You are on page 1of 1
Appen LAPP GROUP T32 32: Schedule of Installation Methods of Cables (Including Reference Method) Table 32-1: Method of Installation of Cables Bee ue Gees Sheathed cables clipped direst oor ng on ‘2 nommetale surtace Method 1 Ge nee nn) ‘Sheathed cables embedded sree a ‘masonry brickwork, concrete lester or the like (ater than thermal insulating materia, Method 1 Cs Single core non-sheathed cables In metal oF ron-metale conduit ona wal or eli Method 3 teprremacwanaamareins | ap Se ese a Fee ep a a = wie ieohe mete YA / thermally conductive surface on one te Method 4 ‘Muticore cables having nonmetalic sheath, Inmetalle or non metalic eandut ono wall oreaing Method 3 +f The wats assumed to conto n outer weather sr, thea neulaton and an Ina sino plesterboard or wood-ke maria having a coetcent of nea transfer not less than 10 Wm2K. The cond sed soa to be close to, ut not necessanly touching, the ner ski, Hest rom te eae is assumed to escape {hreugh tenner sn cy. (sre etererceto 7571 Sa Mera Mosse eon, sro ea vse Me ESTET Sass 70 For current information see www.appeableasialappgroup.com

You might also like