The main objective of my project was to design and estimate the costs of the road and

sewerage networks of the housing estate ″Al bassatine″ in the commune of Bouskoura.
Based on three axes:

Study of the road network, starting with the Autocad 2008 and Covadis 10. 1 software by
tracing the axes of the tracks, after the assembly of all the long profiles, we move on to the
wedging of the project lines, Then we move on to the assembly of the cross profiles of each
long profile which gives us a cross section constituting the TN line and the project line by
estimating the values of the cuttings and embankments.

In the part concerning the study of the sewerage network, we started with the choice of type
of sanitation for the allotment which is the separative system.
then we go on to calculate the wastewater and rainwater flows. Starting with the assessment
of drinking water needs, with a discharge rate we retain the flow of wastewater discharged,
then we calculate the rainwater flows by the Caquot surface method by dividing our
subdivision into artificial watersheds on which we apply the formulas for assembling the
parameters of the Caquot formula either in series or in parallel.
So after we determine for each watershed the flow of storm-water and wastewater, we
calculate the diameters of the collectors that will clean these quantities of flows using the
Manning & Strickler formula.

In the third part and from the meters that we made in the previous part and we apply the unit
prices given by the design office and with the help of MS EXCEL software we calculate the
costs of the networks studies, and gives at the end the total cost of the roads and the sanitation
of approximately 7. 36 Mdhs TTC.