1 1 39 Closed MV

26 26 0 10 10 16 Closed MV
14 14 0 18 18 -4 Closed MV
20.6 20.6 0 2 3 24 29 -8.4 Closed MV
172 220.5 -48.5
172 0 20 28.5 38 50 32 10 15 22 5 Running MV

12 12 0 0 12 Closed MV
40 40 0 10 8 8 42 68 -28 Running MV
40 40 0 5 5 35 Closed MV
20.6 20.6 0 17 8 1 14 40 -19.4 Closed MV

40 40 15 10 13 38 2 Closed MV
20.6 20.6 4 4 16.6 Closed MV
95 22 73
95 3 1 2 7 4 5 Closed MV

5 5 10 10 -5 Closed MV

20.6 20.6 11 10 6 27 -6.4 Closed MV


96 50 146 48 35.5 31 23 45.3 15 197.8 -51.8 Closed MV
20.6 20.6 11 11 9.6 Closed MV
14 14 2 2 12 Closed MV
220 206.5 13.5
220 61.25 64.25 33 36 12 Closed MV

20.6 20.6 12 12 8.6 Closed MV

Page32/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

CT ratio changed from 100/5 to 50/5 on


PSO-Chukpirana (Schon Engineering) TAK A0722 3000623045 01xWIP 12/26/2006 12/28/2006 1/5/2007 1/15/2007 1/16/2007
11-06
Technical Associates Pakistan / Sukh Chayn
RJ A0723 3000634352 01xWIP 12/29/2006 NR - 1/4/2007 S.O. # changed on 17-01
Gardens Housing Estate
IESCO TAK A0724 3000635336 35x63kVA PMTs 1/19/2007 NR 1/22/2007 2/23/2007
IESCO TAK A0725 3000635338 18x100kVA PMTs 1/19/2007 NR 1/22/2007 2/23/2007
IESCO TAK A0726 3000635339 18x200kVA PMTs 1/19/2007 NR 1/22/2007 2/23/2007
Pakistan Cables Ltd. KR A0727 3000628267 11kV Switchgear - 08xSA2 1/8/2007 1/12/2007 1/9/2007 1/18/2007 1/22/2007
01x4-Way RMU+29x3-Way
04-01-07
Punjab Industrial Estate/Sunder Industrial Estate RFQ/RJ A0728 3000628380 RMU+02x11kV Panels (WIPs + 2/15/2007 Revised indent
16-01-07
Owner's Panels)

10.5kV Switchgear - Simoprime


World
Century Paper & Board Mills Ltd. KR/SHR A0729 3000648636 (17xVCB+01xBPT+01xRiser+01xAd 2/2/2007 3/27/2007 3/27/2007
apter Panels) +
02xVCB Trolleys

M. Talib Enterprises / Container Control Program 01xKESC Jr with metering with


RFQ A0730 3000632485 1/10/2007 1/24/2007 1/17/2007
at Port Qasim protection
Kohinoor Soap & Detergents (Pvt) Ltd. RJ A0731 3000632433 01x11kV I/C O/G Panel - SA2 1/10/2007 1/12/2007 1/15/2007 1/24/2007 1/24/2007
Ch. Mubarak Ali Contractors RJ A0732 3000639222 01x11kV I/C O/G Panel - 8BD4 1/18/2007 1/19/2007 1/18/2007 2/14/2007 2/14/2007 Formal indent & S.O. # recd on 18-01
11kV Switchgear -
Go-ahead for rel of drgs from SB S-Ex on
Naubahar Bottling Co. Ltd. TAK A0733 3000636438 01xWCP+01xWIP+01xI/C / O/G 1/18/2007 1/19/2007 1/19/2007 2/2/2007 2/20/2007
20-02
+01xI/C+2xO/G
19xVCB Trolleys (04xI/C+15xO/G) -
FESCO (PTD SE) RJ A0734 3000637480 1/18/2007 1/19/2007 1/22/2007 1/25/2007 1/25/2007
WAPDA
12xVCB Trolleys (04xI/C+08xO/G) -
GEPCO (PTD SE) RJ A0735 3000637488 1/18/2007 1/19/2007 1/22/2007 1/25/2007 1/25/2007
WAPDA
01x3-Way + 02x4-Way RMUs
M/s Riaz-ul-Jannah Housing Scheme, Faisalabad RJ A0736 3000636171 1/19/2007 NR - - 1/23/2007
(WAPDA Specs. DDS-46:90)
M/s Gulshan-e-Madina Housing Scheme, 01x3-Way RMU (WAPDA Specs.
RJ A0737 3000636184 1/19/2007 NR - - 1/23/2007
Faisalabad DDS-46:90)
HMA Building & Maintenance Co. KR/SHR A0738 3000640937 01x 11kV I/C / O/G Panel - SA2 1/23/2007 4/19/2007 3/12/2007
Tritex Cotton Mills SJA/SHR A0739 3000642980 01xWIP 1/25/2007 1/26/2007 2/7/2007 2/9/2007 2/9/2007
K.E.S.C. (EA) / KESC 2480-08 LDC Project SJA/SHR A0740 3000628391 02x11kV I/C / O/G Panels-SA2 2/2/2007 2/3/2007 2/2/2007 2/26/2007 2/26/2007 Clarified on 20-02
11kV Switchgear - 8BD4
SUPARCO (PTD SE) SJA/SHR A0741 3000648613 2/2/2007 2/12/2007 2/19/2007 2/23/2007
(05 Panels)
Construction Management & Engineering
SJA/SHR A0742 3000655082 01x11kV I/C / O/G Panel - SA2 2/9/2007 2/14/2007 2/14/2007 2/22/2007 4/11/2007
Services
Fico Engg. Co. (Pvt.) Ltd. KR A0743 3000650237 20xVCBs for KESC Jr 2/12/2007 2/12/2007 2/13/2007 VCB as per ED/A0717
68x11kV Capacitor O/G Panels - 17-07-07
HESCO SHR A0744 3000656595 2/19/2007 2/20/2007 2/21/2007 8/28/2007 App comments clarified on 20-08
WAPDA 06-09-07
SB Lahore SHR A0745 01xWCP+02xWIP 2/23/2007 2/27/2007 3/2/2007 S.O. # awaited
11kV Switchgear-
Indus Motor Co. Ltd. TAK A0746 3000662539 09xSA2+02x8BD4+ Interlocking 2/22/2007 3/1/2007 3/5/2007 4/12/2007 4/20/2007
Accessories

15kV Switchgear
(100x8BD4+20xSimoprime) 22-02-07 13-04-07 App with change of I/C CT ratio to
K.E.S.C. KR/TAK A0747 3000662403 3/9/2007 4/16/2007
12Lots (01xI/C+08xO/G+01xBC)+ 12-07-07 Items 1-3 2500/5A / Add indent
02xAdapter Panels-SW/8BD4.

Page33/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

20.6 20.6 1 6 5 1 13 7.6 Closed MV

20.6 20.6 6 6 14.6 Closed MV


14 14 4 19.8 23.8 -9.8 Closed MV
13 13 4 15 2 21 -8 Closed MV
13 13 4 13 17 -4 Closed MV
82 82 23 13 34.5 33 10 113.5 -31.5 Closed MV
68 39 29
68 22 17 Closed MV

281 260.8 20.2


206 75 17 37 75 103.8 23 5 Closed MV

20.6 20.6 9 9 11.6 Closed MV


20.6 20.6 11 11 9.6 Closed MV
20.6 20.6 11 20 31 -10.4 Closed MV
40 59 -19
40 22 15 6 6 10 Closed MV

26 26 11 3 14 12 Closed MV

24 24 11 11 13 Closed MV

24 24 11 1 12 12 Closed MV

24 24 11 1 12 12 Closed MV
20.6 20.6 6.5 13 2 2 1 24.5 -3.9 Closed MV
20.6 20.6 11 22 33 -12.4 Closed MV
20.57 20.57 3 2 5 15.57 Running MV
40 40 5 5 35 Closed MV

20 20 2 0.5 2.5 17.5 Closed MV


0 6 15 21 -21 Closed MV
47 25 72 25 8 10 16 20.3 79.3 -7.3 Closed MV
50 50 2 10 12 38 Running MV
103 139 -36
103 24 40 35 15 10 15 Closed MV

235 413.9 -178.9


235 18 66.8 56 20 30 35.5 91.8 95.8 Closed MV

Page34/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

Punjab Beverages Co. Ltd. SHR A0748 3000659344 01x11kV I/C / O/G Panel-8BD4 2/22/2007 2/27/2007 2/27/2007 5/16/2007 5/16/2007 As per WAPDA Specs
Institute of Leadership & Management, UMT 01x WIP, 01x11kV I/C + 02x 11kV Drgs submitted agaisnt advance indent
SHR A0749 3000664272 3/6/2007 - 2/23/2007 2/26/2007 2/28/2007
Lahore O/G Panel-8BD4 by email dtd 20-02
27-03-07
28-03-07
11/15kV Switchgear - 13xSA2 + SA2
International Industries Ltd. KR/SHR A0750 3000668619 3/1/2007 3/5/2007 3/28/2007 16-04-07
03x8BD4 KESC + Spares 21-05-07
16-05-07
KESC
Modification of 11kV O/g Panel into
K.E.P.Z. / Phase II (EC) TAK A0751 3000674406 3/12/2007 3/14/2007
I/O Panel
Zultech (Pvt.) Ltd. SHR A0752 3000680578 01xKESC Jr Panel 3/13/2007 NR 3/16/2007 NR 3/16/2007 CL rel on 14-03 / S.O. # recd on 15-03
20-03-07
K.E.S.C. RJ A0753 3000678592 60xKESC Jr Panels 3/14/2007 3/22/2007 6/5/2007 6/6/2007 Approved against standard drgs
30-05-07
18xKESC Grid Panels+ 22-03-07 Approved against standard drgs,
K.E.S.C. KR/RJ A0754 3000678603 3/14/2007 3/22/2007 6/5/2007 6/4/2007
144xKESC Jr Panels 30-05-07 App awaited for Grid Panels
Fico Engg. Co. (Pvt.) Ltd. KR A0755 3000671925 24xVCBs for KESC Jr + 22x7SJ 3/14/2007 3/30/2007 3/30/2007 - 3/30/2007
01x3-Way RMU (WAPDA Specs. 12-07-07
M/s Abdullah Gardens RJ A0756 3000666169 3/20/2007 3/22/2007 3/22/2007 7/12/2007
DDS-46:90) email
21-03-07 22-03-07 Indent & SB No. recd on 24-04 / Add
M/s METKA, S.A. / KTPP, Karachi KR/TAK A0757 3000709961 6.3kV Switchgear - 19xSA2 3/22/2007 3/30/2007 4/13/2007
11-05-07 13-04-07 indent for 01xMotor Feeder
01xWIP + 01x11kV I/C/O/G Panel - Indent recd on 26-03, CT ratios on 02-04,
A-one Feeds KR/SHR A0758 3000686091 4/2/2007 4/5/2007 4/4/2007 4/17/2007 4/18/2007
SA2 CL on 04-04-07.
Pakistan Cement Co. Ltd. (PWT)/Coal Mill 12kv, 40kA, 1250A Switchgear - 14-06-07
KR/SHR A0759 3000666682 3/27/2007 4/6/2007 4/11/2007 6/19/2007
Project 06x8BK20 + 01xAdapter On e-mail

Mughals Pakistan (Pvt.) Ltd. / Serena Hotel, 02xWIP+ 03-05-07


KR/RJ A0760 3000677337 3/29/2007 4/6/2007 4/3/2007 5/3/2007 WIP go-ahead recd on 17-07
Islamabad 02xI/C+04xO/G 11kV Panels-SA2 18-07-07

Fico Engg. Co. (Pvt.) Ltd. KR A0761 3000685184 15xVCBs for KESC Jr. 3/29/2007 NR 3/30/2007 3/30/2007 [24VDC VCBs]
PTD-SE [KS&EW] KR A0762 3000683878 02 Nos. LBS with Rear Box 3/30/2007 4/2/2007 CL on 02-04
Tariq Glass KR/SHR A0763 3000691205 01x11kV I/C / O/G Panel-SA2 4/5/2007 4/9/2007 4/6/2007 4/23/2007 4/23/2007
Coca Cola Beverages Pakistan Ltd. SHR A0764 3000697066 01xWIP 4/10/2007 4/10/2007 4/10/2007 4/25/2007 4/26/2007
11kV Switchgear - 8BD4 (01xI/C + Energy Meter added in I/C in App / Revd
CPC, DG Khan KR/SHR A0765 3000698815 4/11/2007 4/18/2007 4/13/2007 6/5/2007 6/6/2007
02xO/G) CL on 06-06
M/s Aslam Textile Mills Ltd. SHR A0766 3000692516 01xWIP 4/17/2007 4/20/2007 4/20/2007 5/16/2007 5/17/2007

6.6kV Switchgear - 8BD4


Fecto Cement Co. Ltd. TAK A0767 3000699011 4/12/2007 4/18/2007 4/24/2007 5/8/2007 5/10/2007 CL rel on 19-04
01xI/C FLBS+02xO/G LBS Panels

13-04-07 24-05-07 08-06-07 Clarifications recd from SB-Ex on 28-05 /


M/s Indus Home Ltd. KR/SHR A0768 3000665134 11kV Switchgear - 15xSA2
30-04-07 05-06-07 13-06-07 Scope-II CLs on 05-06
M/s Haji M. Ismail Paper Mills SHR A0769 3000707423 01xWIP 4/23/2007 4/23/2007 4/23/2007 NR 5/17/2007 CL rel on 26-04
M/s Siddiko / Jinnah Naval Base, Ormara TAK A0770 3000704435 01x200kVA PMT 4/23/2007 4/25/2007 4/30/2007 5/10/2007 SB-Ex Go Ahead for Prod on 08-05
200kVA Prototype as per WAPDA
SB S&M SHA A0771 IFO 1213 4/23/2007 4/20/2007 4/20/2007
Specs. DDS 71:2004

01x11kV VCB Loose - 3AH3116-


D. G. Khan Cement Co. Ltd. (PTD SE) TAK A0772 3000709103 4/24/2007 4/25/2007 8/3/2007 NR 8/3/2007 CL rel on 25-04
2AEEA-ABQ2 for replacement

App awaited / CLs rel on 07-05; 8BD4


NTDC-WAPDA (HSS) / 11kV Switchgear - 23-04-07 07-05-07
KR/SHR A0773 3000702852 5/4/2007 ?? 1/10/2008 reqd as per SB Ex email dtd 8-01-08.
500/220/132kV S/S, Gakkhar 02xI/C+02xO/G+01xB/C (8BD4) 20-03-08 16-05-07
Revised CL on 18-01; Revised indent

02xWIP + 1xVCB Changeover + 07-06-07 CT Ratios confirmed on 30-05 / CL rel on


TMA Multan (PWT) / Multan Water Project KR/RJ A0774 3000698908 5/3/2007 5/9/2007 6/5/2007 6/8/2007
02xI/C O/G Panel-SA2 email 05-06

Page35/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

20 20 3 20 5 28 -8 Closed MV
40 40 3 20 23 17 Closed MV
160 125.6 34.4
160 65 21 17.5 2 7.6 7 5.5 Closed MV

0 46.5 46.5 -46.5 Closed MV


20 20 7 7 13 Closed MV
55 55 15 15 30 25 Closed MV

140 25 165 15 15 9 12 51 114 Running MV


5 5 15 15 -10 Closed MV
24 24 11 15 26 -2 Closed MV

103 103 25 45 10 25 15 120 -17 Closed MV

40 40 4 4 36 Closed MV

90 90 48 20 19.6 7 8 102.6 -12.6 Closed MV 8BK


40 25.5 14.5
40 11 14.5 Closed MV

5 5 0 5 Closed MV
20 20 15.8 15.8 4.2 Closed MV
20.6 20.6 4 4 16.6 Closed MV
20.6 20.6 5.5 5.5 15.1 Closed MV
0 7 2 9 -9 Closed MV
20.6 20.6 7 11 18 2.6 Closed MV
40 44 -4
40 25 15 4 Closed MV

0 21.1 10 35.4 6 72.5 -72.5 Closed MV


0 4 2 4 10 -10 Closed MV
15 15 15 25 40 -25 Closed MV
0 0 0 Closed MV
10 16 -6
10 10 6 Closed MV

0 43 -43
34 9 Running MV

0 15 13 14 42 -42 Closed MV

Page36/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

01xWCP + 01xWIP +
Hassan Spinning Mills (Pvt.) Ltd. TAK A0775 3000709928 5/3/2007 5/9/2007 5/11/2007 5/29/2007 5/30/2007 CLs rel on 04-05
01xI/C+03xO/G 11kV Panels - 8BD4

CL rel on 07-05 [w/o trolley & contact


Lucky Energy, Karachi KR A0776 3000717822 01xVCB 800A, 11KV, 25kA, 5/7/2007 NR NR NR 5/7/2007
arms]

CLs rel on 09-05, Owner's Panel as per


Klash (Pvt.) Ltd. KR/SHR A0777 3000716698 01xWIP + 01xI/C / O/G Panel 5/7/2007 5/11/2007 5/9/2007 6/12/2007 8/24/2007
WAPDA specs. / CT ratios recd on 23-08

As per new Prototype - SB-Ex email dtd


IESCO KR/RJ A0778 3000721536 06x200kVA PMTs 5/16/2007 NR NR NR 6/21/2007
20-06 / CL rel on 18-06
CDA Islamabad (EC) / Khanpur Dam KR/RJ A0779 3000723477 6.6kV Switchgear - 08 x 8BD-4 5/17/2007 5/31/2007 6/26/2007 6/28/2007 CLs rel on 31-05
Clarifications recd on 01-06 / CL rel on 01-
NMC-1, D.G. Khan TAK A0780 3000725566 01xWCP+01xWIP+02xO/G - 8BD4 5/21/2007 6/4/2007 6/5/2007 7/4/2007 7/12/2007
06
Advance Indent, CL on 25-05 / Indent,
LESCO / Tender No. 721/GSO TAK A0781 3000753867 07x200kVA PMT Alternate III 5/22/2007 NR NR NR 5/25/2007
S.O. No. recd on 20-06
M. Talib Enterprises / Jinnah Post Graduate
KR A0782 3000729476 02xKESC Jr Panels W/o Metering 5/23/2007 NR NR NR 5/24/2007 CL rel on 24-05.
Medical College
K.E.S.C. / LFIP 31607/07 KR/RJ A0783 3000727059 06xKESC Jr Panels 5/24/2007 NR NR NR 6/6/2007 CL rel on 28-05

24-05-2007 Indent / S.O. No. recd on 28/29-05/ CL rel


Niaz Muhammad & Co. KR/RJ A0784 3000734986 01x11kV I/C / O/G Panel - 8BD4 NR NR NR 5/28/2007
email on 28-05, Siemens CTs/PTs SB-D

IESCO TAK A0785 3000735270 09x63kVA PMTs 6/1/2007 NR NR NR 6/6/2007 CL rel on 06-06
CL on 12-06, CT ratio for WIP awaited /
01xWIP + 01-06-07 12-06-07
M/s Grand Parent Poultry KR/RJ A0786 3000730491 Owner's Panel specs on 19-06 - revd
01x11kV Owners's Panel 26-06-07 20-06-07
indent
11kV Switchgear-WAPDA 19-06-07
Lot 1(A):11xI/C+35xO/G+03xBC Panels+ Advance info on 01-06/07-06 email / App
GEPCO KR/SHR A0787 3000797158 Advance NR NR 6/27/2007 7/23/2007
Lot 1(B):14xI/C+35xO/G+03xBC Panels+ obtained as per MEPCO; CLs on 10-07
Spares Indent

18x200+03x100kVA PMTs + 02x4-


M/s Eden Developers (Pvt.) Ltd. /
TAK A0788 3000739528 Way+01x3-Way RMUs + 01xWCP + 6/5/2007 6/11/2007 6/18/2007 7/3/2007 7/23/2007 CL rel on 15-06
Eden Palace Villas
53 x E/F Indicators (Loose)

M/s Siemens Engineering Ltd. / 6.6kV,25kA,1250A Switchgear - 03-07-07


KR/SHR A0789 3000693562 6/11/2007 6/19/2007 11/13/2007 CL rel on 03-07 / App awaited;
220MW CCPP, Balloki 31xSimoprime World SLD/CL/FV
01x3.3kV Panel with Cable CL rel on 14-06 / Tech clarification recd
Mehran Sugar Mills (Tando Allah Yaar) KR/RJ A0790 3000740770 6/7/2007 6/12/2007 7/3/2007 7/16/2007
Connection/PT Panel on 27-06
International Engineers / 01xKESC Jr Panel with Metering -
KR/SHR A0791 3000743142 6/12/2007 6/13/2007 6/13/2007 6/25/2007 6/12/2007 CL rel on 15-06
YKK-Pakistan (Pvt.) Ltd. [I/C / O/G Type]

08-06-2007 Indent & SB No. recd on 25-10 / CL rel on


SP&EW KR/RJ A0792 3000879413 6.6kV Switchgear - 28xSA2 7/13/2007 7/5/2007 31-10-07
email 22-06 incl spares; / App awaited

CL on 03-07 / App awaited / Scope


18-06-07 03/07/2007
Fatima Sugar Mills KR/SHR A0793 3000742347 01x11kV I/C / O/G Panel-8BD 6/21/2007 10/1/2007 10/1/2007 clarified on 23-08 / Scope on hold /
24-09-07 26/09/07
Revised indent on 24/09

02x4-Way RMUs+01xWIP +
CL Of RMU+WIP rel on 29/06 / CLs of
CDA Islamabad (EC) / Q-Block KR/SHR A0794 3000749380 01x11kV CO Panel (8BD4) + 6/21/2007 6/27/2007 7/17/2007 8/1/2007 8/1/2007
remaining scope on 17-07
02x11kV O/G Panels (SA2)

Indus Sugar Mills Ltd. (OLM) KR/SHR A0795 3000757370 11kV Switchgear-01xLBS+01xFLBS 6/26/2007 6/29/2007 6/29/2007 7/12/2007 7/12/2007 CL on 29-06

06 / 06 xFixed+Moving Contacts for


K.E.S.C. (PTD SE) MR/KR A0796 3000758800 I/C / O/G Grid Panels (3AF VCBs) + 6/28/2007 NR NR NR 7/20/2007 CL on 11-07
other materials

Page37/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

80 13 67
80 10 3 Closed MV

5 5 0 5 Closed MV
40 21 19
40 8 13 Closed MV

20 20 12 12 8 Closed MV
100 100 18 13 19.5 10 60.5 39.5 Closed MV
60 60 2 15 10 27 33 Closed MV
0 10 5 15 -15 Closed MV

20 20 15 15 5 Closed MV
0 5 13 18 -18 Closed MV
20 26.5 -6.5
20 18 8.5 Closed MV

20 20 10 10 10 Closed MV
0 13 -13
13 Running MV

85 64.6 20.4
60 25 25 22.8 16.8 Closed MV

80 20 60
80 20 Closed MV

0 30 20 15 65 -65 Running MV

20 20 13 14.8 12 39.8 -19.8 Closed MV

20 20 9.8 5 14.8 5.2 Closed MV


75 21 54
75 13 8 Closed MV

40 54.4 -14.4
20 20 10 19.6 2 22.8 Closed MV

95 65.9 29.1
95 41.6 24.3 Closed MV

20 20 9.8 9.8 10.2 Closed MV


10 25.5 -15.5
10 25.5 Closed MV

Page38/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

24x3-Way+21x4-Way RMUs +
Prelim indent; CLs rel on 16-07; Color
34x100kVA+207x200kVA+9x400kV
NLC, Rawalpindi / DHA I Project TAK A0797 3000791565 6/28/2007 7/24/2007 29-10-07 RAL 5012 as per SB-S email dt. 19-07;
A PMTs w/o Energy Meters as per
App awaited
WAPDA specs.

11kV Switchgear-Simoprime
CLs rel on 19-07; Scope changed to
Bahria Town (Pvt.) Ltd., Rawalpindi (HSS) KR/RJ A0798 3000759696 01xI/C+06xO/G+01xCap O/G+ 6/29/2007 7/6/2007 9/12/2007 11/7/2007 1/4/2008
Simo-W on 27-08; Revd CLs rel on 05-09.
01x200kVA PMT-Alt III
11kV Switchgear-Simoprime
CLs rel on 19-07; Scope changed to
Bahria Town (Pvt.) Ltd., Lahore (HSS) KR/RJ A0799 3000759687 01xI/C+06xO/G+01xCap O/G+ 6/29/2007 7/6/2007 9/12/2007 11/7/2007 1/4/2008
Simo-W on 27-08; Revd CLs rel on 05-09.
01x200kVA PMT-Alt III
15x11kV I/C O/G Panels-8BD4 + 04-07-07 09-06-07 CL on 05-07; Indent & S.O. # recd on 16-
DP (Air), Rawalpindi KR/SHR A0800 3000779810 7/5/2007 7/5/2007 31-08-07
16x11kV I/C O/G Panels-8BD4 29-01-08 31-01-08 07; Add. Indent on 29-01-08.
Siddiq Leather Works (Pvt.) Ltd. KR/SHR A0801 3000762848 01xWCP 7/5/2007 7/6/2007 7/6/2007 9/5/2007 9/5/2007 CL on 06-07 / Appr recd on 05-09
01x3-Way RMU Scheme 10; (KESC
DHA, Karachi KR/RJ A0802 3000765867 7/6/2007 NR NR NR 7/19/2007 CL on 13-07
Specs. 78)

M/s Packages Ltd. / Bulleh Shah Paper Mills 09-07-07 18-07-07 CL on 18-07 / App with comments, Items
TAK A0803 3000752786 11kV Switchgear-06xSA2 7/30/2007 8/23/2007
Project 04-09-07 23-08-07 4-5 reqd in 8BD4; Revised indent

M/s Packages Ltd. / Bulleh Shah Paper Mills 18-07-07 30-07-07


TAK A0804 3000762953 11kV Switchgear-04xSA2 7/9/2007 8/23/2007 CL on 18-07
Project 23-08-07 05-09-07
CL rel on 11-07 / CT ratio awaited / App
M/s Nazeer & Sons KR/RJ A0805 3000765771 01xWIP 11kV O/G Panel - WAPDA 7/9/2007 7/11/2007 8/24/2007 8/29/2007 awaited; Scope change to WAPDA
design. Rev. CL on 29-08.
06xVCBs for WAPDA O/G Panel
Fico Engg. Co. (Pvt.) Ltd. KR A0806 3000737611 7/12/2007 NR NR NR 7/16/2007 CL on 16-07
(w/o motor)
14x11kV KESC Grid O/G Panels -
K.E.S.C. / FPO/1111/T&D/06 KR/SHR A0807 3000760017 7/12/2007 NR NR NR 7/20/2007 CL rel on 14-07 / Refer ED/A0747
8BD4
CL on 17-07; CT ratio received on
M/s National Industrial Engineers (Pvt.) Ltd. KR/SHR A0808 3000773701 01xWIP 7/12/2007 NR NR NR 9/3/2007
30/08/07
10kV Switchgear SA2 - CL on 23-07 / Clarifation received on 23-
M/s Habib Sugar Mills Ltd. - Nawabshah KR/SHR A0809 3000778641 7/16/2007 7/20/2007 7/23/2007 8/16/2007 8/31/2007
03xO/G+CCB 08-07
11kV Switchgear SA2 -
Ministry of Foreign Affairs - GOP (EC) KR/SHR A0810 3000783021 7/19/2007 7/26/2007 7/27/2007 8/28/2007 8/29/2007 CL on 20-07
01xI/C+02xO/G
NPI Construction & Engineering KR A0811 3000755666 01x11kV I/C O/G Panel - SA2 7/19/2007 7/23/2007 7/20/2007 8/28/2007 8/29/2007 CL on 20-07; CT ratio on 01-08
08x11kV Capacitor O/G Panels as
CL on 23-07; Prelim indent / Order not
QESCO / Tender No. 306 KR/RJ A0812 per WAPDA specs., Neutral CTs 7/13/2007
received.
and Spares

23-07-07
11 kV Switchgear - 02xWIP
WIP
Margalla Engineering Services KR/SHR A0813 3000802816 (01xwith Energy Meter) 7/23/2007 7/26/2007 7/26/2007 8/10/2007 CL on 23-07 & 26-07
13-08-07
01xI/C+01O/G - 8BD4
Item 2

Adamjee Enterprise / Nooriabad Factory KR A0814 3000788661 01xWIP - 50A CTs 7/23/2007 NR NR NR 7/24/2007 CL on 24-07
Punjab Industrial Estate KR/MR A0815 3000348705 01x5-Way RMU 7/24/2007 NR NR NR 7/24/2007
Technical Associates Pakistan / Abu Dhabi 17-08-07
KR/RJ A0816 3000795211 03xKiosk S/Ss - 250, 400 & 750kVA 7/30/2007 8/10/2007 5/9/2007 6/9/2007
Palace 24-08-07
Zultech (Pvt.) Ltd. KR/SHR A0817 3000804173 01x11kV I/C / O/G Panel 01.08.07 8/6/2007 8/7/2007 8/16/2007 8/20/2007 Clarification recd on 06-08;

11kV Switchgear - 01xLBS+02xI/O 22-08-07 CLs rel on 17-08; Clarification recd on 17-
PECT Engineering (Pvt.) Ltd. KR/SHR A0818 3000802906 8/10/2007 8/17/2007 8/17/2007 8/24/2007
VCB Panels-8BD4 email 08

11kV Switchgear - 01xI/C+01xO/G,


M/s Suraj Cotton Mills Ltd. KR A0819 3000795378 8/15/2007 8/21/2007 8/21/2007 9/10/2007 9/10/2007 CL on 20-08.
SA2

Page39/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

100 26 74
60 40 20 6 Running MV

0 37.2 -37.2
8.2 29 Running MV

0 35 -35
8 27 Running MV

0 10 10 -10 Running MV
30 30 5 2 7 23 Closed MV
0 10 10 -10 Closed MV
107 93.6 13.4
82 25 10 42.8 40.8 Closed MV

82 25 107 10 37.8 47.8 59.2 Closed MV


30 5 25
30 5 Closed MV

0 5 5 -5 Closed MV
0 15 12 27 -27 Running MV

20 20 4 4 16 Closed MV

55 55 15 37.8 7 59.8 -4.8 Closed MV

40 40 15 1 16 24 Closed MV
20 20 10 5 15 5 Closed MV
0 12 -12
10 2 Closed MV

40 62.5 -22.5
40 10 52.5 Closed MV

20 20 10 10 10 Closed MV
40 40 26 5 31 9 Closed MV
206 206 50 8.8 58.8 147.2 Closed MV
0 19 19 -19 Closed MV
40 25.8 14.2
40 25.8 Closed MV

40 40 15 15 25 Closed MV

Page40/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

01xWIP+01x11kV I/C / O/G Panel -


M/s Ali Murtaza Associates SHR A0820 3000812496 8/15/2007 8/17/2007 8/20/2007 8/28/2007 8/29/2007 CL on 20-08.
8BD4
6kV Switchgear (09x8BD4+
01xBPT+02Dummy) + 01x1250A
Pak Arab Fertilizers (Pvt.) Ltd. KR/RJ A0821 3000778701 8/16/2007 8/27/2007 9/5/2007 11/1/2007 11/13/2007 CLs on 28-08.
VCB Trolley, Termination kits &
Loose Materials

United Group / Australian High Commission KR A0822 3000818574 01xWIP 8/24/2007 NR NR NR 8/28/2007 CL on 28-08.

25-09-07
DHA Phase V - G Ext, Lahore (EC) TAK/RJ A0823 3000816656 01x3-Way RMU+02x400kVA PMTs 8/24/2007 8/31/2007 9/3/2007 25-10-07 CLs on 03-09.
23-11-07

Ahangar (Pvt.) Ltd. KR A0824 3000821815 01x11kV I/C / O/G Panel - SA2 8/28/2007 8/31/2007 8/29/2007 6/9/2007 6/9/2007 CL on 29-08. App. Received on 06/07/07

02x11kV, 1250A I/C / O/G Panel - 28-08-07 04-09-07 05-09-07


Hydro Electric Board, AJK (OLM Isb) SHR A0825 3000833191 11/22/2007 11/23/2007 CL on 05-09; Add indent
8BD4 WAPDA 02-01-08 08-01-08 08-01-08
01x11kV I/C / O/G Panel 8BD-4 +
19/09/2007
Punjab Beverages Co. Ltd. SHR A0826 3000831938 Loose Components for CO with 9/3/2007 9/6/2007 9/10/2007 9/20/2007
email
existing Panel
Omni Packages TAK A0827 3000668619 01xWIP 9/11/2007 NR NR NR 9/12/2007 Order cancelled
Prelim indent; CL rel on 21-09;
IESCO TAK/RJ A0828 3000877687 25x400kVA PMTs 19-09-07 NR NR NR 9/21/2007
Indent/S.O. recd on 09-10
Prelim indent; CL rel on 21-09;
IESCO TAK/RJ A0829 3000877704 20x630kVA PMTs 19-09-07 NR NR NR 9/21/2007
Indent/S.O. recd on 09-10
24x11kV WAPDA Outgoing Panels - Prelim indent; CL on 24-09; Indent & S.O.
HESCO KR/SHR A0830 3000873609 9/19/2007 9/24/2007 9/24/2007 11/14/2007 11/14/2007
P44:96 No. recd on 03-10
S'Afghanistan KR/RJ A0831 3000863636 01x24kV 8BK20 Panel 26-09-07 10/5/2007 10/8/2007 1/4/2008 CL on 05-10; VCB Carriage
03x100kVA+02x200kVA (Alt. III)
TR TAK A0832 3000868359 10/1/2007 NR NR NR 10/10/2007 CLs on 10-10
PMTs
01xWIP+01x11kV I/C / O/G Panel -
M/s The Lahore Arts Council SHR A0833 3000821834 10/2/2007 10/2/2007 10/2/2007 10/19/2007 10/19/2007
8BD4
Gulshan Spinning Mills Ltd. KR/RJ A0834 3000865141 01xWIP 10/1/2007 10/1/2007 10/2/2007 NR 25-10-07
11kV Switchgear - 01xI/C+03xO/G -
Karachi Marriott Hotel (PTD SE) KR/RJ A0835 3000870027 10/2/2007 10/8/2007 10/10/2007 11/20/2007 11/22/2007 CLs on 10-10
SA2
05-10-07 25-10-07 29-10-07
M/s Engro Chemicals Pakistan Ltd. KR/RJ A0836 3000871810 04x750kVA Kiosks 10/11/2007 24-10-07 Add indent for 01No.
01-02-08 email 11-02-08
Pakistan Air Force KR/RJ A0837 3000876532 06x11kV I/C / O/G Panel - SA2 8/10/2007 10/12/2007 11/13/2007 2/6/2008 2/6/2008 CL rel on 31-10
01XWIP + 01x11kV I/C & O/G -
Shahtaj Sugar Mills Ltd. / OLM SHR A0838 3000857187 10/22/2007 10/24/2007 24-10-07 10/24/2007 11/13/2007 Refer ED/A0685; CL rel on 29-10.
8BD4
NTDC-WAPDA (HSS) /
RJ/FMF A0839 3000881257 02x1000kVA PMTs 17-10-07 11/20/2007 12/17/2007 CL on 20-11.
500/220/132kV S/S, Gakkhar
Drawings released in production as per
Thermo Electro Control Corporation SHR A0840 3000894375 01x11kV I/C / O/G Panel - 8BD4 23-10-07 24-10-07 24-10-07 NR 10/24/2007
goahead from SB S

National Foods SHR A0841 3000899771 01x11kV I/C / O/G Panel - 8BD4 10/29/2007 10/29/2007 10/29/2007 11/1/2007 10/31/2007 Released as per SB Ex email dtd 30-10

M/s ICI Pakistan Ltd. KR/RJ A0842 3000945090 11kV Switchgear - 01xI/C+01xB/C 26-10-07 12/13/2007 12/11/2007 NR 12/11/2007 Main indent on 10-12; CLs on 16-11.

11kV Switchgear- Simoprime


Punjab Industrial Estates Development & 01xI/C+10xO/G+01xCap O/G + 14/11/2007; CLs on 08-11. Revised on 23/11 based on
SHR A0843 3000859305 26-10-07 11/6/2007 2/15/2008 26-02-08
Management Company (HSS) / Sunder 01x200kVA PMT-Alt III 03/12/07 Simoprime.
as per WAPDA specs.
14/11/2007 01/01/2008 CLs on 14-11; App. recd with changes;
Civil Works Organisation (EC) SHR A0844 3000904135 01x11kV I/C / O/G Panel - 8BD4 31-10-07 11/7/2007 1/23/2008
14-01-08 23-01-08 Resubmitted

Page41/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

40 40 15.3 15.3 24.7 Closed MV


0 40 -40
20 20 Closed MV

20 20 10 10 10 Closed MV
0 20 20 -20 Running MV

20 20 15 20 35 -15 Closed MV
0 34.6 34.6 -34.6 Running MV
20 30.3 -10.3
20 30.3 Closed MV

0 2 2 -2 Closed MV
0 13 13 -13 Running MV
0 13 13 -13 Running MV
0 0 0 Running MV
0 15 15 -15 Running MV
0 0 0 Closed MV

40 40 0 40 Closed MV
0 0 0 Running MV
0 0 0 Closed MV
0 0 0 Running MV
0 0 0 Running MV
0 0 0 Running MV
0 0 0 Running MV

20 20 0 20 Closed MV

20 20 0 20 Closed MV
0 0 0 Running MV
0 0 0
Running MV

0 0 0 Running MV

Page42/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

07-05-07
17.5kV, 40kA, 3150A Switchgear - Phase - I
MAN Diesel (CIP) / Atlas Power KR/SHR A0845 3000857597 11/1/2007 11/16/2007
20x8BK20 + 04xLBS Panels+NGR 11/01/08
Phase - II
China Harbour Engineering Co. Ltd. (IS) / KICT 29-10-07 23/11/2007 18-12-07 Indent & S.O. No. recd on 05-11; CL rel on
MTS A0846 3000911179 11kV Switchgear - 10xSA2 16.11.07 1/7/2008
Phase-III Expansion Advance Phase 1 31-01-08 21-11
Al-Moiz Industries Ltd. (OLM) RJ A0847 3000908991 01xWCP 11/5/2007 11/8/2007 11/8/2007 1/2/2008 1/3/2008 CL rel on 08-11.
15/11/07
01xWIP+11kV Switchgear - WIP
M/s Suraj Cotton Mills Ltd. SHR A0848 3000903040 11/5/2007 11/12/2007 11/15/2007 11/27/2007 CL on 15-11
01xI/C+02xO/G (8BD) 27/11/07
I/O

Adamjee Enterprise / Nooriabad Factory KR A0849 3000901075 01x11kV I/C / O/G Panel - SA2 11/2/2007 11/8/2007 11/8/2007 11/21/2007 11/21/2007 CL rel on 08-11
CL rel on 13-11; Prelim indent based on
IESCO KR A0850 3000937802 30x4-Way RMUs 11/8/2007 NR NR NR 11/13/2007
LOI
11kV Switchgear-05xI/C
HESCO KR/SHR A0851 3000873609 as per WAPDA specs. 11/13/2007 11/14/2007 11/14/2007 12/14/2007 12/24/2007 CL on 21-11.
1600:800/5/5A
01x100kVA+25x200kVA PMTs w/o
Habib Rafique Pvt. Ltd. /
RJ/FK A0852 3000923287 EM + 05x3-Way+02x4-Way RMUs 11/20/2007 NR NR NR 12/6/2007 CLs on 27-11.
Sector J - DHA Phase II, Islamabad
as per WAPDA Specs.
06x100kVA+31x200kVA PMTs w/o
Habib Rafique Pvt. Ltd. /
RJ/FK A0853 3000923329 EM + 04x3-Way+05x4-Way RMUs 11/20/2007 NR NR NR 12/6/2007 CLs on 27-11.
Lawyers' Colony - DHA Phase I, Islamabad
as per WAPDA Specs.
62x100kVA+196x200kVA PMTs w/o
Habib Rafique Pvt. Ltd. / Commoners'
RJ/FK A0854 3000923355 EM + 17x3-Way+13x4-Way RMUs 11/20/2007 NR NR NR 12/6/2007 CLs on 27-11.
Town - DHA Phase II, Islamabad
as per WAPDA Specs.
11kV Switchgear - 01xI/C+01xO/G
Clariant Pakistan Jamshoro KR/FK A0855 3000940305 12/3/2007 12/7/2007 12/12/2007 1/14/2008 1/15/2008 CLs on 05-12
(8BD4)
03x11kV WAPDA Outgoing Panels -
Bahria Town, Rawalpindi KR/FK A0856 3000940095 12/3/2007 12/4/2007 12/4/2007 1/29/2008 1/29/2008 CL on 04-12.
P44:96
Azmat Enterprises KR/FK A0857 3000936930 11kV Switchgear - 02xI/C /O/G 12/6/2007 12/11/2007 12/10/2007 2/11/2008 2/11/2008 CL on 07-12.
02x I/C / O/G Panels - 8BD4 +
11-12-07
Resham Textile Mills Ltd. KR/FK A0858 3000943514 Dummy Panel + Loose 12/14/2007 12/17/2007 1/8/2008 1/7/2008 CL on 17-12; Revised indent
22-02-08
components
Blessed Textile Mills SHR/FK A0859 3000949843 01xWIP 12/11/2007 12/12/2007 12/12/2007 12/18/2007 12/18/2007 CL on 12-12-07.

02x3-Way+09x4-Way RMUs +
15x200kVA+48x630kVA+
13-02-08
M/s SKB Engg. & Constructions - DHA Phase VI KR/RJ A0860 3000975429 02x1000kVA PMTs w/o Energy 1/3/2008 1/11/2008 Design indent on 19-12; CLs on 19-12
14-02-08
Meters as per WAPDA specs.
except 1000kVA PMTs

11kV / 6.3kV, 31.5/25kA,


24/03/08 24/03/08
Fatima Fertilizer (Pvt. ) Ltd. KR/SHR A0861 3000975418 2500/1250A MV Switchgear - 12/31/2008 Indent/S.O. recd on 07-01; CLs on 24-03
SLD/FV/CL SLD/FV/CL
Simoprime World
Cadbury Pakistan Ltd. SHR/FK A0862 3000976006 01x I/C / O/G Panels - SA2 1/14/2008 1/14/2008 1/14/2008 2/6/2008 2/6/2008 Cl. on 14-01
Fico Engg. Co. (Pvt.) Ltd. KR A0863 3000977483 05xVCBs for KESC Jr. 1/8/2008 NR NR NR NR

Bahria Town (Pvt.) Ltd., Lahore KR/FK A0864 3000981067 01x11kV, 4800kVAr Capacitor Bank 1/9/2008 1/17/2008 2/7/2008 CL on 21-01.

Bahria Town (Pvt.) Ltd., Rawalpindi KR/FK A0865 3000981498 01x11kV, 4800kVAr Capacitor Bank 1/9/2008 1/17/2008 2/7/2008 CL on 21-01.

15kV Switchgear- Simoprime)


K.E.S.C. KR/RJ A0866 3000975460 (05xI/C+74xO/G+10xBC)+ 1/9/2008 1/22/2008 2/19/2008 2/19/2008 Advance Ordering done
09xAdapter Panels-SW/8BD4

Page43/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

0 0 0
Running MV

0 0 0 Running MV
0 0 0 Running MV
0 0 0
Closed MV

0 0 0 Closed MV
0 0 0 Running MV
0 0 0
Running MV

0 0 0
Running MV

0 0 0
Running MV

0 0 0
Running MV

0 0 0 Running MV
0 0 0 Running MV
0 0 0 Running MV
0 0 0
Running MV

0 0 0 Running MV
0 0 0
Running MV

0 0 0
Running MV

0 0 0 Running MV
5 5 0 5 Closed MV
175 175 149 17.3 5.8 172.1 2.9 Running MV
175 175 149 17.3 5.8 172.1 2.9 Running MV
235 413.9 -178.9
235 18 66.8 56 20 30 35.5 91.8 95.8 Running MV

Page44/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

56xKESC Jr Panel W/Protection &


KESC SHR/FK A0867 3000977672 W/O Metering - [I/C/O/G Type] CT 1/15/2008 1/17/2008 NR NR 1/25/2008 CL on 18.01.08
50/5A
11kV Switchgear - 01xI/C+03xO/G
M. Talib Enterprises SHR/FK A0868 3000981455 1/17/2008 1/23/2008 1/25/2008 1/25/2008 1/28/2008 CL on 18.01.08
(SA2)

Sunlight Wood Industries KR/RJ A0869 3000988249 11KV Changeover Panel; 8BD4 1/18/2008 1/25/2008 NR NR 1/29/2008
CL on 22-01. reduced LV comptt. On 07- 3
04.

Amson Vaccine & Pharma KR/FK A0870 3000991828 01xWIP + 01xI/C / O/G Panel [SA2] 1/18/2008 1/25/2008 1/24/2008 3/19/2008 3/19/2008 CL on 23-01.

Mughal Steel KR A0871 3000979107 Spares 1/16/2008 1/22/2008 NR NR NR CL on 22-01.

Sapphire Power Generation KR A0872 3000993250 01x11kV I/C Panel for Generator 1/21/2008 1/30/2008 1/25/2008 2/4/2008 2/19/2008 CL on 23-01.

01xI/C + 01xB/C + Adapter 11kV Revised indent on 04-02; Change on 21-


Tayyab Textile Mills KR/RJ A0873 3000991918 1/25/2008 1/31/2008 3/3/2008 4/1/2008 4/1/2008
Panel - 8BD4 + Loose Components 02 - revised indent recd on 25-02

Tahir Rafiq Textile Mills FK A0874 3000991864 01xI/C / O/G Panel [8BD4] 1/25/2008 1/31/2008 1/30/2008 2/14/2008 2/15/2008 CL on 30-01.
Gulshan Spinning Mills Ltd. RJ A0875 3000998237 01x11kV CO Panel - 8BD4 1/28/2008 2/1/2008 NR 2/11/2008 CL on 31-01.

Ahmad Jamal Textile Mills Ltd. FK A0876 3001001740 01xWIP + 01xI/C / O/G Panel [8BD4] 1/29/2008 2/4/2008 2/6/2008 3/3/2008 3/4/2008 CLs on 31-01.

Al-Madina Floor Mills FK A0877 3001001886 01xWIP [50/5A CTs] 1/29/2008 2/4/2008 2/6/2008 2/22/2008 CL on 04-02.
6.3kV, 25kA, 3150A Switchgear - CLs on 22-02. App & CTs confirmation
Flying Cement Company Ltd. (HSS) KR/RJ A0878 3000998565 1/28/2008 2/15/2008 2/27/2008
Simoprime awaited.
TR-Varivolt Transformer SHR A0879 3001006869 01x11kV I/C / O/G Panel [SA2] 1/30/2008 NR NR 2/8/2008 2/8/2008 CL on 08-02-08
125xVCBs for KESC Jr. +
Fico Engg. Co. (Pvt.) Ltd. KR A0880 3001002069 1/30/2008 NR NR NR 1/31/2008 CL on 31-01.
7SJ6025…

01xI/C + 01xB/C + Adapter 11kV Change on 21-02 - revised indent recd on


Tahir Rafiq Textile Mills KR/FK A0881 3001004746 2/6/2008 2/11/2008 3/7/2008 4/1/2008 4/1/2008
Panel - 8BD4 + Loose Components 25-02

11kV, 31.5kA, 2500A Switchgear - 27/2/2008 20/03/08


National Management Foundation/LUMS KR/HM A0882 3001004838 2/4/2008 4/15/2008 CLs rel on 25-02.
Simoprime 10/04/2008 SLD/FV/CL
Crescent Bahuman Ltd. KR/FK A0883 3001009432 01x11kV I/C / O/G Panel [SA2] 2/14/2008 2/25/2008 2/22/2008 3/17/2008 3/17/2008 CL on 22-02.
01xWIP + Addition of PT Box in 20-02-08 Advance info; CL rel on 20-02 - PTs to be
City Tower FK A0884 3001031801 2/19/2008 NR NR NR
Existing 8BD4 panel. WIP ordered; Indent recd on 22-02
CLs on 14-03.; To be released
11kV Switchgear - SA2 + 8BD4
Colony Textile Mills Ltd. KR/RJ A0885 3001036792 2/28/2008 3/14/2008 3/14/2008 3/14/2008 simultaneously for manuf; Schemeatics
Scope
pending
Gulistan Power Generation KR/FK A0886 3001043370 01xMetering Panel 2/28/2008 NR NR NR 2/29/2008 CL on 28-02.
20kV Switchgear - Simoprime A4 /
KDEP MEW 300/4 (HSS) KR/FK A0887 3000662403 4/7/2008 3/25/2008 Advance Indent; CLs on … ?
8BK20

11kV Switchgear-
CL on 13-03; To be released
QESCO KR/RJ A0888 3001050270 05xI/C+20xO/G+03xBC+05xCap 3/7/2008 3/12/2008 3/13/2008 3/12/2008
simultaneously for manuf
O/G as per WAPDA specs. 8BD4

11kV Switchgear - 03xI/O VCB


Ghazi Fabrics International Ltd. KR/HM A0889 3001008774 3/10/2008 3/17/2008 4/2/2008 CL rel on 20-03.
Panels-8BD4 + 01xLBS
Punjab Beverages Co. Ltd. KR/RJ A0890 3001054439 01x I/C / O/G Panels - 8BD4 3/10/2008 14/3/2008 3/18/2008 4/3/2008 4/3/2008 CL rel on 18-03.

12xKESC Jr Panels with Metering Email dt. 11-03; CDD 15-04; CLs rel on 19-
K.E.S.C. KR/RJ A0891 3001070351 3/24/2008 4/2/2008 3/26/2008 NR 3/26/2008
[04 Nos. with Battery] 03.

Page45/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

0 0 0
Running MV

0 0 0 Running MV
40 20 60 78.8 78.8 -18.8 Running MV
0 8 13 21 -21 Running MV
0 0 0 Running MV
53.375 53.38 52.5 52.5 0.875 Running MV
63 20 43
63 20 Running
MV
61.71 61.71 42 42 19.71 Running MV
0 0 0 Running MV
0 8 13 21 -21 Running MV
0 0 0 Closed MV
337.5 337.5 243.5 35.25 20 56.25 355 -17.5 Running MV
0 8 13 21 -21 Closed MV
5 5 0 5 Running MV
63 20 43
63 20 Running
MV
337.5 337.5 243.5 35.25 20 56.25 355 -17.5 Running MV
0 8 13 21 -21 Running MV
0 0 0 Running MV
229 289 -60
164 65 282 7 Running
MV
0 10 10 -10 Running MV
235 235 18 66.8 56 20 30 35.5 91.8 95.8 413.9 -178.9 Running MV
0 0 0
Running MV

40 40 25.8 25.8 14.2 Running MV


0 0 0 Running MV
55 30 25
55 15 15 Running MV

Page46/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

Email dt. 11-03; CDD 30-04; CLs rel on 19-


04xI/C+06xO/G VCB Trolleys -
K.E.S.C. KR/FK A0892 3001070361 3/24/2008 4/2/2008 3/31/2008 3/31/2008 03; To be released simultaneously for
KESC Grid 15kV
manuf
01x11kV O/G Panel - 8BD4 CL on 18-03; To be released
Rotax Ltd. KR/HM A0893 3001055090 3/13/2008 3/20/2008 3/18/2008 4/8/2008 3/18/2008
(Reduced height) simultaneously for manuf
M/s Honda Atlas Cars (Pakistan) Ltd. KR A0894 3001059597 IDMT relay CDG-61 3/18/2008 NR NR NR NR CL rel on 18-03.
11kV Switchgear- SA2
CL rel on 01-04. SB-D details shall be
Maritime Technologies Complex KR/FK A0895 3001064766 02xI/C+04xO/G + 04x630kVA PMTs 3/19/2008 4/1/2008 4/10/2008
required for Energy meter / CTs.
as per WAPDA specs.

Reckitt Benckiser (PTD SE) KR/HM A0896 3001051277


01x11kV Simoprime-A2 I/C/O/G
3/25/2008 3/31/2008 3/27/2008 4/2/2008 4/2/2008 CL rel on 27-03. 10
VCB panel
M/s Power Axis MR A0897 3001058578 WAPDA VCB Contact Arms 3/25/2008 NR NR NR 10
Krystalite Ltd. KR A0898 3001071805 01 x WCP 3/25/2008 NR NR NR 3/26/2008 CL rel on 26-03.
01x11kV Bus-PT Panel [SA2] +
Al-Rahim Textile Mills SHR A0899 300105349 3/25/2008 3/28/2008 3/27/2008 3/27/2008 CL rel on 28-03.
Spares
Service Industries Limited KR/HM A0900 3001068114 01x11kV I/C/O/G Panel-8BD4 3/27/2008 4/1/2008 4/2/2008 4/7/2008 4/7/2008 CL rel on 02-04.
01 x 11kV Gen. incoming Panel -
Ghazi Fabrics International KR/HM A0901 3001079741 4/7/2007 4/11/2008 Advance indent on 03-04.
SA2

03-04-03 03-04-03 Succesfully type tested on 23-09 at


14-01-03
1 Prototype 100/200kVA SJA/SHA Y5143 5100002190 100/200kVA PMT 23- 11/4/2004 Rewat/WAPDA Inspection on 20-
-
06-04 23-06-04 10/Approved on 27-10
TOTAL MV HOURS 5822
LV Switchboards
1 Pak Arab Fertilizers (Pvt.) Ltd. SMY A5239 4800012190 MCC (8PU.011) 7/5/2002 16-09-02 16-05-03 09-07-03 Inspected on 28-06
1 WASO - Mianwali ( TD ) SJA A5379 5100002364 AC/DC Switchgear 6/20/2003 07-07-03 26-04-04 15-10-03 Inspected on 28/29-07
Trafo Control Panels - 02x10/13
1 WASO - Mianwali ( TR ) RJ A5386 5100002399 7/15/2003 25-07-03 26-04-04 27-04-04 CL rel on 20-08
MVA, 132/6.6 KV
Trafo Control Panels-
2 WAPDA ( KF - 541 ) RJ A5389 5100002546 7/21/2003 19-08-03 03-09-03 17-10-03 Indent on 15-10/CL rel on 09-10
15x20/26MVA,132/11.5KV

4 PAPCO MA A5390 5100002428 Relay and Control Panels 7/24/2003 NR NR 23-12-03 Add Indent on 07-05/SB D detail on 21-07

3 K.E.S.C. ( TR ) RJ A5403 5100002545 Fan Control Panel-5x31.5/40MVA Tra 9/3/2003 19-09-03 03-11-03 06-11-03
02xProtection Panel, 02xControl
6 WASO - Mianwali ( TD ) MA A5412 5100002364 10/9/2003 NR NR 12-12-03 Inspected on 28/29-07
Panel, 02xTLCC's
1No.CP20,1No.RP3,1No.AC/DC
2 WAPDA ADP 25 MA A5415 5150002564 10/7/2003 NR NR 30-10-03
Aux.Panel
1 220/132kV GIS S/S Islamabad University MA A5416 5100002544 06xCP50+06xRP4 Relay & Control P 10/15/2003 NR NR 30-10-03
6 Bahria Town (Pvt.) Ltd., Rawalpindi FRQ A5418 4800016903 AC/DC Auxiliary Supply Panel 10/16/2003 19-11-03 12-01-04 13-01-04
2 White Oil Pipeline Project RJ A5422 5100002679 Trafo Control Panel - 04x10/13 MVA 10/29/2003 23-12-03 08-01-04 26-01-04 Customer Change rel on 06-04
MDB (1xS1+7xL1+3xC) +
23-01-04 18-
11 CEMAG - Askari Cement Ltd. FRQ A5424 5100002610 MCC(8xS1) - 8PU.011 + BTD + PLC 11/20/2003 18-12-03 05-01-04 BTD App recd on 31-03
03-04
Panels
2 WAPDA RJ A5426 5100002594 02xTrafo Fan Control Panel-20/26M 11/11/2003 11-12-03 NR 11-02-04
3 Sialkot Int'l Airport Ltd. ( EC ) SMY A5435 5100002643 LT Switchgear 12/10/2003 09-01-04 12-02-04 03-03-04 Reinspected on 23-11-04

Page47/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

55 30 25
55 15 15 Running MV

0 8 13 21 -21 Running MV
0 57 57 -57 Running MV
100 26 74
60 40 20 6 Running MV

50 50 24.4 24.4 25.6 Running MV


50 50 24.4 24.4 25.6 Running MV
0 0 0 0 Running MV
0 8 13 21 -21 Running MV
0 0 0 Running MV
100 25 125 147.3 147.3 -22.3 Closed MV
0 0 0 Running MV
0 0 0 Running MV
0 0 0 Running MV
0 0 0
Closed MV
20368 4538.1 ### 23142 23142 1764 Running MV
0 0 0 0 Running LV
0 0 0 0 Closed LV
0 0 0 0 Closed LV
0 26 26 -26 Closed LV TCP
0 0 0 0 Closed LV TCP
0 0 0 0 Closed LV
0 0 0 0 Closed LV TCP
0 0 0 0 Closed LV
0 0 0 0 Closed LV
160 160 184 184 -24 Closed LV
0 0 0 0 Closed LV
0 0 0 0 Closed LV TCP
0 0 0
0 Closed LV

0 0 0 0 Closed LV TCP
200 150 350 538.7 538.7 -188.7 Closed LV

Page48/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

LT Switchgear for Siemens Power


4 BU EPN TAM A5436 5100002647 4/2/2004 09-04-04 09-04-04 Add Indent on 14-06/Drgs rel on22/24-06
House
15 Pakistan PTA Ltd. FRQ/TAM A5439 4800018549 02xMCCs 12/17/2003 24-12-03 10-02-04 12-02-04 Inspection on17-06
01xFan Control Panel For 10/13
16 WAPDA - Colony Textile Mills (TR) RJ A5444 5100002712 1/8/2004 15-01-04 11-02-04 11-02-04 Indent on 22-01
MVA Power Trafo
02xRP3+01xRP4+02xCP30+01xCP
11 Bahria Town (Pvt.) Ltd., Rawalpindi MA A5448 510002716 2/11/2004 NR NR 30-04-04 Front Plate details 07-06
50 Relay & Control Panels

5 K.E.S.C. (TR) RJ A5449 510002749


01xFan Control Panel For
2/12/2004 03-03-04 08-03-04 08-03-04 20
30/37.5MVA Power Trafo
Relay & Control Panels dispatched/
6 WAPDA ADP25 MA A5450 510002564 256x Relay, Control & AC/DC Aux. P 2/17/2004 26-02-04 18-03-04 08-03-04
Inspected on 05-10
20 Bestway Cement Ltd. FRQ A5451 4800019169 02x Starter Module Withdrawable 2/13/2004 25-03-04 20-04-04 25-03-04
5000A LT Switchgear with BTD/Layout App recd on 16-04/Cu size
21 Nishat Chunian Ltd.(Weaving) SMY A5453 4800019386 3/3/2004 15-03-04 25-03-04 26-03-04
1400kVAr PFIP changed
17 MCR - PARCO TAM A5454 4800019400 02x45kW MCC Modules 3/3/2004 NR NR 18-03-04

Indent recd 16-04 / Supporting docs. for


MCBs sent to SB S / Go-ahead to Prod on
19-05-04
1 IESCO FRQ A5455 4800019830 07X AC / DC Panels 3/15/2004 22-04-04 6/23/2004 09-03 / Resubmitted for App to WAPDA as
09-08-05
per SB S email dtd 04-08 / Inspected on
25&26-08

20 ICI Soda Ash Business SMY A5456 4800019715 02 x MCCs 3/26/2004 25-03-04 16-04-04 20-04-04
19 Masood Textile Mills Ltd. FRQ A5458 4800019596 LT Swithgear with 500kVAr PFIP 3/25/2004 4/1/2004 4/1/2004 15-04-04 19-04-04
30x Relay & Control Panels for
8 WAPDA ADP32 (TD) SHA A5459 5100002807 3/29/2004 NR NR 06-05-04 Inspected on 04-10
Capacitors
42x Sivacon 8PT Panels in CKD
27 Scientechnic Dubai TM/FRQ A5460 4900000316 4/6/2004 NR NR 12/13/23-04 Add Indent for 09x ccs2 panels on 28-05
Condition
9 Decon Germany / Rehabilitation of the 110/15(20)k FRQ A5461 4900000306 AC/DC Panels 4/12/2004 25-04-04 17-05-04 15-06-04 15-06-04 Add Indent for 01 x DB on 30-09
22 Sitara Chemical Industries SMY A5462 4800020056 LT Switchgear with 300kVAr PFIP 4/20/2004 26-04-04 13-05-04 13-05-04
18-05-04 CL rel on 28-04/MLT/PFIPs for prod on 19-
30 Ibrahim Fibers Ltd. (AATML) SMY A5464 4800020147 MLT + PFIP + BTD+DBs 4/27/2004 5/4/2004 21-05-04 28-05-04
DBs 05/Ist App DBs 13-05
19-05-04
13 Ibrahim Fibers Ltd. (ITM) SMY A5465 4800020148 MLT + PFIP + BTD+DBs 4/27/2004 5/4/2004 24-05-04 6/1/2004 Inspected on 26-08
PFIPs
Auto Load Transfer Switch
14 Seven Star Company FRQ A5466 4800020227 5/4/2004 18-05-04 21-05-04 6/23/2004 7/13/2004
250kVA/400kVA

10 Decon Germany / Afghanistan(TR) RJ A5467 5100002896


02x Trafo Control Panel for 16/25
4/30/2004 5/10/2004 7/26/2004 NR 8/31/2004 Go ahead on 30-08 40
MVA Power Trafo
17-05-04 26.05.04 MLT 03-06-04MLT
LT Switchgear (LT Panel, MCCs
11 Olympia Chemicals Ltd. TAM A5468 4800020254 4/30/2004 5/12/2004 30.06.04MCC 22-07-04MCC MLT/BTDs/PFIP dispatched
F1,600KVArPFIP,3200A BTD etc) 15.07.04 Layout -
28-05-04
25 DAELIM Ind. for KOC Kuwait(TR) RJ A5469 Not Availabel 14x Temp Control Panels for Trafo 5/11/2004 14-05-04 App awaited
4 WAPDA / NTDC (TR) RJ A5470 5100002899 01x Control panels for 20/26 MVA Tr 5/13/2004 6/24/2004 7/19/2004 NR 7/19/2004 CL rel on 25-05
22-06-04DBs
22-06-04DBs
18 Apollo Textile Mills Ltd. TAM A5471 4800020595 LT Switchgear 5/31/2004 6/11/2004 27-07-04MLT 01 x DB added 17-08
05-08-04 MLT
19 Enar Petrotech TAM A5472 4800020565 02x 55KW Withdrawable Starter Mod 6/3/2004 6/21/2004 6/30/2004 7/6/2004
5 POF Wah RJ A5473 5100002919 01x Fan Control Panel for 10/13 MVA 6/16/2004 7/5/2004 8/3/2004 NR 8/31/2004 Go ahead on 30-08
30 Sanaullah Textile Mills TAM A5474 5100002963 02x 250 KVAr PFIPs 6/30/2004 7/6/2004 7/2/2004 7/21/2004 7/2/2004
14 Ghazi Fabrics International SMY A5475 4800021130 LT Switchgear with 500kVAr PFIP 7/2/2004 7/13/2004 7/20/2004 7/21/2004
3 Decon Germany MA A5476 5100002676 Relay & Control Panels 7/2/2004 NR NR 8/5/2004 Add indent on 22-07 620

Page49/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

0 0 0 0 Closed LV
0 0 0 0 Closed LV
0 0 0 0 Closed LV TCP
0 0 0 0 Closed LV
40 40 52.05 52.05 -12.05 Closed LV TCP
300 150 450 500 500 -50 Closed LV
0 0 0 0 Closed LV
0 0 0 0 Closed LV
0 0 0 0 Closed LV
40 25 65 199 198.8 -133.8

Closed LV

0 0 0 0 Closed LV
0 0 0 0 Closed LV
100 25 125 162.5 162.5 -37.5 Closed LV
0 0 0 0 Closed LV
65 60 125 170 170.3 -45.25 Closed LV
0 0 0 0 Closed LV
0 0 0 0 Closed LV
0 0 0 0 Closed LV
0 0 0 0 Closed LV
55 120 175 209 209.2 -34.15 Closed LV TCP
300 15 315 308.5 308.5 6.5
Closed LV

0 0 0 0 Closed LV TCP
0 0 0 0 Closed LV TCP
205 45 250 262.3 262.3 -12.3 Closed LV
0 0 0 0 Closed LV
0 0 0 0 Closed LV TCP
0 0 0 0 Closed LV
75 75 150 146 145.8 4.25 Closed LV
200 200 307 307.3 -107.3 Closed LV

Page50/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

34 Engineering Services SMY A5477 4800021157 COS Panel for Phase Changeover 7/2/2004 7/12/2004 7/13/2004 App. Awaited
16 PARCO TAM A5478 4800021187 01 X 15kW Withdrawable Starter Mo 9/7/2007 7/19/2004 7/28/2004 7/27/2004 App awaited
07-09-04
04-08-04 const. CL rel on 29-07/Changes in
10 PressonDescon International TM/SMY A5479 4800021289 02 x MCCs- SIVACON 8PT 15-07-04 8/2/2004 8/30/2004
14-09-04 Drgs. App/Inspection on 19-11
14-09-04
29 Blessed Textile Mills Ltd. TAM A5480 4800021316 02x DBs + Loose MCCB 7/26/2004 7/29/2004 7/29/2004 App awaited
06-08-04
27.08.04
7 Gadoon Textile Mills Ltd. FRQ A5481 4800021476 01x MCC (Fixed, Compartmental) 7/27/2004 8/3/2004 8/20/2004 13-
Changes on 30-09/Add Indent on 11- 56
15- 10/Changes on 18-10
10-04
10-04
17 Taj Textile Mills Ltd. TAM A5482 4800021455 01 x 400kVAr PFIP 8/2/2004 8/8/2004 8/18/2004 8/24/2004
18 BP Pakistan TAM A5483 5100003010 01 x PDP , 60Hz 8/5/2004 8/12/2004 8/25/2004 9/14/2004 17
06-09-04
10 Colony Textile Mills Ltd. MYS A5484 4800021612 LT Switchgear , 1200kVAr PFIP 8/6/2004 8/20/2004 9/6/2004 CL rel on 20-08
email

01xPanel added 18-08/03x Panels added 65


4 Scientechnic Dubai TM/SMY A5485 4900000328 48 x Sivacon 8PT Panels in CKD con 8/6/2004 NR NR 8/16/2004
23-09/01xPanel added on 18-11
07-09-04
9 Faisal Spinning Mills Ltd. MYS/TAM A5486 4800021762 LTO,Main LT,2No PFIPs,PDBS,LDBS 8/19/2004 8/20/2004 22- 8/20/2004
Add Indent for BTD on 01-11/Changes in 232
DBs on 25-10
09-04
03-11-04
21-12-
10-09-04 04
17-08-04 04-10-2004 CL rel on 14-10 / Add Indents for
2 Maple Leaf Cement SMY/HJ A5487 5100003131 LT Switchgear(8PU.011 & 8PU.003) 14-02-05 02-03-05
15-04-05 12-05-05 PFIPs/DB/MCCs / CL rel on 26-04
03-05-05 Item 21
13-05-05
Item 23
CL rel on 30-08/Clar & Layout recd on 04-
6 Nishat Mills Ltd. TAM A5488 4800021251 01x4000A ACB I/C Panel 8/23/2004 11/19/2004 23-11-04 12/6/2004 23-11-04
11/App vide email
CL rel on 09-09/Layout changed/ Schematics
17 Ghazi Fabrics International MYS A5489 4800021793 01 x MCC 8/23/2004 9/20/2004 9/20/2004 9/28/2004 10/12/2004 pending
7 Haleeb Foods (Pvt.) Ltd. TAM A5490 4800021812 LT Switchgear 8/24/2004 9/1/2004 10/6/2004 10/15/2004 10/18/2004
13-09-04
13-09-04
Latest WAPDA specs recd 25-05, Al BB
11-02-05 29-09-04
29- changed to 40x10, Prototype
Service 24-02-05
10-04 inspection/testing of SB on 12-07,
Box 03-08-05SB
LT Connection boxes,Street 02-11-04 released for mass production / SLCP rel
3 Habib Rafique Pvt. Ltd. SMY A5491 4800021842 8/24/2004 9/2/2004 14-07-05 29-08-05
Lighting Control Panel 29- for Prototype on 02-11, Inspected on 28-
21-07-05 SLCP
12-04 29/04, Changes, Drgs rel for Prototype
SLCP 09-12-05
07-04-05 based on App, resubmitted, inspected on
04-10-05 SLCP
02-09-05 30-11, resubmitted with inspection points
14-12-05
SLCP proto
01-12-05
17 Sapphire Textile Mills Ltd. RJ A5492 4800021900 01 x DB + Loose MCCB 8/31/2004 9/2/2004 9/2/2004 9/16/2004 9/17/2004
24-09-04
7 West Port Malaysia (TR) RJ A5493 02x Trafo Control Panels 9/3/2004 9/20/2004 21- 10/25/2004 22-11-04 Changes
10-04
05-10-04 04.10.04
23-09-04
15 Paramount Stitching Mills Ltd. RJ A5494 4800021891 LT Switchgear incl. 350 kVAr PFIP 9/6/2004 9/22/2004 07-10- 15- Items 01-03/DBs/FCDB
30-09-04
04 10-04

31 Naveena Exports Pvt. Ltd. TAM A5495 4800022171


LT Switchgear incl. 900 kVAr
9/15/2004 9/17/2004 9/17/2004 10/4/2004 9/17/2004 Items 04-06 / Bal rel on 22-09 122
PFIP+Loose Components
BTD rel on 26-11 / Add box for BTD, etc
4 Gulshan Weaving Mills Ltd. TAM A5496 4800022111 LT Switchgear incl. 1000 kVAr PFIP 9/15/2004 9/24/2004 10/22/2004 12/15/2004 23-11-04
28-02
11.10.04 29-10-04 210
8 Yusuf Textile Mills Ltd. TAM A5497 4800022138 LT Switchgear incl. 2x500 kVAr PFIP 9/16/2004 9/30/2004 11-11-04 11/3/2004 Changes in PDB-8
29-10-04 31-12-04

Page51/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

0 0 0 0 Closed LV
0 0 0 0 Closed LV
130 80 210 332 332.4 -122.4
Closed LV

0 0 0 0 Closed LV
80 45 125 218 217.6 -92.55 Closed LV
15 20 35 13 13 22 Closed LV
45 45 32 32 13 Closed LV
100 100 102.8 102.8 -2.8 Closed LV
250 40 290 481.5 481.5 -191.5
Closed LV

280 280 258 258.3 21.67 Closed LV


1458 150 1608 1307 1307 300.65

Closed LV

25 25 48.75 48.75 -23.75 Closed LV


90 50 140 134 134 6 Closed LV
25 25 79.5 79.5 -54.5 Closed LV
80 80 124 123.6 -43.55

Closed LV

15 15 30.3 30.3 -15.3 Closed LV


40 35 75 262 262.4 -187.4 Closed LV TCP
100 100 161 160.6 -60.55
Closed LV

75 75 83.25 83.25 -8.25 Closed LV


100 100 140 139.8 -39.75 Closed LV
150 150 219 218.8 -68.75
Closed LV

Page52/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D
07-12-04Item
3
08-12-04 15-12-04
LT Switchgear incl.1x400+1x600 Items 01&02 S.O. on 14-10 / Inspected 0n 29-04
4 Abbot Laboratories Pakistan Ltd. AM A5498 5100003137 9/17/2004 9/29/2004 9/28/2004 Item 1&2 /
kVAr PFIPs 20-12-04
4&5
Item
04&05
19 Abdul Majeed & Company AM A5499 4800022490 24 x DBs 10/21/2004 10/21/2004 5
11-11-04DBs
11-11-04 950
01-11-04
23-11-04 01-12-04 MLT/DBs/PFIPs/MCC dispatched / Add
08-11-04
6 Dewan Farooque Spinning Mills Ltd. SMY A5500 3000192068 LT Switchgear incl. 1000 kVAr PFIPs 10/20/2004 15-12-04 16/17- indent for BTD on 04-01 / SB D Details for
31-
27-12-04 12-04 BTDs on 17-02/ Inspection on 16-03
12-04
31-01- 08-02-05
05
12-11-04 190
10-11-04 30-11-04
22-11-04 16-12-04
17-12- 05-
29-12-04
04 01-05
LT Switchgear & MCCs+400&600 CL rel on 04-11 (Consolidated) / Latest
8 Matol Distillery (MES) MYS A5501 5100003150 10/25/2004 11/10/2004 Schematics 31-01-05
KVAr PFIPs Schematics changes on 31-01 / Inspected on 28-02
04-02-05
31-01-05
28-01-05
LVDB&MCC-1
10-02-05 09-02-05
MCC-3
03-12-
03-12-04 22-12-04DBs 04SDBs
LT Switchgear incl. 03 x 600 kVAr Layout 03-12-04LT CL rel on 05-11 / Change in MLT / App
7 Rahman Cotton Mills Ltd. SMY A5502 10/29/2004 11/18/2004 10-12-04
PFIPs 10-01-05e- Drgs on 12-01
14-12-04 mail 31-01-
05
24-12-04 27-12-04 1265
27-12-04 12-01-05(22) 30-12- S.O.# recd on 03-11/Meeting with
LT Switchgear Fixed / 30-12-04 17-01- 04 Customer 09-14/12 / App drgs of Areas
8 Dewan Saadi Cement TAM/HJ A5503 5100003155 10/29/2004 11/25/2004
withdrawable 8PU.011 (22) 07-01- 05(32) 25-01-05 22&32 on 17-01/Changes in App / Last
05(32) 17- 26-01-05(42) 04-02-05 dispatch by 17-03
01-05(42) 25-02-05

23-11-04 13-12-04
27-12-04
13-12-04 Details & Go-ahead for MCC on 04-02 / CL 100
5 Blessed Textile Mills Ltd. SMY A5504 4800022822 LT Switchgear & MCCs+Loose ACB 11/2/2004 06-01-05
09-02-05 14-02-05 02-03-05 for Loose supply 18-03
schematics
03-01-05
Layouts
08-03-05 CL rel on 28-12 / Clar on Trafo dim drg
4 ESS ESS Associates (EC) SMY A5505 300018890 LT Switchgear 18-11-04 12/6/2004 10-01-05 3/3/2005
10-08-05 reqd
26-05-05

7 Sapphire Fiber Ltd. RJ A5506 3000195025 01x PDB 30-11-04 NR 12/1/2004


08-12-04
17-12-04
14 MCB Tower Project (EC) SMY A5507 3000183765 02 x Feeder Pillar (Indoor type) 30-11-04 20- 12/8/2004
22-12-04
12-04
01 x LV DB + 04 x PLC/Screen + 01 14-02-05
03-12-04
KW&SB / Dhabeji Pumping Station (KIII Project) SMY/AAH/ x Instrument Panels + 13JBs + 01 04-02-05 MCC PLC Panels details on 24-01, 02-02, 23-
5 A5508 3000187496 15-12-04 12/22/2004 1/14/2005
(MES) MR x LCB + Outdoor Housing for MOM 25-02-05 02 / Add Indent
28-04-05
Screen Panels MCC
28-12-04
CL rel on 17-12/Changes in MCC App /
KW&SB / NEK Pumping Station (KIII Project) SMY/AAH/ 01 x LV DB+02 x PLC + 01 x 03-12-04 04-02-05
6 A5509 3000187502 12/22/2004 06-01-05 14-02-05 MCC PLC Panels details on 24-01, 02-02, 23-
(MES) MR Instrument Panels + 07JBs 15-12-04 MOM
14- 02 / MCC Inspected on 13-04
02-05
LT Switchgear incl. 02 x 800 kVAr 22-12-04 PFIP CL rel on 13-12/Meters changed /
14 Bismillah Textile Mills Ltd. SMY/KZ A5510 3000196666 12/7/2004 12/16/2004 12/16/2004 12/23/2004
PFIPs email Inspection on 28-03

31 Marmonyx Pvt. Ltd. AAH A5511 3000200884 LT Panel + 150 kVAr PFIP 12/14/2004 12/16/2004 12/17/2004
Change on 21-12 (25 kVAr stage + 30
Exhaast Fan)

Page53/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

200 200 105 104.8 95.25


Closed LV

0 0 5 5 -5 Closed LV
0 0 488.7 488.7 -488.7
Closed LV

0 0 398.6 398.6 -398.6

Closed LV

0 301.1 301.1 -301.1


Closed LV

0 1974 1974 -1974


Closed LV

100 100 133 132.8 -32.75


Closed LV

250 250 229.1 5 49 40 7.8 330.9 -80.9


Closed LV

0 9 9 -9 Closed LV
0 10 10 -10 Closed LV
200 90 290 370.6 370.6 -80.6
Closed LV

80 90 170 214 214 -43.95


Closed LV

0 132.6 132.6 -132.6 Closed LV


0 59.8 59.8 -59.8 Closed LV

Page54/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D
31-01- 02-02-
05LOT1
08-02-05LOT1 05LOT1
As per Design Plan dtd 15-04 / CL Lot 1
1283
20 x MCCs+10xPFIPs 8PU.003 23-02-05LOT2 01-03-05LOT2
7 Pioneer Cement HJ A5512 3000200950 12/16/2004 15-02-05LOT2 on 28-01/Change of MCCBs 07-02,
Fixed 11-03- 15-03-
05PFIP 25- Revised CLs 07-02 / Trip SS on 09-02
25-02-
05LOT3
05LOT3 03-05LOT3
18 Bahria University SMY A5513 3000204975 1600 ACB Panel + BTD 12/21/2004 12/22/2004 1/14/2005 12/29/2004
Indent recd on 27-12 / BTD Details rel on 20
27-01
27-01-05
11 KSB / Pak Arab Fertilizers KZ A5514 3000201240 LT Switchgear + 3200A BTD 12/22/2004 1/5/2005 1/5/2005 1/26/2005
25-02-05 BTD

13 Al-Hamd (TR) AAH/RJ A5515 3000204197


01x Control Panels for 20/26 MVA
12/22/2004 1/5/2005 1/17/2005
28-01-05
1/28/2005 CL rel on 05-01 40
PT email

14 Maple Leaf Cement AAH/RJ A5516 3000204198


01x Control Panels for 10/13 MVA
12/22/2004 1/5/2005 1/11/2005 18-02-05email 2/22/2005 CL rel on 05-01 40
PT
18-03-05email
11-01-05
8 Kidney Center, Peshawar KZ A5517 3000205185 LT Switchgear 12/27/2004 1/7/2005 7/28/2005 CL rel on 06-01
03-08-05 31-03-05
01xControl Panels for 30/36 MVA 01-02-05 08-03-05 CL rel on 01-02 &11-02 / Change from 12
13 Pioneer Cement AAH/RJ A5518 3000208202 1/7/2005 1/19/2005 3/14/2005
PT 11-02-05 email Fans to 08 on 07-02
23 Faisal Spinning Mills Ltd. RJ A5519 3000208036 02x PDBs 1/10/2005 1/17/2005 1/19/2005 2/4/2005 2/15/2005 Changes in App
25 Apollo Textile Mills Ltd. KZ A5520 3000192113 01x DB 1/19/2005 1/25/2005 2/24/2005
11 Pakistan Air Force KZ A5521 3000216361 MLT + DBs 2/3/2005 2/16/2005 2/18/2005 3/31/2005 4/4/2005 CL rel on 09-02
11-02-05email
16 Gadoon Textile Mills Ltd. SMY A5522 3000214924 01x PDB 1/31/2005 2/8/2005 2/11/2005 CL rel on 09-02

9 WAPDA-NTDC (TR) RJ A5523 3000218389 15x FCPs & ACPs - 20/26 MVA PT 2/8/2005 2/16/2005 2/25/2005 2/28/2005 3/9/2005

Modification Works + COS & UPS 01-04-05


10 MCB Tower (EC) KZ A5524 3000219844 2/11/2005 2/17/2005 3/8/2005 3/11/2005 CL rel on 18-03
DBs Items 3&5

16-02-05
15-02-05 15-03-05
14-03-05 10-03-05
15-03-05 PDBs&LDBs
15-02-05 14-03-05 CL rel on 15-02 / Add indent / PFIP CL on
11 Indus Dyeing KZ/SMY/AM A5525 3000218399 Modification Work + LT Switchgear 3/7/2005 16-03- 04-04-05
22-02-05 PDBs&LDBs 10-03
05MLT-A PFIP&LTO
27-04-05 31-03-05
05-
Layout 04-05 LT
11-05-05BTD

15-03-05 06-04-05
08-03-05 Inspected on 25-04,
16 Bhanero Textile Mills Ltd. AM A5526 3000217322 LT Switchgear 2/17/2005 3/4/2005 21- 12-04-05
22-03-05 Inspection Points
04-05 BTD
24-03-05
Const
CL rel on 10-03 / Meeting on 18-03 / ACB
List
12 Cherat Cement SMY A5527 3000215827 MCC in 8PT (withdrawable) Design 2/18/2005 3/7/2005 3/18/2005 4/1/2005 Changed to 2500A 19-04 / Rev Const List
07-04-05
on 05-05 / Meeting on 17-05, 30-05
PFIP
13-04-05
06-04-05
13 Pioneer Cement SAH A5528 3000200950 01x Protection & Metering Panel 2/22/2005 NR
31-05-05
06-04-05
14 Maple Leaf Cement SAH A5529 3000222459 01x Protection & Metering Panel 2/22/2005 NR
31-05-05
18 Nestle Milkpak Ltd. TAM A5530 3000221409 1600A ACB Panel + BTD 2/22/2005 3/8/2005 3/11/2005 3/28/2005 3/28/2005 Cl rel on 10-03
Loose Supply of 4000A ACB + Aux
15 D. S. Textile Ltd. KZ/SHA A5531 3000215568 2/22/2005 3/8/2005 2/28/2005 17-03-05email 5/4/2005 CL rel on 25-02
Comp. & Factory Material
Loose Supply of 2500A ACB + Aux
16 D. S. Industries Ltd. KZ/SHA A5532 3000216345 2/22/2005 3/8/2005 2/28/2005 17-03-05email 4/21/2005 CL rel on 25-02
Comp. & Factory Material
17 KCI Chashma (EC) KR A5533 3000222828 07 x 110VDC Panels 2/23/2005 3/7/2005 3/28/2005 4/14/2005 6/10/2005
18 Abdul Majeed & Company RJ A5534 3000223632 03 x DBs 2/28/2005 3/7/2005 3/14/2005 4/7/2005 4/8/2005

Page55/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

1945 1945 1343 1343 602.25


Closed LV

0 46.6 46.6 -46.6 Closed LV


0 112 111.75 -111.75 Closed LV
0 35 35 -35 Closed LV TCP
0 55.1 55.1 -55.1 Closed LV TCP
85 85 88.85 88.85 -3.85 Closed LV
0 188 188.2 -188.2 Closed LV TCP
0 16 16 -16 Closed LV
0 12 12 -12 Closed LV
60 60 69.5 69.5 -9.5 Closed LV
0 5 5 -5 Closed LV
65 65 109.7 109.7 -44.7 Closed LV TCP
50 50 41.8 41.8 8.2 Closed LV
160 160 175.1 175.1 -15.1

Closed LV

0 50.2 50.2 -50.2


Closed LV

395 395 571.6 571.6 -176.6


Closed LV

80 80 218.8 218.8 -138.8 Closed LV


80 80 162.6 162.6 -82.6 Closed LV
75 75 9 9 66 Closed LV
35 35 95.65 95.65 -60.65 Closed LV
35 35 64.1 64.1 -29.1 Closed LV
30 20 50 38.5 38.5 11.5 Closed LV
25 25 30 30 -5 Closed LV

Page56/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

16-03-05 200
27-04-05 30-03-05 27-04-05 Site visit on 24-05 / Changes in Panels
19 Karachi Export Processing Zone TAM A5535 3000222933 LV Switchgear & Loose Supply 3/2/2005 3/16/2005
10-05-05 09-05-05 10-05-05 dim in App / Layout resub for App
31-05-05
14-03-05 17-03-05
20 Technical Associates Pakistan HJ A5536 3000225691 MLT + DB + 400kVAr PFIP 3/17/2005 3/25/2005 3/25/2005 Cl rel on 17-03/Add indent
24-03-05 25-03-05
21-03-05
29-03- Adv info on 11-03 / CL rel on 14-03 / 160
25 Babri cotton Mills Ltd-Kohat TAM A5537 3000231350 LT Switchgear incl. 6300A ACB 3/16/2005 3/18/2005 4/8/2005
05 Inspected on 18/05
13-04-05
05-04-05
Comments by MES on 06-04 / Meeting on
21 Thatta Cement SMY A5538 3000222460 MCC in 8PT Withdrawable Design 3/18/2005 3/30/2005 08-04- 4/12/2005 4/14/2005
17-05
05
20
Indent ret to SB S on 04-04 / Clar & go-
25-05-05 ahead recd on 18-05 / CL rel on 24-05 /
22 DHA Lahore - Phase VI SMY A5539 3000231988 08x Street Lighting Control Panels 3/18/2005 5/23/2005 6/15/2005 7/22/2005
22-07-05 Changes in App, Go-ahead recd from SB
S on 22-07 / Rev CL on 22-07

28 American Embassy-Islamabad KZ A5540 3000232952 600A MCCB Panel 3/18/2005 3/24/2005 3/29/2005 4/1/2005 Change - I/C from top on 29-03

130
11-04-
05MCC CL rel on 28-03 rev 07-04 (LT) & 29-03 rev
12-04-05LT
07-04 (MCC) / Changes in App / Site visit
22-03-05 06-04-05 13-05-05LTO
23 Nishat Chunian Ltd.(Dyeing Power) TAM/HJ A5541 3000231559 LT Switchgear 4/1/2005 4/8/2005 12-05 / Add indent for 01xBTD+01xLTO /
29-06-05 30-05-05 07-07-05 Changes in BTDs as per email dtd 29-08
27-07-05BTDs
05-09-05 app recd 01-09
Rev BTDs

CL rel on 29-03 rev 07-04 / Changes in


24 Nishat Chunian Ltd.-I(Power) HJ A5542 3000231561 MCC in 8PU.003 Fixed Design 3/22/2005 3/29/2005 4/7/2005 4/8/2005 4/11/2005
App
25 Janana De Malucho Textile TAM A5543 3000234193 LT Switchgear 3/25/2005 3/30/2005 3/31/2005 NR 4/4/2005
26 Atlas Battery Ltd. KZ A5544 3000235343 LT Switchgear 3/25/2005 4/1/2005 4/11/2005 4/19/2005 4/20/2005 CL rel on 31-03 80
27 Gadoon Textile Mills Ltd. TAM A5545 3000235628 CO Panel 3/29/2005 4/4/2005 4/12/2005 4/18/2005 5/19/2005 CL rel on 12-04
34 Umar Spinning Mills (Pvt.) Ltd. RJ A5546 3000233661 01xPDB + Loose Components 3/30/2005 5/10/2005 4/6/2005
19-04-05
Items 02-
21-04-05 28-04-05
28 Nishat Mills Ltd. HJ A5547 3000237733 LT Switchgear 4/4/2005 4/20/2005 05 27- CL rel on 14-04/Changes in App
02-05-05 Items 02-05
04-05 Item
01
14x Control Panels (Fan & Aux) for 05-04-05 Formal Indent on 12-04 /
29 WAPDA - NTDC RJ A5548 3000239181 4/6/2005 5/27/2005 7/6/2005
31.5/40MVA Trafo 07-06-05 Rev indent - qty inc to 14

R&C Panels for NTDC- 12-10-05


RP Const Drgs
30 NTDC-WAPDA (TD) MA A5549 3000352934 KESC500/220kV Interconnection 4/8/2005 Formal Indent, S.O. No. recd on 19-10
15-11-05
Project CP Const Drgs

Formal Indent / S.O. No.


recd on 21-07 / Drgs resubmitted based
23-08-05 22-11-05
on conceptual SLD vide email dtd 15-09 &
31 NTDC-WAPDA (TD) TAM A5550 3000305528 400VAC Switchgear 4/12/2005 8/2/2005 20-10-05 11/2/2005 05-12-05
meeting on 13-10 / Changes in App /
17-11-05 SB D
Fresh changes on 10-11/ CL rel on 17-11 /
Minor SB D Details

CL rel on 15-04 / Meeting with


32 Karachi Golf Club KZ A5551 3000253969 02xMCCs-8PU.003 Fixed Design 4/13/2005 4/18/2005 4/18/2005 5/12/2005 5/11/2005
Consultants on 25-04

Page57/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

135 135 141 141 -6


Closed LV

65 65 20.5 20.5 44.5 Closed LV


160 35 195 206 206.5 -11.45
Closed LV

215 215 282 281.6 -66.55 Closed LV


20 15 35 26.45 26.45 8.55
Closed LV

35 35 61.75 61.75 -26.75 Closed LV


110 110 319.5 319.5 -209.5

Closed LV

45 45 96.25 96.25 -51.25 Closed LV


70 70 85.5 85.5 -15.5 Closed LV
95 95 157.5 157.5 -62.5 Closed LV
25 25 46.8 46.8 -21.8 Closed LV
10 10 5 5 5 Closed LV
215 215 255.5 255.5 -40.5
Closed LV

55 55 80.55 80.55 -25.55 Closed LV TCP


240 659.3 -419.3
240 659.3 Closed LV

80 80 323 323 -243

Closed LV

42 42 44.2 44.2 -2.2 Closed LV

Page58/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

26-04-05
26-05-05 Indent on 16-06 / Changes in App /
33 Attock Cement Ltd. RJ A5552 3000284635 Control Panels for 25MVATrafo 4/13/2005 4/19/2005 29-04-05 6/22/2005
22-06-05 Resubmittal
07-06-05

19-04-05
LDBs 21-04-05
26-04-05 20-04-05 LDBs CL for LT/PFIP / LDBs rel on 15-04 rev 28-
34 Alam Cotton Mills SMY/TAM A5553 3000236665 LT Switchgear 4/14/2005 4/20/2005
LT+PFIP LDBs 06-05-05 04 / 19-04
26-04-05 PFIP & LT
DBs

27-04-05 29-04-05
11-05-05
Items 04-13 Items 04-13
35 Azgard Nine Ltd. HJ A5554 3000256591 LT Switchgear 4/21/2005 4/29/2005 23-05-05 CL (Items 04-13) rel on 27-04
11-05-05 11-05-05
BTDs
Items 01-02 items 01-02

12-05-05 PDBs,
12-05-05
06-05-05 PDBs, Items 06-18, CL LT on 18-05 /
LDBs & MLDB
36 Bhanero Textile Mills Ltd. HJ/KZ A5555 3000257527 LT Switchgear, DBs 4/28/2005 5/13/2005 LDBs & MLDB
25-05-05
31-05-05 Item 01-02 MCC & LCBs put-on-hold
LT, PFIP, MCC on 030605

27-05-05
37 Gadoon Textile Mills Ltd. KZ A5556 3000257609 01xLDB+02xPDBs 4/28/2005 5/3/2005 31-05-05 5/31/2005

06-05-05
38 Telenor (A&D) MR A5557 3000264459 25x GT2 Housings for AMF/MOR Pan 5/5/2005 NR Partial Formal Indent recd on 09-05
11-05-05

17-05-05
14-07-05
Loose Supply - ACB & 11-05-05
39 Bismillah Textile Mills Ltd. KZ A5558 3000264770 5/13/2005 5/13/2005 6/27/2005 BTD1 Rev Indent - 02xBTDs added
Accessories, etc. + 02x BTDs 07-06-05
18-07-05
BTD2

Site visit on 25-05 / Exhaust fan added in


40 PARCO / PS1 Korangi MHF A5559 3000268318 02x 400 + 01x 300 kVAr PFIPs 5/13/2005 5/20/2005 5/20/2005 7/1/2005 7/5/2005
App

31-05-05
17-05-05 DBs, PFIP
DBs, PFIP 30-05-05 20-06-05 Interlocking & S/S layout details recd on
41 Ghazi Fabrics International TAM A5560 3000267850 LT Switchgear 5/16/2005 5/20/2005
02-06-05 17-06-05 LT 30-05 / LT CL rel on 31-05
LT 27-06-05
BTD

42 Cherat Cement SMY A5561 3000272735 01x 3kW + 06x 15kW Starter Module 5/23/2005 5/26/2005 6/27/2005 6/27/2005 7/1/2005
01x 6M W/D module for 200A, 4P
43 New Progressive Builders (PARCO) TAM A5562 3000276064 6/9/2005 6/10/2005 6/13/2005 6/21/2005 6/9/2005 Refer A1355
MCCB Feeder
03-08-05
112x Service boxes as per WAPDA
44 Glamour Developers (Pvt.) Ltd. SMY / HJ A5563 3000240107 6/8/2005 6/10/2005 15-08-05 9/15/2005 9/7/2005 Order put On-Hold on 04-10
specs. P92:75
31-08-05

Control scheme same as Gadoon order


45 Khadim Husain Slatch & Co. TAM A5564 3000284242 250kVA Changeover Panel 6/20/2005 6/21/2005 6/24/2005 4/24/2006 A5545 / Resubmitted as per letter recd 03-
04

CL rel on 20-06 / Resubmitted / App


comments incorporated / Change of
17-06-05 07-10-05
46 Pak & Jinnah Park Projects TAM A5565 3000284763/8 LT Power Panel No.1 & No.2 14-06-05- 6/17/2005 9/28/2005 Cable entries on 12-10, confirmation recd
01-09-05 02-12-05
on 01-12 for Gen panel / Pak Park
dispatched

47 Major Zuberi COS Panel RJ A5566 3000284356 COS Panel for Phase Changeover 6/14/2005 NR 6/14/2005
45Nos RP-3 & 15Nos RP-4
48 NTDC-WAPDA (TD-Lahore) / ADP 59( LOT III) MA A5567 3000285449 6/16/2005 NR 7/5/2005
protection panels

Page59/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

40 20 60 71 71 -11
Closed LV TCP

150 40 190 315.3 315.3 -125.3

Closed LV

210 210 163.2 163.2 46.8


Closed LV

270 367.1 -97.05


270 367.1 Closed LV

24 28.6 -4.6
24 28.6 Closed LV

25 44 -19
25 44 Closed LV

15 145.1 -130.1
15 145.1 Closed LV

22 22 43.5 43.5 -21.5 Closed LV


170 170.8 -0.75

170 170.8 Closed LV

22 22 62.6 62.6 -40.6 Closed LV


20 20 41 41 -21 Closed LV
30 36.6 -6.6
30 36.6 Closed LV

40 94.75 -54.75
40 94.75 Closed LV

140 178.3 -38.25


140 178.3 Closed LV

10 10 28.8 28.8 -18.8 Closed LV


80 80 238.8 238.8 -158.8 Closed LV

Page60/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

15-07-05
CHF LV
18-07-05 Meeting with Consultants & EC on 30-06 /
03-08-05CHF
CHF DBs CL for CHF on 10-08(DBs) & 11-08(LT) /
11-10-05 10-08-05DBs
01-09-05 Changes in App / Add indent for 01xLV
Add indent 12-10-05
PB DBs Panel 8PU.011 Fixed design alignment
21-06-05 01-12-05 Add indent
12-09-05 with existing board / SB D Details /
49 Glaxo Smith Kline TAM/KZ A5568 3000288055 LT Switchgear 29-09-05 7/8/2005 PB LT 17-11-05
Item 1 PB Comments on PB DBs on 14-11 / Major
24-03-06 13-12-05 DBs
20-09-05 changes in PB LT app / Site visit on 22-
PB DBs 27-02-06
Items 04-05PB 12 / CL for PB DBs on 21-12, LT on 16-12
25-01-06 SB D LT
04-10-05 & 21-12, Item 51 PDB ?? deleted / Rev
Items 06-09PB LDB/DBs
indent
03-10-05
Add indent

50 Sapphire Fibres Ltd. - No. 3 KZ A5569 3000285015 01xPDB + 02xLDBs 6/22/2005 6/23/2005 6/22/2005 7/13/2005 7/13/2005
20-09-05
06xRelay Panels+02xMarshalling
51 NTDC-WAPDA (TD) / Shikarpur & Sibbi G/Ss MA A5570 3000288505 6/22/2005 NR 15-11-05
Kiosks
MCs

27-07-05
RP,CP
M/s Rousing Engg Services / M/s A. A. Spinning 01-07-05
52 MA A5571 3000286501 01xCP50+01xRP4+01xAC/DC Panels 6/22/2005 23-08-05 TD drgs recd on 22-08 for RP/CP
Mills Ltd. AC/DC
26-08-05
AC/DC

Victor Pipe Industries - Afghanistan HJ A5572 3000292427 01xLT Panel 6/29/2005 7/1/2005 7/12/2005 30-08-05email 9/7/2005 Clar recd on 11-07 / CL rel on 12-07
Mr. Rahim Dawood - F&C HJ A5573 3000294427 01xCO DB 6/30/2005 NR 7/1/2005
Honda Atlas Cars Pakistan Ltd. (TR) RJ A5574 01xFCP for 2/2.5MVA Trafo 6/24/2005 7/1/2005 7/4/2005 Formal indent, S.O. # awaited

16-08-05 13-09-05 22-09-05


220VDC 220V 220V
NTDC-WAPDA HJ A5575 3000293276 220V & 48VDC DBs 6/29/2005 7/7/2005 Clarified on 02-08 / CL rel on 22-09
25-08-05 29-09-05 04-10-05
48VDC 48V 48V
18-07-05 CL rel on 08-07, rev 22-07 / Changes in
FFC MHF A5576 3000288778 LT Switchgear 7/4/2005 7/8/2005 8/9/2005 8/24/2005
22-07-05 app

13-07-05
19-07-05
DBs/PFIPs 20-07-05
08-07-05 26-07-05DBs
20-07-05 DBs/PFIPs
05-07-05 DBs, LDBs 29-07-05LT CL rel on 07-07 / Add indent for 01xDB /
Blessed Textile Mills Ltd. - Unit No. 3 KZ A5577 3000289586 LT Switchgear DBs resub 02-08-05LT
11-07-05 15-07-05 08-08-05 Changes in App
22-07-05LT 08-08-05
LT, etc. Add indent
03-08-05 BTDs
Layout

11-07-05
15-07-05
MCC 15-07-05 CL rel on 11-07 / meeting with customer
Lucky Textile Mills Ltd. RJ A5578 3000292953 02xDBs, 01xMCC - 8HKO 7/5/2005 7/8/2005 7/18/2005
20-07-05 DBs 21-07, changes
Schematics
22-07-05

Fazal Textile Mills MHF A5579 3000291548 01x LT Panel 7/13/2005 7/18/2005 7/22/2005 8/16/2005 8/19/2005 CL rel on 20-07
28-07-05 CL rel on 25-07 / SLD, FV&Disp in Ist
Allied Engg Services Ltd./Lucky Cement Ltd. TAM A5580 3000302473 5000A LT Switchgear 7/18/2005 7/29/2005 8/24/2005 8/29/2005
02-08-05 submittal

02-08-05LT 16-08-05DBs
D. S. Industries Ltd. MHF A5581 3000302535 LT Switchgear 7/19/2005 8/1/2005 18-08-05LT CL rel on 28-07(LT) & 08-08(DBs)
08-08-05DBs 22-08-05LT

Page61/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

20 20 1179 31.5 14.25 22.25 1247 -1227

Closed LV

0 11.2 11.2 -11.2 Closed LV


0 174 -174
174 Closed LV

0 166.8 -166.8
166.8 Closed LV

60 60 36 36 24 Closed LV
0 24.6 24.6 -24.6 Closed LV
0 42.75 42.75 -42.75 Closed LV TCP
105 105 358 10 368.3 -263.3
Closed LV

60 60 80.75 80.75 -20.75 Closed LV


0 220.4 -220.4

220.4 Closed LV

0 121.3 -121.3

121.3 Closed LV

0 77 77 -77 Closed LV
65 65 165 164.8 -99.75 Closed LV
85 85 146.5 146.5 -61.5
Closed LV

Page62/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

DHA Lahore / Electrification Works of DHA Phase RJ A5582 3000303414 01xStreet Lighting Control Panel 7/27/2005 NR 7/29/2005

10-08-05
17-11-05
26-09-05 13-09-05
MHF A5583 3000309035 LT Switchgear 7/28/2005 8/10/2005 15-12-05 CL rel on 11-08
27-09-05 16-11-05
BTD
Layout

06-10-05
Items 1-4,
14-19 S. O. # on 14-11 / Lot 1 & 2 drgs approved
06-10-05 to during meeting with customer 05-09 to
LT Switchgear, DC DBs, 17-08-05 02-09-05 12-10-05 09-09 / CLs of Lot 1 rel on 14-09, Lot 2
SP&EW SMY/HJ A5584 3000348575
Trafo Control Panel 01-02-07
2/2/2007
21-09-05 Part Lists CLs on 30-09, Lot 3 on 10-10 & 11-10 /
14-10-05 Schematics finalised with customer,
to 18-10-05 Network study report-SINCAL rel on 25-11
Items 5-12
02-02-07

02-09-05 15-09-05 21-09-05


07-09-05 LTO+DB LTO/LDB CL rel on 02-09, 06-09 / Resubmitted
Hussain Mills Ltd. MHF A5585 3000311980 LT Switchgear incl. 02x1000kVAr PF 8/17/2005 9/6/2005
MCC 22-09-05 04-10-05 based on App comments
04-10-05 MCC+LDB Items 1-5
Technical Associates Pakistan / Abu Dhabi 26-08-05 12-09-05 03-10-05 CL rel on 12-08 / Changes in App clarified
TAM A5586 3000315161 LT Switchgear 8/16/2005 8/24/2005
Palace Rahimyar Khan 06-10-05 17-10-05 17-10-05 on 03-10

CL rel on 25-08, rev 12-10, rev 28-10


25-08-05 based on SB S inputs on 25-10 /
08-11-05 28-10-05
Siddiqsons Tin Plate Ltd. MHF A5587 3000297394 6000A & 3200A LT Switchgear 8/16/2005 8/24/2005 28-10-05 Meeting with Consultants on 08-11, App
08-12-05 15-11-05
24-11-05 with comments, Go-ahead for changes on
18-11, Resubmitted

S. O. # on 15-08, Formal indent on 16-08 /


M/s Muhammad Aslam MHF A5588 3000317305 LT Switchgear 8/1/2005 8/19/2005 8/19/2005 19-08-05email 8/24/2005
CL rel on 17-08
23-08-05
Maple Leaf Cement RJ A5589 3000318704 01xFCP+01xACP for 20/26MVA PT 8/17/2005 8/19/2005 12/6/2005 Resubmitted as per comments/changes
13-09-05
18-11-05
NTDC-WAPDA (TD) MA A5590 3000319145 02x Marshalling Kiosks 8/17/2005 NR 13-12-05
TD Drgs

15-09-05
02-09-05 Item 3, 4 CL rel on 07-09 / Comments in App /
Items 1,3,5 16-09-05 Feeder Pillars Put-on-Hold by SB Lhr vide
Olympia Chemicals Ltd. SMY A5591 3000316684 LT Switchgear 8/17/2005 9/1/2005 06-09-05 13-09-05email
LT+PFIP+Layout
Items 2, 6 email 22-09 / LCBs reqd in local design
07-09-05 24-10-05 vide email dtd 19-10
LCBs

08-09-05
15-09-05email 19-09-05 CL rel for App 30-08, App recd 02-09, rel
Gulistan Textile Mills Ltd. - Unit 4 TAM A5592 3000327455 LT Switchgear 8/24/2005 9/9/2005 14-09-05 29-09-05 21-10-05 for proc 02-09
layout

08-09-05
15-09-05email 19-09-05 CL rel for App 30-08, App recd 02-09, rel
Gulshan Weaving Mills Ltd. - Unit 2 TAM A5593 3000326254 LT Switchgear 8/24/2005 9/8/2005 14-09-05 29-09-05 21-10-05 for proc 02-09
layout
International Knitwear Ltd MHF A5594 3000194869 01x100 + 01x50kVAr PFIP stages 8/26/2005 8/29/2005 NR 9/29/2005 Site visit on 28-09 for clarification
15-09-05email 20-09-05
Gulistan Spinning Mills Ltd. TAM/MHF A5595 3000326183 LT Switchgear & Loose supplies 8/29/2005 9/13/2005 9/12/2005 29-09-05 CL rel on 07-09
24-10-05
15-09-05email 20-09-05
Gulshan Spinning Mills Ltd. - Unit 2 TAM/MHF A5596 3000326152 LT Switchgear & Loose supplies 8/29/2005 9/13/2005 9/12/2005 29-09-05 CL rel on 07-09
24-10-05

Page63/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

40 40 22 22 18 Closed LV
65 65 119 119.25 -54.25
Closed LV

20 20 1942 16 39 30 7 2034 -2014

Closed LV

80 80 207 206.8 -126.8


Closed LV

80 80 194 194 -114 Closed LV


90 90 189 189.3 -99.25
Closed LV

45 45 24 24 21 Closed LV
50 50 46.5 46.5 3.5 Closed LV TCP
0 192.8 -192.8
192.8 Closed LV

225 20 245 256.3 256.3 -11.3

Closed LV

85 85 153.5 153.5 -68.5


Closed LV

85 85 135 135 -50


Closed LV

20 20 0 0 20 Closed LV
85 85 27 27 58 Closed LV
85 85 25.5 25.5 59.5 Closed LV

Page64/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

CL rel on 14-09 / App comment, UVT


14-09-05 21-09-05 reqd / Changes reqd during inspection in
Masood Textile Mills Ltd. MHF A5597 3000326457 LT Switchgear 9/5/2005 9/9/2005 9/26/2005
23-09-05 24-03-06 item 03 - PDBs (06Nos.), Go-ahead on 08-
12

Gharibwal Cement Ltd. MHF A5598 3000328590 01x LT Panel 9/6/2005 9/9/2005 9/19/2005 10/18/2005 10/24/2005 CL rel on 19-09 / Minor changes in App

Dost Steel RJ A5599 3000308554 01xFCP+01xACP for 20/26MVA PT 9/8/2005 9/15/2005 9/14/2005 20-09-05email 9/29/2005 CL rel on 14-09
Lucky Cement Ltd. MHF A5600 3000330522 02x PDBs 9/8/2005 9/14/2005 9/16/2005 10/3/2005 10/5/2005 CL rel on 16-09

05-10-05
PDBs
26-10-05
21-09-05 04-10-05
PFIP/LDBs CLs rel on 21-09 (PDBs), 27-09 (bal) / LT,
PDBs PDBs
27-10-05 PDB 10, Compressor Panel, Layout
04-10-05 24-10-05
08-09-05 LTO/MCC revised & PDB 8 deleted in App / Revised
Naveena Exports (Pvt.) Ltd. - Weaving Unit SMY A5601 3000331514 LT Switchgear 9/19/2005 LT LT
15-11-05 15-11-05 indent, Resubmittal of LT / Layout issue
15-11-05 29-11-05
LT resolved in meeting with consultants on
LT LT
17-11-05 09-01, Resubmitted
09-01-06 20-01-06
BTDs
16-01-06
SB D

24-10-05
30-09-05
PFIP CL rel on 27-09 / Layout resubmiited on
07-10-05
10-10-05 02-11-05 17-10 as per revised customer layout vide
Dewan Hattar Cement TAM A5602 3000331543 LT Switchgear - 8PU.011 9/8/2005 9/27/2005 Schematics
24-10-05 GDB, MCC email dtd 12-10 in back-back
11-10-05
18-11-05 arrangement, revised 21-10 with BTD
Layout
BTD

25-10-05
PDB/PFIP
24-11-05 CL rel on 27-09 / Upgrade of BTD/BB
12-09-05 23-09-05 29-09-05 24-10-05
Umar Spinning Mills (Pvt.) Ltd. RJ A5603 3000332848 LT Switchgear LT ratings & other changes vide revised
20-02-06 24-02-06 24-02-06 02-03-06
02-12-05 indent
BTD
24-02-06

Meeting with customer on 22-09 /


3000327376 01xMCC - 8PU.011 + 01xBTD 21-09-05 21-10-05 20-10-05 07-11-05 08-12-05
PARCO SMY/TAM A5604 Changes in App / Rev CL on 07-12 / Revd
3000658417 1250A+02x Loose Modules 15-02-07 20-02-07 17-11-05 05-12-05 19-03-07
layout recd on 21-12

TD drgs for RP, CP recd on 21-11 /


Maple Leaf Cement MA A5605 3000339739 02xRP4+02xCP50 + 02xAC/DC Panel 9/23/2005 10/5/2005 10/11/2005 12/14/2005 Comments on AC/DC recd, replied by SB
S Ex, Drgs released as per Go-ahead

Formal indent recd on 10-10, Revised


12-10-05
30-09-05 17-10-05 SLD on 11-10 / DBs resent from site,
11-10-05 09-01-06 11-10-05
General Syed Absar Hussain MHF A5606 3000347671 08xDBs 05-01-06 18-01-06 Revised indent - qty changed from
09-01-06 18-01-06 23-01-06
24-01-06 23-01-06 03Nos. to 02Nos. / CL of items 1&2 rel on
27-01-06
30-01 / Revised indent - qty/scope change

17-10-05
SL/Clar recd on 17-10 / Entries changed
U. S. Embassy, Islamabad MHF A5607 3000346832 01xLT Panel 10/10/2005 10/17/2005 10/18/2005 24-10-05 12/8/2005
to top in App
07-12-05

17-10-05
SL/Clar recd on 17-10 / Entries changed
U. S. Embassy, Islamabad MHF A5608 3000346848 01xLT Panel + 01xDB 10/10/2005 10/17/2005 10/18/2005 24-10-05 12/8/2005
to top in App
07-12-05

Page65/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

76 76 19 19 57
Closed LV

40 40 23.75 23.75 16.25 Closed LV


50 50 18.75 18.75 31.25 Closed LV TCP
20 20 16.25 16.25 3.75 Closed LV
370 75 445 257.7 257.7 187.3

Closed LV

240 240 315 314.8 -74.75

Closed LV

60 80 140 131 130.8 9.25

Closed LV

440 549.9 -109.9


440 529.9 20 Closed LV

0 153 -153
153 Closed LV

20 40 60 72 72 -12

Closed LV

25 25 30.5 30.5 -5.5


Closed LV

45 45 40.25 40.25 4.75


Closed LV

Page66/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

19-10-05 Formal indent, S. O. # recd on 18-10 /


Carriage Factory Pakistan Railway RJ A5609 3000351055 04x LT Panels 10/17/2005 10/19/2005 11/2/2005
02-11-05 Resubmitted with changes reqd by S'Isb

25-11-05
WAPDA / 220kV Sialkot S/S (TD) MA A5610 3000352797 01xR3 + 01xR4 Protection Panels 10/19/2005 NR
07-12-05
Sitara Chemical Industries (TD) MA A5611 3000354686 01xRP4+01xCP50 + 01xAC/DC Panel 10/24/2005 11/1/2005 11/1/2005
31-10-05 Changes reqd as per ED/A5589 on 14-12,
Sitara Chemical Industries (TR) RJ A5612 3000354712 01xFCP+01xACP for 20/26MVA PT 10/28/2005 10/31/2005
28-12-05 Resubmitted / App awaited
M/s Rousing Engg Services / M/s Dost Steel
MA A5613 3000354680 01xRP4+01xCP50 + 01xAC/DC Panel 10/28/2005 11/8/2005 11/14/2005
(Pvt.) Ltd.
14-11-05 17-11-05
PDBs PDBs
Orient Textile Mills SMY A5614 3000357577 LT Switchgear 10/31/2005 11/11/2005 12/8/2005 CL rel on 01-11
24-11-05 12-12-05
LT LT

08-11-05
LT 08-11-05
15-11-05
10-11-05 LT CL rel on 01-11(LT) / Change in some
Lucky Cotton Mills TAM/MHF A5615 3000358331 LT Switchgear 10/31/2005 11/11/2005 DBs
DBs 10-11-05 DBs, resubmitted & approved
24-11-05
15-11-05 DBs
DBs

Pak Arab Fertilizers (Pvt.) Ltd. MHF A5616 3000350447 LT Panel 11/7/2005 11/11/2005 11/11/2005 11/28/2005 12/1/2005

15-11-05
01-12-05 CL rel on 11-11 / Site visit on 12-12 /
14-12-05 21-11-05
03xGenerator Power (2000A)+ SB D Schematics revised based on customer
Allied Engg Services Ltd./FTC management Co. Lt TAM A5617 3000363990 11/10/2005 11/15/2005 Schematics 03-01-06
02xLTO Panels 09-01-06 drg. recd on 13-12 / CCPs revised to LTOs
16-12-05 email
SB D - thru BTDs (not in scope)
Layout

04xGenerator Power(4000A)+
10-11-05 16-11-05
Al-Karam Textile Mills MHF A5618 3000363970 03xCable Termination(6000A) 11/15/2005 2/16/2006 CL rel on 11-11 / Revised indent
26-12-05 30-12-05
Panels
02xGenerator Power(2000A) CL rel on 21-11, rev 05-12 as per
MHF A5619 3000363976 11/15/2005 11/18/2005 11/22/2005 11/29/2005 12/5/2005
Usman Ltd. LTOs+01xMCC+01xLDB customer comments
NTDC-WAPDA (TD) MA A5620 3000364882 01xDCS Marshalling Kiosk 11/14/2005 TD drgs recd on 18-05 by email

21-11-05 21-12-05
16-11-05
23-11-05 Items 7-8 Items 7&8 21-12-05 CL of items 7-8 on 16-11, bal. on 06-01 /
Philips Electrical Industries of Pakistan Ltd. TAM A5621 3000364875 LT Switchgear 04-01-06
09-01-06 15-12-05 04-01-06 Items 7&8 Revised & Add indents
05-01-06
Items 3-4 Bal.

01xSoft Starter Panel for


BP Pakistan MHF A5622 3000390256 12/26/2005 12/30/2005 1/3/2006 2/10/2006 CL rel on 30-12
75HP/56kW, 480V, 60Hz motor
08-12-05 17-01-06
Novatex Ltd. MHF A5623 3000371920 LT Switchgear 11/23/2005 12/1/2005 1/23/2006 CL rel oh 01-12
15-12-05 Schematics
CL rel on 01-12 / App comment for PES
Punjab Industrial Estate SMY A5624 3000348705 27xSteet Lighting Control Panels 11/24/2005 11/30/2005 12/1/2005 12/15/2005 12/21/2005
clarified on 19-12
24-11-05 02-12-05 02-12-05 15-12-05 06-12-05
Sun Rays Textile Mills Ltd. MHF A5625 3000371221 LT Switchgear CL rel on 02-12
20-01-06 25-01-06 31-01-06 28-02-06 08-03-06
Maple Leaf Cement (OLM) TAM A5626 3000371274 LT Switchgear 11/24/2005 12/9/2005 12/9/2005 12/30/2005 12/28/2005 CL rel on 09-12
14-12-05
Azgard Nine Ltd. SMY A5627 3000378126 LT Switchgear 12/2/2005 12/8/2005 09.12.05 12/19/2005
email
NTDC-WAPDA (HSS) / 500kV Rawat-Lahore 07xRelay + 02xMetering & Control
MA A5628 3000379723 12/9/2005 NR
Extension S/S Project Panels
NTDC-WAPDA (HSS) / 500kV & 220kV Sahiwal 15x500kV+05x220kV Relay +
MA A5629 3000379796 12/9/2005 NR
S/S Project 05xMetering & Control Panels
01xMCC - 8PU.011 for alignment
Enar Petrotech (EC) / Refining Facility TAM A5630 3000383940 12/15/2005 12/22/2005 12/20/2005 12/30/2005 12/28/2005 CL rel on 20-12
with existing MCC

Page67/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

20 20 18.25 18.25 1.75


Closed LV

0 100 100 -100 Closed LV


0 89 89 -89 Closed LV
55 55 35.25 35.25 19.75 Closed LV TCP

188 188 65 2 67 121 Closed LV


165 165 172.2 172.2 -7.2
Closed LV

120 120 81.3 81.3 38.7

Closed LV

40 40 35 35 5 Closed LV
105 105 144.3 144.3 -39.3
Closed LV

130 130 66.5 66.5 63.5


Closed LV

160 160 78.75 78.75 81.25 Closed LV


160 160 38 38 122 Closed LV
75 50 125 259.8 29 39.75 28 15 25 35 431.6 -306.6
Closed LV

40 40 79 10 89 -49 Closed LV
200 200 200 200.3 -0.25 Closed LV
40 40 39.8 39.8 0.2 Closed LV
85 85 90.5 90.5 -5.5 Closed LV
45 45 28 28 17 Closed LV
120 120 82 82 38 Closed LV
127 127 30 22.75 10 16 9 87.75 39.25 Closed LV
200 200 246 12 10.75 10 278.8 -78.75 Closed LV
80 80 45 45 35 Closed LV

Page68/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

27-01-06
LT Switchgear - LT Boards-F1 + 05-01-06 email *As per Design Plan dtd. 05-01 / Changes
Honda Atlas Cars Pakistan Ltd. HJ A5631 3000380721 12/20/2005 * 1/30/2006
MCCs & DBs-8HKO Lot 1 15-02-06 in App
email
22-12-05
K.E.S.C. (TR) RJ A5632 3000416783 05x FCP+TCP for 40MVA PT 12/20/2005 2/10/2006 3/24/2006 Formal indent, S. O. # on 16-02
19-01-06
28-12-05 Resubmitted as per changes reqd by SB
Siemens Afghanistan / Gardez Province MHF A5633 3000388920 01x LT Panel 12/26/2005 12/28/2005 2/22/2006 2/22/2006
02-02-06 S dtd 01-02
01xLT Panel + 01xMCC (8HKO) + 06-01-06
29-12-05 04-01-06 20-01-06
Lucky Tex TAM A5634 3000391409 200kVAr detuned PFIP stage 23-01-06 1/23/2006 Rev indent, CL rel on 14-06
30-05-06 05-06-06 02-08-06
connected with existing PFIP 14-06-06
19-01-06
M/s Suraj Cotton Mills Ltd. MHF A5635 3000391920 01xMCC (8PU.003) + 01xDB 12/30/2005 1/5/2006 1/9/2006 1/23/2006 CL rel on 09-01
email
31-01-06
LDBs
K.E.P.Z. / Phase II SMY A5636 3000394334 LT Switchgear 1/5/2006 27-01-06* 4/25/2006 * Design inputs recd on 20-01
28-02-06
Layout

02-02-06
LTO
23-01-06
LT Switchgear + Loose ACBs & 06-01-06 06-02-06
Bhanero Textile Mills Ltd. TAM A5637 3000390102 1/20/2006 25-01-06 2/20/2006 Revised indent - 4000A ACB reqd in Panel
accessories 25-01-06 MCC
21-02-06
SP

Rahimbux Group of Cos. - Arain Mills Ltd. (PTD


TAM A5638 3000396628 LT Switchgear 1/16/2006 1/24/2006 1/27/2006 3/10/2006 3/14/2006
SE)

K.E.S.C. (TR-TD/Areva) RJ A5639 3000486629 08x FCP+TCP for 40MVA PT 6/7/2006 7/13/2006 Drgs rel on pre indent / CL rel on 14-07

20-02-06 17-03-06
Siemens Afghanistan / Shindand project TAM A5640 3000394277 LT Switchgear 1/25/2006 2/6/2006 2/15/2006 Revised specs. recd on 07-02
14-03-06 17-04-06
31-01-06 CL rel on 26-01 / Panels position changed
Sandal Dyestuff Industries Ltd. SMY A5641 3000396759 LT Switchgear 1/20/2006 1/31/2006 1/31/2006 NR
24-02-06 on 22-02
27-01-06
NTDC-WAPDA (HSS) / Sahiwal 500/220/132kV S/S HJ A5642 3000389030 01xDC Auxiliary Services Panel 1/23/2006 2/4/2006 5/30/2006 SB D Details
30-03-06
01x FCP+01xACP for 160MVA, 23-01-06 26-01-06 S.O., Indent / Resubmitted as per App
WAPDA / WOR-18 RJ A5643 3000652122 4/3/2008 3/12/2008
220kV Auto Trafo 08-02-07 ????? comments / CL rel on 08-05

06-06-06
S/S P1&P2
12-06-06 Site visit & meeting with Customer on 16-
24-01-06 10-02-06 15-02-06 S/S P3&P4, 17/03 / CL rel to SB S on 31-03, rev 10-04,
KCI Chashma (EC) MHF A5644 3000393133 LT Switchgear + 04xDBs 4/20/2006
12-04-07 16-04-07 25-04-06 DBs rev 25-04 / Meeting with customer on 20-
27-06-06 04
BTDs
16-04-07

27-02-06 13-03-06
CL rel on 06-02 / MBB rating changed in
M/s Hussain Mills Ltd. MHF A5645 3000403721 LT Switchgear 1/25/2006 2/6/2006 2/6/2006 14-03-06 15-03-06
App
DBs DBs
NTDC-WAPDA (TD) / 500kV Yousuf Wala S/S-Sahiw MA A5646 3000403443 11x Kiosk Interface Panels 1/25/2006 4/20/2006
NTDC-WAPDA (TD) / 500kV Rawat S/S Ext. (Lot-1) MA A5647 3000403445 03x Kiosk Interface Panels 1/25/2006
23-02-06 20-03-06 BTD layout changed in App drgs recd on
Colony Textile Mills Ltd. TAM A5648 3000409827 LT Switchgear 2/10/2006 2/17/2006 3/20/2006
15-03-06 email 21-03

Page69/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

800 800 661.8 661.8 138.2


Closed LV

60 60 99.25 99.25 -39.25 Closed LV TCP


38 38 34 34 4 Closed LV
80 80 100 100 -20
Closed LV

62 62 58 58 4 Closed LV
155 155 98 98 57
Closed LV

216 217.3 -1.25

216 217.3 Closed LV

0 68.75 68.75 -68.75 Closed LV

65 65 49.5 13 15 77.5 -12.5 Closed LV TCP

113.7 113.7 127.6 127.6 -13.85 Closed LV

55 55 65.05 65.05 -10.05 Closed LV

60 60 142.5 142.5 -82.5 Closed LV

55 55 18.75 18 25 15 10 8 94.75 -39.75 Running LV TCP


512 590.8 -78.75

422 90 429.8 75 29 22 35 Closed LV

45 35 10
45 35 Closed LV

175 175 116 29.5 28.75 15 5 194.3 -19.25 Closed LV


75 75 5 56 5 66 9 Closed LV
425 55 480 304.5 304.5 175.5 Closed LV

Page70/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

* Order on-hold due to pending design


04-04-06 24-04-06 inputs, resolved on 27-03 / CL rel after
OGDC / Chanda Gas Field (EC) TAM A5649 3000412163 LT Switchgear 2/13/2006 27-02-06* 5/26/2006
26-04-06 10-05-06 app on 26-05 / Resubmitted as per App
comments / Ammeters added in App

13-04-06
24-02-06
14-02-06 01-03-06 Item 34 * As per Design Plan / CL for add indent
Zahra Textile Mills SMY A5650 3000412832 LT Switchgear * 14-03-06
07-04-06 Lot II 25-04-06 on 12-04
30-03-06
Items 35-37

Lot I-68 Panels+Lot II-67 Panels+ AC/DC


05-04-06
16-05-06 02-08-06 Panels / TD drgs for 54xR&C Panels recd
NTDC-WAPDA (TD) / WOR-11 Lot III MHF/MA A5651 3000403485 143x Relay & Control + AC + DC Pan 2/13/2006 28-07-06
21-08-06 AC-DC on 24-02 / CLs for AC, DC rel on 18-05
after App, rev CL on 19-07

02-03-06 30-03-06
08-08-06 CL rel on 09-03 as per SB S go-ahead /
Highland Traders / Naval Housing Scheme MHF A5652 3000412156 LT Switchgear 2/20/2006 3/1/2006 11-05-06 26-06-06
23-02-07 Go-ahead for on-hold items on 16-02
08-08-06 13-09-06
MD Siemens Pakistan A5653 Phase CO DB 2/17/2006 NR 2/20/2006

NTDC-WAPDA (TD) / 500/220/132kV S/S-Sahiwal MA A5654 3000420275 02x Kiosk Interface Panels 2/22/2006 NR 3/10/2006

Maple Leaf Cement MA A5655 3000422849 02x Marshalling Kiosks 2/27/2006 NR Order cancelled on 26-05

15-03-06
01-03-06
email
Hassan Spinning Mills (Pvt.) Ltd. TAM A5656 3000421051 LT Switchgear 2/27/2006 3/6/2006 08-03-06 3/16/2006
24-03-06
Layout
Layout
13-03-06
Al-Karam Textile Mills MHF A5657 3000424575 O/G Feeder Panels 2/28/2006 3/6/2006 3/8/2006 3/17/2006 Alignment with A5618 / CL rel on 06-03
13-04-06
2xLT panels, 7xDBs, 3xMCCs, 06-03-06 10-03-06
Civil Works Organisation / SUPARCO TAM/HJ A5658 3000422017 3/3/2006 4/13/2006 5/17/2006 CL rel on 05-04
6xLockable Mushroom boxes 09-03-06 05-04-06

M/s Independent Newspapers Corp. (Pvt.) Ltd. / Clarifications reqd for some items and
SMY A5659 3000430110 LV Panel, DBs, BTD 3/8/2006 3/24/2006
Jang Building, I. I. Chundigar Road (EC) BTD layout / Order put on-hold on 10-04

M/s J & S Enterprises (Pvt.) Ltd. / Jang Press, Clarifications reqd for LVP and BTD
SMY A5660 3000430115 LV Panel, 2Nos BTDs 3/8/2006 3/31/2006
Sultanabad (EC) layouts L248 / Order put on-hold on 10-04

K.E.S.C. (TR) RJ A5661 3000499948 01xFCP for 22/30MVA PT 3/2/2006 3/14/2006 3/14/2006 Formal indent & S.O. # recd on 29-06
Gadoon Textile Mills Ltd. SMY A5662 3000430530 01xPDB 3/13/2006 3/20/2006 3/21/2006 3/27/2006 CL rel on 21-03
28-04-06 CL rel on 21-03 / Changes, go-ahead on
BU TR / New Trafo Hall MHF A5663 3000420320 01xLT Panel 3/13/2006 3/20/2006 3/21/2006 5/29/2006
26-05-06 08-05 / Resubmitted
Pakistan Oil Fields Ltd. MHF A5664 3000433261 LT Switchgear 3/14/2006 3/30/2006 4/10/2006 4/19/2006 5/24/2006 CL rel on 10-04
22-03-06 CL rel on 21-03 / Analogue meters reqd
Nishat Dyeing, Finishing & Spinning - Unit 29 HJ A5665 3000433319 01x2000A ACB I/C / O/G Panel 3/15/2006 3/21/2006 3/27/2006
email instead of Digital in App
British High Commission (OLM) SMY A5666 3000433859 01xLT Panel 3/15/2006 3/22/2006 22.03.06 4/3/2006 3/31/2006 CL rel on 24-03
01x0.25kW DOL Starter module 21-04-06 CL rel on 20-03 , revd 24-04 as per App
New Progressive Builders (PARCO) TAM A5667 3000433142 3/20/2006 3/20/2006 3/21/2006 3/21/2006
(KS type - 8PU.011) 08-05-06 comments
M/s Technical Associates Pakistan (Pvt.) Ltd. / Delayed due to late response to Order
SMY A5668 3000435675 429xService Boxes 3/22/2006 3/28/2006 4/4/2006 7/4/2006
Sukh Chayn Gardens review

Complete scope dispatched, only SS3


24-03-06
Sunlight Wood Industries MHF A5669 3000435774 LT Switchgear 3/29/2006 3/29/2006 5/8/2006 5/15/2006 BTD to be designed after reciept of SS 3
22-05-06
layout from customer

Page71/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

140.8 136.6 4.25

140.8 136.6 Closed LV

280 17 297 304 304.1 -7.05


Closed LV

600 600 592 28.75 94 49.5 45 34.8 15 5 864.3 -264.3


Closed LV

470 470 307 8 17 10 25 45 8 419.8 50.25


Closed LV

0 11 11 -11 Closed
60 60 103 13 5 5 126 -66 Closed LV
0 28 28 -28 Closed LV
140 140 66 66 74
Closed LV

120 120 75 75 45 Closed LV

250 250 376.3 21 397.3 -147.3 Closed LV


180 180 61.78 61.78 118.22
Closed LV

160 160 25 25 135


Closed LV

55 55 169 168.8 -113.8 Closed LV TCP


25 25 10 10 15 Closed LV
70 70 63 63 7 Closed LV
74 74 113 112.75 -38.75 Closed LV
25 25 38 38 -13 Closed LV
20 20 27.75 27.75 -7.75 Closed LV
25 25 30 30 -5 Closed LV
50 50 0 0 50 Closed LV
167.5 167.5 178 178.3 -10.75
Closed LV

Page72/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

Medipharm (Pvt.) Ltd. HJ A5670 3000437228 500kVAr PFIP - 1800mm High Panel 3/30/2006 4/3/2006 4/7/2006 5/26/2006 CL rel on 07-04

Pak Arab Fertilizers (Pvt.) Ltd. HJ A5671 3000442087 01x1600A ACB I/C / O/G Panel 3/31/2006 4/4/2006 4/4/2006 5/29/2006 5/30/2006 CL rel on 05-04
24-04-06 Scope changed in App, Instead of 25kVAr,
AGE (Navy) Mehran MHF A5672 3000446498 09xPFIPs (4x50,1x125,4x175kVAr) 4/7/2006 4/13/2006 5/8/2006 5/19/2006
16-05-06 additional 50kVAr unit reqd

British High Commission - Islamabad HJ A5673 3000450144 FLBS units for 8PU.011 S1-Panels 4/13/2006 4/26/2006 4/26/2006 5/8/2006 5/12/2006 CL rel on 26-04 / SB D Details

Hussain Mills Ltd. HJ A5674 3000449951 LT Switchgear, PFIP & DBs 4/19/2006 NR 5/5/2006 CL rel on 28-04 / Changes in inspection

19xFCPs+19xACPs for 20/26MVA


NTDC-WAPDA RA A5675 3000612276 4/19/2006 4/26/2006 4/28/2006 13.12.06 15.12.06 Formal indent & S.O. # recd on 13-12
PT

Drgs rel based on preliminary info / CLs


26-04-06
Zaver PC Hotel Gwadar (EC) SMY A5676 3000435737 LT Switchgear 4/28/2006 4/21/2006 for bal items rel on 17-05. Additional
26-07-06
indent for 03x DBs received on 26/07/06.

CFO Siemens TAM A5677 IFO-1210 DB for CFO House 4/19/2006 NR 4/21/2006

29-05-06
Item 2
Bolan Castings Ltd. HJ A5678 3000457847 LT Switchgear 4/24/2006 5/8/2006 5/12/2006 5/17/2006 CL rel on 04-05 / Changes in App
30-05-06
Items 3-15
12-05-06
Gulshan Spinning Mills Ltd. TAM A5679 3000456207 LT Switchgear 4/24/2006 5/5/2006 5/8/2006 CL rel on 08-05
email
06-06-06
Deewan Pakland Cement (MES) SMY/TAM A5680 3000459148 LT Switchgear - 8PU.011+8PU.003 4/28/2006 * As per Design Plan
08-06-06
Umar Spinning Mills (Pvt.) Ltd. MHF A5681 3000464309 LT Switchgear 5/4/2006 5/11/2006 5/16/2006 5/30/2006 5/31/2006 CL rel on 09-05
Attock Cement Ltd. RJ A5682 3000426789 01x400kVAr PFIP 5/9/2006 5/11/2006 5/11/2006 5/23/2006 5/24/2006 CL rel on 11-05
19-05-06
Rauf & Co. HJ A5683 3000467254 LT Panel 5/9/2006 5/15/2006 5/16/2006 5/22/2006 CL rel on 11-05
email
Pakistan Cement (OLM) HJ A5684 3000469372 LT Switchgear 5/16/2006 5/19/2006 5/22/2006 5/24/2006
05-06-06 Resubmitted based on info recd from
PPL (BU OLM) MHF A5685 3000472842 LT Panel 5/18/2006 5/23/2006 6/8/2006 6/19/2006
15-06-06 customer
26-06-06
Areva (TR) / KESC RJ A5686 3000534493 01xACP for 31.5/40MVA PT 5/23/2006 6/2/2006 8/7/2006 8/24/2006 Formal indent & S.O. # recd on 23-08
14-07-06
02xFCPs+02xACPs for 20/26MVA
WAPDA 20/26MVA PT RJ A5687 3000479443 5/25/2006 6/5/2006
PT
Pakistan Navy (PTD-Isb / TR) RJ A5688 3000516029 1xAVR Panel for 4MVA PT 5/26/2006 6/7/2006 7/3/2006 8/7/2006 8/11/2006
Maple Leaf Cement Factory Ltd. (OLM) MHF A5689 3000476672 2x15KW DOL starters 5/26/2006 6/1/2006 6/9/2006 CL rel on 09-06
CL (on-hold pending App) rel on 20-06 /
13-06-06
M/s Engro Chemicals Pakistan Ltd. MHF A5690 3000481085 6x30kW MCU 5/29/2006 6/8/2006 6/8/2006 6/20/2006 Qty inc from 01 to 06 on 09-06 / Changes
email
in App
M/s Technical Associates Pakistan (Pvt.) Ltd. / 01x630A MCCB+01x2000A ACB
MHF A5691 3000485471 5/30/2006 6/2/2006 6/2/2006 7/17/2006
Abu Dhabi Palace, RYK Panels - 8PU.003

M/s Sapphire Textile Mills Ltd. (Weaving Unit) HJ A5692 3000480079 LT Switchgear 6/1/2006 6/9/2006 6/9/2006 7/5/2006 7/7/2006 CL rel on 09-06

Main indent Main


01xMCC (F1 Design) + ACB trolley Indent: 16-06-06 10-07-06
BHP Billiton / Zamzama Phase-2 Development + spares + Remote Switching 16-06-06 20-06-06 02-08-06 08-08-06
SMY/ MHF A5693 3000483225 6/2/2006
(EC) Panel Add. 06-09-06 01-09-06 25-08-06
Add indent: Indent: 12-10-06 08-11-06
03xLT Panels (F1 Design) 19-06-06

NTDC-WAPDA / STG-6-26 (LOT-IV) MA A5694 3000483283 07xRP3+27xRP4 Relay Panels 5/31/2006 NR 6/12/2006

Page73/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

30 30 37.75 37.75 -7.75 Closed LV


28 28 36 36 -8 Closed LV
65 65 70 70 -5 Closed LV
45 45 52 52 -7 Closed LV
89.85 89.85 83.25 83.25 6.6 Closed LV
55 55 9.5 22 20 15 13 79.5 -24.5 Running LV TCP
318 20 338 411 13 59 15.8 1 499.6 -161.6
Closed LV

20 20 28 28 -8 Closed LV
210 220.2 -10.15
210 196.2 20 4 Closed LV

180 180 68.25 68.25 111.75 Closed LV

1850 1000 2850 1864 181.6 416.8 95 81 114 63 13 30 50 35 50 25 3018 -167.9 Running LV
135 135 84.75 84.75 50.25 Closed LV
20 20 4.75 4.75 15.25 Closed LV
35 35 54.05 54.05 -19.05 Closed LV
45 45 42.5 42.5 2.5 Closed LV
35 35 63.75 63.75 -28.75 Closed LV
35 35 76.25 12 5 93.25 -58.25 Closed LV TCP
60 60 17.25 6 10 15 48.25 11.75 Closed LV TCP
35 35 31 31 4 Closed LV TCP
30 10 40 32 12 44 -4 Closed LV
60 60 43 43 17
Closed LV

30 30 52 52 -22 Closed LV
140 140 113 112.75 27.25 Closed LV
140 140 490 107 93.75 70.25 110 2 873 -733

Closed LV

82.5 82.5 0 33.25 30 63.25 19.25 Closed LV

Page74/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

DHA CO-GEN (TD) TAM A5695 3000489033 AC & DC Panels 6/12/2006 6/21/2006 6/30/2006 7/12/2006 7/21/2006 CL rel on 13-07
Jang Group Lahore (OLM) MHF A5696 3000488405 01x300kVAr PFIP 6/14/2006 6/20/2006 7/5/2006 7/25/2006
56xRTUs + 88xInterfacing +
K.E.S.C. (TD) / LDC MA A5697 3000488903 6/15/2006 NR 6/20/2006 6/21/2006 CL rel on 20-06
11xEnergy Meter Panels
Pakistan Railways Carriage Factory SMY A5698 3000494509 03x300kVAR PFIPs 6/21/2006 6/30/2006 7/3/2006 CL rel on 04-07

28-06-06
04xLTOs + Loose ACB supply & LTOs
installtion at site + MCC + LDB-1 + 14-07-06 13-07-06
Faisal Spinning Mills Ltd. - 2 / Power House TAM/MHF A5699 3000499040 6/30/2006 7/6/2006 CL rel on 28-06(LTOs), 05-07(bal)
BTD 6000A + Cable termination BTD MCC, LDB
Panel 18-07-06
BTD

01x2500A ACB Panel to be aligned


Faisal Spinning Mills Ltd. - Nooriabad MHF A5700 3000499100 6/29/2006 7/3/2006 7/11/2006 CL rel on 05-07
with existing Siemens Panel

DHA Karachi (TR) / 132kV Creek City Grid


RJ A5701 3000505379 01xFCP + 01xTCP for 40MVA PT 7/5/2006 7/6/2006 7/6/2006 7/6/2006
Station
M/s Khalid & Brothers MHF A5702 3000502316 LV DBs 7/4/2006 7/7/2006 7/7/2006 7/12/2006 7/17/2006 CL rel on 17-07
02-08-06
Lucky Cement Ltd. SMY A5703 3000503418 01xLT Panel 7/4/2006 * 02days - sub to clarification
28-08-06
Indus Motor Co. Ltd. HJ A5704 3000506779 02xLT Switchgears + 02xBTDs 7/5/2006 7/11/2006 7/24/2006 Changes in App
Green City Housing Scheme SMY A5705 3000447858 148x Service Boxes 7/17/2006
01xFCPs+01xACPs for Fesco,
FESCO, Areva & Nizampur (TR) RJ/MAB A5706 3000543142 Areva & Nizampur 20/26 MVA PT 7/18/2006 7/19/2006 7/19/2006 9/10/2006 9/15/2006
respectively.
04xFCPs+04xACPs for 4Nos
Fesco RJ / HJ / MABA5707 3000546366 7/10/2006 7/24/2006 7/24/2006 9/18/2006 9/20/2006
10/13MVA PT

Delta Climate Control Engg. Ltd TAM/HJ A5708 3000517256 01xSML-1+13xLDBs+03xPDBs 7/20/2006 7/25/2006 7/26/2006 8/2/2006 Main Indent with S.O. # recd on 25-07

01xMLT Panel+02x400kVAr CL rel on 28-07 / Drgs to be rel for prod


Dewan Automotive Engg. Ltd. HJ A5709 3000516051 7/25/2006 8/1/2006 8/4/2006 8/10/2006
PFIPs+02xBTDs on SB S go-ahead
TR / PT Hall Extension HJ A5710 3000511934 02xGT3 DBs 7/25/2006 8/9/2006 8/8/2006 8/23/2006 24-0/8-06 Specs recd on 07-08
K.E.S.C. (TD) / KESC-02 TAM A5711 3000517233 03xLVDC + 03xLVAC Panels 7/25/2006 8/8/2006 8/29/2006 11/13/2006 11/2/2006

PPW SJA/RA A5712 3000516016 01xDC+01xAC Distribution Panels 7/26/2006 8/3/2006 11/27/2006

39xRelay+29xControl+
K.E.S.C. (TD) / Tender 2480-02 MA A5713 3000483204 07xDUPLEX+04xSynch+06xMet+08 7/26/2006 NR
xIF Panels
LT Switchgear - 02-08-06 09-08-06 09-08-06 11-08-06 24-08-06
BU-EPN TAM A5714 3000523164 01xCOP+01xLTO+01xMLT+ 22-09-06 26-09-06 27-09-06 05-10-06 10-10-06
01xDB 26-09-06 28-09-06 28-09-06 05-10-06 10-10-06
6xLT boards (MDP-D,L,1,3,4,5), 25-08-06 MDP-D have 70KA MCCBs to be ordered
Baluchistan Wheels Ltd. SMY / TAM A5715 3000514726 8/3/2006 8/8/2006
2xLDBs(1 &2), 4000A BTD Item 02 by 04/08/06
1x LV Board,1x PFIP 400 KVAR, 1x
CL rel on 08-08 / Formal indent duly
Diamond Fabrics Ltd. HJ A5716 3000524043 BTD 3200A (7 meters), 2x PDB, 1x 8/2/2006 8/11/2006 8/16/2006 8/22/2006 8/24/2006
signed recd on 07-08
LDB.
NTDC-WAPDA (TD) / 220/132kV GIS MA A5717 3000524805 01x Metrosil Box 8/4/2006 NR 8/25/2006

13-11-06 05xOMDs reqd against indent item 03,


24-08-06 22-09-06
PFIP earlier cancelled vide email dtd 15-02,
SIAL / NESPAK (EC) /SIAL Package III A-4 TAM A5718 3000517348 LT Switchgear 8/4/2006 8/18/2006 12-09-06 15-11-06
29-03-07 clarified on 26-03 / App with changes,
27-03-07 09-04-07
OMDs clarified on 24-04

Page75/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

75 75 9 9 66 Closed LV
35 35 9 29 38 -3 Closed LV
295 50 345 94.5 29 21 46 57.5 55 13 9 13 10 15 14.8 377.8 -32.8 Running LV
30 30 26.75 26.75 3.25 Closed LV
213 213 148.5 10 158.5 54.5

Closed LV

125 125 36 36 89
Closed LV

60 60 35.5 1 36.5 23.5 Closed LV TCP


67 67 62.75 62.75 4.25 Closed LV
82.5 82.5 24.75 6 2 32.75 49.75 Closed LV
167 30 197 110 109.8 87.25 Closed LV
55 55 9 9 46 Closed LV
60 60 24.75 3 10 37.75 22.25
Closed LV TCP

60 60 25.75 16 18 15 4 78.75 -18.75 Closed LV TCP


130 130 91 91 39 Closed LV
185 185 88 88 97 Cancelled LV
20 20 10 10 10 Closed LV
130 130 73 26 35 134 -4 Closed LV
25 25 20 6.75 1.5 14 42.25 -17.25 Closed LV
300 600 689.9 -89.9
300 5 67.25 74 125.8 179 109.8 97.3 22 4 5.8 Running LV

200 200 235 -35


82.5 101.5 21 15 15 Closed LV

153 172 325 224.8 48.95 28 25 326.8 -1.75 Closed LV


166 166 196 -30
145 35 16 Closed LV

0 0 0 0 0 Closed LV
275 275 288.3 -13.25
96.25 40 39 48 30 35 Closed LV

Page76/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

18x FCPs + 18x TCPs for


K.E.S.C. (TR) / Capacity Enhancement RJ / MAB A5719 3000525381 8/7/2006 8/9/2006 8/9/2006 8/25/2006 8/25/2006
31.5/40MVA Power Trafos
DB & Components for PT Hall 09-08-06 23-08-06
BU TR HJ A5720 3000525387 8/8/2006 8/9/2006 9/6/2006 Change in App
Extension 24-08-06 05-09-06
01xProtection & Metering Panel for
Army Welfare Trust (PWT) / Nizampur Cement SHA A5721 3000482465 5/31/2006 NR
PT
K.E.S.C. (TR) / Capacity Enhancement MAB A5722 3000565712 01xFCP for 30/37.5 MVA PT 7/25/2006 8/17/2006 10/12/2006 10/12/2006
Pakistan Railways MAB A5723 3000545583 01x TCP for 7.5MVA PT 7/27/2006 8/21/2006 9/14/2006 9/15/2006
DHA CO-GEN (TD) MA A5724 3000528782 03xLCC Panels 8/15/2006 NR
03xLCPs+02xLPPs+01xTCP+
DHA CO-GEN (TD) MA A5725 3000528724 8/15/2006 NR
01xTPP+01xMP+01xBBPP

Pakistan Railways (TS) MA A5726 3000526801 17x Relay Group Housings 8/15/2006 NR Drgs recd from TS released for manuf

2x Independent (standalone) S- 28-08-06 05-09-06


PTD SE - for PARCO HJ A5727 3000529527 8/16/2006 8/24/2006 9/20/2006 CL rel on 28-08
Panels _ 8PU.011 06-09-06 19-09-06
M/s Treet Corporation Ltd. Lahore MHF A5728 3000533274 LT Switchgear 8/23/2006 8/30/2006
Dow University of health and Sciences SMY A5729 3000535559 LT Switchgear 8/23/2006 8/29/2006 9/1/2006 9/27/2006 9/28/2006
K.E.S.C. (TD) / KESC-02 HJ A5730 3000555449 04x250V DC Panels 8/23/2006 9/29/2006 11/1/2006 11/23/2006 11/23/2006 Cable Glands / Cutouts
Sample Relay Panel-132kV BB
International Media Zone, U.A.E. MR A5731 IFO 1213 NR
Protection, SIVACON 8PT
MEPCO (TD) / Tender No. 20 MA A5732 3000562509 08xRP3 + 07xRP4 Relay Panel 10/4/2006 NR
01xRP + 01xCP + 01xLCC For
Dewan Cement (TD) MA A5733 3000562529 10/13/2006 NR Drgs recd from TD
Trafo.
M. Talib Enterprises / Container Control Program 08-11-06 10-11-06
MHF A5734 3000574438 01xLT Panel+DBs 10/30/2006 11/6/2006 12/7/2006 App with comments, DB Qty revised
at Port Qasim 14-11-06 30-11-06
Attock Cement Ltd. HJ A5735 3000565413 01x400kVAr PFIP 10/11/2006 11/20/2006 11/21/2006 Same as A5682

10-05-07
25-06-07
Scope clarified on 21-02 / resubmitted /
DHA (TD)/132kV G/S No. 1, DHA Phase VIII, AC
MHF A5736 3000581497 01xAC+01xDC Distribution Panel 10/31/2006 11/10/2006 3/1/2007 2/8/2008 Changes in App; CL rel on 17-01; Finally
Karachi 03-08-07
approved
DC
15-01-08

Impact Design Studio, Islamabad HJ A5737 3000584183 01xLT Panel 11/2/2006 11/3/2006 11/14/2006 11/8/2006
M/s Maple leaf Cement MHF A5738 3000581410 10xDBs 11/3/2006 11/15/2006 11/14/2006 11/20/2006

GEPCO (TD) / Wazirababad Road, 132/11kV 01xCP20+01xCP30+02xCP50+02xR 04-04-07


MA A5739 3000584675 11/3/2006 NR 2/28/2007
Cantt. G/S - Gujranwala P3+02xRP4+01xAC/DC Panels AC/DC

Zafar & Company/SUPARCO SMY A5740 3000587492 01x400kVAr PFIP 11/7/2006 11/22/2006 11/24/2006
28-11-06 30-11-06 05-12-06
LT Switchgear-SIVACON 8PT 27-11-06
Sitara Per Oxide HJ/TAM A5741 3000587675 11/8/2006 01-12-06 15-12-06 14-12-06
Withdrawable (MCC+PFIP) 29-11-06
08-12-06 23-12-06 19-12-06

DHA Karachi (TR)/DHA Phase VIII G/S No.1 MAB/RA A5742 3000645124 01xFCP+01xTCP for 31.5/40MVA PT 11/8/2006 7/5/2007 Formal Indent & S.O. # recd on 31-01

DHA Karachi (HSS)/DHA Phase VIII G/S No.1 RJ A5743 3000541803 01xRemote Control Panel 11/20/2006
05xRelay Panels + 03xMarshalling
NTDC-WAPDA (TD) / WOR-11 Lot III MR/MHF A5744 3000601763 Kiosks + 11/27/2006 11/30/2006 12/21/2006 1/25/2007 2/7/2007
AC/DC Panel
DEWA PROJECT SMY/MHF A5745 IFO-1213 02xSample 8PT Panels 12/1/2006 NR 12/11/2006

Areva (TR) / Faisalabad Industrial Estate RA A5746 3000602668 01xFCP+01xACP for 20/26MVA PT 11/27/2006 NA NA NA 12/5/2006 App already recd at offer stage

Page77/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

60 60 24.75 5 17 24 16 10 12 108.8 -48.75 Running LV TCP


20 20 13 13 7 Closed LV
80 80 5 7.75 8.8 23 4.8 49.35 30.65 Running LV
60 60 60 7 13 80 -20 Closed LV TCP
40 40 26.5 4 1 31.5 8.5 Closed LV TCP
45 45 5 13 12.75 76.05 20 30 15 171.8 -126.8 Closed LV
75 75 5 15 5 40.75 20 42 25 152.8 -77.75 Closed LV
35 35 0 0 35 Closed LV
40 40 64.25 20 11 95.25 -55.25 Closed LV
75 15 90 74.5 5 24 10 113.5 -23.5 Closed LV
60 60 37.5 27.2 64.7 -4.7 Closed LV
100 100 0 45 20 25 90 10 Closed LV
0 0 5 13 5 30 4 15 56 20 148 -148 Running LV
0 0 29 9 38 -38 Running LV
0 0 114.5 10 18 23.8 166.3 -166.3 Closed LV
0 0 58 10 68 -68 Closed LV
0 0 10 10 20 -20 Closed LV
0 137 -137

0 19 30 23 30 5 30 Running LV

41.25 41.25 0 24 24 17.25 Closed LV


80 80 0 81 49 25 35 190 -110 Closed LV
0 140.6 -140.6
0 21 22 2 24.8 24 10 11.8 10 10 5 Running LV

0 0 23.75 6 29.75 -29.75 Closed LV


325 325 527.3 -202.3
0 258 49.75 109.5 85 25 Closed LV

60 60 0 16 25 42 5 8 10 16 122 -62 Running LV TCP


0 20 22 10 52 -52 Running LV
75 75 78 -3
32 25 16 5 Closed LV

60 60 38.25 33.75 6 78 -18 Running LV


30 30 19 10 29 1 Closed LV TCP

Page78/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

Prime Crete (Pvt.) Ltd MHF A5747 3000607827 02xDBs 12/1/2006 12/6/2006 12/8/2006 12/26/2006 12/29/2006
Indus Motor Co. Ltd. HJ A5748 3000612090 02x400kVAr PFIPs 12/8/2006 12/13/2006 12/14/2006 12/14/2006
Formal indent recd on 20-12 / App drgs
Gulshan Weaving Mills Ltd. TAM A5749 3000618720 Main LT+BTD+DBs 12/12/2006 12/20/2006 12/20/2006 1/3/2007 12/27/2006
recd on 15-01

QESCO (TR) RA A5750 3000612278 01xFCP+01xACP for 20/26MVA PT 12/13/2006 12/18/2006 12/21/2006 12/21/2006

GEPCO(TR) RA A5751 3000612279 02xFCP+02xACP for 20/26MVA PT 12/13/2006 12/18/2006

Cable connection instead of BTD - Rev


Gulistan Textile Mills Ltd. - Unit 4 TAM A5752 3000618711 Main LT+BTD+DBs+PFIP 12/20/2006 12/29/2006 1/9/2007 1/11/2007 1/11/2007
indent reqd
DHA Karachi (TR)/DHA Phase VIII G/S No.1 RA A5753 3000581497 01xACP for 31.5/40MVA PT 12/21/2006
05xFCPs+05xACPs for 10/13MVA
NTDC-WAPDA (TR) / STG-621 RA A5754 3000626684 1/3/2007 3/19/2007
PT
Century Paper & Board Mills Ltd. HJ A5755 3000648636 LT Switchgear 2/2/2007

BU SS / Siemens Pakistan HO Building, Block 'D' MHF A5756 3000523164 03xDBs 1/9/2007 NR 1/10/2007

Gadoon Textile Mills Ltd. TAM A5757 3000640923 01xMCC - 8HKO 1/24/2007 1/31/2007 1/31/2007 2/8/2007 2/12/2007 CL rel on 26-01
K.E.S.C. (EA) / KESC 2480-08 LDC Project HJ A5758 3000628391 LT Switchgear 2/1/2007 2/8/2007 3/7/2007 Partly clarified on 20-02
02-02-07 07-02-07
CPC, DG Khan MHF A5759 3000648493 02x400kVAr PFIPs 4/5/2007 4/6/2007 Clarified on 27-02
27-02-07 02-03-07
Deluxe Packages TAM A5760 3000653604 01x400kVAr PFIP 2/9/2007 2/13/2007 2/13/2007 2/26/2007
LT Switchgear-8PU.003 12-04-07
Indus Motor Co. Ltd. TAM A5761 3000662539 01x3200+01x6000A LTO & BTD+ 2/22/2007 3/5/2007 16-04-07 Revised specs for DB recd on 17-04
01x4000A BC+01xDB Items 1-3
Institute of Leadership & Management, UMT
MHF A5762 3000664272 LT Switchgear 2/20/2007 3/5/2007 Formal indent recd on 06-03
Lahore

06-04-07
Indent recd on 22-02, inputs clarified on
01xMCC-8PU.011+ Item 2
Bosicor Pakistan Ltd. MHF A5763 3000662534 3/26/2007 3/30/2007 4/2/2007 4/4/2007 26-03 / Drgs reviewed and approved with
01xLT Panel-8PU.003 09-04-07
comments in meeting with customer
Item1

Allied Engg Services Ltd. TAM A5764 3000669805 01xCO Panel+01xMCC - 8PU.003 3/1/2007 3/8/2007 4/9/2007 4/16/2007 Ref. also A5761 / Changes in App

Novatex Ltd. MHF A5765 3000669026 01xO/G Panel-8PU.003 3/2/2007 3/7/2007 3/26/2007 Changes done as per App
35xLT Distribution Feeder Prelim indent / Go-ahead for release on
05-03-07
K.E.S.C. TAM A5766 3000737188 PillarBoxes - KESC Specs. K-PLB- 03-05 / 630A Fuse Base reqd, parts
04-06-07
217/2004 ordered

15-03-07 15-03-07
Item 1 05-04-07
CL rel on 09-03 / App with changes in
DHA CO-GEN (EC) MHF A5767 3000670913 MCCs+LDB Outdoor 3/6/2007 3/14/2007 28-03-07 4/5/2007 Items 2&4
item 3, meeting with customer on 04-04
Items 2-4 29-05-07
27-04-07 Item 3

Glaxo Smith Kline (EC) / Penicillin Block TAM A5768 3000671556 04xDBs 3/12/2007 3/20/2007 6/6/2007 5/16/2007 6/6/2007 PDB-2 resubmitted as per App comments

11-04-07 19-06-07 Indent & S.O. # recd on 21-06 for FCP / CL


KAPCO (TR) RA A5769 3000755859 01xFCP+01xACP for 20/26MVA PT 3/16/2007 6/26/2007
30-04-07 FCP for FCP rel on 26-06
Century Paper & Board Mills Ltd. MA A5770 3000675258 01xMarshalling Kiosk 3/16/2007 3/28/2007 4/12/2007 4/13/2007
19-03-07 26-04-07 Revised indent, Qty changed from 04Nos.
GEPCO (TR) RA A5771 3000681173 05xFCPs+05xACPs for 40MVA PT 3/21/2007 3/27/2007
12-04-07 email to 05Nos.
04-04-07
(PWT) / Mian Channu Water Project RA A5772 3000660725 02xDBs (8PU.003) 3/21/2007 3/28/2007 4/3/2007 4/4/2007
email

Page79/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

30 30 27 8 35 -5 Closed LV
20 20 25 25 -5 Closed LV
210 210 50 122.5 44 25 241.5 -31.5 Closed LV
30 30 70 15 10 12 10 6 123 -93 Running LV TCP
30 30 19.75 15 10 10 15 69.75 -39.75 Running LV TCP
180 180 55 35 20 110 70 Closed LV
33 33 15 20 20 20 5 8 5 93 -60 Running LV
55 55 20 5 10 10 10 55 0 Running LV TCP
110 110 60 70 23 10 163 -53 Running LV
13 13 10 10 3 Closed LV
67 67 45 35 8 88 -21 Closed LV
66 66 45 20 65 1 Running LV
13 13 8 15 23 -10 Running LV
13 13 18 18 -5 Running LV
140 240 273 -33
100 88 59 24 85 17 Running LV

165 165 60 43 43 146 19 Closed LV


230 230 138 92
30 79 5 9 15 Closed LV

125 125 30 48 55 8 141 -16 Running LV


55 55 13 4 17 38 Running LV
20 20 85.5 -65.5
55.5 5 25 Running LV

95 120 142 -22


25 74 50 10 8 Closed LV

25 25 30 10 28 68 -43 Closed LV
22 22 25 4 6 35 -13 Running LV TCP
50 50 28.5 31 5 13 77.5 -27.5 Running LV
55 55 12 8 5 14 15 6 60 -5 Running LV TCP
80 80 19 22 12 8 61 19 Closed LV

Page80/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

Clariant Pakistan (PWT) / WWTP, Jamshoro MA A5773 3000684708 01xMCC (8PU.003-F1) 3/22/2007 3/29/2007 5/23/2007 5/24/2007

A-one Feeds MHF A5774 3000686091 01x250kVAr PFIP 3/26/2007 3/28/2007 4/17/2007 4/19/2007
01x415V AC + 01x220VDC
NTDC-WAPDA (EA) / WOR-11 MA A5775 3000689946 3/28/2007 4/2/2007 5/23/2007 Put on hold on 05-04 / Go-ahead on 11-05
Distribution Panels
18-05-07
Karachi American School MHF A5776 3000686609 01x250kVAr PFIP 3/30/2007 4/3/2007 4/18/2007 5/21/2007 Alignment clarified in site visit on 14-04
email
04-04-07 04-05-07
21-05-07
01xLT Panel+02xMCCs - 8PU.003 Item 1 Item 1 Clarified on 13-04, CLs rel on 07-05 /
IMS Engineering / Indus Motor Co. Ltd. MHF A5777 3000693392 4/2/2007 5/18/2007 23-05-07
Fixed + Loose PB Boxes 09-04-07 11-05-07 Changes in MCCs as per App comments
Item 3
Items 2&3 Item 2

03xMCCs - 8PT Withdrawable +


10-04-07
02xBTDs + Additional Final customer SLDs recd on 06-04;
Siemens E&A, USA / Reliance Industries Ltd. TAM A5778 3000691655 26-09-07 11/10/2007
Panels/Modules + 02xSoft Starter Add/revd indents
01-11-07
Panels

19-04-07
MLTs
02xMLT Switchgears, 5000A - 16-05-07 MLTs Drgs rel based on Prelim indent /
02-05-07
M/s METKA, S.A. / KTPP, Karachi MHF A5779 3000709961 8PU.003 + 04xMCCs - 8PU.003 4/24/2007 5/7/2007 28-05-07 Meeting with customer on 18-04 / MCCs
Schematics
Fixed Design MCCs CLs rel on 30-04
08-05-07
MCCs

K.E.S.C. (EA) / Tender No. KESC


MA A5780 3000696695 04xLine Duplex Panels 4/9/2007 NR 4/16/2007
FPO/1115/T&D/06
K.E.S.C. (EA) / Tender No. KESC
MA A5781 3000698303 01xLine Duplex Panels 4/9/2007 NR 4/16/2007
FPO/1109/T&D/06
10-05-07
01xMCC - 8PT Withdrawable + 11-04-07 CL&SLD 13-06-07 Add indent for BTD / Part lists rel on 04-
Pakistan Cement Ltd. MHF A5782 3000666682
01xPFIP + 01x3200A BTD 30-04-07 01-06-07 MOM 06
Schematics
03xGT5+03xGT3+01xGT2
BU SBT/OLM / KESC Data Centre MR A5783 3000704987 4/19/2007 NR 4/20/2007
Housings with Busbars, etc.
01xDB - Stab Design, Flush
General Syed Absar Hussain MI A5784 3000707989 4/23/2007 4/23/2007 4/23/2007 SB S intimation on 20-04
mounted
Gulshan Weaving Mills Ltd. MI A5785 3000690370 02xPDBs - 8HKO 4/23/2007 4/24/2007 4/27/2007 5/8/2007 5/10/2007 Soft indent on 20-04
Nishat Mills Ltd. MI A5786 3000703886 01x2500A I/C / O/G ACB Panel 4/24/2007 4/26/2007 5/2/2007 5/16/2007 5/17/2007

M/s Technical Associates Pakistan (Pvt.) Ltd. MI A5787 3000706476 01x800A MCCB O/G Panel 4/24/2007 4/27/2007 5/8/2007 5/11/2007 5/15/2007

NTDC-WAPDA (HSS) / 23-04-07 21-05-07


TAM A5788 3000702852 LT Switchgear - 8PU.003 Fixed 5/10/2007 Revided indent
500/220/132kV S/S, Gakkhar 20-03-08 21-08-07

LT Switchgear - 8PU.003 Fixed 07-06-07


TMA Multan (PWT) / Multan Water Project MA A5789 3000698908 4/26/2007 6/11/2007 CL rel on 04-06
LT+MCCs+Loose Components email

Izhar Construction MI A5790 3000711124 02xDBs - 8HKO 5/2/2007 5/4/2007 5/11/2007 NR 5/10/2007
GEPCO (EA) MA A5791 3000718008 04xCP30 + 04xRP3 5/8/2007 NR Indent recd on 08-05
LT Swithgear with 1200kVAR PFIP, 13-06-07
Klash (Pvt.) Ltd. RA A5792 3000716698 5/8/2007 5/15/2007 6/4/2007 6/18/2007 CL rel on 29-05
01x3200A BTD email

11-06-07 11-06-07
Items 7, 11-20 Items 7, 11-20 CL rel on 05-06 / Layout clarified on 18-06
M/s Indus Home Ltd. / Dyeing Unit MHF A5793 3000717682 LT Switchgear 5/16/2007 5/25/2007 6/20/2007
12-06-07 12-06-07 / App with few changes
Items 1-4, 6, 8-10 Items 1-2, 4, 6, 8-10

CDA Islamabad (EC) / Khanpur Dam SMY/SFH A5794 3000723477 01xDB 5/17/2007 5/24/2007 6/8/2007 6/15/2007 CL rel on 07-06 / Manufacturing by CTI

Page81/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

66 66 69.5 20 24 10 5 128.5 -62.5 Running LV


13 13 5 4 9 4 Running LV
50 50 12 0 7 10 16 5 50 0 Running LV
20 20 14 11 25 -5 Closed LV
110 110 130 -20
35 16 25 5 27 22 Closed LV

600 900 801.9 98.1


300 175.8 70 80 60 222.8 193.3 Running LV

200 200 189 11

62 21 35 15 48 8 Running LV

80 80 23 20 2.8 5 10 10 70.8 9.2 Running LV


80 80 21 18 3.8 5 10 10 67.8 12.2 Running LV
150 150 132.5 17.5
30 24 60.5 18 Running LV

5 5 0 5 Closed LV
0 5 5 -5 Closed LV
10 10 3 3 7 Closed LV
50 50 3 23 20 2 48 2 Closed LV
5 5 3 3 2 Closed LV
134.25 65.75 200 30 15 95 25.8 165.8 34.2 Running LV
100 100 95 5
30 9 15 31 10 Running LV

10 10 5 5 5 Closed LV
0 20 13.8 15 27 5 80.8 -80.8 Running LV
50 50 5 15 14.5 2 12 48.5 1.5 Closed LV
125 125 105 20
5 80 20 Closed LV

10 10 7.5 7.5 2.5 Running LV

Page82/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

NMC-1, D.G. Khan SMY/SFH A5795 3000725566 LT Switchgear 5/21/2007 07.06.07 6/8/2007 7/4/2007 10.07.07 CL rel on 29-05
24-05-07
Niaz Muhammad & Co. TAM A5796 3000734986 01xDB NR 5/28/2007 Indent / S.O. No. recd on 28/29-05
email
TMA Shujabad (PWT) / Shujabad 01 01xLT Panel with 200kVAr PFIP- 08-06-07
MHF A5797 3000728110 5/24/2007 5/30/2007 6/5/2007 6/11/2007 CL rel on 31-05
(Pathanwala) Water Project 8PU.003 email
TMA Khanewal (PWT) / 01xLT Panel with 100kVAr PFIP- 11-06-07
TAM A5798 3000733590 5/28/2007 6/4/2007 6/6/2007 6/11/2007 CL rel on 05-06
Khanewal Water Project 8PU.003+01xDB-8HKO email
01xDB-8HKO+
McDonalds Pakistan RA A5799 3000733930 5/29/2007 6/4/2007 6/6/2007 6/20/2007 6/20/2007
01x250kVAr PFIP-8PU.003
DHA CO-GEN / DHA Power & Desalination
SMY/SFH A5800 3000736260 LT Switchgear 5/30/2007 NR 6/4/2007 CL rel on 31-05
Plants, Karachi

Philips Electrical Industries of Pakistan Ltd. TAM A5801 3000735117 Additions / Amendments in DBs 5/30/2007 NR 6/6/2007 Ref. ED/A5621 / CL rel on 31-05

SABRO / Indus Motor Co. Ltd. SMY/SFH A5802 3000737419 01xMCC-8PU.003 Fixed 5/31/2007 6/6/2007 6/7/2007 6/7/2007 CL rel on 01-06
M/s Eden Developers (Pvt.) Ltd. /
TAM A5803 3000739528 153xLT Service Boxes w/o MCCBs 6/5/2007 6/8/2007 11.06.07 7/3/2007 6/11/2007
Eden Palace Villas
LT Distribution Board - SIVACON
M/s Engro Chemicals Pakistan Ltd. (PTD SE) MHF/SMY A5804 3000737280 6/4/2007 6/19/2007 6/19/2007 7/5/2007 7/10/2007 App with changes / CL rel on 09-07
8PT
01x5000A ACB Panel+ 07-06-07 15-06-07* * sub to receipt of alignment details / CL
Mehran Sugar Mills (Tando Allah Yaar) SMY/SFH A5805 3000740770 6/25/2007 7/16/2007 6/25/2007
02xSynchronizing Boxes 19-07-07 25-07-07 rel on 11-06; Add indent for BTD
02xDBs+01x5.5kW DOL Starter
Glaxo Smith Kline (EC) / Penicillin Block RA A5806 3000752749 6/11/2007 6/22/2007 6/29/2007 7/2/2007 7/2/2007 CL rel on 23-06, revd 29-06
Box+ 01xLoose 100A MCCB

20-07-07
Item 1
23-07-07
Items 2,4
25-07-07
LT Switchgear, DC DBs, 08-06-07 Items 3,5 CL rel on 29-06; Part list on 10-07; Spares
SP&EW MHF/SMY A5807 3000879413 7/13/2007 7/13/2007 NR 08-08-07
Trafo Control Panel email CL to be released;
Item 9&10
16-08-07
Item 11
21-08-07
Items 12&13

04-07-07
14-06-07 29-06-07 MLT
email (only DBs 05-07-07
02-07-07 DBs 06-07-07 Indent & S.O. # recd on 05-07 / Spacer
M/s Indus Home Ltd. / Stitching & WWTP SMY A5808 3000763021 LT Switchgear main page) 6/29/2007 MLT+Layouts 09-07-07 09-07-07 Box sdded on 16-07
specs on 05-07-07 MCCs
21-06-07 MCCs 12-07-07
Layouts

CL rel on 23-06 / Drgs rel for manuf prior


Tullow Pakistan (Developments) Ltd. (OLM) SMY/SFH A5809 3000752744 01xAC Distribution Panel - Outdoor 6/18/2007 6/22/2007 7/9/2007
to App on SB S go-ahead
02x1600A ACB Panels + 02x1600A CL rel on 29-06 / BTD layout submitted on
CDA Islamabad (EC) / Q-Block MHF A5810 3000749380 6/21/2007 03.07.07 7/4/2007 8/6/2007
BTDs 10-08

739x Service Boxes as per WAPDA 28-06-2007 25-07-2007


NLC, Rawalpindi / DHA I Project TAM A5811 3000791565 13-09-07 Prelim indent
Specs. 22.02.08 29.02.08

NTDC-WAPDA / HSS (TR) / 28-06-07 05-10-07


RA A5812 3000819908 01xFCP+01xACP for 10/13MVA PT 7/3/2007 7/3/2007 5/10/2007 Design indent; Indent & S.O. recd
500/220/132kV S/S, Gakkhar 06-09-07 email
01xAC+01xDC Distribution Panels 06.07.07 110V DC board corrected drawings
Bahria Town (Pvt.) Ltd., Rawalpindi (HSS) TAM A5813 3000759696 6/29/2007 06.07.07 07.11.07 12.11.07
- WAPDA Specs. 19.07.07 resubmitted
01xAC+01xDC Distribution Panels 06.07.07 110V DC board corrected drawings
Bahria Town (Pvt.) Ltd., Lahore (HSS) TAM A5814 3000759687 6/29/2007 09.07.07 07.11.07 12.11.07
- WAPDA Specs. 19.07.07 resubmitted
Prelim indent / CL rel on 12-07 / Main
16.07.07
M/s Engro Foods TAM A5815 3000781625 LT Switchgear-8PU.003 F1 Design 7/9/2007 18.07.07 18.07.07 indent on 19-07 / Control voltage changed
to 24VDC for ACBs

Page83/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

50 50 10 20 10 4.8 44.8 5.2 Running LV


10 10 10 10 0 Closed LV
20 20 12 5 17 3 Closed LV
20 20 10 6 16 4 Closed LV
26.4 26.4 12 12 14.4 Closed LV
10 10 9 9 1 Closed LV
20 20 0 20 Closed LV
46 46 7 7 39 Running LV
10 10 20 20 -10 Running LV
79.2 20.8 100 45.8 12.8 15 11.5 85.1 14.9 Closed LV

50 84 134 15.5 27.8 7.5 16 66.8 67.2 Closed LV


60 60 7 12 25 44 16 Closed LV
175 175 53 122

25 23 5 Running LV

100 110 92.8 17.2

10 52.8 10 30 Closed LV

30 20 50 15.5 13 7 5.8 41.3 8.7 Running LV


110 110 15 12.8 28.5 56.3 53.7 Running LV
10 10 20 -10
20 Running LV

55 55 20 12 32 23 Running LV TCP
55 55 8 8 47 Running LV
55 55 7 7 48 Running LV
150 124.8 25.2
150 30 49.8 45 Running LV

Page84/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

16-07-07
Bahria Town (Pvt.) Ltd., Lahore (TR) RA A5816 3000841197 01xFCP+01xACP for 10/13MVA PT 18-07-07 18-07-07 1/4/2008 04.01.08 Prelim indent; Indent & S.O. recd
06-09-07
Ministry of Foreign Affairs - GOP (EC) MTS A5817 3000783021 01x500kVAr PFIP 19.07.07 23.07.07 24.07.07 28-08-07 04.09.07 CL rel on 24-07
Pakistan Railways (TS) MR A5818 3000775122 13x Relay Group Housings 7/19/2007 NR NR NR 7/20/2007

NPI Construction & Engineering MHF A5819 3000755666 LV Switchgear+300kVAr PFIP 19.07.07 25.07.07 25.07.07 31.08.07 4/9/2007 App with changes; Meeting on 27-08

Aiwan-e-Sadar (EC) MTS A5820 3000781566 LT Panels 19.07.07 26.07.07 26.07.07 02.08.07 8/7/2007

23-07-07 06-09-07
04xLTO Panels+04xLT Panels+
15-08-07 27-07-07 31-07-07 03-09-07 Items 3&4 Order on hold vide SB S email dtd 08-08;
Gulistan Textile Mills Ltd. MHF A5821 3000781555 01xMCC+02xLDBs+Loose
23-08-07 31-07-07 07-08-07 MCC+LDB 26-09-07 Revised indents
Materials
10-09-07 Item 2
02xFCP+02xTCP for 10/12.5/15MVA 24.07.07
Siemens Mexico (TR) RA A5822 3000977762 03.08.07 8/6/2007 03.01.08 email 1/8/2008 Indent/S.O. recd; CL rel on 08-01
PT 07-01-08
24-07-07 Meeting in TR dtd 25-07 to clear the
Siemens Saudia (TR) RA A5823 3000855583 01xFCP for 6/7.5MVA PT 08/03/07 8/6/2007 24-08-07 email 24-09-07
19-09-07 scope; Indent & S.O. recd
22-08-07
Mustehkum Cement MTS A5824 3000791477 03x600kVAr PFIPs 7/27/2007 31/07/07 8/2/2007 27.08.07 CL rel on 02-08
email
30-07-07 30-07-07 Email Info - Assembly drgs submitted as
Mrs. Shahid Aziz Residence KAK A5825 3000820376 03xDBs 30-07-07 20-08-07
17-08-07 NR reqd; Indent receipt
Technical Associates Pakistan / Abu Dhabi
MTS A5826 3000795211 01xLT Panel 7/31/2007 03/08/07 8/13/2007 30.10.07 30-10-07 CL rel on 06-08
Palace
Bosicor Pakistan Ltd. RA A5827 3000808999 03xLT Panels - 8PU.003 Housings 9/8/2007 NR 8/10/2007
Pakistan Refinery Ltd. MHF A5828 3000816195 01xLT Panel - 8PU.011-S1 8/15/2007 22.08.07 8/24/2007 13-09-07 17.09.07
10-09-07
M/s Suraj Cotton Mills Ltd. MTS A5829 3000795378 01xLT Panel-8PU.003 15-08-07 22-08-07 24-08-07 12/9/2007
email
17-10-07
SLCP
DHA, Lahore (EC) SMY/KAK A5830 3000816656 02xSLCPs+35xService Boxes 8/24/2007 30.08.07 31.08.07
24-10-07
SB
27-08-07 Indent/S.O. recd on 09-10; as per Design
M/s Packages Ltd. / Deinking Plant MTS A5831 3000874812 MCC+LT+PFIP - F1 Design 27-09-07
22-10-07 plan; Revised indent
27-08-07 Indent/S.O. recd on 09-10; as per Design
M/s Packages Ltd. / PM-7 MHF A5832 3000874812 MCC+LT+PFIP - F1 Design
22-10-07 plan; Revised indent
02xAVR+02xTC Panels for 15MVA Prelim indent; Indent/S.O. recd on 14-02;
Tuwairqi Steel Mills Ltd. (TR) RA A5833 3001019580 8/27/2007 06.09.07 3/19/2008
PT CL rel on 18-03
National Refinery Ltd. SMY/KAK A5834 3000813892 01xMCC - Outdoor Design 28-08-07 03.09.07 04.09.07 26.09.07 17.10.07 Approval with major changes
16-07-07 Prelim indent - Drgs submitted against
Bahria Town (Pvt.) Ltd., Rawalpindi (TR) RA A5835 3000841240 01xFCP+01xACP for 10/13MVA PT 18-07-07 18-07-07 1/4/2008 04.01.08
06-09-07 A5816; Indent & S.O. recd
PAPCO (Keamari Terminal) MTS A5836 3000849171 01xLT Panel - 8PU.011-S1 19-09-07 25-09-07 25-09-07 2/10/2007 11/10/2007
01-11-07
Naveena Exports (Pvt.) Ltd. - Denim Unit MHF A5837 3000859242 LT Switchgear 27-09-07 05.10.07 23-10-07 31-10-07
19-11-07
13-11-07
Allied Bank Ltd. / Kotwali Road Project -
MTS A5838 3000859387 LT Switchgear 27-09-07 05.10.07 25-10-07 11/6/2007 20-11-07 CL rel on 04-10
Faisalabad
Items 1&2
Orient Engg & Services Consultant / Lucky 01x5000A Panel - alignment with 26-10-07
RAB A5839 3000864567 28-09-07 04.10.07 8/10/2007 11/2/2007
Cement existing switchboard email
NTDC-WAPDA / HSS (EA) / 01-11-07
MA A5840 3000867745 126x Relay & Control Panels 1/10/2007 NR
500/220/132kV S/S, Gakkhar LCCs&MKs
FFC (EA) / Substation Automation System MA A5841 3000869958 03xIF+01xRTU Panels 1/10/2007 NR
Kidney Foundation SMY/RA A5842 3000871107 LT Switchgear 2/10/2007 09.10.07 11.10.07 01.11.07

Page85/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

55 55 10 10 20 35 Running LV TCP
30 30 13.8 4.8 18.6 11.4 Closed LV
10 10 0 10 Closed LV
75 75 25 8 33 42 Closed LV
90 90 5 20 25 65 Closed LV
200 225 120 105
25 10 60 50 Closed LV

60 5 65 15 32.5 12 59.5 5.5 Running LV TCP


40 40 15 32.5 7 54.5 -14.5 Closed LV
16 16 11.6 20 3.8 35.4 -19.4 Closed LV

13.2 6.8 20 6.8 32 38.8 -18.8 Closed LV

41.25 41.25 26 26 15.25 Closed LV


10 3 13 7 7 6 Closed LV
55 55 42 36 78 -23 Closed LV
46 46 25 9.8 34.8 11.2 Closed LV
20 20 12 8
12 Running LV

355.65 356 55 189.3 244.3 111.35 Running LV


663.65 664 60 162 222 441.65 Running LV
31 31 0 31 Running LV TCP
20 20 0 20 Closed LV
55 55 8 8 47 Running LV TCP
55 55 7.8 7.8 47.2 Closed LV
134.75 135 0 134.75 Closed LV
146.85 147 0 146.85
Closed LV

16.5 16.5 0 16.5 Closed LV


0 0 0 Running LV
0 0 0 Running LV
82.5 82.5 0 82.5 Running LV

Page86/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

MCC few feeders details pending at PWT


MAN Diesel (CIP) / Atlas Power RAB A5843 3000857597 LT Switchgear+MCCs 5/10/2007 23.10.07 26.10.07 30.11.07
end
08-01-08
Pakistan Air Force MTS A5844 3000876532 LT Switchgear+DBs 8/10/2007 24.10.07 01.11.07 CL rel on 26-10
16-01-08
M/s Engro Chemicals Pakistan Ltd. SMY/RA A5845 3000885409 LT Switchgear - F1 Design 17-10-07 24-10-07 26-10-07 14.11.07 19.11.07 CL rel on 25-10
NTDC-WAPDA (HSS) / 01x48V+01x110V+01x220V DC 11-10-07 05.11.07
MHF A5846 3000881257 13.12.07
500/220/132kV S/S, Gakkhar Distribution Boards 17-10-07 29-10-07
Gadoon Textile Mills Ltd. (PTD SE) SMY/RA A5847 3000896179 01x 4000A ACB Panel - 8PU.003 23-10-07 30.10.07 12.11.07 05.12.07 06.12.07 Approval received through email

25-10-07 31.10.07 08.11.07 Drgs released for info / amnuf on 29-11


Indus Motor Co. Ltd. (PTD SE) OE/RA A5848 3000896229 LT Switchgear + 3500A BTD 19.11.07 29.11.07
15-11-07 12.11.07 14.11.07 after incorporating the changes

Punjab Industrial Estates Development & 01xAC/DC Panel as per WAPDA Approval received with changes, go-
MTS A5849 3000859305 26-10-07 05.11.07 07.11.07 19.02.08 08.04.08
Management Company (HSS) / Sunder specs. ahead awaited from HSS Lahore

09.11.07 16-11-07(it1-
29.10.07 S/S layouts reqd from IS; App recd with
China Harbour Engineering Co. Ltd. (IS) / KICT 16.11.07 13) 07-12-07
SMY/MHF A5850 3000911179 LT+DB+BTD Advance changes; CL rel on 19-12; Revised CL on
Phase-III Expansion 21.11.07 29-11-07(it14 07-01-08
20-03-08 19-03; Revised indent
onwards)

KTPS (HSS) / 220kV GIS S/S RAB A5851 3000844010 01xAC+01xDC Panels 31-10-07 9/11/2007 14.11.07 29.11.07 05.12.07 Approval by email
Ordering to be done after app; CL rel on
Civil Works Organisation (EC) SMY/MTS A5852 3000904135 LT Switchgear 31-10-07 20.11.07 06.12.07 1/7/2008
11-01
Masood Textile Mills Ltd. RA A5853 3000902458 LT Switchgear - 04x8PU.003 11/1/2007 07.11.07 11/20/2007 29.11.07 12/18/2007 App recd with comments
22-11-07
D. G. Khan Cement Co. Ltd. MHF A5854 3000910844 01xMCC-8PT+01xMCC-8PU.011 11/5/2007 23.11.07 30.11.07 07.12.07 Approval rec with comments
23-11-07

Punjab Industrial Estates Development & 01xCP20+01xCP30+01xCP50+02xR


MA A5855 3000911394 11/5/2007 NR
Management Company/HSS (EA) / Sunder P3+01xRP4 Panels: Total 06 Panels

08xCP30+06xCP50+10xRP3+06xR
HESCO (EA) MA A5856 3000911513 11/5/2007 NR
P4 Panels
01xCP20+01xCP30+01xCP50+02xR
Bahria Town (Pvt.) Ltd., Rawalpindi/HSS (EA) MA A5857 3000911516 11/5/2007 NR
P3+01xRP4 Panels
01xCP20+01xCP30+01xCP50+02xR
Bahria Town (Pvt.) Ltd., Lahore/HSS (EA) MA A5858 3000911522 11/5/2007 NR
P3+01xRP4 Panels

GEPCO (EA) / GEPCO 51 MA A5859 3000911550 11xCP20+07xRP3+03xRP4 Panels 11/5/2007 NR

Drawings released prior to approval due


M/s METKA, S.A. / KTPP, Karachi MHF/RAB A5860 3000918916 01xMCC - 8PU.003 11/13/2007 23.11.07 04.12.07 13.12.07 04.12.07 to urgency.Approval received with control
wiring changes

GEPCO/HESCO (TR) RA A5861 3000919932 07xFCPs+07xACPs - 40MVA 11/13/2007 22.11.07 19.11.07 09.01.08 1/9/2008
NTDC-WAPDA (TR) RA A5862 3000877624 05xFCPs+05xACPs - 40MVA 11/13/2007 26.11.07 19.11.07 09.01.08 1/9/2008
02x400kVAr PFIPs + 03.12.07
Attock Cement Ltd. RAB A5863 3000926518 11/19/2007 26.11.07 23.11.07 04.12.07 No app reqd as per SB Ex email dtd 03-12
Loose Capacitors - 48x25kVAr 02-01-08

Habib Rafique Pvt. Ltd. / 239xService Boxes + 07xSLCPs as Drgs to be released after go ahead from
RAB A5864 3000923287 11/20/2007 NR NR
Sector J - DHA Phase II, Islamabad per WAPDA Specs. Mr. Wajid

Habib Rafique Pvt. Ltd. / 141xService Boxes + 07xSLCPs as Drgs to be released after go ahead from
RAB A5865 3000923329 11/20/2007 NR NR
Lawyers' Colony - DHA Phase I, Islamabad per WAPDA Specs. Mr. Wajid

Habib Rafique Pvt. Ltd. / Commoners' 1562xService Boxes as per Drgs to be released after go ahead from
RAB A5866 3000923355 11/20/2007 NR NR
Town - DHA Phase II, Islamabad WAPDA Specs. Mr. Wajid

Page87/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

469 469 0 469 Running LV


115.5 115.5 0 115.5 Running LV
106.15 106 0 106.15 Closed LV
100 100 0 100 Running LV
19.5 19.5 0 19.5 Running LV
248.55 269 0 268.55
20 Closed LV

55 55 0 55 Running LV
460 460 0 460
Running LV

55 55 0 55 Running LV
441.2 441.2 0 441.2 Running LV
48.75 48.75 0 48.75 Running LV
224 224 0 224 Running LV
0 0 0
Running LV

0 0 0 Running LV
0 0 0 Running LV
0 0 0 Running LV
0 0 0 Running LV
70 70 0 70
Running LV

55 55 0 55 Running LV TCP
55 55 0 55 Running LV TCP
20 20 0 20 Closed LV
40 40 0 40
Running LV

40 40 0 40
Running LV

20 20 0 20 Running LV

Page88/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

18.12.07
Continental Biscuits Ltd RAB A5867 3000937795 LV Switchgear/PFIP 03.12.07 12.12.07 24.12.07 1/2/2008 App recd with comments/changes
10-01-08
08No. FCP/ACP for 20/26MVA
BU TR RA A5868 3000950599 10.12.07 14.12.07 17.12.07 17.01.08 1/17/2008
WAPDA(01 QESCO+07 LESCO)
02No. FCP/ACP for 40MVA WAPDA(
BU TR RA A5869 3000950608 10.12.07 19.12.07 17.12.07 09.01.08 1/9/2008
QESCO)
06No. FCP/ACP for 10/13MVA
BU TR RA A5870 3000950491 10.12.07 18.12.07 17.12.07 17.01.08 1/17/2008
WAPDA(01 QESCO +05 LESCO)
10.12.07 17.12.07
Resham Textile Mills Ltd. MTS A5871 3000943514 03xI/C + 02xLTO Panels + 02xBTDs 26.12.07 07.01.08 21.01.08 Revised indent recd
25.02.08 27.02.08
06Nos. Relay and Protection
LESCO (EA) MA A5872 3000950568 11.12.07
panels
Pakistan Railways (TS) MR A5873 3000960638 80x Relay Group Housings 17.12.07 NR 12/18/2007

Indent/S.O. recd on 07-01, Document


Fatima Fertilizer (Pvt. ) Ltd. MTS/MHF A5874 3000975418 16 MCCs(Sivacon 8PT)+5No.DBs 31.12.07
commitments as per design plan

Drgs prepared on the basis of advance


415VAC+110VDC +
TESCO (EA) MA/MHF A5875 3000976025 27.12.07 02.01.08 02.01.08 07.01.08 20.02.08 info; CL rel on 04-01;Go-ahead from SB
02xCP50+03xRP4 Panels
Sales dated:20.02

SKB Engineering & Construction RA A5876 3000975429 02No. Street Lighting control panel 07.01.08 09.01.08 1/9/2008 2/4/2008

M. Talib Enterprises (Income Tax Building) KC A5877 3000981455 03No.ACB Panels 14.01.08 17.01.08 21.01.08 1/28/2008

26-02-08
BU HSS(132kV Grid St No.1 DHA Phase VIII) RAB A5878 3000985603 06xDBs 11.01.08 21.01.08 22.01.08 App comments to be resolved
email
Masood Textile Mills Ltd. RA A5879 3000972373 LTO+BTD 21.01.08 25.01.08 25.01.08 3/17/2008
07xRP+03xCP+01xMet (KCR)
KTPS & KCR (EA / HSS / KESC) MA A5880 3000987319 08xDuplx+01xRP+02xMet (KTPS) : 22.01.08 NR
Total 22 Panels
06xDuplex+01xMet+01xRec+06x
DHA VIII (EA / HSS / NESPAK) MA A5881 3000987356 22.01.08 NR
LCC : Total 14 Panels
KTPS (EA / 220kV GIS) MA A5882 3000993386 01xIFC+01xRTU 22.01.08 NR
Siemens Medical Solutions UPS DB MTS A5883 3001003865 01No. DB 25.01.08 NR 25.01.08
01x 415V/110V AC/DC Distribution 10-03-08
BU HSS(Flying cement) RA A5884 3000998565 31.01.08 05.02.08 2/1/2008 3/11/2008 CL rel on 04-02
Panel email

National Management Foundation/LUMS (TR) RA A5885 3001075128 01xFCP for 7.5/9.5MVA PT 2/6/2008 07.03.08 Prelim indent

11-02-08 22.02.08
M/s Engro Chemicals Pakistan Ltd. (PTD SE) KC A5886 3001018530 03xMCCs-8PU.011 Add indent for 01xMCC
07-03-08 18.03.08 20-03-08
Crescent Bahuman Limited RAB A5887 3001009432 Main LT+600kVAr PFIP+BTD 14.02.08 26.02.08 4/4/2008
19-02-08 Advance information on email; Indent
City Tower RA A5888 3001031801 02No. 8PU.003 panels NR 2/21/2008
22-02-08 receipt
Al-Abid Exports RA A5889 3001033708 01x150kVAr PFIP 22.02.08 26.02.08 28.02.08 3/11/2008
12-03-08
28-02-08 07.03.08
Colony Textile Mills Ltd. RAB A5890 3001036792 LT Switchgear + DBs 20-03-08 3/12/2008 Revised indent; CL rel on 12-03, 18-03
13-03-08 14.03.08
25-03-08
01xLoose Withdrawable Module- 11-03-08
Sitara Per Oxide MHF A5891 3001031439 28.02.08 07.03.08 3/11/2008
8PT email
Maple Leaf Cement Factory KC A5892 3000998633 01xDB 28.02.08 04.03.08 11/3/2008
01xFCP+01x/ACP for 20/26MVA PT
Flying Cement Company Ltd. (TR) RA A5893 3001056781 11/3/2008 11/3/2008 11/3/2008 3/12/2008
(WAPDA)

Page89/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

90 90 0 90 Running LV
55 55 0 55 Running LV TCP
55 55 0 55 Running LV TCP
55 55 0 55 Running LV TCP
97.5 97.5 0 97.5 Running LV
0 0 0 Running LV
0 0 0 Closed LV
0 0 0
Running LV

55 55 0 55
Running LV

20 20 0 20 Running LV
48.75 48.75 0 48.75 Running LV
25.2 25.2 0 25.2 Running LV
111.75 112 0 111.75 Running LV
0 0 0
Running LV

0 0 0 Running LV
0 0 0 Running LV
16.8 16.8 0 16.8 Closed LV
55 55 0 55 Running LV
26 26 0 26 Running LV TCP
277.2 277.2 0 277.2 Running LV
147.7 147.7 0 147.7 Running LV
48.75 48.75 0 48.75 Running LV
0 0 0 Running LV
0 0 0
Running LV

0 0 0 Running LV
0 0 0 Running LV
0 0 0 Running LV TCP

Page90/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

Umar Spinning Mills (Pvt.) Ltd. KAK A5894 3001055020 02xDBs 10/3/2008 11/3/2008 11/3/2008 3/11/2008
MAN Diesel (CIP) / Atlas Power SAH A5895 3001051950 14xControl Panels 10/3/2008
ENI Pakistan KC A5896 3001051828 Outdoor DB 3/7/2008 18.03.08
04xFCP+04xACP for 40MVA PT
GEPCO (TR) RA A5897 3001056772 3/11/2008 19.03.08 17.03.08 3/17/2008
(WAPDA)
01No. FCP+01No.ACP for
Bestway Cement Ltd.(BU Tr) RA A5898 3001056762 3/12/2008 20.03.08 17.03.08 3/17/2008
20/26MVA (WAPDA)
DHA Karachi (EA)/DHA Phase VIII G/S No.1 A5899 3001056904 01xIFC 3/11/2008 NR
Low volatage distribution
BU HSS/Kabul Distribution Enhancement Project KC A5900 14.03.08 19.03.08 19.03.08
boards+AC/DC panels
Masood Textile Mills Ltd. RA A5901 3001075132 01 No. FCP for 4/5 MVA Trafo 29.02.08 24.03.08 24.03.08 4/1/2008
01x SIVACON 8PT Panel for
SB S & M - Khi KC A5902 IFO 1213 25.03.08 NR 4/2/2008
Exhibition
Flying Cement Company Ltd. (EA) A5903 3001063674 01xCP50+01xRP4 Panels 3/26/2008 NR
Amjad Textile Mills KC A5904 3001082111 DBs+BTD 01.04.08 11.04.08
BU-IS-Islamabad(KCI Chashma) KC A5905 3001086044 07No. MCCs in Sivacon 8PT 07.04.08 07.05.08
05xCP30+08xCP50+03xRP3+06xR
QESCO-STG-34 (BU-EA) MA/KAK A5906 3001088325 P4+02xAC/DC Panels (Total 24 08.04.08 NR CP & RP drawings received with Indent
Nos.)
10xCP10+15xCP30+18xCP50+15xR
PESCO-40 (BU-EA) MA/KAK A5907 3001088327 P3+17xRP4+15xAC/DC Panels 08.04.08 NR CP & RP drawings received with Indent
(Total 90 Nos.)
BU HSS (Ghakkhar Substation) KAK A5908 3001089895 48V DC Panel 10.04.08 18.04.08
TOTAL LV HOURS 5918

Page91/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

0 0 0 Running LV
0 0 0 Running LV
0 0 0 Running LV
0 0 0 Running LV
0 0 0 Running LV
0 0 0 Running LV
0 0 0 Running LV
0 0 0 Running LV TCP
0 0 0 Running LV
0 0 0 Running LV
0 0 0 Running LV
0 0 0 Running LV
0 0 0
Running LV

0 0 0
Running LV

0 0 0 Running LV
33757 3187 ### 39458 39458 -2514 Running LV
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 . 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0

Page92/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0

Page93/100 CC: SBS ,SB PL,SB P


SIEMENS Pakistan
BU Switchboards Engineering & Design Plan Printout Date:05/14/2018
SB - E & D

0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0

Page94/100 CC: SBS ,SB PL,SB P


S. Customer DE E&D S.B.No. Description Start

MV Switchgears
1 Umar Spinning Mills (Pvt.) Ltd. KR A0551 3000332848 01xWIP+01xI/C&O/G SA2 Panel 9/12/2005

11kV Switchgear - 01xWIP +


2 FFC MYS/RA A0519 3000288778 7/4/2005
08xSA2 + Loose Components

3 FFC SJA/RA A0552 3000347560 01xI/C+03xO/G 9/16/2005

62x4-Way+29x3-Way RMUs +
4 Punjab Industrial Estate KR A0554 T-010 9/21/2005
01xWIP + 01xWCP

01xI/C+04xO/G+2xB/C WAPDA
5 Sitara Chemical Industries RA A0560 3000346424 10/12/2005
Grid Panels

LV Switchgears

1 ESS ESS Associates (EC) SMY A5505 3000188690 LT Switchgear 18-11-04

2 Bhanero Textile Mills Ltd. HJ/KZ A5555 3000257527 LT Switchgear, DBs 4/28/2005

112x Service boxes as per


3 Glamour Developers (Pvt.) Ltd. SMY / HJ A5563 3000240107 6/8/2005
WAPDA specs. P92:75

4 Khadim Husain Slatch & Co. TAM A5564 3000284242 250kVA Changeover Panel 6/20/2005

5 Pak & Jinnah Park Projects TAM A5565 3000284763/8 LT Power Panel No.1 & No.2 14-06-05-
21-06-05
6 Glaxo Smith Kline TAM/KZ A5568 3000288055 LT Switchgear
29-09-05

7 PAEC / NMC-1 MHF A5583 3000309035 LT Switchgear 7/28/2005

8 Maple Leaf Cement RJ A5589 3000318704 01xFCP+01xACP for 20/26MVA PT 8/17/2005

9 Olympia Chemicals Ltd. SMY A5591 3000316684 LT Switchgear 8/17/2005

10 Naveena Exports (Pvt.) Ltd. - W SMY A5601 3000331514 LT Switchgear 9/8/2005

11 Maple Leaf Cement MA A5605 3000339739 02xRP4+02xCP50 + 02xAC/DC Pan 9/23/2005

12 U. S. Embassy, Islamabad MHF A5607 3000346832 01xLT Panel 10/10/2005

13 U. S. Embassy, Islamabad MHF A5608 3000346848 01xLT Panel + 01xDB 10/10/2005


ForApp. ForApp.
By ON Projected
App. Rec. For Prod. Remarks Hours
Planned

9/16/2005 9/16/2005 App awaited

Customer comments recd on 22-08


clarified on 22-08, Go-ahead for release
in prod / Schematics for changes in
29-07-05
existing panel reqd / 01xO/G to be
12-08-05
7/20/2005 9/1/2005 9/1/2005 aligned with 6.3kV switchgear, S. O. No.
02-09-05
3-347560 - A0552 with new CT ratio /
Schematics
Relay changed to CDG61 from P124 yet
to be confirmed/Informal Meeting @ SB
with customer dt. 2.11.05

9/21/2005 9/23/2005 App awaited

Qty of RMUs revised by EC on 24-09 /


23-09-05 App comments to be clarified for
9/27/2005 10/28/2005
02-11-05 RMUs / WCP to be clarified/Reamining
scope released on 2.11.05

SLD/FV/Assembly/FP submitted to TD
10/14/2005 10/19/2005
on 14-10

03-01-05
CL rel on 28-12 / Clar on Trafo dim drg
Layouts
08-03-05 reqd / Meeting with EC on 23-05 / Resub
12/6/2004 10-01-05 3/3/2005
10-08-05 with changes dtd 24-05 / Go-ahead from
26-05-05
SB PL Ex on 08-08

12-05-05 PDBs,
12-05-05
06-05-05 PDBs, Items 06-18, CL LT on 18-05 /
LDBs & MLDB
5/13/2005 LDBs & MLDB
25-05-05
31-05-05 Item 01-02 MCC & LCBs on hold
LT, PFIP, MCC on 030605

03-08-05
6/10/2005 15-08-05 9/15/2005 9/7/2005 Order put On-Hold on 04-10
31-08-05
Control scheme same as Gadoon order
6/21/2005 6/24/2005
A5545 / App awaited

CL rel on 20-06 / Resubmitted / App


17-06-05 comments incorporated / Change of
6/17/2005 9/28/2005 10/7/2005
01-09-05 Cable entries on 12-10, confirmation
reqd for Gen panel / SB D Details
15-07-05
CHF LV
18-07-05
CHF DBs
01-09-05 Meeting with Consultants & EC on 30-06
PB DBs 03-08- 10-08-
/ CL for CHF on 10-08(DBs) & 11-08(LT) /
12-09-05 05CHF 05DBs
7/8/2005 Changes in App / Add indent for 01xLV
Item 1 PB 11-10-05 12-10-05
Panel 8PU.011 Fixed design alignment
20-09-05 Add indent Add indent
with existing board / SB D Details
Items 04-05PB
04-10-05
Items 06-09PB
03-10-05
Add indent

10-08-05
26-09-05 CL rel on 11-08 / Changes in App /
8/10/2005 9/13/2005
27-09-05 Resubmitted, App awaited
Layout
23-08-05 Resubmitted as per comments/changes
8/19/2005 9/7/2005
13-09-05 / App awaited

15-09-05 CL rel on 07-09 / Comments in App /


02-09-05 Item 3, 4 Partial mtg plates pending / SB D
Items 1,3,5 16-09-05 Details for O/D Feeder Pillars & BTD /
9/1/2005 06-09-05 13-09-05email
LT+PFIP+Layout
Items 2, 6 Feeder Pillars Put-on-Hold by SB Lhr
07-09-05 24-10-05 vide email 22-09 / LCBs reqd in local
LCBs design vide email dtd 19-10

05-10-05 CLs rel on 21-09 (PDBs), 27-09 (bal) /


21-09-05 04-10-05 PDBs PDB 10 put On-Hold 04-10 / PDBs 7&8
PDBs PDBs 26-10-05 also put On-Hold 06-10 / LT, PDB 10,
9/19/2005
04-10-05 24-10-05 PFIP/LDBs Compressor Panel, Layout revised &
LT LT 27-10-05 PDB 8 deleted in App /
LTO/MCC SB D Details

10/5/2005 10/11/2005 App awaited

10/17/2005 10/18/2005 SL/Clar recd on 17-10 / App awaited

10/17/2005 10/18/2005 SL/Clar recd on 17-10 / App awaited


Changes/
Total 10/04 Oct. Nov Dec Jan Feb Mar Apr
Additions

0
Work in
May Jun Jul Aug Sep Total Balance
Hand Status GP

90 -90

36 33 21 Running

MV

You might also like