TRANSFER OF REQUIREMENTS
{As the end user specifies the customer material number in sales order, system has to confirm
‘the quantity in a particular day. So, as to confirm the quantity in a particular day (customer
requested delivery date) system should know the requirements of the particular material for
sales order or delivery.
System can get the requirements of the order/delivery of a material by a function called
transfer of requirements.
TOR carries out requirements of order to MRP and creates a demand. Once TOR creates a
demand with MRP, then system can carry out availability check for particular material for
particular order. During carrying out the availability check function system tries to determine
ATP quantity.
ATP quantity = Warehouse stock + Planned receipts - Planned issues
Planned receipts: Planned orders, production orders, purchase requisitions, purchase orders,
stock in transfer, stock in transit etc,
Planned Issues: Sales orders, deliveries etc.,
1. In Schedule line category
Check availability and requirement
Privo BEE
Detvery block
Movement Type ear
Movement Type 1-Step
order Type [peg.delschea
tom Category
‘Acct Assgt Cat
MyT iss. Val. ST
[irtem rata.
“Transaction flow
30) Det RelSched.ne
qe psaiabiey
By Srinivasulu Algaskhanpet (Sr. SAP SD Consultant) Page 1TRANSFER OF REQUIREMENTS
2. In Material Master under sales general/olant data maintain availability check or
checking group.
WF S&D > Basic functions > Availability check and Transfer of Requirement >
Transfer of Requirements > Define Requirement Classes
Requirement Class is the controlling factor for the availability check and transfer of
requirement.
Requirement class actually controls whether to pass sales order requirement to MRP or not.
It also controls whether to pass the requirement as normal stock or special stock.
011 - Delivery requirement KeB-IPO
041 -Order/Delivery requirement (040 - Make to order
Snow ens Sw ee
By Srinivasulu Algaskhanpet (Sr. SAP SD Consultant) Page 3TRANSFER OF REQUIREMENTS
2. Define Requirement Type:
Path: SPRO > S&D > Basic functions > Availability check and Transfer of Requirement >
Transfer of Requirements > Define Requirement Types
‘The purpose of requirement type is it helps to determine requirement class into sales
document.
A requirement type is assigned to a single requirement class., however, a requirement class
may be assigned to more than one requirement type.
‘The requirement type is displayed in sales order.
F Newenes QOH BE
[__RaTy Requirements type
|e31 order requrement 033 _Order requirements a
Tit Order/delvery equrerent Oi _Order/delvery rear
‘Dev of mat. to subconjresery. S10 Delvery wo MRP
TSF Gross planned ndep. reamts 202 Gross reams planing
‘The standard requirement types are:
011 - Delivery requirement
041 - Order/Del. requirement
KE - Make to order
KEB- IPO
3. Determination of requirement types using transaction:
Here we assign MRP type "PD" to our item category "TANS"
TANS + PD = 041
suesnmient of Remdement Types t0 080600 |
RG Tre [RaTy Q- Requrementstpedescipton
ang W 01 Deberyrequrement
fraus x0
[]FRIS PD 0s! 1 Orderdeherrequrerent
RS z Thdv.custord. w/o consumo
By Srinivasulu Algaskhanpet (Sr. SAP SD Consultant) Page 4TRANSFER OF REQUIREMENTS
Note: In origin of requirement (Q) if we assign "2" then system will give first preference to
"Item cat group + MRP Type" while determining requirement type in to sales document.
4, Define procedure for each schedule line category:
Path: SPRO > S&D > Basic functions > Availability check and Transfer of Requirement >
Transfer of Requirements > Define procedure for each schedule line category
No MRP
Determinstic MRP
63 Leg oO
In this configuration step check availability and requirement in schedule line category.
5. Block quantity confirmation in delivery blocks:
Path: SPRO > S&D > Basic functions > Availability check and Transfer of Requirement >
Transfer of Requirements >Block quantity confirmation in delivery blocks
% vewentres BH ORRR
Jos. Bottleneck materal a oO
In this step we can block quantity confirmation for delivery.
6. Maintain requirements for TOR:
Path: SPRO > S&D > Basic functions > Availability check and Transfer of Requirement >
‘Transfer of Requirements >Maintain requirements for TOR
Q. Client requirement is if sales order is blocked for credit, he wants to block the confirmations?
Where is the control?
Change View "Criteria for Creating Requirements (Availability) for Ord
72eaeaa
Ez Requirement: ‘SyRoutne System requir.
By Srinivasulu Algaskhanpet (Sr. SAP SD Consultant) Page 5TRANSFER OF REQUIREMENTS
A. Routine no: 101
7. Maintain requirements for purchase and assembly order:
Q. In third party and IPO process if order is blocked for credit, system should not generate
Block construction
no: 102
Create Order and check whether system is determining requirement type into sales document
or not.
G8 6 OP How B
sssisetp.[ wee aa
‘aise (Feat essed sitet i
eaten i) sts ss eae
fount, [ae
AnoieB= Pes
punaw & y
7 ar
cody mn. 9 a
: th?
ye ae
te aasamiee Pe
We can see the requirement type under procurement tab.
By Srinivasulu Algaskhanpet (Sr. SAP SD Consultant) Page 6