in Gujarat
Presented By
D. P. Joshi, IAS
Director
Gujarat Energy Development Agency
Gandhinagar
At
Workshop On “Accelerating renewable energy development at
state level”
6th September 2012
Wind 139.21 GW
Biomass 1.89 GW
Total 748.77 GW
2
Gujarat Energy Development Agency, Gandhinagar
Solar Resources
3
Gujarat Energy Development Agency, Gandhinagar
Solar Power
in Gujarat
4
Solar Power Policy and GERC Regulatory Features
Eligible Unit Any company / corporate body /association /individuals
Tariff(MW scale 9.98/kWh for first 12 years and Rs. 11.55 /kWh for 25 years.
projects) 7/kWh for next 13 years for Projects
commissioned from 29-1-2012 to
31-3-2013
Tariff(kW scale 11.14/kWh for Projects
projects) commissioned from 29-1-2012 to
31-3-2013
Open Access /Third Allowed, No cross subsidy charges
party Sale
Wheeling At 66 KV: Normal (present 4.02 %) as applicable to open access
Below 66 KV: 10% of the generated energy plus cash charges as applicable
to open access users
Power Evacuation Transmission line of 66 kV and above to be provided by the State Utility.
8
Gujarat Energy Development Agency, Gandhinagar
Status of Grid-Connected Solar Power Projects
Capacity (MW)
10
Gujarat Energy Development Agency, Gandhinagar
Gandhinagar: The Model Solar City Project
11
Gujarat Energy Development Agency, Gandhinagar
Gandhinagar Solar PV Rooftop Programme
12
Gujarat Energy Development Agency, Gandhinagar
Objective of the Solar PV Rooftop programs
13
Gujarat Energy Development Agency, Gandhinagar
Advantages of the Solar PV Rooftop programs
14
Gujarat Energy Development Agency, Gandhinagar
Milestones of the Solar PV Rooftop programs
• Germany’s solar capacity has grown 500% since 2007. The German
15
Gujarat Energy Development Agency, Gandhinagar
Aim of Gandhinagar Solar PV Rooftop Program
16
Gujarat Energy Development Agency, Gandhinagar
Key Discussion points for a Rooftop Solar Power Policy Contd.
• Operative Period
– Gujarat Solar Power Policy : upto year 2014
– JNNSM-2nd Phase : from 2013 to 2017
• Eligible units and Capacity
– Residential households , Commercial buildings , Industrial Clusters etc,
• Project Identification
– Nodal Agency identified
– Self Identified
• Sale of Energy
– As per the GERC order
17
Gujarat Energy Development Agency, Gandhinagar
Key Discussion points for a Rooftop Solar Power Policy Contd.
• Metering
– Net-metering and energy settlement arrangements
• Electricity Duty
– Benefits to consumers having high level of Electricity Duty and
Consumer Tariff applicability
18
Gujarat Energy Development Agency, Gandhinagar
Pathways for Rooftop Solar PV Projects
3. REC Mode
Project developer may sale electricity generated at a price not exceeding the pooled cost of
power purchase of such distribution licensee
19
Gujarat Energy Development Agency, Gandhinagar
MW Vs Rooftop Solar Plants
20
Gujarat Energy Development Agency, Gandhinagar
Typical PV System Architecture
23
Gujarat Energy Development Agency, Gandhinagar
Other Initiatives
24
Gujarat Energy Development Agency, Gandhinagar
Renewable Energy Generation : Strategy 2017
OR
10,000 MW SPV over next 5 years?
29
Gujarat Energy Development Agency, Gandhinagar