Format for Joint inspection by the Superintending Engineer and State
Technical Agency for Bridges
(Reference para 4.3.1 of Operations Manual sub para 5) HIGH LEVEL SUBMERSIBLE BRIDGE NEAR VILLAGE MAZANIYA RAMPUR MEWASA MARG TO Name of work: PIPLODA AT CH: 0/550 KM Date of Visit:
Name of General Manager Shri: D.D. Pandey
INDORE (MP )
Name of Superintending Engineer:- Shri:-VIJAY GUPTA
UJJAIN Sl.No. Item To be filled in by STA 1 Name of the proposed Bridge HIGH LEVEL SUBMERSIBLE BRIDGE NEAR VILLAGE MAZANIYA RAMPUR MEWASA MARG TO PIPLODA AT CH: 0/550 KM
2 Length of proposed Bridge 60.00 Mts
(Excluding approaches) 3 Width of Bridge Proposed 8.40 Mts
4 Width of existing road carriage way 3.75
5 Sl.no. of CN1 of the road 22
6 OMMS reference of the road including year -
7 Type of obstruction Slab
8 Type of river bed material Sand with bolder particals
9 Type of Terrain PLAN
10 Are the banks well defined ? Yes
11 Length of approach on either side to be 76.80
constructed 12 Has this been already included in the road YES DPR ? 13 Traffic category taken in pavement design T4 of the road 14 Bridge alignment Straight reach of the cause way
15 Height of embankment of approach road 6.00 Mts
from the lowest bed level 16 Are flood marks,if any,available on an No existing structure ? 17 Highest Flood Level (HFL) 102.01 Mts
18 Ordinery flood Level (OFL) 101.51 Mts
19 Lowest Bed Level (LBL) 97.57 Mts
Sl.No. Item To be filled in by STA 20 Average ground level 98.30 Mts
21 Empirical Formula for discharge calculation Manning
22 Is toposheet available for calculation of "Yes"
catchment area ? 23 Name of the nearest place for which highest KALAPIPAL rain data in the mm / hour as per Meterological Department data 24 Rugosity Co-efficient for calculating velocity 0.045 25 Type of proposed Bridge Slab Drain 12.0 mts C/C 26 Type of Super structure R.C.C. Solid Slab
27 No.of spans proposed 5
28 Is the water way prop[osed to be less than "Yes"
calculated effective linear water way ? 29 Has any pit or bore hole dug to assess to "Yes" foundation streta ? 30 Type of proposed foundation Shallow Isolated foundation
31 Are river protection works on up stream as well "NO"
as down stream with cut of wall proposed ? 32 Type of river protection,if any -
33 If rocky streta anticipated has opinion of "YES"
geological expert sought for assesing suitability of location of bridge ? 34 Present arrangement for movement of traffic To make the road all weather as i.e.wheather a causeway/low level bridge is traffic is hindered for more than already existing If yes,reasons for proposing 6 hours during monsoon Long span bridge 35 Atleast 4 photographs of bridge site, indicating the alignment,feasibility,tentative Atteched herewith levels of road and bridge and inspection of bridge site 36 Specific remarks of STA/S.E.about the proposal -