You are on page 1of 22
API 1104 Class Study Questions Seetion(s) 1-4 ‘What topies does API 104 cover? 8) Gae welding of but welds B) Are welding of filler and socket welds (C) Welding carbon and tally tects D) Welding petoleur pipelines Rp Alba the abv 7 Which nondestructive testing method is specified in API 1104? A) Nicer test 1B) Bend tes for bun welds only (C) Radiographic exarainaion D) Metallurgical evaluation E) Allofthe above “Which welding process is specifically mentioned for use with this code? A) Flash butt 1B) Submerged Arc Ch Osyacerstene 1D) Gite Metal Arc 19 Allo ihestene ‘Which organization publishes most ofthe inspeetion test meth ete in APII087 A) ArT B) ASNT ©) ASTM by AWS, 5) NACE zation publishes mast of the ise metal specifications for By ASNT ASTM, b) BSI 5) NACE Which organization publishes a document on personnel cetfestion used by this Code? A) APL 1B) ASNT“, c) AWS b) ks! ) NACE APT 1104 Class Study Questions Section(s) 1-4 ‘What topics does API 1104 cover? A) Gas welding of bur weles B) Are welding of fillet and socket welds ©) Welding euton an ove siete D) Welding peroleum pipelines E) Alla theabave'= 7-7 \Whieh nondestrctive testing method is spesitied in APL 1104? Ay Nick-bre test 1B) Bend tex for bus welds only (C) Radiographic examination 1D) Metallurgica! evaluation F) All ofthe above Which weldiap praces ie specially mentinned for use with this cade? A) Flash but B) Submerged Are ©) Osyaeenstene Dy Gas Meta Are EY Allo thease Which organization publishes most ofthe inspeetivn test methods vite in API 11047 A) APL 5B) ASNT cy aster by ws NACE Which org this Code? zation publishes mest of the filer metal specifications for |Whict organization publishes » document on personnel eerificstion used by this Code? A) APL B) ASNT! ¢) AWS by st B) NACE, ‘Views inspection of welder qualification pipe reveals 3/64" deep undercut con an 8” diameter, 406” wall pipe, The maximum amount allowable for tis pipe is (A) 1/32" in depts B) 1/62" in depch (0) US2" in depth. oF 12-1285 pine wall thicb D) None af the above Aan §-5/8" diameer nipe has crack in the weld 2-1/4" long. ‘This weld may be repained i 'A) No repair is allowed on this pipe diameter B) IF the erack is less thon 8% of Wel length CC) Ih is authorized by the company D) All ofthe above Fy se ‘The procedure was established using SL line pipe witha yield of 42,000 psi \Whith ofthe following materials may'be welded with this procedure? A) 42,004 pa thru 64,999 psi minimum yield scength material B) 41,500 psi yield strength material () All materials regardless of yield strength ) None ofthe above Inadequate penetration of the rot is loeated on a produstion weld 3-78" diameter schedule 60 pipe, which has a wall thchness of 276". The length maybe yoni" By {6} Not more than $Y of weld length 1) Both A and C depending in diameter [A detajléd procedure for the production of radiographs shall be established and shill include: A) Radiation Source B) Radiographer's name ) None of the above D) Aand C above 2, tn the testing of fillet wel, the areas ofall gas pockets shall not exezed ‘A) M32" in diameter 'B) 1/8" in depth ©) 1/6" per (pocket) ) 29% of exposed surface aren (combined) B) Cand Dabove 45,2701 ceeds cin wc ler p49? 1 32 33 a 54 ol None ote sore ” 44, The number of butt weld test specimens for welder qualification in pipe ever FF dimer and wall hikes nf" 75 vot ana Be ci D) 16 B18 45, The rad a) By? © 14 bs E) 2s ide be test jigs bf tig ie ora 4 46. Visual inspection acceptability standards for production welds may be 'A) The seme a destrctve ess 1B) Not specified by the Code C) Defined by the company 1D) The seme as the radiographic method Py None ofthe shave 447. The eompany has the right 1 ingpest ‘A) Welding during the welding 1B) Welding ater the job is completed O)¢At a specified fequeney D) Allo the above E) None ofthe above 4. The masiimum distribution of gas pockets in pipe af" walls found in ‘A) Page 25 5) 9392. © Table 106 D) Figure 19 E) Figure 18 Ina pipe having an outside diameter of 1.90", we have two unrepaired bur- thus 1/8" in length, This condition is A) Defect 1B) Accepiable impzrfction C) Should be passed, andthe welder should be nade aware 1D) Should pass, for burn-thr is not harmfial to aweld 14, A single “V" araove is changed 10 a single procedure qualification requirements? AY No BB) Depends on the depth of penetration ve 12) Depends upon the equired etletve throat E) Band D above foove, Does this change the 15.Power Tools shall be used tien called: for ia dhe welding procedure specification. 8) True B) False C) Power Toals are not allowed to be used 1D) Gly power tools should be used E) Both A snd D 16, Radiographs should be processed to allow storage without discolaation for at Teast = yeoes when requene Ay) B)2 ow D) indefinitely 17. Which pf the following is not an seceptable method of testing welds? ‘AY Trepanaing 1) Rasiogrsply ) Ulrasonic D) Alef the above 18.1n 4 procedure qualiieation test for pipe having outside diameter of 4-1/2" thickness of 2", there shall be _b-mick Dréak tests and 2 root ben test. AY A nick fresh ide els B) 2 ick breaks ~ 2 face bers (C) 2nek breaks -2 root bends 1D) None ofthe above 19. production welding the width of the completed pipe weld face should be the A) Thickness ofthe pipe wall - 1/8" |B) Wien of te origins groove ©) Width ofthe woul groove + 18° 1B) Dime wide B) None ofthe above 7 ‘When qualifying a procedure, specimens for nie: bres testing may be maceo- etched belie being niches ‘AY For any welding process 'B) Awomatic and semi-automatic processes une (C) For submerged are welding only B) This satetn income B) Ferd neal ae et ely 21, When testing nick rakes te wi of rte ms be eat Oi Din 6 2m B) Dam Bi bardDatove 22 When using intemal line-up clamps, the completed part of the root bead. before relesing clamp shall be ____ when pipeis likely © move. A) 100% B) 50% <7 ©) 4 equally spaced segments 1D) Approximately spaced segments E) Cand Dabove 25, The tep"company” as used in API 1104 means The aswner compuny, or the ety 7 construction 1B) Any authorized representative acting on ownes's behalf ©) The prime conzactoe Dp) Any person offisialy employed Aad B 24, API104 cavers A) Gas welding B) Socket welds ) Semi-automutie welding D) None ofthe above E) ABandC // ageiwy in eleupe of ” 2, which wdng process ot ita understate? SS Sutmerges ewes. B) Gas welding — 8 Gas ansten Se weg 5) Gentes a elie Fx cored ae welding 6, For welder qualification tests, which salementistatmerts ae Ue? Ay Onc hendtest faure fs accepiale under cern condivons Destructive testing Is required ZO) Radiography sited D) BEC B) Nonserthe above / 21 For a M8" wall pipe, the maximum dimension nd di jee permitted herween two gas pockets ae Tor the permitied distance use 4. A) ue B) ige—18 © Usa Dd ) None of the above a6, Theron lenis of elongated linear porosity oceing in she root Pass 12 & ‘pele 12" in length shall not exceed at B) Qt Dp) 28" Hw +9, For eutomatic welding, which ofthe follow Tanen qualifying a welding procedure? ‘A) Sirens By ‘Decilty y (©) Impeetpropenies »/ DESC EE) None of the above 40. For automate welding the welding procedure specinesions mt be adhered to, except Aen lage pesca sri Hy he comes wove jn Setion 12.5 . 1p) The welder hasa better 82 B) Te inspector els in nt meses 1) qe welding tobe done isnot necessary FB) None of the above. S51 To qualify a but welding procedure, the nick brea tests may ‘A) Be broken by pling ina tensile machine» 1B) Be broken by supporting the ends and stising the eter ) Re broken hy supporting onc end and seing the ether end with « famier D) Allof the above ) None ofthe sbove ‘Welding procedures shall always be qualified by A) Destructive esting 8) Uluasonies C1 Radiographs D) Nondestructive testing is optional E) All ofthe aboss 7 For automatic weld welding pecifeation? £4) Preheat mens 3) Postheat methods ~ 8) Opewarsnane D) Joint design « B) Type of line-up clamp used which item(s) is nor required when establishing a $34. Welding shall not be done when the quality ofthe completed weld would be impsired by weather conditigne. Who makes this dxermination? a) Thecompany Co B) The welding inspector ) The welder D) The code 1B) Bath A and D above 35. A weld qualified for SMAW using E8016 electrode is also qualified 10 weld wih ‘y emis crabs 3B) E7010 gle © Ems 5) None othe above 36. Which ofthe following materials may be webled using APL 11042 ‘A) API sid. SL B) API su. SLX C) Any mate with ebetnisty and mechariea! properties complying with 4 D) AandB 5) AanéC for automatic welding, who abihing = welling poche iy th weld al be ermine 2) Theinpecor 3B) Desrtivem on-desmsve ning, 6) Visual examination ) Using sales woe '38. The crown reinforcement of api 'A) 1S" in center af ers eld should not exceed 3) 1.6mm oie 1B) 18" E) Band Cabove 39 In weling proceitre quan for manual welding. the procedure Spesfcton should consider a) Cleaning, 3) Removal of ie-pclam & Poston : D) Alef above 5) Roe of 40, mCP sualicon for mansl weg» change in ‘ieee sequnsenton 1) Welding amperage and vlogs 3) Hen niga empersare an ine ©) Filles ett mamber D) alleftheatove B) None of he above 41, Radiographic inspection of welding procedure uaficaon tex fr automatic sveldinatall be wed for 43) fAreas containing diseomtimstes wa 3) Bxaminon of the test pipe nipples ©) Laminations oe 1B) Aang above ) None ofthe above 42. For non-destuctive testing, the only type of crack accepuble, providing it doesn’t exceed 4,0 mm, is 'A) Shallow crater cracks B) Transverse cracks | CC) Surface crater racks B) All ofthe above E) None ofthe ahve 8 2 B) 2 vel Bel a ) None ofthe above 44. The mumber of burt weld tet specimens for welder gualifeston in pipe over 1 diameter an wall thickness a vot a Bik one Dy 16 BE) is 45. The rasof th ie fra ide ben test jigs A) 13i4 8) ona D3 E) 2s0t6" 46. Visual inspection acceptability standards f ‘A) The same a destructive ests 18) Not specified by the Code C) Defined by the company 1D) The seme as the radiographic method FF) None at the above roducion welds may be 41. The company has the right ro inspect 'A) Welding during the welding BB) Welding after the jo is completed C)rAta specified lrequeney D) Allof the abuve E) None ofthe above 48. The masienam dstibotion af gas pockets pipe of 1 wal is oud in A) Page 25 B) 9392 ) Tabte 105 D) Figure 19 E) Figure 18 49. The nowrdesinucive and destructive methods of tesing welders qualification welds shall meet requirements of for vial examination prior 16 A) 26 0r61 Stor ©) 3S0r30 D) 631 or6 ) None of the above 50, In welding procedure qualifiation. the location of est specimens int 13 inch siameter burt weld ae found in Aj Table 1 B) Figure 6 C) Figure 12 DB) All ofthe above E) None of the above 51, Exposed surfeee (not edges) of roat bends ave considered acceptable if no cemieks ov aer defects esceed 'A) 3 mm or the nominal thickness whichever is smaller 5) i/16mm ©) Yeineh D) 25mm 5) 79mm 52, Hand or manual cu bevels are permited by the Coa A} Forshon use only 1) For normal fel use CC) Inthe field with company authorization 1B) Only when normal welding is done” E) None of te above 5, "Wagc el sre loo nom as ‘Poca 3) Bum tro ©) Elman seg incon ‘D) Isolated inclusions — B) None of iabve 54, Who may authorize crack repair ale? |) Welder 8B) Inspector ©) Company D) Allofthe above E) None of the above ‘58. In 12,00 mm wall pipe the maximum standard peneuameter thickness is: A) 0.005 in B) 0.0125in. ©) 0.0175 in D) Alloftheabove F) None ofthe ahve 156, Butt welds bend test AA) They break ino B) Hive eracks aver 1/8" long in the ex (C) Have cracks over! long atthe edge D) All ofthe above E) None ofthe shove imens fll if 57. The but weld reinforcement should not exceed Ay V8 B) fush ©) ist 1) None of the above E) Allof the above 58, The non-destroctve testing acceptability standards may be used fr: ‘A) Radiography BB) Other nor-desructive test methods ) Visual inspection D) Allof the above E) None of the above 59, What is required when using electrodes from filer metal groups 5, 7. and 8° A) Re-qualifcaton i 'B) Inspection ©) ied sens ) ‘Shielding gas F) None ofthe ve (60, Automatic Welding procedures ae '8) Used in shop fbrication only B) Qualified by the X-Ray ofthe first production joint C) To be qualified prior the sat of rode welding D) Not covered by the code E) Written with coverage of 18 ess ial variables 61. Radiographic procedures for automatic welding re 'A) The same as for other welding B) Specially qualified CC) Not useful 1) Allowed for shop wse only E) Modified to find gas pockets 62, The acceptable automatic processes do not include: "A) Submerged are weld B) Gas metal are welding ) Electosieg are welding 1B) Gas rmngston are welding EE) Flux cored are welding 63. The radiographer is responsible for: A) Film storage B) Protestion and personnel monitoring of every man with or near radiation sources (6) Weld join f-ap epproval D) Remoral of defecss E) None of the above (64. For the optional nik: break tes specimen (automatic), the transverse notch shall not exceed indepth a) 16a" By 182" gy ine by 1s" Bt “The base materials used for welded pipe an fining shal: ‘A) Conform to API si SL 1B) Conform to AFI std SLX ©) Conform so APT std SUS 1D) Conform 10 AIS] STDs E) Any ofthe above 66, Radiography of welder qualification test Specimensis ‘A) Not discussed in API 1108 B}-"The method tobe used to locate good areas 0 cut for bend tests ) Allowed at the option ofthe Company 1B) The method to he used 10 locate ba afzas to cut for bend test 0 help disqualify welders E) Acceptable if it meets he standard of acceplaility in Section 1.0 6 Heavy las deposits on in sres of aut weld ea shal 1) Be tred oy ame oun 1) Bi tenone pve eds when reusnedby the Company, ©) Regu RE-QUALIFGSTION of tm welens Ope 1) Be case foreleg the Beat of Filer mal Be Reeser ahs ane Reise ea gis fe aot 8 Weld em sedi che amstp

You might also like