You are on page 1of 1

Objective: ​Designing a grid for San Marin High School 

Sources: 
● https://www.capstoneturbine.com/products/c65 
● https://us.sunpower.com/sites/sunpower/files/media-library/data-sheets/ds-x2
1-series-335-345-residential-solar-panels.pdf 
 
● Average electricity used at san marin-52,531kwh per month, 1751 kwh per day 
● We would need 1460 solar panels 
● Sun Power solar panels- 18 square feet 
● They would take up 26280 ft in total 
● 15768 ft for 876 panels south, 5256 ft for 292 panels west, 5256 ft for 292 panels 
east 
● 60% solar panels facing south, 20% facing west, 20% facing east 
● Solar panels would cost 2.5 billion to 3.5 billion 
● Energy stored in 3 35kwh lithium ion tesla batteries 
● $5250 per battery, $15750 total 
● The electricity will be transferred through underground wires 
● Capstone C65 Microturbine for winter/cloudy days:  
● $195,000 
Rating:​ 65 kW 
Electrical Efficiency LHV:​ 29% 
Combined Heat And Power Efficiency:​ Up to 90% 
Voltage:​ 400-480 VAC 
Electrical Service:​ 3-Phase, 4-Wire Wye 
Width:​ 0.76 m (30 in) 
Depth:​ 1.95 m (77 in) 
Height:​ 1.91 m (75 in) 
Weight:​ Grid Connect - 758 kg (1,671 lb); Dual Mode - 1,121 kg (2,471 lb) 
Compatible Fuels:​ Natural Gas, Liquid Fuels (Kerosene, Aviation Fuels, Ultra Low Sulfur 
Diesel #2), Biogas (Landfill, Digester), Associated Gas, Sour Gas, Propane Gas 
● Average bill now: $8,500 

You might also like