You are on page 1of 20

Estimation of Crop Water Requirements

GCA of the scheme= 29.34 km2 =


CCA of Scheme= 26.11782 km2 =

Proposed Cropping Pattern

Cropping Period Croping Intensity Delta of Crop


Crops (days) (%) (inch)
Rabi Season
Wheat 135 40 15
Grams 100 20 12
Barley 135 10 12
Fodder 100 15 15
Sugar cane 345 15 40
100

Cropping Period Croping Intensity Delta of Crop


Crops (days) (%) (inch)
Kharif Season
Rice 140 43 40
Cotton 165 23 12
Maize 115 13 20
Sugar cane 345 13 40
Fodder 100 8 12
100

Calculation of Design Discharge


Discharge for Rabi(Vr
Season Qr(9600.1
(ft^3))/= x 43560)/
(Time (182 x 24 x 3600)=
(sec))=
Discharge for Kharif
(Vk Season Qk
(ft^3))/ =
(15446.2 x 43560)/
(Time (183 x 24 x 3600)=
(sec))=
Design Discharge = 42.554 cusecs

Calculation of Water Allowance


Water Allowance =
(Qd(42.554
x 6.594
x
1000)/CC
1000)/6453.8 =
A=
Outlet Command Area and number of Outlets
Let Qoutlet = 3 cusecs
Water Allowance
(Qoutletx1000)/
=
(CCA of outlet)
Water Allowance
(Qoutletx1000)/
=
(CCA of outlet)

(𝑄= 𝑜𝑢𝑡𝑙𝑒𝑡 𝑥
CCA of Outlet (3 x
1000)/𝑊𝐴= 1000)/6.
594
(𝐶𝐶𝐴
Number of Outlets = 𝑜𝑓 𝑠𝑐ℎ𝑒𝑚)/
6453.8/454
(𝐶𝐶𝐴 𝑜𝑓 𝑜𝑢𝑡𝑙𝑒𝑡)
.983=
r Requirements
7250.0607 acres
6453.843911 acres

g Pattern

Cropped area Volume of Water


km² acre (acre-ft)
on
10.447128 2581.538 3226.92195555
5.223564 1290.769 1290.76878222
2.611782 645.3844 645.38439111
3.917673 968.0766 1210.0957333313
3.917673 968.0766 3226.92195555
∑ = Vr= 9600.0928177613

Cropped area Volume of Water


km² acre (acre-ft)
on
11.2306626 2775.153 9250.50960591
6.0070986 1484.384 1484.384099553
3.3953166 838.9997 1398.332847405
3.3953166 838.9997 2796.66569481
2.0894256 516.3075 516.307512888
∑ = Vk= 15446.199760566

n Discharge
26.594 cusecs

42.554 cusecs

2.554 cusecs

r Allowance
cusecs/1000a
cres

number of Outlets
454.9828495 acres

14.18480701 ≈ 15
DISCHARGE STATEMENT / CAPACITY STATEMENT
Canal Length of RD / Designation of Outlets / Q reach (ft³/sec)
Sr. # Reach Reach(ft) minors in the Reach Q right Q left
FOR MAIN DISTRIBUTORY
1 AB 7428 TOP DISTRIBUTRY 3.4575 2.584605
2 BC 4015 TOP DISTRIBUTRY 0 3.6782
3 CD 3510 TOP DISTRIBUTRY 0 3.3031
4 DE 2510 TOP DISTRIBUTRY 0 2.4309
5 EF 2007 TOP DISTRIBUTRY 0 2.5526
6 AG 549 Right distributry 3.4575 0
7 GH 4329 Right distributry 3.2763 0
8 HI 2624 Right distributry 3.2163 0
9 IJ 2624 Right distributry 3.2675 0
10 JK 2624 Right distributry 2.7301 0
11 LM 4718 3rd Distributry 0 2.067684
12 MN 2308 3rd Distributry 0 2.7301
13 OP 4198 4th distributry 2.2055 0
14 PQ 3936 4th distributry 2.7874 0
15 QR 3936 4th distributry 2.6037 0
16 QQ' 3936 4th distributry 2.374 0
17 ST 5248 5th Distributry 2.6037 0
18 TU 2624 5th Distributry 3.2661 0
ACITY STATEMENT
reach (ft³/sec) Q in Reach Qd for Reach
Qs (ft³/sec)
Qt (ft³/sec) (ft³/sec)
UTORY
6.042105 0.9063158 6.94842075 20.70794075
3.6782 0.55173 4.22993 13.75952
3.3031 0.495465 3.798565 9.52959
2.4309 0.364635 2.795535 5.731025
2.5526 0.38289 2.93549 2.93549
3.4575 0.518625 3.976125 18.339855
3.2763 0.491445 3.767745 14.36373
3.2163 0.482445 3.698745 10.595985
3.2675 0.490125 3.757625 6.89724
2.7301 0.409515 3.139615 3.139615
2.067684 0.3101526 2.3778366 5.5174516
2.7301 0.409515 3.139615 3.139615
2.2055 0.330825 2.536325 11.46619
2.7874 0.41811 3.20551 8.929865
2.6037 0.390555 2.994255 2.994255
2.374 0.3561 2.7301 2.7301
2.6037 0.390555 2.994255 6.75027
3.2661 0.489915 3.756015 3.756015
54.59279 62.78170735

Total Qd required at point A = 62.78170735


th
DESIGN DISCHARGE OF OUTLETS
RD of Direction of Designation GCA NCCA CCA Qoutlet
6.593655 Sr. # Outlets offtake (acres) (acres) (acres) (ft³/s)
1 0 + 500 L TR₁ 306.2372 0 306.2372 2.019222
2 7 + 928 L TR₂ 435.53 0 435.53 2.871735
3 11 + 943 L TR3 529.2892 137.92 391.3692 2.580554
4 15 + 456 L TR4 379.98 91.94678 288.0332 1.899192
5 17 + 966 L TR5 302.4567 0 302.4567 1.994295
6 1 + 049 R M1R1 409.67 0 409.67 2.701223
7 5 + 378 R M2R1 381.0952 0 381.0952 2.51281
8 8 + 002 R M3R1 381.0952 0 381.0952 2.51281
9 10 + 626 R B1R1 552.287 165.1314 387.1556 2.552771
10 13 + 250 R B2R1 386.9931 106.1622 280.8309 1.851702
11 13 + 800 L M1R3 244.9898 0 244.9898 1.615378
12 18 + 518 L M1R4 323.4772 0 323.4772 2.132897
13 8 + 164 R M1R2 261.3224 0 261.3224 1.72307
14 12 + 362 R M2R2 589.79 259.5177 330.2723 2.177702
15 16 + 298 R BR2 308.5057 0 308.5057 2.03418
16 16 + 298 ML-R BR3 281.2846 0 281.2846 1.854694
17 14 + 568 R B1R4 308.5057 0 308.5057 2.03418
18 19 + 816 R B2R4 386.9931 0 386.9931 2.551699
6008.824
Qs (ft³/s) Qt (ft³/s)

0.605767 2.624989
0.86152 3.733255
0.774166 3.35472
0.569758 2.468949
0.598289 2.592584
0.810367 3.51159
0.753843 3.266653
0.753843 3.266653
0.765831 3.318602
0.555511 2.407213
0.484613 2.099992
0.639869 2.772766
0.516921 2.239991
0.65331 2.831012
0.610254 2.644434
0.556408 2.411102
0.610254 2.644434
0.76551 3.317209
51.50615
DESIGN OF OUTLETS

RD of Outlets Designation of Qt
Sr. # Ѡ (ft) H (ft)
Outlets (ft³/sec)
1 0 + 500 L 2.624989 0.5 1.424471
2 7+928 L 3.733255 0.5 1.801469
3 11 + 943 L 3.35472 0.5 1.677539
4 15 + 456 L 2.468949 0.5 1.367445
5 17 + 966 L 2.592584 0.5 1.412723
6 1 + 049 R 3.51159 0.5 1.729435
7 5+378 R 3.266653 0.5 1.64805
8 8+002 R 3.266653 0.5 1.64805
9 10+626 R 3.318602 0.5 1.665477
10 13+250 R 2.407213 0.5 1.344554
11 13 + 800 L 2.099992 0.5 1.227572
12 18 + 518 L 2.772766 0.5 1.477443
13 8 + 164 R 2.239991 0.5 1.281541
14 12 + 362 R 2.831012 0.5 1.498061
15 16 + 298 R 2.644434 0.5 1.431497
16 16 + 298 ML-R 2.411102 0.5 1.346001
17 14+568 R 2.644434 0.5 1.431497
18 19+816 R 3.317209 0.5 1.665011
Design of Canal Reaches

Canal Reach Discharge Q Wetted Lacey's Silt Hydraulic Area (ft²)


Sr. # Slope
(ft³/sec) Perimeter Factor (f) Radius R
FOR MAIN DISTRIBUTARY
1 AB 20.7079 12.1501 0.8255 0.000238 1.3831 16.8042
2 BC 13.7595 9.9041 0.8255 0.000254 1.2070 11.9546
3 CD 9.5296 8.2423 0.8255 0.000271 1.0681 8.8033
4 DE 5.7310 6.3919 0.8255 0.000294 0.9017 5.7635
5 EF 2.9355 4.5746 0.8255 0.000329 0.7216 3.3011
6 AG 18.3399 11.4343 0.8255 0.000243 1.3282 15.1875
7 GH 14.3637 10.1192 0.8255 0.000253 1.2244 12.3903
8 HI 10.5960 8.6912 0.8255 0.000266 1.1065 9.6166
9 IJ 6.8972 7.0121 0.8255 0.000286 0.9591 6.7250
10 JK 3.1396 4.7310 0.8255 0.000326 0.7379 3.4912
11 LM 5.5175 6.2716 0.8255 0.000296 0.8904 5.5840
12 MN 3.1396 4.7310 0.8255 0.000326 0.7379 3.4912
13 OP 11.4662 9.0411 0.8255 0.000262 1.1359 10.2701
14 PQ 8.9299 7.9787 0.8255 0.000274 1.0452 8.3393
15 QR 2.9943 4.6201 0.8255 0.000328 0.7264 3.3560
16 QQ' 2.7301 4.4116 0.8255 0.000333 0.7044 3.1075
17 ST 6.7503 6.9370 0.8255 0.000287 0.9522 6.6054
18 TU 3.7560 5.1746 0.8255 0.000316 0.7833 4.0534
Depth of Bed Width
B/D Flow (D) (B)

7 2.2989 16.0926
7 2.1080 14.7560
7 1.8708 13.0956
7 1.5268 10.6876
7 0.9876 6.9132
7 2.2058 15.4406
7 2.1287 14.9009
7 1.8897 13.2279
7 1.5687 10.9809
7 0.9687 6.7809
7 0.7654 5.3578
7 0.9687 6.7809
7 1.9876 13.9132
7 1.6987 11.8909
7 0.9365 6.5555
7 0.8976 6.2832
7 1.5589 10.9123
7 0.9987 6.9909
Design of Watercourse
Roughness Slope
Sr. # Designation Discharge Q Co-efficient Depth Width
of Outlets (cusecs) (n) S˳ (ft) (ft)

1 0+500 2.62498923 0.013 0.0002 1.098715 2.197429


2 7+928 3.733255 0.013 0.0002 1.253848 2.507696
3 11 + 943 3.35471959 0.013 0.0002 1.204573 2.409146
4 15 + 456 2.46894923 0.013 0.0002 1.073752 2.147505
5 17 + 966 2.59258372 0.013 0.0002 1.093608 2.187217
6 1 + 049 3.51158951 0.013 0.0002 1.225395 2.450789
7 5+378 3.26665342 0.013 0.0002 1.192616 2.385232
8 8+002 3.26665342 0.013 0.0002 1.192616 2.385232
9 10+626 3.31860166 0.013 0.0002 1.199693 2.399386
10 13+250 2.40721274 0.013 0.0002 1.063604 2.127208
11 13 + 800 2.09999173 0.013 0.0002 1.010517 2.021034
12 18 + 518 2.77276623 0.013 0.0002 1.121514 2.243027
13 8 + 164 2.23999072 0.013 0.0002 1.035272 2.070544
14 12 + 362 2.83101214 0.013 0.0002 1.130291 2.260582
15 16 + 298 2.64443425 0.013 0.0002 1.10176 2.203519
16 16 + 298 2.41110174 0.013 0.0002 1.064248 2.128496
17 14+568 2.64443425 0.013 0.0002 1.10176 2.203519
18 19+816 3.31720875 0.013 0.0002 1.199504 2.399009
wc
COMMAND STATEMENT

Reach/ Section RD / Designation of B.L. of Canal FSL of canal at Water Level in Water Level in
at section
of Canal Outlets section (ft) WC at outlet (ft) WC at Tail (ft)
(ft)
AB TOP DISTRIBUTRY 151 153.2989 151.8745 150.388868896
BC TOP DISTRIBUTRY 149.978203 152.0862 150.2847 149.481733536
CD TOP DISTRIBUTRY 149.0285294 150.8993 149.2218 148.51979043
DE TOP DISTRIBUTRY 148.2893532 149.8162 148.4487 147.946708107
EF TOP DISTRIBUTRY 147.6285885 148.6162 147.2035 146.802065518
AG Right distributry 151 153.2058 151.4764 151.366564786
GH Right distributry 149.9061545 152.0349 150.3868 149.521003989
HI Right distributry 149.20864 151.0983 149.4503 148.925489511
IJ Right distributry 148.4593828 150.0281 148.3626 147.837806173
JK Right distributry 147.6051085 148.5738 147.2293 146.704454868
LM 3rd Distributry 141 141.7654 140.5378 139.594228326
MN 3rd Distributry 140.2486032 141.2173 139.7399 139.278260495
OP 4th distributry 145 146.9876 145.7061 144.866458675
PQ 4th distributry 143.9234673 145.6222 144.1241 143.336905867
QR 4th distributry 142.6318915 143.5684 142.1369 141.349694876
QQ' 4th distributry 141.3202808 142.2179 140.8719 140.084679429
ST 5th Distributry 140.5 142.0589 140.6274 139.577803409
TU 5th Distributry 139.6708708 140.6696 139.0046 138.479760158
Field Level Remarks
(ft)

150
146.5
144
143.3
141.5
150 Area is in
Command
149.2 (gravity Flow)
147.8
147
146
141
138.5
145
144
142.25 Area is not in
Command (No
142.25 gravity Flow)
140.5
138.5
Main Slope of NSL (ft) Depth of Running Length of Bed Level Full Supply
Canal the Level FSL
Reach water (ft) Distance Reach BL (ft)
Reach (ft)
AB 0.000238 150 2.298939 500 7428 151 153.298939
BC 0.000254 146.5 2.108 7928 4015 149.9782 152.086203
CD 0.000271 144.0 1.8708 11943 3510 149.0285 150.899329
DE 0.000294 143.3 1.5268 15456 2510 148.2894 149.816153
EF 0.000329 141.5 0.9876 17966 2007 147.6286 148.616188
AG 0.000243 150.0 2.2058 1049 549 151 153.2058
GH 0.000253 149.2 2.1287 5378 4329 149.9062 152.034854
HI 0.000266 147.8 1.8897 8002 2624 149.2086 151.09834
IJ 0.000286 147.0 1.5687 10626 2624 148.4594 150.028083
JK 0.000326 146.0 0.9687 13250 2624 147.6051 148.573808
LM 0.000296 141.0 0.7654 13800 4718 141 141.7654
MN 0.000326 138.5 0.9687 18518 2308 140.2486 141.217303
OP 0.000262 145.0 1.9876 8164 4198 145 146.9876
PQ 0.000274 144.0 1.6987 12362 3936 143.9235 145.622167
QR 0.000328 142.3 0.9365 16298 3936 142.6319 143.568391
QQ' 0.000333 142.3 0.8976 16298 3936 141.3203 142.217881
ST 0.000287 140.5 1.5589 14568 5248 140.5 142.0589
TU 0.000316 138.5 0.9987 19816 2624 139.6709 140.669571

Longitudinal Profile of Distributary LMN


143.0
142.0
141.0
Elevation (ft)

140.0 NSL
BL
139.0
FSL
138.0
137.0
136.0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000
Running Distance (ft)
Longitudinal Profile of Distributary STU Longitudinal Profile of Distributary OPQR
143.0 148.0
147.0
142.0
146.0
141.0
145.0
140.0 NSL 144.0 NSL
Elevation (ft)

Elevation (ft)
BL BL
139.0 143.0
FSL FSL
142.0
138.0
141.0
137.0 140.0

136.0 139.0
0 2000 4000 6000 8000 10000 0 5000 10000 15000

Running Distance (ft) Running Distance (ft)

Longitudinal Profile of Distributary ADCDEF Longitudinal Profile of Distributary AGHIJK


155 154.0

152.0
150
150.0
NSL NSL
Elevation (ft)

148.0 BL
Elevation (ft)

145 BL
FSL FSL
146.0
140
144.0

135 142.0
0 5000 10000 15000 20000 0 5000 10000 15000 20000

Running Distance (ft) Running Distance (ft)


f Distributary OPQR

NSL
BL
FSL

0000 15000
e (ft)

f Distributary AGHIJK

NSL
BL
FSL

00 15000 20000
nce (ft)
Warabandi Scheme for TR1

Filling Drainage Farmers Time


Name of Area of Time Tf Time Td Unit Irrigation Time Tt
Sr. # Farmer Farmer Tu (Hrs/acres)
(Hrs) (Hrs)
Hrs Min
1 A 25 0.305556 0 0.5476 13 42
2 B 25 0 0 0.5486 13 43
3 C 25 0.275 0 0.5477 13 42
4 D 25 0 0 0.5486 13 43
5 E 25 0.275 0 0.5477 13 42
6 F 25 0 0 0.5486 13 43
7 G 25 0.275 0 0.5477 13 42
8 H 25 0 0 0.5486 13 43
9 I 25 0.275 0 0.5477 13 42
10 J 25 0 0 0.5486 13 43
11 K 25 0.275 0 0.5477 13 42
12 L 6.23 0 0 0.5486 3 26

1.680556 0
Time Estimated 154 1.78
me for TR1

Clock time
Starting Day Ending Day
Start time End time
Hrs min Hrs min
9 0 22 42 1/1/2014 1/1/2014
22 42 12 25 1/1/2014 2/1/2014
12 25 2 9 2/1/2014 3/1/2014
2 9 15 52 3/1/2014 3/1/2014
15 52 5 34 3/1/2014 4/1/2014
5 34 19 2 4/1/2014 4/1/2014
19 2 8 44 4/1/2014 5/1/2014
8 44 22 27 5/1/2014 5/1/2014
22 27 12 6 5/1/2014 6/1/2014
12 6 1 49 6/1/2014 7/2/2014
1 49 15 31 7/1/2014 7/3/2014
15 31 18 57 7/1/2014 7/4/2014

Time given 153.95

You might also like