Professional Documents
Culture Documents
V
Open
(Upto 1 Km)
DGPS Points are
Areial Survey Toposheets set through pair Traverse
coordinates
Close
Design Team
(Upto 2.5Km )
Drawings with respect to
toposurvey
Client
Approval
Stake Out
Various Checks
1) Rail level & alignement
Various Checks Points Given:
check
1) Centerline Check 1) Excavation points for
2)Gap left between viaduct &
2)Viaduct Check 9mm footing acc. To safety norms
pier arm 25mm
3)Corbel level check 2)PCC points
4)Slab level check 3)Footing Points
4)Column points