Data Produktifity Alat
Data Produktifity Alat
31 744
PA PC2000 88% 654.72
UA PC2000 49% 364.56
PERSENTASE WAKTU READY)
STANDBY
28 672 WH BD STB
PA PC1250 90% 604.8 387.072 67.2 217.728
UA PC 1250 64%
90%
64%
0.0055 0.0056 0.0053 0.0047 0.0045 0.0053 0.0052 0.0045 0.0053 0.0050
0.0056 0.0057 0.0054 0.0048 0.0045 0.0053 0.0052 0.0046 0.0053 0.0050
0.0056 0.0057 0.0054 0.0048 0.0045 0.0053 0.0052 0.0046 0.0053 0.0050
0.0056 0.0057 0.0055 0.0048 0.0046 0.0054 0.0053 0.0046 0.0054 0.0051
0.0053 0.0054 0.0051 0.0045 0.0043 0.0050 0.0049 0.0043 0.0050 0.0048
0.0053 0.0054 0.0051 0.0045 0.0043 0.0050 0.0049 0.0043 0.0050 0.0048
0.0053 0.0054 0.0051 0.0045 0.0043 0.0050 0.0049 0.0043 0.0050 0.0048
31 744 WH BD STB
90% 669.6 415.152 74.4 254.448
62%
90%
62%
FLEET ALLOCATION FOR WESTE REMOVAL DAN COA
DESCRIPTION UNIT
WASTE REMOVEL BCM
STH LANGAP COAL GETTING TONNES
RATIO
OB HAULAGE DIST. METER
DESCRIPTION UNIT
WASTE REMOVEL BCM
FCV NTH YARDER COAL GETTING TONNES
RATIO
OB HAULAGE DIST. METER
DESCRIPTION UNIT
WASTE REMOVEL BCM
FCV STH YARDER COAL GETTING TONNES
RATIO
OB HAULAGE DIST. METER
DESCRIPTION UNIT
WASTE REMOVEL BCM
SHT YARDER COAL GETTING TONNES
RATIO
OB HAULAGE DIST. METER
DESCRIPTION UNIT
WASTE REMOVEL BCM
TOTAL COAL GETTING TONNES
RATIO
OB HAULAGE DIST. METER
PRODUCTION TARGET 2018 -PIT LANGAP DAN YARDER
WASTE REMOVAL/BULAN
PC2000SP7 60% 53% 50% 59% 58%
PC1250SP7 60% 53% 50% 59% 58%
HD785-7 60% 53% 50% 59% 58%
HD465-7
3 3 3
5 5 5
31 31 31
31 30 31 744 WH BD STB
89% 89% 89% 662.16 397.296 81.84 264.864
90% 90% 90% 0.89 16.554
90% 90% 90% 12,912.12
3.59
JUNI
WASTE REMOVAL (PA)
PC2000SP7 89% 28 672 598.08
PC1250SP7 90% 28 672 604.8
HD785-7 90% 28 672 604.8
HD465-7
JULI
WASTE REMOVAL (PA)
PC2000SP7 89% 31 744 662.16
PC1250SP7 90% 31 744 669.6
HD785-7 90% 31 744 669.6
HD465-7
AGUSTUS
WASTE REMOVAL (PA)
PC2000SP7 89% 30 720 640.8
PC1250SP7 90% 30 720 648
HD785-7 90% 30 720 648
HD465-7
WASTE REMOVAL (UA)
PC2000SP7 59% 30 720 424.8
PC1250SP7 59% 30 720 424.8
HD785-7 59% 30 720 424.8
HD465-7
SEPTEMBER
WASTE REMOVAL (PA)
PC2000SP7 89% 31 744 662.16
PC1250SP7 90% 31 744 669.6
HD785-7 90% 31 744 669.6
HD465-7
OKTOBER
WASTE REMOVAL (PA)
PC2000SP7 89% 31 744 662.16
PC1250SP7 90% 31 744 669.6
HD785-7 90% 31 744 669.6
HD465-7
NOVEMBER
WASTE REMOVAL (PA)
PC2000SP7 89% 30 720 640.8
PC1250SP7 90% 30 720 648
HD785-7 90% 30 720 648
HD465-7
6,739.20
4,752.00
1,460.16
8,830.22
6,296.40
1,934.71
5,258.45
3,707.88
1,139.33
8,330.40
5,940.00
1,825.20
4,680.00
3,300.00
1,014.00
9,829.87
7,009.20
2,153.74
6,516.43
4,594.92
1,411.89
9,663.26
6,890.40
2,117.23
6,297.41
4,440.48
1,364.44
8,497.01
6,058.80
1,861.70
4,869.07
3,433.32
1,054.97
9,829.87
7,009.20
2,153.74
6,516.43
4,594.92
1,411.89
9,330.05
6,652.80
2,044.22
5,870.59
4,139.52
1,271.96
WASTE REMOVAL
BULAN MEI
UNIT PA UA MONTH WAKTU KERJA/BULAN
PC2000SP7 89% 60% 31 744
PC1250SP7 90% 60% 31 744
HD785-7 90% 60% 31 744
HD465-7
BULAN JUNI
UNIT PA UA MONTH WAKTU KERJA/BULAN
PC2000SP7 89% 53% 28 672
PC1250SP7 90% 53% 28 672
HD785-7 90% 53% 28 672
HD465-7
BULAN JULI
UNIT PA UA MONTH WAKTU KERJA/BULAN
PC2000SP7 89% 50% 31 744
PC1250SP7 90% 50% 31 744
HD785-7 90% 50% 31 744
HD465-7
BULAN AGUSTUS
BULAN SEPTEMBER
BULAN OKTOBER
BULAN DESEMBER
JUNI
COAL GETTING DAN HAULING (PA)
PC 800 91% 28 672
PC400 85% 28 672
PC 300 85% 28 672
DT COAL 85% 28 672
JULI
COAL GETTING DAN HAULING (PA)
PC 800 91% 31 744
PC400 85% 31 744
PC 300 85% 31 744
DT COAL 85% 31 744
AGUSTUS
COAL GETTING DAN HAULING (PA)
PC 800 91% 30 720
PC400 85% 30 720
PC 300 85% 30 720
DT COAL 85% 30 720
SEPTEMBER
COAL GETTING DAN HAULING (PA)
PC 800 91% 31 744
PC400 85% 31 744
PC 300 85% 31 744
DT COAL 85% 31 744
OKTOBER
COAL GETTING DAN HAULING (PA)
PC 800 91% 31 744
PC400 85% 31 744
PC 300 85% 31 744
DT COAL 85% 31 744
NOVEMBER
COAL GETTING DAN HAULING (PA)
PC 800 91% 30 720
PC400 85% 30 720
PC 300 85% 30 720
DT COAL 85% 30 720
DESEMBER
COAL GETTING DAN HAULING (PA)
PC 800 91% 29 696
PC400 85% 29 696
PC 300 85% 29 696
DT COAL 85% 29 696
WH+STB
446.40 267.84 178.56 69,638.40 0.60
446.40 267.84 178.56 45,532.80 0.60
446.40 267.84 178.56 29,462.40 0.60
446.40 267.84 178.56 5,356.80 0.60
3,009.55
1,838.04
1,189.32
216.24
2,839.20
1,734.00
1,122.00
204.00
3,350.26
2,046.12
1,323.96
240.72
3,293.47
2,011.44
1,301.52
236.64
2,895.98
1,768.68
1,144.44
208.08
3,350.26
2,046.12
1,323.96
240.72
3,179.90
1,942.08
1,256.64
228.48
COAL GETTING DAN HAULING
BULAN MEI
UNIT PA UA HARI/BULAN
PC 800 91% 60% 31
PC400 85% 60% 31
PC 300 85% 60% 31
DT COAL 85% 60% 31
BULAN JUNI
UNIT PA UA HARI/BULAN
PC 800 91% 53% 28
PC400 85% 53% 28
PC 300 85% 53% 28
DT COAL 85% 53% 28
BULAN JULI
UNIT PA UA HARI/BULAN
PC 800 91% 50% 31
PC400 85% 50% 31
PC 300 85% 50% 31
DT COAL 85% 50% 31
BULAN AGUSTUS
UNIT PA UA HARI/BULAN
PC 800 91% 59% 30
PC400 85% 59% 30
PC 300 85% 59% 30
DT COAL 85% 59% 30
BULAN SEPTEMBER
UNIT PA UA HARI/BULAN
PC 800 91% 58% 30
PC400 85% 58% 30
PC 300 85% 58% 30
DT COAL 85% 58% 30
BULAN OKTOBER
UNIT PA UA HARI/BULAN
PC 800 91% 51% 31
PC400 85% 51% 31
PC 300 85% 51% 31
DT COAL 85% 51% 31
BULAN NOVEMBER
UNIT PA UA HARI/BULAN
PC 800 91% 59% 30
PC400 85% 59% 30
PC 300 85% 59% 30
DT COAL 85% 59% 30
BULAN DESEMBER
UNIT PA UA HARI/BULAN
PC 800 91% 56% 29
PC400 85% 56% 29
PC 300 85% 56% 29
DT COAL 85% 56% 29
WAKTU KERJA/BULAN WORK HOUR BREAK DOWN STANDBY PRODUKSI/BULAN(TON)
744 406.224 66.96 270.816 105,618.24
744 379.44 111.6 252.96 64,504.80
744 379.44 111.6 252.96 41,738.40
744 379.44 111.6 252.96 7,588.80
PRODUKSI/SHIFT
3,009.55
1,838.04
1,189.32
216.24
PRODUKSI/SHIFT
2,839.20
1,734.00
1,122.00
204.00
PRODUKSI/SHIFT
3,350.26
2,046.12
1,323.96
240.72
PRODUKSI/SHIFT
3,293.47
2,011.44
1,301.52
236.64
PRODUKSI/SHIFT
2,895.98
1,768.68
1,144.44
208.08
PRODUKSI/SHIFT
3,350.26
2,046.12
1,323.96
240.72
PRODUKSI/SHIFT
3,179.90
1,942.08
1,256.64
228.48