You are on page 1of 96

Label Start Node Invert (Start) Stop Node Invert (Stop) Material Diameter (m

NA-1 BR-67 56.49 N/A-1 56 PVC 200 mm


NA-2 BE-56 50.78 N/A-2 50 PVC 200 mm
NA-3 BE-116 64.22 N/A-3 64 PVC 200 mm
TE-2 BE-102 57.72 BE-103 57.6 PVC 200 mm
TE-4 BE-106 58.17 BE-102 57.72 PVC 200 mm
TE-6 BE-107 58.29 BE-108 58.15 PVC 200 mm
TE-8 BR-34 54.12 BE-110 54.1 CSN 300 mm
TE-13 BE-110 54.1 BR-33 54.06 CSN 300 mm
TE-14 BE-117 65.34 BE-116 64.22 CSN 200 mm
TE-15 BE-118 65.12 BE-119 59.72 CSN 200 mm
TE-16 BE-120 69.16 BE-121 66.84 CSN 200 mm
TE-17 BE-188 56.34 BR-18 54.17 PVC 200 mm
TE-19 BE-122X 67.32 BE-118 65.12 CSN 200 mm
TE-26 BE-129 53.68 BE-130 53.29 PVC 200 mm
TE-27 BE-130 53.29 BE-100 52.8 PVC 200 mm
TE-29 BE-122 67.32 BE-117 65.34 CSN 200 mm
TE-32 BE-121 66.84 BE-135 65.08 CSN 200 mm
TE-33 BE-20 54.51 BE-71 54.48 CSN 350 mm
TE-35 BE-51 52.08 BE-49 51.85 CSN 350 mm
TE-38 BE-55 51.22 BE-56 50.78 CSN 350 mm
TE-39 BE-142 60.13 BE-119 59.72 CSN 200 mm
TE-42 BE-26 53.22 BE-63 53.01 CSN 400 mm
TE-44 BE-145 61.35 BR-76 60.67 CSN 200 mm
TE-46 BE-23 53.95 BE-26 53.22 CSN 400 mm
TE-50 BE-119 59.72 BR-17 58.21 CSN 200 mm
TE-52 BE-71 54.48 BE-23 53.95 CSN 400 mm
TE-58 BE-160 51.27 BE-55 51.22 CSN 350 mm
TE-66 BE-63 53.01 BE-51 52.94 CSN 400 mm
TE-72 BE-169X 63.09 BE-170 62.42 CSN 200 mm
TE-84 BE-170 62.42 BR-76 60.82 CSN 200 mm
TE-99 BE-189 59.68 BE-107 58.29 PVC 200 mm
TE-100 BE-182 59.34 BE-102 57.72 PVC 200 mm
TE-101 BE-183 58.97 BE-184 57.98 PVC 200 mm
TE-102 BE-135 65.08 BE-142 60.13 CSN 200 mm
TE-103 BE-49 51.85 BE-160 51.27 CSN 350 mm
TE-106 BE-186 56.94 BE-110 54.1 CSN 200 mm
TE-107 BE-103 57.6 BE-186 56.94 CSN 200 mm
TE-110 BE-187 57.44 BP-8 54.45 CSN 200 mm
TE-111 BE-108 58.15 BE-187 57.44 CSN 200 mm
TE-113 BE-184 57.98 BE-111 57.35 PVC 200 mm
TE-114 BE-13 58.33 BE-14 57.19 CSN 300 mm
TE-117 BE-5 59.21 BE-13 58.33 CSN 300 mm
TE-120 BE-14 57.19 BE-20 54.51 CSN 300 mm
TE-121 BE-109 58.01 BE-111 57.35 PVC 200 mm
TE-122 BE-111 57.35 BE-188 56.34 PVC 200 mm
TP-1 BP-1 65.17 BP-2 63.4 HDPE 200 mm
TP-2 BP-2 63.4 BR-40 61.3 HDPE 200 mm
TP-3 BR-43 57.12 BP-7 55.05 HDPE 200 mm
TP-4 BP-7 55.05 BR-45 54.51 HDPE 200 mm
TP-5 BR-33 54.06 BP-8 53.95 HDPE 250 mm
TP-6 BP-8 53.95 BP-9 53.8 HDPE 250 mm
TP-7 BP-9 53.8 BP-10 53.35 HDPE 250 mm
TP-8 BP-10 53.35 BP-11 53.1 HDPE 250 mm
TP-9 BP-11 53.1 BP-12 52.78 HDPE 250 mm
TP-10 BP-12 52.78 BP-13 52.5 HDPE 250 mm
TP-11 BP-13 52.5 BP-14 52.26 HDPE 250 mm
TP-12 BP-14 52.26 BE-51 52.23 HDPE 250 mm
TP-13 BR-22 53.83 BP-15 53.45 HDPE 200 mm
TP-14 BR-19 54.13 BP-15 53.45 HDPE 200 mm
TP-15 BP-15 53.45 BR-24 53.2 HDPE 200 mm
TR-1 BE-100 52.8 BP-12 52.78 HDPE 200 mm
TR-3 BR-37 69.51 BR-38 68.97 HDPE 200 mm
TR-5 BR-18 54.17 BR-19 54.13 HDPE 200 mm
TR-11 BR-74 58.95 BR-75 58.61 HDPE 200 mm
TR-18 BP-3 54.51 BR-19 54.13 HDPE 200 mm
TR-20 BR-25X 53.45 BR-24 53.2 HDPE 200 mm
TR-22 BR-25 53.45 BE-26 53.22 HDPE 200 mm
TR-23 BR-45 54.51 BR-46 53.7 HDPE 200 mm
TR-24 BP-4 54.47 BR-22 53.83 HDPE 200 mm
TR-28 BR-9 62.22 BR-8 61.92 HDPE 200 mm
TR-31 BR-35 58.83 BR-34 55.06 HDPE 200 mm
TR-34 BR-70X 57.4 BE-71 55.48 HDPE 200 mm
TR-37 BP-5 54.98 BR-48 54.6 HDPE 200 mm
TR-40 BR-73 59.45 BR-74 58.95 HDPE 200 mm
TR-41 BR-46 53.7 BP-12 52.78 HDPE 200 mm
TR-43 BR-58 55 BR-52 54.38 HDPE 200 mm
TR-45 BR-70 57.24 BR-64 56.03 HDPE 200 mm
TR-47 BR-6 60.66 BE-5 60.05 HDPE 200 mm
TR-48 BR-52 54.38 BE-51 52.66 HDPE 200 mm
TR-49 BR-8 61.92 BR-10 61.04 HDPE 200 mm
TR-51 BR-66 57.08 BR-67 56.49 HDPE 200 mm
TR-54 BR-4 61.08 BE-5 60.05 HDPE 200 mm
TR-55 BR-12 59.12 BE-13 58.56 HDPE 200 mm
TR-56 BR-68 57.81 BR-66 57.08 HDPE 200 mm
TR-57 BR-64 56.03 BE-63 53.96 HDPE 200 mm
TR-59 BR-77 60.62 BR-76 60.15 HDPE 200 mm
TR-60 BR-3 61.67 BR-4 61.08 HDPE 200 mm
TR-61 BR-24 53.2 BP-12 52.78 HDPE 200 mm
TR-62 BR-77X 60.67 BR-78 60.28 HDPE 200 mm
TR-63 BR-3X 61.67 BR-2 61.11 HDPE 200 mm
TR-64 BR-78 60.28 BR-79 59.87 HDPE 200 mm
TR-65 BE-1X 62.89 BR-2 61.11 HDPE 200 mm
TR-67 BR-75 58.61 BR-68 57.81 HDPE 200 mm
TR-69 BR-10 61.04 BR-17 58.21 HDPE 200 mm
TR-70 BR-72 58.56 BE-71 55.48 HDPE 200 mm
TR-71 BE-60X 56.26 BR-61 55.54 HDPE 200 mm
TR-73 BR-62 54.95 BE-63 54.01 HDPE 200 mm
TR-75 BR-61 55.54 BR-62 54.95 HDPE 200 mm
TR-76 BR-69 58.4 BR-70 57.24 HDPE 200 mm
TR-77 BR-69X 58.4 BR-68 57.81 HDPE 200 mm
TR-78 BR-65 56.7 BR-64 56.03 HDPE 200 mm
TR-79 BR-66X 57.53 BR-65 56.7 HDPE 200 mm
TR-80 BP-6 57.55 BR-15 57 HDPE 200 mm
TR-81 BR-11 59.79 BR-12 59.12 HDPE 200 mm
TR-82 BR-7 61.3 BR-6 60.66 HDPE 200 mm
TR-83 BR-16 57.59 BR-15 57 HDPE 200 mm
TR-85 BR-17 58.21 BR-16 57.59 HDPE 200 mm
TR-86 BR-4X 61.08 BR-79 59.87 HDPE 200 mm
TR-87 BR-36 61.7 BR-35 58.83 HDPE 200 mm
TR-88 BR-2 61.11 BR-77 60.62 HDPE 200 mm
TR-89 BR-53X 55.51 BE-55 51.57 HDPE 200 mm
TR-90 BR-53 55.51 BR-52 54.75 HDPE 200 mm
TR-91 BR-8X 62.24 BR-7 61.3 HDPE 200 mm
TR-92 BR-10X 61.09 BR-11 59.79 HDPE 200 mm
TR-94 BE-59X 55.71 BR-58 55 HDPE 200 mm
TR-95 BR-57X 55.78 BE-56 51.78 HDPE 200 mm
TR-96 BR-57 55.78 BR-58 55 HDPE 200 mm
TR-97 BR-76 60.15 BR-75 58.61 HDPE 200 mm
TR-98 BR-79 59.87 BR-72 58.76 HDPE 200 mm
TR-104 BR-15 57 BR-18 54.17 HDPE 200 mm
TR-109 BR-73X 59.45 BR-72 58.56 HDPE 200 mm
TR-112 BR-38 68.97 BR-39 63.14 HDPE 200 mm
TR-115 BR-48 54.6 BR-47 54.19 HDPE 200 mm
TR-116 BR-47 54.19 BR-46 53.7 HDPE 200 mm
TR-118 BR-39 63.14 BR-33 54.62 HDPE 200 mm
TR-119 BR-40 61.3 BP-9 54.8 HDPE 200 mm
Diameter (m Manning's n Flow (L/s) Length (m) Slope (m/km)LAY_TUB
200 0.01 1.5 8.79 55.75
200 0.01 1.5 15.54 50.189
200 0.01 1.5 13.71 16.042
200 0.01 1.5 6.2 19.348
200 0.01 1.5 11.71 38.438
200 0.01 1.5 18.78 7.455
300 0.013 1.5 20.55 0.973
300 0.013 1.5 31.15 1.284
200 0.013 1.5 32.85 34.095
200 0.013 1.5 36.38 148.444
200 0.013 1.5 36.85 62.963
200 0.01 1.5 39.71 54.652
200 0.013 1.5 42.6 51.649
200 0.01 1.5 44.88 8.69
200 0.01 1.5 45.02 10.883
200 0.013 1.5 45.61 43.409
200 0.013 1.5 48.36 36.393
350 0.013 1.5 49.43 0.607
350 0.013 1.5 50 4.6
350 0.013 1.5 50.86 8.652
200 0.013 1.5 50.89 8.056
400 0.013 1.5 51.55 4.074
200 0.013 1.5 52.28 13.007
400 0.013 1.5 52.32 13.952
200 0.013 1.5 52.79 28.604
400 0.013 1.5 52.83 10.032
350 0.013 1.5 53.05 0.942
400 0.013 1.5 53.85 1.3
200 0.013 1.5 55.04 12.173
200 0.013 1.5 58.92 27.156
200 0.01 1.5 67.22 20.678
200 0.01 1.5 67.8 23.892
200 0.01 1.5 67.99 14.562
200 0.013 1.5 68.92 71.826
350 0.013 1.5 69.54 8.341
200 0.013 1.5 78.43 36.211
200 0.013 1.5 78.71 8.386
200 0.013 1.5 78.68 38.001
200 0.013 1.5 80.35 8.837
200 0.01 1.5 40.51 15.55
300 0.013 1.5 52.47 21.725
300 0.013 1.5 52.64 16.718
300 0.013 1.5 75.8 35.358
200 0.01 1.5 67.16 9.828
200 0.01 1.5 55.48 18.204
200 0.01 1.5 14.66 120.708
200 0.01 1.5 33.81 62.108
200 0.01 1.5 50.01 41.396
200 0.01 1.5 35.91 15.038
250 0.01 1.5 21.94 5.014
250 0.01 1.5 29.35 5.11
250 0.01 1.5 44.02 10.223
250 0.01 1.5 49.86 5.014
250 0.01 1.5 47.16 6.785
250 0.01 1.5 60.61 4.62
250 0.01 1.5 74.09 3.239
250 0.01 1.5 3.52 8.53
200 0.01 1.5 44.13 8.611
200 0.01 1.5 52.86 12.863
200 0.01 1.5 54.42 4.594
200 0.01 1.5 6.76 2.957
200 0.01 1.5 8.19 65.965
200 0.01 1.5 13.73 2.913
200 0.01 1.5 28.95 11.743
200 0.01 1.5 39.57 9.60
200 0.01 1.5 42.99 5.815
200 0.01 1.5 44.17 5.207
200 0.01 1.5 44.32 18.276
200 0.01 1.5 41.96 15.253
200 0.01 1.5 45.24 6.631
200 0.01 1.5 47.1 80.051
200 0.01 1.5 49.83 38.532
200 0.01 1.5 47.88 7.936
200 0.01 1.5 51.03 9.798
200 0.01 1.5 53.07 17.335
200 0.01 1.5 51.59 12.019
200 0.01 1.5 52.31 23.131
200 0.01 1.5 52.43 11.634
200 0.01 1.5 52.6 32.701
200 0.01 1.5 52.69 16.703
200 0.01 1.5 52.81 11.171
200 0.01 1.5 52.88 19.479
200 0.01 1.5 52.89 10.587
200 0.01 1.5 52.98 13.778
200 0.01 1.5 53.03 39.037
200 0.01 1.5 53.08 8.855
200 0.01 1.5 53.26 11.079
200 0.01 1.5 51.59 8.141
200 0.01 1.5 53.38 7.306
200 0.01 1.5 53.43 10.48
200 0.01 1.5 53.45 7.671
200 0.01 1.5 53.72 33.132
200 0.01 1.5 54 14.814
200 0.01 1.5 54.79 51.653
200 0.01 1.5 54.83 56.171
200 0.01 1.5 54.87 13.121
200 0.01 1.5 55.17 17.037
200 0.01 1.5 55.58 10.616
200 0.01 1.5 56.06 20.693
200 0.01 1.5 56.32 10.477
200 0.01 1.5 56.39 11.882
200 0.01 1.5 56.47 14.699
200 0.01 1.5 53.13 10.353
200 0.01 1.5 57.92 11.567
200 0.01 1.5 58.03 11.029
200 0.01 1.5 58.46 10.093
200 0.01 1.5 59.2 10.474
200 0.01 1.5 59.92 20.194
200 0.01 1.5 60.11 47.748
200 0.01 1.5 60.22 8.137
200 0.01 1.5 60.76 64.843
200 0.01 1.5 60.89 12.481
200 0.01 1.5 61.93 15.179
200 0.01 1.5 61.98 20.976
200 0.01 1.5 62.45 11.368
200 0.01 1.5 62.51 63.992
200 0.01 1.5 62.62 12.456
200 0.01 1.5 66.74 23.074
200 0.01 1.5 67.05 16.555
200 0.01 1.5 72.44 39.067
200 0.01 1.5 80.05 11.119
200 0.01 1.5 54.26 107.441
200 0.01 1.5 43.73 9.376
200 0.01 1.5 43.54 11.253
200 0.01 1.5 39.8 214.073
200 0.01 1.5 47.97 135.515
Section Size (Catalog Conduit)
Label AD X (m) Y (m) Elevation (GrElevation (InvDepth (Struct
BE-5 284,715.86 ### 61.75 59.21 2.54
BE-13 284,731.76 ### 60.56 58.33 2.23
BE-14 284,747.66 ### 59.25 57.19 2.06
BE-20 284,770.66 ### 56.31 54.51 1.8
BE-23 284,832.13 ### 56 53.95 2.05
BE-26 284,847.37 ### 55.42 53.22 2.2
BE-49 284,926.51 ### 56.35 51.85 4.5
BE-51 284,911.86 ### 56.28 52.08 4.2
BE-55 284,998.47 ### 55.34 51.22 4.12
BE-56 285,047.88 ### 55.23 50.78 4.45
BE-63 284,896.57 ### 56.36 53.01 3.35
BR-70X 284,865.60 ### 58.95 57.4 1.55
BE-71 284,818.10 ### 57.93 54.48 3.45
BE-100 284,779.18 ### 55.27 52.8 2.47
BE-102 284,513.16 ### 59.3 57.72 1.58
BE-103 284,519.08 ### 59.37 57.6 1.77
BE-106 284,501.92 ### 59.23 58.17 1.06
BE-107 284,551.03 ### 59.61 58.29 1.32
BE-108 284,568.91 ### 59.66 58.15 1.51
BE-109 284,603.95 ### 59.68 58.01 1.67
BE-110 284,566.85 ### 59.95 54.1 5.85
BE-111 284,627.24 ### 59 57.35 1.65
BE-116 284,487.52 ### 65.62 64.22 1.4
BE-117 284,497.34 ### 66.68 65.34 1.34
BE-118 284,522.93 ### 66.31 65.12 1.19
BE-119 284,533.59 ### 61.58 59.72 1.86
BE-120 284,440.21 ### 70.39 69.16 1.23
BE-121 284,450.87 ### 68.08 66.84 1.24
BE-122 284,510.71 ### 68.75 67.32 1.43
BE-122X 284,510.71 ### 68.75 67.32 1.43
BE-129 284,751.36 ### 56.43 53.68 2.75
BE-130 284,793.96 ### 55.59 53.29 2.3
BE-135 284,465.01 ### 66.35 65.08 1.27
BE-142 284,484.89 ### 61.48 60.13 1.35
BE-145 284,986.94 ### 62.86 61.35 1.51
BE-160 284,947.35 ### 55.88 51.27 4.61
BE-169X 284,902.72 ### 64.54 63.09 1.45
BE-170 284,918.94 ### 63.62 62.42 1.2
BE-182 284,491.46 ### 61.33 59.34 1.99
BE-183 284,566.87 ### 60.62 58.97 1.65
BE-184 284,588.95 ### 59.66 57.98 1.68
BE-186 284,543.34 ### 58.94 56.94 2
BE-187 284,593.00 ### 58.66 57.44 1.22
BE-188 284,679.68 ### 58.1 56.34 1.76
BE-189 284,529.81 ### 61.37 59.68 1.69
BP-1 284,662.56 ### 66.37 65.17 1.2
BP-2 284,658.27 ### 65.3 63.4 1.9
BP-3 284,768.56 ### 56.31 54.51 1.8
BP-4 284,829.86 ### 56 54.47 1.53
BP-5 284,924.27 ### 56.35 54.98 1.37
BP-6 284,745.31 ### 59.25 57.55 1.7
BP-7 284,719.63 ### 56.55 55.05 1.5
BP-8 284,617.92 ### 59.75 53.95 5.8
BP-9 284,645.83 ### 58.9 53.8 5.1
BP-10 284,687.90 ### 56.47 53.35 3.12
BP-11 284,735.20 ### 55.83 53.1 2.73
BP-12 284,780.17 ### 55.2 52.78 2.42
BP-13 284,837.95 ### 55.34 52.5 2.84
BP-14 284,908.41 ### 56.26 52.26 4
BP-15 284,747.54 ### 55 53.45 1.55
BE-1X 284,852.22 ### 64.29 62.89 1.4
BR-2 284,868.22 ### 62.81 61.11 1.7
BR-3 284,817.24 ### 62.91 61.67 1.24
BR-3X 284,817.24 ### 62.91 61.67 1.24
BR-4 284,766.34 ### 62.64 61.08 1.56
BR-4X 284,766.34 ### 62.64 61.08 1.56
BR-6 284,665.75 ### 62.03 60.66 1.37
BR-7 284,610.33 ### 62.67 61.3 1.37
BR-8 284,551.30 ### 63.64 61.92 1.72
BR-8X 284,551.30 ### 63.64 62.24 1.4
BR-9 284,538.13 ### 63.42 62.22 1.2
BR-10 284,566.83 ### 62.44 61.04 1.4
BR-10X 284,566.83 ### 62.44 61.09 1.35
BR-11 284,625.96 ### 61.44 59.79 1.65
BR-12 284,681.28 ### 60.67 59.12 1.55
BR-15 284,694.69 ### 58.7 57 1.7
BR-16 284,638.90 ### 59.25 57.59 1.66
BR-17 284,582.99 ### 60.21 58.21 2
BR-18 284,717.20 ### 56.27 54.17 2.1
BR-19 284,730.91 ### 55.82 54.13 1.69
BR-22 284,789.72 ### 55.28 53.83 1.45
BR-24 284,764.68 ### 54.96 53.2 1.76
BR-25 284,805.57 ### 54.96 53.45 1.51
BR-25X 284,805.57 ### 54.96 53.45 1.51
BR-33 284,597.03 ### 59.92 54.06 5.86
BR-34 284,546.94 ### 59.8 54.12 5.68
BR-35 284,557.11 ### 60.38 58.83 1.55
BR-36 284,564.81 ### 63.35 61.7 1.65
BR-37 284,609.65 ### 71.04 69.51 1.53
BR-38 284,608.86 ### 70.43 68.97 1.46
BR-39 284,602.02 ### 64.69 63.14 1.55
BR-40 284,650.96 ### 62.66 61.3 1.36
BR-43 284,672.13 ### 58.54 57.12 1.42
BR-45 284,753.84 ### 56.41 54.51 1.9
BR-46 284,795.97 ### 55.6 53.7 1.9
BR-47 284,837.41 ### 55.74 54.19 1.55
BR-48 284,879.03 ### 55.92 54.6 1.32
BR-52 284,961.94 ### 56.85 54.38 2.47
BR-53 284,979.88 ### 56.86 55.51 1.35
BR-53X 284,979.88 ### 56.86 55.51 1.35
BR-57 285,029.56 ### 57.33 55.78 1.55
BR-57X 285,029.56 ### 57.33 55.78 1.55
BR-58 285,011.11 ### 57.28 55 2.28
BE-59X 285,070.66 ### 57.36 55.71 1.65
BE-60X 285,054.62 ### 57.91 56.26 1.65
BR-61 285,002.24 ### 57.78 55.54 2.24
BR-62 284,949.21 ### 57.45 54.95 2.5
BR-64 284,880.80 ### 57.63 56.03 1.6
BR-65 284,934.70 ### 58.61 56.7 1.91
BR-66 284,988.69 ### 59.08 57.08 2
BR-66X 284,988.69 ### 59.08 57.53 1.55
BR-67 285,039.21 ### 58.59 56.49 2.1
BR-68 284,972.83 ### 59.86 57.81 2.05
BR-69 284,919.05 ### 59.62 58.4 1.22
BR-69X 284,919.05 ### 59.62 58.4 1.22
BR-70 284,865.60 ### 58.95 57.24 1.71
BR-72 284,803.75 ### 60.41 58.56 1.85
BR-73 284,880.15 ### 60.65 59.45 1.2
BR-73X 284,880.15 ### 60.65 59.45 1.2
BR-74 284,928.98 ### 60.79 58.95 1.84
BR-75 284,956.64 ### 60.86 58.61 2.25
BR-76 284,936.94 ### 62.65 60.15 2.5
BR-77 284,886.18 ### 62.02 60.62 1.4
BR-77X 284,886.18 ### 62.02 60.67 1.35
BR-78 284,835.09 ### 61.82 60.28 1.54
BR-79 284,784.08 ### 61.62 59.87 1.75
Diameter (mm)
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

I.- PRESUPUE
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

ESUPUESTOS
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

II.-SUSTENTO DE MET
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DE METRADO
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

1.-PLANILLA DE METRADO
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

METRADO - ALCANTARILLADO
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

LCANTARILLADO
ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES,
BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA JULIO - 2017

Rev. 0 PLANILLA DE METRADOS

PLANILLA DE METRADOS LINEAS DE ALCANTARILLADO


REDES SECUNDARIAS

Presupuesto ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE,
COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN DE
Subpresupuesto MIRAFLORES – 2DA ETAPA
: REDES SECUNDARIAS DE ALCANTARILLADO
Lugar : San Juan de Miraflores

Alterno Descripción Und. Metrado


01 REDES SECUNDARIAS DE ALCANTARILLADO
01.01 TRABAJOS PRELIMINARES
01.01.1 Trazo y replanteo inicial del proyecto, para líneas-redes con estación total km 4.05
01.01.2 Replanteo final de la obra, para líneas redes con estación total km 4.05
01.01.3 Riego de zona de trabajo para mitigar la contaminación - polvo (Incl. Costo de agua y transporte Surtidor a obra ) m 4,053.07
01.01.4 Cerco de malla HDP de 1 m altura para límite de seguridad de obra m 8,106.14
01.01.5 Señales-iluminación nocturna con lámpara intermitente cada 10m (línea 14" a 24") km 4.05
01.01.6 Puente de madera para pase peatonal sobre zanja s/d (prov. durante obra) und 12.00
01.01.7 Puente de madera para pase vehicular sobre zanja s/d (prov. durante obra) und 5.00
01.01.8 Tranquera tipo tijera de 2,40 x 1,20 m para señal PELIGRO (prov. durante obra) und 8.00
01.01.9 Proteccion de cable eléctrico de baja tensión und 19.00
01.01.10 Proteccion de redes existentes de agua und 35.00
01.01.11 Ubicacion y proteccion de tuberias de Gas und 18.00
01.01.12 Pique para ubicacion de tuberias exist. und 82.00
01.01.13 Desvío de aguas servidas incl. bombeo y alquiler de tubo p/mantenim. servicio DN 200-250 mm m 3,840.85

01.02 MOVIMIENTO DE TIERRAS


01.02.1 Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 1.26 a 1.5m prof. m 688.64
01.02.2 Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 1.51 a 1.75m prof. m 1,468.46
01.02.3 Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 1.76 a 2m prof. m 622.90
01.02.4 Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 2.01 a 2.5m prof. m 647.03
01.02.5 Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 2.51 a 3m prof. m 267.08
01.02.6 Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 3.01 a 3.5m prof. m 214.87
01.02.7 Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 4.01 a 5m prof. m 47.55
01.02.8 Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 5.01 a 6m prof. m 51.29
01.02.9 Excav. Zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 1.26 a 1.5m prof. m 45.25
01.02.10 Refine y nivel de zanja t-normal p/tub. DN 200 a 250 para toda prof. m 4,007.82
01.02.11 Refine y nivel de zanja t-semirocoso p/tub. DN 200 a 250 para toda prof. m 45.25
01.02.12 Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 1.26 a 1.5m prof. m 688.64
01.02.13 Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 1.51 a 1.75m prof. m 1,468.46
01.02.14 Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 1.76 a 2m prof. m 622.90
01.02.15 Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 2.01 a 2.5m prof. m 647.03
01.02.16 Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 2.51 a 3m prof. m 267.08
01.02.17 Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 3.01 a 3.5m prof. m 214.87
01.02.18 Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 4.01 a 5m prof. m 47.55
01.02.19 Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 5.01 a 6m prof. m 51.29
01.02.20 Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 1.26 a 1.5m prof. m 45.25
01.02.21 Elimin. desmonte(carg+v) t-normal D=20 km p/tub. DN 200 - 250 para toda prof. m 4,007.82
01.02.22 Elimin. desmonte(c+v) t-semiroca D=20km p/tub. DN 200 - 250 para toda prof. m 45.25
01.02.23 Entibado metálico ambas caras, tipo cajón (Box), de zanjas de 1.76 a 2.00 m de prof. (Incl. Instalación, mantenimiento y r m 622.90
01.02.24 Entibado metálico ambas caras, tipo cajón (Box), de zanjas de 2.00 a 2.50 m de prof. (Incl. Instalación, mantenimiento y r m 647.03
01.02.25 Entibado metálico ambas caras, tipo cajón (Box), de zanjas de 2.51 a 3.00 m de prof. (Incl. Instalación, mantenimiento y r m 267.08
01.02.26 Entibado metálico ambas caras, tipo cajón (Box), de zanjas de 3.01 a 3.50 m de prof. (Incl. Instalación, mantenimiento y r m 214.87
01.02.27 Entibado metálico ambas caras , tipo cajón (Box), de zanjas de 4.01 a 5.00 m de prof. (Incl. Instalación, mantenimiento y r m 47.55
01.02.28 Entibado metálico ambas caras , tipo cajón (Box), de zanjas de 5.01 a 6.00 m de prof. (Incl. Instalación, mantenimiento y r m 51.29
01.02.29 Provisión de material de préstamo seleccionado para reemplazo de material de relleno m3 3,422.60
01.02.30 Eliminación de desmonte en terreno normal R=20 km con maquinaria m3 3,422.60

01.03 SUMINISTRO E INSTALACION DE TUBERIAS


01.03.1 Suministro de tuberia HDPE ISO 8772, SDR 33, SN-2 de DN 200 mm ( incl. desperd.) m 3,436.38
01.03.2 Suministro de tuberia HDPE ISO 8772, SDR26 SN-4 DN 200 mm (incl. desper.) m 274.13
01.03.3 Suministro de tuberia HDPE ISO 8772, SDR 21, SN-8 de DN 200 mm ( incl. desperd.) m 41.22
01.03.4 Suministro de tuberia HDPE ISO 8772, SDR 33, SN-2 de DN 250 mm ( incl. desperd.) m 108.58
01.03.5 Suministro de tuberia HDPE ISO 8772, SDR 26, SN-4 de DN 250 mm ( incl. desperd.) m 128.66
01.03.6 Suministro de tuberia HDPE ISO 8772, SDR 21, SN-8 de DN 250 mm ( incl. desperd.) m 96.51
01.03.7 Instalación tuberia HDPE unión por termofusión DN 200 mm incluye prueba hidráulica a zanja abierta m 3,751.72
01.03.8 Instalación tuberia HDPE unión por termofusión DN 250 mm incluye prueba hidráulica a zanja abierta m 333.75

01.04 BUZONES
01.04.1 Demolición de buzon en mal estado 1.01 a 1.25m profundidad (incl. acomodo del desmonte para su eliminación) und 4.00
01.04.2 Demolición de buzon en mal estado 1.26 a 1.5m profundidad (incl. acomodo del desmonte para su eliminación) und 10.00
01.04.3 Demolición de buzon en mal estado 1.51 a 1.75m profundidad (incl. acomodo del desmonte para su eliminación) und 19.00
01.04.4 Demolición de buzon en mal estado 1.76 a 2m profundidad (incl. acomodo del desmonte para su eliminación) und 8.00
01.04.5 Demolición de buzon en mal estado 2.01 a 2.5m profundidad (incl. acomodo del desmonte para su eliminación) und 9.00
01.04.6 Demolición de buzon en mal estado 5.01 a 6m profundidad (incl. acomodo del desmonte para su eliminación) und 2.00

Página 19 de 96
ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES,
BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA JULIO - 2017

Rev. 0 PLANILLA DE METRADOS

PLANILLA DE METRADOS LINEAS DE ALCANTARILLADO


REDES SECUNDARIAS

Presupuesto ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE,
COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN DE
Subpresupuesto MIRAFLORES – 2DA ETAPA
: REDES SECUNDARIAS DE ALCANTARILLADO
Lugar : San Juan de Miraflores

Alterno Descripción Und. Metrado


01.04.7 Eliminación desmonte por demoliciones m3 113.75
01.04.8 Buzon Tipo I en TN a MAQ. 1.01 a 1.25m prof. (encofrado exter e inter) C-PV und 4.00
01.04.9 Buzon Tipo I en TN a MAQ. 1.26 a 1.5m prof. (encofrado exter e inter) C-PV incluye entibado metálico y eq. de bombeo und 12.00
01.04.10 Buzon Tipo I en TN a MAQ. 1.51 a 1.75m prof. (encofrado exter e inter) C-PV incluye entibado metálico y eq. de bombeo und 22.00
01.04.11 Buzon Tipo I en TN a MAQ. 1.76 a 2m prof. (encofrado exter e inter) C-PV incluye entibado metálico y eq. de bombeo und 10.00
01.04.12 Buzon Tipo I en TN a MAQ. 2.01 a 2.5m prof. (encofrado exter e inter) C-PV incluye entibado metálico y eq. de bombeo und 10.00
01.04.13 Buzon Tipo I en TN a MAQ. 2.51 a 3m prof. (encofrado exter e inter) C-PV incluye entibado metálico y eq. de bombeo und 2.00
01.04.14 Buzon Tipo I en TN a MAQ. 3.01 a 3.5m prof. (encofrado exter e inter) C-PV incluye entibado metálico y eq. de bombeo und 1.00
01.04.15 Buzon Tipo I en TN a MAQ. 3.51 a 4m prof. (encofrado exter e inter) C-PV incluye entibado metálico y eq. de bombeo und 1.00
01.04.16 Buzon Tipo I en TN a MAQ. 5.01 a 6m prof. (encofrado exter e inter) C-PV incluye entibado metálico y eq. de bombeo und 4.00
01.04.17 Buzon Tipo I en TSR a MAQ. 1.01 a 1.25m prof. (encofrado exter e inter) C-PV und 1.00
01.04.18 Rehabilitación de canaleta de buzon existente en servicio und 16.00

01.05 VARIOS: PAVIMENTOS Y OTROS


01.05.1 Desmontaje y retiro de tuberia HDPE DN 200 - 250 mm m 3,362.11
01.05.2 Mortero Fluido C.A. 1:6 cemento V Incl. Bombeo m3 25.28
01.05.3 Sellado de buzón con concreto de 1.01 a 1.50m prof. incluye demolición y eliminación. und 2.00
01.05.4 Sellado de buzón con concreto de 1.51 a 2.00m prof. incluye demolición y eliminación. und 2.00
01.05.5 Sellado de buzón con concreto de 2.01 a 2.50m prof. incluye demolición y eliminación. und 1.00
01.05.6 Sellado de buzón con concreto de 2.51 a 3.00m prof. incluye demolición y eliminación. und 1.00
01.05.7 Sellado de buzón con concreto de 3.01 a 4.00m prof. incluye demolición y eliminación. und 2.00
01.05.8 Sellado de buzón con concreto de 5.01 a 6.00m prof. incluye demolición y eliminación. und 3.00
01.05.9 Corte+rotura, ED y reposic. de pavimento flexible asfalto caliente de e= 2" m2 3,242.46

01.06 PRUEBAS HIDRÂULICAS, DE CALIDAD Y RESISTENCIA


01.06.1 Prueba hidráulica de tubería p/desague DN 200 m 3,751.72
01.06.2 Prueba hidráulica de tubería p/desague DN 250 m 333.75
01.06.3 Prueba de compactacion de suelos (control de compactacion - densidad de campo) und 48.00
01.06.4 Prueba de calidad del concreto (prueba a la compresión) und 44.00

01.07 EMPALMES A BUZON EXISTENTE EN SERVICIO


01.07.1 Empalmes de tuberías DN 200 a 250 buzón existente en servicio und 16.00

02 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO


02.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
02.01.1 Trazo y replanteo inicial para conexión domiciliaria und 606.00
02.01.2 Replanteo final de la obra para conexión domiciliaria und 606.00
02.01.3 Cerco de malla HDP de 1 m altura para límite de seguridad de obra - SEDAPAL m 1,212.00
02.01.4 Riego de zona de trabajo - zona sin acceso, para mitigar la contaminación - polvo m 606.00
02.01.5 Puente de madera para pase peatonal sobre zanja s/d (prov. durante obra) und 35.00

02.02 MOVIMIENTO DE TIERRAS


02.02.1 Excav. zanja (pulso) p/tub. terr-normal DN 100 - 150 de 0.60m a 1.00m prof. m 3,632.46
02.02.2 Excav. zanja (pulso) p/tub. terr-normal DN 100 - 150 de 1.01m a 1.25m prof. m 650.46
02.02.3 Excav. zanja (pulso) p/tub. terr-normal DN 100 - 150 de 1.26m a 1.50m prof. m 187.71
02.02.4 Excav. zanja (pulso) p/tub. terr-normal DN 100 - 150 de 1.51m a 1.75m prof. m 9.01
02.02.5 Excav. zanja (pulso) p/tub. terr-normal DN 100 - 150 de 1.76m a 2.00m prof. m 17.82
02.02.6 Refine y nivel de zanja terr-normal para tub. DN 100 - 150 para toda profund. m 4,497.46
02.02.7 Relleno comp.zanja(pulso) p/tub t-normal DN 100 - 150 de 0,60 m a 1,00 m prof. m 3,632.46
02.02.8 Relleno comp.zanja(pulso) p/tub t-normal DN 100 - 150 de 1,01 m a 1,25 m prof. m 650.46
02.02.9 Relleno comp.zanja(pulso) p/tub t-normal DN 100 - 150 de 1,26 m a 1,50 m prof. m 187.71
02.02.10 Relleno comp.zanja(pulso) p/tub t-normal DN 100 - 150 de 1,51 m a 1,75 m prof. m 9.01
02.02.11 Relleno comp.zanja(pulso) p/tub t-normal DN 100 - 150 de 1,76 m a 2,00 m prof. m 17.82
02.02.12 Elimin. desmonte(carg+v) t-normal D=20km p/tub. DN 100 - 150 para toda prof. m 4,497.46

02.03 SUMINISTRO E INSTALACIÓN DE TUBERIAS


02.03.1 Suministro de tuberia HDPE ISO 8772, SDR 33, SN-2 de DN 160 mm ( incl. desperd.) m 4,497.46
02.03.2 Instalación tuberia HDPE unión por termofusión DN 160 mm incl. prueba hidráulica a zanja abierta m 4,497.46

02.04 CAJAS DE REGISTRO, INSTALACIÔN


02.04.1 Suministro caja de concreto simple y tapa concreto armado de 0,30 m x 0,60 m H= 0.60 m und 8.00

Página 20 de 96
ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES,
BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA JULIO - 2017

Rev. 0 PLANILLA DE METRADOS

PLANILLA DE METRADOS LINEAS DE ALCANTARILLADO


REDES SECUNDARIAS

Presupuesto ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE,
COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN DE
Subpresupuesto MIRAFLORES – 2DA ETAPA
: REDES SECUNDARIAS DE ALCANTARILLADO
Lugar : San Juan de Miraflores

Alterno Descripción Und. Metrado


02.04.2 Sumin. caja concreto simple y tapa conc ar. 0,30 x 0,60m; H= hasta 0.90 m und 407.00
02.04.3 Sumin. caja concreto s. y tapa c.ar. 0,30x0,60m; H= hasta 1.20 m und 156.00
02.04.4 Sumin. caja concreto s. y tapa c.ar. 0,30x0,60m; H= hasta 1.50 m und 32.00
02.04.5 Sumin. caja concreto s. y tapa c.ar. 0,30x0,60 m; H= hasta 1.80 m und 3.00
02.04.6 Instalación de caja y tapa de registro de 0,30 m x 0,60 m en terreno normal H=0.60 m und 8.00
02.04.7 Instalación caja y tapa de registro 0,30 m x 0,60 m, en t. normal H= 0.90 m und 407.00
02.04.8 Instalación caja y tapa de registro 0,30 m x 0,60 m, en t. normal H= 1.20 m und 156.00
02.04.9 Instalación caja y tapa de registro 0,30 m x 0,60 m, en t. normal H= 1.50 m und 32.00
02.04.10 Instalación caja y tapa de registro 0,30 m x 0,60 m, en t. normal H= 1.80 m und 3.00
02.04.11 Suministro abrazadera p/conexion desague DN 200/160 p/ tub HDPE/ PVC incl. codo derivacion 160x45° und 562.00
02.04.12 Suministro abrazadera p/conexion desague DN 250/160 p/ tub HDPE/ PVC incl. codo derivacion 160x45° und 44.00
02.04.13 Instalación abrazadera en tub HDPE DN 200 mm x 160 mm p/conexion domiciliaria alcantarillado und 562.00
02.04.14 Instalación abrazadera en tub HDPE DN 250 mm x 160 mm p/conexion domiciliaria alcantarillado und 44.00

02.05 PAVIMENTOS, VEREDAS, OTROS


02.05.1 Desmontaje y retiro de tuberia PVC DN 100 - 150 mm m 4,497.46
02.05.2 Demolición caja y tapa en mal estado, conex. dom. desague (incl. eliminacion desmonte) und 389.00
02.05.3 Eliminación desmonte por demoliciones y disposicion final - material peligroso und 157.87
02.05.4 Corte+rotura, ED y reposic. de pavimento flexible asfalto caliente de e= 2" m2 1,083.53
02.05.5 Corte, rotura E.D. y reposicion de rampas de concreto e=15cm fc=175kg/cm2 m2 365.91
02.05.6 Rotura y reposicion de rampa y vereda de adoquinado m2 8.76
02.05.7 Retiro y Reposición de Jardin m2 71.30
02.05.8 Corte+rotura, ED y reposición de vereda rígida f'c 175 kg/cm2 de 10 cm espesor m2 714.62
02.05.9 Rotura, ED y reposición de sardinel de concreto armado m 100.80
02.05.10 Rotura, ED y reposición de grada f'c 175 kg/cm2 de 15 cm espesor m2 4.58

02.06 PRUEBAS HIDÂULICAS, Y DE CALIDAD


02.06.1 Pruebas compactación suelos (proctor modificado y de control de compactación) und 76.00
02.06.2 Prueba hidráulica de tubería p/desague DN 150 m 4,497.46

Página 21 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

2.-METRADO DE TUBERIA - ALCANTARILLADO


MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
TP BP BP TP-1 BP-1 BP-2 1.20 1.90 1.55 14.66 120.72 14.77 14.77 15.17 SN2 200 mm HDPE M TN Propio
TP BP BR TP-2 BP-2 BR-40 1.90 1.36 1.63 33.82 62.09 33.88 33.88 34.28 SN2 200 mm HDPE M TN Propio
TP BR BP TP-3 BR-43 BP-7 1.42 1.50 1.46 50.00 41.40 50.05 50.05 50.45 SN2 200 mm HDPE M TN Propio 50.05
TP BP BR TP-4 BP-7 BR-45 1.50 1.90 1.70 35.91 15.04 35.92 35.92 36.32 SN2 200 mm HDPE M TN Propio
TP BR BP TP-5 BR-33 BP-8 5.86 5.80 5.83 21.94 5.01 21.94 21.94 22.34 SN8 250 mm HDPE M TN prest
TP BP BP TP-6 BP-8 BP-9 5.80 5.10 5.45 29.35 5.11 29.35 29.35 29.75 SN8 250 mm HDPE M TN prest
TP BP BP TP-7 BP-9 BP-10 5.10 3.12 4.11 44.02 10.22 44.03 44.03 44.43 SN8 250 mm HDPE M TN prest
TP BP BP TP-8 BP-10 BP-11 3.12 2.73 2.93 49.85 5.02 49.85 49.85 50.25 SN4 250 mm HDPE M TN prest
TP BP BP TP-9 BP-11 BP-12 2.73 2.42 2.58 47.16 6.79 47.16 47.16 47.56 SN2 250 mm HDPE M TN prest
TP BP BP TP-10 BP-12 BP-13 2.42 2.84 2.63 60.61 4.62 60.62 60.62 61.02 SN2 250 mm HDPE M TN prest
TP BP BP TP-11 BP-13 BP-14 2.84 4.00 3.42 74.08 3.24 74.09 74.09 74.49 SN4 250 mm HDPE M TN Propio
TP BP BE TP-12 BP-14 BE-51 4.00 4.05 4.03 3.52 51.19 3.52 3.52 3.92 SN4 250 mm HDPE M TN Propio
TP BR BP TP-13 BR-22 BP-15 1.45 1.55 1.50 44.13 8.61 44.13 44.13 44.53 SN2 200 mm HDPE M TN prest 44.13
TP BR BP TP-14 BR-19 BP-15 1.69 1.55 1.62 52.86 12.86 52.87 52.87 53.27 SN2 200 mm HDPE M TN prest
TP BP BR TP-15 BP-15 BR-24 1.55 1.76 1.66 54.42 4.59 54.42 54.42 54.82 SN2 200 mm HDPE M TN prest
TR BE BP TR-1 BE-100 BP-12 2.47 2.42 2.45 6.76 2.96 6.76 6.76 7.16 SN2 200 mm HDPE M TN prest
TR BR BR TR-3 BR-37 BR-38 1.53 1.46 1.50 8.19 65.95 8.21 8.21 8.61 SN2 200 mm HDPE M TN prest 8.21
TR BR BR TR-5 BR-18 BR-19 2.10 1.69 1.90 13.73 2.91 13.73 13.73 14.13 SN2 200 mm HDPE M TN prest
TR BR BR TR-11 BR-74 BR-75 1.84 2.25 2.05 28.96 11.74 28.96 28.96 29.36 SN2 200 mm HDPE M TN prest
TR BP BR TR-18 BP-3 BR-19 1.80 1.69 1.75 39.56 9.60 39.57 39.57 39.97 SN2 200 mm HDPE M TN prest
TR BR BR TR-20 BR-25X BR-24 1.51 1.76 1.64 43.00 5.81 43.00 43.00 43.40 SN2 200 mm HDPE M TN prest
TR BR BE TR-22 BR-25 BE-26 1.51 2.20 1.86 44.17 5.21 44.17 44.17 44.57 SN2 200 mm HDPE M TN prest
TR BR BR TR-23 BR-45 BR-46 1.90 1.90 1.90 44.32 18.28 44.32 44.32 44.72 SN2 200 mm HDPE M TN prest
TR BP BR TR-24 BP-4 BR-22 1.53 1.45 1.49 41.96 15.25 41.97 41.97 42.37 SN2 200 mm HDPE M TN prest 41.97
TR BR BR TR-28 BR-9 BR-8 1.20 1.72 1.46 45.25 6.63 45.25 45.25 45.65 SN2 200 mm HDPE M TSR prest 45.25
TR BR BR TR-31 BR-35 BR-34 1.55 4.74 3.15 47.09 100.02 47.33 47.33 47.73 SN4 200 mm HDPE M TN prest
TR BR BE TR-34 BR-70X BE-71 1.55 2.45 2.00 49.84 58.59 49.92 49.92 50.32 SN2 200 mm HDPE M TN prest
TR BP BR TR-37 BP-5 BR-48 1.37 1.32 1.35 47.89 7.94 47.89 47.89 48.29 SN2 200 mm HDPE M TN prest 47.89
TR BR BR TR-40 BR-73 BR-74 1.20 1.84 1.52 51.03 9.80 51.03 51.03 51.43 SN2 200 mm HDPE M TN prest
TR BR BP TR-41 BR-46 BP-12 1.90 2.42 2.16 53.07 17.34 53.07 53.07 53.47 SN2 200 mm HDPE M TN prest
TR BR BR TR-43 BR-58 BR-52 2.28 2.47 2.38 51.59 12.02 51.59 51.59 51.99 SN2 200 mm HDPE M TN prest
TR BR BR TR-45 BR-70 BR-64 1.71 1.60 1.66 52.31 23.13 52.32 52.32 52.72 SN2 200 mm HDPE M TN prest
TR BR BE TR-47 BR-6 BE-5 1.37 1.70 1.54 52.43 27.66 52.45 52.45 52.85 SN2 200 mm HDPE M TN prest
TR BR BE TR-48 BR-52 BE-51 2.47 3.62 3.05 52.60 43.73 52.65 52.65 53.05 SN4 200 mm HDPE M TN prest
TR BR BR TR-49 BR-8 BR-10 1.72 1.40 1.56 52.68 16.70 52.69 52.69 53.09 SN2 200 mm HDPE M TN prest
TR BR BR TR-51 BR-66 BR-67 2.00 2.10 2.05 52.82 11.17 52.82 52.82 53.22 SN2 200 mm HDPE M TN prest
TR BR BE TR-54 BR-4 BE-5 1.56 1.70 1.63 52.88 35.37 52.91 52.91 53.31 SN2 200 mm HDPE M TN prest
TR BR BE TR-55 BR-12 BE-13 1.55 2.00 1.78 52.89 14.94 52.90 52.90 53.30 SN2 200 mm HDPE M TN prest
TR BR BR TR-56 BR-68 BR-66 2.05 2.00 2.03 52.98 13.78 52.98 52.98 53.38 SN2 200 mm HDPE M TN prest
TR BR BE TR-57 BR-64 BE-63 1.60 2.40 2.00 53.03 56.95 53.12 53.12 53.52 SN2 200 mm HDPE M TN prest
TR BR BR TR-59 BR-77 BR-76 1.40 2.50 1.95 53.07 8.86 53.08 53.08 53.48 SN2 200 mm HDPE M TN prest
TR BR BR TR-60 BR-3 BR-4 1.24 1.56 1.40 53.26 11.08 53.26 53.26 53.66 SN2 200 mm HDPE M TN prest 53.26

Página 23 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
TR BR BP TR-61 BR-24 BP-12 1.76 2.42 2.09 51.59 8.14 51.59 51.59 51.99 SN2 200 mm HDPE M TN prest
TR BR BR TR-62 BR-77X BR-78 1.35 1.54 1.45 53.39 7.31 53.39 53.39 53.79 SN2 200 mm HDPE M TN prest 53.39
TR BR BR TR-63 BR-3X BR-2 1.24 1.70 1.47 53.43 10.48 53.44 53.44 53.84 SN2 200 mm HDPE M TN prest 53.44
TR BR BR TR-64 BR-78 BR-79 1.54 1.75 1.65 53.45 7.67 53.45 53.45 53.85 SN2 200 mm HDPE M TN prest
TR BE BR TR-65 BE-1X BR-2 1.40 1.70 1.55 53.73 33.13 53.76 53.76 54.16 SN2 200 mm HDPE M TN prest
TR BR BR TR-67 BR-75 BR-68 2.25 2.05 2.15 54.00 14.81 54.01 54.01 54.41 SN2 200 mm HDPE M TN prest
TR BR BR TR-69 BR-10 BR-17 1.40 2.00 1.70 54.79 51.65 54.86 54.86 55.26 SN2 200 mm HDPE M TN prest
TR BR BE TR-70 BR-72 BE-71 1.85 2.45 2.15 54.83 74.41 54.98 54.98 55.38 SN2 200 mm HDPE M TN prest
TR BE BR TR-71 BE-60X BR-61 1.65 2.24 1.95 54.88 13.12 54.88 54.88 55.28 SN2 200 mm HDPE M TN prest
TR BR BE TR-73 BR-62 BE-63 2.50 2.35 2.43 55.17 35.17 55.20 55.20 55.60 SN2 200 mm HDPE M TN prest
TR BR BR TR-75 BR-61 BR-62 2.24 2.50 2.37 55.58 10.62 55.58 55.58 55.98 SN2 200 mm HDPE M TN prest
TR BR BR TR-76 BR-69 BR-70 1.22 1.71 1.47 56.06 20.69 56.07 56.07 56.47 SN2 200 mm HDPE M TN prest 56.07
TR BR BR TR-77 BR-69X BR-68 1.22 2.05 1.64 56.31 10.48 56.32 56.32 56.72 SN2 200 mm HDPE M TN prest
TR BR BR TR-78 BR-65 BR-64 1.91 1.60 1.76 56.38 11.88 56.38 56.38 56.78 SN2 200 mm HDPE M TN prest
TR BR BR TR-79 BR-66X BR-65 1.55 1.91 1.73 56.47 14.70 56.48 56.48 56.88 SN2 200 mm HDPE M TN prest
TR BP BR TR-80 BP-6 BR-15 1.70 1.70 1.70 53.13 10.35 53.13 53.13 53.53 SN2 200 mm HDPE M TN prest
TR BR BR TR-81 BR-11 BR-12 1.65 1.55 1.60 57.92 11.57 57.93 57.93 58.33 SN2 200 mm HDPE M TN prest
TR BR BR TR-82 BR-7 BR-6 1.37 1.37 1.37 58.03 11.03 58.04 58.04 58.44 SN2 200 mm HDPE M TN prest 58.04
TR BR BR TR-83 BR-16 BR-15 1.66 1.70 1.68 58.45 10.09 58.45 58.45 58.85 SN2 200 mm HDPE M TN prest
TR BR BR TR-85 BR-17 BR-16 2.00 1.66 1.83 59.20 10.47 59.20 59.20 59.60 SN2 200 mm HDPE M TN prest
TR BR BR TR-86 BR-4X BR-79 1.56 1.75 1.66 59.92 20.19 59.93 59.93 60.33 SN2 200 mm HDPE M TN prest
TR BR BR TR-87 BR-36 BR-35 1.65 1.55 1.60 60.11 47.75 60.17 60.17 60.57 SN2 200 mm HDPE M TN prest
TR BR BR TR-88 BR-2 BR-77 1.70 1.40 1.55 60.22 8.14 60.22 60.22 60.62 SN2 200 mm HDPE M TN prest
TR BR BE TR-89 BR-53X BE-55 1.35 3.77 2.56 60.75 70.61 60.91 60.91 61.31 SN4 200 mm HDPE M TN prest
TR BR BR TR-90 BR-53 BR-52 1.35 2.10 1.73 60.89 18.56 60.90 60.90 61.30 SN2 200 mm HDPE M TN prest
TR BR BR TR-91 BR-8X BR-7 1.40 1.37 1.39 61.92 15.18 61.93 61.93 62.33 SN2 200 mm HDPE M TN prest 61.93
TR BR BR TR-92 BR-10X BR-11 1.35 1.65 1.50 61.97 20.98 61.98 61.98 62.38 SN2 200 mm HDPE M TN prest 61.98
TR BE BR TR-94 BE-59X BR-58 1.65 2.28 1.97 62.46 11.37 62.46 62.46 62.86 SN2 200 mm HDPE M TN prest
TR BR BE TR-95 BR-57X BE-56 1.55 3.45 2.50 62.51 79.99 62.70 62.70 63.10 SN4 200 mm HDPE M TN prest
TR BR BR TR-96 BR-57 BR-58 1.55 2.28 1.92 62.62 12.46 62.62 62.62 63.02 SN2 200 mm HDPE M TN prest
TR BR BR TR-97 BR-76 BR-75 2.50 2.25 2.38 66.74 23.07 66.76 66.76 67.16 SN2 200 mm HDPE M TN prest
TR BR BR TR-98 BR-79 BR-72 1.75 1.65 1.70 67.05 19.54 67.06 67.06 67.46 SN2 200 mm HDPE M TN prest
TR BR BR TR-104 BR-15 BR-18 1.70 2.10 1.90 72.44 39.07 72.49 72.49 72.89 SN2 200 mm HDPE M TN prest
TR BR BR TR-109 BR-73X BR-72 1.20 1.85 1.53 80.04 11.12 80.05 80.05 80.45 SN2 200 mm HDPE M TN prest
TR BR BR TR-112 BR-38 BR-39 1.46 1.55 1.51 54.26 107.44 54.58 54.58 54.98 SN2 200 mm HDPE M TN prest 54.58
TR BR BR TR-115 BR-48 BR-47 1.32 1.55 1.44 43.72 9.38 43.72 43.72 44.12 SN2 200 mm HDPE M TN prest 43.72
TR BR BR TR-116 BR-47 BR-46 1.55 1.90 1.73 43.55 11.25 43.55 43.55 43.95 SN2 200 mm HDPE M TN prest
TR BR BR TR-118 BR-39 BR-33 1.55 5.30 3.43 39.79 228.17 40.82 40.82 41.22 SN8 200 mm HDPE M TN prest
TR BR BP TR-119 BR-40 BP-9 1.36 4.10 2.73 47.97 156.36 48.55 48.55 48.95 SN4 200 mm HDPE M TN prest

4049.39 4053.07 4053.07 4085.47 0.00 0.00 733.89

Página 24 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
TRAMOS
BR 116 NUMERO DE DADOS
BP 30 23781.06 CORTE DE PISTA (m²)
-19731.67 ENTIBADOS (m)

Página 25 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50

4,085.47
SUMINISTRO E INSTALACION DE TUBERIAS 4,085.47

DESCRIPCION Cant. (m) DESCRIPCION


110 mm SN2 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN2 DN 110 mm - 110 mm Instalacioó n de tuberia de HDPE p/desague DN 110 mm incluye prueba hid
110 mm SN4 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN4 DN 110 mm - 160 mm Instalacioó n de tuberia de HDPE p/desague DN 160 mm incluye prueba hid
110 mm SN8 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN8 DN 110 mm - 200 mm Instalacioó n de tuberia de HDPE p/desague DN 200 mm incluye prueba hid
160 mm SN2 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN2 DN 160 mm - 250 mm Instalacioó n de tuberia de HDPE p/desague DN 250 mm incluye prueba hid
160 mm SN4 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN4 DN 160 mm - 315 mm Instalacioó n de tuberia de HDPE p/desague DN 315 mm incluye prueba hid
160 mm SN8 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN8 DN 160 mm - 355 mm Instalacioó n de tuberia de HDPE p/desague DN 355 mm incluye prueba hid
200 mm SN2 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN2 DN 200 mm 3,436.38 400 mm Instalacioó n de tuberia de HDPE p/desague DN 400 mm incluye prueba hid
200 mm SN4 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN4 DN 200 mm 274.13 450 mm Instalacioó n de tuberia de HDPE p/desague DN 450 mm incluye prueba hid
200 mm SN8 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN8 DN 200 mm 41.22 500 mm Instalacioó n de tuberia de HDPE p/desague DN 500 mm incluye prueba hid
250 mm SN2 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN2 DN 250 mm 108.58 550 mm Instalacioó n de tuberia de HDPE p/desague DN 550 mm incluye prueba hid
250 mm SN4 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN4 DN 250 mm 128.66 630 mm Instalacioó n de tuberia de HDPE p/desague DN 630 mm incluye prueba hid
250 mm SN8 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN8 DN 250 mm 96.51
315 mm SN2 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN2 DN 315 mm -
315 mm SN4 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN4 DN 315 mm -
315 mm SN8 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN8 DN 315 mm -
355 mm SN2 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN2 DN 355 mm -
355 mm SN4 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN4 DN 355 mm -
355 mm SN8 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN8 DN 355 mm -
400 mm SN2 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN2 DN 400 mm -
400 mm SN4 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN4 DN 400 mm -
400 mm SN8 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN8 DN 400 mm -
450 mm SN2 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN2 DN 450 mm -
450 mm SN4 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN4 DN 450 mm -
450 mm SN8 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN8 DN 450 mm -
500 mm SN2 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN2 DN 500 mm -
500 mm SN4 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN4 DN 500 mm -
500 mm SN8 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN8 DN 500 mm -
550 mm SN2 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN2 DN 550 mm -
550 mm SN4 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN4 DN 550 mm -
550 mm SN8 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN8 DN 550 mm -
630 mm SN2 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN2 DN 630 mm -
630 mm SN4 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN4 DN 630 mm -
630 mm SN8 Suministro de Tuberia HDPE NTP ISO 8772:2009 SN8 DN 630 mm -

Página 26 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50

4,053.07
EXCAVACION TOTAL 4,053.07

D Excav H1 Terr. Exca. RELLENO


160 mm 0.60 TN M Excav. Zanja (maq.) p/tub. t-normal DN 110 a 160 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 1.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 110 a 160 de 1.01 a 1.25m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 1.26 TN M Excav. Zanja (maq.) p/tub. t-normal DN 110 a 160 de 1.26 a 1.5m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 1.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 110 a 160 de 1.51 a 1.75m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 1.76 TN M Excav. Zanja (maq.) p/tub. t-normal DN 110 a 160 de 1.76 a 2m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 2.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 110 a 160 de 2.01 a 2.5m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 2.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 110 a 160 de 2.51 a 3m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 3.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 110 a 160 de 3.01 a 3.5m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 3.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 110 a 160 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 4.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 110 a 160 de 4.01 a 5m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 5.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 110 a 160 de 5.01 a 6m prof. - Relleno comp. zanja (maq.) p/tub. t
* 250 mm 0.60 TN M Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 1.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 1.01 a 1.25m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 1.26 TN M Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 1.26 a 1.5m prof. 688.64 Relleno comp. zanja (maq.) p/tub. t
250 mm 1.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 1.51 a 1.75m prof. ### Relleno comp. zanja (maq.) p/tub. t
250 mm 1.76 TN M Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 1.76 a 2m prof. 622.90 Relleno comp. zanja (maq.) p/tub. t
250 mm 2.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 2.01 a 2.5m prof. 647.03 Relleno comp. zanja (maq.) p/tub. t
250 mm 2.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 2.51 a 3m prof. 267.08 Relleno comp. zanja (maq.) p/tub. t
250 mm 3.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 3.01 a 3.5m prof. 214.87 Relleno comp. zanja (maq.) p/tub. t
250 mm 3.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 4.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 4.01 a 5m prof. 47.55 Relleno comp. zanja (maq.) p/tub. t
250 mm 5.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 200 a 250 de 5.01 a 6m prof. 51.29 Relleno comp. zanja (maq.) p/tub. t
355 mm 0.60 TN M Excav. Zanja (maq.) p/tub. t-normal DN 315 a 315 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 1.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 315 a 315 de 1.01 a 1.25m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 1.26 TN M Excav. Zanja (maq.) p/tub. t-normal DN 315 a 315 de 1.26 a 1.5m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 1.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 315 a 315 de 1.51 a 1.75m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 1.76 TN M Excav. Zanja (maq.) p/tub. t-normal DN 315 a 315 de 1.76 a 2m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 2.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 315 a 315 de 2.01 a 2.5m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 2.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 315 a 315 de 2.51 a 3m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 3.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 315 a 315 de 3.01 a 3.5m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 3.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 315 a 315 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 4.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 315 a 315 de 4.01 a 5m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 5.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 315 a 315 de 5.01 a 6m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 0.60 TN M Excav. Zanja (maq.) p/tub. t-normal DN 400 a 450 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 1.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 400 a 450 de 1.01 a 1.25m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 1.26 TN M Excav. Zanja (maq.) p/tub. t-normal DN 400 a 450 de 1.26 a 1.5m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 1.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 400 a 450 de 1.51 a 1.75m prof. - Relleno comp. zanja (maq.) p/tub. t

Página 27 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
450 mm 1.76 TN M Excav. Zanja (maq.) p/tub. t-normal DN 400 a 450 de 1.76 a 2m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 2.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 400 a 450 de 2.01 a 2.5m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 2.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 400 a 450 de 2.51 a 3m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 3.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 400 a 450 de 3.01 a 3.5m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 3.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 400 a 450 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 4.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 400 a 450 de 4.01 a 5m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 5.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 400 a 450 de 5.01 a 6m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 0.60 TN M Excav. Zanja (maq.) p/tub. t-normal DN 500 a 550 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 1.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 500 a 550 de 1.01 a 1.25m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 1.26 TN M Excav. Zanja (maq.) p/tub. t-normal DN 500 a 550 de 1.26 a 1.5m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 1.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 500 a 550 de 1.51 a 1.75m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 1.76 TN M Excav. Zanja (maq.) p/tub. t-normal DN 500 a 550 de 1.76 a 2m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 2.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 500 a 550 de 2.01 a 2.5m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 2.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 500 a 550 de 2.51 a 3m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 3.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 500 a 550 de 3.01 a 3.5m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 3.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 500 a 550 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 4.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 500 a 550 de 4.01 a 5m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 5.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 500 a 550 de 5.01 a 6m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 0.60 TN M Excav. Zanja (maq.) p/tub. t-normal DN 630 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 1.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 630 de 1.01 a 1.25m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 1.26 TN M Excav. Zanja (maq.) p/tub. t-normal DN 630 de 1.26 a 1.5m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 1.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 630 de 1.51 a 1.75m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 1.76 TN M Excav. Zanja (maq.) p/tub. t-normal DN 630 de 1.76 a 2m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 2.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 630 de 2.01 a 2.5m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 2.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 630 de 2.51 a 3m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 3.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 630 de 3.01 a 3.5m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 3.51 TN M Excav. Zanja (maq.) p/tub. t-normal DN 630 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 4.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 630 de 4.01 a 5m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 5.01 TN M Excav. Zanja (maq.) p/tub. t-normal DN 630 de 5.01 a 6m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 0.60 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 1.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 1.01 a 1.25m pro - Relleno comp. zanja (maq.) p/tub. t
160 mm 1.26 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 1.26 a 1.5m prof - Relleno comp. zanja (maq.) p/tub. t
160 mm 1.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 1.51 a 1.75m pro - Relleno comp. zanja (maq.) p/tub. t
160 mm 1.76 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 1.76 a 2m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 2.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 2.01 a 2.5m prof - Relleno comp. zanja (maq.) p/tub. t
160 mm 2.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 2.51 a 3m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 3.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 3.01 a 3.5m prof - Relleno comp. zanja (maq.) p/tub. t
160 mm 3.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 4.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 4.01 a 5m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 5.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 5.01 a 6m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 0.60 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 1.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 1.01 a 1.25m pro - Relleno comp. zanja (maq.) p/tub. t

Página 28 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
250 mm 1.26 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 1.26 a 1.5m prof. 45.25 Relleno comp. zanja (maq.) p/tub. t
250 mm 1.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 1.51 a 1.75m pro - Relleno comp. zanja (maq.) p/tub. t
250 mm 1.76 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 1.76 a 2m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 2.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 2.01 a 2.5m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 2.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 2.51 a 3m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 3.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 3.01 a 3.5m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 3.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 4.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 4.01 a 5m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 5.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 5.01 a 6m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 0.60 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 1.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 1.01 a 1.25m pro - Relleno comp. zanja (maq.) p/tub. t
355 mm 1.26 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 1.26 a 1.5m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 1.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 1.51 a 1.75m pro - Relleno comp. zanja (maq.) p/tub. t
355 mm 1.76 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 1.76 a 2m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 2.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 2.01 a 2.5m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 2.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 2.51 a 3m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 3.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 3.01 a 3.5m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 3.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 4.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 4.01 a 5m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 5.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 5.01 a 6m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 0.60 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 1.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 1.01 a 1.25m pro - Relleno comp. zanja (maq.) p/tub. t
450 mm 1.26 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 1.26 a 1.5m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 1.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 1.51 a 1.75m pro - Relleno comp. zanja (maq.) p/tub. t
450 mm 1.76 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 1.76 a 2m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 2.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 2.01 a 2.5m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 2.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 2.51 a 3m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 3.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 3.01 a 3.5m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 3.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 4.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 4.01 a 5m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 5.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 5.01 a 6m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 0.60 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 1.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 1.01 a 1.25m pro - Relleno comp. zanja (maq.) p/tub. t
550 mm 1.26 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 1.26 a 1.5m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 1.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 1.51 a 1.75m pro - Relleno comp. zanja (maq.) p/tub. t
550 mm 1.76 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 1.76 a 2m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 2.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 2.01 a 2.5m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 2.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 2.51 a 3m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 3.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 3.01 a 3.5m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 3.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 4.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 4.01 a 5m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 5.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 5.01 a 6m prof. - Relleno comp. zanja (maq.) p/tub. t

Página 29 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
630 mm 0.60 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 630 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 1.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 630 de 1.01 a 1.25m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 1.26 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 630 de 1.26 a 1.5m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 1.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 630 de 1.51 a 1.75m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 1.76 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 630 de 1.76 a 2m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 2.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 630 de 2.01 a 2.5m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 2.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 630 de 2.51 a 3m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 3.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 630 de 3.01 a 3.5m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 3.51 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 630 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 4.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 630 de 4.01 a 5m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 5.01 TSR M Excav. Zanja (maq.) p/tub. t-semirocoso DN 630 de 5.01 a 6m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 0.60 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 1.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 1.01 a 1.25m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 1.26 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 1.26 a 1.5m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 1.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 1.51 a 1.75m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 1.76 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 1.76 a 2m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 2.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 2.01 a 2.5m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 2.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 2.51 a 3m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 3.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 3.01 a 3.5m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 3.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 4.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 4.01 a 5m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 5.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 5.01 a 6m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 0.60 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 1.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 1.01 a 1.25m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 1.26 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 1.26 a 1.5m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 1.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 1.51 a 1.75m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 1.76 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 1.76 a 2m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 2.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 2.01 a 2.5m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 2.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 2.51 a 3m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 3.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 3.01 a 3.5m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 3.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 4.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 4.01 a 5m prof. - Relleno comp. zanja (maq.) p/tub. t
250 mm 5.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 5.01 a 6m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 0.60 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 1.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 1.01 a 1.25m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 1.26 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 1.26 a 1.5m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 1.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 1.51 a 1.75m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 1.76 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 1.76 a 2m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 2.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 2.01 a 2.5m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 2.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 2.51 a 3m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 3.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 3.01 a 3.5m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 3.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t

Página 30 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
355 mm 4.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 4.01 a 5m prof. - Relleno comp. zanja (maq.) p/tub. t
355 mm 5.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 5.01 a 6m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 0.60 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 1.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 1.01 a 1.25m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 1.26 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 1.26 a 1.5m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 1.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 1.51 a 1.75m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 1.76 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 1.76 a 2m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 2.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 2.01 a 2.5m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 2.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 2.51 a 3m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 3.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 3.01 a 3.5m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 3.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 4.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 4.01 a 5m prof. - Relleno comp. zanja (maq.) p/tub. t
450 mm 5.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 5.01 a 6m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 0.60 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 1.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 1.01 a 1.25m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 1.26 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 1.26 a 1.5m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 1.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 1.51 a 1.75m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 1.76 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 1.76 a 2m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 2.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 2.01 a 2.5m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 2.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 2.51 a 3m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 3.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 3.01 a 3.5m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 3.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 4.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 4.01 a 5m prof. - Relleno comp. zanja (maq.) p/tub. t
550 mm 5.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 5.01 a 6m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 0.60 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 630 de 0.6 a 1m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 1.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 630 de 1.01 a 1.25m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 1.26 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 630 de 1.26 a 1.5m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 1.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 630 de 1.51 a 1.75m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 1.76 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 630 de 1.76 a 2m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 2.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 630 de 2.01 a 2.5m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 2.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 630 de 2.51 a 3m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 3.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 630 de 3.01 a 3.5m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 3.51 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 630 de 3.51 a 4m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 4.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 630 de 4.01 a 5m prof. - Relleno comp. zanja (maq.) p/tub. t
630 mm 5.01 TR M Excav. Zanja (maq.) p/tub. t-rocoso DN 630 de 5.01 a 6m prof. - Relleno comp. zanja (maq.) p/tub. t
160 mm 0.60 TN P Excav. Zanja (pulso) p/tub. t-normal DN 110 a 160 de 0.6 a 1m prof. - Relleno comp. zanja (pulso) p/tub. t
160 mm 1.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 110 a 160 de 1.01 a 1.25m prof. - Relleno comp. zanja (pulso) p/tub. t
160 mm 1.26 TN P Excav. Zanja (pulso) p/tub. t-normal DN 110 a 160 de 1.26 a 1.5m prof. - Relleno comp. zanja (pulso) p/tub. t
160 mm 1.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 110 a 160 de 1.51 a 1.75m prof. - Relleno comp. zanja (pulso) p/tub. t
160 mm 1.76 TN P Excav. Zanja (pulso) p/tub. t-normal DN 110 a 160 de 1.76 a 2m prof. - Relleno comp. zanja (pulso) p/tub. t
160 mm 2.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 110 a 160 de 2.01 a 2.5m prof. - Relleno comp. zanja (pulso) p/tub. t
160 mm 2.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 110 a 160 de 2.51 a 3m prof. - Relleno comp. zanja (pulso) p/tub. t

Página 31 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
160 mm 3.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 110 a 160 de 3.01 a 3.5m prof. - Relleno comp. zanja (pulso) p/tub. t
160 mm 3.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 110 a 160 de 3.51 a 4m prof. - Relleno comp. zanja (pulso) p/tub. t
160 mm 4.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 110 a 160 de 4.01 a 5m prof. - Relleno comp. zanja (pulso) p/tub. t
160 mm 5.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 110 a 160 de 5.01 a 6m prof. - Relleno comp. zanja (pulso) p/tub. t
250 mm 0.60 TN P Excav. Zanja (pulso) p/tub. t-normal DN 200 a 250 de 0.6 a 1m prof. - Relleno comp. zanja (pulso) p/tub. t
250 mm 1.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 200 a 250 de 1.01 a 1.25m prof. - Relleno comp. zanja (pulso) p/tub. t
250 mm 1.26 TN P Excav. Zanja (pulso) p/tub. t-normal DN 200 a 250 de 1.26 a 1.5m prof. - Relleno comp. zanja (pulso) p/tub. t
250 mm 1.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 200 a 250 de 1.51 a 1.75m prof. - Relleno comp. zanja (pulso) p/tub. t
250 mm 1.76 TN P Excav. Zanja (pulso) p/tub. t-normal DN 200 a 250 de 1.76 a 2m prof. - Relleno comp. zanja (pulso) p/tub. t
250 mm 2.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 200 a 250 de 2.01 a 2.5m prof. - Relleno comp. zanja (pulso) p/tub. t
250 mm 2.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 200 a 250 de 2.51 a 3m prof. - Relleno comp. zanja (pulso) p/tub. t
250 mm 3.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 200 a 250 de 3.01 a 3.5m prof. - Relleno comp. zanja (pulso) p/tub. t
250 mm 3.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 200 a 250 de 3.51 a 4m prof. - Relleno comp. zanja (pulso) p/tub. t
250 mm 4.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 200 a 250 de 4.01 a 5m prof. - Relleno comp. zanja (pulso) p/tub. t
250 mm 5.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 200 a 250 de 5.01 a 6m prof. - Relleno comp. zanja (pulso) p/tub. t
355 mm 0.60 TN P Excav. Zanja (pulso) p/tub. t-normal DN 315 a 315 de 0.6 a 1m prof. - Relleno comp. zanja (pulso) p/tub. t
355 mm 1.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 315 a 315 de 1.01 a 1.25m prof. - Relleno comp. zanja (pulso) p/tub. t
355 mm 1.26 TN P Excav. Zanja (pulso) p/tub. t-normal DN 315 a 315 de 1.26 a 1.5m prof. - Relleno comp. zanja (pulso) p/tub. t
355 mm 1.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 315 a 315 de 1.51 a 1.75m prof. - Relleno comp. zanja (pulso) p/tub. t
355 mm 1.76 TN P Excav. Zanja (pulso) p/tub. t-normal DN 315 a 315 de 1.76 a 2m prof. - Relleno comp. zanja (pulso) p/tub. t
355 mm 2.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 315 a 315 de 2.01 a 2.5m prof. - Relleno comp. zanja (pulso) p/tub. t
355 mm 2.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 315 a 315 de 2.51 a 3m prof. - Relleno comp. zanja (pulso) p/tub. t
355 mm 3.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 315 a 315 de 3.01 a 3.5m prof. - Relleno comp. zanja (pulso) p/tub. t
355 mm 3.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 315 a 315 de 3.51 a 4m prof. - Relleno comp. zanja (pulso) p/tub. t
355 mm 4.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 315 a 315 de 4.01 a 5m prof. - Relleno comp. zanja (pulso) p/tub. t
355 mm 5.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 315 a 315 de 5.01 a 6m prof. - Relleno comp. zanja (pulso) p/tub. t
450 mm 0.60 TN P Excav. Zanja (pulso) p/tub. t-normal DN 400 a 450 de 0.6 a 1m prof. - Relleno comp. zanja (pulso) p/tub. t
450 mm 1.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 400 a 450 de 1.01 a 1.25m prof. - Relleno comp. zanja (pulso) p/tub. t
450 mm 1.26 TN P Excav. Zanja (pulso) p/tub. t-normal DN 400 a 450 de 1.26 a 1.5m prof. - Relleno comp. zanja (pulso) p/tub. t
450 mm 1.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 400 a 450 de 1.51 a 1.75m prof. - Relleno comp. zanja (pulso) p/tub. t
450 mm 1.76 TN P Excav. Zanja (pulso) p/tub. t-normal DN 400 a 450 de 1.76 a 2m prof. - Relleno comp. zanja (pulso) p/tub. t
450 mm 2.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 400 a 450 de 2.01 a 2.5m prof. - Relleno comp. zanja (pulso) p/tub. t
450 mm 2.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 400 a 450 de 2.51 a 3m prof. - Relleno comp. zanja (pulso) p/tub. t
450 mm 3.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 400 a 450 de 3.01 a 3.5m prof. - Relleno comp. zanja (pulso) p/tub. t
450 mm 3.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 400 a 450 de 3.51 a 4m prof. - Relleno comp. zanja (pulso) p/tub. t
450 mm 4.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 400 a 450 de 4.01 a 5m prof. - Relleno comp. zanja (pulso) p/tub. t
450 mm 5.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 400 a 450 de 5.01 a 6m prof. - Relleno comp. zanja (pulso) p/tub. t
550 mm 0.60 TN P Excav. Zanja (pulso) p/tub. t-normal DN 500 a 550 de 0.6 a 1m prof. - Relleno comp. zanja (pulso) p/tub. t
550 mm 1.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 500 a 550 de 1.01 a 1.25m prof. - Relleno comp. zanja (pulso) p/tub. t
550 mm 1.26 TN P Excav. Zanja (pulso) p/tub. t-normal DN 500 a 550 de 1.26 a 1.5m prof. - Relleno comp. zanja (pulso) p/tub. t
550 mm 1.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 500 a 550 de 1.51 a 1.75m prof. - Relleno comp. zanja (pulso) p/tub. t
550 mm 1.76 TN P Excav. Zanja (pulso) p/tub. t-normal DN 500 a 550 de 1.76 a 2m prof. - Relleno comp. zanja (pulso) p/tub. t

Página 32 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
550 mm 2.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 500 a 550 de 2.01 a 2.5m prof. - Relleno comp. zanja (pulso) p/tub. t
550 mm 2.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 500 a 550 de 2.51 a 3m prof. - Relleno comp. zanja (pulso) p/tub. t
550 mm 3.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 500 a 550 de 3.01 a 3.5m prof. - Relleno comp. zanja (pulso) p/tub. t
550 mm 3.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 500 a 550 de 3.51 a 4m prof. - Relleno comp. zanja (pulso) p/tub. t
550 mm 4.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 500 a 550 de 4.01 a 5m prof. - Relleno comp. zanja (pulso) p/tub. t
550 mm 5.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 500 a 550 de 5.01 a 6m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 0.60 TN P Excav. Zanja (pulso) p/tub. t-normal DN 630 de 0.6 a 1m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 1.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 630 de 1.01 a 1.25m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 1.26 TN P Excav. Zanja (pulso) p/tub. t-normal DN 630 de 1.26 a 1.5m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 1.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 630 de 1.51 a 1.75m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 1.76 TN P Excav. Zanja (pulso) p/tub. t-normal DN 630 de 1.76 a 2m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 2.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 630 de 2.01 a 2.5m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 2.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 630 de 2.51 a 3m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 3.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 630 de 3.01 a 3.5m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 3.51 TN P Excav. Zanja (pulso) p/tub. t-normal DN 630 de 3.51 a 4m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 4.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 630 de 4.01 a 5m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 5.01 TN P Excav. Zanja (pulso) p/tub. t-normal DN 630 de 5.01 a 6m prof. - Relleno comp. zanja (pulso) p/tub. t
160 mm 0.60 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 0.6 a 1m prof. - Relleno comp. zanja (pulso) p/tub. t
160 mm 1.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 1.01 a 1.25m pr - Relleno comp. zanja (pulso) p/tub. t
160 mm 1.26 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 1.26 a 1.5m prof - Relleno comp. zanja (pulso) p/tub. t
160 mm 1.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 1.51 a 1.75m pr - Relleno comp. zanja (pulso) p/tub. t
160 mm 1.76 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 1.76 a 2m prof. - Relleno comp. zanja (pulso) p/tub. t
160 mm 2.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 2.01 a 2.5m prof - Relleno comp. zanja (pulso) p/tub. t
160 mm 2.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 2.51 a 3m prof. - Relleno comp. zanja (pulso) p/tub. t
160 mm 3.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 3.01 a 3.5m prof - Relleno comp. zanja (pulso) p/tub. t
160 mm 3.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 3.51 a 4m prof. - Relleno comp. zanja (pulso) p/tub. t
160 mm 4.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 4.01 a 5m prof. - Relleno comp. zanja (pulso) p/tub. t
160 mm 5.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 5.01 a 6m prof. - Relleno comp. zanja (pulso) p/tub. t
250 mm 0.60 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 0.6 a 1m prof. - Relleno comp. zanja (pulso) p/tub. t
250 mm 1.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 1.01 a 1.25m pro - Relleno comp. zanja (pulso) p/tub. t
250 mm 1.26 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 1.26 a 1.5m prof - Relleno comp. zanja (pulso) p/tub. t
250 mm 1.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 1.51 a 1.75m pro - Relleno comp. zanja (pulso) p/tub. t
250 mm 1.76 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 1.76 a 2m prof. - Relleno comp. zanja (pulso) p/tub. t
250 mm 2.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 2.01 a 2.5m prof - Relleno comp. zanja (pulso) p/tub. t
250 mm 2.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 2.51 a 3m prof. - Relleno comp. zanja (pulso) p/tub. t
250 mm 3.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 3.01 a 3.5m prof - Relleno comp. zanja (pulso) p/tub. t
250 mm 3.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 3.51 a 4m prof. - Relleno comp. zanja (pulso) p/tub. t
250 mm 4.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 4.01 a 5m prof. - Relleno comp. zanja (pulso) p/tub. t
250 mm 5.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 5.01 a 6m prof. - Relleno comp. zanja (pulso) p/tub. t
355 mm 0.60 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 0.6 a 1m prof. - Relleno comp. zanja (pulso) p/tub. t
355 mm 1.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 1.01 a 1.25m pro - Relleno comp. zanja (pulso) p/tub. t
355 mm 1.26 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 1.26 a 1.5m prof - Relleno comp. zanja (pulso) p/tub. t

Página 33 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
355 mm 1.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 1.51 a 1.75m pro - Relleno comp. zanja (pulso) p/tub. t
355 mm 1.76 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 1.76 a 2m prof. - Relleno comp. zanja (pulso) p/tub. t
355 mm 2.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 2.01 a 2.5m prof - Relleno comp. zanja (pulso) p/tub. t
355 mm 2.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 2.51 a 3m prof. - Relleno comp. zanja (pulso) p/tub. t
355 mm 3.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 3.01 a 3.5m prof - Relleno comp. zanja (pulso) p/tub. t
355 mm 3.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 3.51 a 4m prof. - Relleno comp. zanja (pulso) p/tub. t
355 mm 4.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 4.01 a 5m prof. - Relleno comp. zanja (pulso) p/tub. t
355 mm 5.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 5.01 a 6m prof. - Relleno comp. zanja (pulso) p/tub. t
450 mm 0.60 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 0.6 a 1m prof. - Relleno comp. zanja (pulso) p/tub. t
450 mm 1.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 1.01 a 1.25m pro - Relleno comp. zanja (pulso) p/tub. t
450 mm 1.26 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 1.26 a 1.5m prof - Relleno comp. zanja (pulso) p/tub. t
450 mm 1.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 1.51 a 1.75m pro - Relleno comp. zanja (pulso) p/tub. t
450 mm 1.76 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 1.76 a 2m prof. - Relleno comp. zanja (pulso) p/tub. t
450 mm 2.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 2.01 a 2.5m prof - Relleno comp. zanja (pulso) p/tub. t
450 mm 2.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 2.51 a 3m prof. - Relleno comp. zanja (pulso) p/tub. t
450 mm 3.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 3.01 a 3.5m prof - Relleno comp. zanja (pulso) p/tub. t
450 mm 3.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 3.51 a 4m prof. - Relleno comp. zanja (pulso) p/tub. t
450 mm 4.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 4.01 a 5m prof. - Relleno comp. zanja (pulso) p/tub. t
450 mm 5.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 5.01 a 6m prof. - Relleno comp. zanja (pulso) p/tub. t
550 mm 0.60 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 0.6 a 1m prof. - Relleno comp. zanja (pulso) p/tub. t
550 mm 1.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 1.01 a 1.25m pro - Relleno comp. zanja (pulso) p/tub. t
550 mm 1.26 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 1.26 a 1.5m prof - Relleno comp. zanja (pulso) p/tub. t
550 mm 1.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 1.51 a 1.75m pro - Relleno comp. zanja (pulso) p/tub. t
550 mm 1.76 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 1.76 a 2m prof. - Relleno comp. zanja (pulso) p/tub. t
550 mm 2.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 2.01 a 2.5m prof - Relleno comp. zanja (pulso) p/tub. t
550 mm 2.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 2.51 a 3m prof. - Relleno comp. zanja (pulso) p/tub. t
550 mm 3.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 3.01 a 3.5m prof - Relleno comp. zanja (pulso) p/tub. t
550 mm 3.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 3.51 a 4m prof. - Relleno comp. zanja (pulso) p/tub. t
550 mm 4.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 4.01 a 5m prof. - Relleno comp. zanja (pulso) p/tub. t
550 mm 5.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 5.01 a 6m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 0.60 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 630 de 0.6 a 1m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 1.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 630 de 1.01 a 1.25m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 1.26 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 630 de 1.26 a 1.5m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 1.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 630 de 1.51 a 1.75m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 1.76 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 630 de 1.76 a 2m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 2.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 630 de 2.01 a 2.5m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 2.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 630 de 2.51 a 3m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 3.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 630 de 3.01 a 3.5m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 3.51 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 630 de 3.51 a 4m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 4.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 630 de 4.01 a 5m prof. - Relleno comp. zanja (pulso) p/tub. t
630 mm 5.01 TSR P Excav. Zanja (pulso) p/tub. t-semirocoso DN 630 de 5.01 a 6m prof. - Relleno comp. zanja (pulso) p/tub. t

Página 34 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50

4,053.07
RELLENO 4,053.07
D Excav H1 Terr. Exca.
160 mm 0.60 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 110 a 160 de 0.6 a 1m prof -
160 mm 1.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 110 a 160 de 1.01 a 1.25m -
160 mm 1.26 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 110 a 160 de 1.26 a 1.5m p -
160 mm 1.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 110 a 160 de 1.51 a 1.75m -
160 mm 1.76 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 110 a 160 de 1.76 a 2m pro -
160 mm 2.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 110 a 160 de 2.01 a 2.5m p -
160 mm 2.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 110 a 160 de 2.51 a 3m pro -
160 mm 3.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 110 a 160 de 3.01 a 3.5m p -
160 mm 3.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 110 a 160 de 3.51 a 4m pro -
160 mm 4.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 110 a 160 de 4.01 a 5m pro -
160 mm 5.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 110 a 160 de 5.01 a 6m pro -
250 mm 0.60 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 0.6 a 1m prof. -
250 mm 1.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 1.01 a 1.25m -
250 mm 1.26 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 1.26 a 1.5m pr 688.64
250 mm 1.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 1.51 a 1.75m ###
250 mm 1.76 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 1.76 a 2m pro 622.90
250 mm 2.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 2.01 a 2.5m pr 647.03
250 mm 2.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 2.51 a 3m pro 267.08
250 mm 3.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 3.01 a 3.5m pr 214.87
250 mm 3.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 3.51 a 4m pro -
250 mm 4.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 4.01 a 5m pro 47.55
250 mm 5.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 200 a 250 de 5.01 a 6m pro 51.29
355 mm 0.60 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 315 a 315 de 0.6 a 1m prof. -
355 mm 1.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 315 a 315 de 1.01 a 1.25m -
355 mm 1.26 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 315 a 315 de 1.26 a 1.5m pr -
355 mm 1.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 315 a 315 de 1.51 a 1.75m -
355 mm 1.76 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 315 a 315 de 1.76 a 2m pro -
355 mm 2.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 315 a 315 de 2.01 a 2.5m pr -
355 mm 2.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 315 a 315 de 2.51 a 3m pro -
355 mm 3.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 315 a 315 de 3.01 a 3.5m pr -
355 mm 3.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 315 a 315 de 3.51 a 4m pro -
355 mm 4.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 315 a 315 de 4.01 a 5m pro -
355 mm 5.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 315 a 315 de 5.01 a 6m pro -
450 mm 0.60 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 400 a 450 de 0.6 a 1m prof. -
450 mm 1.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 400 a 450 de 1.01 a 1.25m -
450 mm 1.26 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 400 a 450 de 1.26 a 1.5m pr -
450 mm 1.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 400 a 450 de 1.51 a 1.75m -
450 mm 1.76 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 400 a 450 de 1.76 a 2m pro -

Página 35 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
450 mm 2.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 400 a 450 de 2.01 a 2.5m pr -
450 mm 2.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 400 a 450 de 2.51 a 3m pro -
450 mm 3.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 400 a 450 de 3.01 a 3.5m pr -
450 mm 3.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 400 a 450 de 3.51 a 4m pro -
450 mm 4.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 400 a 450 de 4.01 a 5m pro -
450 mm 5.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 400 a 450 de 5.01 a 6m pro -
550 mm 0.60 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 500 a 550 de 0.6 a 1m prof. -
550 mm 1.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 500 a 550 de 1.01 a 1.25m -
550 mm 1.26 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 500 a 550 de 1.26 a 1.5m pr -
550 mm 1.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 500 a 550 de 1.51 a 1.75m -
550 mm 1.76 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 500 a 550 de 1.76 a 2m pro -
550 mm 2.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 500 a 550 de 2.01 a 2.5m pr -
550 mm 2.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 500 a 550 de 2.51 a 3m pro -
550 mm 3.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 500 a 550 de 3.01 a 3.5m pr -
550 mm 3.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 500 a 550 de 3.51 a 4m pro -
550 mm 4.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 500 a 550 de 4.01 a 5m pro -
550 mm 5.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 500 a 550 de 5.01 a 6m pro -
630 mm 0.60 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 630 de 0.6 a 1m prof. -
630 mm 1.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 630 de 1.01 a 1.25m prof. -
630 mm 1.26 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 630 de 1.26 a 1.5m prof. -
630 mm 1.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 630 de 1.51 a 1.75m prof. -
630 mm 1.76 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 630 de 1.76 a 2m prof. -
630 mm 2.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 630 de 2.01 a 2.5m prof. -
630 mm 2.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 630 de 2.51 a 3m prof. -
630 mm 3.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 630 de 3.01 a 3.5m prof. -
630 mm 3.51 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 630 de 3.51 a 4m prof. -
630 mm 4.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 630 de 4.01 a 5m prof. -
630 mm 5.01 TN M Relleno comp. zanja (maq.) p/tub. t-normal DN 630 de 5.01 a 6m prof. -
160 mm 0.60 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 0.6 a 1m -
160 mm 1.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 1.01 a 1 -
160 mm 1.26 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 1.26 a 1. -
160 mm 1.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 1.51 a 1 -
160 mm 1.76 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 1.76 a 2m -
160 mm 2.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 2.01 a 2. -
160 mm 2.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 2.51 a 3m -
160 mm 3.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 3.01 a 3. -
160 mm 3.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 3.51 a 4m -
160 mm 4.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 4.01 a 5m -
160 mm 5.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 110 a 160 de 5.01 a 6m -
250 mm 0.60 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 0.6 a 1m -
250 mm 1.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 1.01 a 1. -
250 mm 1.26 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 1.26 a 1. 45.25

Página 36 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
250 mm 1.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 1.51 a 1. -
250 mm 1.76 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 1.76 a 2m -
250 mm 2.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 2.01 a 2. -
250 mm 2.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 2.51 a 3m -
250 mm 3.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 3.01 a 3. -
250 mm 3.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 3.51 a 4m -
250 mm 4.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 4.01 a 5m -
250 mm 5.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 200 a 250 de 5.01 a 6m -
355 mm 0.60 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 0.6 a 1m -
355 mm 1.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 1.01 a 1. -
355 mm 1.26 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 1.26 a 1. -
355 mm 1.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 1.51 a 1. -
355 mm 1.76 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 1.76 a 2m -
355 mm 2.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 2.01 a 2. -
355 mm 2.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 2.51 a 3m -
355 mm 3.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 3.01 a 3. -
355 mm 3.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 3.51 a 4m -
355 mm 4.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 4.01 a 5m -
355 mm 5.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 315 a 315 de 5.01 a 6m -
450 mm 0.60 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 0.6 a 1m -
450 mm 1.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 1.01 a 1. -
450 mm 1.26 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 1.26 a 1. -
450 mm 1.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 1.51 a 1. -
450 mm 1.76 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 1.76 a 2m -
450 mm 2.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 2.01 a 2. -
450 mm 2.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 2.51 a 3m -
450 mm 3.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 3.01 a 3. -
450 mm 3.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 3.51 a 4m -
450 mm 4.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 4.01 a 5m -
450 mm 5.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 400 a 450 de 5.01 a 6m -
550 mm 0.60 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 0.6 a 1m -
550 mm 1.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 1.01 a 1. -
550 mm 1.26 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 1.26 a 1. -
550 mm 1.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 1.51 a 1. -
550 mm 1.76 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 1.76 a 2m -
550 mm 2.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 2.01 a 2. -
550 mm 2.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 2.51 a 3m -
550 mm 3.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 3.01 a 3. -
550 mm 3.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 3.51 a 4m -
550 mm 4.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 4.01 a 5m -
550 mm 5.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 500 a 550 de 5.01 a 6m -
630 mm 0.60 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 630 de 0.6 a 1m prof. -

Página 37 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
630 mm 1.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 630 de 1.01 a 1.25m pr -
630 mm 1.26 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 630 de 1.26 a 1.5m pro -
630 mm 1.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 630 de 1.51 a 1.75m pr -
630 mm 1.76 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 630 de 1.76 a 2m prof. -
630 mm 2.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 630 de 2.01 a 2.5m pro -
630 mm 2.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 630 de 2.51 a 3m prof. -
630 mm 3.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 630 de 3.01 a 3.5m pro -
630 mm 3.51 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 630 de 3.51 a 4m prof. -
630 mm 4.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 630 de 4.01 a 5m prof. -
630 mm 5.01 TSR M Relleno comp. zanja (maq.) p/tub. t-semirocoso DN 630 de 5.01 a 6m prof. -
160 mm 0.60 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 0.6 a 1m prof -
160 mm 1.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 1.01 a 1.25m -
160 mm 1.26 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 1.26 a 1.5m p -
160 mm 1.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 1.51 a 1.75m -
160 mm 1.76 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 1.76 a 2m pro -
160 mm 2.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 2.01 a 2.5m p -
160 mm 2.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 2.51 a 3m pro -
160 mm 3.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 3.01 a 3.5m p -
160 mm 3.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 3.51 a 4m pro -
160 mm 4.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 4.01 a 5m pro -
160 mm 5.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 110 a 160 de 5.01 a 6m pro -
250 mm 0.60 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 0.6 a 1m prof. -
250 mm 1.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 1.01 a 1.25m p -
250 mm 1.26 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 1.26 a 1.5m pr -
250 mm 1.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 1.51 a 1.75m p -
250 mm 1.76 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 1.76 a 2m prof -
250 mm 2.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 2.01 a 2.5m pr -
250 mm 2.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 2.51 a 3m prof -
250 mm 3.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 3.01 a 3.5m pr -
250 mm 3.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 3.51 a 4m prof -
250 mm 4.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 4.01 a 5m prof -
250 mm 5.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 200 a 250 de 5.01 a 6m prof -
355 mm 0.60 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 0.6 a 1m prof. -
355 mm 1.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 1.01 a 1.25m p -
355 mm 1.26 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 1.26 a 1.5m pr -
355 mm 1.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 1.51 a 1.75m p -
355 mm 1.76 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 1.76 a 2m prof -
355 mm 2.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 2.01 a 2.5m pr -
355 mm 2.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 2.51 a 3m prof -
355 mm 3.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 3.01 a 3.5m pr -
355 mm 3.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 3.51 a 4m prof -
355 mm 4.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 4.01 a 5m prof -

Página 38 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
355 mm 5.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 315 a 315 de 5.01 a 6m prof -
450 mm 0.60 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 0.6 a 1m prof. -
450 mm 1.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 1.01 a 1.25m p -
450 mm 1.26 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 1.26 a 1.5m pr -
450 mm 1.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 1.51 a 1.75m p -
450 mm 1.76 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 1.76 a 2m prof -
450 mm 2.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 2.01 a 2.5m pr -
450 mm 2.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 2.51 a 3m prof -
450 mm 3.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 3.01 a 3.5m pr -
450 mm 3.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 3.51 a 4m prof -
450 mm 4.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 4.01 a 5m prof -
450 mm 5.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 400 a 450 de 5.01 a 6m prof -
550 mm 0.60 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 0.6 a 1m prof. -
550 mm 1.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 1.01 a 1.25m p -
550 mm 1.26 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 1.26 a 1.5m pr -
550 mm 1.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 1.51 a 1.75m p -
550 mm 1.76 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 1.76 a 2m prof -
550 mm 2.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 2.01 a 2.5m pr -
550 mm 2.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 2.51 a 3m prof -
550 mm 3.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 3.01 a 3.5m pr -
550 mm 3.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 3.51 a 4m prof -
550 mm 4.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 4.01 a 5m prof -
550 mm 5.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 500 a 550 de 5.01 a 6m prof -
630 mm 0.60 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 630 de 0.6 a 1m prof. -
630 mm 1.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 630 de 1.01 a 1.25m prof. -
630 mm 1.26 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 630 de 1.26 a 1.5m prof. -
630 mm 1.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 630 de 1.51 a 1.75m prof. -
630 mm 1.76 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 630 de 1.76 a 2m prof. -
630 mm 2.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 630 de 2.01 a 2.5m prof. -
630 mm 2.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 630 de 2.51 a 3m prof. -
630 mm 3.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 630 de 3.01 a 3.5m prof. -
630 mm 3.51 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 630 de 3.51 a 4m prof. -
630 mm 4.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 630 de 4.01 a 5m prof. -
630 mm 5.01 TR M Relleno comp. zanja (maq.) p/tub. t-rocoso DN 630 de 5.01 a 6m prof. -
160 mm 0.60 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 110 a 160 de 0.6 a 1m prof -
160 mm 1.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 110 a 160 de 1.01 a 1.25m -
160 mm 1.26 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 110 a 160 de 1.26 a 1.5m p -
160 mm 1.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 110 a 160 de 1.51 a 1.75m -
160 mm 1.76 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 110 a 160 de 1.76 a 2m pr -
160 mm 2.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 110 a 160 de 2.01 a 2.5m p -
160 mm 2.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 110 a 160 de 2.51 a 3m pr -
160 mm 3.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 110 a 160 de 3.01 a 3.5m p -

Página 39 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
160 mm 3.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 110 a 160 de 3.51 a 4m pr -
160 mm 4.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 110 a 160 de 4.01 a 5m pr -
160 mm 5.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 110 a 160 de 5.01 a 6m pr -
250 mm 0.60 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 200 a 250 de 0.6 a 1m prof -
250 mm 1.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 200 a 250 de 1.01 a 1.25m -
250 mm 1.26 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 200 a 250 de 1.26 a 1.5m p -
250 mm 1.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 200 a 250 de 1.51 a 1.75m -
250 mm 1.76 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 200 a 250 de 1.76 a 2m pro -
250 mm 2.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 200 a 250 de 2.01 a 2.5m p -
250 mm 2.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 200 a 250 de 2.51 a 3m pro -
250 mm 3.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 200 a 250 de 3.01 a 3.5m p -
250 mm 3.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 200 a 250 de 3.51 a 4m pro -
250 mm 4.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 200 a 250 de 4.01 a 5m pro -
250 mm 5.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 200 a 250 de 5.01 a 6m pro -
355 mm 0.60 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 315 a 315 de 0.6 a 1m prof -
355 mm 1.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 315 a 315 de 1.01 a 1.25m -
355 mm 1.26 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 315 a 315 de 1.26 a 1.5m p -
355 mm 1.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 315 a 315 de 1.51 a 1.75m -
355 mm 1.76 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 315 a 315 de 1.76 a 2m pro -
355 mm 2.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 315 a 315 de 2.01 a 2.5m p -
355 mm 2.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 315 a 315 de 2.51 a 3m pro -
355 mm 3.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 315 a 315 de 3.01 a 3.5m p -
355 mm 3.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 315 a 315 de 3.51 a 4m pro -
355 mm 4.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 315 a 315 de 4.01 a 5m pro -
355 mm 5.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 315 a 315 de 5.01 a 6m pro -
450 mm 0.60 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 400 a 450 de 0.6 a 1m prof -
450 mm 1.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 400 a 450 de 1.01 a 1.25m -
450 mm 1.26 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 400 a 450 de 1.26 a 1.5m p -
450 mm 1.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 400 a 450 de 1.51 a 1.75m -
450 mm 1.76 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 400 a 450 de 1.76 a 2m pro -
450 mm 2.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 400 a 450 de 2.01 a 2.5m p -
450 mm 2.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 400 a 450 de 2.51 a 3m pro -
450 mm 3.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 400 a 450 de 3.01 a 3.5m p -
450 mm 3.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 400 a 450 de 3.51 a 4m pro -
450 mm 4.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 400 a 450 de 4.01 a 5m pro -
450 mm 5.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 400 a 450 de 5.01 a 6m pro -
550 mm 0.60 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 500 a 550 de 0.6 a 1m prof -
550 mm 1.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 500 a 550 de 1.01 a 1.25m -
550 mm 1.26 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 500 a 550 de 1.26 a 1.5m p -
550 mm 1.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 500 a 550 de 1.51 a 1.75m -
550 mm 1.76 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 500 a 550 de 1.76 a 2m pro -
550 mm 2.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 500 a 550 de 2.01 a 2.5m p -

Página 40 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
550 mm 2.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 500 a 550 de 2.51 a 3m pro -
550 mm 3.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 500 a 550 de 3.01 a 3.5m p -
550 mm 3.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 500 a 550 de 3.51 a 4m pro -
550 mm 4.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 500 a 550 de 4.01 a 5m pro -
550 mm 5.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 500 a 550 de 5.01 a 6m pro -
630 mm 0.60 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 630 de 0.6 a 1m prof. -
630 mm 1.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 630 de 1.01 a 1.25m prof. -
630 mm 1.26 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 630 de 1.26 a 1.5m prof. -
630 mm 1.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 630 de 1.51 a 1.75m prof. -
630 mm 1.76 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 630 de 1.76 a 2m prof. -
630 mm 2.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 630 de 2.01 a 2.5m prof. -
630 mm 2.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 630 de 2.51 a 3m prof. -
630 mm 3.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 630 de 3.01 a 3.5m prof. -
630 mm 3.51 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 630 de 3.51 a 4m prof. -
630 mm 4.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 630 de 4.01 a 5m prof. -
630 mm 5.01 TN P Relleno comp. zanja (pulso) p/tub. t-normal DN 630 de 5.01 a 6m prof. -
160 mm 0.60 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 0.6 a 1m -
160 mm 1.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 1.01 a 1 -
160 mm 1.26 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 1.26 a 1 -
160 mm 1.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 1.51 a 1 -
160 mm 1.76 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 1.76 a 2 -
160 mm 2.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 2.01 a 2 -
160 mm 2.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 2.51 a 3 -
160 mm 3.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 3.01 a 3 -
160 mm 3.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 3.51 a 4 -
160 mm 4.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 4.01 a 5 -
160 mm 5.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 110 a 160 de 5.01 a 6 -
250 mm 0.60 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 0.6 a 1m -
250 mm 1.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 1.01 a 1. -
250 mm 1.26 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 1.26 a 1. -
250 mm 1.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 1.51 a 1. -
250 mm 1.76 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 1.76 a 2m -
250 mm 2.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 2.01 a 2. -
250 mm 2.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 2.51 a 3m -
250 mm 3.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 3.01 a 3. -
250 mm 3.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 3.51 a 4m -
250 mm 4.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 4.01 a 5m -
250 mm 5.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 200 a 250 de 5.01 a 6m -
355 mm 0.60 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 0.6 a 1m -
355 mm 1.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 1.01 a 1. -
355 mm 1.26 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 1.26 a 1. -
355 mm 1.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 1.51 a 1. -

Página 41 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
355 mm 1.76 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 1.76 a 2m -
355 mm 2.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 2.01 a 2. -
355 mm 2.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 2.51 a 3m -
355 mm 3.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 3.01 a 3. -
355 mm 3.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 3.51 a 4m -
355 mm 4.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 4.01 a 5m -
355 mm 5.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 315 a 315 de 5.01 a 6m -
450 mm 0.60 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 0.6 a 1m -
450 mm 1.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 1.01 a 1. -
450 mm 1.26 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 1.26 a 1. -
450 mm 1.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 1.51 a 1. -
450 mm 1.76 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 1.76 a 2m -
450 mm 2.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 2.01 a 2. -
450 mm 2.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 2.51 a 3m -
450 mm 3.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 3.01 a 3. -
450 mm 3.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 3.51 a 4m -
450 mm 4.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 4.01 a 5m -
450 mm 5.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 400 a 450 de 5.01 a 6m -
550 mm 0.60 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 0.6 a 1m -
550 mm 1.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 1.01 a 1. -
550 mm 1.26 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 1.26 a 1. -
550 mm 1.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 1.51 a 1. -
550 mm 1.76 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 1.76 a 2m -
550 mm 2.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 2.01 a 2. -
550 mm 2.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 2.51 a 3m -
550 mm 3.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 3.01 a 3. -
550 mm 3.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 3.51 a 4m -
550 mm 4.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 4.01 a 5m -
550 mm 5.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 500 a 550 de 5.01 a 6m -
630 mm 0.60 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 630 de 0.6 a 1m prof. -
630 mm 1.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 630 de 1.01 a 1.25m pr -
630 mm 1.26 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 630 de 1.26 a 1.5m pro -
630 mm 1.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 630 de 1.51 a 1.75m pr -
630 mm 1.76 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 630 de 1.76 a 2m prof. -
630 mm 2.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 630 de 2.01 a 2.5m pro -
630 mm 2.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 630 de 2.51 a 3m prof. -
630 mm 3.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 630 de 3.01 a 3.5m pro -
630 mm 3.51 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 630 de 3.51 a 4m prof. -
630 mm 4.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 630 de 4.01 a 5m prof. -
630 mm 5.01 TSR P Relleno comp. zanja (pulso) p/tub. t-semirocoso DN 630 de 5.01 a 6m prof. -
160 mm 0.60 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 110 a 160 de 0.6 a 1m prof -
160 mm 1.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 110 a 160 de 1.01 a 1.25m -

Página 42 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
160 mm 1.26 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 110 a 160 de 1.26 a 1.5m p -
160 mm 1.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 110 a 160 de 1.51 a 1.75m -
160 mm 1.76 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 110 a 160 de 1.76 a 2m pro -
160 mm 2.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 110 a 160 de 2.01 a 2.5m p -
160 mm 2.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 110 a 160 de 2.51 a 3m pro -
160 mm 3.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 110 a 160 de 3.01 a 3.5m p -
160 mm 3.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 110 a 160 de 3.51 a 4m pro -
160 mm 4.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 110 a 160 de 4.01 a 5m pro -
160 mm 5.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 110 a 160 de 5.01 a 6m pro -
250 mm 0.60 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 200 a 250 de 0.6 a 1m prof. -
250 mm 1.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 200 a 250 de 1.01 a 1.25m -
250 mm 1.26 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 200 a 250 de 1.26 a 1.5m pr -
250 mm 1.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 200 a 250 de 1.51 a 1.75m -
250 mm 1.76 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 200 a 250 de 1.76 a 2m prof -
250 mm 2.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 200 a 250 de 2.01 a 2.5m pr -
250 mm 2.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 200 a 250 de 2.51 a 3m prof -
250 mm 3.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 200 a 250 de 3.01 a 3.5m pr -
250 mm 3.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 200 a 250 de 3.51 a 4m prof -
250 mm 4.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 200 a 250 de 4.01 a 5m prof -
250 mm 5.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 200 a 250 de 5.01 a 6m prof -
355 mm 0.60 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 315 a 315 de 0.6 a 1m prof. -
355 mm 1.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 315 a 315 de 1.01 a 1.25m -
355 mm 1.26 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 315 a 315 de 1.26 a 1.5m pr -
355 mm 1.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 315 a 315 de 1.51 a 1.75m -
355 mm 1.76 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 315 a 315 de 1.76 a 2m prof -
355 mm 2.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 315 a 315 de 2.01 a 2.5m pr -
355 mm 2.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 315 a 315 de 2.51 a 3m prof -
355 mm 3.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 315 a 315 de 3.01 a 3.5m pr -
355 mm 3.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 315 a 315 de 3.51 a 4m prof -
355 mm 4.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 315 a 315 de 4.01 a 5m prof -
355 mm 5.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 315 a 315 de 5.01 a 6m prof -
450 mm 0.60 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 400 a 450 de 0.6 a 1m prof. -
450 mm 1.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 400 a 450 de 1.01 a 1.25m -
450 mm 1.26 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 400 a 450 de 1.26 a 1.5m pr -
450 mm 1.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 400 a 450 de 1.51 a 1.75m -
450 mm 1.76 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 400 a 450 de 1.76 a 2m prof -
450 mm 2.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 400 a 450 de 2.01 a 2.5m pr -
450 mm 2.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 400 a 450 de 2.51 a 3m prof -
450 mm 3.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 400 a 450 de 3.01 a 3.5m pr -
450 mm 3.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 400 a 450 de 3.51 a 4m prof -
450 mm 4.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 400 a 450 de 4.01 a 5m prof -
450 mm 5.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 400 a 450 de 5.01 a 6m prof -

Página 43 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE TUBERIA
MO
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. Relleno
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo Material
Pulso Prestamo
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.60 1.01 1.26
Bzi BZf (m) o/oo (m) Buzon) PVC - U 1.00 1.25 1.50
550 mm 0.60 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 500 a 550 de 0.6 a 1m prof. -
550 mm 1.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 500 a 550 de 1.01 a 1.25m -
550 mm 1.26 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 500 a 550 de 1.26 a 1.5m pr -
550 mm 1.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 500 a 550 de 1.51 a 1.75m -
550 mm 1.76 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 500 a 550 de 1.76 a 2m prof -
550 mm 2.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 500 a 550 de 2.01 a 2.5m pr -
550 mm 2.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 500 a 550 de 2.51 a 3m prof -
550 mm 3.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 500 a 550 de 3.01 a 3.5m pr -
550 mm 3.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 500 a 550 de 3.51 a 4m prof -
550 mm 4.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 500 a 550 de 4.01 a 5m prof -
550 mm 5.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 500 a 550 de 5.01 a 6m prof -
630 mm 0.60 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 630 de 0.6 a 1m prof. -
630 mm 1.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 630 de 1.01 a 1.25m prof. -
630 mm 1.26 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 630 de 1.26 a 1.5m prof. -
630 mm 1.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 630 de 1.51 a 1.75m prof. -
630 mm 1.76 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 630 de 1.76 a 2m prof. -
630 mm 2.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 630 de 2.01 a 2.5m prof. -
630 mm 2.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 630 de 2.51 a 3m prof. -
630 mm 3.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 630 de 3.01 a 3.5m prof. -
630 mm 3.51 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 630 de 3.51 a 4m prof. -
630 mm 4.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 630 de 4.01 a 5m prof. -
630 mm 5.01 TR P Relleno comp. zanja (pulso) p/tub. t-rocoso DN 630 de 5.01 a 6m prof. -

Página 44 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.
14.77 14.77 14.66 14.66 1.00 250 mm 1.51
33.88 33.88 33.82 33.82 1.00 250 mm 1.51
50.05 50.00 50.00 1.00 250 mm 1.26
35.92 35.92 35.91 35.91 1.00 250 mm 1.51
21.94 21.94 21.94 21.94 1.00 250 mm 5.01
29.35 29.35 29.35 29.35 1.00 250 mm 5.01
44.03 44.03 44.02 44.02 1.00 250 mm 4.01
49.85 49.85 49.85 49.85 1.00 250 mm 2.51
47.16 47.16 47.16 47.16 1.00 250 mm 2.51
60.62 60.62 60.61 60.61 1.00 250 mm 2.51
74.09 74.09 74.08 74.08 1.00 250 mm 3.01
3.52 3.52 3.52 3.52 1.00 250 mm 4.01
44.13 44.13 44.13 1.00 250 mm 1.26
52.87 52.87 52.86 52.86 1.00 250 mm 1.51
54.42 54.42 54.42 54.42 1.00 250 mm 1.51
6.76 6.76 6.76 6.76 1.00 250 mm 2.01
8.21 8.19 8.19 1.00 250 mm 1.26
13.73 13.73 13.73 13.73 1.00 250 mm 1.76
28.96 28.96 28.96 28.96 1.00 250 mm 2.01
39.57 39.57 39.56 39.56 1.00 250 mm 1.51
43.00 43.00 43.00 43.00 1.00 250 mm 1.51
44.17 44.17 44.17 44.17 1.00 250 mm 1.76
44.32 44.32 44.32 44.32 1.00 250 mm 1.76
41.97 41.96 41.96 1.00 250 mm 1.26
45.25 45.25 45.25 1.00 250 mm 1.26
47.33 47.33 47.09 47.09 1.00 250 mm 3.01
49.92 49.92 49.84 49.84 1.00 250 mm 1.76
47.89 47.89 47.89 1.00 250 mm 1.26
51.03 51.03 51.03 51.03 1.00 250 mm 1.51
53.07 53.07 53.07 53.07 1.00 250 mm 2.01
51.59 51.59 51.59 51.59 1.00 250 mm 2.01
52.32 52.32 52.31 52.31 1.00 250 mm 1.51
52.45 52.45 52.43 52.43 1.00 250 mm 1.51
52.65 52.65 52.60 52.60 1.00 250 mm 3.01
52.69 52.69 52.68 52.68 1.00 250 mm 1.51
52.82 52.82 52.82 52.82 1.00 250 mm 2.01
52.91 52.91 52.88 52.88 1.00 250 mm 1.51
52.90 52.90 52.89 52.89 1.00 250 mm 1.76
52.98 52.98 52.98 52.98 1.00 250 mm 2.01
53.12 53.12 53.03 53.03 1.00 250 mm 1.76
53.08 53.08 53.07 53.07 1.00 250 mm 1.76
53.26 53.26 53.26 1.00 250 mm 1.26

Página 45 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.
51.59 51.59 51.59 51.59 1.00 250 mm 2.01
53.39 53.39 53.39 1.00 250 mm 1.26
53.44 53.43 53.43 1.00 250 mm 1.26
53.45 53.45 53.45 53.45 1.00 250 mm 1.51
53.76 53.76 53.73 53.73 1.00 250 mm 1.51
54.01 54.01 54.00 54.00 1.00 250 mm 2.01
54.86 54.86 54.79 54.79 1.00 250 mm 1.51
54.98 54.98 54.83 54.83 1.00 250 mm 2.01
54.88 54.88 54.88 54.88 1.00 250 mm 1.76
55.20 55.20 55.17 55.17 1.00 250 mm 2.01
55.58 55.58 55.58 55.58 1.00 250 mm 2.01
56.07 56.06 56.06 1.00 250 mm 1.26
56.32 56.32 56.31 56.31 1.00 250 mm 1.51
56.38 56.38 56.38 56.38 1.00 250 mm 1.51
56.48 56.48 56.47 56.47 1.00 250 mm 1.51
53.13 53.13 53.13 53.13 1.00 250 mm 1.51
57.93 57.93 57.92 57.92 1.00 250 mm 1.51
58.04 58.03 58.03 1.00 250 mm 1.26
58.45 58.45 58.45 58.45 1.00 250 mm 1.51
59.20 59.20 59.20 59.20 1.00 250 mm 1.76
59.93 59.93 59.92 59.92 1.00 250 mm 1.51
60.17 60.17 60.11 60.11 1.00 250 mm 1.51
60.22 60.22 60.22 60.22 1.00 250 mm 1.51
60.91 60.91 60.75 60.75 1.00 250 mm 2.51
60.90 60.90 60.89 60.89 1.00 250 mm 1.51
61.93 61.92 61.92 1.00 250 mm 1.26
61.98 61.97 61.97 1.00 250 mm 1.26
62.46 62.46 62.46 62.46 1.00 250 mm 1.76
62.70 62.70 62.51 62.51 1.00 250 mm 2.01
62.62 62.62 62.62 62.62 1.00 250 mm 1.76
66.76 66.76 66.74 66.74 1.00 250 mm 2.01
67.06 67.06 67.05 67.05 1.00 250 mm 1.51
72.49 72.49 72.44 72.44 1.00 250 mm 1.76
80.05 80.05 80.04 80.04 1.00 250 mm 1.51
54.58 54.26 54.26 1.00 250 mm 1.26
43.72 43.72 43.72 1.00 250 mm 1.26
43.55 43.55 43.55 43.55 1.00 250 mm 1.51
40.82 40.82 39.79 39.79 1.00 250 mm 3.01
48.55 48.55 47.97 47.97 1.00 250 mm 2.51

1468.46 622.90 647.03 267.08 214.87 0.00 47.55 51.29 0.00 4053.07 0.00 0.00 0.00 0.00 4049.39 4049.39

Página 46 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.
81
162
3,239.5
4,049.4

Página 47 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.

4,085.47
Cant. (m)
cluye prueba hidraulica -
cluye prueba hidraulica -
cluye prueba hidraulica 3,751.72
cluye prueba hidraulica 333.75
cluye prueba hidraulica -
cluye prueba hidraulica -
cluye prueba hidraulica -
cluye prueba hidraulica -
cluye prueba hidraulica -
cluye prueba hidraulica -
cluye prueba hidraulica -

DIAMETROS EXCAVACION
TN t-normal TUB EXCAV Nomen. PROF. EXCAVACION 1.51
TSR t-semirocoso 110 mm 160 mm 110 a 160 0.60
TR t-rocoso 160 mm 160 mm 110 a 160 1.01
200 mm 250 mm 200 a 250 1.26
250 mm 250 mm 200 a 250 1.76
315 mm 355 mm 315 a 315 2.01
355 mm 355 mm 315 a 315 2.51
400 mm 450 mm 400 a 450 3.01
450 mm 450 mm 400 a 450 3.51
500 mm 550 mm 500 a 550 4.01
550 mm 550 mm 500 a 550 5.01
630 mm 630 mm 630

Página 48 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.

maq.) p/tub. t-normal DN 110 a 160 de 0.6 a 1m


maq.) p/tub. t-normal DN 110 a 160 de 1.01 a
maq.) p/tub. t-normal DN 110 a 160 de 1.26 a 1
maq.) p/tub. t-normal DN 110 a 160 de 1.51 a
maq.) p/tub. t-normal DN 110 a 160 de 1.76 a
maq.) p/tub. t-normal DN 110 a 160 de 2.01 a 2
maq.) p/tub. t-normal DN 110 a 160 de 2.51 a
maq.) p/tub. t-normal DN 110 a 160 de 3.01 a 3
maq.) p/tub. t-normal DN 110 a 160 de 3.51 a
maq.) p/tub. t-normal DN 110 a 160 de 4.01 a
maq.) p/tub. t-normal DN 110 a 160 de 5.01 a
maq.) p/tub. t-normal DN 200 a 250 de 0.6 a 1m
maq.) p/tub. t-normal DN 200 a 250 de 1.01 a 1
maq.) p/tub. t-normal DN 200 a 250 de 1.26 a 1
maq.) p/tub. t-normal DN 200 a 250 de 1.51 a 1
maq.) p/tub. t-normal DN 200 a 250 de 1.76 a 2
maq.) p/tub. t-normal DN 200 a 250 de 2.01 a 2
maq.) p/tub. t-normal DN 200 a 250 de 2.51 a 3
maq.) p/tub. t-normal DN 200 a 250 de 3.01 a 3
maq.) p/tub. t-normal DN 200 a 250 de 3.51 a 4
maq.) p/tub. t-normal DN 200 a 250 de 4.01 a 5
maq.) p/tub. t-normal DN 200 a 250 de 5.01 a 6
maq.) p/tub. t-normal DN 315 a 315 de 0.6 a 1m
maq.) p/tub. t-normal DN 315 a 315 de 1.01 a 1
maq.) p/tub. t-normal DN 315 a 315 de 1.26 a 1
maq.) p/tub. t-normal DN 315 a 315 de 1.51 a 1
maq.) p/tub. t-normal DN 315 a 315 de 1.76 a 2
maq.) p/tub. t-normal DN 315 a 315 de 2.01 a 2
maq.) p/tub. t-normal DN 315 a 315 de 2.51 a 3
maq.) p/tub. t-normal DN 315 a 315 de 3.01 a 3
maq.) p/tub. t-normal DN 315 a 315 de 3.51 a 4
maq.) p/tub. t-normal DN 315 a 315 de 4.01 a 5
maq.) p/tub. t-normal DN 315 a 315 de 5.01 a 6
maq.) p/tub. t-normal DN 400 a 450 de 0.6 a 1m
maq.) p/tub. t-normal DN 400 a 450 de 1.01 a 1
maq.) p/tub. t-normal DN 400 a 450 de 1.26 a 1
maq.) p/tub. t-normal DN 400 a 450 de 1.51 a 1

Página 49 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.
maq.) p/tub. t-normal DN 400 a 450 de 1.76 a 2
maq.) p/tub. t-normal DN 400 a 450 de 2.01 a 2
maq.) p/tub. t-normal DN 400 a 450 de 2.51 a 3
maq.) p/tub. t-normal DN 400 a 450 de 3.01 a 3
maq.) p/tub. t-normal DN 400 a 450 de 3.51 a 4
maq.) p/tub. t-normal DN 400 a 450 de 4.01 a 5
maq.) p/tub. t-normal DN 400 a 450 de 5.01 a 6
maq.) p/tub. t-normal DN 500 a 550 de 0.6 a 1m
maq.) p/tub. t-normal DN 500 a 550 de 1.01 a 1
maq.) p/tub. t-normal DN 500 a 550 de 1.26 a 1
maq.) p/tub. t-normal DN 500 a 550 de 1.51 a 1
maq.) p/tub. t-normal DN 500 a 550 de 1.76 a 2
maq.) p/tub. t-normal DN 500 a 550 de 2.01 a 2
maq.) p/tub. t-normal DN 500 a 550 de 2.51 a 3
maq.) p/tub. t-normal DN 500 a 550 de 3.01 a 3
maq.) p/tub. t-normal DN 500 a 550 de 3.51 a 4
maq.) p/tub. t-normal DN 500 a 550 de 4.01 a 5
maq.) p/tub. t-normal DN 500 a 550 de 5.01 a 6
maq.) p/tub. t-normal DN 630 de 0.6 a 1m prof.
maq.) p/tub. t-normal DN 630 de 1.01 a 1.25m p
maq.) p/tub. t-normal DN 630 de 1.26 a 1.5m pr
maq.) p/tub. t-normal DN 630 de 1.51 a 1.75m p
maq.) p/tub. t-normal DN 630 de 1.76 a 2m prof
maq.) p/tub. t-normal DN 630 de 2.01 a 2.5m pr
maq.) p/tub. t-normal DN 630 de 2.51 a 3m prof
maq.) p/tub. t-normal DN 630 de 3.01 a 3.5m pr
maq.) p/tub. t-normal DN 630 de 3.51 a 4m prof
maq.) p/tub. t-normal DN 630 de 4.01 a 5m prof
maq.) p/tub. t-normal DN 630 de 5.01 a 6m prof
maq.) p/tub. t-semirocoso DN 110 a 160 de 0.6
maq.) p/tub. t-semirocoso DN 110 a 160 de 1.0
maq.) p/tub. t-semirocoso DN 110 a 160 de 1.2
maq.) p/tub. t-semirocoso DN 110 a 160 de 1.5
maq.) p/tub. t-semirocoso DN 110 a 160 de 1.7
maq.) p/tub. t-semirocoso DN 110 a 160 de 2.0
maq.) p/tub. t-semirocoso DN 110 a 160 de 2.5
maq.) p/tub. t-semirocoso DN 110 a 160 de 3.0
maq.) p/tub. t-semirocoso DN 110 a 160 de 3.5
maq.) p/tub. t-semirocoso DN 110 a 160 de 4.0
maq.) p/tub. t-semirocoso DN 110 a 160 de 5.0
maq.) p/tub. t-semirocoso DN 200 a 250 de 0.6
maq.) p/tub. t-semirocoso DN 200 a 250 de 1.01

Página 50 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.
maq.) p/tub. t-semirocoso DN 200 a 250 de 1.26
maq.) p/tub. t-semirocoso DN 200 a 250 de 1.51
maq.) p/tub. t-semirocoso DN 200 a 250 de 1.76
maq.) p/tub. t-semirocoso DN 200 a 250 de 2.01
maq.) p/tub. t-semirocoso DN 200 a 250 de 2.51
maq.) p/tub. t-semirocoso DN 200 a 250 de 3.01
maq.) p/tub. t-semirocoso DN 200 a 250 de 3.51
maq.) p/tub. t-semirocoso DN 200 a 250 de 4.01
maq.) p/tub. t-semirocoso DN 200 a 250 de 5.01
maq.) p/tub. t-semirocoso DN 315 a 315 de 0.6
maq.) p/tub. t-semirocoso DN 315 a 315 de 1.01
maq.) p/tub. t-semirocoso DN 315 a 315 de 1.26
maq.) p/tub. t-semirocoso DN 315 a 315 de 1.51
maq.) p/tub. t-semirocoso DN 315 a 315 de 1.76
maq.) p/tub. t-semirocoso DN 315 a 315 de 2.01
maq.) p/tub. t-semirocoso DN 315 a 315 de 2.51
maq.) p/tub. t-semirocoso DN 315 a 315 de 3.01
maq.) p/tub. t-semirocoso DN 315 a 315 de 3.51
maq.) p/tub. t-semirocoso DN 315 a 315 de 4.01
maq.) p/tub. t-semirocoso DN 315 a 315 de 5.01
maq.) p/tub. t-semirocoso DN 400 a 450 de 0.6
maq.) p/tub. t-semirocoso DN 400 a 450 de 1.01
maq.) p/tub. t-semirocoso DN 400 a 450 de 1.26
maq.) p/tub. t-semirocoso DN 400 a 450 de 1.51
maq.) p/tub. t-semirocoso DN 400 a 450 de 1.76
maq.) p/tub. t-semirocoso DN 400 a 450 de 2.01
maq.) p/tub. t-semirocoso DN 400 a 450 de 2.51
maq.) p/tub. t-semirocoso DN 400 a 450 de 3.01
maq.) p/tub. t-semirocoso DN 400 a 450 de 3.51
maq.) p/tub. t-semirocoso DN 400 a 450 de 4.01
maq.) p/tub. t-semirocoso DN 400 a 450 de 5.01
maq.) p/tub. t-semirocoso DN 500 a 550 de 0.6
maq.) p/tub. t-semirocoso DN 500 a 550 de 1.01
maq.) p/tub. t-semirocoso DN 500 a 550 de 1.26
maq.) p/tub. t-semirocoso DN 500 a 550 de 1.51
maq.) p/tub. t-semirocoso DN 500 a 550 de 1.76
maq.) p/tub. t-semirocoso DN 500 a 550 de 2.01
maq.) p/tub. t-semirocoso DN 500 a 550 de 2.51
maq.) p/tub. t-semirocoso DN 500 a 550 de 3.01
maq.) p/tub. t-semirocoso DN 500 a 550 de 3.51
maq.) p/tub. t-semirocoso DN 500 a 550 de 4.01
maq.) p/tub. t-semirocoso DN 500 a 550 de 5.01

Página 51 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.
maq.) p/tub. t-semirocoso DN 630 de 0.6 a 1m p
maq.) p/tub. t-semirocoso DN 630 de 1.01 a 1.2
maq.) p/tub. t-semirocoso DN 630 de 1.26 a 1.5
maq.) p/tub. t-semirocoso DN 630 de 1.51 a 1.7
maq.) p/tub. t-semirocoso DN 630 de 1.76 a 2m
maq.) p/tub. t-semirocoso DN 630 de 2.01 a 2.5
maq.) p/tub. t-semirocoso DN 630 de 2.51 a 3m
maq.) p/tub. t-semirocoso DN 630 de 3.01 a 3.5
maq.) p/tub. t-semirocoso DN 630 de 3.51 a 4m
maq.) p/tub. t-semirocoso DN 630 de 4.01 a 5m
maq.) p/tub. t-semirocoso DN 630 de 5.01 a 6m
maq.) p/tub. t-rocoso DN 110 a 160 de 0.6 a 1m
maq.) p/tub. t-rocoso DN 110 a 160 de 1.01 a 1
maq.) p/tub. t-rocoso DN 110 a 160 de 1.26 a 1
maq.) p/tub. t-rocoso DN 110 a 160 de 1.51 a 1
maq.) p/tub. t-rocoso DN 110 a 160 de 1.76 a 2
maq.) p/tub. t-rocoso DN 110 a 160 de 2.01 a 2
maq.) p/tub. t-rocoso DN 110 a 160 de 2.51 a 3
maq.) p/tub. t-rocoso DN 110 a 160 de 3.01 a 3
maq.) p/tub. t-rocoso DN 110 a 160 de 3.51 a 4
maq.) p/tub. t-rocoso DN 110 a 160 de 4.01 a 5
maq.) p/tub. t-rocoso DN 110 a 160 de 5.01 a 6
maq.) p/tub. t-rocoso DN 200 a 250 de 0.6 a 1m
maq.) p/tub. t-rocoso DN 200 a 250 de 1.01 a 1
maq.) p/tub. t-rocoso DN 200 a 250 de 1.26 a 1.
maq.) p/tub. t-rocoso DN 200 a 250 de 1.51 a 1
maq.) p/tub. t-rocoso DN 200 a 250 de 1.76 a 2m
maq.) p/tub. t-rocoso DN 200 a 250 de 2.01 a 2.
maq.) p/tub. t-rocoso DN 200 a 250 de 2.51 a 3m
maq.) p/tub. t-rocoso DN 200 a 250 de 3.01 a 3.
maq.) p/tub. t-rocoso DN 200 a 250 de 3.51 a 4m
maq.) p/tub. t-rocoso DN 200 a 250 de 4.01 a 5m
maq.) p/tub. t-rocoso DN 200 a 250 de 5.01 a 6m
maq.) p/tub. t-rocoso DN 315 a 315 de 0.6 a 1m
maq.) p/tub. t-rocoso DN 315 a 315 de 1.01 a 1
maq.) p/tub. t-rocoso DN 315 a 315 de 1.26 a 1.
maq.) p/tub. t-rocoso DN 315 a 315 de 1.51 a 1
maq.) p/tub. t-rocoso DN 315 a 315 de 1.76 a 2m
maq.) p/tub. t-rocoso DN 315 a 315 de 2.01 a 2.
maq.) p/tub. t-rocoso DN 315 a 315 de 2.51 a 3m
maq.) p/tub. t-rocoso DN 315 a 315 de 3.01 a 3.
maq.) p/tub. t-rocoso DN 315 a 315 de 3.51 a 4m

Página 52 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.
maq.) p/tub. t-rocoso DN 315 a 315 de 4.01 a 5m
maq.) p/tub. t-rocoso DN 315 a 315 de 5.01 a 6m
maq.) p/tub. t-rocoso DN 400 a 450 de 0.6 a 1m
maq.) p/tub. t-rocoso DN 400 a 450 de 1.01 a 1
maq.) p/tub. t-rocoso DN 400 a 450 de 1.26 a 1.
maq.) p/tub. t-rocoso DN 400 a 450 de 1.51 a 1
maq.) p/tub. t-rocoso DN 400 a 450 de 1.76 a 2m
maq.) p/tub. t-rocoso DN 400 a 450 de 2.01 a 2.
maq.) p/tub. t-rocoso DN 400 a 450 de 2.51 a 3m
maq.) p/tub. t-rocoso DN 400 a 450 de 3.01 a 3.
maq.) p/tub. t-rocoso DN 400 a 450 de 3.51 a 4m
maq.) p/tub. t-rocoso DN 400 a 450 de 4.01 a 5m
maq.) p/tub. t-rocoso DN 400 a 450 de 5.01 a 6m
maq.) p/tub. t-rocoso DN 500 a 550 de 0.6 a 1m
maq.) p/tub. t-rocoso DN 500 a 550 de 1.01 a 1
maq.) p/tub. t-rocoso DN 500 a 550 de 1.26 a 1.
maq.) p/tub. t-rocoso DN 500 a 550 de 1.51 a 1
maq.) p/tub. t-rocoso DN 500 a 550 de 1.76 a 2m
maq.) p/tub. t-rocoso DN 500 a 550 de 2.01 a 2.
maq.) p/tub. t-rocoso DN 500 a 550 de 2.51 a 3m
maq.) p/tub. t-rocoso DN 500 a 550 de 3.01 a 3.
maq.) p/tub. t-rocoso DN 500 a 550 de 3.51 a 4m
maq.) p/tub. t-rocoso DN 500 a 550 de 4.01 a 5m
maq.) p/tub. t-rocoso DN 500 a 550 de 5.01 a 6m
maq.) p/tub. t-rocoso DN 630 de 0.6 a 1m prof.
maq.) p/tub. t-rocoso DN 630 de 1.01 a 1.25m pr
maq.) p/tub. t-rocoso DN 630 de 1.26 a 1.5m pro
maq.) p/tub. t-rocoso DN 630 de 1.51 a 1.75m pr
maq.) p/tub. t-rocoso DN 630 de 1.76 a 2m prof.
maq.) p/tub. t-rocoso DN 630 de 2.01 a 2.5m pro
maq.) p/tub. t-rocoso DN 630 de 2.51 a 3m prof.
maq.) p/tub. t-rocoso DN 630 de 3.01 a 3.5m pro
maq.) p/tub. t-rocoso DN 630 de 3.51 a 4m prof.
maq.) p/tub. t-rocoso DN 630 de 4.01 a 5m prof.
maq.) p/tub. t-rocoso DN 630 de 5.01 a 6m prof.
pulso) p/tub. t-normal DN 110 a 160 de 0.6 a 1
pulso) p/tub. t-normal DN 110 a 160 de 1.01 a
pulso) p/tub. t-normal DN 110 a 160 de 1.26 a
pulso) p/tub. t-normal DN 110 a 160 de 1.51 a
pulso) p/tub. t-normal DN 110 a 160 de 1.76 a
pulso) p/tub. t-normal DN 110 a 160 de 2.01 a
pulso) p/tub. t-normal DN 110 a 160 de 2.51 a

Página 53 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.
pulso) p/tub. t-normal DN 110 a 160 de 3.01 a
pulso) p/tub. t-normal DN 110 a 160 de 3.51 a
pulso) p/tub. t-normal DN 110 a 160 de 4.01 a
pulso) p/tub. t-normal DN 110 a 160 de 5.01 a
pulso) p/tub. t-normal DN 200 a 250 de 0.6 a 1m
pulso) p/tub. t-normal DN 200 a 250 de 1.01 a 1
pulso) p/tub. t-normal DN 200 a 250 de 1.26 a 1
pulso) p/tub. t-normal DN 200 a 250 de 1.51 a 1
pulso) p/tub. t-normal DN 200 a 250 de 1.76 a 2
pulso) p/tub. t-normal DN 200 a 250 de 2.01 a 2
pulso) p/tub. t-normal DN 200 a 250 de 2.51 a 3
pulso) p/tub. t-normal DN 200 a 250 de 3.01 a 3
pulso) p/tub. t-normal DN 200 a 250 de 3.51 a 4
pulso) p/tub. t-normal DN 200 a 250 de 4.01 a 5
pulso) p/tub. t-normal DN 200 a 250 de 5.01 a 6
pulso) p/tub. t-normal DN 315 a 315 de 0.6 a 1m
pulso) p/tub. t-normal DN 315 a 315 de 1.01 a 1
pulso) p/tub. t-normal DN 315 a 315 de 1.26 a 1
pulso) p/tub. t-normal DN 315 a 315 de 1.51 a 1
pulso) p/tub. t-normal DN 315 a 315 de 1.76 a 2
pulso) p/tub. t-normal DN 315 a 315 de 2.01 a 2
pulso) p/tub. t-normal DN 315 a 315 de 2.51 a 3
pulso) p/tub. t-normal DN 315 a 315 de 3.01 a 3
pulso) p/tub. t-normal DN 315 a 315 de 3.51 a 4
pulso) p/tub. t-normal DN 315 a 315 de 4.01 a 5
pulso) p/tub. t-normal DN 315 a 315 de 5.01 a 6
pulso) p/tub. t-normal DN 400 a 450 de 0.6 a 1m
pulso) p/tub. t-normal DN 400 a 450 de 1.01 a 1
pulso) p/tub. t-normal DN 400 a 450 de 1.26 a 1
pulso) p/tub. t-normal DN 400 a 450 de 1.51 a 1
pulso) p/tub. t-normal DN 400 a 450 de 1.76 a 2
pulso) p/tub. t-normal DN 400 a 450 de 2.01 a 2
pulso) p/tub. t-normal DN 400 a 450 de 2.51 a 3
pulso) p/tub. t-normal DN 400 a 450 de 3.01 a 3
pulso) p/tub. t-normal DN 400 a 450 de 3.51 a 4
pulso) p/tub. t-normal DN 400 a 450 de 4.01 a 5
pulso) p/tub. t-normal DN 400 a 450 de 5.01 a 6
pulso) p/tub. t-normal DN 500 a 550 de 0.6 a 1m
pulso) p/tub. t-normal DN 500 a 550 de 1.01 a 1
pulso) p/tub. t-normal DN 500 a 550 de 1.26 a 1
pulso) p/tub. t-normal DN 500 a 550 de 1.51 a 1
pulso) p/tub. t-normal DN 500 a 550 de 1.76 a 2

Página 54 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.
pulso) p/tub. t-normal DN 500 a 550 de 2.01 a 2
pulso) p/tub. t-normal DN 500 a 550 de 2.51 a 3
pulso) p/tub. t-normal DN 500 a 550 de 3.01 a 3
pulso) p/tub. t-normal DN 500 a 550 de 3.51 a 4
pulso) p/tub. t-normal DN 500 a 550 de 4.01 a 5
pulso) p/tub. t-normal DN 500 a 550 de 5.01 a 6
pulso) p/tub. t-normal DN 630 de 0.6 a 1m prof.
pulso) p/tub. t-normal DN 630 de 1.01 a 1.25m p
pulso) p/tub. t-normal DN 630 de 1.26 a 1.5m pr
pulso) p/tub. t-normal DN 630 de 1.51 a 1.75m p
pulso) p/tub. t-normal DN 630 de 1.76 a 2m prof
pulso) p/tub. t-normal DN 630 de 2.01 a 2.5m pr
pulso) p/tub. t-normal DN 630 de 2.51 a 3m prof
pulso) p/tub. t-normal DN 630 de 3.01 a 3.5m pr
pulso) p/tub. t-normal DN 630 de 3.51 a 4m prof
pulso) p/tub. t-normal DN 630 de 4.01 a 5m prof
pulso) p/tub. t-normal DN 630 de 5.01 a 6m prof
pulso) p/tub. t-semirocoso DN 110 a 160 de 0.6
pulso) p/tub. t-semirocoso DN 110 a 160 de 1.0
pulso) p/tub. t-semirocoso DN 110 a 160 de 1.2
pulso) p/tub. t-semirocoso DN 110 a 160 de 1.5
pulso) p/tub. t-semirocoso DN 110 a 160 de 1.7
pulso) p/tub. t-semirocoso DN 110 a 160 de 2.0
pulso) p/tub. t-semirocoso DN 110 a 160 de 2.5
pulso) p/tub. t-semirocoso DN 110 a 160 de 3.0
pulso) p/tub. t-semirocoso DN 110 a 160 de 3.5
pulso) p/tub. t-semirocoso DN 110 a 160 de 4.0
pulso) p/tub. t-semirocoso DN 110 a 160 de 5.0
pulso) p/tub. t-semirocoso DN 200 a 250 de 0.6
pulso) p/tub. t-semirocoso DN 200 a 250 de 1.0
pulso) p/tub. t-semirocoso DN 200 a 250 de 1.26
pulso) p/tub. t-semirocoso DN 200 a 250 de 1.5
pulso) p/tub. t-semirocoso DN 200 a 250 de 1.76
pulso) p/tub. t-semirocoso DN 200 a 250 de 2.01
pulso) p/tub. t-semirocoso DN 200 a 250 de 2.51
pulso) p/tub. t-semirocoso DN 200 a 250 de 3.01
pulso) p/tub. t-semirocoso DN 200 a 250 de 3.51
pulso) p/tub. t-semirocoso DN 200 a 250 de 4.01
pulso) p/tub. t-semirocoso DN 200 a 250 de 5.01
pulso) p/tub. t-semirocoso DN 315 a 315 de 0.6
pulso) p/tub. t-semirocoso DN 315 a 315 de 1.0
pulso) p/tub. t-semirocoso DN 315 a 315 de 1.26

Página 55 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.
pulso) p/tub. t-semirocoso DN 315 a 315 de 1.5
pulso) p/tub. t-semirocoso DN 315 a 315 de 1.76
pulso) p/tub. t-semirocoso DN 315 a 315 de 2.01
pulso) p/tub. t-semirocoso DN 315 a 315 de 2.51
pulso) p/tub. t-semirocoso DN 315 a 315 de 3.01
pulso) p/tub. t-semirocoso DN 315 a 315 de 3.51
pulso) p/tub. t-semirocoso DN 315 a 315 de 4.01
pulso) p/tub. t-semirocoso DN 315 a 315 de 5.01
pulso) p/tub. t-semirocoso DN 400 a 450 de 0.6
pulso) p/tub. t-semirocoso DN 400 a 450 de 1.0
pulso) p/tub. t-semirocoso DN 400 a 450 de 1.26
pulso) p/tub. t-semirocoso DN 400 a 450 de 1.5
pulso) p/tub. t-semirocoso DN 400 a 450 de 1.76
pulso) p/tub. t-semirocoso DN 400 a 450 de 2.01
pulso) p/tub. t-semirocoso DN 400 a 450 de 2.51
pulso) p/tub. t-semirocoso DN 400 a 450 de 3.01
pulso) p/tub. t-semirocoso DN 400 a 450 de 3.51
pulso) p/tub. t-semirocoso DN 400 a 450 de 4.01
pulso) p/tub. t-semirocoso DN 400 a 450 de 5.01
pulso) p/tub. t-semirocoso DN 500 a 550 de 0.6
pulso) p/tub. t-semirocoso DN 500 a 550 de 1.0
pulso) p/tub. t-semirocoso DN 500 a 550 de 1.26
pulso) p/tub. t-semirocoso DN 500 a 550 de 1.5
pulso) p/tub. t-semirocoso DN 500 a 550 de 1.76
pulso) p/tub. t-semirocoso DN 500 a 550 de 2.01
pulso) p/tub. t-semirocoso DN 500 a 550 de 2.51
pulso) p/tub. t-semirocoso DN 500 a 550 de 3.01
pulso) p/tub. t-semirocoso DN 500 a 550 de 3.51
pulso) p/tub. t-semirocoso DN 500 a 550 de 4.01
pulso) p/tub. t-semirocoso DN 500 a 550 de 5.01
pulso) p/tub. t-semirocoso DN 630 de 0.6 a 1m p
pulso) p/tub. t-semirocoso DN 630 de 1.01 a 1.2
pulso) p/tub. t-semirocoso DN 630 de 1.26 a 1.5
pulso) p/tub. t-semirocoso DN 630 de 1.51 a 1.7
pulso) p/tub. t-semirocoso DN 630 de 1.76 a 2m
pulso) p/tub. t-semirocoso DN 630 de 2.01 a 2.5
pulso) p/tub. t-semirocoso DN 630 de 2.51 a 3m
pulso) p/tub. t-semirocoso DN 630 de 3.01 a 3.5
pulso) p/tub. t-semirocoso DN 630 de 3.51 a 4m
pulso) p/tub. t-semirocoso DN 630 de 4.01 a 5m
pulso) p/tub. t-semirocoso DN 630 de 5.01 a 6m

Página 56 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.

Página 57 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.

Página 58 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.

Página 59 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.

Página 60 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.

Página 61 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.

Página 62 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.

Página 63 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.

Página 64 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.

Página 65 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

DOS
TARILLADO
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

A
MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)
CORTE Y REPOSICION
CLASIFICACION POR RANGO DE PROFUNDIDAD ENTIBADO
PAVIMENTO FLEXIBLE CAIDA ESPECIAL
VEREDA JARDIN
1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 ASFALTO e=2" e=15cm SARDINEL (m) LONG LONG Diam
ASFALTO e=3" (m2)
(m2)
1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m2) (m2) (m) (m) Mov. Tierra Rango excav.

Página 66 de 96
BR1-BR2 53.72
BR3-BR2 53.46
BR3-BR4 53.26
BR4-BE5 52.87
BE6-BR5 52.43
BR7-BR6 58.03
BR8-BR7 61.93
BR9-BR8 45.24
BR8-BR10 52.69
BR10-BR11 61.99
BR11-BR12 57.92
BR12-BE13 52.89
BR10-BR17 54.79
BR17-BR16 59.2
BR16-BR15 58.46
BP6-BR15 53.15
BR15-BR18 72.44
BR18-BR19 13.73
BP3-BR19 39.57
BR2-BR77 60.22
BR4-BR79 59.92
BR77-BR76 53.08
BR77-BR78 53.4
BR78-BR79 53.45
BR76-BR75 66.74
BR79-BR72 67.05
BR74-BR75 28.65
BR73-BR74 51.01
BR73-BR72 80.03
BR75-BR68 54
BR72-BE71 54.83
BR69-BR68 56.3
BR69-BR70 56.06
BR70-BE71 49.84
1852.35
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

3.-METRADO DE BUZONES - ALCANTARILLADO


MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO

OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA
AMERICA EN EL DISTRITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA
UBICACIÓN : SAN JUAN DE MIRAFLORES
SUB-PRESUPUESTO : REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE BUZONES
MOVIMIENTO DE TIERRA : UNIDAD
Tipo Excav.
CLASIFICACION POR RANGO DE PROFUNDIDAD TIPO DE PAVIMENTO
Tipo
ADD BUZON PROF (m) Maq.
Suelo
Pulso
0.30 0.60 1.01 1.26 1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 7.01 TIPO AREA
0.59 1.00 1.25 1.50 1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 8.00 M2
Coop. Americas BP-1 1.20 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BP-2 1.90 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BP-3 1.80 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BP-4 1.53 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BP-5 1.37 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BP-6 1.70 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BP-7 1.50 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BP-8 5.80 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BP-9 5.10 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BP-10 3.12 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BP-11 2.73 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BP-12 2.42 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BP-13 2.84 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BP-14 4.00 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BP-15 1.55 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-2 1.70 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-3 1.24 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-4 1.56 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-6 1.37 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-7 1.37 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-8 1.72 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-9 1.20 M TSR 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-10 1.40 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-11 1.65 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-12 1.55 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-15 1.70 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-16 1.66 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-17 2.00 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-18 2.10 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-19 1.69 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-22 1.45 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-24 1.76 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-25 1.51 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-33 5.86 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-34 5.68 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-35 1.55 M TN 1 ASFALTO e=2" (m2) 0.76727

Página 69 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO

OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA
AMERICA EN EL DISTRITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA
UBICACIÓN : SAN JUAN DE MIRAFLORES
SUB-PRESUPUESTO : REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE BUZONES
MOVIMIENTO DE TIERRA : UNIDAD
Tipo Excav.
CLASIFICACION POR RANGO DE PROFUNDIDAD TIPO DE PAVIMENTO
Tipo
ADD BUZON PROF (m) Maq.
Suelo
Pulso
0.30 0.60 1.01 1.26 1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 7.01 TIPO AREA
0.59 1.00 1.25 1.50 1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 8.00 M2
Coop. Americas BR-36 1.65 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-37 1.53 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-38 1.46 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-39 1.55 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-40 1.36 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-43 1.42 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-45 1.90 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-46 1.90 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-47 1.55 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-48 1.32 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-52 2.47 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-53 1.35 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-57 1.55 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-58 2.28 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-61 2.24 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-62 2.50 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-64 1.60 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-65 1.91 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-66 2.00 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-67 2.10 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-68 2.05 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-69 1.22 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-70 1.71 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-72 1.85 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-73 1.20 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-74 1.84 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-75 2.25 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-76 2.50 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-77 1.40 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-78 1.54 M TN 1 ASFALTO e=2" (m2) 0.76727
Coop. Americas BR-79 1.75 M TN 1 ASFALTO e=2" (m2) 0.76727

0 0 5 12 22 10 10 2 1 1 0 4 0 0 51.4068

Página 70 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

4.-METRADO EXTRACCION DE TUBERIA


EXISTENTE - ALCANTARILLADO
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
OBRA ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA
UBICACIÓN : San Juan de Miraflores
SUB-PRESUPUESTO : REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO EXTRACCION DE TUBERIA EXISTENTE
DEMOLICION DE TUBERIA : LONGITUD EN METROS (m)
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. CLASIFICACION POR RANGO DE PROFUNDIDAD
Tipo
TRAMO ZANJA EXC LONGITUD Maq.
Suelo
Pulso
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.30 0.60 1.01 1.26 1.51 1.76 2.01 2.51 3.01 3.51 4.01
(m) o/oo (m) Buzon) PVC - U 0.59 1.00 1.25 1.50 1.75 2.00 2.50 3.00 3.50 4.00 5.00
TE-1 BE-100 BE-27 2.47 2.40 2.44 5.22 3.83 5.22 4.0 4.42 - 200 mm PVC 4.0
TE-3 BE-37 BE-38 1.53 1.46 1.50 8.19 65.97 8.21 7.0 7.41 - 200 mm CSN 7.0
TE-5 BE-18 BE-19 2.10 1.69 1.90 13.73 2.91 13.73 12.5 12.93 - 200 mm CSN 12.5
TE-11 BE-74 BE-75 1.84 2.25 2.05 28.95 11.74 28.95 27.8 28.15 - 200 mm CSN 27.8
TE-18 BE-20X BE-19 1.80 1.69 1.75 41.77 9.10 41.77 40.6 40.97 - 200 mm CSN 40.6
TE-20 BE-25X BE-24 1.51 1.76 1.64 42.99 5.82 42.99 41.8 42.19 - 200 mm CSN 41.8
TE-22 BE-25 BE-26 1.51 2.20 1.86 44.17 5.21 44.17 43.0 43.37 - 200 mm CSN 43.0
TE-23 BE-45 BE-46 1.90 1.90 1.90 44.32 18.28 44.33 43.1 43.53 - 200 mm CSN 43.1
TE-24 BE-23X BE-22 1.53 1.45 1.49 44.35 14.43 44.35 43.2 43.55 - 200 mm CSN 43.2
TE-28 BE-9 BE-8 1.20 1.72 1.46 45.24 6.63 45.24 44.0 44.44 - 200 mm CSN 44.0
TE-31 BE-35 BE-34 1.55 4.74 3.15 47.10 80.05 47.25 46.1 46.45 - 200 mm CSN 46.1
TE-34 BE-70X BE-71 1.55 2.40 1.98 49.83 37.53 49.87 48.7 49.07 - 200 mm CSN 48.7
TE-37 BE-49X BE-48 1.37 1.32 1.35 50.30 7.56 50.30 49.1 49.50 - 200 mm CSN 49.1
TE-40 BE-73 BE-74 1.20 1.84 1.52 51.03 9.80 51.03 49.8 50.23 - 200 mm CSN 49.8
TE-41 BE-46 BE-27 1.90 2.40 2.15 51.29 17.94 51.30 50.1 50.50 - 200 mm CSN 50.1
TE-43 BE-58 BE-52 2.28 2.47 2.38 51.59 12.02 51.59 50.4 50.79 - 200 mm CSN 50.4
TE-45 BE-70 BE-64 1.71 1.60 1.66 52.31 23.13 52.32 51.1 51.52 - 200 mm CSN 51.1
TE-47 BE-6 BE-5 1.37 1.70 1.54 52.43 11.63 52.43 51.2 51.63 - 200 mm CSN 51.2
TE-48 BE-52 BE-51 2.47 3.62 3.05 52.60 32.70 52.63 51.4 51.83 - 200 mm CSN 51.4
TE-49 BE-8 BE-10 1.72 1.40 1.56 52.69 16.70 52.70 51.5 51.90 - 200 mm CSN 51.5
TE-51 BE-66 BE-67 2.00 2.10 2.05 52.81 11.17 52.81 51.6 52.01 - 200 mm CSN 51.6
TE-54 BE-4 BE-5 1.56 1.70 1.63 52.88 19.48 52.89 51.7 52.09 - 200 mm CSN 51.7
TE-55 BE-12 BE-13 1.55 2.00 1.78 52.89 10.59 52.89 51.7 52.09 - 200 mm CSN 51.7
TE-56 BE-68 BE-66 2.05 2.00 2.03 52.98 13.78 52.99 51.8 52.19 - 200 mm CSN 51.8
TE-57 BE-64 BE-63 1.60 2.40 2.00 53.03 39.04 53.07 51.9 52.27 - 200 mm CSN 51.9
TE-59 BE-77 BE-76 1.40 2.50 1.95 53.08 8.86 53.08 51.9 52.28 - 200 mm CSN 51.9
TE-60 BE-3 BE-4 1.24 1.56 1.40 53.26 11.08 53.26 52.1 52.46 - 200 mm CSN 52.1
TE-61 BE-24 BE-27 1.76 2.40 2.08 53.37 7.87 53.37 52.2 52.57 - 200 mm CSN 52.2
TE-62 BE-77X BE-78 1.35 1.54 1.45 53.38 7.31 53.38 52.2 52.58 - 200 mm CSN 52.2
TE-63 BE-3X BE-2 1.24 1.70 1.47 53.43 10.48 53.43 52.2 52.63 - 200 mm CSN 52.2
TE-64 BE-78 BE-79 1.54 1.75 1.65 53.45 7.67 53.45 52.3 52.65 - 200 mm CSN 52.3
TE-65 BE-1X BE-2 1.40 1.70 1.55 53.72 33.13 53.75 52.5 52.95 - 200 mm CSN 52.5
TE-67 BE-75 BE-68 2.25 2.05 2.15 54.00 14.81 54.01 52.8 53.21 - 200 mm CSN 52.8
TE-69 BE-10 BE-17 1.40 2.00 1.70 54.79 51.65 54.86 53.7 54.06 - 200 mm CSN 53.7
TE-70 BE-72 BE-71 1.85 2.37 2.11 54.83 54.71 54.91 53.7 54.11 - 200 mm CSN 53.7
TE-71 BE-60X BE-61 1.65 2.24 1.95 54.87 13.12 54.87 53.7 54.07 - 200 mm CSN 53.7
TE-73 BE-62 BE-63 2.50 2.32 2.41 55.17 16.49 55.18 54.0 54.38 - 200 mm CSN 54.0
TE-75 BE-61 BE-62 2.24 2.50 2.37 55.58 10.62 55.58 54.4 54.78 - 200 mm CSN 54.4
TE-76 BE-69 BE-70 1.22 1.71 1.47 56.06 20.69 56.07 54.9 55.27 - 200 mm CSN 54.9
TE-77 BE-69X BE-68 1.22 2.05 1.64 56.32 10.48 56.32 55.1 55.52 - 200 mm CSN 55.1
TE-78 BE-65 BE-64 1.91 1.60 1.76 56.39 11.88 56.39 55.2 55.59 - 200 mm CSN 55.2
TE-79 BE-66X BE-65 1.55 1.91 1.73 56.47 14.70 56.48 55.3 55.68 - 200 mm CSN 55.3
TE-80 BE-14X BE-15 1.70 1.70 1.70 55.62 9.89 55.62 54.4 54.82 - 200 mm CSN 54.4
TE-81 BE-11 BE-12 1.65 1.55 1.60 57.92 11.57 57.92 56.7 57.12 - 200 mm CSN 56.7
TE-82 BE-7 BE-6 1.37 1.37 1.37 58.03 11.03 58.03 56.8 57.23 - 200 mm CSN 56.8
TE-83 BE-16 BE-15 1.66 1.70 1.68 58.46 10.09 58.46 57.3 57.66 - 200 mm CSN 57.3
TE-85 BE-17 BE-16 2.00 1.66 1.83 59.20 10.47 59.20 58.0 58.40 - 200 mm CSN 58.0
TE-86 BE-4X BE-79 1.56 1.75 1.66 59.92 20.19 59.93 58.7 59.13 - 200 mm CSN 58.7
TE-87 BE-36 BE-35 1.65 1.55 1.60 60.11 47.75 60.18 59.0 59.38 - 200 mm CSN 59.0
TE-88 BE-2 BE-77 1.70 1.40 1.55 60.22 8.14 60.22 59.0 59.42 - 200 mm CSN 59.0
TE-89 BE-53X BE-55 1.35 3.77 2.56 60.76 64.84 60.89 59.7 60.09 - 200 mm CSN 59.7
TE-90 BE-53 BE-52 1.35 2.10 1.73 60.89 12.48 60.89 59.7 60.09 - 200 mm CSN 59.7
TE-91 BE-8X BE-7 1.40 1.37 1.39 61.93 15.18 61.94 60.7 61.14 - 200 mm CSN 60.7
TE-92 BE-10X BE-11 1.35 1.65 1.50 61.98 20.98 61.99 60.8 61.19 - 200 mm CSN 60.8
TE-94 BE-59X BE-58 1.65 2.28 1.97 62.45 11.37 62.45 61.3 61.65 - 200 mm CSN 61.3
TE-95 BE-57X BE-56 1.55 3.45 2.50 62.51 63.99 62.64 61.4 61.84 - 200 mm CSN 61.4
TE-96 BE-57 BE-58 1.55 2.28 1.92 62.62 12.46 62.62 61.4 61.82 - 200 mm CSN 61.4

Página 72 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

METRADO EXTRACCION DE TUBERIA EXISTENTE


DEMOLICION DE TUBERIA : LONGITUD EN METROS (m)
BUZON PROFUNDIDAD LONG DEL TRAMO
Tipo Excav. CLASIFICACION POR RANGO DE PROFUNDIDAD
Tipo
TRAMO ZANJA EXC LONGITUD Maq. Suelo
Pulso
DEL AL DEL AL MEDIA PLANTA S REAL (no incl Diam. TUBERIA (SERIE) (DN) Mat. 0.30 0.60 1.01 1.26 1.51 1.76 2.01 2.51 3.01 3.51 4.01
(m) o/oo (m) Buzon) PVC - U 0.59 1.00 1.25 1.50 1.75 2.00 2.50 3.00 3.50 4.00 5.00
TE-97 BE-76 BE-75 2.50 2.25 2.38 66.74 23.07 66.76 65.6 65.96 - 200 mm CSN 65.6
TE-98 BE-79 BE-72 1.75 1.65 1.70 67.05 16.56 67.06 65.9 66.26 - 200 mm CSN 65.9
TE-104 BE-15 BE-18 1.70 2.10 1.90 72.44 39.07 72.50 71.3 71.70 - 200 mm CSN 71.3
TE-109 BE-73X BE-72 1.20 1.85 1.53 80.05 11.12 80.05 78.9 79.25 - 200 mm CSN 78.9
TE-112 BE-38 BE-39 1.46 1.55 1.51 54.26 107.44 54.57 53.4 53.77 - 200 mm CSN 53.4
TE-115 BE-48 BE-47 1.32 1.55 1.44 43.73 9.38 43.73 42.5 42.93 - 200 mm CSN 42.5
TE-116 BE-47 BE-46 1.55 1.90 1.73 43.54 11.25 43.54 42.3 42.74 - 200 mm CSN 42.3
TE-118 BE-39 BE-33 1.55 5.30 3.43 39.80 214.07 40.70 39.5 39.90 - 200 mm CSN 39.5
TE-119 BE-40 BE-30 1.36 4.13 2.75 45.47 142.50 45.93 44.7 45.13 - 200 mm CSN 44.7

3,438.6 3,441.3 3,362.1 3,388.5 - - - 628.9 1,253.7 608.4 629.7 104.4 137.0 - -

Página 73 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

5.-METRADO DE DEMOLICION DE BUZONES -


ALCANTARILLADO
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO
ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZON
OBRA DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA
UBICACIÓN : San Juan de Miraflores
RED SECUNDARIA : REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017
METRADO DE DEMOLICION DE BUZONES
MOVIMIENTO DE TIERRA : UNIDAD
Tipo Excav.
CLASIFICACION POR RANGO DE PROFUNDIDAD
Tipo
TRAMO BUZON PROF (m) Maq.
Pulso Suelo
1.01 1.26 1.51 1.76 2.01 2.51 3.01 3.51
1.25 1.50 1.75 2.00 2.50 3.00 3.50 4.00
BE-2 1.70 1
BE-3 1.24 1
BE-4 1.56 1
BE-6 1.37 1
BE-7 1.37 1
BE-8 1.72 1
BE-9 1.20 1
BE-10 1.40 1
BE-11 1.65 1
BE-12 1.55 1
BE-15 1.70 1
BE-16 1.66 1
BE-17 2.00 1
BE-18 2.10 1
BE-19 1.69 1
BE-22 1.45 1
BE-24 1.76 1
BE-25 1.51 1
BE-33 5.86
BE-34 5.68

Página 75 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

METRADO DE DEMOLICION DE BUZONES


MOVIMIENTO DE TIERRA : UNIDAD
Tipo Excav.
CLASIFICACION POR RANGO DE PROFUNDIDAD
Tipo
TRAMO BUZON PROF (m) Maq.
Pulso Suelo
1.01 1.26 1.51 1.76 2.01 2.51 3.01 3.51
1.25 1.50 1.75 2.00 2.50 3.00 3.50 4.00
BE-35 1.55 1
BE-36 1.65 1
BE-37 1.53 1
BE-38 1.46 1
BE-39 1.55 1
BE-40 1.36 1
BE-43 1.42 1
BE-45 1.90 1
BE-46 1.90 1
BE-47 1.55 1
BE-48 1.32 1
BE-52 2.47 1
BE-53 1.35 1
BE-57 1.55 1
BE-58 2.28 1
BE-61 2.24 1
BE-62 2.50 1
BE-64 1.60 1
BE-65 1.91 1
BE-66 2.00 1
BE-67 2.10 1
BE-68 2.05 1
BE-69 1.22 1
BE-70 1.71 1
BE-72 1.85 1
BE-73 1.20 1
BE-74 1.84 1

Página 76 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

METRADO DE DEMOLICION DE BUZONES


MOVIMIENTO DE TIERRA : UNIDAD
Tipo Excav.
CLASIFICACION POR RANGO DE PROFUNDIDAD
Tipo
TRAMO BUZON PROF (m) Maq.
Pulso Suelo
1.01 1.26 1.51 1.76 2.01 2.51 3.01 3.51
1.25 1.50 1.75 2.00 2.50 3.00 3.50 4.00
BE-75 2.25 1
BE-76 2.50 1
BE-77 1.40 1
BE-78 1.54 1
BE-79 1.75 1

4 10 19 8 9 0 0 0

Página 77 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

USTENTO DE METRADOS
UNDARIAS DE ALCANTARILLADO
ECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES
RITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

O DE DEMOLICION DE BUZONES
MOVIMIENTO DE TIERRA : UNIDAD
CLASIFICACION POR RANGO DE PROFUNDIDAD

4.01 5.01 6.01 7.01


5.00 6.00 7.00 8.00

1
1

Página 78 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

O DE DEMOLICION DE BUZONES
MOVIMIENTO DE TIERRA : UNIDAD
CLASIFICACION POR RANGO DE PROFUNDIDAD

4.01 5.01 6.01 7.01


5.00 6.00 7.00 8.00

Página 79 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

O DE DEMOLICION DE BUZONES
MOVIMIENTO DE TIERRA : UNIDAD
CLASIFICACION POR RANGO DE PROFUNDIDAD

4.01 5.01 6.01 7.01


5.00 6.00 7.00 8.00

0 2 0 0

Página 80 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

5.1.-METRADO DE INTERFERENCIAS EN LA RED


SECUNDARIA DE ALCANTARILLADO
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS

ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES


OBRA
CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN DE MIRAFL
UBICACIÓN : San Juan de Miraflores
SUB PRESUPUEST: REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017

METRADO DE INTERFERENCIAS EN LA RED SECUNDARIA DE


Lamina Tramo del
01 TR-65 BR-1
01 TR-65 BR-1
01 TR-65 BR-1
01 TR-88 BR-2
01 TR-88 BR-2
01 TR-97 BR-76
01 TR-67 BR-75
01 TR-67 BR-75
01 TR-67 BR-75
02 TR-63 BR-3
02 TR-60 BR-3
02 TR-91 BR-8
02 TR-91 BR-8
02 TR-91 BR-8
02 TR-54 BR-4
02 TR-54 BR-4
02 TR-28 BR-9
03 TR-49 BR-8
03 TR-69 BR-10
03 TR-69 BR-10
03 TR-85 BR-17
03 TR-85 BR-17
03 TR-92 BR-10
03 TR-92 BR-10
03 TR-80 BP-6
03 TR-80 BP-6
04 TR-86 BR-4
04 TR-86 BR-4
04 TR-70 BR-72
04 TR-70 BR-72
04 TR-70 BR-72
04 TR-70 BR-72
05 TR-76 BR-69
05 TR-45 BR-70
05 TR-45 BR-70
05 TR-57 BR-64
05 TR-79 BR-66
05 TR-78 BR-65

Página 82 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

METRADO DE INTERFERENCIAS EN LA RED SECUNDARIA DE


Lamina Tramo del
05 TR-95 BR-57
06 TR-71 BR-60
06 TR-73 BR-62
06 TR-73 BR-62
06 TR-94 BR-59
06 TR-94 BR-59
06 TR-43 BR-58
06 TR-43 BR-58
06 TR-48 BR-52
06 TR-48 BR-52
06 TR-48 BR-52
06 TR-89 BR-53
07 TR-18 BP-3
07 TP-13 BR-22
07 TR-104 BR-15
07 TR-5 BR-18
07 TR-5 BR-18
07 TR-61 BR-24
08 TR-20 BR-25
08 TP-10 BP-12
08 TP-11 BP-13
08 TP-6 BP-8
08 TP-7 BP-9
09 TR-115 BR-48
09 TR-41 BR-46
09 TR-41 BR-46
09 TR-41 BR-46
09 TR-1 BE-100
10 TR-31 BR-35
10 TR-31 BR-35
10 TR-118 BR-39
10 TR-118 BR-39
11 TR-119 BR-40
11 TR-119 BR-40

Página 83 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS

ENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y


A AMERICA EN EL DISTRITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

RENCIAS EN LA RED SECUNDARIA DE ALCANTARILLADO


al DN tub Interferencia
BR-2 200 mm GAS
BR-2 200 mm SP
BR-2 200 mm RAPP
BR-77 200 mm BT
BR-77 200 mm RAPP
BR-75 200 mm GAS
BR-68 200 mm GAS
BR-68 200 mm RAPP
BR-68 200 mm RAPP
BR-2 200 mm SP
BR-4 200 mm GAS
BR-7 200 mm BT
BR-7 200 mm GAS
BR-7 200 mm RAPP
BE-5 200 mm RAPP
BE-5 200 mm RAPE
BR-8 200 mm RAPP
BR-10 200 mm GAS
BR-17 200 mm BT
BR-17 200 mm RAPP
BR-16 200 mm BT
BR-16 200 mm RAPP
BR-11 200 mm GAS
BR-11 200 mm RAPP
BR-15 200 mm BT
BR-15 200 mm RAPE
BR-79 200 mm GAS
BR-79 200 mm RAPP
BE-71 200 mm BT
BE-71 200 mm GAS
BE-71 200 mm RAPP
BE-71 200 mm RAPP
BR-70 200 mm RAPP
BR-64 200 mm BT
BR-64 200 mm GAS
BR-63 200 mm BT
BR-65 200 mm GAS
BR-64 200 mm RAPP

Página 84 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

RENCIAS EN LA RED SECUNDARIA DE ALCANTARILLADO


al DN tub Interferencia
BE-56 200 mm GAS
BR-61 200 mm BT
BR-63 200 mm GAS
BR-63 200 mm RAPP
BR-58 200 mm BT
BR-58 200 mm GAS
BR-52 200 mm BT
BR-52 200 mm RAPE
BR-51 200 mm BT
BR-51 200 mm RAPE
BR-51 200 mm SP
BE-55 200 mm GAS
BR-19 200 mm RAPP
BP-15 200 mm RAPP
BR-18 200 mm BT
BR-19 200 mm RAPE
BR-19 200 mm RAPE
BP-12 200 mm RAPE
BR-24 200 mm RAPP
BP-13 250 mm BT
BP-14 250 mm BT
BP-9 250 mm RAPP
BP-10 250 mm RAPE
BR-47 200 mm RAPP
BP-12 200 mm GAS
BP-12 200 mm RAPE
BP-12 200 mm RAPE
BP-12 200 mm RAPP
BR-34 200 mm GAS
BR-34 200 mm RAPP
BR-33 200 mm GAS
BR-33 200 mm RAPP
BP-9 200 mm SP
BP-9 200 mm RAPE

Página 85 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

6.-METRADO DE CLAUSURA DE BUZONES -


ALCANTARILLADO
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO

OBRA
ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA
POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE
SAN JUAN DE MIRAFLORES – 2DA ETAPA
UBICACIÓN SAN JUAN DE MIRAFLORES
SUB-PRESUPUESTO : REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017

METRADO DE CLAUSURA DE BUZONES


CLAUSURA : UNIDAD
CLASIFICACION POR RANGO DE PROFUNDIDAD
Tipo
CALLE BUZON PROF (m) Lamina
Suelo
1.01 1.51 2.01 2.51 3.01 4.01 5.01
1.50 2.00 2.50 3.00 4.00 5.00 6.00
Coope Las Americas BE-21 1.55 TN 1
Coope Las Americas BE-27 2.40 1
Coope Las Americas BE-28 2.68 1
Coope Las Americas BE-29 3.30 1
Coope Las Americas BE-30 5.15 1
Coope Las Americas BE-31 5.56 1
Coope Las Americas BE-32 5.75 TN 1
Coope Las Americas BE-41 1.90 TN 1
Coope Las Americas BE-42 1.30 TN 1
Coope Las Americas BE-44 1.50 TN 1
Coope Las Americas BE-50 3.10 TN 1

2 2 1 1 2 0 3

Página 87 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281

7.-METRADO CLAUSURA DE TUBERIA


EXISTENTE - ALCANTARILLADO
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
REDES SECUNDARIAS DE ALCANTARILLADO

ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE


OBRA REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA
COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA

UBICACIÓN SAN JUAN DE MIRAFLORES


SUB-PRESUPUESTO : REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017

METRADO CLAUSURA DE TUBERIA EXISTENTE


BUZON LONG DEL TRAMO

TRAMO
DEL AL PLANTA Material D LONG. CLAUSURA
(m) (mm) (mm) (m)
TE-7 BE-42 BE-41 19.51 CSN 200.00 19.51
TE-9 BE-33 BE-32 21.99 CSN 250.00 21.99
TE-10 BE-32 BE-31 14.95 CSN 250.00 14.95
TE-12 BE-43 BE-44 50.12 CSN 200.00 50.12
TE-21 BE-22 BE-21 41.84 CSN 200.00 41.84
TE-25 BE-30 BE-29 44.51 CSN 250.00 44.51
TE-30 BE-28 BE-27 47.01 CSN 250.00 47.01
TE-36 BE-29 BE-28 50.03 CSN 250.00 50.03
TE-53 BE-19 BE-21 54.84 CSN 200.00 54.84
TE-68 BE-21 BE-24 52.54 CSN 200.00 52.54
TE-74 BE-44 BE-45 35.93 CSN 200.00 35.93
TE-93 BE-27 BE-50 62.25 CSN 250.00 62.25
TE-105 BE-50 BE-51 75.53 CSN 250.00 75.53
TE-108 BE-41 BE-40 34.09 CSN 200.00 34.09
TE-123 BE-31 BE-30 13.89 CSN 250.00 13.89

619.03 619.03

Página 89 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

8.-SUSTENTO DE METRADO DE CONEXIONES


DOMICILIARIAS DE ALCANTARILLADO
CAMBIADAS
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADOS
CONEXIONES DOMICILIARIAS DE ALCANTARILLADO

OBRA
ELABORACION DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DE OBRA DE REPOSICION DE REDES DE AGUA POTABLE, COLECTORES, BUZONES Y CONEXIONES DOMICILIARIAS EN LA COOPERATIVA AMERICA EN EL DISTRITO DE SAN JUAN DE MIRAFLORES – 2DA ETAPA
UBICACIÓN : SAN JUAN DE MIRAFLORES
SUB-PRESUPUESTO : REDES SECUNDARIAS DE ALCANTARILLADO
FECHA : 31/07/2017

SUSTENTO DE METRADO DE CONEXIONES DOMICILIARIAS DE ALCANTARILLADO CAMBIADAS


MOVIMIENTO DE TIERRA COLECTOR CORTE Y REPOSICION

ADOQUINA

ADOQUINA
PAVIMENT

PAVIMENT
TIPO DE RELLENO

ESCALERA
O MIXTO 1

SARDINEL
Ubicación de la Altura de la Demolición de N_LAMIN

FLEXIBLE

DA (m2)
VEREDA
VEREDA
DA(m2)

BERMA
RAMPA

RAMPA

JARDIN
Manzana Lote NUEVA o REHAB LONG MAQUINA o Material del Diametro del Rango de

(m2)

(m2)

(m2)

(m2)

(m2)
(m2)

(M2)
Conexión Existente Caja Registro Caja? A SUELO (PRESTAMO ALT EXCAV DIM. CAJA ID_ CAD

O
PULSO Colector Colector profundidad
(Excavación) O PROPIO)
A1-1 En Vereda A1 1 Renov 0.70 SI 4.69 P TN Prestamo HDPE 200 1.88 1.20 h: 0.9 Renov 0.1 30x60 1 ID_1
A1-22 En Vereda A1 22 Renov 1.00 SI 4.58 P TN Prestamo HDPE 200 2.30 1.21 h: 1.2 Renov 0.1 30x60 1 ID_2
A1-21 En Vereda A1 21 Renov 0.93 SI 5.04 P TN Prestamo HDPE 200 2.30 0.18 1.00 h: 1.2 Renov 0.1 30x60 1 ID_3
A1-20 En Vereda A1 20 Renov 0.80 SI 4.58 P TN Prestamo HDPE 200 2.30 1.00 h: 0.9 Reub 0.1 30x60 1 ID_4
A1-19 En Vereda A1 19 Renov 0.80 SI 4.45 P TN Prestamo HDPE 200 2.30 h: 0.9 Renov 0.1 30x60 1 ID_5
A1-18 En Vereda A1 18 Renov 0.95 SI 4.63 P TN Prestamo HDPE 200 2.30 h: 1.2 Renov 0.1 30x60 1 ID_6
A1-17 En Vereda A1 17 Renov 0.80 SI 4.36 P TN Prestamo HDPE 200 2.30 1.00 h: 0.9 Reub 0.1 30x60 1 ID_7
A1-16 En Vereda A1 16 Renov 0.93 SI 3.88 P TN Prestamo HDPE 200 2.30 1.21 h: 1.2 Reub 0.1 30x60 1 ID_8
D1-S/N No Ubic D1 S/N Renov 0.80 SI 5.28 P TN Prestamo HDPE 200 2.16 h: 0.9 Reub 0.1 30x60 1 ID_487
K2-1 Dentro del LP K2 1 Reub 0.99 NO 9.77 P TN Prestamo HDPE 200 2.20 1.00 h: 1.2 Renov 0.1 30x60 1 ID_343
D1-MERCADO Dentro del LP D1 MERCADO Reub 1.80 NO 9.33 P TN Prestamo HDPE 200 1.80 1.80 1.20 h: 1.8 Renov 1.76 60x60 1 ID_498
D1-1 En Vereda D1 1 Renov 0.80 SI 9.55 P TN Prestamo HDPE 200 1.80 1.62 1.50 1.60 h: 0.9 Renov 0.1 30x60 1 ID_497
D1-2 En Vereda D1 2 Renov 0.85 SI 9.12 P TN Prestamo HDPE 200 1.80 h: 0.9 Renov 0.1 30x60 1 ID_496
D1-3 En Vereda D1 3 Renov 0.80 SI 9.34 P TN Prestamo HDPE 200 1.80 h: 0.9 Renov 0.1 30x60 1 ID_495
D1-4 En Vereda D1 4 Renov 0.80 SI 8.47 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_494
D1-5 En Vereda D1 5 Renov 0.67 SI 8.83 P TN Prestamo HDPE 200 1.80 1.32 1.60 h: 0.9 Renov 0.1 30x60 1 ID_493
D1-6 En Vereda D1 6 Renov 1.05 SI 9.15 P TN Prestamo HDPE 200 1.80 1.32 1.80 h: 1.2 Renov 1.01 30x60 1 ID_492
D1-7 En Vereda D1 7 Renov 0.94 SI 9.12 P TN Prestamo HDPE 200 1.80 1.32 1.30 h: 1.2 Renov 0.1 30x60 1 ID_491
D1-8 En Vereda D1 8 Renov 0.98 SI 9.13 P TN Prestamo HDPE 200 1.80 1.32 1.20 h: 1.2 Renov 0.1 30x60 1 ID_490
D1-9 En Vereda D1 9 Renov 0.80 SI 8.81 P TN Prestamo HDPE 200 1.80 1.32 1.20 h: 0.9 Reub 0.1 30x60 1 ID_489
D1-10 En Vereda D1 10 Renov 0.80 SI 8.86 P TN Prestamo HDPE 200 1.80 1.20 1.32 h: 0.9 Reub 0.1 30x60 1 ID_488
D1-11C En Vereda D1 11C Renov 0.80 SI 9.40 P TN Prestamo HDPE 200 1.80 2.30 h: 0.9 Renov 0.1 30x60 1 ID_475
D1-11A-11B En Vereda D1 11A-11B Renov 0.95 SI 9.57 P TN Prestamo HDPE 200 3.60 2.46 4.40 h: 1.2 Reub 0.1 30x60 1 ID_476
D1-11 En Vereda D1 11 Renov 0.80 SI 10.30 P TN Prestamo HDPE 200 1.80 2.58 2.00 h: 0.9 Reub 0.1 30x60 1 ID_477
D1-12 En Vereda D1 12 Renov 0.80 SI 9.44 P TN Prestamo HDPE 200 1.80 2.40 2.20 h: 0.9 Reub 0.1 30x60 1 ID_478
D1-13 En Vereda D1 13 Renov 0.80 SI 9.82 P TN Prestamo HDPE 200 1.80 2.34 2.20 h: 0.9 Reub 0.1 30x60 1 ID_479
D1-14 En Vereda D1 14 Renov 1.04 SI 10.51 P TN Prestamo HDPE 200 1.80 1.00 h: 1.2 Reub 1.01 30x60 1 ID_480
D1-15 En Vereda D1 15 Renov 0.80 SI 8.79 P TN Prestamo HDPE 200 1.80 1.00 h: 0.9 Reub 0.1 30x60 1 ID_481
D1-16 En Vereda D1 16 Renov 0.95 SI 9.91 P TN Prestamo HDPE 200 1.80 h: 1.2 Renov 0.1 30x60 1 ID_482
D1-17 En Vereda D1 17 Renov 0.80 SI 9.32 P TN Prestamo HDPE 200 1.80 2.16 1.00 1.60 h: 0.9 Reub 0.1 30x60 1 ID_483
D1-18 En Vereda D1 18 Renov 0.80 SI 9.69 P TN Prestamo HDPE 200 1.80 1.20 3.80 h: 0.9 Reub 0.1 30x60 1 ID_484
D1-19 En Vereda D1 19 Renov 0.80 SI 8.87 P TN Prestamo HDPE 200 1.80 4.30 0.78 h: 0.9 Reub 0.1 30x60 1 ID_485
D1-20 En Vereda D1 20 Renov 0.80 SI 8.51 P TN Prestamo HDPE 200 1.80 2.22 2.20 h: 0.9 Reub 0.1 30x60 1 ID_486
K2-17-18 No Ubic K2 17-18 Renov 0.80 SI 18.04 P TN Prestamo HDPE 200 0.90 1.60 h: 0.9 Reub 0.1 30x60 1 ID_335
T1-7 En Vereda T1 7 Renov 0.73 SI 10.23 P TN Prestamo HDPE 200 1.92 h: 0.9 Reub 0.1 30x60 1 ID_114
K-10 En Vereda K 10 Renov 0.80 SI 8.13 P TN Prestamo HDPE 200 1.80 1.46 1.33 h: 0.9 Reub 0.1 30x60 1 ID_388
K-3 No Ubic K 3 Renov 0.80 SI 7.22 P TN Prestamo HDPE 200 1.80 1.36 1.20 h: 0.9 Reub 0.1 30x60 1 ID_395
K-42715 Dentro del LP K 42715 Reub 0.80 NO 9.88 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_387
K1-15 En Vereda K1 15 Renov 0.76 SI 6.66 P TN Prestamo HDPE 200 2.40 h: 0.9 Reub 0.1 30x60 1 ID_371
K1-14 En Vereda K1 14 Renov 0.80 SI 5.88 P TN Prestamo HDPE 200 2.10 0.84 2.32 h: 0.9 Reub 0.1 30x60 1 ID_372
K1-13 En Vereda K1 13 Renov 1.20 SI 6.42 P TN Prestamo HDPE 200 2.10 0.85 2.36 h: 1.2 Reub 1.01 30x60 1 ID_373
K1-12 En Vereda K1 12 Renov 0.80 SI 6.56 P TN Prestamo HDPE 200 2.10 1.22 h: 0.9 Reub 0.1 30x60 1 ID_374
K1-11 En Vereda K1 11 Renov 0.77 SI 6.55 P TN Prestamo HDPE 200 2.10 1.00 h: 0.9 Reub 0.1 30x60 1 ID_375
K1-11A En Vereda K1 11A Renov 0.80 SI 6.17 P TN Prestamo HDPE 200 2.10 0.78 1.20 1.60 h: 0.9 Reub 0.1 30x60 1 ID_376
K1-10 En Vereda K1 10 Renov 0.56 SI 6.22 P TN Prestamo HDPE 200 2.10 0.93 1.30 h: 0.6 Reub 0.1 30x60 1 ID_377
K1-9 Dentro del LP K1 9 Reub 0.84 NO 6.27 P TN Prestamo HDPE 200 2.10 1.98 h: 0.9 Reub 0.1 30x60 1 ID_378
K1-8 No Ubic K1 8 Renov 0.80 SI 6.22 P TN Prestamo HDPE 200 2.10 0.75 1.50 h: 0.9 Reub 0.1 30x60 1 ID_379
K1-7 No Ubic K1 7 Renov 0.80 SI 6.41 P TN Prestamo HDPE 200 2.10 0.99 1.02 h: 0.9 Reub 0.1 30x60 1 ID_380
K1-6 En Vereda K1 6 Renov 0.64 SI 6.56 P TN Prestamo HDPE 200 2.10 0.81 1.68 h: 0.9 Reub 0.1 30x60 1 ID_381
K1-5 Dentro del LP K1 5 Reub 1.12 NO 6.29 P TN Prestamo HDPE 200 2.10 0.90 2.48 h: 1.2 Reub 1.01 30x60 1 ID_382
K1-4 En Vereda K1 4 Renov 0.80 SI 6.12 P TN Prestamo HDPE 200 1.86 h: 0.9 Reub 0.1 30x60 1 ID_383
K1-3 En Vereda K1 3 Renov 1.12 SI 5.61 P TN Prestamo HDPE 200 1.86 1.36 h: 1.2 Reub 1.01 30x60 1 ID_384
K1-2 Dentro del LP K1 2 Reub 0.80 NO 5.22 P TN Prestamo HDPE 200 1.86 1.36 h: 0.9 Reub 0.1 30x60 1 ID_385
K1-1 En Vereda K1 1 Renov 0.58 SI 4.93 P TN Prestamo HDPE 200 1.86 1.20 h: 0.6 Reub 0.1 30x60 1 ID_386
R1-4 En Vereda R1 4 Renov 0.93 SI 6.82 P TN Prestamo HDPE 200 1.74 0.66 2.90 h: 1.2 Reub 0.1 30x60 1 ID_166
R1-3 En Vereda R1 3 Renov 0.80 SI 6.85 P TN Prestamo HDPE 200 1.74 0.90 1.37 h: 0.9 Reub 0.1 30x60 1 ID_165
R1-2 En Vereda R1 2 Renov 0.60 SI 6.96 P TN Prestamo HDPE 200 1.74 0.76 2.13 h: 0.6 Reub 0.1 30x60 1 ID_164
R1-1 En Vereda R1 1 Renov 0.80 SI 7.74 P TN Prestamo HDPE 200 1.74 0.96 1.25 h: 0.9 Reub 0.1 30x60 1 ID_163
L-19 En Vereda L 19 Renov 0.77 SI 7.05 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_319
L-20 Dentro del LP L 20 Reub 0.50 NO 7.24 P TN Prestamo HDPE 200 1.80 1.44 1.21 1.60 h: 0.6 Reub 0.1 30x60 1 ID_320
L-21 En Vereda L 21 Renov 0.80 SI 6.86 P TN Prestamo HDPE 200 1.80 1.44 1.21 h: 0.9 Reub 0.1 30x60 1 ID_321
L-22 No Ubic L 22 Renov 0.80 SI 7.05 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_322
L-23 En Vereda L 23 Renov 0.95 SI 7.08 P TN Prestamo HDPE 200 1.80 1.68 1.44 h: 1.2 Reub 0.1 30x60 1 ID_323
L-24 En Vereda L 24 Renov 0.80 SI 7.74 P TN Prestamo HDPE 200 1.80 1.56 2.25 h: 0.9 Reub 0.1 30x60 1 ID_324
L-25 En Vereda L 25 Renov 1.05 SI 7.33 P TN Prestamo HDPE 200 1.80 1.44 1.69 h: 1.2 Reub 1.01 30x60 1 ID_325
L-26 Dentro del LP L 26 Reub 0.96 NO 7.24 P TN Prestamo HDPE 200 1.80 2.04 h: 1.2 Reub 0.1 30x60 1 ID_326
L-27 Dentro del LP L 27 Reub 0.80 NO 7.22 P TN Prestamo HDPE 200 1.80 1.50 1.44 h: 0.9 Reub 0.1 30x60 1 ID_327
L-28 Dentro del LP L 28 Reub 0.80 NO 7.47 P TN Prestamo HDPE 200 1.80 1.69 h: 0.9 Reub 0.1 30x60 1 ID_328
L-29 Dentro del LP L 29 Reub 0.80 NO 7.42 P TN Prestamo HDPE 200 1.80 1.26 1.44 h: 0.9 Reub 0.1 30x60 1 ID_329
L-30 No Ubic L 30 Renov 0.80 SI 7.43 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_330
L-31 En Vereda L 31 Renov 0.80 SI 7.58 P TN Prestamo HDPE 200 1.80 1.20 1.69 h: 0.9 Reub 0.1 30x60 1 ID_331
L-32 No Ubic L 32 Renov 0.80 SI 7.04 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_332
L-33 Dentro del LP L 33 Reub 0.80 NO 7.52 P TN Prestamo HDPE 200 1.80 1.53 1.00 h: 0.9 Reub 0.1 30x60 1 ID_333
L-34 En Vereda L 34 Renov 0.80 SI 7.21 P TN Prestamo HDPE 200 1.80 1.56 1.44 1.60 h: 0.9 Reub 0.1 30x60 1 ID_334
L-18 Dentro del LP L 18 Reub 0.80 NO 7.45 P TN Prestamo HDPE 200 1.80 0.99 1.21 h: 0.9 Reub 0.1 30x60 1 ID_318
L-17 En Vereda L 17 Renov 0.75 SI 6.62 P TN Prestamo HDPE 200 1.80 0.84 1.69 h: 0.9 Reub 0.1 30x60 1 ID_317
L-16 En Vereda L 16 Renov 1.22 SI 6.73 P TN Prestamo HDPE 200 1.80 1.20 1.69 1.60 h: 1.5 Reub 1.01 30x60 1 ID_316
L-15 En Vereda L 15 Renov 1.15 SI 6.84 P TN Prestamo HDPE 200 1.80 1.32 1.69 1.60 h: 1.2 Reub 1.01 30x60 1 ID_315
L-14 En Vereda L 14 Renov 1.02 SI 7.10 P TN Prestamo HDPE 200 1.80 1.32 1.69 1.60 h: 1.2 Reub 1.01 30x60 1 ID_314
L-13 En Vereda L 13 Renov 0.80 SI 6.74 P TN Prestamo HDPE 200 1.80 1.38 1.44 h: 0.9 Reub 0.1 30x60 1 ID_313
L-12 En Vereda L 12 Renov 1.05 SI 7.06 P TN Prestamo HDPE 200 1.80 1.38 1.44 h: 1.2 Reub 1.01 30x60 1 ID_312
L-11 En Vereda L 11 Renov 1.00 SI 6.76 P TN Prestamo HDPE 200 1.80 1.26 1.44 h: 1.2 Reub 0.1 30x60 1 ID_308
L-10 Dentro del LP L 10 Reub 0.95 NO 6.64 P TN Prestamo HDPE 200 1.80 1.32 1.69 h: 1.2 Reub 0.1 30x60 1 ID_311
L-9 En Vereda L 9 Renov 1.05 SI 7.75 P TN Prestamo HDPE 200 1.80 1.44 1.96 1.60 h: 1.2 Reub 1.01 30x60 1 ID_310
L-8 No Ubic L 8 Renov 0.80 SI 7.04 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_309
L-7 Dentro del LP L 7 Reub 0.83 NO 7.42 P TN Prestamo HDPE 200 1.80 1.32 1.69 h: 0.9 Reub 0.1 30x60 1 ID_307
L-6 Dentro del LP L 6 Reub 1.30 NO 6.80 P TN Prestamo HDPE 200 1.80 1.38 1.44 h: 1.5 Reub 1.26 30x60 1 ID_306
L-5 Dentro del LP L 5 Reub 0.75 NO 6.87 P TN Prestamo HDPE 200 1.80 1.50 1.44 h: 0.9 Reub 0.1 30x60 1 ID_305
L-4 Dentro del LP L 4 Reub 1.05 NO 6.83 P TN Prestamo HDPE 200 1.80 1.00 h: 1.2 Reub 1.01 30x60 1 ID_304
L-3 Dentro del LP L 3 Reub 1.06 NO 6.90 P TN Prestamo HDPE 200 1.80 h: 1.2 Reub 1.01 30x60 1 ID_303
L-2 En Vereda L 2 Renov 0.80 SI 6.53 P TN Prestamo HDPE 200 1.80 1.44 1.21 h: 0.9 Reub 0.1 30x60 1 ID_302
L-1 En Vereda L 1 Renov 0.90 SI 6.33 P TN Prestamo HDPE 200 1.80 1.44 1.44 h: 0.9 Reub 0.1 30x60 1 ID_301
L-38 En Vereda L 38 Renov 0.80 SI 6.01 P TN Prestamo HDPE 200 1.80 1.50 1.69 1.60 h: 0.9 Reub 0.1 30x60 1 ID_300
J-21 No Ubic J 21 Renov 0.80 SI 6.72 P TN Prestamo HDPE 200 1.74 1.20 1.38 h: 0.9 Reub 0.1 30x60 1 ID_418
J-21A En Vereda J 21A Renov 0.87 SI 7.35 P TN Prestamo HDPE 200 1.74 1.20 1.38 h: 0.9 Reub 0.1 30x60 1 ID_417
J-22 En Vereda J 22 Renov 0.72 SI 6.61 P TN Prestamo HDPE 200 2.16 1.20 0.96 h: 0.9 Reub 0.1 30x60 1 ID_416
J-23 Dentro del LP J 23 Reub 0.82 NO 6.68 P TN Prestamo HDPE 200 2.16 1.20 0.96 h: 0.9 Reub 0.1 30x60 1 ID_415

Página 91 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADO DE CONEXIONES DOMICILIARIAS DE ALCANTARILLADO CAMBIADAS


MOVIMIENTO DE TIERRA COLECTOR CORTE Y REPOSICION

ADOQUINA

ADOQUINA
PAVIMENT

PAVIMENT
TIPO DE RELLENO

ESCALERA
O MIXTO 1

SARDINEL
Ubicación de la Altura de la Demolición de N_LAMIN

FLEXIBLE

DA (m2)
VEREDA
VEREDA
DA(m2)

BERMA
RAMPA

RAMPA

JARDIN
Manzana Lote NUEVA o REHAB LONG MAQUINA o Material del Diametro del Rango de

(m2)

(m2)

(m2)

(m2)

(m2)
(m2)

(M2)
Conexión Existente Caja Registro Caja? A SUELO (PRESTAMO ALT EXCAV DIM. CAJA ID_ CAD

O
PULSO Colector Colector profundidad
(Excavación) O PROPIO)
J-24 En Vereda J 24 Renov 0.80 SI 6.47 P TN Prestamo HDPE 200 2.16 1.38 h: 0.9 Reub 0.1 30x60 1 ID_414
J-25 Dentro del LP J 25 Reub 1.05 NO 6.14 P TN Prestamo HDPE 200 2.16 0.77 1.20 h: 1.2 Reub 1.01 30x60 1 ID_413
J-26 Dentro del LP J 26 Reub 0.92 NO 6.24 P TN Prestamo HDPE 200 2.16 1.00 1.20 h: 1.2 Reub 0.1 30x60 1 ID_412
J-27 Dentro del LP J 27 Reub 0.80 NO 6.76 P TN Prestamo HDPE 200 2.16 1.02 0.69 h: 0.9 Reub 0.1 30x60 1 ID_411
J-28 Dentro del LP J 28 Reub 0.80 NO 6.52 P TN Prestamo HDPE 200 2.16 0.81 1.15 h: 0.9 Reub 0.1 30x60 1 ID_410
J-29 Dentro del LP J 29 Reub 0.82 NO 6.30 P TN Prestamo HDPE 200 2.16 0.84 1.20 h: 0.9 Reub 0.1 30x60 1 ID_409
J-30 Dentro del LP J 30 Reub 0.80 NO 6.63 P TN Prestamo HDPE 200 2.16 0.93 1.20 h: 0.9 Reub 0.1 30x60 1 ID_408
J-31 En Vereda J 31 Renov 0.80 SI 6.63 P TN Prestamo HDPE 200 2.16 0.75 1.48 1.60 h: 0.9 Reub 0.1 30x60 1 ID_407
J-32 En Vereda J 32 Renov 0.80 SI 6.22 P TN Prestamo HDPE 200 2.16 1.20 0.90 h: 0.9 Reub 0.1 30x60 1 ID_406
J-33 No Ubic J 33 Renov 0.80 SI 6.02 P TN Prestamo HDPE 200 2.16 1.15 0.84 h: 0.9 Reub 0.1 30x60 1 ID_405
J-34 No Ubic J 34 Renov 0.80 SI 6.15 P TN Prestamo HDPE 200 2.16 0.60 1.20 h: 0.9 Reub 0.1 30x60 1 ID_404
J-35 En Vereda J 35 Renov 0.80 SI 6.08 P TN Prestamo HDPE 200 2.16 0.78 1.20 h: 0.9 Reub 0.1 30x60 1 ID_403
J-36 En Vereda J 36 Renov 0.80 SI 5.68 P TN Prestamo HDPE 200 2.16 0.93 0.95 h: 0.9 Reub 0.1 30x60 1 ID_402
J-37 En Vereda J 37 Renov 0.80 SI 6.23 P TN Prestamo HDPE 200 2.16 1.02 1.20 h: 0.9 Reub 0.1 30x60 1 ID_401
J-38 No Ubic J 38 Renov 0.80 SI 5.70 P TN Prestamo HDPE 200 2.16 0.90 1.20 h: 0.9 Reub 0.1 30x60 1 ID_400
J-39 En Vereda J 39 Renov 1.12 SI 5.96 P TN Prestamo HDPE 200 2.16 1.07 1.30 h: 1.2 Reub 1.01 30x60 1 ID_399
J-40 En Vereda J 40 Renov 0.80 SI 5.52 P TN Prestamo HDPE 200 2.16 1.50 1.80 1.60 h: 0.9 Reub 0.1 30x60 1 ID_398
B-24 No Ubic B 24 Renov 0.80 SI 7.60 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_558
B-22 No Ubic B 22 Renov 0.80 SI 6.96 P TN Prestamo HDPE 200 1.80 1.38 1.18 h: 0.9 Reub 0.1 30x60 1 ID_556
B-21 Dentro del LP B 21 Reub 0.95 NO 7.19 P TN Prestamo HDPE 200 1.80 h: 1.2 Reub 0.1 30x60 1 ID_555
B-20 En Vereda B 20 Renov 0.92 SI 6.85 P TN Prestamo HDPE 200 1.86 0.63 h: 1.2 Reub 0.1 30x60 1 ID_554
B-19 No Ubic B 19 Renov 0.80 SI 7.12 P TN Prestamo HDPE 200 1.80 1.44 0.99 h: 0.9 Reub 0.1 30x60 1 ID_553
B-18 En Vereda B 18 Renov 0.70 SI 7.25 P TN Prestamo HDPE 200 1.86 1.35 1.16 1.60 h: 0.9 Reub 0.1 30x60 1 ID_552
B-17 Dentro del LP B 17 Reub 0.80 NO 7.67 P TN Prestamo HDPE 200 1.80 0.66 0.66 1.18 1.60 h: 0.9 Reub 0.1 30x60 1 ID_551
B-16 En Vereda B 16 Renov 1.10 SI 7.24 P TN Prestamo HDPE 200 1.80 1.44 1.43 h: 1.2 Reub 1.01 30x60 1 ID_550
B-15 En Vereda B 15 Renov 0.90 SI 7.26 P TN Prestamo HDPE 200 1.80 1.44 1.20 h: 0.9 Reub 0.1 30x60 1 ID_549
B-14 En Vereda B 14 Renov 0.95 SI 7.41 P TN Prestamo HDPE 200 1.80 1.44 1.20 h: 1.2 Reub 0.1 30x60 1 ID_548
B-13 Dentro del LP B 13 Reub 0.80 NO 8.02 P TN Prestamo HDPE 200 2.22 4.12 h: 0.9 Reub 0.1 30x60 1 ID_547
Q-10 En Vereda Q 10 Renov 0.80 SI 6.66 P TN Prestamo HDPE 200 1.68 1.17 1.37 h: 0.9 Reub 0.1 30x60 1 ID_191
P-1 No Ubic P 1 Renov 0.80 SI 8.13 P TN Prestamo HDPE 200 1.98 1.50 h: 0.9 Reub 0.1 30x60 1 ID_224
P-36 Dentro del LP P 36 Reub 1.02 NO 7.83 P TN Prestamo HDPE 200 1.98 0.53 1.78 h: 1.2 Reub 1.01 30x60 1 ID_225
P-35 Dentro del LP P 35 Reub 0.80 NO 7.32 P TN Prestamo HDPE 200 1.98 0.67 1.10 h: 0.9 Reub 0.1 30x60 1 ID_226
P-34 Dentro del LP P 34 Reub 0.80 NO 7.53 P TN Prestamo HDPE 200 1.98 0.72 1.00 h: 0.9 Reub 0.1 30x60 1 ID_227
P-33 Dentro del LP P 33 Reub 0.80 NO 7.31 P TN Prestamo HDPE 200 1.98 0.78 1.00 h: 0.9 Reub 0.1 30x60 1 ID_228
P-32 Dentro del LP P 32 Reub 0.80 NO 7.81 P TN Prestamo HDPE 200 1.98 1.78 h: 0.9 Reub 0.1 30x60 1 ID_229
P-31 Dentro del LP P 31 Reub 0.80 NO 7.47 P TN Prestamo HDPE 200 1.98 0.78 1.00 h: 0.9 Reub 0.1 30x60 1 ID_230
P-30 Dentro del LP P 30 Reub 0.80 NO 7.75 P TN Prestamo HDPE 200 1.98 0.50 1.65 h: 0.9 Reub 0.1 30x60 1 ID_231
P-29 Dentro del LP P 29 Reub 1.00 NO 7.47 P TN Prestamo HDPE 200 1.98 0.50 2.53 h: 1.2 Reub 0.1 30x60 1 ID_232
P-28 Dentro del LP P 28 Reub 0.80 NO 7.38 P TN Prestamo HDPE 200 1.98 1.48 h: 0.9 Reub 0.1 30x60 1 ID_233
P-27 Dentro del LP P 27 Reub 0.80 NO 7.45 P TN Prestamo HDPE 200 1.98 2.60 h: 0.9 Reub 0.1 30x60 1 ID_234
P-26 En Vereda P 26 Renov 0.80 SI 7.12 P TN Prestamo HDPE 200 1.98 2.17 h: 0.9 Reub 0.1 30x60 1 ID_235
P-25 No Ubic P 25 Renov 0.80 SI 7.21 P TN Prestamo HDPE 200 1.98 1.90 h: 0.9 Reub 0.1 30x60 1 ID_236
P-24A Dentro del LP P 24A Reub 0.80 NO 7.30 P TN Prestamo HDPE 200 1.98 0.54 1.00 h: 0.9 Reub 0.1 30x60 1 ID_237
P-24 Dentro del LP P 24 Reub 0.80 NO 7.21 P TN Prestamo HDPE 200 1.98 1.08 h: 0.9 Reub 0.1 30x60 1 ID_238
P-23 Dentro del LP P 23 Reub 0.98 NO 7.04 P TN Prestamo HDPE 200 1.98 2.19 h: 1.2 Reub 0.1 30x60 1 ID_239
P1-2 En Vereda P1 2 Renov 0.80 SI 7.09 P TN Prestamo HDPE 200 1.62 0.84 1.30 h: 0.9 Reub 0.1 30x60 1 ID_204
P1-3 Dentro del LP P1 3 Reub 1.10 NO 8.12 P TN Prestamo HDPE 200 1.62 0.84 2.70 h: 1.2 Reub 1.01 30x60 1 ID_205
P1-4 En Vereda P1 4 Renov 0.70 SI 8.13 P TN Prestamo HDPE 200 1.62 3.20 h: 0.9 Reub 0.1 30x60 1 ID_206
P1-5 Dentro del LP P1 5 Reub 1.00 NO 6.35 P TN Prestamo HDPE 200 1.68 1.10 2.43 h: 1.2 Reub 0.1 30x60 1 ID_207
P1-6 Dentro del LP P1 6 Reub 0.83 NO 6.52 P TN Prestamo HDPE 200 1.68 1.17 2.23 h: 0.9 Reub 0.1 30x60 1 ID_208
P1-7 Dentro del LP P1 7 Reub 0.85 NO 7.00 P TN Prestamo HDPE 200 1.68 0.75 2.57 1.60 h: 0.9 Reub 0.1 30x60 1 ID_209
P1-8 Dentro del LP P1 8 Reub 1.00 NO 6.99 P TN Prestamo HDPE 200 1.68 0.75 2.48 h: 1.2 Reub 0.1 30x60 1 ID_210
P1-9 Dentro del LP P1 9 Reub 0.80 NO 6.97 P TN Prestamo HDPE 200 1.68 1.02 2.60 h: 0.9 Reub 0.1 30x60 1 ID_211
P1-10 En Vereda P1 10 Renov 0.70 SI 6.14 P TN Prestamo HDPE 200 1.68 1.02 1.08 h: 0.9 Reub 0.1 30x60 1 ID_212
P1-11 En Vereda P1 11 Renov 1.20 SI 6.20 P TN Prestamo HDPE 200 1.68 2.90 h: 1.2 Reub 1.01 30x60 1 ID_213
P1-12 En Vereda P1 12 Renov 0.90 SI 6.52 P TN Prestamo HDPE 200 1.68 h: 0.9 Reub 0.1 30x60 1 ID_214
P1-13 Dentro del LP P1 13 Reub 1.00 NO 9.60 P TN Prestamo HDPE 200 1.68 1.10 0.90 h: 1.2 Reub 0.1 30x60 1 ID_215
P1-14 En Vereda P1 14 Renov 0.80 SI 8.13 P TN Prestamo HDPE 200 1.68 1.02 2.50 h: 0.9 Reub 0.1 30x60 1 ID_216
Q-25 No Ubic Q 25 Renov 0.80 SI 5.84 P TN Prestamo HDPE 200 1.68 1.30 h: 0.9 Reub 0.1 30x60 1 ID_179
Q-26 No Ubic Q 26 Renov 0.80 SI 6.18 P TN Prestamo HDPE 200 1.68 1.02 1.28 1.60 h: 0.9 Reub 0.1 30x60 1 ID_180
Q-1 No Ubic Q 1 Renov 0.80 SI 6.26 P TN Prestamo HDPE 200 1.68 h: 0.9 Reub 0.1 30x60 1 ID_181
Q-2 En Vereda Q 2 Renov 0.80 SI 6.25 P TN Prestamo HDPE 200 1.68 0.15 4.20 h: 0.9 Reub 0.1 30x60 1 ID_182
Q-3 Dentro del LP Q 3 Reub 0.80 NO 5.88 P TN Prestamo HDPE 200 1.68 1.80 h: 0.9 Reub 0.1 30x60 1 ID_183
Q-4 En Vereda Q 4 Renov 1.13 SI 6.30 P TN Prestamo HDPE 200 1.68 1.05 1.00 h: 1.2 Reub 1.01 30x60 1 ID_184
Q-5 Dentro del LP Q 5 Reub 0.80 NO 6.29 P TN Prestamo HDPE 200 1.68 1.05 1.10 h: 0.9 Reub 0.1 30x60 1 ID_185
Q-6 Dentro del LP Q 6 Reub 0.80 NO 6.02 P TN Prestamo HDPE 200 1.68 0.69 1.05 h: 0.9 Reub 0.1 30x60 1 ID_186
Q-7 Dentro del LP Q 7 Reub 1.05 NO 7.00 P TN Prestamo HDPE 200 1.68 0.88 2.53 1.60 h: 1.2 Reub 1.01 30x60 1 ID_187
Q-8 Dentro del LP Q 8 Reub 0.80 NO 6.85 P TN Prestamo HDPE 200 1.68 1.30 h: 0.9 Reub 0.1 30x60 1 ID_188
Q-8A Dentro del LP Q 8A Reub 0.54 NO 6.33 P TN Prestamo HDPE 200 1.68 0.99 1.07 h: 0.6 Reub 0.1 30x60 1 ID_189
Q-9 No Ubic Q 9 Renov 0.80 SI 7.93 P TN Prestamo HDPE 200 1.68 h: 0.9 Reub 0.1 30x60 1 ID_190
Q-22 En Vereda Q 22 Renov 0.93 SI 6.58 P TN Prestamo HDPE 200 1.68 1.29 1.07 h: 1.2 Reub 0.1 30x60 1 ID_203
Q-21 En Vereda Q 21 Renov 0.78 SI 6.76 P TN Prestamo HDPE 200 1.68 1.32 1.15 h: 0.9 Reub 0.1 30x60 1 ID_202
Q-20 No Ubic Q 20 Renov 0.80 SI 6.23 P TN Prestamo HDPE 200 1.68 2.10 h: 0.9 Reub 0.1 30x60 1 ID_201
Q-19 Dentro del LP Q 19 Reub 0.80 NO 6.35 P TN Prestamo HDPE 200 1.68 h: 0.9 Reub 0.1 30x60 1 ID_200
Q-18 Dentro del LP Q 18 Reub 0.80 NO 6.32 P TN Prestamo HDPE 200 1.68 1.11 2.40 h: 0.9 Reub 0.1 30x60 1 ID_199
Q-17 En Vereda Q 17 Renov 0.80 SI 6.39 P TN Prestamo HDPE 200 1.68 h: 0.9 Reub 0.1 30x60 1 ID_198
Q-16 En Vereda Q 16 Renov 0.78 SI 6.24 P TN Prestamo HDPE 200 1.68 0.85 2.60 h: 0.9 Reub 0.1 30x60 1 ID_197
Q-15 Dentro del LP Q 15 Reub 0.80 NO 6.45 P TN Prestamo HDPE 200 1.68 0.94 1.20 h: 0.9 Reub 0.1 30x60 1 ID_196
Q-14 Dentro del LP Q 14 Reub 0.82 NO 6.29 P TN Prestamo HDPE 200 1.68 1.08 1.00 1.60 h: 0.9 Reub 0.1 30x60 1 ID_195
Q-13 No Ubic Q 13 Renov 0.80 SI 6.06 P TN Prestamo HDPE 200 1.68 0.84 3.07 1.60 h: 0.9 Reub 0.1 30x60 1 ID_194
Q-12 Dentro del LP Q 12 Reub 0.95 NO 6.37 P TN Prestamo HDPE 200 1.68 2.70 h: 1.2 Reub 0.1 30x60 1 ID_193
Q-11 Dentro del LP Q 11 Reub 0.95 NO 6.32 P TN Prestamo HDPE 200 1.68 1.08 1.25 h: 1.2 Reub 0.1 30x60 1 ID_192
R-24 No Ubic R 24 Renov 0.80 SI 7.11 P TN Prestamo HDPE 200 1.26 h: 0.9 Reub 0.1 30x60 1 ID_169
R-25 Dentro del LP R 25 Reub 0.80 NO 6.67 P TN Prestamo HDPE 200 1.26 1.20 1.33 h: 0.9 Reub 0.1 30x60 1 ID_168
R-26 Dentro del LP R 26 Reub 0.80 NO 6.39 P TN Prestamo HDPE 200 1.26 1.20 1.30 h: 0.9 Reub 0.1 30x60 1 ID_167
R-1 En Vereda R 1 Renov 1.00 SI 7.05 P TN Prestamo HDPE 200 1.26 1.14 1.30 1.60 h: 1.2 Reub 0.1 30x60 1 ID_178
R-2 En Vereda R 2 Renov 1.12 SI 6.99 P TN Prestamo HDPE 200 1.68 1.08 1.30 h: 1.2 Reub 1.01 30x60 1 ID_177
R-3 Dentro del LP R 3 Reub 0.80 NO 5.89 P TN Prestamo HDPE 200 1.68 1.08 2.77 1.60 h: 0.9 Reub 0.1 30x60 1 ID_176
R-4 Dentro del LP R 4 Reub 0.94 NO 6.03 P TN Prestamo HDPE 200 1.68 1.26 2.55 h: 1.2 Reub 0.1 30x60 1 ID_175
R-5 Dentro del LP R 5 Reub 0.80 NO 6.06 P TN Prestamo HDPE 200 1.68 1.08 1.30 h: 0.9 Reub 0.1 30x60 1 ID_174
R-6 Dentro del LP R 6 Reub 0.84 NO 6.04 P TN Prestamo HDPE 200 1.68 0.94 2.85 1.60 h: 0.9 Reub 0.1 30x60 1 ID_173
R-7 Dentro del LP R 7 Reub 1.16 NO 6.28 P TN Prestamo HDPE 200 1.68 2.61 1.20 h: 1.2 Reub 1.01 30x60 1 ID_172
R-8A-8 En Vereda R 8A-8 Renov 0.78 SI 6.23 P TN Prestamo HDPE 200 1.68 1.90 1.15 h: 0.9 Reub 0.1 30x60 1 ID_170
R-9-9A No Ubic R 9-9A Renov 0.80 SI 6.71 P TN Prestamo HDPE 200 1.68 1.10 h: 0.9 Reub 0.1 30x60 1 ID_171
A1-12 En Vereda A1 12 Renov 0.73 SI 6.16 P TN Prestamo HDPE 200 1.88 1.20 0.72 h: 0.9 Reub 0.1 30x60 1 ID_13
A1-13 En Vereda A1 13 Renov 0.64 SI 6.48 P TN Prestamo HDPE 200 1.88 1.20 0.72 h: 0.9 Reub 0.1 30x60 1 ID_12
A1-14 En Vereda A1 14 Renov 0.65 SI 6.53 P TN Prestamo HDPE 200 1.88 1.20 h: 0.9 Reub 0.1 30x60 1 ID_10
A1-14A En Vereda A1 14A Renov 0.80 SI 6.58 P TN Prestamo HDPE 200 1.88 1.20 h: 0.9 Reub 0.1 30x60 1 ID_9
A1-15 En Vereda A1 15 Renov 0.84 SI 7.57 P TN Prestamo HDPE 200 2.30 h: 0.9 Reub 0.1 30x60 1 ID_11
M1-17B En Vereda M1 17B Renov 1.23 SI 5.48 P TN Prestamo HDPE 200 1.38 1.52 h: 1.5 Reub 1.01 30x60 1 ID_267
M1-19 En Vereda M1 19 Renov 0.80 SI 5.80 P TN Prestamo HDPE 200 1.38 2.23 h: 0.9 Reub 0.1 30x60 1 ID_265
M1-18 En Vereda M1 18 Renov 0.80 SI 5.48 P TN Prestamo HDPE 200 1.38 1.66 0.78 h: 0.9 Reub 0.1 30x60 1 ID_266
M1-17 En Vereda M1 17 Renov 1.18 SI 5.56 P TN Prestamo HDPE 200 1.38 1.59 h: 1.2 Reub 1.01 30x60 1 ID_268
M1-16 Dentro del LP M1 16 Reub 0.80 NO 5.60 P TN Prestamo HDPE 200 1.38 1.45 h: 0.9 Reub 0.1 30x60 1 ID_269
M1-15 Dentro del LP M1 15 Reub 0.80 NO 5.52 P TN Prestamo HDPE 200 1.38 2.45 h: 0.9 Reub 0.1 30x60 1 ID_270
M1-14 En Vereda M1 14 Renov 1.04 SI 5.48 P TN Prestamo HDPE 200 1.38 0.62 2.03 h: 1.2 Reub 1.01 30x60 1 ID_271

Página 92 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADO DE CONEXIONES DOMICILIARIAS DE ALCANTARILLADO CAMBIADAS


MOVIMIENTO DE TIERRA COLECTOR CORTE Y REPOSICION

ADOQUINA

ADOQUINA
PAVIMENT

PAVIMENT
TIPO DE RELLENO

ESCALERA
O MIXTO 1

SARDINEL
Ubicación de la Altura de la Demolición de N_LAMIN

FLEXIBLE

DA (m2)
VEREDA
VEREDA
DA(m2)

BERMA
RAMPA

RAMPA

JARDIN
Manzana Lote NUEVA o REHAB LONG MAQUINA o Material del Diametro del Rango de

(m2)

(m2)

(m2)

(m2)

(m2)
(m2)

(M2)
Conexión Existente Caja Registro Caja? A SUELO (PRESTAMO ALT EXCAV DIM. CAJA ID_ CAD

O
PULSO Colector Colector profundidad
(Excavación) O PROPIO)
M1-13 En Vereda M1 13 Renov 0.80 SI 5.15 P TN Prestamo HDPE 200 1.38 1.02 1.34 h: 0.9 Reub 0.1 30x60 1 ID_272
M1-12 En Vereda M1 12 Renov 1.03 SI 5.14 P TN Prestamo HDPE 200 1.38 0.81 1.21 h: 1.2 Reub 1.01 30x60 1 ID_273
M1-7 En Vereda M1 7 Renov 0.80 SI 3.72 P TN Prestamo HDPE 200 2.30 h: 0.9 Reub 0.1 30x60 1 ID_278
M1-10 En Vereda M1 10 Renov 1.25 SI 4.84 P TN Prestamo HDPE 200 1.38 0.73 1.26 h: 1.5 Reub 1.01 30x60 1 ID_275
M1-11 No Ubic M1 11 Renov 0.80 SI 4.83 P TN Prestamo HDPE 200 1.38 h: 0.9 Reub 0.1 30x60 1 ID_274
M1-9 No Ubic M1 9 Renov 0.80 SI 4.95 P TN Prestamo HDPE 200 2.30 h: 0.9 Reub 0.1 30x60 1 ID_276
M1-8 No Ubic M1 8 Renov 0.80 SI 5.08 P TN Prestamo HDPE 200 2.30 h: 0.9 Reub 0.1 30x60 1 ID_277
M1-6 No Ubic M1 6 Renov 0.80 SI 6.21 P TN Prestamo HDPE 200 2.30 h: 0.9 Reub 0.1 30x60 1 ID_279
Z-1 En Vereda Z 1 Renov 0.80 SI 11.03 P TN Prestamo HDPE 250 2.40 1.44 h: 0.9 Reub 0.1 30x60 1 ID_15
X1-2 No Ubic X1 2 Renov 0.80 SI 2.98 P TN Prestamo HDPE 200 1.08 1.47 h: 0.9 Reub 0.1 30x60 1 ID_37
X1-3 Dentro del LP X1 3 Reub 0.80 NO 3.95 P TN Prestamo HDPE 200 1.20 h: 0.9 Reub 0.1 30x60 1 ID_38
X1-4 Dentro del LP X1 4 Reub 0.83 NO 4.79 P TN Prestamo HDPE 200 2.07 1.28 h: 0.9 Reub 0.1 30x60 1 ID_39
X1-5 En Vereda X1 5 Renov 0.94 SI 5.57 P TN Prestamo HDPE 200 2.07 h: 1.2 Reub 0.1 30x60 1 ID_40
X1-6 En Vereda X1 6 Renov 1.11 SI 5.16 P TN Prestamo HDPE 200 2.07 h: 1.2 Reub 1.01 30x60 1 ID_41
X1-7 Dentro del LP X1 7 Reub 0.80 NO 5.05 P TN Prestamo HDPE 200 2.07 h: 0.9 Reub 0.1 30x60 1 ID_42
X1-8 En Vereda X1 8 Renov 0.80 SI 4.70 P TN Prestamo HDPE 200 2.07 h: 0.9 Reub 0.1 30x60 1 ID_43
X1-9 No Ubic X1 9 Renov 0.80 SI 4.84 P TN Prestamo HDPE 200 1.80 1.00 h: 0.9 Reub 0.1 30x60 1 ID_572
X1-10 En Vereda X1 10 Renov 0.80 SI 4.49 P TN Prestamo HDPE 200 1.80 1.00 h: 0.9 Reub 0.1 30x60 1 ID_571
X1-11 En Vereda X1 11 Renov 1.02 SI 4.40 P TN Prestamo HDPE 200 1.80 1.00 h: 1.2 Reub 1.01 30x60 1 ID_573
X1-12 En Vereda X1 12 Renov 0.95 SI 4.11 P TN Prestamo HDPE 200 1.80 1.00 h: 1.2 Reub 0.1 30x60 1 ID_574
X-14 En Vereda X 14 Renov 0.80 SI 5.85 P TN Prestamo HDPE 200 2.07 1.00 h: 0.9 Reub 0.1 30x60 1 ID_55
X-13 Dentro del LP X 13 Reub 0.80 NO 5.71 P TN Prestamo HDPE 200 2.07 0.54 1.00 1.60 h: 0.9 Reub 0.1 30x60 1 ID_57
X-12 Dentro del LP X 12 Reub 0.95 NO 6.57 P TN Prestamo HDPE 200 2.07 1.00 h: 1.2 Reub 0.1 30x60 1 ID_58
X-11 En Vereda X 11 Renov 1.04 SI 6.29 P TN Prestamo HDPE 200 2.07 1.54 h: 1.2 Reub 1.01 30x60 1 ID_59
X-10 En Vereda X 10 Renov 0.80 SI 5.37 P TN Prestamo HDPE 200 2.07 1.00 h: 0.9 Reub 0.1 30x60 1 ID_60
X-9 No Ubic X 9 Renov 0.80 SI 5.15 P TN Prestamo HDPE 200 1.38 0.54 1.00 1.60 h: 0.9 Reub 0.1 30x60 1 ID_61
X-8 En Vereda X 8 Renov 0.80 SI 4.73 P TN Prestamo HDPE 200 1.38 1.00 h: 0.9 Reub 0.1 30x60 1 ID_62
X-7 Dentro del LP X 7 Reub 0.90 NO 4.66 P TN Prestamo HDPE 200 1.38 1.54 h: 0.9 Reub 0.1 30x60 1 ID_63
X-6 En Vereda X 6 Renov 0.80 SI 4.94 P TN Prestamo HDPE 200 2.37 1.00 h: 0.9 Reub 0.1 30x60 1 ID_64
X-5 En Vereda X 5 Renov 0.80 SI 5.87 P TN Prestamo HDPE 200 2.37 1.54 h: 0.9 Reub 0.1 30x60 1 ID_65
X-4A En Vereda X 4A Renov 0.98 SI 6.36 P TN Prestamo HDPE 200 2.37 1.00 h: 1.2 Reub 0.1 30x60 1 ID_56
X-1 En Vereda X 1 Renov 1.12 SI 6.38 P TN Prestamo HDPE 200 2.00 1.00 h: 1.2 Reub 1.01 30x60 1 ID_45
X-24 En Vereda X 24 Renov 0.80 SI 5.75 P TN Prestamo HDPE 200 2.00 h: 0.9 Reub 0.1 30x60 1 ID_46
X-23 En Vereda X 23 Renov 0.83 SI 5.76 P TN Prestamo HDPE 200 2.00 h: 0.9 Reub 0.1 30x60 1 ID_47
X-22 En Vereda X 22 Renov 0.97 SI 5.90 P TN Prestamo HDPE 200 2.00 1.00 0.53 h: 1.2 Reub 0.1 30x60 1 ID_48
X-21 En Vereda X 21 Renov 0.80 SI 5.61 P TN Prestamo HDPE 200 2.00 h: 0.9 Reub 0.1 30x60 1 ID_49
X-20A En Vereda X 20A Renov 0.99 SI 5.48 P TN Prestamo HDPE 200 2.00 1.63 h: 1.2 Reub 0.1 30x60 1 ID_44
X-20 En Vereda X 20 Renov 0.80 SI 6.09 P TN Prestamo HDPE 200 2.00 h: 0.9 Reub 0.1 30x60 1 ID_50
X-19 En Vereda X 19 Renov 1.02 SI 5.67 P TN Prestamo HDPE 200 1.77 h: 1.2 Reub 1.01 30x60 1 ID_51
X-18 Dentro del LP X 18 Reub 0.81 NO 6.13 P TN Prestamo HDPE 200 1.77 h: 0.9 Reub 0.1 30x60 1 ID_52
X-17 No Ubic X 17 Renov 0.80 SI 6.10 P TN Prestamo HDPE 200 1.77 0.53 1.60 h: 0.9 Reub 0.1 30x60 1 ID_53
X-16 No Ubic X 16 Renov 0.80 SI 5.92 P TN Prestamo HDPE 200 1.77 h: 0.9 Reub 0.1 30x60 1 ID_54
Z-13 En Vereda Z 13 Renov 1.13 SI 6.80 P TN Prestamo HDPE 200 1.77 1.20 h: 1.2 Reub 1.01 30x60 1 ID_14
Z-12 En Vereda Z 12 Renov 0.70 SI 6.33 P TN Prestamo HDPE 200 1.77 1.60 h: 0.9 Reub 0.1 30x60 1 ID_36
Z-11 En Vereda Z 11 Renov 0.80 SI 6.23 P TN Prestamo HDPE 200 1.77 0.60 1.00 h: 0.9 Reub 0.1 30x60 1 ID_34
Z-10 En Vereda Z 10 Renov 0.75 SI 6.02 P TN Prestamo HDPE 200 1.77 0.30 h: 0.9 Reub 0.1 30x60 1 ID_35
Z-9 Dentro del LP Z 9 Reub 0.80 NO 5.83 P TN Prestamo HDPE 200 2.00 1.20 h: 0.9 Reub 0.1 30x60 1 ID_33
Z-8 En Vereda Z 8 Renov 0.80 SI 5.06 P TN Prestamo HDPE 200 2.00 1.60 h: 0.9 Reub 0.1 30x60 1 ID_32
Z-7 Dentro del LP Z 7 Reub 0.80 NO 6.52 P TN Prestamo HDPE 200 2.00 h: 0.9 Reub 0.1 30x60 1 ID_31
Z-6 Dentro del LP Z 6 Reub 0.80 NO 7.27 P TN Prestamo HDPE 200 2.00 h: 0.9 Reub 0.1 30x60 1 ID_30
Z-5 En Vereda Z 5 Renov 1.10 SI 5.79 P TN Prestamo HDPE 200 2.00 1.20 h: 1.2 Reub 1.01 30x60 1 ID_29
Z-4A En Vereda Z 4A Renov 1.00 SI 4.86 P TN Prestamo HDPE 200 2.00 1.72 h: 1.2 Reub 0.1 30x60 1 ID_28
Z-4C En Vereda Z 4C Renov 0.80 SI 6.03 P TN Prestamo HDPE 200 2.00 0.60 1.20 1.60 h: 0.9 Reub 0.1 30x60 1 ID_27
Z-3 En Vereda Z 3 Renov 0.70 SI 8.43 P TN Prestamo HDPE 250 2.24 1.08 1.72 h: 0.9 Reub 0.1 30x60 1 ID_26
Z-2 No Ubic Z 2 Renov 0.80 SI 9.66 P TN Prestamo HDPE 250 2.24 1.20 h: 0.9 Reub 0.1 30x60 1 ID_25
Z-25 No Ubic Z 25 Renov 0.80 SI 6.64 P TN Prestamo HDPE 200 1.74 1.10 h: 0.9 Reub 0.1 30x60 1 ID_24
Z-24 En Vereda Z 24 Renov 0.80 SI 5.50 P TN Prestamo HDPE 200 1.82 0.60 1.10 1.60 h: 0.9 Reub 0.1 30x60 1 ID_23
Z-23 No Ubic Z 23 Renov 0.80 SI 6.60 P TN Prestamo HDPE 200 1.82 0.60 1.72 h: 0.9 Reub 0.1 30x60 1 ID_22
Z-22 Dentro del LP Z 22 Reub 0.80 NO 6.62 P TN Prestamo HDPE 200 1.82 0.60 1.20 1.60 h: 0.9 Reub 0.1 30x60 1 ID_21
Z-21 En Vereda Z 21 Renov 0.80 SI 6.71 P TN Prestamo HDPE 200 1.74 0.60 1.72 1.60 h: 0.9 Reub 0.1 30x60 1 ID_20
Z-20 En Vereda Z 20 Renov 0.80 SI 9.34 P TN Prestamo HDPE 200 1.74 0.60 2.50 1.60 h: 0.9 Reub 0.1 30x60 1 ID_19
Z-19 Dentro del LP Z 19 Reub 1.13 NO 10.94 P TN Prestamo HDPE 200 1.82 0.60 2.80 1.60 h: 1.2 Reub 1.01 30x60 1 ID_18
Z-18 En Vereda Z 18 Renov 0.80 SI 10.76 P TN Prestamo HDPE 200 1.82 0.60 3.40 1.60 h: 0.9 Reub 0.1 30x60 1 ID_17
Z-17 En Vereda Z 17 Renov 0.80 SI 12.97 P TN Prestamo HDPE 200 1.82 2.40 2.80 h: 0.9 Reub 0.1 30x60 1 ID_16
K2-13-14 No Ubic K2 13-14 Renov 0.80 SI 7.00 P TN Prestamo HDPE 200 h: 0.9 Reub 0.1 30x60 1 ID_338
K2-9 En Vereda K2 9 Renov 0.75 SI 6.54 P TN Prestamo HDPE 200 h: 0.9 Reub 0.1 30x60 1 ID_342
K2-10 En Vereda K2 10 Renov 1.04 SI 6.51 P TN Prestamo HDPE 200 1.00 h: 1.2 Reub 1.01 30x60 1 ID_341
K2-11 No Ubic K2 11 Renov 0.80 SI 6.37 P TN Prestamo HDPE 200 h: 0.9 Reub 0.1 30x60 1 ID_340
K2-12A En Vereda K2 12A Renov 0.80 SI 5.96 P TN Prestamo HDPE 200 1.20 h: 0.9 Reub 0.1 30x60 1 ID_339
K2-15 En Vereda K2 15 Renov 1.23 SI 5.80 P TN Prestamo HDPE 200 1.20 h: 1.5 Reub 1.01 30x60 1 ID_337
K2-16 En Vereda K2 16 Renov 0.80 SI 6.12 P TN Prestamo HDPE 200 h: 0.9 Reub 0.1 30x60 1 ID_336
K2-29 No Ubic K2 29 Renov 0.80 SI 8.92 P TN Prestamo HDPE 250 2.20 h: 0.9 Reub 0.1 30x60 1 ID_346
K2-19 En Vereda K2 19 Renov 1.30 SI 9.77 P TN Prestamo HDPE 250 2.05 1.00 h: 1.5 Reub 1.26 30x60 1 ID_356
K2-20 Dentro del LP K2 20 Reub 1.65 NO 9.01 P TN Prestamo HDPE 250 2.05 1.00 h: 1.8 Reub 1.51 60x60 1 ID_355
K2-21 Dentro del LP K2 21 Reub 1.40 NO 9.08 P TN Prestamo HDPE 250 2.05 1.68 1.20 h: 1.5 Reub 1.26 30x60 1 ID_354
K2-22 Dentro del LP K2 22 Reub 0.80 NO 8.85 P TN Prestamo HDPE 250 2.05 h: 0.9 Reub 0.1 30x60 1 ID_353
K2-23 Dentro del LP K2 23 Reub 0.80 NO 9.23 P TN Prestamo HDPE 250 2.05 1.00 h: 0.9 Reub 0.1 30x60 1 ID_352
K2-24 Dentro del LP K2 24 Reub 1.15 NO 9.40 P TN Prestamo HDPE 250 2.05 h: 1.2 Reub 1.01 30x60 1 ID_351
K2-25 Dentro del LP K2 25 Reub 1.14 NO 9.59 P TN Prestamo HDPE 250 2.05 1.20 h: 1.2 Reub 1.01 30x60 1 ID_350
K2-26 En Vereda K2 26 Renov 1.49 SI 9.25 P TN Prestamo HDPE 250 2.05 0.72 h: 1.5 Reub 1.26 30x60 1 ID_349
K2-27 Dentro del LP K2 27 Reub 1.26 NO 9.48 P TN Prestamo HDPE 250 2.20 1.21 h: 1.5 Reub 1.26 30x60 1 ID_348
K2-28 En Vereda K2 28 Renov 1.04 SI 9.13 P TN Prestamo HDPE 250 2.20 1.20 h: 1.2 Reub 1.01 30x60 1 ID_347
K2-31 Dentro del LP K2 31 Reub 1.26 NO 8.12 P TN Prestamo HDPE 250 2.20 0.96 1.92 h: 1.5 Reub 1.26 30x60 1 ID_344
P-17 Dentro del LP P 17 Reub 0.80 NO 8.58 P TN Prestamo HDPE 200 1.80 1.42 1.27 h: 0.9 Reub 0.1 30x60 1 ID_240
P-16 Dentro del LP P 16 Reub 0.80 NO 8.54 P TN Prestamo HDPE 200 1.80 1.41 1.33 h: 0.9 Reub 0.1 30x60 1 ID_241
P-15 Dentro del LP P 15 Reub 0.78 NO 8.61 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_242
P-14 En Vereda P 14 Renov 0.80 SI 8.00 P TN Prestamo HDPE 200 1.80 1.39 1.35 h: 0.9 Reub 0.1 30x60 1 ID_243
P-14A En Vereda P 14A Renov 0.80 SI 7.76 P TN Prestamo HDPE 200 1.80 1.38 1.82 1.60 h: 0.9 Reub 0.1 30x60 1 ID_244
P-13 En Vereda P 13 Renov 0.95 SI 8.44 P TN Prestamo HDPE 200 1.80 1.62 1.50 h: 1.2 Reub 0.1 30x60 1 ID_245
P-12 No Ubic P 12 Renov 0.80 SI 8.60 P TN Prestamo HDPE 200 1.86 h: 0.9 Reub 0.1 30x60 1 ID_246
P-11 No Ubic P 11 Renov 0.80 SI 8.31 P TN Prestamo HDPE 200 1.86 1.34 1.00 h: 0.9 Reub 0.1 30x60 1 ID_247
P-10 Dentro del LP P 10 Reub 0.80 NO 8.13 P TN Prestamo HDPE 200 1.80 1.32 1.08 h: 0.9 Reub 0.1 30x60 1 ID_218
P-9 En Vereda P 9 Renov 1.20 SI 7.92 P TN Prestamo HDPE 200 1.80 1.38 1.59 h: 1.2 Reub 1.01 30x60 1 ID_219
P-8 En Vereda P 8 Renov 0.80 SI 7.46 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_220
P-7 En Vereda P 7 Renov 1.20 SI 7.73 P TN Prestamo HDPE 200 1.86 1.44 1.09 h: 1.2 Reub 1.01 30x60 1 ID_221
P-6 Dentro del LP P 6 Reub 0.80 NO 6.82 P TN Prestamo HDPE 200 1.86 h: 0.9 Reub 0.1 30x60 1 ID_222
P-5 En Vereda P 5 Renov 0.80 SI 7.65 P TN Prestamo HDPE 200 1.86 h: 0.9 Reub 0.1 30x60 1 ID_223
P-4 En Vereda P 4 Renov 1.00 SI 7.37 P TN Prestamo HDPE 200 1.80 1.74 h: 1.2 Reub 0.1 30x60 1 ID_217
K-1A En Vereda K 1A Renov 1.20 SI 6.70 P TN Prestamo HDPE 200 1.80 h: 1.2 Reub 1.01 30x60 1 ID_397
K-2 Dentro del LP K 2 Reub 1.10 NO 7.01 P TN Prestamo HDPE 200 1.80 1.41 1.05 h: 1.2 Reub 1.01 30x60 1 ID_396
K-4 Dentro del LP K 4 Reub 1.10 NO 6.90 P TN Prestamo HDPE 200 1.80 1.43 1.20 h: 1.2 Reub 1.01 30x60 1 ID_394
K-5 Dentro del LP K 5 Reub 1.30 NO 6.84 P TN Prestamo HDPE 200 1.80 1.43 1.15 h: 1.5 Reub 1.26 30x60 1 ID_393
K-6 Dentro del LP K 6 Reub 0.80 NO 6.60 P TN Prestamo HDPE 200 1.80 1.20 h: 0.9 Reub 0.1 30x60 1 ID_392
K-7 Dentro del LP K 7 Reub 0.80 NO 7.04 P TN Prestamo HDPE 200 1.80 2.04 1.22 h: 0.9 Reub 0.1 30x60 1 ID_391
K-8 Dentro del LP K 8 Reub 0.95 NO 7.16 P TN Prestamo HDPE 200 1.80 1.44 1.25 h: 1.2 Reub 0.1 30x60 1 ID_390
K-9 No Ubic K 9 Renov 0.80 SI 7.28 P TN Prestamo HDPE 200 1.80 1.54 1.20 h: 0.9 Reub 0.1 30x60 1 ID_389

Página 93 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADO DE CONEXIONES DOMICILIARIAS DE ALCANTARILLADO CAMBIADAS


MOVIMIENTO DE TIERRA COLECTOR CORTE Y REPOSICION

ADOQUINA

ADOQUINA
PAVIMENT

PAVIMENT
TIPO DE RELLENO

ESCALERA
O MIXTO 1

SARDINEL
Ubicación de la Altura de la Demolición de N_LAMIN

FLEXIBLE

DA (m2)
VEREDA
VEREDA
DA(m2)

BERMA
RAMPA

RAMPA

JARDIN
Manzana Lote NUEVA o REHAB LONG MAQUINA o Material del Diametro del Rango de

(m2)

(m2)

(m2)

(m2)

(m2)
(m2)

(M2)
Conexión Existente Caja Registro Caja? A SUELO (PRESTAMO ALT EXCAV DIM. CAJA ID_ CAD

O
PULSO Colector Colector profundidad
(Excavación) O PROPIO)
D-1A No Ubic D 1A Renov 0.80 SI 8.34 P TN Prestamo HDPE 200 1.98 1.20 1.10 h: 0.9 Reub 0.1 30x60 1 ID_535
D-2A En Vereda D 2A Renov 0.86 SI 6.93 P TN Prestamo HDPE 200 1.98 1.05 1.30 h: 0.9 Reub 0.1 30x60 1 ID_534
D-2 En Vereda D 2 Renov 0.55 SI 6.99 P TN Prestamo HDPE 200 1.98 1.28 0.72 0.24 h: 0.6 Reub 0.1 30x60 1 ID_533
D-3 Dentro del LP D 3 Reub 0.80 NO 8.50 P TN Prestamo HDPE 200 1.50 2.52 1.30 1.60 h: 0.9 Reub 0.1 30x60 1 ID_532
D-4 No Ubic D 4 Renov 0.80 SI 8.39 P TN Prestamo HDPE 200 1.50 1.25 2.52 h: 0.9 Reub 0.1 30x60 1 ID_531
D-5 Dentro del LP D 5 Reub 0.80 NO 8.49 P TN Prestamo HDPE 200 1.50 2.46 1.25 h: 0.9 Reub 0.1 30x60 1 ID_530
D-6 Dentro del LP D 6 Reub 1.05 NO 9.10 P TN Prestamo HDPE 200 1.50 2.46 1.10 h: 1.2 Reub 1.01 30x60 1 ID_529
D-7 No Ubic D 7 Renov 0.80 SI 8.54 P TN Prestamo HDPE 200 1.50 2.46 1.30 h: 0.9 Reub 0.1 30x60 1 ID_528
D-8 No Ubic D 8 Renov 0.80 SI 8.63 P TN Prestamo HDPE 200 1.50 1.25 2.46 h: 0.9 Reub 0.1 30x60 1 ID_527
D-9 Dentro del LP D 9 Reub 0.95 NO 8.68 P TN Prestamo HDPE 200 1.50 1.25 2.46 h: 1.2 Reub 0.1 30x60 1 ID_526
D-10 No Ubic D 10 Renov 0.80 SI 8.67 P TN Prestamo HDPE 200 1.50 1.26 h: 0.9 Reub 0.1 30x60 1 ID_525
D-11 No Ubic D 11 Renov 0.80 SI 8.57 P TN Prestamo HDPE 200 1.50 1.25 2.46 h: 0.9 Reub 0.1 30x60 1 ID_524
D-12 En Vereda D 12 Renov 0.80 SI 8.78 P TN Prestamo HDPE 200 1.50 1.25 2.46 h: 0.9 Reub 0.1 30x60 1 ID_523
D-13 Dentro del LP D 13 Reub 1.10 NO 8.29 P TN Prestamo HDPE 200 1.50 2.46 1.25 h: 1.2 Reub 1.01 30x60 1 ID_522
D-14 Dentro del LP D 14 Reub 1.00 NO 8.69 P TN Prestamo HDPE 200 1.50 2.46 1.25 h: 1.2 Reub 0.1 30x60 1 ID_521
D-15 Dentro del LP D 15 Reub 0.95 NO 9.58 P TN Prestamo HDPE 200 1.50 2.46 1.30 h: 1.2 Reub 0.1 30x60 1 ID_520
D-16 Dentro del LP D 16 Reub 0.95 NO 9.82 P TN Prestamo HDPE 200 1.50 2.46 1.30 h: 1.2 Reub 0.1 30x60 1 ID_519
D-17 Dentro del LP D 17 Reub 0.82 NO 9.81 P TN Prestamo HDPE 200 1.50 2.46 1.30 h: 0.9 Reub 0.1 30x60 1 ID_518
D-18 Dentro del LP D 18 Reub 0.80 NO 9.44 P TN Prestamo HDPE 200 1.50 2.46 1.30 h: 0.9 Reub 0.1 30x60 1 ID_517
D-19 En Vereda D 19 Renov 0.90 SI 8.19 P TN Prestamo HDPE 200 1.98 1.20 2.10 h: 0.9 Reub 0.1 30x60 1 ID_516
D-1 No Ubic D 1 Renov 0.80 SI 7.18 P TN Prestamo HDPE 200 1.92 1.38 1.20 h: 0.9 Reub 0.1 30x60 1 ID_557
D-36 En Vereda D 36 Renov 0.80 SI 7.59 P TN Prestamo HDPE 200 1.92 3.72 1.10 h: 0.9 Reub 0.1 30x60 1 ID_499
D-35 En Vereda D 35 Renov 1.12 SI 7.28 P TN Prestamo HDPE 200 1.92 1.98 h: 1.2 Reub 1.01 30x60 1 ID_500
D-34 En Vereda D 34 Renov 1.30 SI 7.75 P TN Prestamo HDPE 200 1.92 1.32 0.18 1.60 h: 1.5 Reub 1.26 30x60 1 ID_501
D-33 No Ubic D 33 Renov 0.80 SI 7.70 P TN Prestamo HDPE 200 1.92 2.04 h: 0.9 Reub 0.1 30x60 1 ID_502
D-32 No Ubic D 32 Renov 0.80 SI 7.03 P TN Prestamo HDPE 200 1.92 1.14 1.30 h: 0.9 Reub 0.1 30x60 1 ID_503
D-31 No Ubic D 31 Renov 0.80 SI 6.98 P TN Prestamo HDPE 200 1.92 1.20 1.10 h: 0.9 Reub 0.1 30x60 1 ID_504
D-30 Dentro del LP D 30 Reub 0.80 NO 7.08 P TN Prestamo HDPE 200 1.92 1.20 1.35 1.60 h: 0.9 Reub 0.1 30x60 1 ID_505
D-29 No Ubic D 29 Renov 0.80 SI 7.00 P TN Prestamo HDPE 200 1.92 1.30 1.08 h: 0.9 Reub 0.1 30x60 1 ID_506
D-28 Dentro del LP D 28 Reub 0.80 NO 6.83 P TN Prestamo HDPE 200 1.92 1.08 1.30 h: 0.9 Reub 0.1 30x60 1 ID_507
D-27 Dentro del LP D 27 Reub 0.80 NO 6.70 P TN Prestamo HDPE 200 1.92 1.00 1.30 h: 0.9 Reub 0.1 30x60 1 ID_508
D-26 Dentro del LP D 26 Reub 0.80 NO 6.79 P TN Prestamo HDPE 200 1.92 1.00 1.45 h: 0.9 Reub 0.1 30x60 1 ID_509
D-25 En Vereda D 25 Renov 0.90 SI 6.80 P TN Prestamo HDPE 200 1.92 1.05 1.55 h: 0.9 Reub 0.1 30x60 1 ID_510
D-24 En Vereda D 24 Renov 0.80 SI 6.81 P TN Prestamo HDPE 200 1.92 1.74 0.90 h: 0.9 Reub 0.1 30x60 1 ID_511
D-23 En Vereda D 23 Renov 0.80 SI 6.79 P TN Prestamo HDPE 200 1.92 1.26 1.25 h: 0.9 Reub 0.1 30x60 1 ID_512
D-22 No Ubic D 22 Renov 0.80 SI 7.05 P TN Prestamo HDPE 200 1.92 1.32 1.30 h: 0.9 Reub 0.1 30x60 1 ID_513
D-21 No Ubic D 21 Renov 0.80 SI 6.75 P TN Prestamo HDPE 200 1.92 0.95 1.56 h: 0.9 Reub 0.1 30x60 1 ID_514
D-20 Dentro del LP D 20 Reub 0.80 NO 7.22 P TN Prestamo HDPE 200 1.98 1.20 2.90 h: 0.9 Reub 0.1 30x60 1 ID_515
A-36 No Ubic A 36 Renov 0.80 SI 7.00 P TN Prestamo HDPE 200 1.86 h: 0.9 Reub 0.1 30x60 1 ID_575
A-35 Dentro del LP A 35 Reub 0.80 NO 7.64 P TN Prestamo HDPE 200 1.86 h: 0.9 Reub 0.1 30x60 1 ID_576
A-34 No Ubic A 34 Renov 0.80 SI 6.91 P TN Prestamo HDPE 200 1.86 1.26 1.29 h: 0.9 Reub 0.1 30x60 1 ID_577
A-33 No Ubic A 33 Renov 0.80 SI 6.98 P TN Prestamo HDPE 200 1.86 1.26 1.09 h: 0.9 Reub 0.1 30x60 1 ID_578
A-32 En Vereda A 32 Renov 0.85 SI 7.35 P TN Prestamo HDPE 200 1.80 1.46 h: 0.9 Reub 0.1 30x60 1 ID_579
A-31 Dentro del LP A 31 Reub 0.97 NO 7.14 P TN Prestamo HDPE 200 1.86 1.04 1.20 h: 1.2 Reub 0.1 30x60 1 ID_580
A-30 No Ubic A 30 Renov 0.80 SI 7.07 P TN Prestamo HDPE 200 1.86 0.99 1.24 1.60 h: 0.9 Reub 0.1 30x60 1 ID_581
A-29 Dentro del LP A 29 Reub 0.80 NO 6.70 P TN Prestamo HDPE 200 1.86 1.12 1.20 h: 0.9 Reub 0.1 30x60 1 ID_582
A-28 No Ubic A 28 Renov 0.80 SI 7.05 P TN Prestamo HDPE 200 1.80 1.20 h: 0.9 Reub 0.1 30x60 1 ID_583
A-27 Dentro del LP A 27 Reub 0.80 NO 6.91 P TN Prestamo HDPE 200 1.86 1.14 1.13 h: 0.9 Reub 0.1 30x60 1 ID_584
A-26 En Vereda A 26 Renov 1.15 SI 7.01 P TN Prestamo HDPE 200 2.04 1.00 1.04 h: 1.2 Reub 1.01 30x60 1 ID_585
A-25 Dentro del LP A 25 Reub 1.15 NO 6.71 P TN Prestamo HDPE 200 1.80 1.72 h: 1.2 Reub 1.01 30x60 1 ID_586
A-24 No Ubic A 24 Renov 0.80 SI 6.59 P TN Prestamo HDPE 200 1.80 1.96 h: 0.9 Reub 0.1 30x60 1 ID_587
A-23 No Ubic A 23 Renov 0.80 SI 6.84 P TN Prestamo HDPE 200 1.80 2.04 h: 0.9 Reub 0.1 30x60 1 ID_588
A-22 Dentro del LP A 22 Reub 1.03 NO 6.70 P TN Prestamo HDPE 200 1.80 h: 1.2 Reub 1.01 30x60 1 ID_589
A-1 En Vereda A 1 Renov 1.00 SI 7.47 P TN Prestamo HDPE 200 1.68 1.98 1.20 h: 1.2 Reub 0.1 30x60 1 ID_606
A-2 Dentro del LP A 2 Reub 1.00 NO 8.47 P TN Prestamo HDPE 200 1.80 1.97 1.18 h: 1.2 Reub 0.1 30x60 1 ID_605
A-3 Dentro del LP A 3 Reub 1.00 NO 7.59 P TN Prestamo HDPE 200 1.80 1.95 1.20 h: 1.2 Reub 0.1 30x60 1 ID_604
B-1 En Vereda B 1 Renov 0.90 SI 7.58 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_570
B-2 Dentro del LP B 2 Reub 0.98 NO 8.05 P TN Prestamo HDPE 200 1.80 1.26 1.20 h: 1.2 Reub 0.1 30x60 1 ID_569
B-3 Dentro del LP B 3 Reub 0.70 NO 8.05 P TN Prestamo HDPE 200 1.80 1.23 1.17 h: 0.9 Reub 0.1 30x60 1 ID_568
B-4 En Vereda B 4 Renov 0.95 SI 7.19 P TN Prestamo HDPE 200 1.80 1.26 1.08 h: 1.2 Reub 0.1 30x60 1 ID_567
B-5 En Vereda B 5 Renov 0.92 SI 7.54 P TN Prestamo HDPE 200 1.74 1.28 1.26 h: 1.2 Reub 0.1 30x60 1 ID_566
B-6 En Vereda B 6 Renov 1.08 SI 7.25 P TN Prestamo HDPE 200 1.74 1.44 1.00 h: 1.2 Reub 1.01 30x60 1 ID_565
B-7 Dentro del LP B 7 Reub 0.80 NO 7.92 P TN Prestamo HDPE 200 1.80 1.38 0.90 h: 0.9 Reub 0.1 30x60 1 ID_564
B-8 En Vereda B 8 Renov 0.92 SI 7.34 P TN Prestamo HDPE 200 1.80 1.10 h: 1.2 Reub 0.1 30x60 1 ID_563
B-9 En Vereda B 9 Renov 0.90 SI 7.55 P TN Prestamo HDPE 200 1.98 h: 0.9 Reub 0.1 30x60 1 ID_562
B-10 En Vereda B 10 Renov 1.34 SI 6.67 P TN Prestamo HDPE 200 1.92 1.26 1.10 h: 1.5 Reub 1.26 30x60 1 ID_561
B-11 No Ubic B 11 Renov 0.80 SI 8.26 P TN Prestamo HDPE 200 1.98 1.23 1.20 h: 0.9 Reub 0.1 30x60 1 ID_560
B-12 En Vereda B 12 Renov 0.70 SI 6.92 P TN Prestamo HDPE 200 1.98 h: 0.9 Reub 0.1 30x60 1 ID_559
A-4 En Vereda A 4 Renov 1.05 SI 7.98 P TN Prestamo HDPE 200 1.80 1.38 1.24 h: 1.2 Reub 1.01 30x60 1 ID_603
A-5 Dentro del LP A 5 Reub 0.80 NO 8.56 P TN Prestamo HDPE 200 1.80 1.26 1.30 1.60 h: 0.9 Reub 0.1 30x60 1 ID_602
A-6 No Ubic A 6 Renov 0.80 SI 9.06 P TN Prestamo HDPE 200 1.92 1.05 1.50 h: 0.9 Reub 0.1 30x60 1 ID_601
A-7 Dentro del LP A 7 Reub 1.10 NO 9.06 P TN Prestamo HDPE 200 1.80 1.26 2.24 1.60 h: 1.2 Reub 1.01 30x60 1 ID_600
A-8A Dentro del LP A 8A Reub 0.97 NO 8.94 P TN Prestamo HDPE 200 1.80 1.32 1.26 h: 1.2 Reub 0.1 30x60 1 ID_599
A-8 Dentro del LP A 8 Reub 0.80 NO 8.70 P TN Prestamo HDPE 200 1.86 1.32 1.35 h: 0.9 Reub 0.1 30x60 1 ID_598
A-9 No Ubic A 9 Renov 0.80 SI 8.72 P TN Prestamo HDPE 200 1.86 1.34 1.20 h: 0.9 Reub 0.1 30x60 1 ID_597
A-10 Dentro del LP A 10 Reub 0.94 NO 8.96 P TN Prestamo HDPE 200 1.80 1.32 3.35 h: 1.2 Reub 0.1 30x60 1 ID_596
A-11 Dentro del LP A 11 Reub 1.00 NO 8.66 P TN Prestamo HDPE 200 1.80 1.12 1.44 1.60 h: 1.2 Reub 0.1 30x60 1 ID_595
A-12 No Ubic A 12 Renov 0.80 SI 8.50 P TN Prestamo HDPE 200 1.80 3.22 h: 0.9 Reub 0.1 30x60 1 ID_594
A-13 Dentro del LP A 13 Reub 0.85 NO 8.81 P TN Prestamo HDPE 200 1.80 4.80 h: 0.9 Reub 0.1 30x60 1 ID_593
A-14 Dentro del LP A 14 Reub 0.89 NO 8.42 P TN Prestamo HDPE 200 1.80 1.06 2.70 h: 0.9 Reub 0.1 30x60 1 ID_592
A-15 En Vereda A 15 Renov 0.80 SI 7.92 P TN Prestamo HDPE 200 1.80 1.08 2.25 h: 0.9 Reub 0.1 30x60 1 ID_591
A-16 No Ubic A 16 Renov 0.80 SI 7.01 P TN Prestamo HDPE 200 1.80 2.28 h: 0.9 Reub 0.1 30x60 1 ID_590
C-22 En Vereda C 22 Renov 1.10 SI 7.58 P TN Prestamo HDPE 200 1.92 1.64 1.50 h: 1.2 Reub 1.01 30x60 1 ID_536
C-1 Dentro del LP C 1 Reub 0.80 NO 8.52 P TN Prestamo HDPE 200 1.92 1.38 1.32 h: 0.9 Reub 0.1 30x60 1 ID_537
C-2 En Vereda C 2 Renov 0.80 SI 7.77 P TN Prestamo HDPE 200 1.92 0.22 3.81 h: 0.9 Reub 0.1 30x60 1 ID_538
C-3 No Ubic C 3 Renov 0.80 SI 7.95 P TN Prestamo HDPE 200 1.98 0.54 2.60 h: 0.9 Reub 0.1 30x60 1 ID_539
C-4 No Ubic C 4 Renov 0.80 SI 8.23 P TN Prestamo HDPE 200 1.92 0.65 2.00 h: 0.9 Reub 0.1 30x60 1 ID_540
C-5 En Vereda C 5 Renov 0.80 SI 8.13 P TN Prestamo HDPE 200 1.92 1.20 1.00 h: 0.9 Reub 0.1 30x60 1 ID_541
C-6 Dentro del LP C 6 Reub 1.24 NO 7.90 P TN Prestamo HDPE 200 1.98 1.26 1.12 h: 1.5 Reub 1.01 30x60 1 ID_542
C-7 En Vereda C 7 Renov 1.26 SI 7.41 P TN Prestamo HDPE 200 1.80 2.20 h: 1.5 Reub 1.26 30x60 1 ID_543
C-8 No Ubic C 8 Renov 0.80 SI 7.79 P TN Prestamo HDPE 200 1.80 1.10 h: 0.9 Reub 0.1 30x60 1 ID_544
C-9 En Vereda C 9 Renov 0.95 SI 7.23 P TN Prestamo HDPE 200 1.74 1.34 1.10 h: 1.2 Reub 0.1 30x60 1 ID_545
C-10 No Ubic C 10 Renov 0.80 SI 7.50 P TN Prestamo HDPE 200 1.80 1.38 h: 0.9 Reub 0.1 30x60 1 ID_546
E-8 En Vereda E 8 Renov 0.80 SI 7.27 P TN Prestamo HDPE 200 1.80 1.26 1.20 h: 0.9 Reub 0.1 30x60 1 ID_419
G-20 En Vereda G 20 Renov 0.80 SI 10.17 P TN Prestamo HDPE 200 2.04 1.35 1.35 1.69 1.60 h: 0.9 Reub 0.1 30x60 1 ID_466
G-21 En Vereda G 21 Renov 0.80 SI 10.17 P TN Prestamo HDPE 200 2.04 2.88 1.00 h: 0.9 Reub 0.1 30x60 1 ID_467
G-22 No Ubic G 22 Renov 0.80 SI 7.82 P TN Prestamo HDPE 200 1.86 0.96 1.30 h: 0.9 Reub 0.1 30x60 1 ID_465
H-22C En Vereda H 22C Renov 0.80 SI 7.97 P TN Prestamo HDPE 200 2.34 1.00 1.20 h: 0.9 Reub 0.1 30x60 1 ID_462
H-1A En Vereda H 1A Renov 0.80 SI 7.80 P TN Prestamo HDPE 200 2.34 1.20 1.28 1.60 h: 0.9 Reub 0.1 30x60 1 ID_463
H-1 En Vereda H 1 Renov 0.80 SI 7.10 P TN Prestamo HDPE 200 2.04 1.98 2.35 h: 0.9 Reub 0.1 30x60 1 ID_464
H-2 En Vereda H 2 Renov 0.80 SI 10.32 P TN Prestamo HDPE 200 2.04 3.48 h: 0.9 Reub 0.1 30x60 1 ID_442
H-3 No Ubic H 3 Renov 0.80 SI 9.86 P TN Prestamo HDPE 200 2.04 4.08 h: 0.9 Reub 0.1 30x60 1 ID_441
H-3A En Vereda H 3A Renov 0.80 SI 9.78 P TN Prestamo HDPE 200 2.04 2.04 2.50 h: 0.9 Reub 0.1 30x60 1 ID_440
H-4 En Vereda H 4 Renov 0.90 SI 9.86 P TN Prestamo HDPE 200 2.04 4.25 1.65 h: 0.9 Reub 0.1 30x60 1 ID_439
H-5 En Vereda H 5 Renov 0.80 SI 9.78 P TN Prestamo HDPE 200 2.04 2.16 2.40 h: 0.9 Reub 0.1 30x60 1 ID_443
H-6 En Vereda H 6 Renov 0.80 SI 9.01 P TN Prestamo HDPE 200 2.04 2.40 2.16 h: 0.9 Reub 0.1 30x60 1 ID_444

Página 94 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADO DE CONEXIONES DOMICILIARIAS DE ALCANTARILLADO CAMBIADAS


MOVIMIENTO DE TIERRA COLECTOR CORTE Y REPOSICION

ADOQUINA

ADOQUINA
PAVIMENT

PAVIMENT
TIPO DE RELLENO

ESCALERA
O MIXTO 1

SARDINEL
Ubicación de la Altura de la Demolición de N_LAMIN

FLEXIBLE

DA (m2)
VEREDA
VEREDA
DA(m2)

BERMA
RAMPA

RAMPA

JARDIN
Manzana Lote NUEVA o REHAB LONG MAQUINA o Material del Diametro del Rango de

(m2)

(m2)

(m2)

(m2)

(m2)
(m2)

(M2)
Conexión Existente Caja Registro Caja? A SUELO (PRESTAMO ALT EXCAV DIM. CAJA ID_ CAD

O
PULSO Colector Colector profundidad
(Excavación) O PROPIO)
H-7 En Vereda H 7 Renov 0.78 SI 9.89 P TN Prestamo HDPE 200 2.04 2.10 1.70 h: 0.9 Reub 0.1 30x60 1 ID_445
H-8 En Vereda H 8 Renov 0.80 SI 9.64 P TN Prestamo HDPE 200 2.04 2.10 1.70 h: 0.9 Reub 0.1 30x60 1 ID_446
H-9 En Vereda H 9 Renov 0.80 SI 10.29 P TN Prestamo HDPE 200 2.04 1.45 2.64 h: 0.9 Reub 0.1 30x60 1 ID_447
H-10 En Vereda H 10 Renov 0.94 SI 10.19 P TN Prestamo HDPE 200 2.04 3.48 h: 1.2 Reub 0.1 30x60 1 ID_448
H-11 En Vereda H 11 Renov 0.90 SI 10.29 P TN Prestamo HDPE 200 2.04 1.00 2.76 h: 0.9 Reub 0.1 30x60 1 ID_449
H-22 No Ubic H 22 Renov 0.80 SI 8.75 P TN Prestamo HDPE 200 1.74 0.86 1.07 1.60 h: 0.9 Reub 0.1 30x60 1 ID_461
H-22A En Vereda H 22A Renov 0.80 SI 7.07 P TN Prestamo HDPE 200 1.74 3.27 1.08 h: 0.9 Reub 0.1 30x60 1 ID_460
H-21 Dentro del LP H 21 Reub 0.80 NO 6.70 P TN Prestamo HDPE 200 1.74 2.64 h: 0.9 Reub 0.1 30x60 1 ID_459
H-20 Dentro del LP H 20 Reub 0.80 NO 6.79 P TN Prestamo HDPE 200 1.74 1.02 1.53 h: 0.9 Reub 0.1 30x60 1 ID_458
H-19 Dentro del LP H 19 Reub 0.83 NO 6.98 P TN Prestamo HDPE 200 1.74 1.20 1.20 h: 0.9 Reub 0.1 30x60 1 ID_457
H-18 Dentro del LP H 18 Reub 0.80 NO 7.30 P TN Prestamo HDPE 200 1.74 1.20 1.32 h: 0.9 Reub 0.1 30x60 1 ID_456
H-17 En Vereda H 17 Renov 0.80 SI 6.94 P TN Prestamo HDPE 200 1.74 1.74 1.40 h: 0.9 Reub 0.1 30x60 1 ID_455
H-16 En Vereda H 16 Renov 0.80 SI 6.93 P TN Prestamo HDPE 200 1.74 1.40 1.32 h: 0.9 Reub 0.1 30x60 1 ID_454
H-15 En Vereda H 15 Renov 0.80 SI 6.96 P TN Prestamo HDPE 200 1.74 1.40 1.38 h: 0.9 Reub 0.1 30x60 1 ID_453
H-14 En Vereda H 14 Renov 0.80 SI 7.66 P TN Prestamo HDPE 200 1.74 1.41 1.40 h: 0.9 Reub 0.1 30x60 1 ID_452
H-13 En Vereda H 13 Renov 0.80 SI 7.01 P TN Prestamo HDPE 200 1.74 1.44 1.20 h: 0.9 Reub 0.1 30x60 1 ID_451
H-12 En Vereda H 12 Renov 0.80 SI 6.65 P TN Prestamo HDPE 200 1.86 2.25 h: 0.9 Reub 0.1 30x60 1 ID_450
G-7 Dentro del LP G 7 Reub 0.80 NO 8.10 P TN Prestamo HDPE 200 1.86 0.96 1.00 1.60 h: 0.9 Reub 0.1 30x60 1 ID_474
G-6 Dentro del LP G 6 Reub 1.02 NO 7.95 P TN Prestamo HDPE 200 1.86 1.96 h: 1.2 Reub 1.01 30x60 1 ID_473
G-5 No Ubic G 5 Renov 0.80 SI 7.94 P TN Prestamo HDPE 200 1.86 2.00 h: 0.9 Reub 0.1 30x60 1 ID_472
G-4 No Ubic G 4 Renov 0.80 SI 7.42 P TN Prestamo HDPE 200 1.86 0.90 1.00 h: 0.9 Reub 0.1 30x60 1 ID_471
G-3 En Vereda G 3 Renov 0.80 SI 8.14 P TN Prestamo HDPE 200 1.86 0.90 1.00 h: 0.9 Reub 0.1 30x60 1 ID_470
G-2 No Ubic G 2 Renov 0.80 SI 7.98 P TN Prestamo HDPE 200 1.86 0.90 1.10 h: 0.9 Reub 0.1 30x60 1 ID_469
G-1 Dentro del LP G 1 Reub 0.80 NO 7.71 P TN Prestamo HDPE 200 1.86 0.96 1.20 1.60 h: 0.9 Reub 0.1 30x60 1 ID_468
I-14 Dentro del LP I 14 Reub 0.50 NO 8.68 P TN Prestamo HDPE 200 1.86 1.20 2.34 h: 0.6 Reub 0.1 30x60 1 ID_435
I-15 En Vereda I 15 Renov 1.20 SI 7.58 P TN Prestamo HDPE 200 1.86 1.71 1.70 1.60 h: 1.2 Reub 1.01 30x60 1 ID_436
I-16 En Vereda I 16 Renov 1.14 SI 8.19 P TN Prestamo HDPE 200 1.86 1.80 h: 1.2 Reub 1.01 30x60 1 ID_437
I-17 No Ubic I 17 Renov 0.80 SI 8.00 P TN Prestamo HDPE 200 1.86 6.10 h: 0.9 Reub 0.1 30x60 1 ID_438
I-13 No Ubic I 13 Renov 0.80 SI 8.84 P TN Prestamo HDPE 200 1.86 1.98 h: 0.9 Reub 0.1 30x60 1 ID_434
I-12 Dentro del LP I 12 Reub 0.80 NO 8.22 P TN Prestamo HDPE 200 1.86 1.14 1.20 h: 0.9 Reub 0.1 30x60 1 ID_433
I-11 Dentro del LP I 11 Reub 0.80 NO 8.10 P TN Prestamo HDPE 200 1.86 1.14 2.05 1.60 h: 0.9 Reub 0.1 30x60 1 ID_432
I-10 Dentro del LP I 10 Reub 0.80 NO 7.86 P TN Prestamo HDPE 200 1.86 1.14 1.20 h: 0.9 Reub 0.1 30x60 1 ID_431
I-9 No Ubic I 9 Renov 0.80 SI 7.83 P TN Prestamo HDPE 200 1.86 1.14 1.20 h: 0.9 Reub 0.1 30x60 1 ID_430
I-8 Dentro del LP I 8 Reub 0.85 NO 7.35 P TN Prestamo HDPE 200 1.86 1.14 1.20 1.60 h: 0.9 Reub 0.1 30x60 1 ID_429
I-7 En Vereda I 7 Renov 0.80 SI 7.58 P TN Prestamo HDPE 200 1.86 1.18 1.14 h: 0.9 Reub 0.1 30x60 1 ID_428
I-6 No Ubic I 6 Renov 0.80 SI 7.93 P TN Prestamo HDPE 200 1.86 1.44 1.07 h: 0.9 Reub 0.1 30x60 1 ID_427
I-5 No Ubic I 5 Renov 0.80 SI 7.88 P TN Prestamo HDPE 200 1.86 1.05 1.24 h: 0.9 Reub 0.1 30x60 1 ID_426
I-4 Dentro del LP I 4 Reub 0.80 NO 7.46 P TN Prestamo HDPE 200 1.86 1.14 1.20 h: 0.9 Reub 0.1 30x60 1 ID_425
I-3 Dentro del LP I 3 Reub 0.80 NO 7.66 P TN Prestamo HDPE 200 1.86 1.38 1.10 h: 0.9 Reub 0.1 30x60 1 ID_424
I-2 Dentro del LP I 2 Reub 0.80 NO 7.78 P TN Prestamo HDPE 200 1.86 1.02 0.84 1.60 h: 0.9 Reub 0.1 30x60 1 ID_423
I-2A No Ubic I 2A Renov 0.80 SI 7.40 P TN Prestamo HDPE 200 1.86 1.02 1.40 1.60 h: 0.9 Reub 0.1 30x60 1 ID_420
I-1 No Ubic I 1 Renov 0.80 SI 7.41 P TN Prestamo HDPE 200 1.86 1.20 0.90 h: 0.9 Reub 0.1 30x60 1 ID_422
I-34 En Vereda I 34 Renov 0.80 SI 6.76 P TN Prestamo HDPE 200 1.86 1.77 0.90 h: 0.9 Reub 0.1 30x60 1 ID_421
M-38 En Vereda M 38 Renov 0.80 SI 7.11 P TN Prestamo HDPE 200 1.80 1.08 1.44 h: 0.9 Reub 0.1 30x60 1 ID_299
M-17 No Ubic M 17 Renov 0.80 SI 6.53 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_282
M-18 En Vereda M 18 Renov 0.90 SI 5.97 P TN Prestamo HDPE 200 1.80 2.25 h: 0.9 Reub 0.1 30x60 1 ID_281
M-19 No Ubic M 19 Renov 0.80 SI 5.72 P TN Prestamo HDPE 200 1.80 1.32 1.10 h: 0.9 Reub 0.1 30x60 1 ID_280
M-16 Dentro del LP M 16 Reub 0.80 NO 8.75 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_283
M-15 Dentro del LP M 15 Reub 0.95 NO 7.36 P TN Prestamo HDPE 200 1.80 h: 1.2 Reub 0.1 30x60 1 ID_284
M-14 En Vereda M 14 Renov 0.80 SI 7.29 P TN Prestamo HDPE 200 1.80 1.23 1.00 h: 0.9 Reub 0.1 30x60 1 ID_285
M-13 No Ubic M 13 Renov 0.80 SI 6.61 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_286
M-12 Dentro del LP M 12 Reub 1.05 NO 6.45 P TN Prestamo HDPE 200 1.80 0.96 1.44 h: 1.2 Reub 1.01 30x60 1 ID_287
M-11 No Ubic M 11 Renov 0.80 SI 6.56 P TN Prestamo HDPE 200 1.80 0.96 1.44 1.60 h: 0.9 Reub 0.1 30x60 1 ID_288
M-10 En Vereda M 10 Renov 1.00 SI 6.43 P TN Prestamo HDPE 200 1.80 1.21 h: 1.2 Reub 0.1 30x60 1 ID_289
M-9 Dentro del LP M 9 Reub 0.80 NO 6.93 P TN Prestamo HDPE 200 1.80 1.69 h: 0.9 Reub 0.1 30x60 1 ID_290
M-8 Dentro del LP M 8 Reub 0.80 NO 6.73 P TN Prestamo HDPE 200 1.80 0.96 1.44 h: 0.9 Reub 0.1 30x60 1 ID_291
M-7 En Vereda M 7 Renov 1.05 SI 6.57 P TN Prestamo HDPE 200 1.80 1.02 1.44 h: 1.2 Reub 1.01 30x60 1 ID_292
M-6 No Ubic M 6 Renov 0.80 SI 6.54 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_293
M-5 Dentro del LP M 5 Reub 0.80 NO 6.98 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_294
M-4 Dentro del LP M 4 Reub 0.85 NO 6.77 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_295
M-3 Dentro del LP M 3 Reub 0.50 NO 6.97 P TN Prestamo HDPE 200 1.80 1.08 1.69 1.60 h: 0.6 Reub 0.1 30x60 1 ID_296
M-2 En Vereda M 2 Renov 1.05 SI 6.82 P TN Prestamo HDPE 200 1.80 1.20 1.56 h: 1.2 Reub 1.01 30x60 1 ID_297
M-1 Dentro del LP M 1 Reub 1.15 NO 6.77 P TN Prestamo HDPE 200 1.80 1.26 1.21 h: 1.2 Reub 1.01 30x60 1 ID_298
K1-16 En Vereda K1 16 Renov 1.86 SI 8.49 P TN Prestamo HDPE 250 1.80 1.00 h: 1.8 Reub 1.76 60x60 1 ID_370
K1-17 Dentro del LP K1 17 Reub 1.02 NO 8.42 P TN Prestamo HDPE 250 1.80 1.08 h: 1.2 Reub 1.01 30x60 1 ID_369
K1-18 En Vereda K1 18 Renov 1.11 SI 8.16 P TN Prestamo HDPE 250 1.80 1.38 2.73 h: 1.2 Reub 1.01 30x60 1 ID_368
K1-19 En Vereda K1 19 Renov 1.22 SI 8.80 P TN Prestamo HDPE 250 1.80 1.38 1.74 h: 1.5 Reub 1.01 30x60 1 ID_367
K1-20 En Vereda K1 20 Renov 1.44 SI 8.22 P TN Prestamo HDPE 250 1.80 0.75 2.68 h: 1.5 Reub 1.26 30x60 1 ID_366
K1-21 En Vereda K1 21 Renov 1.12 SI 7.72 P TN Prestamo HDPE 250 1.80 h: 1.2 Reub 1.01 30x60 1 ID_365
K1-22 No Ubic K1 22 Renov 0.80 SI 8.10 P TN Prestamo HDPE 250 1.80 h: 0.9 Reub 0.1 30x60 1 ID_364
K1-23 No Ubic K1 23 Renov 0.80 SI 8.63 P TN Prestamo HDPE 250 1.80 h: 0.9 Reub 0.1 30x60 1 ID_363
K1-24 En Vereda K1 24 Renov 1.40 SI 8.21 P TN Prestamo HDPE 250 1.80 1.15 0.91 h: 1.5 Reub 1.26 30x60 1 ID_362
K1-25 Dentro del LP K1 25 Reub 0.80 NO 7.75 P TN Prestamo HDPE 250 1.80 1.08 1.13 h: 0.9 Reub 0.1 30x60 1 ID_361
K1-26 Dentro del LP K1 26 Reub 1.20 NO 7.76 P TN Prestamo HDPE 250 1.80 0.92 1.66 h: 1.2 Reub 1.01 30x60 1 ID_360
K1-27 En Vereda K1 27 Renov 1.29 SI 8.60 P TN Prestamo HDPE 250 1.80 1.20 h: 1.5 Reub 1.26 30x60 1 ID_359
K1-28 Dentro del LP K1 28 Reub 1.13 NO 8.89 P TN Prestamo HDPE 250 1.80 1.08 1.33 h: 1.2 Reub 1.01 30x60 1 ID_358
K1-29 Dentro del LP K1 29 Reub 1.29 NO 8.82 P TN Prestamo HDPE 250 1.80 1.08 1.30 h: 1.5 Reub 1.26 30x60 1 ID_357
W-2 Dentro del LP W 2 Reub 1.20 NO 5.82 P TN Prestamo HDPE 250 1.80 0.66 1.00 h: 1.2 Reub 1.01 30x60 1 ID_90
W-3 Dentro del LP W 3 Reub 1.30 NO 6.05 P TN Prestamo HDPE 250 1.80 0.56 1.22 h: 1.5 Reub 1.26 30x60 1 ID_89
W-4 Dentro del LP W 4 Reub 1.00 NO 6.34 P TN Prestamo HDPE 250 1.80 0.90 1.28 h: 1.2 Reub 0.1 30x60 1 ID_88
W-5 Dentro del LP W 5 Reub 0.80 NO 6.11 P TN Prestamo HDPE 250 1.80 1.39 h: 0.9 Reub 0.1 30x60 1 ID_87
W-6 En Vereda W 6 Renov 1.45 SI 6.01 P TN Prestamo HDPE 250 1.80 0.78 1.32 h: 1.5 Reub 1.26 30x60 1 ID_86
W-7 Dentro del LP W 7 Reub 1.30 NO 6.32 P TN Prestamo HDPE 250 1.80 1.97 h: 1.5 Reub 1.26 30x60 1 ID_85
W-8 Dentro del LP W 8 Reub 1.40 NO 6.12 P TN Prestamo HDPE 250 1.80 3.30 h: 1.5 Reub 1.26 30x60 1 ID_84
W-9 Dentro del LP W 9 Reub 0.80 NO 6.58 P TN Prestamo HDPE 250 1.80 2.03 h: 0.9 Reub 0.1 30x60 1 ID_83
W-10 Dentro del LP W 10 Reub 1.30 NO 6.64 P TN Prestamo HDPE 250 1.80 h: 1.5 Reub 1.26 30x60 1 ID_82
W-11 Dentro del LP W 11 Reub 1.40 NO 6.58 P TN Prestamo HDPE 250 1.80 h: 1.5 Reub 1.26 30x60 1 ID_81
W-12 Dentro del LP W 12 Reub 1.50 NO 6.79 P TN Prestamo HDPE 250 1.80 h: 1.5 Reub 1.26 30x60 1 ID_80
W-13 En Vereda W 13 Renov 1.50 SI 6.14 P TN Prestamo HDPE 250 1.80 h: 1.5 Reub 1.26 30x60 1 ID_79
W-14 En Vereda W 14 Renov 1.10 SI 5.95 P TN Prestamo HDPE 250 1.80 0.60 1.42 h: 1.2 Reub 1.01 30x60 1 ID_78
W-15 Dentro del LP W 15 Reub 1.30 NO 5.69 P TN Prestamo HDPE 250 1.80 1.08 h: 1.5 Reub 1.26 30x60 1 ID_77
W-16 En Vereda W 16 Renov 0.90 SI 8.25 P TN Prestamo HDPE 200 0.60 1.07 h: 0.9 Reub 0.1 30x60 1 ID_75
W-16A En Vereda W 16A Renov 0.95 SI 7.77 P TN Prestamo HDPE 200 h: 1.2 Reub 0.1 30x60 1 ID_74
W-25 Dentro del LP W 25 Reub 0.90 NO 8.28 P TN Prestamo HDPE 200 1.77 h: 0.9 Reub 0.1 30x60 1 ID_66
W-24 En Vereda W 24 Renov 1.33 SI 7.93 P TN Prestamo HDPE 200 1.77 h: 1.5 Reub 1.26 30x60 1 ID_67
W-23 Dentro del LP W 23 Reub 0.90 NO 7.33 P TN Prestamo HDPE 200 1.77 h: 0.9 Reub 0.1 30x60 1 ID_68
W-22 En Vereda W 22 Renov 1.25 SI 7.82 P TN Prestamo HDPE 200 1.73 h: 1.5 Reub 1.01 30x60 1 ID_69
W-21 Dentro del LP W 21 Reub 0.80 NO 7.28 P TN Prestamo HDPE 200 1.73 h: 0.9 Reub 0.1 30x60 1 ID_70
W-20 Dentro del LP W 20 Reub 0.85 NO 8.19 P TN Prestamo HDPE 200 1.73 h: 0.9 Reub 0.1 30x60 1 ID_71
W-19 No Ubic W 19 Renov 0.80 SI 7.22 P TN Prestamo HDPE 200 1.70 h: 0.9 Reub 0.1 30x60 1 ID_72
W-18 Dentro del LP W 18 Reub 1.05 NO 8.96 P TN Prestamo HDPE 200 1.70 1.58 1.36 h: 1.2 Reub 1.01 30x60 1 ID_73
W-17 En Vereda W 17 Renov 0.65 SI 7.13 P TN Prestamo HDPE 200 1.70 h: 0.9 Reub 0.1 30x60 1 ID_76
U-2 Dentro del LP U 2 Reub 1.00 NO 6.71 P TN Prestamo HDPE 200 1.77 1.35 1.20 1.60 h: 1.2 Reub 0.1 30x60 1 ID_106
U-3 En Vereda U 3 Renov 1.00 SI 6.83 P TN Prestamo HDPE 200 1.77 1.20 h: 1.2 Reub 0.1 30x60 1 ID_105
U-4 Dentro del LP U 4 Reub 0.80 NO 7.08 P TN Prestamo HDPE 200 1.71 1.35 1.20 h: 0.9 Reub 0.1 30x60 1 ID_104
U-5 En Vereda U 5 Renov 1.00 SI 6.95 P TN Prestamo HDPE 200 1.71 1.00 h: 1.2 Reub 0.1 30x60 1 ID_103

Página 95 de 96
MEDRANO PRADO HUARCAYA
CONSULTOR - CIP Nº 34281..

SUSTENTO DE METRADO DE CONEXIONES DOMICILIARIAS DE ALCANTARILLADO CAMBIADAS


MOVIMIENTO DE TIERRA COLECTOR CORTE Y REPOSICION

ADOQUINA

ADOQUINA
PAVIMENT

PAVIMENT
TIPO DE RELLENO

ESCALERA
O MIXTO 1

SARDINEL
Ubicación de la Altura de la Demolición de N_LAMIN

FLEXIBLE

DA (m2)
VEREDA
VEREDA
DA(m2)

BERMA
RAMPA

RAMPA

JARDIN
Manzana Lote NUEVA o REHAB LONG MAQUINA o Material del Diametro del Rango de

(m2)

(m2)

(m2)

(m2)

(m2)
(m2)

(M2)
Conexión Existente Caja Registro Caja? A SUELO (PRESTAMO ALT EXCAV DIM. CAJA ID_ CAD

O
PULSO Colector Colector profundidad
(Excavación) O PROPIO)
U-6 En Vereda U 6 Renov 0.85 SI 6.60 P TN Prestamo HDPE 200 1.70 1.35 1.20 h: 0.9 Reub 0.1 30x60 1 ID_102
U-7 No Ubic U 7 Renov 0.80 SI 7.38 P TN Prestamo HDPE 200 1.70 1.00 h: 0.9 Reub 0.1 30x60 1 ID_101
U-8 En Vereda U 8 Renov 1.00 SI 7.43 P TN Prestamo HDPE 200 1.70 1.20 h: 1.2 Reub 0.1 30x60 1 ID_100
U-9 No Ubic U 9 Renov 0.80 SI 7.40 P TN Prestamo HDPE 200 1.70 1.00 h: 0.9 Reub 0.1 30x60 1 ID_99
U-10 En Vereda U 10 Renov 1.20 SI 8.63 P TN Prestamo HDPE 200 1.80 1.20 h: 1.2 Reub 1.01 30x60 1 ID_98
U-11 Dentro del LP U 11 Reub 0.80 NO 9.10 P TN Prestamo HDPE 200 1.80 1.80 2.02 h: 0.9 Reub 0.1 30x60 1 ID_97
U-12 Dentro del LP U 12 Reub 0.80 NO 9.19 P TN Prestamo HDPE 200 1.80 1.20 h: 0.9 Reub 0.1 30x60 1 ID_96
U-13 En Vereda U 13 Renov 1.05 SI 8.23 P TN Prestamo HDPE 200 1.80 1.20 h: 1.2 Reub 1.01 30x60 1 ID_95
U-14 Dentro del LP U 14 Reub 1.00 NO 8.90 P TN Prestamo HDPE 200 1.80 1.80 1.20 h: 1.2 Reub 0.1 30x60 1 ID_94
U-15 En Vereda U 15 Renov 0.90 SI 9.18 P TN Prestamo HDPE 200 1.80 1.80 1.20 h: 0.9 Reub 0.1 30x60 1 ID_93
U-16 Dentro del LP U 16 Reub 0.80 NO 8.89 P TN Prestamo HDPE 200 1.80 1.80 1.20 h: 0.9 Reub 0.1 30x60 1 ID_92
U-17 No Ubic U 17 Renov 0.80 SI 8.32 P TN Prestamo HDPE 200 1.80 1.20 h: 0.9 Reub 0.1 30x60 1 ID_91
T-1 En Vereda T 1 Renov 1.00 SI 8.09 P TN Prestamo HDPE 200 1.80 1.44 h: 1.2 Reub 0.1 30x60 1 ID_115
T-2 En Vereda T 2 Renov 1.10 SI 7.88 P TN Prestamo HDPE 200 1.80 1.46 1.44 1.60 h: 1.2 Reub 1.01 30x60 1 ID_116
T-3 En Vereda T 3 Renov 1.05 SI 7.67 P TN Prestamo HDPE 200 1.80 1.46 1.44 h: 1.2 Reub 1.01 30x60 1 ID_117
T-4 En Vereda T 4 Renov 0.76 SI 8.25 P TN Prestamo HDPE 200 1.80 1.46 1.30 h: 0.9 Reub 0.1 30x60 1 ID_118
T-5 Dentro del LP T 5 Reub 0.80 NO 9.55 P TN Prestamo HDPE 200 1.80 1.44 h: 0.9 Reub 0.1 30x60 1 ID_119
T-6 En Vereda T 6 Renov 0.82 SI 8.52 P TN Prestamo HDPE 200 1.80 1.46 1.30 h: 0.9 Reub 0.1 30x60 1 ID_120
T-7 En Vereda T 7 Renov 0.90 SI 8.14 P TN Prestamo HDPE 200 1.80 1.46 1.30 h: 0.9 Reub 0.1 30x60 1 ID_121
T-8 Dentro del LP T 8 Reub 1.00 NO 9.09 P TN Prestamo HDPE 200 1.80 1.78 h: 1.2 Reub 0.1 30x60 1 ID_122
T-9 En Vereda T 9 Renov 1.15 SI 10.44 P TN Prestamo HDPE 200 1.00 h: 1.2 Reub 1.01 30x60 1 ID_123
T-10 En Vereda T 10 Renov 0.90 SI 10.84 P TN Prestamo HDPE 200 1.00 h: 0.9 Reub 0.1 30x60 1 ID_124
T-11 Dentro del LP T 11 Reub 0.80 NO 8.41 P TN Prestamo HDPE 200 1.92 1.50 2.12 h: 0.9 Reub 0.1 30x60 1 ID_125
T-12 Dentro del LP T 12 Reub 0.90 NO 7.84 P TN Prestamo HDPE 200 1.92 1.00 h: 0.9 Reub 0.1 30x60 1 ID_126
T-13 Dentro del LP T 13 Reub 0.80 NO 9.74 P TN Prestamo HDPE 200 1.92 2.20 h: 0.9 Reub 0.1 30x60 1 ID_127
T1-1 En Vereda T1 1 Renov 0.80 SI 9.52 P TN Prestamo HDPE 200 1.80 1.50 1.20 1.60 h: 0.9 Reub 0.1 30x60 1 ID_108
T1-14 En Vereda T1 14 Renov 0.95 SI 9.02 P TN Prestamo HDPE 200 1.80 1.50 1.20 1.60 h: 1.2 Reub 0.1 30x60 1 ID_107
T1-8-9 No Ubic T1 8-9 Renov 0.80 SI 11.98 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_113
T1-10 En Vereda T1 10 Renov 1.10 SI 9.38 P TN Prestamo HDPE 200 1.80 1.00 h: 1.2 Reub 1.01 30x60 1 ID_112
T1-11 En Vereda T1 11 Renov 1.00 SI 8.99 P TN Prestamo HDPE 200 1.80 0.60 1.00 h: 1.2 Reub 0.1 30x60 1 ID_111
T1-12 En Vereda T1 12 Renov 1.20 SI 8.09 P TN Prestamo HDPE 200 1.80 h: 1.2 Reub 1.01 30x60 1 ID_109
T1-13 En Vereda T1 13 Renov 0.95 SI 7.93 P TN Prestamo HDPE 200 1.80 h: 1.2 Reub 0.1 30x60 1 ID_110
S-16 En Vereda S 16 Renov 0.80 SI 9.02 P TN Prestamo HDPE 200 1.80 1.20 1.96 h: 0.9 Reub 0.1 30x60 1 ID_162
S-15 En Vereda S 15 Renov 1.06 SI 8.72 P TN Prestamo HDPE 200 1.80 1.50 1.44 1.60 h: 1.2 Reub 1.01 30x60 1 ID_161
S-14 Dentro del LP S 14 Reub 0.90 NO 9.47 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_160
S-13 No Ubic S 13 Renov 0.80 SI 8.89 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_159
S-12 En Vereda S 12 Renov 0.80 SI 8.16 P TN Prestamo HDPE 200 1.80 1.32 1.21 1.60 h: 0.9 Reub 0.1 30x60 1 ID_158
S-11 En Vereda S 11 Renov 1.07 SI 8.32 P TN Prestamo HDPE 200 1.80 1.00 h: 1.2 Reub 1.01 30x60 1 ID_157
S-10 Dentro del LP S 10 Reub 0.80 NO 9.26 P TN Prestamo HDPE 200 1.80 1.32 1.69 h: 0.9 Reub 0.1 30x60 1 ID_156
S-9 Dentro del LP S 9 Reub 0.95 NO 8.62 P TN Prestamo HDPE 200 1.80 1.44 h: 1.2 Reub 0.1 30x60 1 ID_155
S-8 Dentro del LP S 8 Reub 0.80 NO 8.24 P TN Prestamo HDPE 200 1.80 1.44 1.00 h: 0.9 Reub 0.1 30x60 1 ID_154
S-7 En Vereda S 7 Renov 0.74 SI 7.52 P TN Prestamo HDPE 200 1.80 1.26 1.44 1.60 h: 0.9 Reub 0.1 30x60 1 ID_153
S-6 No Ubic S 6 Renov 0.80 SI 8.35 P TN Prestamo HDPE 200 1.80 1.00 h: 0.9 Reub 0.1 30x60 1 ID_152
S-5 En Vereda S 5 Renov 0.80 SI 7.25 P TN Prestamo HDPE 200 1.80 1.20 1.44 h: 0.9 Reub 0.1 30x60 1 ID_151
S-4 En Vereda S 4 Renov 0.80 SI 7.04 P TN Prestamo HDPE 200 1.80 1.26 1.44 h: 0.9 Reub 0.1 30x60 1 ID_150
S-3 Dentro del LP S 3 Reub 0.80 NO 8.42 P TN Prestamo HDPE 200 1.80 1.98 h: 0.9 Reub 0.1 30x60 1 ID_149
S-2 Dentro del LP S 2 Reub 0.80 NO 8.31 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_148
S-1 Dentro del LP S 1 Reub 1.16 NO 8.43 P TN Prestamo HDPE 200 1.80 h: 1.2 Reub 1.01 30x60 1 ID_147
S-38A En Vereda S 38A Renov 0.68 SI 7.40 P TN Prestamo HDPE 200 1.80 1.00 h: 0.9 Reub 0.1 30x60 1 ID_146
S-34 En Vereda S 34 Renov 1.07 SI 8.03 P TN Prestamo HDPE 200 h: 1.2 Reub 1.01 30x60 1 ID_128
S-33 Dentro del LP S 33 Reub 0.95 NO 7.70 P TN Prestamo HDPE 200 h: 1.2 Reub 0.1 30x60 1 ID_129
S-32 Dentro del LP S 32 Reub 0.80 NO 7.55 P TN Prestamo HDPE 200 h: 0.9 Reub 0.1 30x60 1 ID_130
S-31 Dentro del LP S 31 Reub 0.80 NO 7.73 P TN Prestamo HDPE 200 h: 0.9 Reub 0.1 30x60 1 ID_131
S-30 Dentro del LP S 30 Reub 0.86 NO 7.71 P TN Prestamo HDPE 200 h: 0.9 Reub 0.1 30x60 1 ID_132
S-29 Dentro del LP S 29 Reub 1.00 NO 8.19 P TN Prestamo HDPE 200 1.80 1.02 1.69 h: 1.2 Reub 0.1 30x60 1 ID_133
S-28 En Vereda S 28 Renov 0.85 SI 8.37 P TN Prestamo HDPE 200 1.80 1.20 2.25 h: 0.9 Reub 0.1 30x60 1 ID_134
S-27 Dentro del LP S 27 Reub 0.95 NO 7.85 P TN Prestamo HDPE 200 1.80 1.08 2.25 h: 1.2 Reub 0.1 30x60 1 ID_135
S-26 Dentro del LP S 26 Reub 0.80 NO 7.72 P TN Prestamo HDPE 200 1.80 1.20 1.96 h: 0.9 Reub 0.1 30x60 1 ID_136
S-25 Dentro del LP S 25 Reub 0.80 NO 7.73 P TN Prestamo HDPE 200 1.80 1.26 1.69 1.60 h: 0.9 Reub 0.1 30x60 1 ID_137
S-24 No Ubic S 24 Renov 0.80 SI 7.80 P TN Prestamo HDPE 200 1.80 1.26 1.69 h: 0.9 Reub 0.1 30x60 1 ID_138
S-23 No Ubic S 23 Renov 0.80 SI 7.55 P TN Prestamo HDPE 200 1.80 1.20 1.96 1.60 h: 0.9 Reub 0.1 30x60 1 ID_139
S-22 Dentro del LP S 22 Reub 0.82 NO 7.77 P TN Prestamo HDPE 200 1.80 1.20 1.96 h: 0.9 Reub 0.1 30x60 1 ID_140
S-21 No Ubic S 21 Renov 0.80 SI 8.59 P TN Prestamo HDPE 200 1.80 2.25 h: 0.9 Reub 0.1 30x60 1 ID_141
S-20 Dentro del LP S 20 Reub 1.00 NO 8.60 P TN Prestamo HDPE 200 1.80 1.14 1.69 1.60 h: 1.2 Reub 0.1 30x60 1 ID_142
S-19 Dentro del LP S 19 Reub 0.90 NO 8.50 P TN Prestamo HDPE 200 1.80 0.84 1.44 1.60 h: 0.9 Reub 0.1 30x60 1 ID_143
S-18 En Vereda S 18 Renov 1.10 SI 8.69 P TN Prestamo HDPE 200 1.80 0.84 1.69 h: 1.2 Reub 1.01 30x60 1 ID_144
S-17 En Vereda S 17 Renov 0.95 SI 9.47 P TN Prestamo HDPE 200 1.80 1.02 1.44 h: 1.2 Reub 0.1 30x60 1 ID_145
N-2 No Ubic N 2 Renov 0.80 SI 8.42 P TN Prestamo HDPE 200 h: 0.9 Reub 0.1 30x60 1 ID_248
N-3 Dentro del LP N 3 Reub 0.80 NO 7.93 P TN Prestamo HDPE 200 1.80 1.02 2.50 h: 0.9 Reub 0.1 30x60 1 ID_249
N-4 No Ubic N 4 Renov 0.80 SI 8.83 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_250
N-5 En Vereda N 5 Renov 1.15 SI 8.62 P TN Prestamo HDPE 200 1.80 2.80 1.44 h: 1.2 Reub 1.01 30x60 1 ID_251
N-6 Dentro del LP N 6 Reub 1.30 NO 8.42 P TN Prestamo HDPE 200 3.00 3.48 h: 1.5 Reub 1.26 30x60 1 ID_252
N-7 No Ubic N 7 Renov 0.80 SI 8.86 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_253
N-8 En Vereda N 8 Renov 0.78 SI 8.01 P TN Prestamo HDPE 200 1.80 1.52 1.96 h: 0.9 Reub 0.1 30x60 1 ID_254
N-9 En Vereda N 9 Renov 0.90 SI 8.06 P TN Prestamo HDPE 200 1.80 1.59 1.54 h: 0.9 Reub 0.1 30x60 1 ID_255
N-10 En Vereda N 10 Renov 0.80 SI 8.57 P TN Prestamo HDPE 200 1.00 h: 0.9 Reub 0.1 30x60 1 ID_256
N-11 Dentro del LP N 11 Reub 0.80 NO 8.67 P TN Prestamo HDPE 200 1.80 3.55 h: 0.9 Reub 0.1 30x60 1 ID_257
N-12 En Vereda N 12 Renov 0.80 SI 8.22 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_258
N-13 En Vereda N 13 Renov 0.80 SI 8.22 P TN Prestamo HDPE 200 1.80 3.43 h: 0.9 Reub 0.1 30x60 1 ID_259
N-14 No Ubic N 14 Renov 0.80 SI 8.71 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_260
N-15 No Ubic N 15 Renov 0.80 SI 8.55 P TN Prestamo HDPE 200 1.80 1.44 h: 0.9 Reub 0.1 30x60 1 ID_261
N-16 Dentro del LP N 16 Reub 0.80 NO 8.50 P TN Prestamo HDPE 200 1.80 h: 0.9 Reub 0.1 30x60 1 ID_262
N-17 Dentro del LP N 17 Reub 0.80 NO 8.70 P TN Prestamo HDPE 200 1.80 1.44 1.44 h: 0.9 Reub 0.1 30x60 1 ID_263
N-18 En Vereda N 18 Renov 0.80 SI 8.70 P TN Prestamo HDPE 200 1.80 0.24 1.44 h: 0.9 Reub 0.1 30x60 1 ID_264
K2-30 Dentro del LP K2 30 Reub 1.08 NO 8.61 P TN Prestamo HDPE 250 2.20 1.68 1.20 h: 1.2 Reub 1.01 30x60 1 ID_345
4497.46 m de conexiones 1083.53 0.00 365.91 2.76 71.30 714.62 6.00 57.24 4.58 100.80

Página 96 de 96

You might also like