You are on page 1of 4
oo for sensors would be required. “LW OTICNA system Is not in the scope of transformer supplier then it is required t0 mention the following Parain schedule A of respective ems L comegive tes _ 3 Fy * Famainn | Serer | Presartscaps | seope of | Remar | 2 | Required of orien ‘ | ‘transformer | supplier | | | | = | nonufacturer i q E 2 3 = | [+ | isting eakaze [On oad Tan Yes | Tete | current | delta & | supplied by | |__| measurement _| capacinnce | onc J [Bushing Tan Delta | Measurement | siooter | ; | —_ | measurement _ | _| 3 Toiltemperature | P7100 | ‘Yes No | } | measurement | emperstre (Mandatory) | | | [si a sensor «| | | Ta [Winding Hot Spot | Fiber an No | Tobe | | temperature sensor | (Oevenall | mentioned | | measurement in Schedule-| @ aot | iE render [e ‘Dynamic oventoad | Winding es No ~ a y | amit |temperature- | (Mandatory) \ | || rmeasurement | through P7200 | | ‘Oil temperature yes: No | = through PT200 |_(Mandatory} Het Sport Yes wo | temperature- | (Optional | Mentioned | through FOS | inSchedule~| | (ae | | transformer | = | eee cxtaionete\netandenevromenerst emer dt aT rae SW | Function Sensor reset e8pe ee | T Remarks |] | Required oTicM \ ae ee | Manes fst Pr | Samal —_\winv aay no | | | trrough ave | (Mandatory) | __ | Eee Yes No | | = AVR __|_{Mandatory) | i . Ambient Temperature | No | Yes | Tobe Temperature supplied by | \ orien | - || et Tpimolvedgeses | Online DGA ve | Me robe | | ond rate of gas (Optional) | | mentioned | generationin onuine D6A | | 1 Schedule] | transtormer oil \witho@as+ | | aot | | |Horatiaast \ Moisture | Trenstormer | |na,co,c2r2& | Measurement | tender | c oe ie ‘Moisture in Oil In Moisture | Yes 2pm Messurement | (Optional) | | \ inl ea | sched | | 0GA | | AoF | ) es | | transformer fis alll ein [ST Oparationar | Pemp & Fens Yes No Tobe \ status ofthe }Operating | | Mentioned | pumps&fans contactor with | | insteds| tt | contact \ | Pump | | | aainne | | | | pave Ke | | ree contact \ | ‘oindicale | | | over | position jransformer | supplier recminate semein No forte be compatibiel Ne [ar [autcherer signature {supplied ®Y | ore | — pic Va or | Tie oute current,” \ accumulated in nividual 2P* ent il samoling quantity ta be supmteS shall be mentioned schedule “A 3. Required Creepese aistance shall be mention ed in chedule Act tender ready pen wncororared I encnenrm ey Present SCOPE Scope of Remarks | | ar] fnetion cam | | required of oricw \ \ ‘Transforme! | supplier \ | anaes (ane al ee = \ | oure —— a “ine price lst for such Sensors snail be Keet aparate than tat of complete OTICM. eded to be mentioned i" schedule ed engineering & viniare acraaterouicee: ANY process required vo cNeek fas cariew out during demaie’ engineering, both sUPDIet of wensformer am shalt co-ordinate © ccesstul commissioning operation of ach other fOr 54S from time to ime: Bottles specific re othe | shall also 12 ‘atmat actuat sensors €0 BE provides made only for those to be decided suring deta payment shall be icy shal Fave 10 B= 0 oTIeM system ation is 2tready epee the ‘rip Polymer type Hes 38 fare requirement of BUSTING” ae Be nop busting, & ts NORGE exawwation sal DE Department for timely delivery of material, particularly for reviewed by Procuremen 220KV Class. alent to Moose oF ZEbrs TRE red are Twin ALS eau chedule A the terminal requil ‘the same shall Be ca mentioned in the 5 6, otner items ‘a. NoofCoresof gushing CT shall be te Fos shallbe part of supply of transformer c., GPS) GPRSIGSM tpased on line transformer ovement systers wil 52 be partof supply mended & shall not mento? any specific ot recom ‘ade generic technical bye on ate 29032027, make oil filter machine jreschecule® since we already have mi pacification ssi or your forherneestel Hane - Woo SE (engineesina) ace {Proe)

You might also like