You are on page 1of 97

PENAWARAN HARGA PEKERJAAN MEP

RENOVASI SUNTER MALL (BQ 1) IMPROVEMENT

NO ITEM UNIT PRICE (Rp) TOTAL PRICE (Rp)


DESCRIPTION VOL SAT MATERIAL JASA MATERIAL
BY CONTRACTOR
I PRELIMINARY WORKS
a Mobilisasi dan demobilisasi 1 Ls -
b General Cleaning 1 Ls -
c Protection Works 1 Ls -
d Scaffolding 1 Ls -

II M/E WORKS

IIA DUCT WORKS ( VAC )

II A 1 BASEMENT FLOOR

a Ex Agantea ( OPERASIONAL )

b EX CROCODILE & SINAR MULIA (IMPROVEMENT )

1 AC Split Duct 10 PK (by Owner) 1 Unit -


Drain Pan 190 CM x 110 CM x 10 CM ( BJLS 0.5 Dgn 1 Bh -
Siku 3 x 3 CM
2 Pipa cooper tube 1.3/8 x 1/2" Merk Inaba /Setara 60 M -
3 Cable Control NYMHY 4 x 1.5 mm Supreme 60 M -
4 Thermostat NYMHY 4 x1.5 mm Supreme 10 M -
5 Cable Power NYY 4 x 16 mm Supreme 80 M -
6 Cable Fan NYY 4 x 4 mm Supreme 60 M -
7 MCB 3 Phase MG 32 Amp 1 BH -
8 Cable Tray 30 x 5 50 M -
9 Pipa Drainage Dia 1 Inch PVC RUCIKA AW 3 BT -
10 Pipa Drainage Dia 2 Inch PVC RUCIKA AW 6 BT -
11 Long Drat Dia 10 mm 40 BH -
12 Besi Siku 40 x 40 thicness 3 mm 5 Bt -
13 Mur & Baut 10 mm 80 BH -
14 Rubber Mounting 50 x 50 mm lengkap Mur baut 4 BH -
15 Rubber Mounting 70 x 50 mm Lengkap Mur baut 4 Bh -
16 Long Drat Dia 12 mm 4 BH -
17 Mur 12 mm 16 Bh -
18 Canal UNP 100 mm Support FCU 3 BT -
19 Canal UNP 100 mm Support Condensing unit 4 BT -
20 Pipa GIP Dia 3 Inch 1 BT -
21 Freon R 407 1 tbg -
22 See Glass Ø 1/2" Castel 1 Bh -
23 Hand Valve Ø 1/2" 2 Bh -
24 Material Bantu termasuk Unit dan Instalasi Duct 1 Lot

c EX PARIS & HE N SHE ( OPERASIONAL )

d EX PARABONA & STARSTUDIO( OPERASIONAL )

e EX OPTIK MELAWAI ( STAR BUCK ) ( OPERSIONAL )

f EX DOMINO ( IMPROVEMENT )

1 AC SPLIT DUCT 12 PK (by owner) 1 UNIT -


Drain Pan 190 CM x 110 CM x 10 CM ( BJLS 0.5 Dgn 1 Bh -
Siku 3 x 3 CM
2 Pipa cooper tube 1.3/8 x 1/2 Merk Inaba /Setara 40 M -
3 Cable Control NYMHY 4 x 1.5 mm Supreme 40 M -
4 Thermostat NYMHY 4 x1.5 mm Supreme 10 M -
5 Cable Power NYY 4 x 10 mm NYY Supreme 30 M -
6 Cable FCU NYY 4 x 4 mm Supreme 40 M -
7 MCB 3 Phase MG 32 Amp 1 BH -
8 Cable Tray 30 x 5 40 M -
9 Pipa Drainage Dia 1 Inch PVC RUCIKA AW 1 BT -
10 Pipa Drainage Dia 2 Inch PVC RUCIKA AW 30 M -
11 Long Drat Dia 10 mm 20 Set -
12 Besi Siku 40 x 40 thicness 3 mm 3 Bt -
13 Mur 10 mm 40 BH -
14 Rubber Mounting 50 x 50 mm 4 BH -
15 Rubber Mounting 70 x 50 mm 4 Bh -
16 Long Drat Dia 12 mm 4 BH -
17 Mur 12 mm 16 Bh -
18 Canal UNP 100 mm Support FCU 2 BT -
19 Canal UNP 100 mm Support Condensing unit 2 BT -
20 Pipa GIP Dia 3 Inch 3 BT -
21 Besi Siku 50 x 50 x 5 mm 2 Lot -
22 Material Bantu termasuk Unit dan Instalasi Duct 1 Lot -
23 Return Air Grille 120 x 60 cm 1 Bh -
Lengkap Plenum Box & Pre Filter
24 Freon R.407 1 Tbg -
25 See Glass Ø 1/2" Castel 1 Bh -
26 Hand Valve Ø 1/2" 2 Bh -
27 Cable Control NYMHY 3 x 1.5 mm Supreme 30 Mtr -

g Corridor lt.1 Sisi Timur ( IMPROVEMENT )

1 Pengadaan AC Baru kapasitas : 12 PK Merk: Trane (by owner) 1 unit -


2 Pipa cooper tube 13/8 x 1/2 Merk Inaba /Setara 30 Mtr -
3 Kabel Power Indoor unit 4 x 4 mm NYY HY Supreme 30 Mtr -
4 Kabel Power Outdoor unit 4 x 10 mm NYY HY Supreme 24 Mtr -
5 Kabel Control Panel Ø 3 x 2.5 mm NYM HY Supreme 24 Mtr -
6 Kabel Control Indoor Ø 4 x 1.5 mm NYM HY Supreme 30 Mtr -
7 Kabel Thermostat Ø 4 x 1.5 mm NYM HY Supreme 10 Mtr -
8 MCB 3 2 Amp 3 Phase (Schneider) 1 Bh -
9 Support UNP 100 x 50 x 600 3 Btg -
10 long Drat Ø 12 mm Lengkap Mur 4 Btg -
11 Rubber Mounting 50 x 50 mm Lengkap Mur baut 4 Bh -
12 Rubber Mounting 70 mm x 50 mm Lengkap Mur baut 4 Bh -
13 Braket Pipa Instalasi 15 Set -
14 Drain Pan 190 CM x 110 CM x 10 CM ( BJLS 0.5 Dgn 1 Bh -
15 Siku 3 x 3 CM
16 Pipa Drain Ø 2 " Rucika AW Lengkap Isolasi Insuplek 5 Btg -
17 Pipa Drain Ø 1 " Rucika AW Lengkap Isolasi Insuplek 1 Btg -
18 See Glass Ø 1/2" Castel 1 Bh -
19 Hand Valve Ø 1/2" Castel 2 Bh -
20 Freon R.407 1 Tbg -
21 RAG Ø 120 x 60 cm 1 Bh -
Lengkap Plenum Box & Pre Filter
22 Material Bantu termasuk Unit dan Instalasi Duct 1 Lot -

Pengadaan dan pemasangan instalasi Ducting PU


termasuk bracket ,gantungan support dan perlengkapan bantu lainya
sesuai gambar dan spesifikasi (first duct atau setara)

24 PU Duct size 525 x 525 2 M2 -


25 PU Duct size 475 x 475 10 M2 -
26 PU Duct size 425 x 425 7 M2 -
27 PU Duct size 400 x 400 7 M2 -
28 PU Duct size 325 x 325 6 M2 -
29 PU Duct size 275 x 275 7 M2 -
30 PU Duct size 225 x 225 36 M2 -

31 Simetrical Wye,ConvergingTee 45,Converging Wye,Elbow,Rectangular 1 LS -


Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis

32 Round Diffuser Dia 300 mm Colour Sesuai Ceiling 12 Pcs -


33 Spigot Dumper Dia 8 Inch,termasuk flexible Round Duct 12 Pcs -

h CORRIDOR LT.1 SISI BARAT ( IMPROVEMENT )

1 AC SPLIT DUCT KAP 120.000 BTU/H MERK TRANE 1 unit -


2 Pipa cooper tube 13/8 x 1/2 Merk Inaba /Setara 45 Mtr -
3 Kabel Power Indoor unit 4 x 4 mm NYY HY Supreme 45 Mtr -
4 Kabel Power Outdoor unit 4 x 10 mm NYY HY Supreme 60 Mtr -
5 Kabel Control Panel Ø 3 x 2.5 mm NYM HY Supreme 60 Mtr -
6 Kabel Control Indoor Ø 4 x 1.5 mm NYM HY Supreme 45 Mtr -
7 Kaberl Thermostat Ø 4 x 1.5 mm NYM HY Supreme 10 Mtr -
8 MCB 3 Phase MG 32 Amp 1 Pcs -
9 Support UNP 100 x 50 x 600 4 Btg -
10 Pipa GIP Ø 3 " SCH 40 Bakrie Atau Setara 1 Btg -
11 long Drat Ø 12 mm Lengkap Mur 4 Btg -
12 Rubber Mounting 50 x 50 mm Lengkap Mur baut 4 Bh -
13 Rubber Mounting 70 mm x 50 mm Lengkap Mur baut 4 Bh -
14 Braket Pipa Instalasi 20 Set -
15 Drain Pain 190 CM x 110 CM x 10 CM ( BJLS 0.5 Dgn 1 Bh -
16 Siku 3 x 3 CM
17 Pipa Drain Ø 2 " Lengkap Isolasi Insuplek 16 Mtr -
18 Pipa Drain Ø 1 " Lengkap Isolasi Insuplek 4 Mtr -
19 Freon R.407 1 Tbg -
20 RAG Ø 120 x 60 cm 1 Bh -
Lengkap Plenum Box & Pre Filter
21 See Glass Ø 1/2" Castel 1 Bh -
22 Hand Valve Ø 1/2" Castel 2 Bh -
23 Material Bantu termasuk Unit dan Instalasi Duct 1 Lot -

Pengadaan dan pemasangan instalasi Ducting PU


termasuk bracket ,gantungan support dan perlengkapan bantu lainya
sesuai gambar dan spesifikasi

25 PU Duct size 525 x 525 2 M2 -


26 PU Duct size 500 x 500 4 M2 -
27 PU Duct size 450 x 450 8 M2 -
28 PU Duct size 400 x 400 5 M2 -
29 PU Duct size 275 x 275 4 M2 -
30 Tree Way 525 x 500 1 LS -
31 Tree Way 500 x 225 1 LS -
32 Tree Way 450 x 400 1 LS -
33 Tree Way 400 x 275 1 LS -
34 Tree Way 275 x 225 1 LS -
35 Tree Way 225 x 225 1 LS -
36 Simetrical Wye,ConvergingTee 45,Converging Wye,Elbow,Rectangular 1 LS -
Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis
37 Round Diffuser Dia 300 mm Colour Sesuai Ceiling 12 Pcs -
38 Spigot Dumper Dia 8 Inch,termasuk flexible Round Duct 12 Pcs -

i Burger King ( IMPROVEMENT )


1 AC SPLIT DUCT 10 PK 3 UNIT -
Drain Pan 190 CM x 110 CM x 10 CM ( BJLS 0.5 Dgn 1 Bh -
Siku 3 x 3 CM
2 Pipa cooper tube 13/8 x 1/2" Merk Inaba Denco(setara) 195 M -
3 Cable Control NYMHY 4 x 1.5 mm Supreme ( outdoor to indoor ) 195 M -
Cable Control NYMHY 3 x 1.5 mm Supreme ( panel to Outdoor ) -
4 Thermostat NYMHY 4 x1.5 mm 30 M -
5 Cable Power NYY 4 x 10 mm 240 M -
6 Cable Fan NYY 4 x 4 mm 195 M -
7 Cable Jumper 4 x 25 mm + Grounding 6 M -
8 Panel control lengkap MCB 3 Phase 32 Amper ( 3 line )
Lengkap Push Button On Of ,2 BH Relay Omron LY2 2N 1 Ls -
220 Volt dan Lamp Indikator On , OFF & TRIP
dengan MCB Induk 3 Phase MG. 100 Amper
9 Cable Tray 30 x 5 lengkap gantungan 60 M -
10 Pipa Drainage Dia 1 Inch PVC RUCIKA AW + Insuflex Setara 3 BT -
11 Pipa Drainage Dia 2 Inch PVC RUCIKA AW + Insuflex Setara 8 BT -
12 Besi Siku 30 x 30 thicness 3 mm 6 Bt -
13 Rubber Mounting 50 x 50 mm 12 BH -
14 Rubber Mounting 70 x 50 mm 12 Bh -
15 Long Drat Dia 12 mm 12 BH -
16 Mur & baut 12 mm 24 Bh -
17 Canal UNP 100 mm Support FCU 6 BT -
18 Canal UNP 100 mm Support Condensing unit 6 BT -
19 Besi Siku 50 x 50 x 5 mm 5 BT -
20 Material Bantu termasuk Unit dan Instalasi 1 Lot -
21 Return Air Grille 120 x 60 cm 1 Bh -
Lengkap Plenum Box & Pre Filter
25 Freon R.407 3 Tbg -
26 See Glass Ø 1/2" Castel 3 Bh -
27 Hand Valve Ø 1/2" 6 Bh -

j 2.6.Fresh Air Duct LT 1 ( FA )

Ducting Galvanize Sheet


Ducting Joint Flange L 30
( BJLS 50.60 & BJLS 80 )
Ducting Joint Flange L 40
( BJLS 100 & BJLS 120 )

j.1 SIDE TIMUR


1 Ducting 650 x 650 mm ( Thickness BJLS 0,6 mm ) 57 M2 -
2 Ducting 575 x 575 mm ( Thickness BJLS 0.6 mm ) 7 M2 -
3 Ducting 500 x 500 mm ( Thickness BJLS 0,6 mm ) 7 M2 -
4 Ducting 400 x 400 mm ( Thickness BJLS 0.6 mm ) 7 M2 -
5 Ducting 375 x 375 mm ( Thickness BJLS 0.5 mm ) 10 M2 -
6 Simetrical Wye,ConvergingTee 45,Converging Wye,Elbow,Rectangular 1 LS -
Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis
7 Volume Dumper ( VD ) 475 x 475 mm 4 BH -

j.2 SIDE BARAT

1 Ducting 650 x 650 mm ( Thickness BJLS 0,6 mm ) 57 M2 -


2 Ducting 575 x 575 mm ( Thickness BJLS 0.6 mm ) 7 M2 -
3 Ducting 500 x 500 mm ( Thickness BJLS 0,6 mm ) 7 M2 -
4 Ducting 400 x 400 mm ( Thickness BJLS 0.6 mm ) 7 M2 -
5 Ducting 375 x 375 mm ( Thickness BJLS 0.5 mm ) 10 M2 -
6 Simetrical Wye,ConvergingTee 45,Converging Wye,Elbow,Rectangular 1 LS -
Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis
7 Volume Dumper ( VD ) 475 x 475 mm 4 BH -

k MECHANICAL EXHAUSE TOILET WEST


Ducting Galvanize Sheet
Ducting Joint Flange L 30
( BJLS 50.60 & BJLS 80 )
Ducting Joint Flange L 40
( BJLS 100 & BJLS 120 )

Pekerjaan Exhause Air Ducting SIDE WEST

1 Exhause Air Duct 475 x 475 mm ( BJLS 0.6 mm ) 5 M2 -


2 Exhause Air Duct 425 x 425 mm ( BJLS 0.5 mm ) 4 M2 -
4 Exhause Air Duct 375 x 375 mm ( BJLS 0.5 mm ) 4 M2 -
Exhause Air Duct 350 x 350 mm ( BJLS 0.5 mm ) 3 M2 -
5 Exhause Air Duct 275 x 275 mm ( BJLS 0.5 mm ) 3 M2 -
6 Exhause Air Duct 225 x 225 mm ( BJLS 0.5 mm ) 18 M2 -
7 Simetrical Wye,ConvergingTee 45,Converging Wye,Elbow,Rectangular 1 LS -
Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis
8 Griller HS Daun Medium 200 x 200 mm As used Colour Ceiling 9 Pcs -
Lengkap Shutter Handle.Powder Coating & Material Alumunium
9 Supporting Material 1 Lot -

II A 3 SECOND FLOOR

a Sisi Timur Depan Lift ( 6.10 ) ( OPERASIONAL )

b VOID LANTAI 2 ( Timur dan Barat )(IMPROVEMENT )

1 AC SPLIT DUCT KAP 120.000 BTU/H MERK TRANE (by owner) 2 UNIT -
2 Crane untuk lifting AC 1 ls -
3 Pipa cooper tube 13/8 x 1/2 Merk Inaba /Setara 100 M -
4 Cable power indoor NYY 4 x 6 mm Supreme ( untuk 2 unit ) 100 M -
5 Cable Thermostat NYMHY 4 x 1.5 mm Supreme ( untuk 2 unit ) 120 M -
6 Cable Thermostat NYMHY 4 x1.5 mm Supreme ( untuk 2 unit ) 20 M -
7 Cable Power Outdoor NYY 4 x 16 mm Supreme ( untuk 2 unit ) 220 M -
8 Cable Control 3 x 2.5 mm NYM HY Supreme ( untuk 2 unit ) 220 M -
9 Pipa Drainage Dia 2 Inch Lengkap Isolasi Armaflex 16 M -
10 Pipa Drainage Dia 2 Inch Lengkap Isolasi Armaflex 16 M -
11 Pipa Drainage Dia 1 Inch Lengkap Isolasi Armaflex 8 M -
12 Drain Pain 190 CM x 110 CM x 10 CM ( BJLS 0.5 Dgn 2 BH -
Siku 3 x 3 CM (2 x)
13 Support UNP 100 x 50 x 600 Untuk Indoor Unit ( untuk 2 unit ) 4 BT -
14 Support UNP 100 x 50 x 600 Untuk Outdoor Unit ( untuk 2 unit ) 2 BT -
15 Long Drat Dia 12 mm Lengkap Mur & Ring ( untuk 2 unit ) 8 BH -
16 Rubber Mounting 70 x 50 mm Lengkap Mur baut 8 Bh -
17 Bracket Pipa Instalasi ( untuk 2 unit ) 30 SET -
18 Freon R 407 Dupont ( untuk 2 unit ) 2 Can -
19 Sight Glass Dia 1/2 Merk Alco 2 BH -
20 Hand Valve Dia 1/2 Merk Cstel 4 BH -
21 RAG 120 x 60 cm Alumunium ( untuk 2 unit ) 2 BH -
Lengkap Plenum Box & Pre Filter
22 MCB 3 Phase 40 Amp 1 Bh ( untuk 1 unit ) 1 LS -
Panel Control Direck Online Lengkap Push Button On-Of
32 Amper . Untuk 1 Unit AC ( ukuran Panel 50 x 40 x 20 )
Lengkap Push Button On Of , 2 BH Relay Omron LY 2N
220 Volt dan Lamp Indikator On , OFF & TRIP
23 Material Bantu ( untuk 2 unit ) 2 Lot -

Side Timur

25 PU DUCT SIZE 525 X 525 mm 9 M2 -


26 PU DUCT SIZE 425 X 425 mm 6 M2 -
27 PU DUCT SIZE 375 X 375 mm 4 M2 -
28 PU DUCT SIZE 350 X 350 mm 4 M2 -
29 PU DUCT SIZE 275 X 270 mm 4 M2 -
30 PU DUCTSIZE 250 X 250 mm 4 M2 -

31 Simetrical Wye,ConvergingTee 45,Converging Wye,Elbow,Rectangular 1 LS -


Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis

32 Plenum Box Linier Griil 10 Pcs -


33 Linier Grill 1200 x 100 10 Pcs -
34 Spigot Dumper Dia 10 Inch,termasuk flexible Round Duct 10 Pcs -
35 Kabel Jumper 4 x 25 mm NYY Supreme 10 Mtr -
36 Coring 4 " 2 Titik -

Side Barat

37 PU DUCT SIZE 525 X 525 mm 9 M2 -


38 PU DUCT SIZE 425 X 425 mm 6 M2 -
39 PU DUCT SIZE 375 X 375 mm 4 M2 -
40 PU DUCT SIZE 350 X 350 mm 4 M2 -
41 PU DUCT SIZE 275 X 270 mm 4 M2 -
42 PU DUCTSIZE 250 X 250 mm 4 M2 -

43 Simetrical Wye,ConvergingTee 45,Converging Wye,Elbow,Rectangular 1 LS -


Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis

44 Plenum Box Linier Griil 10 Pcs -


45 Linier Grill 1200 x 100 10 Pcs -
46 Spigot Dumper Dia 10 Inch,termasuk flexible Round Duct 10 Pcs -

47 Panel Control DOL Lengkap Push Button On-Off .32 Amper 1 LS -


untuk 1 line ( ukuran Panel 50 x 40 x 20 cm ) dgn MCB Induk 40 Amper
48 Kabel Jumper 4 x 16 mm NYY Supreme 10 Mtr -
49 Coring 4 " 2 Titik -

c MECHANICAL EXHAUSE TOILET


Ducting Galvanize Sheet
Ducting Joint Flange L 30
( BJLS 50.60 & BJLS 80 )
Ducting Joint Flange L 40
( BJLS 100 & BJLS 120 )

Pekerjaan Exhause Air Ducting SIDE WEST

50 Exhause Air Duct 475 x 475 mm ( BJLS 0.6 mm ) 5 M2 -


51 Exhause Air Duct 425 x 425 mm ( BJLS 0.5 mm ) 4 M2 -
52 Exhause Air Duct 375 x 375 mm ( BJLS 0.5 mm ) 4 M2 -
53 Exhause Air Duct 350 x 350 mm ( BJLS 0.5 mm ) 3 M2 -
54 Exhause Air Duct 275 x 275 mm ( BJLS 0.5 mm ) 3 M2 -
55 Exhause Air Duct 225 x 225 mm ( BJLS 0.5 mm ) 18 M2 -
56 Simetrical Wye,ConvergingTee 45,Converging Wye,Elbow,Rectangular 1 LS -
Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis
57 Griller HS Daun Medium 200 x 200 mm As used Colour Ceiling 9 Pcs -
Lengkap Shutter Handle.Powder Coating & Material Alumunium
58 Supporting Material 1 Lot -

II A 4 THIRD FLOOR

a Food Court WEST ( PUSAT JAJAN ) IMPROVEMENT

1 Pengadaan AC Baru kapasitas : 12 PK Merk: Trane (by Owner) 1 unit -


2 Crane untuk lifting AC 1 ls -
3 Pipa cooper tube 13/8 x 1/2 Merk Inaba /Setara 15 Mtr -
4 Kabel Power Indoor unit 4 x 4 mm NYY HY Supreme 15 Mtr -
5 Kabel Power Outdoor unit 4 x 10 mm NYY HY Supreme 35 Mtr -
6 Kabel Control Panel Ø 3 x 2.5 mm NYM HY Supreme 35 Mtr -
7 Kabel Control Indoor Ø 4 x 1.5 mm NYM HY Supreme 15 Mtr -
8 Kabel Thermostat Ø 4 x 1.5 mm NYM HY Supreme 10 Mtr -
9 Support Indoor-Outdoor UNP 100 x 50 x 600 3 Btg -
10 long Drat Ø 12 mm Lengkap Mur dan ring 4 Btg -
11 Rubber Mounting 50 x 50 mm Lengkap Mur baut 4 Bh -
12 Rubber Mounting 70 mm x 50 mm Lengkap Mur baut 4 Bh -
13 Braket Pipa Instalasi / Gantungan 10 mm 10 Set -
14 Drain Pan 190 CM x 110 CM x 10 CM ( BJLS 0.5 Dgn 1 Bh -
Siku 3 x 3 CM
15 Pipa Drain Ø 2 " Rucika AW Lengkap Isolasi Insuplek 4 Btg -
16 Pipa Drain Ø 1 " Rucika AW Lengkap Isolasi Insuplek 1 Btg -
17 See Glass Ø 1/2" Castel 1 Bh -
18 Hand Valve Ø 1/2" Castel 2 Bh -
19 MCB 3 Phase 32 Amper MG 1 Bh -
20 Freon R.407 1 Tbg -
21 RAG Ø 120 x 60 cm 1 Bh -
22 Coring Lantai Ø 4" 1 Bh -
23 Material Bantu 1 Lot -
24 Test Commisioning 1 Lot
25 Lengkap Push Button On Of , 2 BH Relay Omron LY 2N 1 Ls -
220 Volt dan Lamp Indikator On , OFF & TRIP
26 BJLS 0.6 Duct size 525 x 525 5 M2 -
27 BJLS 0.6 Duct size 500 x 500 9 M2 -
28 BJLS 0.5 Duct size 450 x 450 14 M2 -
29 BJLS 0.5 Duct size 350 x 350 8 M2 -
30 BJLS 0.5 Duct size 300 x 300 9 M2 -
31 BJLS 0.5 Duct size 275 x 275 8 M2 -
32 BJLS 0.5 Duct size 225 x 225 52 M2 -
33 Simetrical Wye,ConvergingTee 45,Converging Wye,Elbow,Rectangular 1 LS -
Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis
34 Round Diffuser Dia 300 mm As Used Colour Ceiling 12 Pcs -
Spigot Dumper Dia 8 Inch,termasuk flexible Round Duct 12 Ps -

b MECHANICAL EXHAUSE & FRESH AIR FOODCOURT WEST & NORTH ( PUSAT JAJAN )

Ducting Galvanize Sheet


Ducting Joint Flange L 30
( BJLS 50.60 & BJLS 80 )
Ducting Joint Flange L 40
( BJLS 100 & BJLS 120 )
Pekerjaan Fresh Air Ducting FOODCOURT WEST&NORTH
IMPROVEMENT
SIDE WEST

36 Fresh Air Duct 675 x 675 mm ( BJLS 0.6 mm ) 25 M2 -


37 Fresh Air Duct 650 x 650 mm ( BJLS 0.6 mm ) 9 M2 -
38 Fresh Air Duct 600 x 600 mm ( BJLS 0.6 mm ) 7 M2 -
39 Fresh Air Duct 550 x 550 mm ( BJLS 0.6 mm ) 8 M2 -
40 Fresh Air Duct 500 x 500 mm ( BJLS 0.6 mm ) 5 M2 -
41 Fresh Air Duct 425 x 425 mm ( BJLS 0.5 mm ) 7 M2 -
42 Fresh Air Duct 325 x 325 mm ( BJLS 0.5 mm ) 16 M2 -

43 Pemasangan Fresh Air 8000 CFM Type Axial Include Dudukan 1 Lot -
e

44 Supply Air Griil ( SAG ) 200 x 200 mm 7 Pcs -


Lengkap Shutter Handle.Powder Coating,Baking Paint ,Anodize
& Material Alumunium

45 Pedestal 20x20x 80 cm K 300 ( 0.064 M3 ) /unit 2 Unit -

46 Instalasi Cable 4 x 4 mm termasuk Grounding 50 M -

47 Simetrical Wye,ConvergingTee 45,Converging Wye,Elbow,Rectangular 1 Ls -


Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis

48 Coring Plat 700 x 700 mm termasuk perapihan ,grouting 1 lot -


water profing ,peralatan bantu dan kelengkapan lainya
sesuai spesifikasi ( existing )

SIDE NORTH

49 Fresh Air Duct 750 x 750 mm ( BJLS 0.6 mm ) 8 M2 -


50 Fresh Air Duct 700 x 700 mm ( BJLS 0.6 mm ) 4 M2 -
51 Fresh Air Duct 675 x 675 mm ( BJLS 0.6 mm ) 4 M2 -
52 Fresh Air Duct 650 x 650 mm ( BJLS 0.6 mm ) 4 M2 -
53 Fresh Air Duct 600 x 600 mm ( BJLS 0.6 mm ) 21 M2 -
54 Fresh Air Duct 550 x 550 mm ( BJLS 0.6 mm ) 7 M2 -
55 Fresh Air Duct 500 x 500 mm ( BJLS 0.6 mm ) 3 M2 -
56 Fresh Air Duct 425 x 425 mm ( BJLS 0.5 mm ) 8 M2 -
57 Fresh Air Duct 350 x 350 mm ( BJLS 0.5 mm ) 19 M2 -

58 Pemasangan Fresh Air 10000 CFM Type Axial Include Dudukan 1 Lot -
UNP 100 x 50 dan Spring Vibration(Fan By Owner )

59 Supply Air Griil ( SAG ) 200 x 200 mm 9 Pcs -


Lengkap Shutter Handle.Powder Coating,Baking Paint ,Anodize
& Material Alumunium

60 Pedestal 20x20x 80 cm K 300 ( 0.064 M3 ) /unit 2 Unit -

61 Instalasi Cable 4 x 4 mm termasuk Grounding 50 M -

62 Simetrical Wye,ConvergingTee 45,Converging Wye,Elbow,Rectangular 1 Ls -


Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis

63 Supporting Material 1 Lot -

Pekerjaan Exhause Air Ducting FOOD COURT WEST&NORTH


IMPROVEMENT

SIDE WEST

1 Unit Pengadaan exhause Fan 1, 4000 CFM AXIAl Type 1 Bh -


EEN - D24/1/4 RPM 1400 ,P=380
Exhause Air Duct 525 x 525 mm ( BJLS 0.6 mm ) 6 M2 -
Exhause Air Duct 425 x 425 mm ( BJLS 0.5 mm ) 3 M2 -
2 Unit Pengadaan exhause Fan 2,4000 CFM AXIAl Type 1 Bh -
EEN - D24/1/4 RPM 1400 ,P=380
Exhause Air Duct 525 x 525 mm ( BJLS 0.6 mm ) 6 M2 -
Exhause Air Duct 425 x 425 mm ( BJLS 0.5 mm ) 4 M2 -

3 Unit Pengadaan exhause Fan 3,6000 CFM AXIAl Type 1 Bh -


EEFC-24/1 RPM 1400 ,P=1100 W
Exhause Air Duct 625 x 625 mm ( BJLS 0.6 mm ) 6 M2 -
Exhause Air Duct 525 x 525 mm ( BJLS 0.6 mm ) 7 M2 -
Exhause Air Duct 425 x 425 mm ( BJLS 0.5 mm ) 31 M2 -
Simetrical Wye,ConvergingTee 45,Converging
4 1 Ls -
Wye,Elbow,Rectangular
Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis

5 VD ( Volume Dumper ) 425 x 425 7 Pcs -

6 Supporting Material 1 Lot -

Instalasi Cable Fan Exhause WEST

7 Exhause Fan 1 , 4000 CFM


Pengadaan Kable 4 x4 mm 40 M -

8 Exhause Fan 2 , 4000 CFM


Pengadaan Kable 4 x4 mm 30 M -

9 Exhause Fan 3 , 6000 CFM


Pengadaan Kable 4 x4 mm 30 M -

SIDE NORTH

1 Unit Pengadaan exhause Fan 4 , 4000 CFM AXIAl Type 1 Bh -


EEN - D24/1/4 RPM 1400 ,P=380
Exhause Air Duct 525 x 525 mm ( BJLS 0.6 mm ) 6 M2 -
Exhause Air Duct 425 x 425 mm ( BJLS 0.5 mm ) 6 M2 -

2 Unit Pengadaan exhause Fan 5, 4000 CFM AXIAl Type 1 Bh -


EEN - D24/1/4 RPM 1400 ,P=380
Exhause Air Duct 525 x 525 mm ( BJLS 0.6 mm ) 6 M2 -
Exhause Air Duct 425 x 425 mm ( BJLS 0.5 mm ) 5 M2 -

3 Unit Pengadaan exhause Fan 6, 6000 CFM AXIAl Type 1 Bh -


EEFC-24/1 RPM 1400 ,P=1100 W
Exhause Air Duct 625 x 625 mm ( BJLS 0.6 mm ) 6 M2 -
Exhause Air Duct 525 x 525 mm ( BJLS 0.6 mm ) 3 M2 -
Exhause Air Duct 425 x 425 mm ( BJLS 0.5 mm ) 9 M2 -

4 Unit Pengadaan exhause Fan 7, 4000 CFM AXIAl Type 1 Bh -


EEN - D24/1/4 RPM 1400 ,P=380
Exhause Air Duct 525 x 525 mm ( BJLS 0.6 mm ) 6 M2 -
Exhause Air Duct 425 x 425 mm ( BJLS 0.5 mm ) 5 M2 -
Simetrical Wye,ConvergingTee 45,Converging
5 1 Ls -
Wye,Elbow,Rectangular
Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis

6 VD ( Volume Dumper ) 425 x 425 9 Pcs -

7 Supporting Material 1 Lot -

Instalasi Cable Fan Exhause North

8 Exhause Fan 4 , 4000 CFM


Pengadaan Kable 4 x4 mm 50 M -

9 Exhause Fan 5 , 4000 CFM


Pengadaan Kable 4 x4 mm 55 M -

10 Exhause Fan 6, 6000 CFM


Pengadaan Kable 4 x4 mm 60 M -

11 Exhause Fan 7 , 4000 CFM


Pengadaan Kable 4 x4 mm 65 M -

c MECHANICAL EXHAUSE TOILET LT 3( IMPROVEMENT )


Ducting Galvanize Sheet
Ducting Joint Flange L 30
( BJLS 50.60 & BJLS 80 )
Ducting Joint Flange L 40
( BJLS 100 & BJLS 120 )

Pekerjaan Exhause Air Ducting SIDE WEST

Exhause Air Duct 525 x 525 mm ( BJLS 0.6 mm ) 9 M2 -


Exhause Air Duct 500 x 500 mm ( BJLS 0.6 mm ) 4 M2 -
Exhause Air Duct 475 x 475 mm ( BJLS 0.6 mm ) 4 M2 -
Exhause Air Duct 450 x 450 mm ( BJLS 0.6 mm ) 3 M2 -
Exhause Air Duct 425 x 425 mm ( BJLS 0.5 mm ) 3 M2 -
Exhause Air Duct 375 x 375 mm ( BJLS 0.5 mm ) 8 M2 -
Exhause Air Duct 300 x 300 mm ( BJLS 0.5 mm ) 2 M2 -
Exhause Air Duct 275 x 275 mm ( BJLS 0.5 mm ) 2 M2 -
Exhause Air Duct 250 x 250 mm ( BJLS 0.5 mm ) 2 M2 -
Exhause Air Duct 225 x 225 mm ( BJLS 0.5 mm ) 18 M2 -

Griller HS Daun Medium ( RAG ) 200 x 200 mm Refer to Colour Ceiling 16 Pcs -
Lengkap Shutter Handle.Powder Coating,Baking Paint ,Anodize
& Material Alumunium

d Fund World lt.3

d.1 Penggantian Unit AC lt.3 no: 120 ( OPERASIONAL )

II A 5 FOURTH FLOOR

a Fundworld lt.4

a.1 Penggantian AC lt.4 no.135(OPERASIONAL )

a.2 Penambahan AC Fundworld lt.4 Kapasitas 12 PK


IMPROVEMENT

1 Pengadaan AC baru Kapasitas 12 PK Merk : Trane (by owner) 1 Unit -


2 Craneuntuk lifting AC 1 ls -
3 Pipa cooper tube 1.3/8 x 1/2 Merk Inaba /Setara 36 Mtr -
4 Kabel Power Indoor unit 4 x 4 mm NYY HY Supreme 36 Mtr -
5 Kabel Power Outdoor unit 4 x 10 mm NYY HY Supreme 25 Mtr -
6 Kabel Control Ø 3 x 2.5 mm NYM HY Supreme 25 Mtr -
7 Kabel Control Ø 4 x 1.5 mm NYM HY Supreme 36 Mtr -
8 Kabel Thermostat Ø 4 x 1.5 mm NYM HY Supreme 10 Mtr -
9 Support UNP 100 x 50 x 600 6 Btg -
10 Siku 3 x 3 Thickness 3 mm 6 Btg -
11 Rubber Mounting Ø 50 x 50 mm Lengkap Mur baut 4 Bh -
12 Rubber Mounting Ø 70 mm x 50 mm Lengkap Mur baut 4 Bh -
13 Drain Pan 190 CM x 110 CM x 10 CM ( BJLS 0.5 Dgn Siku 3 x 3 CM ) 1 Bh -
14 Pipa Drain Ø 1 " Rucika AW Lengkap Isolasi Insuplek 1 Btg -
15 Pipa Drain Ø 2 " Rucika AW Lengkap Isolasi Insuplek 4 Btg -
16 See Glass Ø 1/2" Castel 1 Bh -
17 Hand Valve Ø 1/2" Castel 2 Bh -
18 Freon R.407 1 Tbg -
19 Panel Control Direck Online Lengkap Push Button On-Off 1 Bh -
32 Amper . Untuk 1 Unit AC ( ukuran Panel 50 x 40 x 20 )
Lengkap Push Button On Of , 2 BH Relay Omron LY 2N
220 Volt dan Lamp Indikator On , OFF & TRIP
Lengkap Push Button On Of , 2 BH Relay Omron LY 2N
20 Cable Jumper 4 x 16 mm 10 M -
21 Material Bantu 1 Bh -
22 Test Commisioning 1 lot -

Pengadaan dan pemasangan instalasi Ducting PU


termasuk bracket ,gantungan support dan perlengkapan bantu lainya
sesuai gambar dan spesifikasi (Firstduct atau setara)

23 PU Duct size 525 x 525 14 M2 -


24 PU Duct size 450 x 450 10 M2 -
25 PU Duct size 350 x 350 14 M2 -
26 PU Duct size 275 x 275 2 M2 -
27 PU Duct size 225 x 225 4 M2 -

28 Simetrical Wye,ConvergingTee 45,Converging Wye,Elbow,Rectangular 1 LS -


Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis

29 Round Diffuser Dia 350 mm Colour Black 6 Pcs -


30 Spigot Dumper Dia 10 Inch,sudah termasuk flexible Round Duct 6 Pcs -

Pengadaan danpemasangan instalasi ducting supply dengan isolasi


termasuk bracket ,gantungan support dan perlengkapan bantu lainya
sesuai gambar dan spesifikasi

a3 AHU 122 ( OPERASIONAL )

a.4 AHU 123( OPERASIONAL )


a.5 AHU 124 ( OPERASIONAL )

a.6 AHU 125 ( OPERASIONAL )

a.7 AHU 126 ( OPERASIONAL )

a.8 AHU 127 ( OPERASIONAL )

a.9 MECHANICAL EXHAUSE DUCT TOILET

Ducting Galvanize Sheet


Ducting Joint Flange L 30
( BJLS 50.60 & BJLS 80 )
Ducting Joint Flange L 40
( BJLS 100 & BJLS 120 )

PEKERJAAN EXHAUSE RAISER DUCT TOILET WEST

Exhause Air Duct 800 x 800 mm ( BJLS 0.8 mm ) 12 M2 -


Exhause Air Duct 750 x 750 mm ( BJLS 0.6 mm ) 16 M2 -
Exhause Air Duct 650 x 650 mm ( BJLS 0.6 mm ) 14 M2 -
Exhause Air Duct 525 x 525 mm ( BJLS 0.6 mm ) 13 M2 -
Exhause Air Duct 475 x 475 mm ( BJLS 0.6 mm ) 6 M2 -
Exhause Air Duct 325 x 325 mm ( BJLS 0.6 mm ) 2 M2 -

Simetrical Wye,ConvergingTee 45,Converging Wye,Elbow,Rectangular 1 LS -


Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis

a.10 MECHANICAL EXHAUSE TOILET FUNWORLD

Exhause Air Duct 325 x 325 mm ( BJLS 0.5 mm ) 10 M2 -


Exhause Air Duct 250 x 250 mm ( BJLS 0.5 mm ) 4 M2 -
Exhause Air Duct 225 x 225 mm ( BJLS 0.5 mm ) 8 M2 -

Griller HS Daun Medium 200 x 200 mm Refer to Colour Ceiling 4 Pcs -


Lengkap Shutter Handle.Powder Coating,Baking Paint ,Anodize
& Material Alumunium

Simetrical Wye,ConvergingTee 45,Converging Wye,Elbow,Rectangular 1 LS -


Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis

II B PLUMBING WORKS

II B 1 BASEMENT FLOOR

II B 2 FIRST FLOOR
A PEMIPAAN AIR BEKAS AIR BEKAS ( WASTE WATER )
UNTUK LEMAK SISI TIMUR
Pengadaan dan pemasangan Pipa Air Bekas ( WW ) ,Vent
bahan pipa PVC Class AW ,lengkap terpasang alat bantu
dan accessorries yang diperlukan sesuai gambar perenca
naan dan spesifikasi teknis.

Pipa PVC Rucika AW / Setara


1 Pipe Size Ø 6 inch 84 M -
2 Pipe Size Ø 4 inch 16 M -

Fitting PVC Rucika AW / Setara

3 L. bow 45 Ø 6 inch 2 Pcs -


4 TY 45 , Ø 6 x 6 Inch 1 Pcs -
5 TY 90 , Ø 6 x 6 inch 2 Pcs -
6 TY 90 , Ø 6 x 4 Inch 5 Pcs -
7 Ty 90 , Ø 4 x 2 Inch 4 Pcs -
8 L.bow 90 Ø 6 Inch 1 Pcs -
9 L. bow 90 Ø 4" 20 Pcs -
10 Socket Ø 6 Inch 12 Pcs -
11 CO Ø 4 Inch ( Clean Out ) 4 Pcs -
12 CO Ø 6 Inch 3 Pcs -

Flange Pipe PVC Rucika AW /Setara


13 flange PVC Ø 6" 28 Pcs -

Material Bantu ( Supporting Material )


14 UNP 100 x 50 mm 15 Bt -
15 Longdrrat 12 mm 70 Pcs -
16 Dinabolt 14 mm Length 7 cm 70 Pcs -
17 Glue PVC Ex Japan 500 gr 6 klg -
18 Bolt & Nut M20 Lenth 90mm 160 set -
19 Include Ring Plate & Per 160 set -
20 Rubber Packing 20 Pcs -
21 Ubolt 6 inch 35 Pcs -

22 coring Ø 6 Inch 1 ttk -


23 coring Ø 1 Inch 1 ttk -

B PEMIPAAN AIR BEKAS ( SEWAGE WATER ) SISI TIMUR


UNTUK Air Bekas Wastafel,Drain,Janitor

Pengadaan dan pemasangan Pipa Air Bekas ( WW ) ,Vent


bahan pipa PVC Class AW ,lengkap terpasang alat bantu
dan accessorries yang diperlukan sesuai gambar perenca
naan dan spesifikasi teknis.

Pipa PVC Rucika AW / Setara


1 Pipe size Ø 4 inch 82 M -
2 Pipe Ø 2 inch 8 M -

Fitting Pipe PVC Rucika AW/Setara


3 TY 90 Ø 4 inch 5 Pcs -
4 TY 90 Ø 4 inch 3 x 2 5 Pcs -
5 Ty 45 Ø 2 inch 2 Pcs -
6 Elbow 45 , Ø 4 Inch 12 Pcs -
7 Elbow 90 , Ø 2 Inch 8 Pcs -
8 Elbow 45 , Ø 2 Inch 2 Pcs -
9 Socket Ø 4 Inch 18 Pcs -
10 Socket Ø 2 Inch 4 Pcs -
11 Socket Drat Luar ( faucet ) Ø 2 Inch 4 Pcs -
12 Reducer Ø Inch 4 x 3 5 Pcs -
13 Lem PVC 4 Pcs -
14 CO PVC , Ø 4 inch 2 Pcs -
15 CO PVC , Ø 3 inch 5 Pcs -
Flange Pipe PVC Rucika AW /Setara
16 Flange PVC Ø 2 Inch 4 Pcs -

Peralatan Pompa
Pengadaan dan Pemasangan peralatan utama plambing
( Pompa ) lengkap terpasang dengan alat bantu dan acces
sorriesnya termasuk :
17 Gate valve Dia 2 Inch 2 Bh -
18 Check valve Dia 2 inch 2 Bh -
19 Pompa Ebara 50 DNA 1,5 Kw 2 Bh -
20 Panel Control DOL lengkap Indikator Lamp On,Off Dn Trip dan MCB 1 Bh -
21 Pembuatan Sumpit 2 M3 1 Unit -

B1 Supporting Material

1 Siku 4 x 4 mm 2 Bt -
2 Long drat 10 mm ,P= 1 M 72 Bt -
3 U Bolt 4 Inch Include Mur 36 Pcs -
4 Mur 10 mm 150 Pcs -
5 Mata Bor Besi 12 mm 4 Pcs -
6 Mata Bor Beton 12 mm 4 Pcs -
7 Dyna Bolt 10 mm x 7 cm 100 Pcs -

B2 Clean Water Instalation

1 Pipe PPR Wavin Tigris Green PN 10 Ø 1 inch 72 M -


2 Water Meter Ø 1 Inch 6 Pcs -
3 Gate Valve Ø 1 Inch 6 Pcs -
4 Supporting material 1 Lot -

D4 TOILET BARAT LT 1 DISABLE

Intalasi Pipa Air Bekas Lavatory & Fulldrain


1 Pipa PVC Rucika AW Dia 2 inch 12 m -

Fitting
2 Socket PVC Rucika AW Dia 2 inch 3 bh -
3 Socket PVC Rucika AW Dia 1 inch 5 bh -
4 L.bow 45 PVC Rucika AW Dia 2 inch 1 bh -
5 L.bow PVC Rucika AW Dia 2 inch 14 bh -
6 Reduser PVC AW 2 x 1 inch 6 bh -
Accessorries -
7 CO stainles Steel Ø 2 inch , Toto 2 bh -
8 Full Drain Stainles Steel 2 inch Toto 2 bh -

Material Support ( Material Bantu )


30 Hanger Clamp Ø 2 inch 5 Set -
31 Siku 4 x 4 1 Bt -
32 Dina Bolt 10 mm 5 Pcs -
33 Longdrat 10 mm 5 Pcs -
34 Lem PVC 2 Pcs -

Coring 2,5 inchi 7 ttk -

Intalasi Pipe Air Kotor


35 Pipa PVC Rucika AW Ø 4 inch 4 M -
36 Pipa PVC Rucika AW Ø 2 inch 12 M -

Fiting Pipe
37 Y PVC Rucika AW Ø 4 inch 1 bh -
38 Y PVC Rucika AW Ø 4 x 2 inch 1 bh -
39 Ty PVC Rucika AW Ø 4 x 2 inch 1 bh -
40 Ty PVC Rucika AW Ø 2 inch 5 bh -
41 L.bow PVC Rucika AW Ø 4 inch 1 bh -
42 L.bow PVC Rucika AW Ø 2 inch 12 bh -
43 Reduser PVC Rucika AW Ø 2 x 1 1/4 inch 4 bh -
44 Shock PVC Rucika AW Ø 2 inch 4 bh -
45 Flange PVC Rucika AW Ø 4 inch 4 bh -

46 Coring 2,5 inchi 6 ttk -


47 Coring 5 inchi 1 ttk -

Accessorries
48 CO stainles Steel Ø 2 inch , Toto 3 bh -

Supporting Material
49 Hanger Clamp Ø 4 inch 2 set -
50 Hanger Clamp Ø 2 inch 5 set -
51 Longdrat 10 mm 7 Pcs -
52 Siku 4 x 4 mm 1 Bt -
53 Dyna Bolt 10 mm ( 7,5 cm ) 7 Pcs -
54 Mur 10 mm 20 Pcs -
55 Lem PVC 3 Pcs -

56 Instalasi Pipa Air Bersih Disable & Wastafle Male /Female

Pipe PPR Wavin Tigris Green PN 10

57 Pipe PPR Ø 1 inch 8 M -


58 Pipe PPR Ø 1/2 inch 18 M -

Fitting PPR Wavin Tigris Green PN 10

59 L.bow PPR Ø1 inch 4 bh -


60 L.bow PPR Ø 1/2 inch 7 bh -
61 sok PPR Ø 1 inch 2 bh -
62 sok PPR Ø 1/2 inch 9 bh -
63 Tee PPR Ø 1 inch 8 bh -
64 Reduser PPR Ø 1 x 1/2 inch 9 bh -
65 Plug PPR Ø 1 inch 2 bh -

Accessorries
66 Gate Valve Ø 1 inchi 4 bh -

Supporting Material
68 Hanger Clamp Ø 1 inch 5 Set -
69 Siku 4 x 4 1 Bt -
70 Dina Bolt 10 mm 5 Pcs -
71 Longdrat 10 mm 5 Pcs -

Pipe PPR Wavin Tigris Green PN 10 Air Bersih Urinal


1 Pipe PPR Ø 1 Inch 12 M -
2 Pipae PPR Ø 1/2 Inch 12 M -

Fitting PPR Wavin Tigris Green PN 10


3 Watermur PPR Ø 1 inch 1 bh -
4 double napel PPR Ø 1 inch 4 bh -
5 double napel PPR Ø 1/2 inch 3 bh -
6 L.bow PPR Ø 1 inch 5 bh -
7 L.bow PPR Ø 1/2 inch 3 bh -
8 Tee PPR Ø 1 inch 2 bh -
9 Reduser PPR Ø 2 x 1 inch 1 bh -
10 Reduser PPR Ø 1 x 1/2 inch 3 bh -

II B 2 SECOND FLOOR

A Plumbing Instalation SW SALON


( Air Bekas Wastafel,Drain,Janitor )

Instalasi Pipa Air Bekas Salon


Pipa
1 Pipe Ø 3 inch 52 M -
2 Pipe Ø 2 inch 8 BT -

Fitting Pipe :
3 TY 90 Ø 3 inch 4 Pcs -
4 Elbow 90 Ø ,3 Inch 4 Pcs -
5 Ty 90 Ø 3 x 2 Inch 4 Pcs -
6 Soc PVC Ø 3 Inch 4 Pcs -
7 CO PVC Ø 3 INCH 4 Pcs -

Material Support ( Material Bantu )


8 Ubolt 3 inch + MUR 32 Pcs -
9 Siku 4 x 4 2 Bt -
10 Dina Bolt 10 mm 32 Pcs -
11 Longdrat 10 mm 32 Pcs -
12 Lem PVC 6 Pcs -

B Instalasi Pipa Air Bersih Salon & Optik

Pipe PPR Wavin Tigris Green PN 10


1 Pipe PPR Ø 1 inch 148 M -
2 Pipe PPR Ø 3/4 inch 16 M -
3 Water Meter Ø 3/4 INCH 5 Pcs -

Valve
4 Gate Valve Ø 1 Inch 3 Pcs -
5 Gate Valve Ø 3/4 Inch 2 Pcs -

Fitting PPR Wavin Tigris Green PN 10


6 Elbow PPR Ø 1 inch 10 Pcs -
7 T PPR Ø 1 Inch 6 Pcs -
8 Elbow 90 PPR Ø 3/4 inch 8 Pcs -
9 SockeT PPR Ø 1 Inch 8 Pcs -
10 SockeT PPR Ø 3/4 Inch 4 Pcs -
11 Double Niple PPR Ø 3/4 Inch 8 Pcs -
12 Reducer Ø 1 x 3/4 Inch 4 Pcs -

Material Support
13 clamp Hanging Ø 1 Inch 60 Pcs -
14 Longdrat 8 mm 24 Pcs -
15 Mur 8 mm 50 Pcs -
16 siku 4 x 4 mm 1 Bt -
17 Paku ramset 3/8 + mesiu 1 Dus -

C TOILET BARAT LT 2
1 To adjust plumbing from existing to new toilet design 1 ls -
REVIEW DESIGN

C1 Urinal Lengkap Valve Dan Accessorries 3 Set -

D4 TOILET BARAT LT 2 DISABLE

Intalasi Pipa Air Bekas Lavatory & Fulldrain

22 Pipa PVC Rucika AW Dia 2 inch 12 m -

Fitting
23 Socket PVC Rucika AW Dia 4 inch 3 BH -
24 Socket PVC Rucika AW Dia 2 inch 3 bh -
25 Socket PVC Rucika AW Dia 1 inch 5 bh -
26 L.bow 45 PVC Rucika AW Dia 2 inch 1 bh -
27 L.bow PVC Rucika AW Dia 2 inch 14 bh -
28 L.bow PVC Rucika AW Dia 4 inch 3 bh -
29 Reduser PVC AW 2 x 1 inch 6 bh -
30 Coring 2,5 inchi 7 ttk -

Accessorries
31 CO stainles Steel Ø 2 inch , Toto 2 bh -
32 Full Drain Stainles Steel 2 inch Toto 2 bh -

Material Support ( Material Bantu )


33 Hanger Clamp Ø 2 inch 5 Set -
34 Siku 4 x 4 1 Bt -
35 Dina Bolt 10 mm 5 Pcs -
36 Longdrat 10 mm 5 Pcs -
37 Lem PVC 2 Pcs -

Intalasi Pipe Air Kotor


38 Pipa PVC Rucika AW Ø 4 inch 8 M -
39 Pipa PVC Rucika AW Ø 2 inch 12 M -

Fiting Pipe
40 Y PVC Rucika AW Ø 4 inch 1 bh -
41 Y PVC Rucika AW Ø 4 x 2 inch 1 bh -
42 Ty PVC Rucika AW Ø 4 x 2 inch 1 bh -
43 Ty PVC Rucika AW Ø 2 inch 5 bh -
44 L.bow PVC Rucika AW Ø 4 inch 1 bh -
45 L.bow PVC Rucika AW Ø 2 inch 12 bh -
46 Reduser PVC Rucika AW Ø 2 x 1 1/4 inch 4 bh -
47 Shock PVC Rucika AW Ø 2 inch 4 bh -
48 Flange PVC Rucika AW Ø 4 inch 4 bh -

Accessorries
49 CO stainles Steel Ø 2 inch , Toto 3 bh -
50 Coring 2,5 inchi 6 ttk -
51 Coring 5 inchi 1 ttk -

Supporting Material
52 Hanger Clamp Ø 4 inch 2 set -
53 Hanger Clamp Ø 2 inch 5 set -
54 Longdrat 10 mm 7 Pcs -
55 Siku 4 x 4 mm 1 Bt -
56 Dyna Bolt 10 mm ( 7,5 cm ) 7 Pcs -
57 Mur 10 mm 20 Pcs -
58 Lem PVC 3 Pcs -

Instalasi Pipa Air Bersih Disable & Wastafle Male /Female

Pipe PPR Wavin Tigris Green PN 10

59 Pipe PPR Ø 1 inch 8 M -


60 Pipe PPR Ø 1/2 inch 18 M -

Fitting PPR Wavin Tigris Green PN 10

61 L.bow PPR Ø1 inch 4 bh -


62 L.bow PPR Ø 1/2 inch 7 bh -
63 sock PPR Ø 1 inch 2 bh -
64 sock PPR Ø 1/2 inch 9 bh -
65 Tee PPR Ø 1 inch 8 bh -
66 Reduser PPR Ø 1 x 1/2 inch 9 bh -
67 Plug PPR Ø 1 inch 2 bh -

Accessorries
68 Gate Valve Ø 1 inchi 4 bh -

69 Coring Ø 2 inch 6 Ttk -


70 Coring Ø 3 inch 1 Ttk -
71 Coring Ø 5 inch 4 Ttk -

Supporting Material
72 Hanger Clamp Ø 1 inch 5 Set -
73 Siku 4 x 4 1 Bt -
74 Dina Bolt 10 mm 5 Pcs -
75 Longdrat 10 mm 5 Pcs -

Pipe PPR Wavin Tigris Green PN 10 Air Bersih Urinal


1 Pipe PPR Ø 1 Inch 12 M -
2 Pipe PPR Ø 1/2 Inch 12 M -

Fitting PPR Wavin Tigris Green PN 10


3 Watermur PPR Ø 1 inch 1 bh -
4 double napel PPR Ø 1 inch 4 bh -
5 double napel 1/2 inch 3 bh -
6 L.bow PPR Ø 1 inch 5 bh -
7 L.bow PPR Ø 1/2 inch 3 bh -
8 Tee PPR Ø 1 icnh 2 bh -
9 Reduser PPR Ø 2 x 1 1 bh -
10 Reduser PPR Ø 1 x 1/2 3 bh -

D TOILET TIMUR LT 2
1 To adjust plumbing from existing to new MUSHOLLA 1 ls -

MUSHOLLA
d1 Instalasi Air Bersih Wudhu
Pipe PPR Wavin Tigris Green PN 10 Air Bersih Wudhu
1 Pipe PPR Ø 1 1/2 inch 6 M -
2 Pipe PPR Ø 1 inch 6 M -
3 Pipe PPR Ø 1/2 inch 6 M -

Fitting PPR Wavin Tigris Green PN 10


4 L.bow PPR Ø 1. 1/2 inch 3 bh -
5 L.bow PPR Ø 1 inch 3 bh -
6 L.bow PPR Ø 1/2 inch 3 bh -

7 reduser PPR Ø 1 1/2 x 1 inch 1 bh -


8 reduser PPR Ø 1. x 1/2 inch 1 bh -
9 Tee PPR Ø 1/2 inch 3 bh -
10 Sock PPR Ø 1/2 inch 8 bh -
Accessorries
11 Gate Valve KITZ Ø 1 Inch 1 bh -

Material Support
12 Hanger Clamp Ø 1 1/2 inch 2 Set -
13 Hanger Clamp Ø 1 inch 2 Set -

d2 Instalasi Air Bekas Wudhu

Pipa PVC
1 Pipa Pvc Rucika AW Ø 3 inch 12 M -
2 Pipa Pvc Rucika AW Ø 2 inch 4 M -

Fitting PVC
3 L.bow 45 Pvc Rucika AW Ø 3 inch 2 bh -
4 L.bow Pvc Rucika AW Ø 3 inch 4 bh -

5 Y Pvc Rucika AW Ø 3 inch 1 bh -


6 Reduser Pvc Rucika AW Ø 3 x 2 inch 2 bh -
7 Shock Pvc Rucika AW Ø 2 inch 2 bh -

8 Full drain Stainless Ø 2 inch 2 bh -

9 Coring Dia 3 inch 2 Ttk -

Material Support
10 Hanger Clamp Pipa Ø 3 inch 7 Set -
11 Siku 4 x 4 1 Bt -
12 Dina Bolt 10 mm 10 Pcs -
13 Longdrat 10 mm 10 Pcs -

II B 3 THIRD FLOOR
d New Design Toilet
Intalasi Pipa WW ( Air Bekas )

1 Pipa Pvc Rucika AW Ø 2 inch 36 M -

Fitting
2 Y Pvc R Dia 3x2 inch 1 Pcs -
3 Y Pvc R Dia 2 inch 4 Pcs -
4 TY pvc R Dia 2 inch 6 Pcs -
5 L.bow Pvc R Dia 2 inch 12 Pcs -
6 L.bow Pvc R Dia 1 inch 4 Pcs -
7 L.45 Pvc R Dia 2 inch 5 Pcs -
8 shock Pvc dia 1 inch 4 Pcs -
9 shock Pvc dia 2 inch 5 Pcs -
10 Reduser Pvc dia 2x1 inch 4 Pcs -

11 CO stainlese dia 2 inch 3 Pcs -


12 Floor drine dia 2 inch 6 Pcs -

13 coring dia 2 inchi 14 Ttk -

Suporting material
14 hunger klem 2 inchi 11 set -
15 - long drat 10 mm 11 bH -
16 - siku 4 x 4 1 Bt -
17 - dinabolt 10 mm P. 7,5 cm 11 bh -

Intalasi Pipa SW ( Air Kotor )


Urinal/Closet
Pipe PVC
18 Pipa Pvc Rucika AW Ø 4 inch 24 M -
19 Pipa Pvc Rucika AW Ø 3 inch 6 M -

Fitting PVC
Y Pvc Rucika AW Ø 4 inch 6 Pcs -
Y Pvc Rucika AW Ø 4 x 3 inch 5 Pcs -

20 L.bow Pvc Rucika AW Ø 4 inch 5 Pcs -


21 L.bow 45 Pvc Rucika AW Ø 3 inch 8 Pcs -
22 Shock Pvc Rucika AW Ø 4 inch 1 Pcs -

Accessorries
23 CO Stainless Ø 3 inch 5 Pcs -
24 CO Stainless Ø 4 inch 1 Pcs -

25 Coring Ø 3 inch 5 Ttk -


26 Coring Ø 4 inch 5 Ttk -
27 Coring Ø 5 inch 6 Ttk -

Material Support
28 Hanger Clamp Pipa Ø 4 inch 10 Set -
29 Siku 4 x 4 1 Bt -
30 Dina Bolt 10 mm (P=7.5CM ) 10 Set -
31 Longdrat 10 mm 10 M -
32 Lem PVC 6 Kg -

Urinal
Pipa PVC
29 Pipa Pvc Rucika AW Ø 2 inch 12 M -

Fitting Pipa PVC


30 Y Pvc Rucika AW Ø 4 x 2 inch 2 Bh -
31 TY pvc R Dia 2 inch 3 Bh -
32 L.bow Pvc Rucika AW Ø 2 inch 3 Bh -
33 L.bow Pvc Rucika AW Ø 1 1/4 inch 4 Bh -
34 Reduser Pvc dia 2 x 1 1/4 inch 4 Bh -

Accessorries
35 CO Stainless Ø 2 inch 1 Bh -

36 Coring Ø 2 inch 5 Ttk -

Material Support
37 Hanger Clamp Pipa Ø 2 inch 5 Set -
38 Siku 4 x 4 1 Bt -
39 Dina Bolt 10 mm (P=7.5CM ) 5 Bh -
40 Longdrat 10 mm 5 Bh -
41 Lem PVC 2 Kg -

Instalasi Pipa Air Bersih


Pipe PPR Wavin Tigris Green PN 10 Air Bersih

41 Pipe PPR Ø 0.5 Inch 32 M -


42 Pipe PPR Ø 1 Inch 24 M -
43 Pipe PPR Ø 2 Inch 6 M -

Fitting PPR Wavin Tigris Green PN 10 Air Bersih


1 Reducer PPR Ø 2 x 1 Inch 2 Bh -
2 Reducer PPR Ø 1 x 1/2 Inch 15 Bh -
3 T PPR Ø 1/2 Inch 12 Bh -
4 T PPR Ø 1 Inch 12 Bh -
5 T PPR Ø 2 x 1 Inch 3 Bh -
6 L Bow PPR Ø 1/2 Inch 27 Bh -
7 L Bow PPR Ø 1 Inch 20 Bh -
8 Sock PPR 1/2 Inch 15 Bh -
9 Sock PPR Ø 1 Inch 4 Bh -
10 Double Nipple PPR Ø 1 inch 15 Bh -
11 Plug Dia 1 Inch 2 Bh -
12 Gate Valve Dia 1 Inch 6 Bh -

SUPORTING MATERIAL

13 Hanger Clamp Pipa Ø 1 inch 15 Set -


14 Siku 4 x 4 1 Bt -
15 Dina Bolt 10 mm (P=7.5CM ) 15 Bh -
16 Longdrat 10 mm ( 1BT= 1M ) 15 Bt -
17 Cat Zincromite 2 Kg -
18 Thinner 2 Kg -
19 Cat Biru 2 Kg -

I TOILET lt 4 ( IMPROVEMENT )
1 To adjust plumbing from existing to new toilet design 1 ls -

TOILET OFFICE
URINAL
2 urinal lengkap flus valve t0t0 3 set -

Pipe PVC Rucika AW


3 pipa 2 " pvc rucika aw 24 M -
4 pipa 1 1/4 " pvc rucika aw 6 M -
Fitting
5 Tee 2 inch pvc 1 bh -
6 Socket pvc R aw 2" 6 bh -
7 L.bow 2 " 5 bh -
8 reduser 2 x 1 1/4pvc 3 bh -
9 L.bow 1 1/4" 5 bh -

10 CORING LANTAI 1 1/4 inchi 3 ttk -

CLOSET
11 PIPA Pvc Rucika aw 4 " 6 M -

Fitting
12 Y Pvc 4 inch 3 bh -
13 TY pvc 4 inch 1 bh -
14 L. bow Pvc 4 inch 4 bh -
15 socket Pvc 4 inch 1 bh -
16 CO stainlese 4 inch 1 bh -
17 coring lantai 4 inchi 4 ttk -

WASTAFEL
18 wastafel lengkap kran 2 set -
19 PIPA PVC 1 1/4 inch 6 M -
20 Socket pvc 2 inch 2 bh -
21 L.bow Pvc 2 inch 10 bh -
22 L.bow Pvc 1 1/4 inch 2 bh -
23 TY 2 inch pvc 6 bh -
24 Reduser Pvc 2 x 1 1/4 2 bh -
25 CO stainlese 2 inch 1 bh -
26 floor draine 3 bh -
27 coring lantai 2 inchi 6 ttk -

CLEAN WATER
Pipe PPR Wavin Tigris Green PN 10 Air Bersih
28 PIPA PPR Ø 1 INCHI 44 M -

FITTING PPR Wavin Tigris Green PN 10


29 Watermur PPR Ø 1/2 inchi 10 bh -
30 Sok PPR Ø 1/2 inchi 8 bh -
31 L.bow PPR Ø 1/2 inchi 18 bh -
32 Tee PPR Ø 1/2 inchi 8 bh -
33 Gate valve KITZ Ø 1/2 inchi 1 bh -
34 Double niple PPR Ø 1/2 inchi 2 bh -
35 Plug PPR Ø 1 inchi 1 bh -

SUPORTING MATERIAL
36 Klem gantung Ø 1/2 inchi 10 bh -
longdrat 10 mm 5 bh -
Dinabolt 10 mm 10 bh -

III FIRE WORKS

1 BASEMENT FLOOR

2 FIRST FLOOR

3 SCOND FLOOR
PEKERJAAN INSTALASI PEMADAM KEBAKARAN

a Pemipaan Instalasi Hydrant Box Timur

Pengadaan dan pemasangan Pipa Pemadam Kebakaran


pipa Black Steel Sch 40 SNI 00-39 -87/BS. 1387-85 ,dilengka
pi dengan alat bantu dan accessorries terpasang yang di
butuhkan sesuai gambar perencanaan & spesisfikasi teknis

Pekerjaan Instalasi Pipa


1 Pipa BS SCH 40 Ø 2,5 Inch 24 m -

Fitting Pipa ( Welded )


2 Elbow BS SCH Ø 2,5 inch 3 pcs -
3 Tee BS SCh Ø 2,5 x 1,5 Inch 1 pcs -

4 Inchian Screw Pipa Ø 2,5 Inch 1 Pcs -


5 Inchian Screw Pipa Ø 1,5 Inch 1 Pcs -

6 Pelepasan Box Hydrant Termasuk Accessorriesnya 1 Lot -

7 Pemasangan Box Hydrant Termasuk Accessorriesnya 1 Lot -

Material Bantu ( Support )


8 Bracket Pipa 8 Set -
9 Kawat lass RB 26 1 Box -
10 Cat Dasar ( Zincromite ) 3 kg -
11 Cat Warna Merah 3 kg -
12 Thiner Impala / Setara 1 Klg -

Pekerjaan Instalasi Pipa Hydrant BOX Barat


13 Pipa BS SCH 40 Ø 2,5 Inch 14 m -

Fitting Pipa ( Welded )


14 Elbow BS SCH Ø 2,5 inch 3 pcs -
15 Tee BS SCh Ø 2,5 x 1,5 Inch 1 pcs -
16 Inchian Screw Pipa Ø 2,5 Inch 1 bh -
17 Inchian Screw Pipa Ø 1,5 Inch 1 bh -
18 Pelepasan Box Hydrant Termasuk Accessorriesnya 1 Lot -
19 Pemasangan Box Hydrant Termasuk Accessorriesnya 1 Lot -

Material Bantu ( Support )


20 Bracket Pipa 6 Set -
21 Kawat lass RB 26 1 Box -
22 Cat Dasar ( Zincromite ) 2 kg -
23 Cat Warna Merah termasuk tiner 2 kg -
24 Thiner Impala/Setara 3 Ltr -

IV ELEKTRICAL WORKS

IV1 GROUND FLOOR


To replace (uninstall and reinstall) Downlight at side corridor drop off
1 52 pt -
area
2 To replace (uninstall and reinstall) TL Lamp at Parking Lot 245 pt -
3 To
To take outand
Supply canopy
Installdrop off3lamp
cable x 2.5 mm + conduit Pipe 20 mm 9 unit -
4 (Material new decorative lamp at Canopy Drop Off - SUPPLY BY 1 set -
OTHERS)
IV2 FIRST FLOOR - Public Area
1 To replace (uninstall and reinstall) Downlight at drop off area 112 pt -
To replace (uninstall and reinstall) Spot Light MR 16 5W at entrance
2 5 pt -
area
To replace (uninstall and reinstall) Spot Light MR 16 5W at below
3 16 pt -
escalator
To replacearea
(uninstall and reinstall) Downlight LED 9W at service room /
4 1 ls -
shaft / storage room
5 To install Downlight Panel 12W (4000K) 165 pt -
6 To install Spotlight MR16 5W (3000K) 46 pt -
To install Downlight for Gutter Ceiling in black colour armature (Type
7 40 pt -
TBA)
8 To install LED TL T5 Lamp 120cm (4000K) 116 pt -
9 To install LED TL T5 Lamp 60cm (4000K) 14 pt -
10 To install LED TL T5 Lamp 30cm (4000K) 6 pt -
11 To install power outlet 7 pt -
12 To install power outlet (on floor) 4 pt -
13 To install power outlet (on desk) 2 pt -
14 Pekerjaan Regrouping lamp common area termasuk adjusment 1 LS -
15 sesuai gambar dan spesifikasi teknis

IV3 FIRST FLOOR - East Toilet


1 To install Spotlight MR16 5W (3000K) 22 pt -
2 To install Downlight LED 7W (4000K) - Nursery 1 pt -
3 To install Downlight LED 9W (6000K) - Janitor 1 pt -
4 To install LED TL T5 Lamp 120cm (4000K) 2 pt -
5 To install LED TL T5 Lamp 60cm (4000K) 2 pt -
6 Pekerjaan Regrouping lamp common area termasuk adjusment 1 LS -
sesuai gambar dan spesifikasi teknis

IV4 SECOND FLOOR - PUBLIC AREA


To replace (uninstall and reinstall) Spot Light MR 16 5W at below
1 8 pt -
escalator
To replacearea
(uninstall and reinstall) Downlight LED 9W at service room /
2 1 ls -
shaft / storage room
3 To install Downlight Panel 12W (4000K) 178 pt -
4 To install Spotlight MR16 5W (3000K) 26 pt -
To install Downlight for Gutter Ceiling in black colour armature (Type
5 129 pt -
TBA)
6 To install LED TL T5 Lamp 120cm (4000K) 114 pt -
7 To install LED TL T5 Lamp 60cm (4000K) 17 pt -
8 To install LED TL T5 Lamp 30cm (4000K) 13 pt -
9 To install power outlet 7 pt -
10 Pekerjaan Regrouping lamp common area termasuk adjusment 1 LS -
sesuai gambar dan spesifikasi teknis

IV5 SECOND FLOOR - EAST TOILET


NEW MUSHOLLA by Owner

IV6 SECOND FLOOR - WEST TOILET


1 To install Spotlight MR16 5W (3000K) 13 pt -
2 To install Downlight 9W (6000K) - Janitor 1 pt -
3 To install LED TL T5 Lamp 120cm (4000K) 2 pt -
4 To install LED TL T5 Lamp 60cm (4000K) 2 pt -
5 To install LED TL T5 Lamp 30cm (4000K) 4 pt -
6 Pekerjaan Regrouping lamp common area termasuk adjusment 1 LS -
sesuai gambar dan spesifikasi teknis

IV7 THIRD FLOOR - PUBLIC AREA


1 To replace (uninstall and reinstall) Downlight LED 9W at service room / 1 ls
shaft / storage room -
2 To replace (uninstall and reinstall) Downlight at Slooping Ceiling 88 pt -
3 To install Downlight Panel 12W (4000K) 21 pt -
4 To install Spotlight MR16 5W (3000K) 24 pt -
To install Downlight for Gutter Ceiling in black colour armature (Type
5 16 pt -
TBA)
6 To install LED TL T5 Lamp 120cm (4000K) 132 pt -
7 To install LED TL T5 Lamp 60cm (4000K) 66 pt -
8 To install LED TL T5 Lamp 30cm (4000K) 66 pt -
9 To install Downlight CMDT/CMDR (4000K) - at New Drop Ceiling 172 pt -
10 To install power outlet 4 pt -
11 To Provide Electrical Power (Cable Only) - Island Counter 2 pt -
12 Pekerjaan Regrouping lamp common area termasuk adjusment 1 LS -
sesuai gambar dan spesifikasi teknis

IV8 THIRD FLOOR - EAST TOILET AREA

IV9 THIRD FLOOR - WEST TOILET AREA


1 To install Spotlight MR16 5W (3000K) 13 pt -
2 To install Downlight 9W (6000K) - Janitor 1 pt -
3 To install LED TL T5 Lamp 120cm (4000K) 2 pt -
4 To install LED TL T5 Lamp 60cm (4000K) 2 pt -
5 To install LED TL T5 Lamp 30cm (4000K) 4 pt -
6 Pekerjaan Regrouping lamp common area termasuk adjusment 1 ls -
sesuaigambar dan spesifikasi teknis

IV10 FOOD COURT

1 Peralatan Utama Elektrikal


Pengadaan dan pemasangan perlatan Utama Elektrikal
lengkap dan accessorries lain dengan alat bantu yang di
perlukan sesuai gambar perencanaan & spesifikasi teknis

1.A Pengadaan Panel Foodcourt


1 Box Panel ( PxLxT = 70x50x20 cm ) Thicknes 1,2 mm 1 Bh -
2 Main MCB 63 Amp 1 Bh -

3 MCB 32 Amp 3 PHASE FRESH Air 1, 10.00 CFM ,DOL 1 Bh -


4 MCB 32 Amp 3 PHASE FRESH Air 2, 8.000 CFM ,DOL 1 Bh -
5 MCB 10 Amp 3 Phase Exhause Air , 6.000 CFM ,DOL 2 Bh -
6 MCB 10 Amp 3 Phase Exhause Air , 4.000 CFM ,DOL 5 Bh -
7 Cable Jumper 4 x 16 mm 6 M -

8 Lengkap dengan lamp indikator R,S & T ,Voltage Meter ,Contactor 1 Ls -


Selector Phase ,Push Button On& Off ,Th ( Overload )
dan Acces sorries lainya

9 Cable Tray 200 x 100 mm termasuk support dan accessorriesnya 60 M -


Cover Tray 30 M -

IV11 FOURTH FLOOR - PUBLIC AREA


1 To replace (uninstall and reinstall) Downlight LED 9W at service room / 1 ls
shaft / storage room -
2 To install Downlight 9W (6000K) 27 pt -
3 To install Spotlight MR16 5W (3000K) 8 pt -
4 To install LED TL T5 Lamp 120cm (6000K) 14 pt -
5 To install LED TL T5 Lamp 60cm (6000K) 4 pt -
6 Pekerjaan Regrouping lamp common area termasuk adjusment 1 ls -
7 sesuaigambar dan spesifikasi teknis

IV 12 FOURTH FLOOR - TOILET AREA


1 To install Downlight 9W (6000K) 12 pt -
2 Pekerjaan Regrouping lamp common area termasuk adjusment 1 ls -
sesuaigambar dan spesifikasi teknis

V TEST COMMISIONING
1 Lantai 1 1 ls -
2 Lantai 2 1 ls -
3 Lantai 3 1 ls -
4 Lantai 4 1 ls -

SUB TOTAL III


TOTAL BY CONTRACTOR -
GRAND TOTAL
TOTAL PRICE (Rp)
JASA

-
-
-
-

-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-

-
-
-
-
-
-
-

-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-

-
-
-

-
-
-
-
-
-
-
-
-
-
-
-

-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
-
-

-
-
-
-
-
-
-

-
-

-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-

-
-
-
-
-
-

-
-
-
-
-

-
-
-
-
-
-

-
-
-

-
-
-

-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-
-

-
-

-
-
-
-

-
-

-
-

-
-
-

-
-
-

-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-

-
-
-
-
-

-
-
-
-
-
-
-
-

-
-
-

-
-

-
-

-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-

-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-

-
-
-
-
-
-
-

-
-
-
-

-
-
-
-
-
-
-
-

-
-
-
-
-

-
-

-
-
-
-
-
-
-
-
-

-
-

-
-
-
-
-
-
-
-

-
-

-
-
-
-
-
-
-

-
-
-
-

-
-
-
-
-
-
-
-
-
-

-
-

-
-
-
-
-

-
-
-
-
-

-
-
-

-
-

-
-
-
-
-
-
-

-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-

-
-
-
-
-

-
-

-
-
-
-
-
-
-
-
-

-
-
-

-
-
-
-
-
-
-

-
-

-
-
-
-
-
-
-

-
-
-
-
-
-

-
-

-
-
-
-
-
-
-
-

-
-
-

-
-
-

-
-
-
-
-

-
-

-
-

-
-

-
-
-

-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-

-
-
-
-

-
-

-
-

-
-
-

-
-

-
-
-

-
-
-
-
-

-
-
-
-
-

-
-
-
-
-

-
-
-

-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-

-
-

-
-

-
-
-
-
-

-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-

-
-
-

-
-

-
-

-
-
-
-
-

-
-
-
-
-
-

-
-
-
-
-

-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-

-
-

-
-
-
-
-

-
-

-
-
-
-
-
-

-
-
-
-
-
-

-
-
EXCLUDE PPN
PENAWARAN HARGA PEKERJAAN MEP
RENOVASI SUNTER MALL (BQ 2) OPERASIONAL

NO ITEM
DESCRIPTION VOL SAT
BY CONTRACTOR
I PRELIMINARY WORKS
1 Bongkar Lantai Keramik R.tamu, koridor dan Bath Room m2

II M/E WORKS

IIA DUCT WORKS ( VAC )

II A 1 BASEMENT FLOOR

a Ex Agantea ( OPERASIONAL )

b EX CROCODILE & SINAR MULIA (IMPROVEMENT )

c EX PARIS & HEN N SHE ( OPERASIONAL )

1 AC SPLIT DUCT 10 PK (by owner) 1 UNIT


Drain Pan 190 CM x 110 CM x 10 CM ( BJLS 0.5 Dgn 1 Bh
Siku 3 x 3 CM
2 Pipa cooper tube 13/8 x 1/2" Merk Inaba /Setara 60 M
3 Cable Control NYMHY 4 x 1.5 mm supreme 60 M
4 Thermostat NYMHY 4x1.5 mm 10 60
5 Cable Power NYY 4 x 10 mm 80 M
6 Cable Fan NYY 4 x 4 mm 60 M
7 MCB 3 Phase MG 32 Amp 1 BH
8 Lengkap Push Button On Of ,2 BH Relay Omron LY2 2N 1 Ls
9 220 Volt dan Lamp Indikator On , OFF & TRIP
10 Pipa Drainage Dia 1 Inch PVC RUCIKA AW 18 BT
11 Long Drat Dia 10 mm 40 BH
12 Besi Siku 30 x 30 thicness 3 mm 5 Bt
13 Mur & Baut 10 mm 80 BH
14 Rubber Mounting 50 x 50 mm Lengkap mur baut 4 BH
15 Rubber Mounting 70 x 50 mm Lengkap Mur baut 4 Bh
16 Long Drat Dia 12 mm 4 BH
17 Mur 12 mm 16 Bh
18 Canal UNP 100 mm Support FCU Unit 3 BT
19 Canal UNP 100 mm Support Condensing Unit 4 BT
20 Pipa GIP Dia 3 Inch 1 BT
21 Besi Siku 50 x 50 thicknes 3 mm 5 BT
22 Material Bantu termasuk Unit dan Instalasi Duct 1 Lot
23 Return Air Grille 120 x 60 cm 1 Bh
Lengkap Plenum Box & Pre Filter
24 Freon R.407 1 Tbg
25 See Glass Ø 1/2" Castel 1 Bh
26 Hand Valve Ø 1/2" 2 Bh
d EX PARABONA & STARSTUDIO( OPERASIONAL )

1 AC SPLIT DUCT 10 PK 1 UNIT


Drain Pan 190 CM x 110 CM x 10 CM ( BJLS 0.5 Dgn 1 Bh
Siku 3 x 3 CM
2 Pipa cooper tube 13/8 x 1/2" Merk Inaba Denco 55 M
3 Cable Control NYMHY 4 x 1.5 mm Supreme 55 M
4 Thermostat NYMHY 4 x1.5 mm 10 M
5 Cable Power NYY 4 x 10 mm 80 M
6 Cable Fan NYY 4 x 4 mm 50 M
7 MCB 3 Phase MG 32 Amp 1 BH
8 Lengkap Push Button On Of ,2 BH Relay Omron LY2 2N 1 Ls
220 Volt dan Lamp Indikator On , OFF & TRIP
9 Cable Tray 30 x 5 50 M
10 Pipa Drainage Dia 1 Inch PVC RUCIKA AW + Insuflex Setara 3 BT
11 Pipa Drainage Dia 2 Inch PVC RUCIKA AW + Insuflex Setara 6 BT
12 Long Drat Dia 10 mm 40 BH
13 Besi Siku 40 x 40 thicness 3 mm 3 Bt
14 Mur & Baut 10 mm 80 BH
15 Rubber Mounting 50 x 50 mm 4 BH
16 Rubber Mounting 70 x 50 mm 4 Bh
17 Long Drat Dia 12 mm 4 BH
18 Mur & baut 12 mm 16 Bh
19 Canal UNP 100 mm Support FCU 3 BT
20 Canal UNP 100 mm Support Condensing unit 4 BT
21 Pipa GIP Dia 3 Inch 1 BT
22 Besi Siku 50 x 50 x 5 mm 5 BT
23 Material Bantu termasuk Unit dan Instalasi Duct 1 Lot
24 Return Air Grille 120 x 60 cm 1 Bh
Lengkap Plenum Box & Pre Filter
25 Freon R.407 1 Tbg
26 See Glass Ø 1/2" Castel 1 Bh
27 Hand Valve Ø 1/2" 2 Bh

e EX OPTIK MELAWAI ( STAR BUCK ) ( OPERSIONAL )

1 AC Split Duct 12 PK (by owner) 1 Unit


Drain Pan 190 CM x 110 CM x 10 CM ( BJLS 0.5 Dgn 1 Bh
Siku 3 x 3 CM
2 Pipa cooper tube 1.3/8 x 1/2 "Merk Inaba /Setara 50 M
3 Cable Control NYMHY 4 x 1.5 mm 50 M
4 Thermostat NYMHY 4 x1.5 mm 10 M
5 Cable Power NYY 4 x 16 mm 80 M
6 Cable Fan NYY 4 x 4 mm 50 M
7 MCB 3 Phase MG 32 Amp 1 BH
8 Lengkap Push Button On Of ,2 BH Relay Omron LY2 2N 1 Ls
9 220 Volt dan Lamp Indikator On , OFF & TRIP
10 Cable Tray 40 x 10 cm 50 M
11 Pipa Drainage Dia 1 Inch PVC RUCIKA AW 1 BT
12 Pipa Drainage Dia 2 Inch PVC RUCIKA AW 6 BT
13 Long Drat Gantungan Tray Dia 10 mm 40 BH
14 Besi Siku 40 x 40 4 Bt
15 Mur & Baut 10 mm 80 BH
16 Rubber Mounting 50 x 50 mm 4 BH
17 Rubber Mounting 70 x 50 mm 4 Bh
18 Mur & baut 10 mm 16 Bh
19 Canal UNP 100 mm Support Indoor 2 BT
20 Canal UNP 100 mm Support Out Door Fan 4 BT
21 Pipa GIP Ø 3" 1 BT
22 Material Bantu termasuk Unit dan Instalasi Duct 1 Lot
23 Return Air Grille 120 x 60 cm 1 Bh
24 Lengkap Plenum Box & Pre Filter
25 Freon R.407 1 Tbg
26 See Glass Ø 1/2" Castel 1 Bh
27 Hand Valve Ø 1/2" 2 Bh

f EX DOMINO ( IMPROVEMENT )

g Corridor lt.1 Sisi Timur ( IMPROVEMENT )

h CORRIDOR LT.1 SISI BARAT ( IMPROVEMENT )

i Burger King ( IMPROVEMENT )

j 2.6.Fresh Air Duct LT 1 ( FA )

j.1 SIDE TIMUR

j.2 SIDE BARAT

k .MECHANICAL EXHAUSE TOILET WEST

II A 2 SECOND FLOOR

a Sisi Timur Depan Lift ( 6.10 ) ( OPERASIONAL )

1 Pengadaan AC Baru kapasitas : 12 PK Merk: Trane (by Owner) 2 unit


2 Crane untuk lifting AC 1 ls
3 Pipa cooper tube 13/8 x 1/2 Merk Inaba /Setara 90 Mtr
4 Kabel Power Indoor unit 4 x 4 mm NYY HY Supreme 90 Mtr
5 Kabel Power Outdoor unit 4 x 10 mm NYY HY Supreme 60 Mtr
6 Kabel Control Ø 3 x 2.5 mm NYM HY Supreme 60 Mtr
7 Kabel Control Ø 4 x 1.5 mm NYM HY Supreme 90 Mtr
8 Kabel Thermostat Ø 4 x 1.5 mm NYM HY Supreme 20 Mtr
9 long Drat Ø 12 mm Lengkap Mur 8 Btg
10 Rubber Mounting Ø 50 x 50 mm Lengkap Mur baut 8 Bh
11 Rubber Mounting Ø 70 mm x 50 mm Lengkap Mur baut 8 Bh
12 Braket Pipa Instalasi 20 Set
13 Drain Pan 190 CM x 110 CM x 10 CM ( BJLS 0.5 Dgn 2 Bh
14 Siku 3 x 3 CM
15 Pipa Drain Ø 1 " Rucika AW Lengkap Isolasi Insuplek 2 Btg
16 Pipa Drain Ø 2 " Rucika AW Lengkap Isolasi Insuplek 25 Btg
17 See Glass Ø 1/2" Castel 2 Bh
18 Hand Valve Ø 1/2" Castel 4 Bh
19 Freon R.407 2 Tbg
20 RAG Ø 120 x 60 cm 2 Bh
Lengkap Plenum Box & Pre Filter
21 Panel Control Direck Online Lengkap Push Button On-Off 1 Bh
32 Amper x 3 . Untuk 3 Unit AC ( ukuran Panel 60 x 50 x 20 )
Lengkap Push Button On Of , 6 BH Relay Omron LY2 2N
220 Volt dan Lamp Indikator On , OFF & TRIP
22 Material Bantu termasuk Unit dan Instalasi Duct 1 Lot

Pengadaan dan pemasangan instalasi Ducting PU

termasuk bracket ,gantungan support dan perlengkapan bantu lainya


sesuai gambar dan spesifikasi (Firstduct atau setara)

24 PU Duct size 525 x 525 7 M2


25 PU Duct size 450 x 450 6 M2
26 PU Duct size 425 x 425 3 M2
27 PU Duct size 375 x 375 10 M2
28 PU Duct size 350 x 350 12 M2
29 PU Duct size 300 x 300 13 M2
30 PU Duct size 275 x 275 12 M2
31 PU Duct size 225 x 225 8 M2

32 Simetrical Wye,ConvergingTee 45,Converging Wye,Elbow,Rectangular 1 LS


Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis

33 PU Duct size 525 x 525 20 M2


34 PU Duct size 425 x 425 17 M2
35 PU Duct size 375 x 375 6 M2
36 PU Duct size 300 x 300 4 M2
37 PU Duct size 275 x 275 4 M2
38 PU Duct size 250 x 250 7 M2
39 PU Duct size 225 x 225 3 M2

40 Simetrical Wye,ConvergingTee 45,Converging Wye,Elbow,Rectangular 1 LS


Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis

41 Round Diffuser Dia 300 mm Colour Black 24 Pcs


42 Spigot Dumper Dia 8 Inch,termasuk flexible Round Duct 24 Pcs

b VOID LANTAI 2 ( Timur dan Barat )(IMPROVEMENT )

c MECHANICAL EXHAUSE TOILET

Pekerjaan Exhause Air Ducting SIDE WEST


II A 3 THIRD FLOOR

a Food Court WEST ( PUSAT JAJAN ) IMPROVEMENT

b MECHANICAL EXHAUSE FOODCOURT WEST ( PUSAT JAJAN )


IMPROVEMENT

c MECHANICAL EXHAUSE TOILET LT 3( IMPROVEMENT )

b MECHANICAL FRESH AIR DUCT FOODCOURT

c Pekerjaan Fresh Air Ducting Food Court


c.1 Side East

f Fund World lt.3

f.1 Penggantian Unit AC lt.3 no: 120 ( OPERASIONAL )

1 Bongkar AC lama kapasitas:12 PK dan Instalasi 1 Unit


2 Crane untuk lifting AC 1 ls
3 Pengadaan AC Baru kapasitas : 12 PK Merk: Trane 1 unit
4 Pipa cooper tube 13/8 x 1/2 Merk Inaba /Setara 30 Mtr
5 Kabel Control Ø 4 x 1.5 mm NYM HY Supreme 30 Mtr
6 Kabel Thermostat Ø 4 x 1.5 mm NYM HY Supreme 10 Mtr
7 long Drat Ø 12 mm Lengkap Mur 4 Btg
8 Rubber Mounting Ø 50 x 50 mm Lengkap Mur baut 4 Bh
9 Rubber Mounting Ø 70 mm x 50 mm Lengkap Mur baut 4 Bh
10 Drain Pan 190 CM x 110 CM x 10 CM ( BJLS 0.5 Dgn 1 Bh
Siku 3 x 3 CM
11 Pipa Drain Ø 1 " Rucika AW Lengkap Isolasi Insuplek 1 Btg
12 See Glass Ø 1/2" Castel 1 Bh
13 Hand Valve Ø 1/2" Castel 2 Bh
14 Freon R.407 1 Tbg
15 Conecting unit ke Ducting 1 Lot
16 Material Bantu 1 Lot

f.2 Relokasi AC Funworld Lt3 NO 119

Bongkar dan pasang Unit 1 Unit


Pemindahan Ducting Dimensi 34 x 16 2 M
Pemindahan Ducting Dimensi 28 x 16 6 M
Pemindahan Ducting Dimensi 20 x 12 7 M
Pemindahan Ducting Dimensi 14 x 10 13 M

Pengadaan Kable NYY 4 x 6mm 5 M


Pengadaan Pipa Cooper Tube 1 1/8 x 3/4 Inaba 5 M
atau Setara
Pengadaan Freon R 22 1 Tbg
Material Bantu 1 Lot
II A 4 FOURTH FLOOR

a Fundworld lt.4

a.1 Penggantian AC lt.4 no.135(OPERASIONAL )

1 Bongkar AC lama kapasitas 12 PK dan termasuk bongkar Instalasi lama 1 unit


2 Pengadaan AC Baru kapasitas : 12 PK Merk: Trane (by owner) 1 unit
3 Crane untuk lifting AC 1 ls
4 Pipa cooper tube 13/8 x 1/2 Merk Inaba /Setara 22 Mtr
5 Kabel Control Indoor Ø 4 x 1.5 mm NYM HY Supreme 30 Mtr
6 Kabel Thermostat Ø 4 x 1.5 mm NYM HY Supreme 10 Mtr
7 Support UNP 100 x 50 x 600 1 Btg
8 Rubber Mounting Ø 50 x 50 mm Lengkap Mur baut 4 Bh
9 Rubber Mounting Ø 70 mm x 50 mm Lengkap Mur baut 4 Bh
10 Conecting Ducting ke unit AC 1 Lot
11 Drain Pan 190 CM x 110 CM x 10 CM ( BJLS 0.5 Dgn Siku 3 x 3 CM ) 1 Bh
12 Pipa Drain Ø 1 " Rucika AW Lengkap Isolasi Insuplek 1 Btg
13 Freon R.407 1 Tbg
14 Material Bantu 1 Lot
15 Test Commisioning 1 Lot

a.2 Penambahan AC Fundworld lt.4 Kapasitas 12 PK


IMPROVEMENT

a3 AHU 122 ( OPERASIONAL )


1 BJLS 60 Ducting size 525 x 525 mm 10 M2
2 BJLS 60 Ducting size 425 x 425 mm 17 M2
3 Three Way Duct 675 x 525 mm 5 M2
4 Reducer Duct ( 525 x 525 ) x ( 525 x 425 ) mm 5 M2
5 Straight Duct 425 x 425 mm 5 M2
6 Elbow Duct 5 M2
7 Pengbongkaran Ducting Existing 1 Ls

a.4 AHU 123( OPERASIONAL )


1 BJLS 60 Ducting size 525 x 525 mm 10 M2
2 BJLS 60 Ducting size 425 x 425 mm 17 M2
3 Three Way Duct 675 x 525 mm 5 M2
4 Reducer Duct ( 525 x 525 ) x ( 525 x 425 ) mm 5 M2
5 Straight Duct 425 x 425 mm 5 M2
6 Elbow Duct 5 M2
7 Pengbongkaran Ducting Existing 1 Ls

a.5 AHU 124 ( OPERASIONAL )


1 BJLS 60 Ducting size 525 x 525 mm 8 M2
2 BJLS 60 Ducting size 425 x 425 mm 13 M2
3 Three Way Duct 675 x 525 mm 5 M2
4 Reducer Duct ( 525 x 525 ) x ( 525 x 425 ) mm 5 M2
5 Straight Duct 425 x 425 mm 5 M2
6 Elbow Duct 5 M2
7 Pengbongkaran Ducting Existing 1 Ls
a.6 AHU 125 ( OPERASIONAL )
1 BJLS 60 Ducting size 525 x 525 mm 8 M2
2 BJLS 60 Ducting size 425 x 425 mm 13 M2
3 Three Way Duct 675 x 525 mm 5 M2
4 Reducer Duct ( 525 x 525 ) x ( 525 x 425 ) mm 5 M2
5 Straight Duct 425 x 425 mm 5 M2
6 Elbow Duct 5 M2
7 Pengbongkaran Ducting Existing 1 Ls

a.7 AHU 126 ( OPERASIONAL )


1 BJLS 60 Ducting size 525 x 525 mm 9 M2
2 BJLS 60 Ducting size 425 x 425 mm 9 M2
3 Three Way Duct 675 x 525 mm 5 M2
4 Reducer Duct ( 525 x 525 ) x ( 525 x 425 ) mm 5 M2
5 Straight Duct 425 x 425 mm 5 M2
6 Elbow Duct 5 M2
7 Pengbongkaran Ducting Existing 1 Ls

a.8 AHU 127 ( OPERASIONAL )


1 BJLS 60 Ducting size 525 x 525 mm 5 M2
2 BJLS 60 Ducting size 425 x 425 mm 9 M2
3 Three Way Duct 675 x 525 mm 5 M2
4 Reducer Duct ( 525 x 525 ) x ( 525 x 425 ) mm 5 M2
5 Straight Duct 425 x 425 mm 5 M2
6 Elbow Duct 5 M2
7 Pengbongkaran Ducting Existing 1 Ls
8 Simetrical Wye,ConvergingTee 45,Converging Wye,Elbow,Rectangular 1 Ls
Rectangular Wye,Dll sudah termasuk dan sesuai spesifikasi teknis
9 Three Way Duct 675 x 525 mm 5 M2
10 Reducer Duct ( 525 x 525 ) x ( 525 x 425 ) mm 5 M2
11 Straight Duct 425 x 425 mm 5 M2
12 Elbow Duct 5 M2
13 Round Diffuser Dia 400 mm Colour Refer to Colour Wall ( Dia Inside ) 24 PCS
14 Supporting Material 1 Lot
AAN MEP
PERASIONAL

UNIT PRICE (Rp) TOTAL PRICE (Rp)


MATERIAL JASA MATERIAL JASA
TRACTOR

- -
- -

- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -

- -
- -

- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -

- -
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -

- -

- -

- -
- -
- -
- -
- -
- -
- -
- -

- -

- -
- -
- -
- -
- -
- -
- -

- -

- -
- -
- -
-
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -

- -
- -

- -
- -
- -
- -
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -

SUB TOTAL III


TOTAL BY CONTRACTOR - -
GRAND TOTAL -
EXCLUDE PPN
REKAPITULASI PENAWARAN HARGA PEKERJAAN MEP
RENOVASI SUNTER MALL (BQ 1) IMPROVEMENT

I PRELIMINARY WORKS SUB TOTAL I -


TOTAL I -
II M/E WORKS
IIA DUCT WORKS ( VAC )
II A 1 FIRST FLOOR SUB TOTAL II -
TOTAL II -
II A 2 SECOND FLOOR SUB TOTAL III -
TOTAL III -
II A 3 THIRD FLOOR SUB TOTAL IV -
TOTAL IV -
II A 4 FOURTH FLOOR SUB TOTAL V -
TOTAL V -
IIB PLUMBING WORKS
II B 1 FIRST FLOOR SUB TOTAL VI -
TOTAL VI -
II B 2 SECOND FLOOR SUB TOTAL VII -
TOTAL VII -
II B 3 THIRD FLOOR SUB TOTAL VIII -
TOTAL VIII -
II B 4 FOURTH FLOOR SUB TOTAL IX -
TOTAL IX -
III FIRE WORKS SUB TOTAL X -
TOTAL X -
IV ELECTRICAL WORKS SUB TOTAL XI -
TOTAL XI -
V TEST COMMISSIONING SUB TOTAL XII -
TOTAL XII -

GRAND TOTAL -
REKAPITULASI PENAWARAN HARGA PEKERJAAN MEP
RENOVASI SUNTER MALL (BQ 2) OPERASIONAL

II M/E WORKS
IIA DUCT WORKS ( VAC )
II A 1 FIRST FLOOR SUB TOTAL I -
TOTAL I -
II A 2 SECOND FLOOR SUB TOTAL II -
TOTAL II -
II A 3 THIRD FLOOR SUB TOTAL III -
TOTAL III -
II A 4 FOURTH FLOOR SUB TOTAL IV -
TOTAL IV -

GRAND TOTAL -
N MEP
ENT

-
-

-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
N MEP
AL

-
-
-
-
-
-
-
-

-
REKAPITULASI PENAWARAN HARGA PEKERJAAN MEP
RENOVASI SUNTER MALL

I ( BQ 1 ) IMPROVEMENT -

II ( BQ 2 ) OPERASIONAL -

GRAND TOTAL -

PEMBULATAN -

PPN 10% -

GRAND TOTAL + PPN -