The document outlines the operational schedule of water pumps in Karang Tanjung from April 6-15, 2018. It assigns each of the three pumps to work either from 9 PM to 5 AM or 5 AM to 9 PM on a rotating basis. Pump 1 works from 9 PM to 5 AM while Pumps 2 and 3 alternate between the 5 AM to 9 PM shift each day according to the schedule. The schedule repeats every two weeks.
The document outlines the operational schedule of water pumps in Karang Tanjung from April 6-15, 2018. It assigns each of the three pumps to work either from 9 PM to 5 AM or 5 AM to 9 PM on a rotating basis. Pump 1 works from 9 PM to 5 AM while Pumps 2 and 3 alternate between the 5 AM to 9 PM shift each day according to the schedule. The schedule repeats every two weeks.
The document outlines the operational schedule of water pumps in Karang Tanjung from April 6-15, 2018. It assigns each of the three pumps to work either from 9 PM to 5 AM or 5 AM to 9 PM on a rotating basis. Pump 1 works from 9 PM to 5 AM while Pumps 2 and 3 alternate between the 5 AM to 9 PM shift each day according to the schedule. The schedule repeats every two weeks.