L1 = 3,0 m ; I1 = 1,5 m
L2 = 5,5 m : I2 = 1,5 m
a. Menghitung koefisien tekanan tanah dengan menggunakan rumus Teori
Rankine koefisien tekanan tanah terdiri dari koefisien tekanan tanah aktif dan
koefisien tekanan tanah pasif.
Ka1 = tan2 (45 – θ/2) -2c.√𝑘𝑝 = -2 × 10. √6,5
= tan2 (45 – 11/2) = -50,990
= 0,679
Kp1 = tan2 (45 + θ/2) K’ = Kp - Ka
= tan2 (45 + 12/2) = 6 – 0.679
= 1,524 = 5,321
c. Perhitungan panjang L3
L3 = Jarak diukur dari dasar galian ke titik dimana tekanan tanahnya sama
dengan nol, jarak ini dapat dihitung dari persamaan (γ. L1 + γ’.L2+q) ka=
γ’.L3.K ,ddapat :
(γ. L1 + γ’. L2 + q)𝑘𝑎
𝐿3 =
γ’. K′
A1 = 1,5 . (I1+L2+L3)
= 1,5 . (1,5 + 5,5 + 1,448)
= 17,919 m2
3R(L1 + L2 + L3) − (𝑍1 + 𝐼1))
𝐴2 =
γ’. K
3 . 258,660 (3 + 5,5 + 1,448) − (4,998 + 1,5))
=
(18 − 9,81)5,321
= 61,431 m2
g. Perhitungan jarak L4
L43 + A1 . L42 – A2 = 0
L43 + 17,919 L42 – A2 = 0
Nilai L4 didapat dengan metode coba-coba (trial and error)
Coba-coba Hasil
2,000 18,245
1,800 2,458
1,780 0,983
1,770 0,252
1,767 0,034
L4 = 1,767 m
Bila L4 sudah didapat, maka kedalaman pemancangan dapat dihitung
dengan menjumlahkan nilai L3 + L4
Untuk keamanan, maka panjang bagian turap yang tertahan dikalikan dengan
20% sehingga Daman :
Daktual = 1,2 . 3,215
= 3,858 m
L total = Daktual + L1 + L2
= 3,858 + 3,0 + 5,5
= 12,358 m = 13 m
i. Perhitungan P8 dan p8’
P8 = γ’. K. L4
= ( 18 – 9,81) (5,321) (1,767)
= 77,004 KN/m2
P8’ = (P8. L4)/2
= ( 77,004) (1,676)/2
= 64,529 KN/m2
F = R –P8’
= 258,660 – 64,529
= 194,131 KN/ m2
∑𝐻 = 0
= R – F + P8’
= 258,660 – 194,131 + 64,529
= 0 ( Aman )
∑𝑍 = 0
Mmax = - ((1/2. P1.L1)) ((x + 1/3. L1) + ((F (x + I1)) – ((P1.x) (x/2)) – ((1/2. Ka.
γ’.x2.1/3))
= -(1/2. 34,629.3)) (5,750 + (1/3 .3)) + (194,131 (5,750 + 1,5)) – ((34,629
. 5,750) (5,750/2)) – ((1/2 . 0,679 . 7,19 . 5,7502 – 1/3. 5,750))
= -350,618 + 1407,449 – 572,460 – 154,685
= 329,686 KNm
= 32968,6 kgm
= 3296860 kgcm
Sling Baja
R = 258,660
F = 194,131 KN/m = 19413,1 Kg
P8’ = 64,529 KN/m
a. Dia angkur
Jarak antar angkur = 5 m
F = 194,131 KN /m = 19413,1 × 5 m = 97065,5 KN/m
σangkur = 17250 Kg/cm2
σangkur = F/A
17,250 = 97065,5 / 0,25 πd2
13548,118 d2 = 97065,5
d2 = 7,164 m
d = 2,676 m
Perhitungan Pile Cap
Perhitungan Penulangan Pile Cap
Diketahui :
- Ukuran (Pile Cap) = 3,0m × 0,8m × 1m
= 2,4 m3
- Beban Pile Cap sendiri = 2,4 × 2400 kg/ m3
= 5760 kg = 5,76 ton
- Mutu Beton = K-175
- Fc’ = 25 Mpa
- Fy = 240 Mpa
Ø Tulangan Utama = 12 mm
Ø Sengkang = 10 mm
Selimut Beton (s) =
Tinggi Effektif = h – s Ø Sengkang - ½ Ø tulangan utama
Tulangan Pile Cap
Mu =
K =
As =