FOR RDS

Room Name / Room Mechanical Team


Sr.No HVAC Design Considerations
No. DATA
Purification Lab-1 / 02-
1 1500 CFM (Exhaust) 0 CFM (Exhaust).
222
2 Instrument Lab / 02-229 500 CFM (Exhaust) 0 CFM (Exhaust).
Purification Lab -2 / 02-
3 1500 CFM (Exhaust) 0 CFM (Exhaust).
223
1800 CFM + 500 CFM= 2300 CFM
1800 CFM (Exhaust..
(TOTAL)
4 Wet Lab / 02-240 from Fume Hood 2
1800 CFM FUME HOOD.
Nos.)
500 CFM SPOT EXTRACTOR (5 Nos.)
5 LCMS 1750 CFM (Exhaust) 0 CFM (Exhaust).
3000 CFM (Exhaust) 2000 CFM (Exhaust)..from the Spot
6 PREP LC & HPLC
4500 cfm Extractor.
Waste Collection - 1 &
Misc. Equipment 1000 CFM (Exhaust)
7 0 CFM (Exhaust).
exhaust outside Lab SA 1200 cfm
& SC
Waste Collection - 2 &
Misc. Equipment 1000 CFM (Exhaust)
8 0 CFM (Exhaust).
exhaust outside Lab SB 1200 cfm
& SD