BoQ As Built SUM 36
BoQ As Built SUM 36
xlsx
No DESCRIPTION UOM
Signature:
Responsible Subcontractor
Name: Anggun Setiyono
Signature:
Date:
05/15/2018
387237865.xlsx
Tamansari
SOW Total
Depapilio Tower A
Bridge Permit 13 13
Public Right of Way Permit, for National & Public Road included district road and
provincial road 1,306 1,306
05/15/2018
387237865.xlsx
No DESCRIPTION UOM
Signature:
Responsible Subcontractor
Name: Anggun Setiyono
Signature:
Date:
Tamansari
SOW Depapilio
Tower A
Services
1. Subcontractors are required to do the survey and give the output with min. 3 options for the route, incl. survey
for the cable and duct route until OTB / Termination Location
2. The output result is completed As Plan Drawing and As Plan BoQ ( incl. civil design, cable drawing, optical core
schedule, link buget loss calculation etc.)
3. The route should be the shortest route, safe and ease to construct.
4. If the route is rejected, Subcontractors are required to re-do the survey without any additional charge. 1,463
5. The survey quantity will be calculated based on approved route and total km for trenching / boring.
6. The Documentation should be provided in 3 copies (softcopies and hardcopies).
7.The route will consist in hidden path and not in the straight line
1. Subcontractors are required to open handhole/manhole by using suitable tools and check the existing FO
backbone route according to customer data.
2. Subcontractor shall take the coordinate data and existing FO backbone route from customer data.
3. The output result is location existing Hand Hole and idle duct/subduct information, existing FO backbone
information. 1
3. If the result is rejected, Subcontractors are required to re-do the survey without any additional charge.
4. The Documentation should be provided in 3 copies (softcopies and hardcopies),include: Photograph,b.
Coordinate of HH Existing, ACAD Drawing of HH existing,etc.
1. Subcontractors are required to do the survey and give the output with min. 3 options for the route, incl. survey
for the cable and duct route from ODF to ODP Termination Location through building shaft .
2. The route will consist in hidden path and not in the straight line .
3. The output result is completed As Plan Drawing and As Plan BoQ. Means completed si incl. civil design, cable
drawing etc. 50
4. The route should be the shortest route, safe and easy to construct.
5. If the route is rejected, Subcontractors are required to re-do the survey without any additional charge.
6. The survey quantity will be calculated based on approved route.
7. The Documentation should be provided in 3 copies (softcopies and hardcopies).
Total
1,463
50
No DESCRIPTION UOM
2 Material
2.2 Pipe & Duct
5 Cable Work
7 DUCT INSTALLATION
Install flexible spiral pipe 1.5" included
7.2 M
accessories
8 Testing and Acceptance
Signature:
Responsible Subcontractor
Name: Anggun Setiyono
Signature:
Date:
SOW AS PLAN
deliveryand Install micro splitter inside existing closure or pedestal FAT. Material included in 2.5
Detail standard refer to specification and design -
delivery and Install micro splitter inside existing closure. Material included in 2.5
Detail standard refer to specification and design 2
1. perform the link testing(ODF-FAT)- OPM bidirectional for 2 wavelength: 1310nm and 1550nm, OTDR
bidirectional for 2 wavelength: 1310nm and 1550nm
2. provide the link test report 11
3. all the tools and accessories included
1 EACH = 1 CORE
1.Perform the optical splitter testing with - OPM and laser source using 1310/1490/1550 wavelength.
2.Plug-in or direct splice all pigtail according to port/core assignment. 120
3.Provide document test report.
Subcontractor are required to finish up and provide OTDR & OPM test photos, test results and all acceptance
documentation base on project requirements 1
1EACH=1Building
Supply & install labeling for cable, the detail standard cable labeling as requirement of 1pc for 3m length. The
propose material for label would be vinyl and font,dimension follow as customer requirement. -
Supply & install labeling for cable, the detail standard cable labeling as requirement on outside using vinyl and
inside using glossy and normal paper sticker. The propose font,dimension follow as customer requirement. 5
ACTUAL DELTA
18 18
- -38
- -5
18 18
11 11
1 -
11 11
2 -
18 18
4 -128
11 -
120 -
1 -
1 -
6 6
12 7
No DESCRIPTION UOM
SUBPACKAGE A+B+C
2 Material
2.2 Pipe & Duct
2.3 Pole
2.4 Wire
3 Civil Work
4 AERIAL WORK
5 Cable Work
7 DUCT INSTALLATION
Signature:
Responsible Subcontractor
Name: Anggun Setiyono
Signature:
Date:
SOW S36
SUBPACKAGE A+B+C
Delivery & installation stay / guy wire incl. accessories and steel plate under the ground, exluded Stay/guy wire
and steel plate materials 140
Detail standard refer to specification and design
Delivery & installation 6mm messenger wire incl. accessories,exclude messenger wire materials
Detail standard refer to specification and design 140
Delivery & Install Additional Pole Accessories for more than 1 FO cable routing.
Detail standard refer to specification and design 6
1. receive and store the 96-144 cores Self support aerial cable ( Figure 8 cable ) on site.
2. installation of the cable with the standard work method
3. included all the accessories, tools, cable labelling etc.(except for slack hanger) 140
4. cable is supplied by Huawei
5. detail standard refer to specification and design
1. Perform the cable testing: OTDR unidirectional for 2 wavelengths: 1310 and 1550nm
2. provide the test report
3. all the tools and accessories and splicing service included 4
4.1 EACH = 1 CORE
Total
140
140
140
140
140
140
73
140
140