Professional Documents
Culture Documents
Prediction of Axial Shortening in Buildings PDF
Prediction of Axial Shortening in Buildings PDF
Shrinkage
- Drying shrinkage (instant)
- Autogenous shrinkage
(time dependant).
Strength of concrete.
Age of loading.
Magnitude of loading
Ambient humidity.
Dimensions of element.
Composition of concrete.
Ambient humidity.
Dimensions of element.
Composition of concrete.
Strength of concrete.
Magnitude of sustained load.
Age of loading.
COLUMNS
and
COREWALL ELEMENTS
Long term Shortening yet to take place AFTER PLACEMENT is the key figure
to assess impact.
LEVEL ADJUSTMENT:
0.85[(220+110. ds1).
cd.0 Basic drying shrinkage strain exp(-
6
ds2.fcm/fcmo)]. RH/10
(t-ts)
ds(t,ts)
(t-ts)+0.04 ho3
kh Coefficient depending on "ho" Equals 0.7 for ho =>500
Data base for geometric, material and loading information for each
column / corewall element, including the construction schedule,
has been entered into a Master Spreadsheet.
28-Oct-08
28-Nov-08
28-Oct-09
28-Nov-09
28-Jan-08
28-Feb-08
28-Jun-08
28-Jul-08
28-Aug-08
28-Dec-08
28-Jan-09
28-Feb-09
28-Jun-09
28-Jul-09
28-Aug-09
28-Dec-09
28-Jan-10
28-Feb-10
28-Apr-08
28-May-08
28-Sep-08
28-Apr-09
28-May-09
28-Sep-09
28-Apr-10
28-May-10
28-Mar-08
28-Mar-09
28-Mar-10
-10.00
PREDICTED
-20.00 FINAL
MEASURED
-30.00
-40.00
-50.00
-60.00
-70.00
-60.00
-50.00
-40.00
-30.00
-20.00
-10.00
PROFILE AT L-7
0.00
9-Feb-08
9-Mar-08
-140.00
-120.00
-100.00
-80.00
-60.00
-40.00
-20.00
0.00
INTERFACING STRUCTURE LONG
9-Apr-08
26-Apr-08
9-Jul-08
26-Jul-08
9-Aug-08
THE LANDMARK ABU DHABI – ALHABTOOR CCC JV
26-Aug-08
9-Sep-08
26-Sep-08
9-Oct-08
26-Oct-08
9-Nov-08
26-Nov-08
9-Dec-08
26-Dec-08
SHORTENING PREDICTION
9-Jan-09
26-Jan-09
9-Feb-09
26-Feb-09
9-Mar-09
26-Mar-09
9-Apr-09
26-Apr-09
9-May-09
26-May-09
9-Jun-09
26-Jun-09
9-Jul-09
26-Jul-09
9-Aug-09
26-Aug-09
9-Sep-09
26-Sep-09
9-Oct-09
26-Oct-09
9-Nov-09
26-Nov-09
9-Dec-09
26-Dec-09
9-Jan-10
INSTALLATION COMPLETION
A
26-Jan-10
B
INTERFACING STRUCTURE
9-Feb-10
26-Feb-10
9-Mar-10
14 APRIL 2010
26-Mar-10
9-Apr-10
26-Apr-10
9-May-10
26-May-10
9-Jun-10
26-Jun-10
26-Jul-10
26-Aug-10
29
IMPACT ON INTERFACING STRUCTURES ASSESSED.
-350.00 0.00
-300.00
-250.00
-200.00
-150.00
-100.00
-50.00
0.00
-350.00
-300.00
-250.00
-200.00
-150.00
-100.00
-50.00
4-Dec-08
24-Dec-08
4-Jan-09
24-Feb-09
4-Mar-09
H = A – B = 2.1 mm
24-Mar-09
4-Apr-09
24-Apr-09
THE LANDMARK ABU DHABI – ALHABTOOR CCC JV
4-May-09
24-May-09
4-Jun-09
24-Jun-09
4-Jul-09
24-Jul-09
4-Aug-09
24-Aug-09
4-Sep-09
SHORTENING PREDICTION
24-Sep-09
4-Oct-09
24-Oct-09
4-Nov-09
24-Nov-09
4-Dec-09
24-Dec-09
4-Jan-10
INSTALLATION COMPLETION
24-Jan-10
A B
4-Feb-10
24-Feb-10
4-Mar-10
INTERFACING
20 APRIL 2010
24-Mar-10
4-Apr-10
24-Apr-10
4-May-10
24-May-10
4-Jun-10
24-Jun-10
4-Jul-10
24-Jul-10
4-Aug-10
A 24-Aug-10
4-Sep-10
24-Sep-10
4-Oct-10
24-Oct-10
4-Nov-10
24-Nov-10
4-Dec-10
24-Dec-10
4-Jan-11
24-Jan-11
4-Feb-11
24-Feb-11
4-Mar-11
24-Mar-11
4-Apr-11
24-Apr-11
31
CONSTRUCTION TOLERANCE IN INTERFACING INSTALLATION VERIFIED
M.H.