ISGS/IPPs in E. Region
Agenda B3
CERC order dt. 31/07/17 on Petition No.
84/MP/2015
Section 23 (a):
– “… the Commission, starting from the month of
September, 2017 shall be closely watching the
primary response of ISGSs as reported by
POSOCO/NLDCs.
– At the State level, SLDCs shall report the
frequency response of intra-State generators to
the concerned SERCs.”
Section 23(c)
• “All ISGSs are directed to provide primary
response compulsorily in terms of
Regulation 5.2 (f), (g), (h) and (i) of the
Grid Code failing which we would not
hesitate in initiating action under Section
142 of Electricity Act, 2003 for not
providing desired RGMO/FGMO response
without any valid reasons.”
N.B. All ISGSs have been communicated about Hon’ble Commission’s order vide letter
no ERLDC/SS/FGMO/2017/2505 dated 25-08-17.
Section 24
• “….. The Committee (on implementation of FGMO /
primary response) has also recommended that
there is no requirement for granting any
exemption even to LMZ units from operation
under RGMO/FGMO with manual intervention
• … has the option of either expediting the R&M of
old units which shall include installation of new
EHG governors capable of providing adequate
primary response or
• to go in for retrofit of mechanical governors for
adopting RGMO features or
• to operate on FGMO with manual intervention…”
Regulation 24(2) of CERC Terms &
Conditions of Tariff 2014-19
• IV) The rate of return of a new project shall be
reduced by 1% for such period as may be decided by
the Commission, if the generating station or
transmission system is found to be declared under
commercial operation without commissioning of any
of the Restricted Governor Mode Operation (RGMO)/
Free Governor Mode Operation (FGMO), data
telemetry, communication system up to load dispatch
centre or protection system:
• V) as and when any of the above requirements are
found lacking in a generating station based on the
report submitted by the respective RLDC, RoE shall be
reduced by 1% for the period for which the deficiency
continues:
Performance of ISGS units in Eastern
region with regard to RGMO/FGMO
Nov’17 to Feb’18
As per Regulation 5.2 (f), (g), (h) and
(i) of the Grid Code
Brief description of the events
100
Below
Satisfactory 70 Satisfactory
30
Data not
Unsatisfactory
available
Observations
• Out of 35 units within the scope of monitoring by ERLDC,
only one or two units have so far been able to exhibit
satisfactory response
• Response of none of the units is consistent in nature
• Non-availability of real time data is a major impediment in
monitoring the performance of the units
• Cooperation from all ISGSs / IPPs is solicited for making
available 1sec or 5 sec interval data from their respective
DCS, for each incident of frequency response evaluation
• SLDCs are requested to share the observations in respect
of the units within their own jurisdiction, with RLDC, for
proper understanding of the region-wide performance
• Roadmap may be chalked out for improving generator
responses in a time-bound manner
Governor response of various
generators during the mentioned
events
Change in generation of KhSTPP #1 during Generation
loss at Talwandi at 07:14 hrs on 12-11-17.