PREDICTION OF AXIAL SHORTENING

THE LANDMARK ABU DHABI ALHABTOOR CCC JV


SHORTENING PREDICTION
Introduction

This presentation is intended to


shed the light on the nature of
the Shortening criterion in concrete, the
method of prediction
and application of information.

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 2
TYPES OF SHORTENING

Elastic shortening (instant)

Shrinkage
- Drying shrinkage (instant)
- Autogenous shrinkage
(time dependant).

Creep (time dependant)

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 3
FACTORS AFFECTING SHORTENING
1 – ELASTIC SHORTENING

Strength of concrete.

Age of loading.

Magnitude of loading

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 4
FACTORS AFFECTING SHORTENING
2 – SHRINKAGE

Ambient humidity.

Dimensions of element.

Composition of concrete.

SHRINKAGE DOES NOT DEPEND ON LOADING

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 5
FACTORS AFFECTING SHORTENING
3 – CREEP

Ambient humidity.
Dimensions of element.
Composition of concrete.
Strength of concrete.
Magnitude of sustained load.
Age of loading.

CREEP IS DEPENDANT ON SUSTAINED LOADING

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 6
MONITORED OBJECTS

Shortening is being predicted


and monitored for all “Vertical
Structural Elements”,
That is:

COLUMNS
and
COREWALL ELEMENTS

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 7
THE LANDMARK ABU DHABI – ALHABTOOR CCC JV
April 09 SHORTENING PREDICTION 8
LET’S LOOK AGAIN AT THAT LAST IMAGE….

Long term Shortening yet to take place AFTER PLACEMENT is the key figure
to assess impact.

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 9
LONG TERM SHORTENING YET TO TAKE PLACE AFTER PLACEMENT

Long term Cumulative shortening for a column at


level 30, starts well before placement date.

Long term cumulative shortening yet to take place


at that point equals:

Long term cumulative shortening at that point LESS


Interim Cumulative Shortening that has already
taken place at time of pouring the slab.

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 10
WE NEED TO AGREE ON THE DEFINITION OF THE TERMS
JUST MENTIONED:

Final floor Shortening: “FFS”


Is the final (30+ years) shortening for a “VSE” at a given level.

Final Cumulative Shortening “FCS”:


Is the final (30 + years) and cumulative shortening for all the VSEs
underneath a point at a given level.

Interim Cumulative Shortening “ICS”:


Is the cumulative shortening for all the VSEs underneath a Target
Point at a given time.

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 11
MORE DEFINITIONS

LEVEL ADJUSTMENT:

Floor slab should be constructed to a higher level than that designed


such that design level would be reached to upon completion of final
shortening.

Adjustment at a given level should be equal to the “Cumulative


Shortening” yet to take place for all columns underneath that level
from the date of slab placement and for 30 years to come after
loading completion.

Level Adjustment = Final (30 Y) Cumulative Shortening at the point less


the “Interim Cumulative Shortening at time of placement = FCS – ICS.

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 12
WHY DO WE NEED TO PREDICT SHORTENING ?.

To determine the level adjustment amount.

To assess the impact on interfacing structures.

To establish construction tolerance in interfacing


installations (cladding, pipe risers, vertical railing ..etc)
.

To assess the impact of column / core wall differential


shortening on the structure.

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 13
CALCULATION METHODOLOGY

The magnitude of long term elastic,


shrinkage and creep strains has been
calculated as per the provisions of BS EN
1992-1-1:2004.

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 14
PREDICTION METHODOLOGY 1 - ANALYSIS PARAMETERS

SHORTENING CALCULATIONS TO THE REQUIREMENTS OF "EUROCODE 2, BS EN 1992-1-1:2004


RH Relative Humidity % age

A coefficient depending on the relative


H 1.5[1+(.012 RH)18] ho + 250 3 , <= 1500 3
humidity & member size - for fcm => 35

t0 Age of concrete at loading


c Compressive stress applied at age to

ho Section notional size = 2 Area / Perimeter

t Age of concrete at the moment)


t-t0 Non-adjusted duration of loading
Cefficient for the calculation of
cc(t) exp{s[1-(28/t)1/2]} = e{s[1- (28/t)]}

compressive strength fcm(t) at age t

fcm(t) Compressive strength at age t cc(t). fcm

Ecm Concrete secant modulus of elasticity 22 (fcm/10)0.3

Ecm(t) Tangent Modulus of Elasticity at age "t" [fcm(t) / fcm]0.3 .Ecm

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 15
PREDICTION METHODOLOGY 2 - ELASTIC SHORTENING

e t Elastic strain at time "t" c / Ecm(t)

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 16
PREDICTION METHODOLOGY 3 - DRYING SHRINKAGE

Coefficient related to relative


RH
humidity
1.55 [1 - (RH/RHO)3]

ds1 Coefficient depends on cement type

ds2 Coefficient depends on cement type

0.85[(220+110. ds1).
cd.0 Basic drying shrinkage strain exp(-
6
ds2.fcm/fcmo)]. RH/10

(t-ts)
ds(t,ts)
(t-ts)+0.04 ho3
kh Coefficient depending on "ho" Equals 0.7 for ho =>500

cd (t) Long term drying shrinkage ds(t,ts).kh. cd.0


ca ( ) 2.5(fck-10)106
as(t) 1 - exp(-2t0.5)
ca (t) The autogenous shrinkage as(t) . ca ( )

cs Total shrinkage strain cd + ca

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 17
PREDICTION METHODOLOGY 4 - CREEP

Ec Tangent Modulus of Elasticity. 1.05 Ecm

1 1 2, 3 are coefficients to (35/fcm)0.7

2 consider the influence of the (35/fcm)0.2


3 concrete strength on the creep strain. (35/fcm)0.5
(to) A factor allowing for age of loading effect. 1 / (0.1 + to0.2)

A factor to allow for the effect of concrete 16.8


(fcm)
strength on the notional creep coefficient fcm

(t,to) A coefficient to count time effect [(t-t0) / ( H+ t - t0)]0.3

RH A factor to allow for the effect of humidity. [1+(1-RH/100). 1/(0.1 ho^0.333)]. 2

0 Notional creep coefficient RH . (fcm). ( (t0)

t,to The creep coefficient. . c(t,to)

cc t,to Creep deformation (strain) at time "t" t,to c Ec

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 18
THE MASTER SPREADSHEET

Data base for geometric, material and loading information for each
column / corewall element, including the construction schedule,
has been entered into a Master Spreadsheet.

Cells of the Master Spreadsheet encapsulate the formulae needed to


calculate the strain in the column corresponding to following
loadings imposed by floor slabs supported by the column:

SWL : Self Weight Load.


SDL : Super-imposed Dead Load.
SLL : Super-imposed Live Load.

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 19
MASTER SPREAD SHEET - INSERTING CONSTRUCTION SCHEDULE

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 20
MASTER SPREAD SHEET - INSERTING COLUMN PROPERTIES

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 21
MASTER SPREAD SHEET – PART 1

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 22
DETAIL “A”

MASTER SPREAD SHEET – PART 2

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 23
MASTER SPREAD SHEET – DETAIL “A”

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 24
MASTER SPREAD SHEET – GETTING A SHORTENING VALUE ON A GIVEN DATE

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 25
THE LANDMARK ABU DHABI – ALHABTOOR CCC JV
April 09 SHORTENING PREDICTION 26
LEVEL ADJUSTMENT ACHIEVED

To determine the level


adjustment amount.

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 27
MASTER SPREAD SHEET – GETTING A COLUMN PROFILE AT A GIVEN LEVEL

PREDICTED PROFILE FOR C1- L 30 TOP


0.00

28-Oct-08

28-Nov-08

28-Oct-09

28-Nov-09
28-Jan-08

28-Feb-08

28-Jun-08

28-Jul-08

28-Aug-08

28-Dec-08

28-Jan-09

28-Feb-09

28-Jun-09

28-Jul-09

28-Aug-09

28-Dec-09

28-Jan-10

28-Feb-10
28-Apr-08

28-May-08

28-Sep-08

28-Apr-09

28-May-09

28-Sep-09

28-Apr-10

28-May-10
28-Mar-08

28-Mar-09

28-Mar-10
-10.00

PREDICTED
-20.00 FINAL
MEASURED

-30.00

-40.00

-50.00

-60.00

CHART NO. C3-L30-04009-01 COLUMN C3 POINT AT L 30 DATE 3-Jun-08

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 28
MASTER SPREAD SHEET – IMPACT OF SHORTENING ON INTERFACING STRUCTURES (THE CANOPY)
PROFILE AT L-1
April 09

-70.00

-60.00

-50.00

-40.00

-30.00

-20.00

-10.00
PROFILE AT L-7

0.00
9-Feb-08

9-Mar-08

-140.00

-120.00

-100.00

-80.00

-60.00

-40.00

-20.00

0.00
INTERFACING STRUCTURE LONG
9-Apr-08
26-Apr-08

TERM DIMENSIONAL CHANGE


9-May-08
26-May-08
H = A – B = 4.9 mm
9-Jun-08
26-Jun-08

9-Jul-08
26-Jul-08

9-Aug-08
THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

26-Aug-08

9-Sep-08
26-Sep-08
9-Oct-08
26-Oct-08

9-Nov-08
26-Nov-08

9-Dec-08
26-Dec-08
SHORTENING PREDICTION

9-Jan-09
26-Jan-09

9-Feb-09
26-Feb-09
9-Mar-09
26-Mar-09

9-Apr-09
26-Apr-09

9-May-09
26-May-09

9-Jun-09
26-Jun-09
9-Jul-09
26-Jul-09

9-Aug-09
26-Aug-09

9-Sep-09
26-Sep-09

9-Oct-09
26-Oct-09

9-Nov-09
26-Nov-09
9-Dec-09
26-Dec-09

9-Jan-10
INSTALLATION COMPLETION

A
26-Jan-10

B
INTERFACING STRUCTURE

9-Feb-10
26-Feb-10
9-Mar-10
14 APRIL 2010

26-Mar-10

9-Apr-10
26-Apr-10
9-May-10
26-May-10

9-Jun-10
26-Jun-10

26-Jul-10

26-Aug-10
29
IMPACT ON INTERFACING STRUCTURES ASSESSED.

To determine the level adjustment


amount.

To assess the impact on interfacing


structures.

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 30
MASTER SPREAD SHEET – IMPACT OF SHORTENING ON INTERFACING INSTALLATIONS (CURTAIN WALL)
PROFILE AT L-36 PROFILE AT L-35
April 09

-350.00 0.00

-300.00

-250.00

-200.00

-150.00

-100.00

-50.00

0.00
-350.00

-300.00

-250.00

-200.00

-150.00

-100.00

-50.00
4-Dec-08

24-Dec-08
4-Jan-09

INTERFACING STRUCTURE LONG


24-Jan-09

TERM DIMENSIONAL CHANGE


4-Feb-09

24-Feb-09
4-Mar-09
H = A – B = 2.1 mm

24-Mar-09
4-Apr-09

24-Apr-09
THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

4-May-09

24-May-09
4-Jun-09

24-Jun-09
4-Jul-09

24-Jul-09
4-Aug-09

24-Aug-09
4-Sep-09
SHORTENING PREDICTION

24-Sep-09
4-Oct-09

24-Oct-09
4-Nov-09

24-Nov-09
4-Dec-09

24-Dec-09
4-Jan-10
INSTALLATION COMPLETION

24-Jan-10

A B
4-Feb-10

24-Feb-10
4-Mar-10
INTERFACING
20 APRIL 2010

24-Mar-10
4-Apr-10

24-Apr-10
4-May-10

24-May-10
4-Jun-10

24-Jun-10
4-Jul-10

24-Jul-10
4-Aug-10

A 24-Aug-10
4-Sep-10

24-Sep-10
4-Oct-10

24-Oct-10
4-Nov-10

24-Nov-10
4-Dec-10

24-Dec-10
4-Jan-11

24-Jan-11
4-Feb-11

24-Feb-11
4-Mar-11

24-Mar-11
4-Apr-11

24-Apr-11
31
CONSTRUCTION TOLERANCE IN INTERFACING INSTALLATION VERIFIED

To determine the level adjustment amount.

To assess the impact on interfacing


structures.

To establish construction tolerance


in interfacing installations (cladding,
pipe risers, vertical railing ..etc) .

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 32
THE EXECUTIVE SUMMARY

Information extracted from various Master Spreadsheets has

been classified sorted in 5 schedules A through E.

These schedules were listed in an “Implementation Duty

Matrix” along with a listing for their

functions and concerned parties.

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 33
THE LANDMARK ABU DHABI – ALHABTOOR CCC JV
April 09 SHORTENING PREDICTION 34
SCHEDULE A
A summary for
30 years final
cumulative
shortening

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 35
SCHEDULE B
Balance Final
Cumulative
Shortening yet
to take place
after placement
of VSEs
THE LANDMARK ABU DHABI – ALHABTOOR CCC JV
April 09 SHORTENING PREDICTION 36
SCHEDULE
C
Change in
inter-floor
height

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 37
SCHEDULE D
Floor level
adjustment

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 38
SCHEDULE E
Differential
shortening
between
corewall &
columns at
pivots.
THE LANDMARK ABU DHABI – ALHABTOOR CCC JV
April 09 SHORTENING PREDICTION 39
COLUMN / COREWALL DIFFERENTIAL SHORTENING COMPUTED.

To determine the level adjustment amount.

To assess the impact on interfacing


structures.

To establish construction tolerance in


interfacing installations (cladding, pipe
risers, vertical railing ..etc) .

To assess the impact of column /


core wall differential shortening on
the structure.

THE LANDMARK ABU DHABI – ALHABTOOR CCC JV


April 09 SHORTENING PREDICTION 40
THIS IS THE END OF THE PRESENTATION

Thank you very much for listening..


I shall be ready for your question after
viewing a Master Spreadsheet.