Straight Line Diagram: As-Built Drawings
Straight Line Diagram: As-Built Drawings
AS-BUILT DRAWINGS
935+073.70
935+191.92
935+224.72
935+446.70
Beginning of Project 935+355.55
KM 935+000.00 935+100 935+300 RCPC 935+400
935+200 935+500
L/S
E X C E P T I O N
R/S
935+352.00
935+249.00
Abutment "B" 935+583.90
Abutment "A" 935+539
LABIRANAN
BRIDGE
935+600.00
936+488.050
936+500.00
Intersection
KO936+038.20
937+192.85
936+580.00
936+584.65
936+618.20
936+623.78
936+680.00
937+182.50
937+500
937+600 937+700 937+900 938+000
937+860.00
937+589.26
Intersection
937+736.00
LEGEND: KO937+830.90
PREPARED BY: CHECKED AND VERIFIED BY: RECOMMENDING APPROVAL: APPROVED: PROJECT TITLE & LOCATION: SHEET CONTENTS: SHEET NO.:
RMC1 - BILATERAL, UPMO REGIONAL OFFICE VIII RMC1 - BILATERAL , UPMO See Cover Sheet for Signature AWP-2 / PM 07 DAANG MAHARLIKA
(DULAG - MAYORGA SECTION)
Republic of the Philippines STRAIGHTLINE DIAGRAM B - 1a
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PROVINCE OF LEYTE
ERICSON A. SALAZAR ELMER A. IGNACIO EDGAR B. TABACON , CESO IV VIRGILIO C. CASTILLO EMIL K. SADAIN , CESO II FOR DRAINAGE AND 7a 36
CENTRAL OFFICE SECTION ID: 15Z00015, REGION VIII
AVP FOR OPERATION Manila
PROJECT ENGINEER III REGIONAL DIRECTOR PROJECT DIRECTOR UNDERSECRETARY SLOPE PROTECTIONS
CONTRACTOR DPWH - RMC1 , BILATERAL - UPMO FOR UPMO OPERATION
(KO935+000.00 TO KO950+000.00)
LENGTH = 15.00 Km.