Professional Documents
Culture Documents
Daily Progress Report As of April 10, 2018 - Final
Daily Progress Report As of April 10, 2018 - Final
A. BATTERY PROJECTS
1) PBI & RTI STEEL FENCE REPAINTING PROJECT – (On Progress)
2) MCB EMPLOYEE’S LOUNGE – (Waiting for delivery of unserved items)
3) PBI Bridge Repainting – (On Progress)
4) PBI Court Floor Repainting – (Complete)
B. SPECIAL PROJECTS
1) AGUS DORMITORY REHABILITATION 2017 PLUMBING WORKS – (wall tile installation still on progress)
2) REPAINTING OF COMMON CR (Dorm1 & 2) – (waiting for advise prior to mobilization)
3) SMIP ILOILO STEEL YARD
C. STORE PROJECTS
1) KFC TANAY – (Pre Fab works already completed)
2) KFC SINDALAN – (Pre Fab works already completed)
3) KFC SAN DIONISIO – (Pre Fab works already completed)
4) KFC CAVITE – (Pre Fab works already completed)
D. FABRICATION INVENTORY
1) CHB Fabrication – (On progress)
2) Container Van Inventory (20 & 40 footer)
BATTERY PROJECTS UPDATE
PBI & RTI STEEL FENCE
REPAINTING PROJECT
SITE ACTIVITIES
1.0 Installation of yellow spacer prior to coating
works
2.0 On going top coating of steel fence (PBI
FENCE ONLY)
Site Plan Reflecting the
Accomplished Portion of Steel
Fence (PBI)
Project Status as of April 10
Other Site Issues & Concerns
1.0 Waiting for pre-mixed paint for RTI Fence
Site Photos (PBI)
Site Photos (PBI)
Site Photos (PBI)
Site Photos (PBI)
Site Photos (PBI)
Site Photos (PBI)
PBI MCB LOCKER EXPANSION &
EMPLOYEE’S LOUNGE
Site Status (Employee’s Lounge) as
of April 10
Additional Works
“Adjustment of lighting fixture opening at
ceiling already done as of today April 5.
Manpower (3carp)”
Site Pictures
Site Pictures
Site Pictures
Site Status (Locker Expansion) as
of April 10
Manpower
“No manpower on site”
Site Activity
“No activity on site since April 7”
Site Photos
Site Photos
Site Photos
Site Photos
Site Photos
Site Photos
Site Photos
PBI BRIDGE REPAINTING
Project Status as of April 10
Manpower
1. Foreman – 1/1
2. Painter – 7/7
Site Status
Site Photos
Site Photos
Site Photos
Site Photos
STORE PROJECTS UPDATE
KFC TANAY
KFC SINDALAN
KFC SAN DIONISIO
KFC CAVITE CITY
Site Photo
(KFC Cavite 3rd Gen.)
Site Photo
(KFC Tanay, Sindalan & San Dionisio
3rd Gen.)
SPECIAL PROJECTS UPDATE
DORM 1 & 2 COMMON CR
PLUMBING REPAIR
Project Status (Dorm 1 & 2) as of
April 10
Site Photos (Dorm 1 GF)
Site Photos (Dorm 1 GF)
Site Photos (Dorm 2nd Floor)
Site Photos (Dorm 2nd Floor)
Site Photos (Dorm 1 - 3rd Floor)
Site Photos (Dorm 1 - 4th Floor)
Site Photos (Dorm 2 – 1st Floor)
Site Photos (Dorm 2 – 1st Floor)
Iloilo Steel Project
Site Dev’t Status
Site Status
“No site activity until to date”