dirección X R (albañilería)= 6

nivel Vi (ton) Ki (ton/m) ∆Xi=Vi/Ki (m) Xi=∆Xi + X(i-1) (m) Xi*0.75*R (m) Xi*0.75*R (cm)
1 71.78 184187.608 0.0003897113 0.0003897113 0.001753701 0.18
2 57.67 54984.2092 0.0010488466 0.0014385579 0.0064735107 0.65
3 30.94 22884.2239 0.0013520231 0.0027905811 0.0125576147 1.26

dirección Y R (albañilería)= 6

nivel Vi (ton) Ki (ton/m) ∆Xi=Vi/Ki (m) Xi=∆Xi + X(i-1) (m) Xi*0.75*R (m) Xi*0.75*R (cm)
1 71.78 135638.282 0.0005292016 0.0005292016 0.0023814073 0.24
2 57.67 30625.96 0.001883043 0.0024122446 0.0108551009 1.09
3 30.94 10709.4739 0.0028890308 0.0053012754 0.023855739 2.39
para albañilería la DERIVA= 0.005

∆ri=Xi - X(i-1) (cm) ≤ 0.005*hi (cm) hi (cm)


0.18 ≤ 1.35 270 cumple
0.47 ≤ 1.3 260 cumple
0.61 ≤ 1.3 260 cumple

para albañilería la DERIVA= 0.005

∆ri=Xi - X(i-1) (cm) ≤ 0.005*hi (cm) hi (cm)


0.24 ≤ 1.35 270 cumple
0.85 ≤ 1.3 260 cumple
1.30 ≤ 1.3 260 cumple