You are on page 1of 17

Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-

Awendo Electrification Project


Customer: Republic of Kenya- Ministry of Energy
PO Number:
Commissioning Number:
GE MULTILIN Representative
Engineer Name: Organization: GE Power Management

1 D30 RELAY...................................................................................................................... 3
1.1 RELAY DATA .................................................................................................................................... 3
1.2 VISUAL INSPECTION & SYSTEM CHECK ........................................................................................... 3
1.3 COMMUNICATIONS ........................................................................................................................ 3
1.4 POWER SUPPLY............................................................................................................................... 3
1.5 CONTACT INPUTS............................................................................................................................ 4
1.6 CONTACT OUPUTS .......................................................................................................................... 5
1.7 TERMINAL BLOCKS V&I CONNECTIONS .......................................................................................... 6
1.8 VOLTAGE AND CURRENT INPUTS METERING ................................................................................. 6
1.8.1 CT/VT SETTINGS 6
1.8.2 SIGNAL SOURCES6
1.8.3 BREAKERS 7
1.8.1 79 - AUTORECLOSE ..................................................................................................................... 8
1.8.2 UNBALANCED SYSTEM TO IDENTIFY PHASES............................................................................. 9
1.8.3 BALANCED V&I SYSTEM.............................................................................................................. 9
1.9 PROTECTION ELEMENTS ............................................................................................................... 10
1.9.1 PHASE DISTANCE (21) Z1 3 PHASE FAULT ................................................................................ 10
1.9.2 PHASE DISTANCE (21) Z2 3 PHASE FAULT ................................................................................ 11
1.9.3 GROUND DISTANCE (21) Z1...................................................................................................... 12
1.9.4 GROUND DISTANCE (21) Z2...................................................................................................... 13
1.10 PROTECTION SUMMARY............................................................................................................... 14
1.11 OPERATION TABLE ........................................................................................................................ 15
2 ADDITIONAL COMMENTS/FACTS IMPACTING THE FIELD SERVICE/ETC.: ...................... 16
3 OPEN POINTS: .............................................................................................................. 16

2
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo Electrification Project
Customer: Republic of Kenya- Ministry of Energy
PO Number:
Commissioning Number:
GE MULTILIN Representative
Engineer Name: Organization: GE Power Management

1 D30 RELAY

1.1 RELAY DATA

MANUFACTURER GE MULTILIN
PANEL IDENTIFICATION H01+RH01
RELAY ORDER CODE D30-N03-HKH-F8L-H6N-M6N-P6C
SERIAL NUMBER AAAC16000152
SETTINGS DOCUMENT Customer propietary
FIRMWARE REVISION 6.0x
IP ADDRESS 192.168. 1. 57
MODBUS ADDRESS 254
PROTECTION ELEMENTS 21P, 21G, 79

1.2 VISUAL INSPECTION & SYSTEM CHECK

TEST DATE
 Equipment integrity: OK 18/3/17
 LED test: OK 18/3/17
 Frontal display: OK 18/3/17
 Keypad: OK 18/3/17
 Equipment grounding: OK 18/3/17

1.3 COMMUNICATIONS

TEST DATE
 Ethernet communication: OK 18/3/17
 Serial communication: OK 18/3/17
 IRIG-B NA 18/3/17
 SNTP NA 18/3/17
 Configuration file download (Factory default.urs) NA 18/3/17
 Configuration file upload (D30:
OK 18/3/17
D30_NdhiToHoma_13032017.urs)

1.4 POWER SUPPLY

MEASURE DATE
 Supply type: DC 107.2Vdc 18/3/17

3
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo Electrification Project
Customer: Republic of Kenya- Ministry of Energy
PO Number:
Commissioning Number:
GE MULTILIN Representative
Engineer Name: Organization: GE Power Management

1.5 CONTACT INPUTS

RELAY TERMINALS NAME FORCED BY TEST DATE


H5a BCPU IntFail OK 18/3/17
H5c DC fail M2 OK 18/3/17
H6a VT Fail OK 18/3/17
H6c ManualClsCMD OK 18/3/17
H7a 79 Init BCU OK 18/3/17
H7c 79 IN OK 18/3/17
H8a 79 OUT OK 18/3/17
H8c BLOCK 79 OK 18/3/17
M5a CB OPEN OK 18/3/17
M5c CB CLOSED OK 18/3/17
M6a CB 79LOCKOUT OK 18/3/17
M6c Cont E/P 12 NA
M7a Cont E/P 13 NA
M7c Cont E/P 14 NA
M8a Cont E/P 15 NA
M8c Cont E/P 16 NA

4
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo Electrification Project
Customer: Republic of Kenya- Ministry of Energy
PO Number:
Commissioning Number:
GE MULTILIN Representative
Engineer Name: Organization: GE Power Management

1.6 CONTACT OUPUTS

RELAY TERMINALS NAME OPERATE CONTACT TYPE TEST DATE


H1b-H1c Cont Op 1 OFF
H2b-H2c Cont Op 2 OFF
H3b-H3c Cont Op 3 OFF
H4b-H4c Cont Op 4 OFF
M1b-M1c Cont Op 1 OFF
M2b-M2c CB 79 CMD AR 1 CLOSE NO OK 18/3/17
M3b-M3c CB BLOCK BCU CBBLOCKtoBCU On (VO5) DISABLED DISABLED 18/3/17
M4b-M4c CB 79 LOCKOU AR 1 LO NO OK 18/3/17
P1b-P1c Cont Op 9 OFF
P2b-P2c CB TRIP TC1 GEN TRIP On (VO1) NO OK 18/3/17
P3b-P3c CB TRIP TC2 GEN TRIP On (VO1) NO OK 18/3/17
P4b-P4c Cont Op 12 OFF
P5b-P5c InitCBFtoBCU GEN TRIP On (VO1) NO OK 18/3/17
P6b-P6c Cont Op 14 OFF
P7b-P7c Cont Op 15 OFF
P8b-P8c Cont Op 16 OFF

B1a -B1b KA27PR-60 CRITICAL FAILURE NC OK 18/3/17

5
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo Electrification Project
Customer: Republic of Kenya- Ministry of Energy
PO Number:
Commissioning Number:
GE MULTILIN Representative
Engineer Name: Organization: GE Power Management

1.7 TERMINAL BLOCKS V&I CONNECTIONS

CT Feeder F1 VT BANK F5
CURRENTS VOLTAGES
A 1 1
B 2 2
XCT-1 VA VT-1
C 3 3
N 4 4

1.8 VOLTAGE AND CURRENT INPUTS METERING

1.8.1 CT/VT SETTINGS

CT SETTINGS
PARAMETER CT F1
Phase CT Primary 250 OK
Phase CT Secondary 1 OK
Ground CT Primary 250 OK
Ground CT Secondary 1 OK

VT SETTINGS
PARAMETER VT F5
Phase VT Connection Wye OK
Phase VT Secondary 63.5 V OK
Phase VT Ratio 300 :1 OK
Auxiliary VT Connection Vbg OK
Auxiliary VT Secondary 63.5 V OK
Auxiliary VT Ratio 300 :1 OK

1.8.2 SIGNAL SOURCES

SIGNAL SOURCES
PARAMETER SCR 1 SRC2
Name Feeder BusSyc
Phase CT F1 None
Ground CT F1 None
Phase VT F5 None
Aux VT None F5

6
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo Electrification Project
Customer: Republic of Kenya- Ministry of Energy
PO Number:
Commissioning Number:
GE MULTILIN Representative
Engineer Name: Organization: GE Power Management

1.8.3 BREAKERS

BREAKERS
SETTING PARAMETER
Breaker 1 Function Enabled
Breaker 1 Push Button Control Disabled
Breaker 1 Name Bkr 1
Breaker 1 Mode 3-Pole
Breaker 1 Open OFF
Breaker 1 Block Open OFF
Breaker 1 Close ManualClsCMD On(H6c)
Breaker 1 Block Close OFF
Breaker 1 Phase A/3-Pole Closed CB CLOSED On(M5c)
Breaker 1 Phase A/3-Pole Opened CB OPEN On(M5a)
Breaker 1 Phase B Closed OFF
Breaker 1 Phase B Opened OFF
Breaker 1 Phase C Closed OFF
Breaker 1 Phase C Opened OFF
Breaker 1 Toperate 0.070 s
Breaker 1 External Alarm OFF
Breaker 1 Alarm Delay 0.000 s
Breaker 1 Manual Close Recal Time 0.000 s
Breaker 1 Out Of Service OFF
Breaker 1 Events Enabled

Breaker 2 Function Disabled


Breaker 2 Push Button Control Disabled
Breaker 2 Name Bkr 2
Breaker 2 Mode 3-Pole
Breaker 2 Open OFF
Breaker 2 Block Open OFF
Breaker 2 Close OFF
Breaker 2 Block Close OFF
Breaker 2 Phase A/3-Pole Closed OFF
Breaker 2 Phase A/3-Pole Opened OFF
Breaker 2 Phase B Closed OFF
Breaker 2 Phase B Opened OFF
Breaker 2 Phase C Closed OFF
Breaker 2 Phase C Opened OFF
Breaker 2 Toperate 0.070 s
Breaker 2 External Alarm OFF
Breaker 2 Alarm Delay 0.000 s
Breaker 2 Manual Close Recal Time 0.000 s
Breaker 2 Out Of Service OFF
Breaker 2 Events Disabled

7
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo Electrification Project
Customer: Republic of Kenya- Ministry of Energy
PO Number:
Commissioning Number:
GE MULTILIN Representative
Engineer Name: Organization: GE Power Management

1.8.1 79 - AUTORECLOSE

AUTORECLOSE 1
SETTING PARAMETER
Function Enabled
Initiate AR INIT On (VO2)
Block 79 BLOCK/OUT On (VO3)
Max Number Of Shots 2
Reduce Max to 1 OFF
Reduce Max to 2 OFF
Reduce Max to 3 OFF
Manual Close ManualClsCMD On(H6c)
Manual Reset from LO OFF
Reset Lockout if Breaker Closed On
Reset Lockout On Manual Close On
Breaker Closed BREAKER 1 CLOSED
Breaker Open BREAKER 1 OPEN
Block Time Upon Manual Close 10.00 s
Dead Time Shot 1 0.50 s
Dead Time Shot 2 5.00 s
Dead Time Shot 3 3.00 s
Dead Time Shot 4 4.00 s
Add Delay 1 OFF
Delay 1 0.00 s
Add Delay 2 OFF
Delay 2 0.00 s
Reset Lockout Delay 25.00 s
Reset Time 25.00 s
Incomplete Sequence Time 10.00 s
Events Enabled

8
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo Electrification Project
Customer: Republic of Kenya- Ministry of Energy
PO Number:
Commissioning Number:
GE MULTILIN Representative
Engineer Name: Organization: GE Power Management

1.8.2 UNBALANCED SYSTEM TO IDENTIFY PHASES


VOLTAGE INJECTION CURRENT INJECTION
READ VALUE READ VALUE
TERMINAL F5 TERMINAL F1

Vph-g Mag V Angle Vph-g Mag V Angle I Mag I Angle I Mag I Angle

A 10 V 0º 2.969KV 0.0º 1A 0º 249.926A -359.4º

B 20 V -120º 5.997KV -119.8º 2A -120º 499.353A -119.6º

C 30 V 120º 8.996KV -239.9º 3A 120º 749.306A -239.6A

METERING OK METERING OK

1.8.3 BALANCED V&I SYSTEM


VOLTAGE INJECTION CURRENT INJECTION
READ VALUE READ VALUE
TERMINAL F5 TERMINAL F1
Vph-g Mag V Angle Vph-g Mag V Angle I Mag I Angle I Mag I Angle

A 63.5 V 0º 19.032KV 0.0º 1A 0º 249.883A -359.6º

B 63.5 V -120º 19.040KV -120.1º 1A -120º 249.889A -119.8º

C 63.5 V 120º 19.041KV -240.1º 1A 120º 249.921A -239.7º

METERING OK METERING OK

9
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo Electrification Project
Customer: Republic of Kenya- Ministry of Energy
PO Number:
Commissioning Number:
GE MULTILIN Representative
Engineer Name: Organization: GE Power Management

1.9 PROTECTION ELEMENTS

1.9.1 PHASE DISTANCE (21) Z1 3 PHASE FAULT

The following graph shows distance function


characteristics

Function is blocked if 21BLOCK (VO6) is Enabled

Phase INJECTION SETTING VALUE TESTED VALUE CONCLUSION


RESULT
TERM
I Mag I Angle V Mag V Angle PKP & TIME test TIME (OK/NOT DATE
(SRC1)
OK)
A 1A -62ª 8V↓ 0ª
Quad diagram
B 1A -242ª 8V↓ -120ª 6.2 Ω 38.2ms OK 18/3/17
Reach=6.18 Ω
0s
C 1A 2ª 8V↓ 120ª

CONTACT OUTPUTS 21BLOCK On (VO6) OFF P2 P3 P5…..LED#1


OK
ACTIVATED
21BLOCK On (VO6) ON NONE

10
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo Electrification Project
Customer: Republic of Kenya- Ministry of Energy
PO Number:
Commissioning Number:
GE MULTILIN Representative
Engineer Name: Organization: GE Power Management

1.9.2 PHASE DISTANCE (21) Z2 3 PHASE FAULT

The following graph shows distance function


characteristics

Function is blocked if 21BLOCK (VO6) is Enabled

Phase INJECTION SETTING VALUE TESTED VALUE CONCLUSION


RESULT
TERM
I Mag I Angle V Mag V Angle PKP & TIME test TIME (OK/NOT DATE
(SRC1)
OK)
A 1A -62ª 18V↓ 0ª
Quad diagram
B 1A -242ª 18V↓ -120ª 15.5 Ω 420.5ms OK 18/3/17
Reach=15.47 Ω
0.4 s
C 1A 2ª 18V↓ 120ª

CONTACT OUTPUTS 21BLOCK On (VO6) OFF P2 P3 P5…..LED#3


OK
ACTIVATED
21BLOCK On (VO6) ON NONE

11
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo Electrification Project
Customer: Republic of Kenya- Ministry of Energy
PO Number:
Commissioning Number:
GE MULTILIN Representative
Engineer Name: Organization: GE Power Management

1.9.3 GROUND DISTANCE (21) Z1

The following graph shows distance function


characteristics

Function is blocked if 21BLOCK (VO6) is Enabled

Phase INJECTION SETTING VALUE TESTED VALUE CONCLUSION


RESULT
TERM
I Mag I Angle V Mag V Angle PKP & TIME test TIME (OK/NOT DATE
(SRC1)
OK)
A 1A -90ª 8V↓ 0ª
Quad diagram
B - - 8V -120ª 6.1Ω 46.8ms OK 18/3/17
Reach=6.19Ω
0s
C - - 8V 120ª

CONTACT OUTPUTS 21BLOCK On (VO6) OFF P2 P3 P5…LED#2


OK
ACTIVATED
21BLOCK On (VO6) ON NONE

12
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo Electrification Project
Customer: Republic of Kenya- Ministry of Energy
PO Number:
Commissioning Number:
GE MULTILIN Representative
Engineer Name: Organization: GE Power Management

1.9.4 GROUND DISTANCE (21) Z2

The following graph shows distance function


characteristics

Function is blocked if 21BLOCK (VO6) is Enabled

Phase INJECTION SETTING VALUE TESTED VALUE CONCLUSION


RESULT
TERM
I Mag I Angle V Mag V Angle PKP & TIME test TIME (OK/NOT DATE
(SRC1)
OK)
A 1A -90ª 18V↓ 0ª
Quad diagram
B - - 18V -120ª 15.2Ω 438.5ms OK 18/3/17
Reach=15.47Ω
0.4s
C - - 18V 120ª

CONTACT OUTPUTS 21BLOCK On (VO6) OFF P2 P3 P5…LED#4


OK
ACTIVATED
21BLOCK On (VO6) ON NONE

13
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo Electrification Project
Customer: Republic of Kenya- Ministry of Energy
PO Number:
Commissioning Number:
GE MULTILIN Representative
Engineer Name: Organization: GE Power Management

1.10 PROTECTION SUMMARY

14
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo Electrification Project
Customer: Republic of Kenya- Ministry of Energy
PO Number:
Commissioning Number:
GE MULTILIN Representative
Engineer Name: Organization: GE Power Management

1.11 OPERATION TABLE

Protection operation Table

D30
FUNCTIO CB
CB TRIP CB TRIP InitCBFt AR INIT
N BLOCK
TC1 TC2 oBCU On
BCU

21P X X X X
21G X X X X
79 X
21G Z1 X
21G Z2 X

15
Project Name: Sondu (Therdibuoro)- Homa Bay (Ndhiwa)-
Awendo Electrification Project
Customer: Republic of Kenya- Ministry of Energy
PO Number:
Commissioning Number:
GE MULTILIN Representative
Engineer Name: Organization: GE Power Management

2 Additional Comments/Facts impacting the Field Service/etc.:

3 Open points:

16