2.2.1 Upon completion of manufacture, the nozzle is to be 2.1 Watertight decks, trunks, etc. subjected to a leak test. 2.1.1 After completion, a hose or flooding test is to be applied to watertight decks and a hose test to watertight trunks, tunnels and ventilators.