Professional Documents
Culture Documents
Tiempo para Programacion
Tiempo para Programacion
1.0
1.0
1.0
1.0
2.0
1.0
8.0
2.0
1.0
1.0
20.0 1 2 3 4 5 6 7 8
5.0 1 1 1 1 1
4.0
5.0 1 2 3 4 5
1.0
5.0 1 1 1 1
1.0
6.0 1 2 3 4 5 6
3.0
1.0
3.0
4.0
4.0
1.0
5.0
1.0
4.0
2.0
1.0
1.0
1.0
4.0
4.0
3.0
1.0
1.0
1.0
9.0
2.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
4.0
2.0
1.0
1.0
1.0
1.0
29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59
1 1 1 1 1
60
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA
Obra : CONSTRUION LOCAL MULTIUSOS Y CERCO PERIMETRICO EN EL COMPLEJO DEPORTIVO CERRO BLANCO - CALANA
Ubicación: Depatamento : TACNA
O BLANCO - CALANA
Distrito: CALANA
MES 01 MES 02
S/. S/.
6,475.68 0.00
1,077.44
1,263.60
1,070.80
331.17
620.94
157.30
650.50
165.91
138.02
1,000.00
58,043.9581 35,979.5807
58,043.96 0.00
12,772.05 0.00
3,573.11
1,649.47
3,945.11
1,708.68
1,895.68
36,970.39 0.00
7,895.42
3,648.54
25,426.43
8,301.52 0.00
556.91
703.97
817.85
2,428.00
3,794.80
0.0000 9,841.3468
0.00 107.21
107.21
0.00 9,734.13
1,886.81
1,001.07
1,188.52
5,657.73
0.00 7,229.15
1,932.88
5,296.27
0.00 17,261.35
0.00 6,753.67
4,243.91
2,509.77
0.00 10,507.68
302.46
192.95
160.52
1,903.82
1,750.66
3,557.72
2,153.94
53.76
191.13
240.71
0.00 1,647.73
44.35
27.40
531.36
301.53
169.61
239.98
333.50
0.00 6,149.53
0.00 5,193.28
3,642.21
1,551.07
0.00 956.25
100.38
597.87
258.00
0.00 500.00
500.00
64,519.63 42,629.11
6,451.96 4,262.91
70,971.60 46,892.02
------------------- -------------------
2,838.86 1,875.68
3,548.58 2,344.60
============ ============
77,359.04 51,112.31
60.22% 39.78%
60.22% 100.00%
CRONOGRAMA DE ADQUISICION DE MATERIALES - MANO DE OBRA - EQUIPO
OBRA
MEJORAMIENTO Y AMPLIACION DEL COMPLEJO DEPORTIVO PIEDRA BLANCA EN EL DISTRITO DE CALANA
:
UBICACIÓN TACNA - TACNA - CALANA
FECHA JULIO - 2010
Fecha 02/06/2008
41,821.76
MATERIALES
020008 ALAMBRE NEGRO RECOCIDO # 8 KG 5.50 20.41 112.26 78.5785 8.316
020105 CLAVOS PARA MADERA C/C 3" KG 5.50 5.04 27.72 19.404 150
020350 EMBELLECIMIENTO DEL AREA DE TRABA GLB 500.00 1.00 500.00 350 47.454
020409 ALAMBRE NEGRO N°16 KG 5.50 28.76 158.18 110.726 39.138
020410 ALAMBRE NEGRO N°8 KG 5.50 23.72 130.46 91.322 10.47
021060 CLAVOS DE 1" KG 10.00 3.49 34.90 24.43 43.989
021061 CLAVOS DE 4" KG 5.50 26.66 146.63 102.641 67.2045
021099 CLAVOS DE 3" KG 5.50 40.73 224.02 156.8105 8.1
025103 PERNOS 1/4" X 6" PZA 4.50 6.00 27.00 18.9 605.2455
029742 ACERO CORRUGADO F'Y = 4,200KG/CM2 KG 4.50 448.33 2,017.49 1412.2395 72.9
031102 LAMINA REFLECTIVA ALTA INTENS. P2 270.00 0.90 243.00 170.1 61.2
040000 ARENA FINA M3 40.00 5.10 204.00 142.8 99.405
050003 PIEDRA CHANCADA DE 1/2" M3 47.00 7.05 331.35 231.945 797.1
050100 AFIRMADO M3 25.00 106.28 2,657.00 1859.9 518.805
050104 ARENA GRUESA M3 27.00 64.05 1,729.35 1210.545 118.5
050108 CONFITILLO M3 50.00 7.90 395.00 276.5 551.34
050133 MATERIAL CLASIFICADO PARA BASE (INC. M3 30.00 61.26 1,837.80 1286.46 622.08
050376 PIEDRA DE 1/2" M3 30.00 69.12 2,073.60 1451.52 5.061
060151 CORDEL DE ALGODON M 0.50 33.74 16.87 11.809 66
100232 INODORO TQUE. BAJO NORMAL BLANCO UND 220.00 1.00 220.00 154 1373.256
130006 ASFALTO RC-250 GLN 12.00 381.46 4,577.52 3204.264 4715.1576
210000 CEMENTO PORTLAND TIPO I (42.5KG) BOL 21.90 717.68 15,717.19 11002.0344 300
210305 TAPA DE FºFº PARA AGUA UND 25.00 40.00 1,000.00 700 540
210306 CAJA DE CONCRETO CONEXION DESAGU UND 45.00 40.00 1,800.00 1260 360
210307 TAPA DE FºFº PARA DESAGUE UND 30.00 40.00 1,200.00 840 14.031
290300 TIZA EN POLVO KG 1.50 31.18 46.77 32.739 9.7353
290304 YESO BOL 8.70 3.73 32.45 22.7157 0.144
290501 CINTA TEFLON RLL 1.20 0.40 0.48 0.336 76.536
291509 OCRE DE COLOR KG 12.00 21.26 255.12 178.584 14.904
291599 OCRE KG 12.00 4.14 49.68 34.776 131.46
301541 LACA SELLADORA PARA MADERA GLN 35.00 12.52 438.20 306.74 7.74
304637 PEGAMENTO PARA PVC GLN 60.00 0.43 25.80 18.06 180
315120 CAJA DE CONCRETO P/MEDIDOR AGUA UND 15.00 40.00 600.00 420 300
329703 MOVILIZACION Y DESMOVILIZACION DE EST 1,000.00 1.00 1,000.00 1,000.00
370123 BROCHA DE 2" UND 12.00 6.75 81.00 81.00
370125 BROCHA DE 4" UND 14.00 9.27 129.78 129.78
370164 ESCOBA UND 12.00 7.20 86.40 86.40
380000 HORMIGON M3 28.00 0.26 7.28 7.28
390224 LIJA PARA CONCRETO HJA 1.50 0.30 0.45 0.45
390271 COLA SINTETICA GLN 20.00 6.34 126.80 126.80
390275 LIJA PARA MADERA UND 1.50 17.69 26.54 26.54
390500 AGUA M3 5.00 111.99 559.95 559.95
390625 ESPONJA 2" PLN 34.00 8.50 289.00 289.00
391316 ESTERA DE 2.00 X 3.00 M. UND 22.00 16.01 352.22 352.22
391385 CASETA DE MADERA PREFABRICADA DE 2EST 600.00 1.00 600.00 600.00
39909 CARTEL DE IDENTIFICACIO DE OBRA 2.4 UND 750.00 1.00 750.00 750.00
430103 MADERA TORNILLO P2 4.20 951.60 3,996.72 3,996.72
431652 REGLA DE MADERA P2 4.20 25.51 107.14 107.14
440317 TRIPLAY DE 4'x8'x 12 mm PLN 85.00 3.65 310.25 310.25
440321 TRIPLAY DE 4'x8'x 4 mm PLN 28.00 4.80 134.40 134.40
440328 TRIPLAY DE 4'x8'x 18 mm PLN 118.00 0.52 61.36 61.36
450108 TRIPLAY DE 18 MM. PLN 118.00 16.58 1,956.44 1,956.44
530000 KEROSENE INDUSTRIAL GLN 13.68 30.97 423.67 423.67
530327 THINER GLN 18.00 4.52 81.36 81.36
530333 THINER ACRILICO GLN 17.00 11.37 193.29 193.29
540600 PINTURA ANTICORROSIVA GLN 40.00 0.09 3.60 3.60
541190 PINTURA ESMALTE GLN 35.00 3.35 117.25 117.25
544480 XILOL GLN 42.00 13.74 577.08 577.08
544571 PINTURA TRAFICO GLN 100.00 17.57 1,757.00 1,757.00
590100 CALAMINA # 30 DE 1.83m x 0.83m x 3mm PZA 14.00 15.36 215.04 215.04
600002 TEKNOPOR DE 1" x 4' x 8' PLN 20.00 0.42 8.40 8.40
610001 PLANCHA GALVANIZADA DE 1/16" M2 56.00 1.35 75.60 75.60
621802 POSTE DE TUBERIA DE FIERRO NEGRO DEUND 100.00 2.10 210.00 210.00
663202 PERNOS DE FIERRO CORRUGADO DE 1/2 KG 2.50 0.43 1.08 1.08
720332 UNION UNIVERSAL PVC SAP DE 1/2" UND 2.00 20.00 40.00 40.00
720830 TUBERIA PVC SAP 3/4" M 1.50 1.73 2.60 2.60
770252 VALVULA DE PASO DE 1/2" UND 5.88 20.00 117.60 117.60
53,229.11
EQUIPOS
305556 PLANCHA COMPACTADORA MANUAL 8 HP, HM 12.50 103.21 1,290.13 1,290.13
480111 MEZCLADORA DE CONCRETO DE 9 -11P3 HM 25.00 83.07 2,076.75 2,076.75
481107 CAMION VOLQUETE 15 M3 HM 125.00 19.37 2,421.25 2,421.25
490293 COMPRESORA NEUMATICA 90 HP 250 P3 HM 80.00 1.59 127.20 127.20
490313 RODILLO LISO VIBR AUTOP 70-100 HP 7-9 HM 105.00 8.18 858.90 858.90
490325 RODILLO NEUMATICO AUTOP 81-100HP 5.5HM 105.00 8.18 858.90 858.90
490491 CARGADOR FRONTA DE 1.5 M3 HM 135.00 7.48 1,009.80 1,009.80
490532 CALENTADOR DE ASFALTO 5 HP 500 GLN HM 75.00 1.53 114.75 114.75
490704 VIBRADOR DE CONCRETO 4 HP 2.40" HM 15.00 5.36 80.40 80.40
490900 MOTONIVELADORA DE 125 HP HM 105.00 8.18 858.90 858.90
491193 RODILLO VIBRATORIO LISO DE 2 TN HM 105.00 3.06 321.30 321.30
493105 CAMION IMPRIMADOR DE 2300 GLS. HM 150.00 0.98 147.00 147.00
498802 NIVEL TOPOGRAFICO HM 5.00 7.21 36.05 36.05
498803 TEODOLITO HM 7.00 12.67 88.69 88.69
INSUMOS COMODIN
EQUIPOS
370101 HERRAMIENTAS MANUALES %MO 1,772.98 886.49 886.49
0.00
SUB-TOTAL 0.00
TOTAL 105,340.89
MONTO PARTIDAS ESTIMADAS 0.00
107,148.88
La columna parcial es el producto del precio por la cantidad requerida; y en la última columna se muestra el Monto Real que se está util
izando