ESTRUCTURA S/. 136,401.43 S/. 17,445.57 S/. 17,336.80 S/. 171,183.80 S/. 30,813.08
ARQUITECTURA S/. 210,000.00 S/. 26,858.73 S/. 26,691.27 S/. 263,550.00 S/. 47,439.00
INSTALACIONES SANITARIAS S/. 130,000.00 S/. 16,626.84 S/. 16,523.16 S/. 163,150.00 S/. 29,367.00
INSTALACIONES ELÉCTRICAS S/. 110,000.00 S/. 14,068.86 S/. 13,981.14 S/. 138,050.00 S/. 24,849.00
TOTAL S/. 586,401.43 S/. 75,000.00 S/. 74,532.37 S/. 735,933.80 S/. 132,468.08
No de Estructuras 20
MEDIDAS
PARTIDA N° ESPECIFICACIONES N° VECES
LARGO ANCHO ALTO
Concreto de Viga
Vigas Soleras 40 5.7 0.25 0.4
Vigas de Amarre 40 5 0.15 0.4
Encofrado de Vigas
40 5.7 0.4
40 5.2 0.15
40 5.5 0.4
40 5 0.15
40 5 0.15
Acero de Vigas 20
*F.Conc*
Concreto Losa e=25 cm 20 5 5.2 0.1
Encofrado 20 5 5.2
S/. 201,996.88
S/. 310,989.00
S/. 192,517.00
S/. 162,899.00
S/. 868,401.88
TURAS
34.80 m3
22.8
12
270.40 m2
91.2
31.2
88
30
30
284.64 5692.80 kg
52 52.00 m3
520 520.00 m2
110.55 2210.99 kg
0.00
TOTAL (MTS) 102.60
PESO (KG/MT) POR DIAMETRO VARILLA 0.22
TOTAL KGS 110.55 KG 22.57
Acero de Viga
Viga de Amarre
Aceros Longitudinales 5/8" 2 4 6.02
Estribos 3/8" 2 33 1.10
TOTAL (MTS) 0.00
PESO (KG/MT) POR DIAMETRO VARILLA 0.22
TOTAL KGS 284.64 KG 0.00
LONGITUD (METROS LINEALES DE VARILLAS)
8 mm 3/8" 12 mm 1/2" 5/8" 3/4" 1"
M M M M M M M
31.85
70.85
74.64
93.60
48.16
72.60
0.00 166.20 0.00 0.00 122.80 0.00 0.00
0.40 0.56 0.89 0.99 1.56 2.25 3.97
0.00 93.07 0.00 0.00 191.57 0.00 0.00
PRESUPUESTO - ESTRUCTURAS
Item Descripción Unidad Metrado Precio U. Parcial
02.03.04 VIGAS
02.03.04.01 VIGAS - CONCRETO F'C=210 KG/CM2 M3 34.80 S/. 308.96 S/. 10,751.81
02.03.04.03 VIGAS - ACERO F'Y=4200 KG/CM2 KG 5692.80 S/. 4.64 S/. 26,427.17
02.03.05 LOSAS ALIGERADAS
CONCRETO F'c= 210 kg/cm2 EN LOSA
02.03.05.01 M3 52.00 S/. 291.77 S/. 15,172.06
ALIGERADA
ENCOFRADO Y DESENCOFRADO EN LOSA
02.03.05.02 M2 520.00 S/. 74.08 S/. 38,521.95
ALIGERADA
ACERO Fy = 4200 Kg/ cm2 EN LOSA
02.03.05.03 KG 2210.99 S/. 4.64 S/. 10,263.88
ALIGERADA
02.03.05.04 LADRILLO HUECO 20x30X30 UND 4331.60 S/. 2.91 S/. 12,587.47
COSTO DIRECTO S/. 136,401.43
GASTOS GENERALES ( _______ %CD ) 12.78987% S/. 17,445.57
UTILIDAD ( _____ %CD ) 12.71013% S/. 17,336.80
S/.
Coeficiente de Incidencia
MONOMIO IU
1 47
MONOMIO IU
4+5 5
2 17
43
MONOMIO IU
21+30 21
3 37
48
MONOMIO IU
2
4 3
K= 0.313 Jr/Jo +
Acero de Acero de
Agregado Bloque y Herramienta
construcción construcción Agregado fino cemento Dólar
grueso Ladrillo Manual
liso corrugado
S/. 613.42 S/. 937.83 S/. 5,882.53 S/. 27.43 S/. 125.21
S/. 916.61 S/. 1,401.36 S/. 8,789.98 S/. 40.98 S/. 153.94
S/. 3,047.68 S/. 23,651.09 S/. 1,530.03 S/. 2,339.19 S/. 14,672.51 S/. 8,883.45 S/. 68.41 S/. 2,677.49
0.0178 0.1382 0.0089 0.0137 0.0857 0.0519 0.0004 0.0156
** *
0.3128 0.2032
INCIDENCIA %
0.0226 11.000%
0.0519 25.255%
0.1310 63.745%
0.2055
INCIDENCIA %
0.0861 70.270%
0.0156 12.764%
0.0208 16.967%
0.1225
0.3128+0.2055+0.1225+
Comprobación
INCIDENCIA % 1.000
0.0178 11.415%
0.1382 88.585%
0.1560
Madera
Mano de obra
importada para Maquinaria y equipo gastos generales
(incluido leyes + Utilidad
encofrado y nacional
sociales)
carpintería
S/. 22,422.58 S/. 53,549.74 S/. 3,559.28 S/. 34,782.37 S/. 171,183.80
0.1310 0.3128 0.0208 0.2032 1.0000
0.313 1.002
0.209
0.109
0.168
0.203
0.3128+0.2055+0.1225+0.01560+0.2032=1
1.0000
+ 0.203 GGUUr/GGUUo
Partida vigas concreto f¨c=210Kg/cm2 , cemento portland tipo I
Especificaciones concreto f'c 210 kg/cm2 CAP OP
Cuadrilla 0.1 1
Rendimiento 20 m3/dia
Und m3
DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNITARIO PARCIAL TOTAL
Materiales
CEMENTO BLS 9.73 17.37 169.04
A GRUESA M3 0.52 33.90 17.63
P CHANCADA M3 0.53 50.85 26.95
AGUA M3 0.186 4.24 0.79
Costo Materiales 214.40
Mano de Obra
CAPATAZ HH 0.04 23.09 0.92
OPERARIO HH 0.4 20.99 8.40
OFICIAL HH 0.8 17.02 13.62
PEON HH 3.2 15.32 49.02
Costo Mano de Obra 71.96
Equipos
HERRAMIENTAS % 5% 71.96 3.60
MEZCLADORA HM 0.4 25 10.00
WINCHE HM 0.4 10 4.00
VIBRADORA HM 0.4 12.5 5.00
Costo Equipos y Herr. 22.60
COSTO TOTAL 308.96
IU
21
4
5
30
47
47
47
47
37
48
48
48
/m3
OF PE
1
1
1 1
IU
43
2
2
47
47
47
47
37
/m2
A
OF PE
1
IU
3
2
47
47
47
47
37
48
/kg
21
4
5
30
47
47
47
47
37
48
48
48
75 m2/día Habilitación
12 Encofrado
36 Desencofrado
IU
43
2
2
47
47
47
47
37
A
OF PE
1
IU
3
2
47
47
47
47
37
48
/kg
OF PE
1 8
IU
17
47
47
47
47
37
/und
VALORIZACION M
FORMULA : 01 ESTRUCTURAS
PRESUPUESTO BASE (Octubre 2017) (Inc. IGV) S/. 868,401.88 S/. 735,933.80 (sin IGV)
PRESUPUESTO CONTRATADO (Inc. IGV) S/. 824,981.79 S/. 699,137.11 (sin IGV)
PRESUPUESTADO
ITEM DESCRIPCION UND
CANTIDAD P.UNIT PARCIAL
02.03.04 VIGAS
VIGAS - CONCRETO F'C=210
02.03.04.01
KG/CM2 m3 34.80 308.96 10751.81
VIGAS - ENCOFRADO Y
02.03.04.02
DESENCOFRADO m2 270.40 83.87 22677.10
VIGAS - ACERO F'Y=4200
02.03.04.03
KG/CM2 kg 5692.80 4.64 26427.17
02.03.05 LOSAS ALIGERADAS
VALORIZACION M
FORMULA : 01 ESTRUCTURAS
PRESUPUESTO BASE (Octubre 2017) (Inc. IGV) S/. 868,401.88 S/. 735,933.80 (sin IGV)
PRESUPUESTO CONTRATADO (Inc. IGV) S/. 824,981.79 S/. 699,137.11 (sin IGV)
PRESUPUESTADO
ITEM DESCRIPCION UND
CANTIDAD P.UNIT PARCIAL
02.03.04 VIGAS
VIGAS - CONCRETO F'C=210
02.03.04.01
KG/CM2 m3 34.80 308.96 10751.81
VIGAS - ENCOFRADO Y
02.03.04.02
DESENCOFRADO m2 270.40 83.87 22677.10
VIGAS - ACERO F'Y=4200
02.03.04.03
KG/CM2 kg 5692.80 4.64 26427.17
02.03.05 LOSAS ALIGERADAS 0.00 0.00 0.00
CONCRETO F'c= 210 kg/cm2
02.03.05.01
EN LOSA ALIGERADA
52.00 291.77 15172.06
m3
ENCOFRADO Y
02.03.05.02 DESENCOFRADO EN LOSA 520.00 74.08 38521.95
ALIGERADA m2
ACERO Fy = 4200 Kg/ cm2 EN
02.03.05.03
LOSA ALIGERADA kg 2210.99 4.64 10263.88
02.03.05.04 LADRILLO HUECO 20x30X30 pza 4331.60 2.91 12587.47
COSTO DIRECTO 136401.43
GASTOS GENERALES 12.78987%
S/. 17,445.57
( _______ %CD )
UTILIDAD ( _____ %CD ) 12.71013% S/. 17,336.80
0.00% 21.57%
21.57% 78.43%
LAZO DE EJECUCION: 60 días Calendario
ACTOR DE RELACION: 0.95 Factor de Relación = Monto Contratado / Monto Base
21.57% 78.43%
100.00% 0.00%
DESCRIPCION IU C. INCIDENCIAS
4
Mano de obra 47 0.313
Agregado grueso 5
Bloque y Ladrillo 17 0.205
Madera importada para encofrado y carpintería 43
Cemento 21
Herramienta Manual 37 0.123
Maquinaria y equipo nacional 48
1.198 0.246
1.001 0.123
1.054 0.164
1.003 0.204
K Febrero 1.060
DESCRIPCION IU C. INCIDENCIAS
4
Mano de obra 47 0.313
Agregado grueso 5
Bloque y Ladrillo 17 0.205
Madera importada para encofrado y carpintería 43
Cemento 21
Herramienta Manual 37 0.123
Maquinaria y equipo nacional 48
K Marzo
(1*2/1*3)*4
0.314
0.247
0.128
0.167
0.204
1.060
DESCRIPCION IU C. INCIDENCIAS
4
Mano de obra 47 0.313
Agregado grueso 5
Bloque y Ladrillo 17 0.205
Madera importada para encofrado y carpintería 43
Cemento 21
Herramienta Manual 37 0.123
Maquinaria y equipo nacional 48
K Abril
(1*2/1*3)*4
0.314
0.248
0.128
0.168
0.205
1.063
Resumen de Valorización 1 Cua
Resumen de Valorización 2
Valorización 2 127540.18
Reajuste por Valorización 1 -26.46
Reajuste por Valorización 2 7619.37
Subtotal 135133.09
IGV 18% 24323.96