NO URAIAN HARGA SATUAN

UPAH

1 Pekerja 35,000.00
2 Tukang Kayu 50,000.00
3 Tukang Batu 50,000.00
4 Tukang Besi 50,000.00
5 Tukang Pancang 50,000.00
6 Tukang Listrik 50,000.00
7 Tukang Cat 50,000.00
8 Tukang Gali 50,000.00
9 Kepala Tukang 65,000.00
10 Mandor 65,000.00
11 Penjaga Malam 400,000.00
12 Sopir 50,000.00
13 Pembantu Sopir 40,000.00

BAHAN PASANGAN

1 Pasir Pasang Lokal 75,000.00


2 Pasir Urug 60,000.00
3 Pasir Beton (Ex. Palu) 215,000.00
4 Batu Gunung 125,000.00
5 Split/Batu Lokal 85,000.00
6 Kerikil Beton/Koral Palu 250,000.00
7 Batako 4,000.00
8 Batu Bata 450.00
9 Tanah Urug 80,000.00
10 Semen Warna 10,000.00
11 Portland Cement @ 50 Kg 38,000.00
12 Roster 4,500.00
13 Buis Beton 67,500.00
14 Batu Pecah 240,000.00
15 Paving Block 3,000.00

BAHAN KAYU DAN PLAFOND

1 Kayu Ulin 1,600,000.00


2 Kayu Bengkirai 1,700,000.00
3 Kayu Meranti 4,000,000.00
4 Kayu Balok Kasau & Reng 1,350,000.00
5 Kayu Papan Siring Ulin 10,000.00
6 Kayu Papan Ulin 1,700,000.00
7 Kayu Papan/Bouwplank 1,500,000.00
8 Kayu Papan Lisplank 1,200,000.00
9 Papan Gypsum 65,000.00
10 Kayu Bekisting 1,100,000.00
11 Plywood 4 mm 38,000.00
12 Les Profil 25,000.00
13 Kayu Profil Lumbersiring 15,000.00
14 Kayu Kapur 1,150,000.00
15 Kayu Papan Siring Ulin 10,000.00
16 Paving Block 3,000.00
NO URAIAN HARGA SATUAN

BAHAN PAKU/BESI

1 Paku Biasa 12,500.00


2 Paku Ulin 13,000.00
3 Paku Seng 13,000.00
4 Paku Reng 5,000.00
5 Paku Plywood 13,000.00
6 Paku Alumunium 150.00
7 Besi Beton Polos 9,500.00
8 Besi Beton Ulir 11,000.00
9 Kawat Bendrat 11,000.00
10 Beton K-225 1,014,163.34

BAHAN ATAP DAN CAT

1 Atap Genteng Metal 115,000.00


2 Bubungan Genteng Metal 65,000.00
3 Seng Gelombang BJLS 20 40,000.00
4 Cat Tembok Warna 43,000.00
5 Cat Meny Kayu 16,000.00
6 Cat Meny Besi 24,000.00
7 Kertas Gosok 2,000.00
8 Plamir Tembok 29,000.00
9 Dempul Cat Kilat 15,000.00
10 Cat Kayu Mengkilat 25,200.00
11 Minyak Cat 9,600.00
12 Cat Kayu Dasar 16,000.00
13 Politur Merk 22,000.00
14 Ter - Teran 12,000.00

BAHAN PENGGANTUNG

1 Engsel Jendela 3" SES 31,000.00


2 Engsel Pintu 5" SES 37,500.00
3 Grendel Jendela 4" SES 15,000.00
4 Grendel Pintu 4" SES 15,000.00
5 Hak Angin 31,000.00
6 Kunci Pintu 2 Slaag 200,000.00
7 Expanyolet 120,500.00
8 Handle Jendela 25,000.00
9 Kunci Pintu KM/WC 125,000.00
10 Kunci Gembok 15,000.00
11 Kunci Pintu Utama 400,000.00
NO URAIAN HARGA SATUAN

BAHAN LANTAI DAN SANITAIR

1 Keramik 20x20 cm 3,500.00


2 Keramik 20 x 25 cm 3,750.00
3 Keramik 30x30 cm 4,000.00
4 Closed Jongkok + Plumbing 450,000.00
5 Stop Kran 50,000.00
6 Septictank + Peresapan 7,500,000.00
7 Saringan Air 24,700.00
8 Pipa PVC 1/2 " 7,500.00
9 Pipa PVC 3/4" 15,000.00
10 Pipa PVC 2" 20,500.00
11 Pipa PVC 4" 48,750.00
12 Wastafel + Cermin 1,265,000.00
13 Kran Air 50,000.00
14 Tandon Air 1200 Ltr & Instalasi Air 1,500,000.00
15 Floor Drain 24,700.00
16 Bak Control Terbuka 175,000.00
17 Bak Air Fiber Lapis Keramik 20/20 450,000.00
18 Closed Jongkok KIA/STD 250,000.00
19 Bak Mandi Fiber 200,000.00

BAHAN KACA

1 Kaca Bening Tebal 5 mm 70,000.00


2 Kaca Buram Tebal 5 mm 94,250.00

BAHAN LISTRIK

1 Lampu TL 2 x 20 Watt 150,000.00


2 Lampu Philip SL 18 Watt 100,000.00
3 Lampu Philip SL 8 Watt 75,000.00
4 Stop Kontak 85,000.00
5 Sakelar Tunggal 75,000.00
6 Sakelar Ganda 90,000.00
7 Sakelar Tukar 95,000.00
8 Box MCB 4 Group/Zakring 140,000.00
9 Box Panil Induk 500,000.00
10 Penangkal Petir 2 Split 1 Arde 2,500,000.00
11 Penangkal Petir 3 Split 1 Arde 3,500,000.00
12 Box Panel 300 x 200 x 250 mm/ Legrand+Accessories 1,250,000
`+ Instalasi ( Komplit )
13 MMCB. IP. 16 A 250,000
14 MMCB. IP. 10 A 250,000
15 MMCB. IP. 6 A 175,000
16 Lampu TLD 1 x 40 Watt Philips 125,000
17 Lampu Pijar 25 Watt Philips + Fitting Broco Lux 37,500
18 Saklar Tunggal Legrand 80,000
19 Saklar Seri Legrand 95,000
20 Stop Kontak Legrand 90,000
21 Stop Kontak AC Legrand 215,000
22 Grounding 35,000
HAL. 1

HARGA SATUAN

/ orang
/ orang
/ orang
/ orang
/ orang
/ orang
/ orang
/ orang
/ orang
/ orang
/ org / bln
/ orang
/ orang

/ M3
/ M3
/ M3
/ M3
/M3
/ M3
/ Bh
/ Bh
/ M3
/ Kg
/ Zak
/ Bh
/ Bh
/ M3
/ Bh

/ M3
/ M3
/ M3
/ M3
/ Lbr
/ M3
/ M3
/ M3
/ Lbr
/ M3
/ Lbr
/ Btg
/ Lbr
/ M3
/ Lbr
/ Bh
HAL. 2

HARGA SATUAN

/ Kg
/ Kg
/ Kg
/ Kg
/ Kg
/ Bh
/ Kg
/ Kg
/ Kg
/M3

/ Lbr
/ M1
/ Lbr
/ Kg
/ Kg
/ Kg
/ Lbr
/ Kg
/ Kg
/ Kg
/ Ltr
/ Kg
/ Kg
/ Kg

/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
HAL. 3

HARGA SATUAN

/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Unit
/ Bh
/ M'
/ M'
/ M'
/ M'
/ Unit
/ Bh
/ Unit
/ Bh
/ Bh
/ Bh
/Set
/ Bh

/ M2
/ M2

/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Unit
/ Unit
/ Unit
/Unit

Bh
Bh
Bh
Bh
Bh
Bh
bh
Bh
Bh
Bh