You are on page 1of 13

REPUBLIC OF THE PHILIPPINES

TABLE OFFICE OF THE CITY/MUNICIPAL


ENGINEER/BUILDING OFFICIAL
OF CONCRETE SUNBREAK

CONTENTS 150mm THK. CHB W


DISTRICT/CITY/MUNICIPALITY PLASTER AND PAINT

LAND USE & ZONING


ARCHITECTURAL

675

A-1 PERSPECTIVE VIEW & TABLE OF
CONTENTS

A-2 GROUND, SECOND FLOOR, ROOF,


REFLECTED CEILING PLANS

A-3 LONGITUDINAL, CROSS SECTION,


FRONT, REAR, RIGHT, LEFT SIDE

7000
ELEV.

A-4 LEFT SIDE ELEV., SCHED. OF LINE & GRADE


DOORS & WINDOWS, BALCONY
RAILING, EAVES,
VENT., & RAMP DETAILS

A-6 STAIR, HANDRAIL DETAILS

A-5 TOILET, CONC. COUNTER, 


SUN BREAKER DETAILS

2500
ARCHITECTURAL 
RAILING (SEE D

STRUCTURAL

S-1 FOUNDATION, SCHEDULE OF SLAB STRUCTURAL


2ND FLOOR & ROOF FRAMING PLAN

S-2 DET. STAIR ON GRADE, RAMP &


BEAM, FOOTING/TIE BEAM/COLUMN
DETAIL
S-3 TRUSS DIAGRAM, STAIR DET.
DETAILS OF STEEL CONNECTION

1 
A-1 SCALE : N T S
SANITARY

ELECTRICAL

E-1 GEN. NOTES, LEGEND, LOAD


SCHEDULE, RISER DIAGRAM, SINGLE
LINE DIAGRAM

E-2 POWER LAYOUTS(GRND & 2ND FLR)


LIGHT'G LAYOUTS(GRND & 2ND FLR)
ELECTRICAL

SANITARY

P-1 PLUMBING RO-IN LAYOUT, ROOF MECHANICAL


DRAIN LAYOUT & ISOMETRIC VIEW

P-2 SEPTIC TANK, CATCH BASIN DETAILS


LEGEND, NOTES & DESIGN CRITERIA

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:


DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

 ENCODED BY: MMC DepED 


S
AND
SCHOO
L
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG NATHANIEL Q. MENDOZA LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
 CHECKED BY: LGP
SHEET CONTENTS :


SE
L FAC I L IT I E

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


NG IN

PERSPECTIVE VIEW & TABLE OF CONTENTS


EER ING D

PDO III, PFSED-DepED ARCHITECT III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
ICA

MERALCO AVENUE, PASIG CITY


IV I

S S IO
PFSED-DepED DepED DepED
PHY
LOCATION : DATE :
N
De p E D

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


CONCRETE SUNBREAKER
            6mm THK. MARINE PLYWOOD CEILING

w/GROOVE ON 50x50mm CEILING


9000 9000 4500 600 9000 9000 4500 600
JOISTS (PAINT FIN.)
150mm THK. CHB WALL 4500 4500 4500 4500 600 4500 4500 4500 4500
PLASTER AND PAINT FIN. CONCRETE CEILING VENT. (SEE
SUNBREAKER (SEE DETAIL)
DETAIL) GA.24 PLAIN G.I. GUTTER
1 ON 12x300mm THK.

A-3 FIBER CEMENT FASCIA


675

1000
 BOARD

W-1 W-1 W-1 W-1


W-1
WF1

LANDING LIGHTING FIXTURE
WF1 WF1

6mm THK. ORD PLYWOOD CEILING

dn. w/6mm GROOVE ON 50x50mm


CLEILING JOISTS (PAINT FIN.)
7000

CLASSROOM-3 CLASSROOM-4

7000
FL-1 FL-1

CHALKBOARD

CHALKBOARD
WF1

W-2 W-2 W-2 W-2


D-1 D-1 D-1 D-1

 25mm
DEP.
25mm
DEP.
25mm
DEP.
25mm
DEP.

2500

2500
FL1 C O R R I D O R


FD FD FD FD FD
FD FD

1000
RAILING (SEE DETAIL) ROOF LINE

1  A-3

A-2 SCALE : 1 : 100 METERS

4 
A-2 SCALE : 1 : 100 METERS

     
9000 9000 4500

150mm THK. CHB WALL


4500 4500 4500 4500
     
1
PLASTER AND PAINT FIN.
A-3 9000 9000

600 4500 4500 4500 4500 4500 600

LN. OF SUNBREAKER
W-3 W-4
675

800
850
1100

WF1 WF1
SHE 1
W-1 W-1 W-1 W-1 HE RD RD RD RD RD RD
D-4 D-4 A-3

1000
D-3

1100
800

D-3


D-2

7000
7000

CLASSROOM CLASSROOM HCR

1 1 4776
9500

FL1 FL1 GA.26 CORR. G.I.


SHEET ROOFING

7000
WF1
PAINT FINISH

W-2 W-2 W-2 W-2


D-1 D-1 D-1 D-1 GA. 26 PLAIN G.I. SHT.

 25mm
DEP.
25mm
25mm
DEP.
25mm
RIDGE ROLL PAINT FIN.

DEP. DEP. UP
2500

FL1 C O R R I D O R

 GA.26 PLAIN. G.I.


FD FD FD FD FD FD FD
SHEET FLASHING ON
12x300mm FIBER
2500

CEMENT FASCIA BOARD


UP RAMP PAINT FINISH
RAILING (SEE DETAIL) UP


2
 A-4
1000

LN. OF STRUCTURE

GA.26 PLAIN. G.I.


RD


RD RD RD RD RD SHEET GUTTER

2 7
PAINT FINISH

A-2 SCALE : 1 : 100 METERS


A-4
3 
A-2 SCALE : 1 : 100 METERS

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:


DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

 ENCODED BY: MMC DepED 


S
AND
SCHOO
L
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG NATHANIEL Q. MENDOZA LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
 CHECKED BY: LGP
SHEET CONTENTS :


SE
L FAC I L IT I E

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


NG IN
EER ING D

PDO III, PFSED-DepED ARCHITECT III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
GROUND, SECOND FLOOR, REFLECTED CEILING &
ICA

MERALCO AVENUE, PASIG CITY


IV I

S S IO
PFSED-DepED DepED DepED ROOF PLAN
PHY
LOCATION : DATE :
N
De p E D

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


     
600 9000 9000

4500 4500 4500 4500 4500 600

APEX OF TRUSS

2500
SEE TRUSS DETAILS

TOP OF ROOF BEAM

3200
10200

W-1 CLASSROOM 3 W-1 W-1 CLASSROOM 4 W-1 W-1
SECOND FLOOR LEVEL
3
LANDING

A-3 SCALE : 100

W-3

3200
200x200mm
GLAZED WALL

  
TILES

   GROUND FLOOR LEVEL


W-1 CLASSROOM 1 W-1 W-1 CLASSROOM 2 W-1
HE SHE

325
9500
NAT. GRD. LN.
9500 1000 7000 2500 1000
1000 7000 2500 1000
TOP OF TRUSS
EXPOSED CEILING UNDER
APEX LINE OF TRUSS

  
SLAB PAINT FIN.

GA. 26 CORR. G.I.

2500
9500
2500

SHEET ROOFING
SEE TRUSS DETAIL
(PAINT FINISH) 1000 2500 7000 1000

APEX LINE OF TRUSS


TOP OF ROOF BEAM
TOP OF ROOF BEAM

538
GA. 26 PLAIN G.I. SHEET GA. 26 CORR. G.I.
GUTTER ON 12x300mm SHEET ROOFING (PAINT

2500
FIBER CEMENT FASCIA BOARD FINISH)
(PAINT FINISH)

3200
3200

10
W-1 W-2
TOP OF ROOF BEAM GA. 26 PLAIN G.I.
A-5
SHEET GUTTER ON
12x300mm FIBER
150mm THK. CHB CLASSROOM
CEMENT FASCIA BOARD SECOND FLOOR LEVEL 3
CORRIDOR

6725
PLAIN PLASTER
SECOND FLR. LVL.
(PAINT FINISH)
6725

PAINTED FIN.

3200
50mm GA# 40
150mm THK. CHB PLAIN G.I. PIPE

3200
PLASTER PAINT FIN. HANDRAIL
12
3200

W-1 W-2
32mm Ø G.I. PIPE SECOND FLR. LVL.
A-4

6725
HANDRAIL WITH 32mmØ 150mm THK.
VERT. SUPPORT CLASSROOM
GROUND FLOOR LEVEL 1 CHB WALL
@300mm O.C. (PAINT PLASTER PAINT

325
GROUND FLR. LVL.
FIN. GRD. LN.
325

FINISH) FIN.

3200
NAT. GRD. LN.
EXPOSE CEILING
32mm Ø G.I. PIPE

2  HANDRAIL WITH 32mmØ


VERT. SUPPORT
UNDERSLAB PAINT FINISH
6 
GROUND FLR. LVL. @300mm O.C. (PAINT
A-3 SCALE : 1 : 100 METERS
A-3 SCALE : 1 : 100 METERS

325
NAT. GRD. LN. FINISH)

4 
      A-3 SCALE : 1 : 100 METERS
     
9000 9000 9000 9000 600
600 4500 4500 4500 4500 4500 600
600 4500 4500 4500 4500 4500

APEX LINE OF TRUSS APEX LINE OF TRUSS


GA.26 CORR. G.I.
GA.26 CORR G.I. SHEET
SHEET ROOFING
ROOFING (PAINT FIN.)
(PAINT FINISH)
2500

2500
GA.26 PLAIN G.I.
GA.26 PLAIN G.I.SHT. SHEET GUTTER ON
TOP OF ROOF BEAM TOP OF ROOF BEAM
GUTTER ON 12x300mm 12x300mm FIBER
THK FIBER CEMENT CEMENT FASCIA BD.
FASCIA BOARD (PAINT (PAINT FINISH)
FIN.)
3200

3200
D-1 D-1 D-1 D-1
PLAIN CEMENT
PLASTER PAINT WALL
100mm THK. CHB RAILING
FINISH

W-2 W-2 W-2 W-2


w/50mmØ G.I. PIPE HANDRAIL W-1 W-1 W-1 W-1 W-1
W-1
SECOND FLOOR LEVEL (PAINT FINISH) SECOND FLOOR LEVEL
6725

6725
CONCRETE SUN

BREAKER (SEE
DETAIL)
3200

3200
D-1 D-1 D-1 D-1 32mmØ G.I. PIPE W-4 W-3
HANDRAIL w/32mmØ
VERT. SUPPORT @300mm
D-1
W-2 W-2 W-2 W-2 O.C. (PAINT FIN.) W-1 W-1 W-1 W-1
GROUND FLOOR LEVEL GROUND FLOOR LEVEL
325

325

NAT. GRD. LN. FIN. GRD. LN.

1  5 
A-4 SCALE : 1 : 100 METERS
A-3 SCALE : 1 : 100 METERS

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:


DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

 ENCODED BY: MMC DepED 


S
AND
SCHOO
L
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG NATHANIEL Q. MENDOZA LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
 CHECKED BY: LGP
SHEET CONTENTS :


SE
L FAC I L IT I E

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


NG IN

FRONT, REAR, RIGHT & LEFT ELEVATIONS


EER ING D

PDO III, PFSED-DepED ARCHITECT III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
ICA

MERALCO AVENUE, PASIG CITY


IV I

S S IO
PFSED-DepED DepED DepED
PHY
LOCATION : DATE :
N
De p E D

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


900 4 EQUAL PARTS = 2500 2 EQUAL PARTS = 1400 4 EQUAL PARTS = 2500
4 EQUAL PARTS = 600
700
900

7-BLADES

7-BLADES
300
300

300

±635

±635
600

14-BLADES

14-BLADES
±1200

±1200
2400
2400

2400

2400

2400
2100

2100
2054
STAINLESS STEEL

1200

1765

1765
KICKING PLATE
800

1500

900
900
300

300
FFL FFL

CLASSROOM TOILET (DISABLED) TOILET TOILET (CUBICLE)


JALOUSIE WINDOWS WITH CLEAR GLASS
BLADES ON STANDARD ALUMINUM
TANGUILE PANEL DOOR ON 50X150 MM HOLLOW CORE FLUSH TYPE SWING HOLLOW CORE FLUSH TYPE SWING DOOR SWING DOOR ON 50X100 JALOUSIE WINDOWS WITH CLEAR GLASS JALOUSIE WINDOWS WITH CLEAR GLASS BLADES JALOUSIE WINDOWS WITH CLEAR GLASS

THK. YACAL/GUIJO JAMB W/ FIXED DOOR W/ MARINE PLYWOOD FACING W/ MARINE PLYWOOD FACING INSIDE AND YACAL/GUIJO DOOR JAMB BLADES ON STANDARD ALUMINUM CASING ON STANDARD ALUMINUM CASING AND FIXED BLADES ON STANDARD ALUMINUM CASING W-4 CASING ON 50X150 YACAL/GUIJO
D-1 D-2 D-3 D-4
AND FIXED CLEAR GLASS TRANSOM ON CLEAR GLASS TRANSOM ON 50X150 JAMB COMPLETE WITH HARDWARES
CLEAR GLASS TRANSOM COMPLETE INSIDE AND ORDINARY OUTSIDE
ORDINARY OUTSIDE COMPLETE W/ COMPLETE WITH HARDWARES
W-1 W-2 W-3 ON 50X150 YACAL/GUIJO JAMB COMPLETE AND ACCESSORIES
WITH HARDWARES AND ACCESSORIES
COMPLETE W/ HARDWARES AND HARDWARES AND ACCESSORIES ACCESSORIES 50X150 YACAL/GUIJO JAMB COMPLETE WITH YACAL/GUIJO JAMB COMPLETE WITH WITH HARDWARES AND ACCESSORIES
ACCESSORIES PROVIDE KICK PLATE HARDWARES AND ACCESSORIES HARDWARES AND ACCESSORIES

CONCRETE HOLLOW
1  GA#26 CORR. G.I.
BLOCKS
A-1 SCALE : 1:100 ROOFING SHT. PAINT FIN.

CONCRETE SLAB 1000


6mm THK. MARINE PLYWOOD
POLYETHYLENE SHEET DAMP PROOFING
TOP CHORD SEE STRUCTURAL DETAIL CEILING ON 50x50mm CEILING

GRAVEL BEDDING JOIST @600mm BW

38mmØ TEKSCREW 38mmØ TEKSCREW


2-32mmØ G.I. PIPE
C-PURLIN (SEE STRUC'L DETAIL) GA#26 GI STRAP

200
HANDRAIL w/32mmØ COPPER RIVET
VERT. SUPPORT @300mm SAG ROD SEE STRUCTURAL DETAIL
12x300mm FIBER CEMENT
OC (PAINT FIN.)
6mm THK. MARINE PLYWOOD CEILING
FASCIA BOARD FIX W/METAL


SCREW ON STL. FRAME PAINT
6 ON 50x50mm CEILING JOIST
FINISH

900
@600mm BW

NOT TO SCALE
GA#26 GI GUTTER PAINT FIN.
A-4 6mm THK. ORD. GA#26 GI STRAP
12mMØ STEEL DOWEL
PLYWOOD CEILING W/ ROOF

700
20x20X2mm ANGULAR BAR
EMBEDD IN CONC. 6mm GROOVE ON
9
BEAM GA#26 G.I. GUTTER ON 12x300mm FOR FASCIA BOARD FRAME
A-4 FIBER CEMENT FASCIA BOARD PAINT
NON-SKID PLAIN CEMENT 50x50mm CEILING COATED WITH PRIMER
32mmØ G.I. PIPE HANDRAIL FIN.
JOIST @600mm BW
w/32mmØ VERT. SUPPORT FLOOR FIN. w/ GROOVE
BASKET STRAINER
LINES (PAINT FIN.)
@1200mm O.C.(PAINT FIN.)

100
BASKET STRAINER

NON-SKID PLAIN
75mmØ PVC DOWNSPOUT PAINT
CEMENT FLOOR FINISH 8
2 FINISH
w/GROOVE LINES A-4
200

75mmØ PVC
A-4
DOWNSPOUT PAINT
CEILING VENT (SEE DETAIL)
200

900

FINISH
700

1200

 
900

7 8
700

2A DETAIL SECTION
300

A-1 SCALE 1:10 M


A-4 SCALE : 1 : 40 m.
A-4 SCALE : 1:10 m.

SEE TRUSS DET.


3 DET. ELEVATION OF RAMP 100

A-4 SCALE 1:50 M


100X100 CONCRETE

  SKIRTING

4500

6mm THK. ORD.


100

PLYWD. CEILING
32 mm Ø G.I PIPE
(PAINTED) ON
150

VERTICAL SUPPORT
CONC. BEAM
@ 600mm ON CENTER 50x50mm CLG. JST.
PROVIDE 12mmØ STEEL @600mm OC BW

 DOWELS (PAINTED FIN.)


10mmØ @250mm
ON CENTER

100
6mm THK. MARINE
FR. QUARTER-C
PLYWD. CEILING
MOULDING CEILING
CONTACT TO CONC. (PAINTED) ON

100
2500

50x50mm CLG. JST.


C O R R I D O R WALL
@600mm OC BW

5 SPOT DETAIL
1200
A-4 SCALE 1:5 M
9  12x12mm GROOVE

11 A-4 SCALE : 1 : 10 m.
BEAM REBARS SEE
STRUCTURAL DETAIL
25x25mm WOOD VENT.
A-4
 FR. 25x75mm WOOD PROVIDE INSECT SCREEN
175

FRAMEPAINT FIN.
50 12 325 12 50
675
1400
1400

RAMP UP

3
300

A-4

NON-SKID PLAIN
3600 12 
CEMENT FLOOR
5150
1175 6 25 300
6mm THK PLYWOOD
A-4 SCALE: 1:10 mts.

FINISH w/GROOVE TOTAL RUN OF RAMP 32mmØ G.I. PIPE


25x25mm WOOD VENT FR.25x75mm CEILING ON 50x50mm
LINES
4 HANDRAIL w/32mmØ PROVIDE INSECT SCREEN VENT FRAME CEILING JOIST @600mm
VERT. SUPPORT @300mm
A-4 (PAINT FIN.) OC. BW (PAINT FIN.)
O.C. (PAINT FIN.)
2 DET. PLAN OF RAMP
10  11 
A-4 SCALE 1:50 M
A-4 SCALE : 1 : 10 m.
A-4 SCALE : 1 : 5 m

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:


DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

 ENCODED BY: MMC DepED 


S
AND
SCHOO
L
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG NATHANIEL Q. MENDOZA LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
 CHECKED BY: LGP
SHEET CONTENTS :


SE
L FAC I L IT I E

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


NG IN

LONGITUDINAL & CROSS SECTION, DOOR & WINDOW


EER ING D

PDO III, PFSED-DepED ARCHITECT III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
SCHEDULE, EAVES, VENTILATION, BALCONY &
ICA

MERALCO AVENUE, PASIG CITY


IV I

S S IO
PFSED-DepED DepED DepED
PHY
LOCATION : DATE :
N
De p E D
DAMPROOFING DET.

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


 3
A-5
 5 50mmØ G.I. PIPE SCH.
50mmØ G.I. PIPE SCH. 250
40 PAINT FIN.
4500 A-5 40 PAINT FIN.
2200 2200 50mm%% G.I. PIPE SCH.
100 146 40 PAINT FIN.
100
50mmØ G.I. PIPE

50
SCHEDULE 40
19mm sQUARE BAR WELD (PAINT FINISH)
19mm SQUARE BAR
TO G.I. PIPE HANDRAIL
W-1 WELDED TO G.I. PIPE
@146mm O.C.
HANDRAIL @146mm O.C.

PLAIN CEMENT STEEL


19mm SQUARE BAR
TROWELL FIN.

900
WELDED TO G.I. PIPE
19mm SQUARE BAR
2500

LANDING HANDRAIL @146mm O.C.


WELDED TO G.I. PIPE

TYPICAL

W A L L
HANDRAIL @146mm O.C.
9

900
50
8
A-5

900

850
6
A-5 SECOND F.F.L.
5 

TYPICAL
A-5

±168
18 17

146
ANCHOR @R.C. STAIR

19 16
A-5 SCALE : 1:20 mts

50
LANDING ANCHORED @R.C. STAIR
TREAD
15 50mmØ G.I. PIPE SCH.
DN
40 w/19mm SQ. BAR
4672mm

14
@146mm ON CENTER 146
25x25x2mm ANGULAR
7000

13 PAINT FIN.

12 292
BAR NOSING
7  9 
=

25
TYPICAL
G.I. 11
A-5 SCALE : 1:20 mts A-5 SCALE : 1:20 MTS
EACH

. PAINT FIN.

MARINE PLYWOOD
10
4 

25
292mm

N 50x50mm CEILING 2x25x25mm


4672

00mm BW
A-5 SCALE : 1:20 mts
ANGULAR BAR

168
KSCREW NOSING @STEP
@

STRAP
12x12x2mm FLAT
TREADS

VET

FIBER CEMENT BAR STRAP

ARD FIX W/METAL @600mm O.C.


STL. FRAME PAINT
175
16

50mmØ SCH. 40 G.I.


175 50mmØ G.I. PIPE
50
UTTER PAINT FIN. PIPE PAINT FIN.
SCHEDULE 40


50 50

m ANGULAR BAR
6 (PAINT FINISH)
19mm SQ. BAR
A BOARD FRAME
TH PRIMER  A-5 SCALE : 1:10 mts ANCHORED TO THE WALL

(PAINT FIN.)

TREAD
RAINER

(SECOND FLOOR TO GROUND FLOOR)

100

50
2 

FROM
19 mm SQUARE
BAR ANCHORED
TO THE WALL
1:50 mts
C
A-5 SCALE :

900mm
PAINT (PAINT FINISH)

   7000 2500

8 
ROOF LINE 2460 4540
m. 4500

2200 A-5 SCALE : 1:5 MTS

2067

 10 
W-3 W-4
11 A-5 SCALE : 1:5 MTS
3200
1100

W-1 A-5
TOILET 4 146
2328
100

A-6

200
100 650 100
2 RISERS @±168
850

900
700
SECOND FLOOR LINE CORRIDOR
19 50mm G.I.PIPE SCH. 40
17
C HANDRAIL w/25mm SQ.
337

18
18 16
LANDING 17
50mmØ SCH. 40 G.I. BRACKECT @600mm O.C. C
16 PAINT FIN.
19 15 15
PIPE HANDRAIL w/19mm
SQ. BAR @146mm O.C
14
17 RISERS @±168 = 2856

14 38mmØ STAINLESS
13
4672mm

STEEL GRAB BAR 1


12 5

200
13
7000

W-3 0
5mm THK.

0
11

20
12 PLASTER PAINT FIN. FACIAL MIRROR 700 400 10
3200

100mm THK CHB RAILING

700
9
2863

PLASTER AND PAINT FIN.


2763
=

11 8

600
SECOND FLOOR LEVEL
EACH

50
200x200mm VITRIFIED
10 50mmØ G.I. PIPE SCH.
GLAZED WALL TILES 6
40 w/19mm SQ. BAR
295

300
5

1726
1625
4672

200
9 @146mm ON CENTER 292 4
292mm

PAINT FIN. CS LAV 3


342

8

±168
WC

±900

900
WC 2
787

700
7
GROUND FLOOR LINE
1
CORRIDOR SCALE: 1:50m

SHE HCR
@

SCALE: 1:20m
6
16TREADS

325

9 NATURAL GRADE LINE


5

4
A-5 11 
2460 4672
A-5 SCALE: AS SHOWN
292

3
16 TREADS @ 292 = 4672
50

 1

UP 3 
(GRD FLOOR TO SECOND FLOOR)
A-6 SCALE : 1:50 mts.
1 
A-5 SCALE : 1:100 mts

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:


DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

 ENCODED BY: MMC DepED 


S
AND
SCHOO
L
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG NATHANIEL Q. MENDOZA LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
 CHECKED BY: LGP
SHEET CONTENTS :


SE
L FAC I L IT I E

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


NG IN
EER ING D

PDO III, PFSED-DepED ARCHITECT III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY STAIR DETAILS
ICA

MERALCO AVENUE, PASIG CITY


IV I

S S IO
PFSED-DepED DepED DepED
PHY
LOCATION : DATE :
N
De p E D

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


  200x200mm GLAZED
WALL TILES
PLAIN CEM. PLASTERED 3mm THK. FACIAL
PAINT FIN. MIRROR ON AL. FRAMING
4500
PLAIN CEM. PLASTERED 1100
PAINT FIN.
PLAIN CEMENT PLASTER 700
PAINT WALL FINISH

100 1700 200X200 VITRIFIED 200x200mm VITRIFIED


CERAMIC WALL 1100
2ND FLR. LVL. WALL TILES (GLAZED)
TILES ( GLAZED ) W-3
350 400 350
4
512

600
LANDING LVL. A-7 LANDING

AD

200

1710
3200

600
W-3 W-4 COUNTER SINK

300
2688

2738
2613

100

800
CONC. COUNTER

1600
SINK

300
800

WC
6

800
MALE A-7
CLASSROOM LVL. TOILET
50

300
TOILET LVL.

600 URINAL

2  5  6 


A-6 SCALE : 1:20 M
A-6 SCALE : 1:20 m.

A-6 SCALE : 1:40 m.


2680 1820

3
4 
W-3 W-4 A-6 A-6 SCALE : 1:20 m.

8
A-5

850

SHE
1100

SECOND FLOOR LINE


HE
2
A-6 LANDING FLOOR LINE 17
D-4
2074

D-4
16
D-3 50mmØ SCH. 40 G.I.

PLASTER PAINT FIN.


15 PIPE HANDRAIL w/19mm
SQ. BAR @600mm OC.
UNDER SLAB 14
1100

9
13
850

D-3 38mmØ STAINLESS A-5


12
STEEL GRAB BAR
W-4
5mm THK. FACIAL 11

0
20
MIRROR 150mm THK CHB WALL
700 400 10 PLASTER PAINT FIN.
3200

9
2856

8
2763

600
7
200x200mm VITRIFIED
D-2
GLAZED WALL TILES 6

2100

2100
5

200
1700

300
1625
292 4
3
342
HCR

±920
2

168
1
SHE HCR
GROUND FLOOR LINE

NATURAL GRADE LINE


1609 1074

1 
A-6

SCALE : 1:30 m.
3

A-6 SCALE : 1 : 30 m.

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:


DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

 ENCODED BY: MMC DepED 


S
AND
SCHOO
L
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG NATHANIEL Q. MENDOZA LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
 CHECKED BY: LGP
SHEET CONTENTS :


SE
L FAC I L IT I E

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


NG IN
EER ING D

PDO III, PFSED-DepED ARCHITECT III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
TOILET DETAILS, SUNBREAKER &
ICA

MERALCO AVENUE, PASIG CITY


IV I

S S IO
PFSED-DepED DepED DepED
PHY
LOCATION : DATE :
N
De p E D
RAMP DETAILS

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


           
4500 4500 4500 4500 4500
LEVEL
4500 4500 4500 4500 4500

F-3 F-3 F-3 F-3 F-3 F-3


C-3 C-3 C-3 C-3 C-3 C-3 RG-1 RG-1 RG-1 RG-1 RG-1
 TG-3 TG-3 TG-3 TG-3 TG-3

2ND FLOOR LEVEL TO


RG-2

RG-2

RG-2

RG-2

RG-2

RG-2
TG-2

TG-2

TG-2

TG-2

T-1

T-1

T-1

T-1

T-1

T-1
7000

7000
100mm THICK
SLAB ON FILL
WITH Ø10mm
SPACED AT 400
BOTHWAYS

F-2 F-2 F-2 F-2 F-2 F-2


C-2 C-2 C-2 C-2 C-2 C-2

 TG-3 TG-3 TG-3 TG-3 TG-3


 RG-1 RG-1 RG-1 RG-1 RG-1
2500

2500

RG-1

RG-1
RG-1

RG-1

RG-1

RG-1
TG-1

TG-1

TG-1

TG-1
B

S-2

F-1 F-1 F-1 F-1 F-1 F-1 RG-1 RG-1 RG-1 RG-1 RG-1
 C-1
TG-3
C-1
TG-3
C-1
TG-3
C-1
TG-3
C-1
TG-3
C-1

FOUNDATION LEVEL TO
LC-120x40x20x2.0 PURLINS
Ø12mm CROSS
SPACED @ 750 mm O.C
BRACINGS
WITH Ø10 SAGRODS @ MIDSPAN

C 
A  S-1 SCALE : 1:100 M.

S-1 SCALE : 1:100 M.

L1 L2

      L1/3 TOP BAR


L1/3 L2/3 TOP BAR

4500 4500 4500 4500 4500

L1/6 BOTTOM BAR L1/5 L2/5 BOTTOM BAR

G-3 G-3 G-3 G-3 G-3a


S-1 S-1 S-1 S-1


STAIR WELL
D 

G-5
S-1
7

B-1 B-1 B-1 B-1 CB-1


7000

G-5

-
G

B-2

S-2
S-1 S-1 S-1 S-1

REBAR SPACING ALONG SHORT DIRECTION REBAR SPACING ALONG LONG DIRECTION
in mm in mm
G-2 G-2 G-2 G-2 G-2
 FLOOR
LEVEL
SLAB
MARK
THICK-
NESS
REBAR
LEFT SUPPORT MIDSPAN RIGHT SUPPORT
REBAR
LEFT SUPPORT MIDSPAN RIGHT SUPPORT REMARKS

in mm SIZE SIZE
S-2 S-2 S-2 S-2 S-2 BOTT. BOTT. BOTT. TOP BOTT. TOP BOTT. TOP BOTT.
2500

TOP TOP TOP


G-4

G-6

G-6

G-6

G-6

G-4

LEVEL
SECOND
G-1 G-1 G-1 G-1 G-1

S-1 100 10Ø 200 300 - 300 200 300 10Ø 250 300 - 300 250 300 TWO-WAY

S-2 100 10Ø 300 300 - 300 300 300 10Ø 300 300 - 300 300 300 TWO-WAY

B 
S-1 SCALE : 1:100 M.

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:


DESIGNED BY:
DEPARTMENT OF EDUCATION

 ENCODED BY: MMC DepED 


S
AND
SCHOO
L
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG BERNADETTE N. AQUINO LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
 CHECKED BY: LGP
SHEET CONTENTS :


SE
L FAC I L IT I E

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


NG IN
EER ING D

PDO III, PFSED-DepED STRUCTURAL CONSULTANT, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
FOUNDATION, SCHEDULE OF SLAB
ICA

MERALCO AVENUE, PASIG CITY


IV I

S S IO
PFSED-DepED DepED DepED
PHY
LOCATION : DATE :
N
De p E D

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


 AS SHOWN
Ø10 SPACED

LEVEL C-1 C-2 C-3


MAIN BARS
Ø10 @250 Ø10 @250
CUT BARS
 
1-Ø10
NOSING BAR
NGL

2500
350 350 350

100

125
5
TIE BEAM

12
Ø10 300mm TEMP
(SEE SCHEDULE)
BARS BOTHWAYS

100
2ND FLOOR LEVEL TO

400
350

350

350
4-Ø10 CONT. BARS
ROOF DECKLEVEL

125
Ø10 @250
Ø10mm
CUT BARS W-2

1000

MAIN BAR: MAIN BAR: MAIN BAR:

8-Ø16mm 8-Ø20mm 8-Ø20mm


A  B  C 
TIES : Ø10 mm TIES : Ø10 mm TIES : Ø10 mm SCALE NTS SCALE 1 : 25M SCALE 1 : 50M
S-2 S-2 S-2
1@50, 8@75, REST @ 1@50, 8@75, REST @ 1@50, 8@75, REST @
150mm TO CENTER 150mm TO CENTER 150mm TO CENTER

L1 L2 L3
350 350 350

L2/3 L2/3 L3/3 L3/3

2D 2D LAP SPLICES ARE ALLOWED 2D 2D LAP SPLICES ARE ALLOWED 2D


ONLY IN THIS PORTION ONLY IN THIS PORTION C
P
TO
FOUNDATION LEVEL TO

350

350

350

D
2ND FLOOR LEVEL

L2/5 L2/5 L2/5 L3/6

2-Ø12mm SIDE BARS

FULL WELD

MAIN BAR: MAIN BAR: MAIN BAR:

8-Ø16mm 14-Ø20mm 12-Ø20mm


D 
TIES : Ø10 mm TIES : Ø10 mm TIES : Ø10 mm
S-2
1@50, 8@75, REST @ 1@50, 8@75, REST @ 1@50, 8@75, REST @
150mm TO CENTER 150mm TO CENTER 150mm TO CENTER D 
S
S-3
B E A M S C H E D U L E

BEAM S T E E L R E I N F O R C E M E N T S
DIMENSIONS S T I R R U P S
FLOOR BEAM
LEVEL MARK ( in / mm ) REBAR
LEFT MID SPAN RIGHT
Ø10mm
L
(mm Ø) (UNLESS NOTED OTHERWISE)
b h TOP BOTTOM TOP BOTTOM TOP BOTTOM

NGL
G-1 200 400 Ø20mm 2 2 2 2 2 2 1@50, 6@100, REST@200

G-2 200 400 Ø20mm 3 2 2 2 3 2 1@50, 6@100, REST@200

G-3 200 400 Ø20mm 3 2 2 2 3 2 1@50, 6@100, REST@200


D

Y-BARS
X-BARS G-3a 200 800 Ø20mm 3 2 2 2 3 2 1@50, 8@175, REST@300
W

G-4 200 400 Ø20mm 2 2 2 2 5 3 1@50, 6@100, REST@200

2ND FLOOR LEVEL


t

Y-BARS G-5 250 500 Ø20mm 5 3 2 4 5 3 1@50, 8@100, REST@200


100

X-BARS
G-6 200 400 Ø20mm 2 2 2 2 5 3 1@50, 6@100, REST@200
100 mm THICK
L G-7 250 500 Ø20mm 5 3 2 6 5 3 1@50, 8@100, REST@200
GRAVEL BEDDING

PLAN SECTION B-1 200 400 Ø16mm 4 2 2 2 4 2 1@50, 6@100, REST@200 E 


B-2 200 400 Ø16mm 2 2 2 4 2 2 S
1@50, 6@100, REST@200
S-3
E  CB-1 200 400 Ø16mm 4 2 4 2 4 2 1@50, 6@100, REST@200

SCALE NTS
S-2
RG-1 200 400 Ø16mm 2 2 2 2 2 2 1@50, 6@100, REST@200

ROOF
LEVEL
RG-2 200 500 Ø16mm 5 3 2 3 4 3 1@50, 8@100, REST@200

1-Ø10mm A-307

 TG-1 300 500 Ø20mm 3 2 2 2 4 3


ANCHOR BOLT

1@50, 8@100, REST@200

BEAM
FOOTING DIMENSIONS (mm)

TIE
REINFORCEMENT REMARKS
FOOTING TG-2 300 500 Ø20mm 4 3 2 2 4 3 1@50, 8@100, REST@200

MARK LENGTH WIDTH DEPTH Thickness


BAR X BAR Y TG-3 300 500 Ø20mm 2 2 2 2 2 2 1@50, 6@100, REST@200
(L) (W) (D) (t)

F-1 1400 1400 1500 300 7 - 16mmØ 7 - 16mmØ SQUARE FOOTING


STB-1 200 400 Ø16mm 3 2 2 4 3 2 1@50, 6@100, REST@200
BEAM
STAIR

F-2 2300 2300 1500 300 12 - 16mmØ 12- 16mmØ SQUARE FOOTING STB-2 200 500 Ø16mm 4 2 2 4 4 2 1@50, 8@100, REST@200
G 
SCA
F-3 2100 2100 1500 300 11 - 16mmØ 11 - 16mmØ SQUARE FOOTING S-3

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:


DESIGNED BY:
DEPARTMENT OF EDUCATION
  ENCODED BY: MMC DepED 

S
AND
SCHOO
L
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG BERNADETTE N. AQUINO LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
 CHECKED BY: LGP
SHEET CONTENTS :


SE
L FAC I L IT I E

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


NG IN
EER ING D

PDO III, PFSED-DepED STRUCTURAL CONSULTANT, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
DET. STAIR ON GRADE, RAMP & BEAM
ICA

MERALCO AVENUE, PASIG CITY


IV I

S S IO
PFSED-DepED DepED DepED
PHY
LOCATION : DATE :
N
De p E D

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


S-4
L

C
 S-3

200 4500
S-4

 50 50 50 50 2200 2200

6mm GUSSET PLATE

BOTTOM CHORD 
2500

W-2
W
1 - 4-Ø12x300mm LONG
1

2
-

W-2

W-2
W

-
ANCHOR STUDS

W
2

2
F

W-2
S-2

W-2
-

-
W

W
S-4

50

2442
2
W-2

- 200x200x10mm

W-2
W

2834
EMBEDED PLATE

1187
W-1
W-2

W-2

200

100
STB-2
E
W-2 S-4
2L-2x2x1/4 STRUT W-2

1000 2-SPAN @1250 2-SPAN @1125 4-SPAN @1187.5 1000 DC-1


DC-1 P
2500 2250 4750

50
9500 S-3
SEE SCHEDULE OF

4500mm
2ND FLOOR LEVEL
DN S-2 (2ND/3RD LVL)
CB-1 FOR DETAIL OF REIN.
CB-1

 PLAN

7000
A G-2

=
G-3a M
STB-2

EACH
SCALE 1 : 25 M S-3
S-3 2150

300mm
N

4500

3200
S-3

2856
6mm GUSSET PLATE
292



0
200
BOTTOM CHORD (FULLY

20
TREADS
WELDED TO BASE PLATED)

B-2
TO 6mm GUSSET PLATE (TYP.) 50 50 50 50

168
D P
R CH
C HO OR
P D MARK DESCRIPTION QTY SIZE 4-Ø12x250mm LONG
TO
ANCHOR STUDS

15
W-1 TOP & BOT. CHORDS 2L 2"x2"x1/4" GROUND FLOOR LEVEL
200x200x10mm BASE
PLATE
W-2 WEB MEMBERS 2L 2"x2"x3/16"

FULL WELD
COLUMN OR BEAM
 S-3
TG-3

O
KING POST

D  K  L 


1 : 5 M
S-3
SCALE
O RD S-3 SCALE 1:50 M
S-3 SCALE 1:50 M

CH
P
TO 6mm GUSSET PLATE (TYP.)

Ø16 @200 Ø10 @300


FULL WELD
TEMP BARS

Ø12@ 125 TOP Ø12@ 125


MAIN BARS STEP BARS 2-Ø10

SECTION STEP BAR

200mm 200

200
Ø12 @120



200
H  Ø16 @ 200
MAIN BAR MAIN BAR:
FULL WELD SCALE 1:5 M 4-Ø16mm
S-3

0
 

0
F M

2
6mm GUSSET PLATE (TYP.) Ø12 @300
TIES : Ø10 mm

SCALE 1 : 5 M 1@50, 8@75, REST @


S-3 S-3 SCALE 1:25 M
150mm TO CENTER

N  DC-1
BOTTOM CHORD SCALE 1 : 25 M
SEE TRUSS ANCHORAGE DETAIL
S-3 (FROM LANDING TO
E  W
-
1
Ø10 @300 2ND/3RD FLOOR LEVEL)

SCALE 1 : 5 M 120x40x20x2.0mm
S-3 STEEL C-PURLINS
2-Ø10
±750mm O.C.
STEP BAR
10mmØ SAG ROD WITH 200mm
STANDARD NUTS & Ø10 @300
75

W-2
WASHERS @ EACH END
±7
50
LC-120x40x20x2.0 6-Ø10x200mm LONG
2-Ø10
PURLINS
STEP BAR
75

1-Ø10mm A-307
ANCHOR BOLT
L-2.5x2.5x1/4

100
100
100 100
100
CB-1
W-2
Ø10mm @
TG-3
300mm o.c.

3-Ø10mm STB-2

 O  P 


G  I  J  S-3
SCALE 1 : 25 M
S-3
SCALE 1 : 25 M

SCALE 1 : 5 M SCALE 1 : 10 M SCALE 1 : 10 M


S-3 S-3 S-3

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:


DESIGNED BY:
DEPARTMENT OF EDUCATION
  ENCODED BY: MMC DepED 

S
AND
SCHOO
L
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG BERNADETTE N. AQUINO LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
 CHECKED BY: LGP
SHEET CONTENTS :


SE
L FAC I L IT I E

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


NG IN
EER ING D

PDO III, PFSED-DepED STRUCTURAL CONSULTANT, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
TRUSS DIAGRAM, DETAIL OF STAIR
ICA

MERALCO AVENUE, PASIG CITY


IV I

S S IO
PFSED-DepED DepED DepED DETAILS OF STEEL CONNECTION
PHY
LOCATION : DATE :
N
De p E D

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 1 2 3 4 5 6

A A
a b c d 2

2 2 2 2

CLASSROOM CLASSROOM

F F
S

a b c d
2 2 2 2

Sab Sf Scd Sf
B B
Sefg
LP e f g
2 2 2 2

B B LP

C C
F
5

SECOND FLOOR POWER LAYOUT SECOND FLOOR LIGHTING LAYOUT


SCALE : 1:100 M SCALE : 1:100 M

1 2 3 4 5 6 1 2 3 4 5 6

A A S EF
EF

a b c d
2 2 2 2 S
CLASSROOM CLASSROOM h
Shi
F F
i
a b c d
ENCLOSED AIR CIRCUIT BREAKER
RATING: 220 V, 2P, 20AT, 50AF
M
LP

TO LINE SIDE OF LP
2 2 2 2

OVERHEAD SERVICE ENTRANCE


LP
FA

REFER TO RISER DIAGRAM

Sab Sf Scd Sf
B B
4

Sefg
e f g
TO C.O.

LP
2 2 2
1
B B

C C
F
TO FA LP
3

GROUND FLOOR POWER LAYOUT GROUND FLOOR LIGHTING LAYOUT


SCALE : 1:100 M
SCALE : 1:100 M

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: VDS
DEPARTMENT OF EDUCATION

FOUR (4) CLASSROOM ENCODED BY: MMC DepED E-1


S
AND
SCHOO
L
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG VENERANDO D. SAHAGUN LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS : GROUND FLOOR POWER LAYOUT

2
SE
L FAC I L IT I E

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


NG IN

SECOND FLOOR POWER LAYOUT


EER ING D

PDO III, PFSED-DepED ENGINEER III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
GROUND FLOOR LIGHTING LAYOUT
ICA

MERALCO AVENUE, PASIG CITY


IV I

S S IO
PFSED-DepED DepED DepED
PHY
LOCATION : DATE :
N
De p E D
SECOND FLOOR LIGHTING LAYOUT

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


GENERAL NOTES LEGEND LOAD SCHEDULE
SYMBOL DESCRIPTION
1. ALL ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITH
THESE PLANS AND SPECIFICATIONS. THE APPLICABLE PROVISIONS - CEILING LIGHT OUTLET
OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC). - 2 x 40 WATTS FLUORESCENT LAMP
PANELBOARD: LP
2

MAIN : 60AT, 100AF, 2P, 230V


THE RULES AND REGULATION OF THE LOCAL ENFORCING AUTHORITY F - CEILING FAN OUTLET
AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY. CIRCUIT BREAKER
S/Sa - ONE GANG DEVICE SWITCH CKT. VA
DESCRIPTION WIRE & CONDUIT SIZE
THE ELECTRICAL WORKS SHALL BE UNDER IMMEDIATE SUPERVISION NO. LOAD
S ab - TWO GANG DEVICE SWITCH VOLT POLE AT AF
OF A DULY REGISTERED ELECTRICAL ENGINEER.
S cde - THREE GANG DEVICE SWITCH CONV. OUTLET - 6 x 180W 2
2. THE ELECTRICAL SERVICE POWER IS 1-PHASE, 2-WIRE, 1 1080 230 2 20 50 3-3.5mm THW IN 15mm C
230 V AC, 60 Hz. S 3W - THREE WAY DEVICE SWITCH 2
2 CONV. OUTLET - 6 x 180W 1080 230 2 20 50 3-3.5mm THW IN 15mm C
3. WIRING METHOD SHALL BE AS FOLLOWS : Sf - FAN CONTROL SWITCH
LIGHT OUTLET - 6 x 100W 2
3 EXHAUST FAN OUTLET - 1 x 180W
780 230 2 20 50 3-3.5mm THW IN 15mm C
a. FEEDERS AND RISERS - INTERMEDIATE METALLIC CONDUIT S EF - EXHAUST FAN SWITCH
2
b. LIGHTING, POWER RECEPTACLE - POLYVINYL CHLORIDE CONDUIT - RACEWAY CONDUIT CONCEALED IN CEILING 4 LIGHT OUTLET - 10 x 100W 1000 230 2 20 50 3-3.5mm THW IN 15mm C
BRANCH CKT., & AUXILIARY SCH. 40
2
- RACEWAY CONDUIT CONCEALED UNDER FLOOR 5 LIGHT OUTLET - 14 x 100W 1400 230 2 20 50 3-3.5mm THW IN 15mm C
4. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE
"THW" UNLESS OTHERWISE INDICATED IN THE PLAN. THE MINIMUM 6 S P A R E 1500 230 2 20 50
- PANELBOARD
SIZE OF WIRE FOR POWER AND LIGHTING CIRCUIT HOMERUN SHALL BE
2
- CKT. BREAKER, RATING AS INDICATED TOTAL 6840
3.5mm AND INSULATED FOR 600 VOLTS. SMALLEST RACEWAY SHALL
- DUPLEX CONVENIENCE OUTLET, GROUNDING TYPE
BE 15mm TRADE/NOMINAL
O
I SIZE.
10 AMPS, 250 VOLT WITH MODERN PLATE COVER
5. ALL OUTLET BOXES SHALL BE GALVANIZED GAGE NO. 16 DEEP 2
TYPE WITH FACTORY KNOCKOUTS. EF
- EXHAUST FAN OUTLET, SINGLE, GROUNDING TYPE
IL = 6840 = 29.7 A FEEDER: 2-14mm THW IN 25mm C
10 AMPS, 250 VOLT WITH MODERN PLATE COVER
230 V PROTECTION: 60 AT, 100 AF, 2P, 230 V
6. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED LP
TYPE FOR THE PARTICULAR LOCATION AND PURPOSE OF USAGE. - HOMERUN DIRECT TO PANELBOARD

- PUSH BUTTON
7. GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND
POWER CIRCUIT AS PER PHILIPPINE ELECTRICAL CODE REQUIREMENT. - ENCLOSED AIR CIRCUIT BREAKER

FA - FIRE ALARM CONTROL PANEL


8. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOWS :
F - FIRE ALARM STATION OUTLET
a. LIGHT SWITCH - 1.20 M ABOVE FINISH FLOOR
B
- VIBRATING BELL OUTLET
b. CONVENIENCE OUTLET - 0.30 M ABOVE FINISH FLOOR. OVERHEAD SERVICE ENTRANCE
B - FIRE ALARM BELL CONNECTED TO 220V AC, 1O,
2 WIRE, 60 Hz FITTED WITH
c. PANELBOARD - 1.50 M ABOVE FINISH FLOOR M - SERVICE METER 25mm O TYPE "F" CONDULET

- SERVICE ENTRANCE
d. FIRE ALARM STATION OUTLET - 1.50 M. ABOVE FINISH FLOOR
BUILDING WALL

TO SIMILAR OUTLET
@ SECOND FLOOR
2ND FLOOR LINE
e. PUSH BUTTON OUTLET - 1.20 M ABOVE FINISH FLOOR

PANEL LP
f. FIRE ALARM & VIBRATING BELL - 0.30 M BELOW CEILING LINE

2-14mm THW2 B B
IN 25mmORSC

60AT, 100AF, 2P, 230V AC


TO LINE SIDE OF LP

20 20 F
METERING CONDUIT
20 20 3-3.5mm THW2
KWHR METER IN 15MMORSC

20 20
FA
2-3.5mm THW2
IN 15MMORSC

ENCLOSED ACB TO NEAREST C.O.


RATING: 20AT, 50AF,
230V, 2P
GROUND TERMINAL 2-3.5mm THW2
IN 15MMORSC

1500 mm
1800 mm
2 COPPER WIRE
#8mm BARE

ELECTRICAL FIRE ALARM VIBRATING BELL


16mm x O
2.40m GROUND FLOOR LINE
I

COPPERWELD
GROUND ROD
FIN. GRADE LINE
2
1-8.0mm BARE COPPER WIRE
IN 15mmO C

SINGLE LINE DIAGRAM


16MMO x 240MM LENGTH
GROUNDING ROD COPPERWELD

NOT TO SCALE

RISER DIAGRAM
NOT TO SCALE

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:

TWO STOREY
DESIGNED BY: VDS
DEPARTMENT OF EDUCATION

FOUR (4) CLASSROOM ENCODED BY: MMC DepED E-2


S
AND
SCHOO
L
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG VENERANDO D. SAHAGUN LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
G.I. ROOF SCHOOL BUILDING CHECKED BY: LGP
SHEET CONTENTS :
SHEET CONTENTS : LOAD SCHEDULE
2
SE
L FAC I L IT I E

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


NG IN
EER ING D

PDO III, PFSED-DepED ENGINEER III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY GENERAL NOTES LEGEND
ICA

MERALCO AVENUE, PASIG CITY


IV I

S S IO
PFSED-DepED DepED DepED SINGLE LINE DIAGRAM RISER DIAGRAM
PHY
LOCATION : DATE :
N
De p E D

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


     
9000 9000

600 4500 4500 4500 4500 4500 600

RD RD RD RD RD RD

1000

7000


2500

75mmPVCDS


1000

LN. OF STRUCTURE

C

B
RD RD RD RD RD RD

2 


7
5

75mmPVCDS
m
m
Ø
P-1

P
SCALE : 1 : 100 METERS

P
75mmPVCDS

E
D

V
N
C

C
I
L

D
Ø

S
F
m

O
m

O
0

1
5

5
1

0
m


m
C
P
D
     2500 1000

C
3950

C
L

B
A
S
S
R


O

50mmØ PVCVTR
O
M

7
5
P

m S

75mmPVCDS
2300

2000

m
C
C

D
B

Ø
SEPTIC TANK

75mmPVCDS
5
m
M

m
E
T
PVCSP TO

Ø
S
Y
S

P
V

F
E
G
NEAREST SEWER

1
A
D DP

D
N

5
I

0
C


R

RTVCVP
SYSTEM

0
m
m

3
C
m

0
2
0

0
M
5

0
1

2
150mmCPD 150mmCPD

2
5
CB CB

0
0
CB

Ømm05

3
9
S

5
5

0
0

1
5

P
m
0

0
T
m
C
m

0
I
Ø
L
m

100mmØ

0
Ø

B
A

P
7

T
1
S
1
P

A
0
V

S
5
PVCSP

V
P

N
R
C

T R
R

I
0

m
V


R
V

S
m
T

O
m

E
Ø
m
W

O
m
75mmØ

M
Ø

P
C

PVCWP m
75mmØ
V
P
P
75mmØ PVCDS 75mmØ

C
100mmØ PVCSP

7
L
P

W
PVCDS

5
P
C

m S
I

V
PVCDS
75mPVCDS

C
50mmØ PVCVTR

Ø
Ø
75mPVCDS

P
75mPVCDS

m
75mmPVCDS

V
7

2
5
0
m
m
Ø
P
V
C
V
T
W
N
P Ø

C
RISER

1
5

E
S m
H
P

S
S
WC

C m
m S

A
V

P
50mØPVCTR

Y
V 0

R
m
C

E
D

1
GICWL

T
T
C

S
C
SHE 12mmØ GICWL

O
E
B

P
O

T
F

M
D
HE W

S
T

E
V

W
C
50mmØ PVCVTR V

E
1
S
P

R
0
H
100mmØ PVCWP

0
Ø

PVCVTW
E

m
RISER m

m
m

Ø
12mmØ

50mØPVCTR
FD 5

P
F

V
D

C
S
P
CO

C
1
CS

S
5

H
2

1
0
ROOF LINE

2
50mmØ PVCVTW

m
R

W
m

m
5
C
Ø

Ø
F

0
50mmØ
CO

R
C
D

m R
I
G
C

G
m
S
100mmØ PVCSP

I
D

I
Ø
E
C

C
P
1

L
W
WC

W
P
A
5

L
V

V
5
0

C
0

V
m
m

T
HCR

m
m
12mmØ GICWL

R
Ø
0
C

m
C

P
2
P

m
5
O

V
m
D

Ø
0
R UP

C
FD

R
CDP

m R

V
I
A

P
m

T
S
M
CLASSROOM CLASSROOM

V
Ø
E

W
C
P

I
50mmØ PVCVTW

S
P

C
LAV

P
V

W
C

L
V
RISER

T
W
CO

U
P

m S

P
V

m
C
150mmØ

20mmØ GICWL

Ø
C
B
M
E
T
S
Y
S
E
G
A
D DP

N
I
N C

A
R
A Ø
m
m

I
0

M
5
1

O
T

L
W
C
R N I

Y
L
E I G

P
P
M Ø

U
m
G

S
m

T A
V

8
M

O
T

A
W
G
V
UP

 FD FD
75mPVCDS

75mPVCDS

75mmØ 75mmØ
75mPVCDS

75mmØ PVCDS
PVCDS PVCDS
RAMP
WATER SUPPLY
GICWL

150mmØ CDP
UP
TO MAIN
38mmØ

150mmCPD 150mmCPD
CB CB CB

3 
GV

P-1
TO MAIN DRAINAGE SYSTEM

TO MAIN DRAINAGE SYSTEM

SCALE : N T S

2 
M
GV

P-1 SCALE : 1 : 100 METERS


CDP

CDP
150mmØ

150mmØ

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:


DESIGNED BY: NQM
DEPARTMENT OF EDUCATION

 ENCODED BY: MMC DepED 


S
AN
D SCHO
OL
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG ELIAS M. EMEL B. CUBA II LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
 CHECKED BY: LGP
SHEET CONTENTS :


S
IE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


ENG
FAC IL IT

INEERING D

HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY PLUMBING RO-IN LAYOUT, ROOF DRAIN LAOUT,
PDO III, PFSED-DepED ENGINEER III, PFSED-DepED
AL

ISOMETRIC VIEW
IC

MERALCO AVENUE, PASIG CITY


IV

SI
I

YS

PFSED-DepED DepED DepED


ON
LOCATION : DATE :
PH
De ED
p .

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545



CB CATCH BASIN

CDP CONCRETE DRAIN PIPE

CO CLEAN OUT

CV CHECK VALVE

HB HOSE BIBB

FD FLOOR DRAIN

GICWL GALVANIZED IRON COLD WATER LINE (SCH. 40)

4650 100mm THK. + FIN. SLAB W/ GICWR GALVANIZED IRON COLD WATER RISER (SCH. 40)
10mmØ BENT UP 2 OUT OF 3
100mm THK. + FIN. SLAB W/ AT L/4 FROM FACE SUPPORT BW
10mmØ REBARS AT 200mm O.C. GV GATE VALVE
BENT UP 2 OUT OF 3 AT L/4
FROM FACE SUPPORT. BOTH WAYS 150X300mm RC BEAM W/2-16mmØ
TOP AND BOT. REBARS & 10mmØ STIRRUPS MH MANHOLE

100
1@50,3@100, REST @300mm O.C. NGL
600 MH
AIR SPACE
PVCDS POLYVINYL CHLORIDE DOWNSPOUT
NGL AIR SPACE
INLET

100
100

PVCDP POLYVINYL CHLORIDE DRAIN PIPE


VAR

MANHOLE MANHOLE

AIR SPACE INLET WATER LEVEL 700


PVCDS POLYVINYL CHLORIDE DOWNSPOUT
100

PLASTERED W/WATERPROOFING
COMPOUND OR APPLY ONE FACE
BITUMEN TAR 150 400 150
PVCSP POLYVINYL CHLORIDE SOIL PIPE
350

300
25
WATER
LEVEL
PVCVAC POLYVINYL CHLORIDE VENT. ACROSS CEILING
150 700 150
DIGESTIVE (W. LEVEL)

WALLS REINFORCEMENT
LEACHING 10mmØ VERT. & HOR. BAR PLASTERED W/ WATERPROOFING 10mmØ REINF. VERT & HOR.
PVCVP POLYVINYL CHLORIDE VENT. PIPE

150
2125

@200mm OC BW COMPOUND OR APPLY ONE @200mm O.C BWAYS


1600

CHAMBER
FACE BITUMEN TAR
DRAINAGE PIPE
DIGESTIVE CHAMBER
PVCVS POLYVINYL CHLORIDE VENT STACK
GRAVEL BED

700

400
100mm THK. SLAB W/ OUTLET
10mmØ REBARS @ 150 2500 150
INLET PVCVTR/W POLYVINYL CHLORIDE VENT TROUGH ROOF/WALL
300mm BOTH WAYS 2% SLOPE
125

2800
PVCWP POLYVINYL CHLORIDE WASTE PIPE

150
100mm THK. + FIM. SLAB W/
10mmØ REBARS @300mm O.C. BW
PVCWS POLYVINYL CHLORIDE WASTE STACK
150 1000 150 3200 150

RD ROOF DRAIN

2  5a 
3  P-2 SCALE : 1:20 M
UD URINAL DRAIN

P-2 SCALE : 1:50 M WC WATER CLOSET


P-2 SCALE : 1:50 M

LAV LAVATORY

CS COUNTER SINK

2-10mmØ EXTRA
S-1a 100mm THK. + FIN. SLAB W/
BARS TOP/BOT. ON 10mmØ REBARS @ 300mm O.C. 
TWO PARALLEL SIDE
BENT UP 2 OUT OF 3 AT L/4
FROM FACE OF SUPPORT B.W. 1. GRADES OF HORIZONTAL PIPINGS
4650 RUN ALL HORIZONTAL PIPINGS IN PERPECT ALIGNMENT AND AT A FORM GRADE NOT LESS THAN TWO PERCENT (2%)
1000 3200
150 150 150
2. CHANGE IN DIRECTION
700
200 600 200 1100 150 700 150 1100
ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF FORTY-FIVE DEGREES (45°) WYES, LONG SWEEP
75mmØ PVCDS
QUARTER BEND, SIXTH-EIIGHT OR SIXTEENTH BEND. WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL TO VERTICAL A
150 400 150
SINGLE 1/8 BEND COMBINATION MAYBE USED ON VERTICAL STACKS AND SHORT QUARTER BENDS MAYBE USED ON WASTE
150MM THK. CHB W/ 10mmØ LINE, TEE AND CROSSES MAYBE USED IN BENT PIPES.
REBARS HOR. EVERY 2-LAYERS
75 VERT. @600mm O.C.
150

3. PROHIBITED FITTINGS
NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL AND WASTE LINES, THE DRILLINGS AND TAPPING

100
10mmØ BAR
OF HOUSE DRAIN, WASTE OR VENT PIPES AND USED OF SADDLE HUB AND BEND ARE PROHIBITED.
3-10mmØ (E.W.)
900

OUTLET HANDLE
CDP

1.
4. PIPE CLEAN-OUTS
600

(VARIABLE)
600 min.
50 CLEAN-OUTS ARE REQUIRED UNDER THE F0LLOWING CONDITIONS:
50 600 50

250 100 250 2% SLOPE


INLET
CDP a) EVERY CHANGE OF HORIZONTAL DIRECTION EXCEEDING TWENTY TWOAND ONE-HALF DEGREES (22 1/2°).
2800
2500

MH MH
2% SLOPE b) ONE AND ONE-HALF METERS (1.50m.) INSIDE THE PROPERTY LINES BEFORE THE HOUSE DRAINAGE CONNECTION.
50
c) EVERY FIFTEEN METERS (15.00m) IN HORIZONTAL RUN OF PIPES.
50 (TYP.) 2
OUTLET
d) AT THE END OF ANY HORIZONTAL PIPE LINES.

100
100

P-2

100
900

5. THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE WATERPROOFED.


50 50
6. NOT LESS THAN 0.30 METER OF AIR SPACE MUST BE LEFT BETWEEN THE TOP OF THE SEWAGE AND THE UNDER PART OF
50 50
150

VAULT ROOF SLAB.

S2 100mm THK. + FIN. SLAB W/


10mmØ REBARS @ 300mm O.C.
5b  7. NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE BUILDING.

INLET
BENT UP 2/3 OUT AT L/4 FACE
SUPPORT AND SHORT SPAN AND
10mmØ TEMP BARS @300mm E.W.
INLET 4  P-2 SCALE : 1:20 M 8. ALL PLUMBING WORKS SHALL BE UNDER THE SUPRVISION OF A LICENSED MASTER PLUMBER AND A LICENCED PLUMBING
CONTRACTOR.

3
P-2 SCALE : 1:10 M


P-2

5  i. LIVE LOAD_________________ 1000Pa


ii ALLOWABLE STRESSES
P-2 SCALE : 1:20 M

1  1. CONCRETE

a. FOR FOOTING, BEAMS AND SLABS

P-2 SCALE : 1:50 M fc'' = 20 MPa

2. CONCRETE MASONRY UNITS (LOAD BEARING CHB)


fm' =6.90 MPa, fm = 2.41 MPa
3. REINFORCING STEEL BARS
FOR BARS SMALLER THAN 16mmØ

fy = 230 MPa
4. ASSUMED ALLOWABLE BEARING CAPACITY Y = 100KPa


WATER TABLE IS 1500 BELOW GROUND LEVEL.

REPUBLIC OF THE PHILIPPINES DESIGNER: CHECKED BY : RECOMMENDING APPROVAL : RECOMMENDING APPROVAL : APPROVED BY : PROJECT TITLE : PROJECT NO: OWNER : SHEET NO:


DESIGNED BY: NQM
DEPARTMENT OF EDUCATION
  ENCODED BY: MMC DepED 

S
AND
SCHOO
L
DEPARTMENT OF EDUCATION MAXIMO M. CALBANG ELIAS M. EMEL B. CUBA II LUIS G. PURISIMA OLIVER R. HERNANDEZ RAMON C. BACANI
 CHECKED BY: LGP
SHEET CONTENTS :


SE
L FAC I L IT I E

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


NG IN

SEPTIC TANK, CATCH BASIN DETAIL, LEGEND, NOTES


EER ING D

PDO III, PFSED-DepED ENGINEER III, PFSED-DepED HEAD, PLANNING AND DESIGN UNIT CHIEF, PFSED-OPS UNDERSECRETARY
& DESIGN CRITERIA
ICA

MERALCO AVENUE, PASIG CITY


IV I

S S IO
PFSED-DepED DepED DepED
PHY
LOCATION : DATE :
N
De p E D

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

You might also like